SlideShare une entreprise Scribd logo
1  sur  30
GEMBA KAIZEN By Ismail Clement http://gembakaizenemailconsultancy.weebly.com/ 1 Gemba Kaizen Email Consultancy
2 GEMBA KAIZEN INTRODUCTION GEMBA KAIZEN HOW TO MANAGE QCD IN GEMBA STANDARDS 5 S MUDA THE FOUNDATION OF THE HOUSE OF GEMBA VISUAL MANAGEMENT SUPERVISORS ROLE IN GEMBA Gemba Kaizen Email Consultancy
3 CHAPTER ONEINTRODUCTIONTOGEMBA KAIZEN	 Gemba Kaizen Email Consultancy
4 What is Kaizen? Kaizen means ‘change for the better’ in Japanese.  The best English equivalent is ‘improvement'.  Kaizen is made up of two characters:    Gemba Kaizen Email Consultancy
Where did kaizen originate? ,[object Object]
Many of the concepts and tools of kaizen came from industrial engineering and Dr. Edward Deming's teachings. Masaaki Imai's book 'Kaizen' made it a common word outside Japan back in the 1980s. 5 Gemba Kaizen Email Consultancy
6 DEFINITION OF LEAN ,[object Object],Focus on the customer ,[object Object]
What is an internal customer?
What is the value to the customer?Gemba Kaizen Email Consultancy
7 CONT Eliminate the 7 waste of production. ,[object Object]
What causes the waste?
How do we eliminate waste?Do more with less ,[object Object]
How to waste less resources?
How can we do both?Gemba Kaizen Email Consultancy
8 Is Kaizen a shop floor thing? ,[object Object],Gemba Kaizen Email Consultancy
9 Kaizen is a Japanese word. What if I don’t want to use that word? ,[object Object],Gemba Kaizen Email Consultancy
10 Is Kaizen against technology? ,[object Object],Gemba Kaizen Email Consultancy
11 KAIZEN Is continuous improvement.  The KAIZEN philosophy - is our way of life and should focus on constant improvement efforts. The improvements are small and incremental. KAIZEN process are based on commonsense and low cost approaches. RUSSIAN  Gemba Kaizen Email Consultancy
12 MAJOR KAIZEN CONCEPTS KAIZEN and management. Process versus result. Following the PDCA/SDCA. Putting quality first. Speak with data. The next process is the customer. Gemba Kaizen Email Consultancy
13 KAIZEN AND MANAGEMENT Has two major functions: Maintenanceand Improvement. Maintenance: current technological, managerial and operating standards. Improvements: activities directed toward elevating current standards. Gemba Kaizen Email Consultancy
14 Japanese Perceptions Of Job Functions Top management Middle managementImprovement Supervisors Maintenance Workers				 Gemba Kaizen Email Consultancy
15 KAIZEN n TECHNOLOGY Whenever money is a key factor, innovation is expensive. Kaizen emphasizes human efforts, morale, communication, training, teamwork, involvement and self discipline – a commonsense low cost approach to improvement.  Gemba Kaizen Email Consultancy
16 Improvement Broken Down Into Innovation Top managementInnovation Middle managementKaizen Supervisors  Maintenance Workers Gemba Kaizen Email Consultancy
17 PROCESSVERSUS RESULT Kaizen fosters process-oriented thinking. Kaizen focuses on human efforts A process-oriented approach should also be:- ,[object Object]
SDCA
QCD
TQM
TPMKaizen strategies have failed many companies simply because they ignored process. The most crucial element in the kaizen process is the commitment and involvement of top management. Gemba Kaizen Email Consultancy
18 Following the PDCA/SDCA Cycles The first step in the kaizen process establishes the PDCA cycle. Plan refers to establishing a target for improvement. Do refers to implementing the plan. Check refers to determining whether the implementation remains on track. Gemba Kaizen Email Consultancy
19 Cont. Act refers to performing and standardizing prevent recurrence of the original problem or to set goals for the new improvement. The PDCA cycle revolves continuously. Management must initiate PDCA by establishing continuously challenging goals. Before working on PDCA, any current process must be stabilized. Gemba Kaizen Email Consultancy

Contenu connexe

Tendances

Kaizen study material
Kaizen study materialKaizen study material
Kaizen study material
Anitha CM
 
Lean Daily Management System
Lean Daily Management SystemLean Daily Management System
Lean Daily Management System
Operational Excellence Consulting
 

Tendances (20)

Kaizen Event Guide
Kaizen Event GuideKaizen Event Guide
Kaizen Event Guide
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen
KaizenKaizen
Kaizen
 
Gemba walks
Gemba walksGemba walks
Gemba walks
 
Kaizen
KaizenKaizen
Kaizen
 
Kaizen
KaizenKaizen
Kaizen
 
Gemba walk discussion
Gemba walk  discussionGemba walk  discussion
Gemba walk discussion
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
The 3 actual’s 3Gen
The 3 actual’s  3GenThe 3 actual’s  3Gen
The 3 actual’s 3Gen
 
Kaizen | Continuous Improvement for Organization
Kaizen | Continuous Improvement for OrganizationKaizen | Continuous Improvement for Organization
Kaizen | Continuous Improvement for Organization
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
Dmaic
DmaicDmaic
Dmaic
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
Continuous Improvement Strategy
Continuous Improvement StrategyContinuous Improvement Strategy
Continuous Improvement Strategy
 
Kaizen study material
Kaizen study materialKaizen study material
Kaizen study material
 
Lean Daily Management System
Lean Daily Management SystemLean Daily Management System
Lean Daily Management System
 
Gemba walk: the start of your lean journey
Gemba walk: the start of your lean journeyGemba walk: the start of your lean journey
Gemba walk: the start of your lean journey
 

Similaire à Gemba Kaizen

Similaire à Gemba Kaizen (20)

070 170731 bookclub_kaizen - kaizen & suggestion system - kaizen & QCD
070 170731 bookclub_kaizen - kaizen & suggestion system - kaizen & QCD070 170731 bookclub_kaizen - kaizen & suggestion system - kaizen & QCD
070 170731 bookclub_kaizen - kaizen & suggestion system - kaizen & QCD
 
6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx6 Sigma and Kaizen.pptx
6 Sigma and Kaizen.pptx
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Kaizen 101 Continuous improvement
Kaizen 101  Continuous improvement Kaizen 101  Continuous improvement
Kaizen 101 Continuous improvement
 
9 Keys to Increasing Competitiveness through Lean
9 Keys to Increasing Competitiveness through Lean9 Keys to Increasing Competitiveness through Lean
9 Keys to Increasing Competitiveness through Lean
 
TQM kaizen modified
TQM kaizen modifiedTQM kaizen modified
TQM kaizen modified
 
GENEVA CONSTRUCTION AND RISK (GCR)
GENEVA CONSTRUCTION AND RISK (GCR)GENEVA CONSTRUCTION AND RISK (GCR)
GENEVA CONSTRUCTION AND RISK (GCR)
 
6 SIGMA AND KAIZEN
6 SIGMA AND KAIZEN6 SIGMA AND KAIZEN
6 SIGMA AND KAIZEN
 
Managing Continuous Improvement Syst.pdf
Managing Continuous Improvement Syst.pdfManaging Continuous Improvement Syst.pdf
Managing Continuous Improvement Syst.pdf
 
Kaizenpresentation
KaizenpresentationKaizenpresentation
Kaizenpresentation
 
DMAIC
DMAICDMAIC
DMAIC
 
Pillars of productivity redux final -photo
 Pillars of productivity redux final -photo Pillars of productivity redux final -photo
Pillars of productivity redux final -photo
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Continuous Process Improvement.pptx
Continuous Process Improvement.pptxContinuous Process Improvement.pptx
Continuous Process Improvement.pptx
 
sixsigmavskaizen-110520221636-phpapp02.pdf
sixsigmavskaizen-110520221636-phpapp02.pdfsixsigmavskaizen-110520221636-phpapp02.pdf
sixsigmavskaizen-110520221636-phpapp02.pdf
 
CTO Summit NASDAQ NYC 2017: Creating a QA Strategy
CTO Summit NASDAQ NYC 2017: Creating a QA StrategyCTO Summit NASDAQ NYC 2017: Creating a QA Strategy
CTO Summit NASDAQ NYC 2017: Creating a QA Strategy
 
Hundreds of Innovative Products and Solutions
Hundreds of Innovative Products and SolutionsHundreds of Innovative Products and Solutions
Hundreds of Innovative Products and Solutions
 
Total Quality Management Project Charter for HP India
Total Quality Management Project Charter for HP IndiaTotal Quality Management Project Charter for HP India
Total Quality Management Project Charter for HP India
 
Problem management foundation - Continious improvement
Problem management foundation - Continious improvementProblem management foundation - Continious improvement
Problem management foundation - Continious improvement
 

Gemba Kaizen

  • 1. GEMBA KAIZEN By Ismail Clement http://gembakaizenemailconsultancy.weebly.com/ 1 Gemba Kaizen Email Consultancy
  • 2. 2 GEMBA KAIZEN INTRODUCTION GEMBA KAIZEN HOW TO MANAGE QCD IN GEMBA STANDARDS 5 S MUDA THE FOUNDATION OF THE HOUSE OF GEMBA VISUAL MANAGEMENT SUPERVISORS ROLE IN GEMBA Gemba Kaizen Email Consultancy
  • 3. 3 CHAPTER ONEINTRODUCTIONTOGEMBA KAIZEN Gemba Kaizen Email Consultancy
  • 4. 4 What is Kaizen? Kaizen means ‘change for the better’ in Japanese.  The best English equivalent is ‘improvement'.  Kaizen is made up of two characters:   Gemba Kaizen Email Consultancy
  • 5.
  • 6. Many of the concepts and tools of kaizen came from industrial engineering and Dr. Edward Deming's teachings. Masaaki Imai's book 'Kaizen' made it a common word outside Japan back in the 1980s. 5 Gemba Kaizen Email Consultancy
  • 7.
  • 8. What is an internal customer?
  • 9. What is the value to the customer?Gemba Kaizen Email Consultancy
  • 10.
  • 12.
  • 13. How to waste less resources?
  • 14. How can we do both?Gemba Kaizen Email Consultancy
  • 15.
  • 16.
  • 17.
  • 18. 11 KAIZEN Is continuous improvement. The KAIZEN philosophy - is our way of life and should focus on constant improvement efforts. The improvements are small and incremental. KAIZEN process are based on commonsense and low cost approaches. RUSSIAN Gemba Kaizen Email Consultancy
  • 19. 12 MAJOR KAIZEN CONCEPTS KAIZEN and management. Process versus result. Following the PDCA/SDCA. Putting quality first. Speak with data. The next process is the customer. Gemba Kaizen Email Consultancy
  • 20. 13 KAIZEN AND MANAGEMENT Has two major functions: Maintenanceand Improvement. Maintenance: current technological, managerial and operating standards. Improvements: activities directed toward elevating current standards. Gemba Kaizen Email Consultancy
  • 21. 14 Japanese Perceptions Of Job Functions Top management Middle managementImprovement Supervisors Maintenance Workers Gemba Kaizen Email Consultancy
  • 22. 15 KAIZEN n TECHNOLOGY Whenever money is a key factor, innovation is expensive. Kaizen emphasizes human efforts, morale, communication, training, teamwork, involvement and self discipline – a commonsense low cost approach to improvement. Gemba Kaizen Email Consultancy
  • 23. 16 Improvement Broken Down Into Innovation Top managementInnovation Middle managementKaizen Supervisors Maintenance Workers Gemba Kaizen Email Consultancy
  • 24.
  • 25. SDCA
  • 26. QCD
  • 27. TQM
  • 28. TPMKaizen strategies have failed many companies simply because they ignored process. The most crucial element in the kaizen process is the commitment and involvement of top management. Gemba Kaizen Email Consultancy
  • 29. 18 Following the PDCA/SDCA Cycles The first step in the kaizen process establishes the PDCA cycle. Plan refers to establishing a target for improvement. Do refers to implementing the plan. Check refers to determining whether the implementation remains on track. Gemba Kaizen Email Consultancy
  • 30. 19 Cont. Act refers to performing and standardizing prevent recurrence of the original problem or to set goals for the new improvement. The PDCA cycle revolves continuously. Management must initiate PDCA by establishing continuously challenging goals. Before working on PDCA, any current process must be stabilized. Gemba Kaizen Email Consultancy
  • 31.
  • 32. Did it happen because the standard was not followed?
  • 33. Did it happen because the standard was not adequate?Gemba Kaizen Email Consultancy
  • 34. 21 Cont. SDCA standardizes and stabilizes the current process. PDCA improves the current process. SDCA refers to maintenance and PDCA refers to improvement, these become the two major responsibilities of management. Gemba Kaizen Email Consultancy
  • 35. 22 IMPROVEMENT - PDCA ACT PLAN P A D C DO CHECK Gemba Kaizen Email Consultancy
  • 36. 23 MAINTENANCE - SDCA STANDARDIZE ACT s A C D DO CHECK Gemba Kaizen Email Consultancy
  • 37. 24 PUTTING QUALITY FIRST Of quality, cost and delivery, which should always have the highest priority? ? concept requires management commitment. Managers often face the temptation to make compromises in meeting delivery requirements or cutting cost. Gemba Kaizen Email Consultancy
  • 38. 25 SPEAK WITH DATA KAIZEN is a problem solving process. The problem must be understood and recognized. Solving a problem without data is not a very scientific or objective approach. Collecting, verifying and analyzing data for improvement is vital. Gemba Kaizen Email Consultancy
  • 39. 26 THE NEXT PROCESS IS THE CUSTOMER The next process should always be regarded as the customer. Refers to two types of customers: internal and external. When everyone in the organization practices this the external customer will receive a high quality product or service as a result. Gemba Kaizen Email Consultancy
  • 40.
  • 41. A just in time production system.
  • 45. Small group activities.Gemba Kaizen Email Consultancy
  • 46. 28 TQC / TQM One of the principles of Japanese management has been TQC in its early development. This has evolved into a system encompassing all aspects of management and is now referred to as TQM – a term used internationally. TQC / TQM should not be regarded as strictly as a quality control activity: It has developed as a strategy to aid management to be more competitive and profitable by helping it to improve in all aspect of business. Gemba Kaizen Email Consultancy
  • 47. 29 Cont. “Q” meaning quality, has priority but there other goals too – namely cost and delivery. “T” signifies total, meaning that it involves everybody in the organization. “C” refers to control or process control. In TQC/TQM key process must be identified, controlled and improved on continuously in order to improve results. Gemba Kaizen Email Consultancy
  • 48. 30 TQM Quality assurance Quality control inspection Aim for continuous improvement / Involve suppliers & customers / Involve all operations / Performance measurement / Team work / Employee involvement Third party approval, systems audits, advanced quality planning, involvement of non production operations, failure mode and effect analysis, statistical process control Develop quality manual, process performance data, self inspection, product testing, basic quality planning, use of basic statistics, paper work control Salvage, sorting, grading, corrective actions, identify sources of non conformance Gemba Kaizen Email Consultancy