FDH (I) INSTALLATION GUIDE
1. Introduction
This guide will serve as reference in installing various types of FDH, including the
rack module placements, patching & routing of cables, labeling, record updating
and testing procedures.
Terminologies:
Rack Frame – 42U Open Rack FDH (R&M)
Feeder Module – 24 ports unirack module where incoming cable or feeder cables
are terminated
Splitter Module – 2 X 32 Splitter module (residential or business splitter)
Drop Module – 24 ports unirack module (DME Prolink, R&M) where drop cables
are terminated. Also, Drop modules are identified as ODF1, ODF2, ODF3, and so
on.
2. Test Equipments and Tools
 OTDR
 Optical Power Meter / Optical Light Source
 Visual Fault Locator
 Fast-field Connector Toolkit
 Drill Machine
 Drill Bit with hole saw attachment (38mm & 25mm)
 Cable Cutter
 Side Cutter
 Basic Tools (Pliers, Screw Drivers, Measuring Tape etc.)
3. 42U FDH Open Rack Frame
Open rack is mainly used for terminating fiber in the POP location but it was used
as indoor FDH for large residential buildings.
3.1 Configuration 1: FDH Setup for maximum 256 tenancies
The following configuration shall be used in buildings where tenancies are ranging
from 100 to 224 and can be expanded up to maximum 256 tenancies.
 42U open rack frame
 1X1U Feeder module
 1X1U PC Drawer
 8X1U Splitter modules
 11X1U Drop module patch panel
Additional materials
 10mm Spiral Plastic Wrap
 8mm Spiral Plastic Wrap
 6mm Spiral Plastic Wrap ( for Patch cord)
 Cable tie (Length: 203mm Width: 3.6mm)
 Velcro Straps
 Trunking PVC size 50X100mm, 2.9meters color white
Frame and Feeder Module
 Install the rack frame as per instruction guide.
 Secure the frame and keep it sturdy.
 Then install the Feeder module at the bottom of the frame.
2
FO Feeder Cable
 Route the FO feeder cable in to the FDH trunking.
 Fusion splice the required number of fibers with the pigtails.
 Coil the spare fibers properly in the splice tray.
 Clean connector and connect the pigtails to the Feeder module’s adaptor.
Splitter Modules
 Install the Splitter module starting from the bottom, after the Feeder module.
Note: Keep 1U space for every module installed.
FO Drop Modules
 Mark the PVC trunking and drill 38mm hole. The hole shall be in line with
Drop module’s side access cable entry.
 Remove the sharp edges using sand paper.
 Prepare the Drop module (shown is DME Prolink type).
 Slide-open the Drop module and remove the splice cassette.
3
 Remove the Splice cassette’s screw stud.
 Then install SC/APC adapter.
 Install PC drawer first for Splicing Record storage after Splitter 8 with 1U gap
in between.
 After the PC drawer, install the first Drop module with no gap in between.
Note: Complete the FO drop cable arrangement in the first Drop module
before installing the next Drop module for better access.
4
FO Drop Cable Installation & Termination
 Install the Drop cable and bunch it into 24 (preferably cables that emanates
floor-wise and flat-wise).
 Route the Drop cables in the trunking to determine the appropriate cable loops.
 Arrange the Drop cable loops in such a way it reaches the bottom of the
trunking.
 Then insert the Drop cables in the trunking’s access hole and into the Drop
module’s opening (left side cable entry).
5
 With proper Drop cable loops in the trunking, mark the Drop cables in reference
to Drop module entry point.
 Pull the Drop cable and measure 1meter from the cable mark. The 1 meter
length of cable will serve as Drop cable loop inside the Drop module.
 Cut the excess cable lengths. Keep the fiber scrap and dispose it properly.
 Prepare the Drop cable and install FAST-field connector.
Note: Use a black mat to catch the fiber scrap during fiber cutting and cleaving
and dispose it properly.
6
 Test the Drop cable for any faults (Refer to Appendix 3/Continuity test).
 Replace faulty Drop cables if any.
 Arrange the first set of Drop cables in circular loop and clean the connectors.
Note: Drop cable should be continuous length and should not be spliced with
other cable segment to extend cable reach.
 Then connect the Drop cables to the SC/APC adaptors according to flat
numbers (preferably in ascending order).
Note: Drop module top cover can be removed for better access.
 Secure the Drop cables using 45cm long spiral plastic wrap (8mm size). Start
the wrapping approximately 25cm from the connector.
 Re-arrange the Drop cable in circular loop.
7
 Adjust the cables and provide approximately 12cm diameter of cable loop when
Drop module is fully open. Then secure the cables using cable tie.
 After completing the first set, arrange the second set of cables.
 Clean the connectors and connect to SC/APC adaptors.
 Arrange the cable and install 45cm long spiral plastic wrap (8mm size).
 Install cable tie in the upper most holes of the Drop module to secure the
cables.
 Install a 20cm long spiral plastic wrap (10mm size) to the bunch of 24 Drop
cables and secure the cables using cable tie.
 Then fix the Drop module cover.
8
 After completing the cable connections, re-arrange the Drop cable in the
trunking. Then close the cover.
Note: Bunch the cables emanating from the Drop module either using electrical
tape or cable tie for easy cable identification.
 After completing the Drop cable connections, prepare the labeling machine.
 Label the FO drop cable in the Drop module. Refer to Appendix 1 for the
labeling guide.
 Print the label and stick the label properly in the cable.
9
 After completing all FO drop cable labeling, print the label for Splitter and Drop
modules. Place the label on the left side part of the modules.
 Place the Splitter label on top of its cover.
 And for the Drop module and PC drawer, place the label at the front side of the
patch cord management.
FO Patch Cord Trunking
 Install 189.5cm long PVC trunking (size 50X100mm) on the left side of the
frame.
 Secure the trunking using an L-Type clamp.
10
 Mark the trunking where access holes are to be provided.
Note: Holes should be in-line with the Splitter and Drop modules.
 Drill 25mm holes and remove the sharp edges using sand paper.
FO Patching (Splitter to Drop Module)
a) Using Fostec SC/APC 0.9mm Patch Cord
 Install 2-meter patch cords. Connect one end to Splitter’s output port, and the
other end to the Drop module input port based on the flats and splitter port’s
assignment (Refer to Appendix 2).
 After completing the patching in one splitter, arrange the patch cord into
bunch of 16 and secure the patch cords using a 30cm long spiral plastic wrap
(size 6mm).
11
 At the Drop module side, arrange the first set of patch cords into bunch of 12
and secure it using a 65cm long spiral plastic wrap (size 6mm).
 Form a loop as shown.
 Then arrange the second set of patch cords as shown and install a 65cm long
spiral plastic wrap (size 6mm).
 Secure the patch cords using Velcro straps.
Note: When opening and closing the Drop module, guide the patch cords to
slide smoothly in the trunking.
b) Using Corning SC/APC 2mm Patch Cord
 Install two-meter patch cords. Connect one end to the Splitter’s output port
and the other end to the Drop module input port.
 Arrange the patch cords and secure it using Velcro strap.
 Then install a 30cm long spiral plastic wrap (size 10mm).
 In the Drop module end, arrange the patch cords and secure it using Velcro
strap
 Then Install a 45cm long spiral plastic wrap (size 10mm).
12
FO Patching (From Feeder module to Splitter)
 Install a 2-meter patch cord. Connect one end from the Feeder module and
the other end to Splitter Input 1.
 Arrange the patch cords in the Feeder module and secure it using a 45cm
long spiral plastic wrap (size10mm).
Note: Guide the patch cords in the trunking when opening and closing the
Feeder module.
 After completing the patching, label all patch cords. Refer to Appendix 1 for
labeling guide.
 Print FDH label (OLT/FDH Number & EID) in a sticker and place it on top of the
4U plate of the frame.
 Test the FDH and measure the Power levels. (Refer to Appendix3/Post-
Installation Testing)
 Update the Fiber Splicing Record (Appendix2) and place it in PC drawer.
 Keep the work area/ telephone room tidy and clean at all times.
13
3.2 Configuration 2: FDH Setup for 256 to 480 tenancies
For buildings where tenancy ranges from 256 to 480, two rack frames shall be
considered, where
1 Rack frame for Splitter modules
- 1X1U Feeder module
- 15X1U Splitter modules
1 Rack frame for Drop modules
- 20X1U Drop modules
Rack Frame & Trunking
 Install two rack frames with considerable distance.
 Link the two rack frames using appropriate size and length of cable tray.
 Then install trunking for patch cord management on the following location.
- On top of the cable tray
- Left side of the rack frame
 Provide access holes for patch cords.
Note: Access holes should be in-line with the Splitter and Drop modules and
sharp edges should be removed using sand paper.
Feeder & Splitter Module
 Install the Feeder module preferably at the bottom of the rack frame.
 After the Feeder module, install the Splitter modules and keep 1U space in
between.
Note: Limit the number of Splitters module per rack frame to maximum 15
numbers equivalent to 480 tenancies.
14
Drop Module
 Install the Drop modules on the other Rack frame starting at the bottom.
 Keep 1U space in between.
Note: Limit the number of Drop modules per rack frame to maximum 20
numbers.
FO Drop Cable Installation and Termination
 All drop cables should connect from the back of the Drop module with specific
spare length according to the desired Flat/Floor labeling.
 Install connector
 Test the cables before connecting to the Drop module. Refer to Appendix
3/Drop cable continuity testing.
 Replace cables if faulty.
Note: Drop cable should be continuous length and should not be spliced with
other cable segment to extend cable reach.
 Arrange the cable in circular loop inside the Drop module, clean connector
and connect to SC/APC adaptor.
15
 Then secure the cables with Velcro strap.
Note: Provide enough cable loops to avoid sharp cable bends when opening
the Drop module.
FO Patching (Feeder Module to Splitter Module)
 Connect the patch cord from the Feeder module to Splitter module input port
number 1.
 Route the patch cords in the trunking located at the left side of the rack frame.
FO Patching (Splitter Module to Drop Module)
 Connect the patch cord from the Splitter port to Drop module ports according
to assigned port location.
 At the Splitter module, route the patch cords on the left side of the rack frame
trunking.
16
 At the Drop module rack frame, patch cord termination from the Splitter
module to Drop module should be made balance, where
- Ports 1-12, patch cord should be routed on the left side of the
module.
- Ports 13-24, patch cord should be routed on the right side of the
module.
Note: When opening and closing the Drop module, guide the patch cords to
slide smoothly in the trunking.
 Secure the patch cords using spiral plastic wrap and Velcro straps.
 Provide all the necessary labels. Refer to Appendix 1.
 Test the FDH and measure the Power levels. (Refer to Appendix3/Post-
Installation Testing).
 Update the Fiber Splicing Record (Appendix2) and place it in PC drawer.
17
4.0 GPX-147 FAT3202 Wall-mount type FDH
This type of indoor FDH shall be used for buildings where tenancy is ranging
from 50 to 100 home passes.
FDH configurations are as follows;
 128 maximum ports capacity
 Requires modular type of splitters
 Splitter mounting can hold 2 splitters each
Additional Materials
 Cable Tray (30 X 290cm)
Cabinet Preparation
 Install SC/APC adaptors for input and Drop cables.
 Install the additional Splitter in the slot where the first splitter is located.
 Clean connectors and connect to the SC/APC adaptors.
Note: Install Splitter output tails based on port numbers in the cabinet.
Cabinet Installation
 Mark the wall to drill using Line Drawing Template board for Cabinet installation.
Then drill the wall and install anchor bolts.
 Install the cabinet and tighten the anchor bolts.
18
Feeder Cable
 Route the Feeder cable in the cabinet and fusion splice the required fibers.
Note: Loop the spare fibers properly in the splice tray.
Cable Tray (for Drop cable loops)
 Install cable tray 35cm long, one above the cabinet and the other one below
the cabinet for Drop cable loops.
FO Drop Cable
 Install the Drop cables.
 For Splitter 1 & 2 connections, install the Drop cable using the cable access
located at the bottom of the cabinet and for Splitter 3 & 4 use the top cable
access.
 Install connector and test Drop cable. Refer to Appendix 3/Drop Cable
continuity testing.
 After continuity testing, connect the Drop cables in the SC/APC adaptors
(preferably cables that emanates floor-wise and flat-wise).
Note: Drop cable should be continuous length and should not be spliced with
other cable segment to extend cable reach.
19
 Group the Drop cables into 32 and arrange it in circular loop and secure it
in the cable tray.
Note: When opening or accessing the Splitter part of the cabinet, release
the Drop cable loops in order not to strain the Drop cable connectors.
 Label the Drop cables. Refer to appendix 1/Drop Cable labeling.
 Test the FDH and measure the Power levels. (Refer to Appendix3/Post-
Installation Testing).
 Update the Optical Distribution Diagram Sheet attached in the FDH. Write
the Flat number based on Splitter port assignments.
 Fix the FDH Label (OLT/FDH Number, EID Number).
20
Appendix 1: Labeling
 Patch cord label must be high quality printed self laminating type.
 For the drop cable, label can be either self laminating type or ferule type.
 Label specifications
- self laminating
- UV proof
- 9mm width
 Feeder Module to Splitter Patch Cord Label
Patch Cord End 1 – Feeder Module end
Patch Cord End 2 – Splitter Input end
Sample Labeling
 Splitter to Drop Module Patch Cord Label
Patch Cord End 1 – Splitter end
Patch Cord End 2 – Drop Module end
21
Sample Labeling
 FO Drop Cable Label – Drop Module end
 Splitter and Drop Module Label
 FDH Label
Appendix 2: Fiber Splicing Record
 Print the Fiber Splicing Record, bind it in a plastic folder and keep in PC
drawer.
 Inform concerned Department for any changes in patching.
SPLITTER 1 Connection Details
Splitter Port No.
Drop Module ODF
Port
No.
Flat No. Notes
No. Port
1 1 1 1 SHOP1 Modern Bakery
2 1 2 2 SHOP2 German Rent-a-car
3 1 3 3 SHOP3 The Textile Co.
4 1 4 4 SHOP4 Clock Grocery
5 1 5 5 MZ01
6 1 6 6 MZ02
7 1 7 7 MZ03
8 1 8 8 MZ04
9 1 9 9 101
10 1 10 10 102
11 1 11 11 103
12 1 12 12 104
13 1 13 13 201
14 1 14 14 202
15 1 15 15 203
16 1 16 16 204
17 1 17 17 301
18 1 18 18 302
19 1 19 19 303
20 1 20 20 304
21 1 21 21 401
22 1 22 22 402
23 1 23 23 403
24 1 24 24 404
25 2 1 25 501
26 2 2 26 502
27 2 3 27 503
28 2 4 28 504
29 2 5 29 601
30 2 6 30 602
31 2 7 31 603
32 2 8 32 604
E3SECTOR/BLOCK
NO.
PLOT/BLDG.
NO.
C29
OAQ/544OLT / FDH NO. Master EID
NO.
AU000998000
22
Appendix 3: Installation Test Procedures
Drop Cable Continuity Testing
1.Connectorize one end of Drop cable.
2.Clean the connector and connect the Visual Fault Locator.
3.Check the cable continuity and replace Drop cable if faulty.
Note: Perform the cable continuity test first before connecting the Drop cable in
the FDH.
Post-Installation Testing (Insertion Loss Measurement)
Measurement Setting: 1310,& 1550nm
Test Result Format
Sector/Block Number: E3 Plot Number: C29
OLT/FDH Number:
OAQ/5505 Master EID: AU000998000
SPLITTER
1
Wavelength Flat No. Wavelength
Remarks1310 1550 1310 1550
Output
1 SHOP1
2 SHOP2
3 SHOP3
4 SHOP4
5 MZ01
6 MZ02
7 MZ03
8 MZ04
9 101
- -
- -
29 601
30 602
31 603
32 604
1.Connect Optical Light Source to Splitter input port.
2.Set the reference power level to 0dBm.
3.Connect Optical Power Meter or OTDR to Splitter output port 1 and measure
received power level.
4.Measure the remaining Splitter output ports and write the test results.
5.After measuring the Splitter output ports, connect Optical Power Meter or OTDR
in the Drop cable (at rosette end).
6.Measure the received power level and write the test results for each Flat.
7.After completing the test measurements in each Flat, compare the measured
levels based on the Power Level calculation below.
Power Level = Splitter Output measured level – Losses
Where Losses are as follows;
Patch Cord = 1 X 0.6dB
SC/APC Adaptor Insertion Loss = 2 X 0.2dB
Fast-field Connector = 2 X 0.4dB
Drop Cable = 0.35dB/km
Example:
Flat604 with 40 meters Drop cable, and Splitter1 Port32 measured output level
is -19dBm.
Power Level = -19dBm – (0.6+0.4+0.8+0.014)dB
= -19dBm – 1.814dB
Power Level= -20.814dBm
8.If the difference between measured levels and calculated levels is more than 1
dB, then check patch cords, Drop cable and connectors for any faults and
rectify.
9.Follow steps 1 to 8 for the remaining Splitters.
23
Appendix 4: ODF Port Assignment
Drop Module ODF Port Number Assignment
Drop Module / ODF20 ODF 457 to 480
Drop Module / ODF19 ODF 433 to 456
Drop Module / ODF18 ODF 409 to 432
Drop Module / ODF17 ODF 385 to 408
Drop Module / ODF16 ODF 361 to 384
Drop Module / ODF15 ODF 337 to 360
Drop Module / ODF14 ODF 313 to 336
Drop Module / ODF13 ODF 289 to 312
Drop Module / ODF12 ODF 265 to 288
Drop Module / ODF11 ODF 241 to 264
Drop Module / ODF10 ODF 217 to 240
Drop Module / ODF9 ODF 193 to 216
Drop Module / ODF8 ODF 169 to 192
Drop Module / ODF7 ODF 145 to 168
Drop Module / ODF6 ODF 121 to 144
Drop Module / ODF5 ODF 97 to 120
Drop Module / ODF4 ODF 73 to 96
Drop Module / ODF3 ODF 49 to 72
Drop Module / ODF2 ODF 25 to 48
Drop Module / ODF1 ODF 1 to 24

Contenu connexe

Tendances

Epon Solutions
Epon SolutionsEpon Solutions
Epon Solutions
Devain
 
568 c0 c1_and_c3_overview
568 c0 c1_and_c3_overview568 c0 c1_and_c3_overview
568 c0 c1_and_c3_overview
Fadir Salmen
 
Induction(Product) training programme for Schneider-electric , Goa
Induction(Product) training programme for Schneider-electric , GoaInduction(Product) training programme for Schneider-electric , Goa
Induction(Product) training programme for Schneider-electric , Goa
Abhishek Singh
 
Gponfundamentals 130805074507-phpapp02
Gponfundamentals 130805074507-phpapp02Gponfundamentals 130805074507-phpapp02
Gponfundamentals 130805074507-phpapp02
morris otieno
 
Gepon Presentation
Gepon PresentationGepon Presentation
Gepon Presentation
ScorpAL
 

Tendances (20)

Ls simple cable solution
Ls simple  cable solutionLs simple  cable solution
Ls simple cable solution
 
Figure-8 Aerial Fiber-SUN-FIG8-24P-SM
Figure-8 Aerial Fiber-SUN-FIG8-24P-SMFigure-8 Aerial Fiber-SUN-FIG8-24P-SM
Figure-8 Aerial Fiber-SUN-FIG8-24P-SM
 
Fiber Optic Connectors, Designs, Applications, Choices
Fiber Optic Connectors, Designs, Applications, Choices Fiber Optic Connectors, Designs, Applications, Choices
Fiber Optic Connectors, Designs, Applications, Choices
 
1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System1 Introduction To Premises Cabling System
1 Introduction To Premises Cabling System
 
PON design considerations for FTTH FTTx
PON design considerations for FTTH FTTxPON design considerations for FTTH FTTx
PON design considerations for FTTH FTTx
 
Next Generation Fiber Structured Cabling and Migration to 40/100g
Next Generation Fiber Structured Cabling and Migration to 40/100gNext Generation Fiber Structured Cabling and Migration to 40/100g
Next Generation Fiber Structured Cabling and Migration to 40/100g
 
FTTH Basics & Network Design
FTTH Basics & Network DesignFTTH Basics & Network Design
FTTH Basics & Network Design
 
The Outlook of Broad Band Optical Access Networks
The Outlook of Broad Band Optical Access NetworksThe Outlook of Broad Band Optical Access Networks
The Outlook of Broad Band Optical Access Networks
 
Epon Solutions
Epon SolutionsEpon Solutions
Epon Solutions
 
Chapter10
Chapter10Chapter10
Chapter10
 
568 c0 c1_and_c3_overview
568 c0 c1_and_c3_overview568 c0 c1_and_c3_overview
568 c0 c1_and_c3_overview
 
GEPON Presentation
GEPON  PresentationGEPON  Presentation
GEPON Presentation
 
Optical Fiber Communication
Optical Fiber CommunicationOptical Fiber Communication
Optical Fiber Communication
 
Ftth ft tx cabling system
Ftth ft tx cabling systemFtth ft tx cabling system
Ftth ft tx cabling system
 
FTTH Basics
FTTH BasicsFTTH Basics
FTTH Basics
 
Fiberhome Smart ODN Solution
Fiberhome Smart ODN SolutionFiberhome Smart ODN Solution
Fiberhome Smart ODN Solution
 
Induction(Product) training programme for Schneider-electric , Goa
Induction(Product) training programme for Schneider-electric , GoaInduction(Product) training programme for Schneider-electric , Goa
Induction(Product) training programme for Schneider-electric , Goa
 
Gpon fundamentals
Gpon fundamentals Gpon fundamentals
Gpon fundamentals
 
Gponfundamentals 130805074507-phpapp02
Gponfundamentals 130805074507-phpapp02Gponfundamentals 130805074507-phpapp02
Gponfundamentals 130805074507-phpapp02
 
Gepon Presentation
Gepon PresentationGepon Presentation
Gepon Presentation
 

En vedette (6)

Optical fiber
Optical fiber   Optical fiber
Optical fiber
 
GPON Introduction
GPON IntroductionGPON Introduction
GPON Introduction
 
Fibre optic FTTH FTTX network design, engineering and planning solutions,
Fibre optic FTTH FTTX network design, engineering and planning solutions,Fibre optic FTTH FTTX network design, engineering and planning solutions,
Fibre optic FTTH FTTX network design, engineering and planning solutions,
 
Groovy Grammar! Interesting ways to learn grammar!
Groovy Grammar! Interesting ways to learn grammar!Groovy Grammar! Interesting ways to learn grammar!
Groovy Grammar! Interesting ways to learn grammar!
 
Uptime certification in a ust(ipp)
Uptime certification in a ust(ipp)Uptime certification in a ust(ipp)
Uptime certification in a ust(ipp)
 
Gpon Fundamentals
Gpon FundamentalsGpon Fundamentals
Gpon Fundamentals
 

Similaire à Annex 4 part 1-fdh (i) installation guide

Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cablesHeat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
Thorne & Derrick International
 

Similaire à Annex 4 part 1-fdh (i) installation guide (20)

EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
 
FTTX Expanding our Reach with Fiber
FTTX Expanding our Reach with FiberFTTX Expanding our Reach with Fiber
FTTX Expanding our Reach with Fiber
 
Navassa 5.pdf
Navassa 5.pdfNavassa 5.pdf
Navassa 5.pdf
 
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
1. Heat Shrink Cable Termination (HV) - 11kV 33kV 3 Core XLPE BS6622 Cables
 
Foc pulling
Foc pullingFoc pulling
Foc pulling
 
Splice Closures - Fibre Optic Closures - 3M BPEO
Splice Closures - Fibre Optic Closures - 3M BPEOSplice Closures - Fibre Optic Closures - 3M BPEO
Splice Closures - Fibre Optic Closures - 3M BPEO
 
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
 
MSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation GuideMSAN Huawei T500 (MA5600T) Quick Installation Guide
MSAN Huawei T500 (MA5600T) Quick Installation Guide
 
Epp 0275-12 02 - 1xcore term.(2) RAYCHEM
Epp 0275-12 02 - 1xcore term.(2) RAYCHEM Epp 0275-12 02 - 1xcore term.(2) RAYCHEM
Epp 0275-12 02 - 1xcore term.(2) RAYCHEM
 
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
Instruction- 3 Core Polymeric (XLPE EPR) 6.6kV-7.2kV Heat Shrink Cable Termin...
 
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
3. Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
 
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 CablesHeat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
Heat Shrink Cable Joint (HV) - 11kV 3 Core XLPE BS6622 Cables
 
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cablesHeat shrink cable joint (hv)   11k v 3 core xlpe bs6622 cables
Heat shrink cable joint (hv) 11k v 3 core xlpe bs6622 cables
 
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
 
RF Reserves for Installation, Preventative Maintenance and Acceptance
RF Reserves for Installation, Preventative Maintenance and AcceptanceRF Reserves for Installation, Preventative Maintenance and Acceptance
RF Reserves for Installation, Preventative Maintenance and Acceptance
 
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and AcceptanceMicrowave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
 
Paxton Access 921-161-US Instruction Manual
Paxton Access 921-161-US Instruction ManualPaxton Access 921-161-US Instruction Manual
Paxton Access 921-161-US Instruction Manual
 
Doc 1010
Doc 1010Doc 1010
Doc 1010
 

Plus de Igors Cardoso (10)

Cuadernillo preescolar 1
Cuadernillo preescolar 1Cuadernillo preescolar 1
Cuadernillo preescolar 1
 
Soluções fo gpon
Soluções fo gponSoluções fo gpon
Soluções fo gpon
 
Fttx configuration-577 k-_ver_31072011
Fttx configuration-577 k-_ver_31072011Fttx configuration-577 k-_ver_31072011
Fttx configuration-577 k-_ver_31072011
 
Fttx curitiba mat
Fttx curitiba matFttx curitiba mat
Fttx curitiba mat
 
Ftth development manual part1 (1)
Ftth development manual part1 (1)Ftth development manual part1 (1)
Ftth development manual part1 (1)
 
Folder pt ont gepon
Folder pt ont geponFolder pt ont gepon
Folder pt ont gepon
 
2ªapresentação workshop caio
2ªapresentação workshop caio2ªapresentação workshop caio
2ªapresentação workshop caio
 
Comunicacoes opticas I
Comunicacoes opticas IComunicacoes opticas I
Comunicacoes opticas I
 
Manual sap v40
Manual sap v40Manual sap v40
Manual sap v40
 
Manutenção de equipamentos
Manutenção de equipamentosManutenção de equipamentos
Manutenção de equipamentos
 

Dernier

Call Girls in Prashant Vihar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Prashant Vihar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Prashant Vihar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Prashant Vihar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...
6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...
6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...
@Chandigarh #call #Girls 9053900678 @Call #Girls in @Punjab 9053900678
 
VIP Call Girls Pollachi 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Pollachi 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Pollachi 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Pollachi 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
valsad Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
valsad Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...valsad Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
valsad Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 
Thalassery Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call G...
Thalassery Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call G...Thalassery Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call G...
Thalassery Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call G...
Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 

Dernier (20)

(INDIRA) Call Girl Pune Call Now 8250077686 Pune Escorts 24x7
(INDIRA) Call Girl Pune Call Now 8250077686 Pune Escorts 24x7(INDIRA) Call Girl Pune Call Now 8250077686 Pune Escorts 24x7
(INDIRA) Call Girl Pune Call Now 8250077686 Pune Escorts 24x7
 
Call Girls Sangvi Call Me 7737669865 Budget Friendly No Advance BookingCall G...
Call Girls Sangvi Call Me 7737669865 Budget Friendly No Advance BookingCall G...Call Girls Sangvi Call Me 7737669865 Budget Friendly No Advance BookingCall G...
Call Girls Sangvi Call Me 7737669865 Budget Friendly No Advance BookingCall G...
 
𓀤Call On 7877925207 𓀤 Ahmedguda Call Girls Hot Model With Sexy Bhabi Ready Fo...
𓀤Call On 7877925207 𓀤 Ahmedguda Call Girls Hot Model With Sexy Bhabi Ready Fo...𓀤Call On 7877925207 𓀤 Ahmedguda Call Girls Hot Model With Sexy Bhabi Ready Fo...
𓀤Call On 7877925207 𓀤 Ahmedguda Call Girls Hot Model With Sexy Bhabi Ready Fo...
 
Pune Airport ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
Pune Airport ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...Pune Airport ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...
Pune Airport ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
 
Microsoft Azure Arc Customer Deck Microsoft
Microsoft Azure Arc Customer Deck MicrosoftMicrosoft Azure Arc Customer Deck Microsoft
Microsoft Azure Arc Customer Deck Microsoft
 
Russian Call Girls Pune (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...
Russian Call Girls Pune  (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...Russian Call Girls Pune  (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...
Russian Call Girls Pune (Adult Only) 8005736733 Escort Service 24x7 Cash Pay...
 
APNIC Updates presented by Paul Wilson at ARIN 53
APNIC Updates presented by Paul Wilson at ARIN 53APNIC Updates presented by Paul Wilson at ARIN 53
APNIC Updates presented by Paul Wilson at ARIN 53
 
Real Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirtReal Men Wear Diapers T Shirts sweatshirt
Real Men Wear Diapers T Shirts sweatshirt
 
Ganeshkhind ! Call Girls Pune - 450+ Call Girl Cash Payment 8005736733 Neha T...
Ganeshkhind ! Call Girls Pune - 450+ Call Girl Cash Payment 8005736733 Neha T...Ganeshkhind ! Call Girls Pune - 450+ Call Girl Cash Payment 8005736733 Neha T...
Ganeshkhind ! Call Girls Pune - 450+ Call Girl Cash Payment 8005736733 Neha T...
 
All Time Service Available Call Girls Mg Road 👌 ⏭️ 6378878445
All Time Service Available Call Girls Mg Road 👌 ⏭️ 6378878445All Time Service Available Call Girls Mg Road 👌 ⏭️ 6378878445
All Time Service Available Call Girls Mg Road 👌 ⏭️ 6378878445
 
20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
20240509 QFM015 Engineering Leadership Reading List April 2024.pdf20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
20240509 QFM015 Engineering Leadership Reading List April 2024.pdf
 
2nd Solid Symposium: Solid Pods vs Personal Knowledge Graphs
2nd Solid Symposium: Solid Pods vs Personal Knowledge Graphs2nd Solid Symposium: Solid Pods vs Personal Knowledge Graphs
2nd Solid Symposium: Solid Pods vs Personal Knowledge Graphs
 
Katraj ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Katraj ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Katraj ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Katraj ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Call Girls in Prashant Vihar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Prashant Vihar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Prashant Vihar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Prashant Vihar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
VVIP Pune Call Girls Sinhagad WhatSapp Number 8005736733 With Elite Staff And...
VVIP Pune Call Girls Sinhagad WhatSapp Number 8005736733 With Elite Staff And...VVIP Pune Call Girls Sinhagad WhatSapp Number 8005736733 With Elite Staff And...
VVIP Pune Call Girls Sinhagad WhatSapp Number 8005736733 With Elite Staff And...
 
WhatsApp 📞 8448380779 ✅Call Girls In Mamura Sector 66 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Mamura Sector 66 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Mamura Sector 66 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Mamura Sector 66 ( Noida)
 
6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...
6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...
6.High Profile Call Girls In Punjab +919053900678 Punjab Call GirlHigh Profil...
 
VIP Call Girls Pollachi 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Pollachi 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Pollachi 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Pollachi 7001035870 Whatsapp Number, 24/07 Booking
 
valsad Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
valsad Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...valsad Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
valsad Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
Thalassery Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call G...
Thalassery Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call G...Thalassery Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call G...
Thalassery Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call G...
 

Annex 4 part 1-fdh (i) installation guide

  • 1. 1 FDH (I) INSTALLATION GUIDE 1. Introduction This guide will serve as reference in installing various types of FDH, including the rack module placements, patching & routing of cables, labeling, record updating and testing procedures. Terminologies: Rack Frame – 42U Open Rack FDH (R&M) Feeder Module – 24 ports unirack module where incoming cable or feeder cables are terminated Splitter Module – 2 X 32 Splitter module (residential or business splitter) Drop Module – 24 ports unirack module (DME Prolink, R&M) where drop cables are terminated. Also, Drop modules are identified as ODF1, ODF2, ODF3, and so on. 2. Test Equipments and Tools  OTDR  Optical Power Meter / Optical Light Source  Visual Fault Locator  Fast-field Connector Toolkit  Drill Machine  Drill Bit with hole saw attachment (38mm & 25mm)  Cable Cutter  Side Cutter  Basic Tools (Pliers, Screw Drivers, Measuring Tape etc.) 3. 42U FDH Open Rack Frame Open rack is mainly used for terminating fiber in the POP location but it was used as indoor FDH for large residential buildings. 3.1 Configuration 1: FDH Setup for maximum 256 tenancies The following configuration shall be used in buildings where tenancies are ranging from 100 to 224 and can be expanded up to maximum 256 tenancies.  42U open rack frame  1X1U Feeder module  1X1U PC Drawer  8X1U Splitter modules  11X1U Drop module patch panel Additional materials  10mm Spiral Plastic Wrap  8mm Spiral Plastic Wrap  6mm Spiral Plastic Wrap ( for Patch cord)  Cable tie (Length: 203mm Width: 3.6mm)  Velcro Straps  Trunking PVC size 50X100mm, 2.9meters color white Frame and Feeder Module  Install the rack frame as per instruction guide.  Secure the frame and keep it sturdy.  Then install the Feeder module at the bottom of the frame.
  • 2. 2 FO Feeder Cable  Route the FO feeder cable in to the FDH trunking.  Fusion splice the required number of fibers with the pigtails.  Coil the spare fibers properly in the splice tray.  Clean connector and connect the pigtails to the Feeder module’s adaptor. Splitter Modules  Install the Splitter module starting from the bottom, after the Feeder module. Note: Keep 1U space for every module installed. FO Drop Modules  Mark the PVC trunking and drill 38mm hole. The hole shall be in line with Drop module’s side access cable entry.  Remove the sharp edges using sand paper.  Prepare the Drop module (shown is DME Prolink type).  Slide-open the Drop module and remove the splice cassette.
  • 3. 3  Remove the Splice cassette’s screw stud.  Then install SC/APC adapter.  Install PC drawer first for Splicing Record storage after Splitter 8 with 1U gap in between.  After the PC drawer, install the first Drop module with no gap in between. Note: Complete the FO drop cable arrangement in the first Drop module before installing the next Drop module for better access.
  • 4. 4 FO Drop Cable Installation & Termination  Install the Drop cable and bunch it into 24 (preferably cables that emanates floor-wise and flat-wise).  Route the Drop cables in the trunking to determine the appropriate cable loops.  Arrange the Drop cable loops in such a way it reaches the bottom of the trunking.  Then insert the Drop cables in the trunking’s access hole and into the Drop module’s opening (left side cable entry).
  • 5. 5  With proper Drop cable loops in the trunking, mark the Drop cables in reference to Drop module entry point.  Pull the Drop cable and measure 1meter from the cable mark. The 1 meter length of cable will serve as Drop cable loop inside the Drop module.  Cut the excess cable lengths. Keep the fiber scrap and dispose it properly.  Prepare the Drop cable and install FAST-field connector. Note: Use a black mat to catch the fiber scrap during fiber cutting and cleaving and dispose it properly.
  • 6. 6  Test the Drop cable for any faults (Refer to Appendix 3/Continuity test).  Replace faulty Drop cables if any.  Arrange the first set of Drop cables in circular loop and clean the connectors. Note: Drop cable should be continuous length and should not be spliced with other cable segment to extend cable reach.  Then connect the Drop cables to the SC/APC adaptors according to flat numbers (preferably in ascending order). Note: Drop module top cover can be removed for better access.  Secure the Drop cables using 45cm long spiral plastic wrap (8mm size). Start the wrapping approximately 25cm from the connector.  Re-arrange the Drop cable in circular loop.
  • 7. 7  Adjust the cables and provide approximately 12cm diameter of cable loop when Drop module is fully open. Then secure the cables using cable tie.  After completing the first set, arrange the second set of cables.  Clean the connectors and connect to SC/APC adaptors.  Arrange the cable and install 45cm long spiral plastic wrap (8mm size).  Install cable tie in the upper most holes of the Drop module to secure the cables.  Install a 20cm long spiral plastic wrap (10mm size) to the bunch of 24 Drop cables and secure the cables using cable tie.  Then fix the Drop module cover.
  • 8. 8  After completing the cable connections, re-arrange the Drop cable in the trunking. Then close the cover. Note: Bunch the cables emanating from the Drop module either using electrical tape or cable tie for easy cable identification.  After completing the Drop cable connections, prepare the labeling machine.  Label the FO drop cable in the Drop module. Refer to Appendix 1 for the labeling guide.  Print the label and stick the label properly in the cable.
  • 9. 9  After completing all FO drop cable labeling, print the label for Splitter and Drop modules. Place the label on the left side part of the modules.  Place the Splitter label on top of its cover.  And for the Drop module and PC drawer, place the label at the front side of the patch cord management. FO Patch Cord Trunking  Install 189.5cm long PVC trunking (size 50X100mm) on the left side of the frame.  Secure the trunking using an L-Type clamp.
  • 10. 10  Mark the trunking where access holes are to be provided. Note: Holes should be in-line with the Splitter and Drop modules.  Drill 25mm holes and remove the sharp edges using sand paper. FO Patching (Splitter to Drop Module) a) Using Fostec SC/APC 0.9mm Patch Cord  Install 2-meter patch cords. Connect one end to Splitter’s output port, and the other end to the Drop module input port based on the flats and splitter port’s assignment (Refer to Appendix 2).  After completing the patching in one splitter, arrange the patch cord into bunch of 16 and secure the patch cords using a 30cm long spiral plastic wrap (size 6mm).
  • 11. 11  At the Drop module side, arrange the first set of patch cords into bunch of 12 and secure it using a 65cm long spiral plastic wrap (size 6mm).  Form a loop as shown.  Then arrange the second set of patch cords as shown and install a 65cm long spiral plastic wrap (size 6mm).  Secure the patch cords using Velcro straps. Note: When opening and closing the Drop module, guide the patch cords to slide smoothly in the trunking. b) Using Corning SC/APC 2mm Patch Cord  Install two-meter patch cords. Connect one end to the Splitter’s output port and the other end to the Drop module input port.  Arrange the patch cords and secure it using Velcro strap.  Then install a 30cm long spiral plastic wrap (size 10mm).  In the Drop module end, arrange the patch cords and secure it using Velcro strap  Then Install a 45cm long spiral plastic wrap (size 10mm).
  • 12. 12 FO Patching (From Feeder module to Splitter)  Install a 2-meter patch cord. Connect one end from the Feeder module and the other end to Splitter Input 1.  Arrange the patch cords in the Feeder module and secure it using a 45cm long spiral plastic wrap (size10mm). Note: Guide the patch cords in the trunking when opening and closing the Feeder module.  After completing the patching, label all patch cords. Refer to Appendix 1 for labeling guide.  Print FDH label (OLT/FDH Number & EID) in a sticker and place it on top of the 4U plate of the frame.  Test the FDH and measure the Power levels. (Refer to Appendix3/Post- Installation Testing)  Update the Fiber Splicing Record (Appendix2) and place it in PC drawer.  Keep the work area/ telephone room tidy and clean at all times.
  • 13. 13 3.2 Configuration 2: FDH Setup for 256 to 480 tenancies For buildings where tenancy ranges from 256 to 480, two rack frames shall be considered, where 1 Rack frame for Splitter modules - 1X1U Feeder module - 15X1U Splitter modules 1 Rack frame for Drop modules - 20X1U Drop modules Rack Frame & Trunking  Install two rack frames with considerable distance.  Link the two rack frames using appropriate size and length of cable tray.  Then install trunking for patch cord management on the following location. - On top of the cable tray - Left side of the rack frame  Provide access holes for patch cords. Note: Access holes should be in-line with the Splitter and Drop modules and sharp edges should be removed using sand paper. Feeder & Splitter Module  Install the Feeder module preferably at the bottom of the rack frame.  After the Feeder module, install the Splitter modules and keep 1U space in between. Note: Limit the number of Splitters module per rack frame to maximum 15 numbers equivalent to 480 tenancies.
  • 14. 14 Drop Module  Install the Drop modules on the other Rack frame starting at the bottom.  Keep 1U space in between. Note: Limit the number of Drop modules per rack frame to maximum 20 numbers. FO Drop Cable Installation and Termination  All drop cables should connect from the back of the Drop module with specific spare length according to the desired Flat/Floor labeling.  Install connector  Test the cables before connecting to the Drop module. Refer to Appendix 3/Drop cable continuity testing.  Replace cables if faulty. Note: Drop cable should be continuous length and should not be spliced with other cable segment to extend cable reach.  Arrange the cable in circular loop inside the Drop module, clean connector and connect to SC/APC adaptor.
  • 15. 15  Then secure the cables with Velcro strap. Note: Provide enough cable loops to avoid sharp cable bends when opening the Drop module. FO Patching (Feeder Module to Splitter Module)  Connect the patch cord from the Feeder module to Splitter module input port number 1.  Route the patch cords in the trunking located at the left side of the rack frame. FO Patching (Splitter Module to Drop Module)  Connect the patch cord from the Splitter port to Drop module ports according to assigned port location.  At the Splitter module, route the patch cords on the left side of the rack frame trunking.
  • 16. 16  At the Drop module rack frame, patch cord termination from the Splitter module to Drop module should be made balance, where - Ports 1-12, patch cord should be routed on the left side of the module. - Ports 13-24, patch cord should be routed on the right side of the module. Note: When opening and closing the Drop module, guide the patch cords to slide smoothly in the trunking.  Secure the patch cords using spiral plastic wrap and Velcro straps.  Provide all the necessary labels. Refer to Appendix 1.  Test the FDH and measure the Power levels. (Refer to Appendix3/Post- Installation Testing).  Update the Fiber Splicing Record (Appendix2) and place it in PC drawer.
  • 17. 17 4.0 GPX-147 FAT3202 Wall-mount type FDH This type of indoor FDH shall be used for buildings where tenancy is ranging from 50 to 100 home passes. FDH configurations are as follows;  128 maximum ports capacity  Requires modular type of splitters  Splitter mounting can hold 2 splitters each Additional Materials  Cable Tray (30 X 290cm) Cabinet Preparation  Install SC/APC adaptors for input and Drop cables.  Install the additional Splitter in the slot where the first splitter is located.  Clean connectors and connect to the SC/APC adaptors. Note: Install Splitter output tails based on port numbers in the cabinet. Cabinet Installation  Mark the wall to drill using Line Drawing Template board for Cabinet installation. Then drill the wall and install anchor bolts.  Install the cabinet and tighten the anchor bolts.
  • 18. 18 Feeder Cable  Route the Feeder cable in the cabinet and fusion splice the required fibers. Note: Loop the spare fibers properly in the splice tray. Cable Tray (for Drop cable loops)  Install cable tray 35cm long, one above the cabinet and the other one below the cabinet for Drop cable loops. FO Drop Cable  Install the Drop cables.  For Splitter 1 & 2 connections, install the Drop cable using the cable access located at the bottom of the cabinet and for Splitter 3 & 4 use the top cable access.  Install connector and test Drop cable. Refer to Appendix 3/Drop Cable continuity testing.  After continuity testing, connect the Drop cables in the SC/APC adaptors (preferably cables that emanates floor-wise and flat-wise). Note: Drop cable should be continuous length and should not be spliced with other cable segment to extend cable reach.
  • 19. 19  Group the Drop cables into 32 and arrange it in circular loop and secure it in the cable tray. Note: When opening or accessing the Splitter part of the cabinet, release the Drop cable loops in order not to strain the Drop cable connectors.  Label the Drop cables. Refer to appendix 1/Drop Cable labeling.  Test the FDH and measure the Power levels. (Refer to Appendix3/Post- Installation Testing).  Update the Optical Distribution Diagram Sheet attached in the FDH. Write the Flat number based on Splitter port assignments.  Fix the FDH Label (OLT/FDH Number, EID Number).
  • 20. 20 Appendix 1: Labeling  Patch cord label must be high quality printed self laminating type.  For the drop cable, label can be either self laminating type or ferule type.  Label specifications - self laminating - UV proof - 9mm width  Feeder Module to Splitter Patch Cord Label Patch Cord End 1 – Feeder Module end Patch Cord End 2 – Splitter Input end Sample Labeling  Splitter to Drop Module Patch Cord Label Patch Cord End 1 – Splitter end Patch Cord End 2 – Drop Module end
  • 21. 21 Sample Labeling  FO Drop Cable Label – Drop Module end  Splitter and Drop Module Label  FDH Label Appendix 2: Fiber Splicing Record  Print the Fiber Splicing Record, bind it in a plastic folder and keep in PC drawer.  Inform concerned Department for any changes in patching. SPLITTER 1 Connection Details Splitter Port No. Drop Module ODF Port No. Flat No. Notes No. Port 1 1 1 1 SHOP1 Modern Bakery 2 1 2 2 SHOP2 German Rent-a-car 3 1 3 3 SHOP3 The Textile Co. 4 1 4 4 SHOP4 Clock Grocery 5 1 5 5 MZ01 6 1 6 6 MZ02 7 1 7 7 MZ03 8 1 8 8 MZ04 9 1 9 9 101 10 1 10 10 102 11 1 11 11 103 12 1 12 12 104 13 1 13 13 201 14 1 14 14 202 15 1 15 15 203 16 1 16 16 204 17 1 17 17 301 18 1 18 18 302 19 1 19 19 303 20 1 20 20 304 21 1 21 21 401 22 1 22 22 402 23 1 23 23 403 24 1 24 24 404 25 2 1 25 501 26 2 2 26 502 27 2 3 27 503 28 2 4 28 504 29 2 5 29 601 30 2 6 30 602 31 2 7 31 603 32 2 8 32 604 E3SECTOR/BLOCK NO. PLOT/BLDG. NO. C29 OAQ/544OLT / FDH NO. Master EID NO. AU000998000
  • 22. 22 Appendix 3: Installation Test Procedures Drop Cable Continuity Testing 1.Connectorize one end of Drop cable. 2.Clean the connector and connect the Visual Fault Locator. 3.Check the cable continuity and replace Drop cable if faulty. Note: Perform the cable continuity test first before connecting the Drop cable in the FDH. Post-Installation Testing (Insertion Loss Measurement) Measurement Setting: 1310,& 1550nm Test Result Format Sector/Block Number: E3 Plot Number: C29 OLT/FDH Number: OAQ/5505 Master EID: AU000998000 SPLITTER 1 Wavelength Flat No. Wavelength Remarks1310 1550 1310 1550 Output 1 SHOP1 2 SHOP2 3 SHOP3 4 SHOP4 5 MZ01 6 MZ02 7 MZ03 8 MZ04 9 101 - - - - 29 601 30 602 31 603 32 604 1.Connect Optical Light Source to Splitter input port. 2.Set the reference power level to 0dBm. 3.Connect Optical Power Meter or OTDR to Splitter output port 1 and measure received power level. 4.Measure the remaining Splitter output ports and write the test results. 5.After measuring the Splitter output ports, connect Optical Power Meter or OTDR in the Drop cable (at rosette end). 6.Measure the received power level and write the test results for each Flat. 7.After completing the test measurements in each Flat, compare the measured levels based on the Power Level calculation below. Power Level = Splitter Output measured level – Losses Where Losses are as follows; Patch Cord = 1 X 0.6dB SC/APC Adaptor Insertion Loss = 2 X 0.2dB Fast-field Connector = 2 X 0.4dB Drop Cable = 0.35dB/km Example: Flat604 with 40 meters Drop cable, and Splitter1 Port32 measured output level is -19dBm. Power Level = -19dBm – (0.6+0.4+0.8+0.014)dB = -19dBm – 1.814dB Power Level= -20.814dBm 8.If the difference between measured levels and calculated levels is more than 1 dB, then check patch cords, Drop cable and connectors for any faults and rectify. 9.Follow steps 1 to 8 for the remaining Splitters.
  • 23. 23 Appendix 4: ODF Port Assignment Drop Module ODF Port Number Assignment Drop Module / ODF20 ODF 457 to 480 Drop Module / ODF19 ODF 433 to 456 Drop Module / ODF18 ODF 409 to 432 Drop Module / ODF17 ODF 385 to 408 Drop Module / ODF16 ODF 361 to 384 Drop Module / ODF15 ODF 337 to 360 Drop Module / ODF14 ODF 313 to 336 Drop Module / ODF13 ODF 289 to 312 Drop Module / ODF12 ODF 265 to 288 Drop Module / ODF11 ODF 241 to 264 Drop Module / ODF10 ODF 217 to 240 Drop Module / ODF9 ODF 193 to 216 Drop Module / ODF8 ODF 169 to 192 Drop Module / ODF7 ODF 145 to 168 Drop Module / ODF6 ODF 121 to 144 Drop Module / ODF5 ODF 97 to 120 Drop Module / ODF4 ODF 73 to 96 Drop Module / ODF3 ODF 49 to 72 Drop Module / ODF2 ODF 25 to 48 Drop Module / ODF1 ODF 1 to 24