SlideShare une entreprise Scribd logo
1  sur  41
Télécharger pour lire hors ligne
About us: Finmeccanica
Innovation in Railway and Application in
the GCC.
Abu Dhabi October 2013

Finmeccanica is Italy’s leading manufacturer in the high technology sector.
Issam Chehimi
Finmeccanica is the largest shareholder in Ansaldo STS with a 40% stake.

1
About us: Ansaldo STS

Ansaldo STS is a leading technology company operating in the global
Railway & Mass Transit industries, providing signaling systems and
complete turnkey solutions worldwide.

2
Worldwide presence

3
About us: Ansaldo STS

Listed on Milan Stock Exchange (STAR Sector) - 2012

STS.MI
Revenues

€ 1,248 Mln

Orders

€ 1,492 Mln

Backlog

€ 5,683 Mln

EBIT

€ 117 Mln

NFP

€ (302) Mln

Employees

~ 4,100

4
Business Lines
Ansaldo STS delivers a full range of Railway and Mass
TransitTransportation Solutions and Signalling Systems, such as…

High Speed

Tramwave
(catenary free)

Sub-urban
Main Lines

Driveless UTO
Metro

Tramway

Conventional
Metro

Light Rail

5
Last decades Main Innovations in
Railway
Over the last 3 decades the main worldwide innovations
were :
• GoA 4 Driverless Metro,
• Catenary less Tramway System,
• Interoperable Signalling System.

6
More than 140 USD Bn. To be invested in the GCC Railways
Projects,
Most advanced and innovative solutions are required :
• Fully automated driverless Metro for a fast growing cities (Riyadh,
Jeddah, Dubai, Doha, Abu Dhabi...)
• Centenary less Tramway solution for Iconic cities (Dubai,
Lusail,...)
• Interoperable Cross Border Main lines (GCC line)

7
Ansaldo STS Driverless Solutions :
Copenhagen Show case

8
Ansaldo STS Driverless Solutions :
Copenhagen Show case
Copenhagen Metro
Winner:

European Metro of the Year

Winner:

World Metro of the Year

Winner:

Driverless Metro of the Year

Ansaldo STS

Turnkey E&M Contractor,
Operator, Maintainer

9
Copenhagen M1/M2 Driverless Metro
Features
Passenger service around the clock
Line length phase 1-3

21.5 km

Min Headway (Day)

90 sec

Min Headway (Night)

15 min

Train capacity (4 p/m2)

300 pass

Line capacity (4

p/m2)

May 2003

December 2003

12,000 pphpd

Passengers/year phase 1-3

61 millions

Fleet

34 – 3 cars trains of
39m

Commercial speed

39 km/h

Max speed

80 km/h

Third rail power supply

750Vdc

In passenger service and operated by AnsaldoSTS
since 2002

•Phase 1 + 2
Lenght: 17,5 Km
Stops: 17
(9 underground, 8 ground level)
• Phase 3
Lenght: 4 Km
Stops: 5
(all ground level)

October 2007
October 2002

10
11
12
Copenhagen, a successful case:
Supplier, Operator and Maintainer

Supply
–
–
–
–

System Design/Integration
Technological systems
Equipment
Rolling Stock

Operation & Maintenance
–
–
–
–
–

Mobilization
Staff
Operation
Rules and procedures
Maintenance
13
Performance Parameters
System Service Availability (Copenhagen M1/M2)

2011 Service
Availability
year average:
98,8%

98,0%

Service Availability Formula: (1 – (missed departures / planned departures))*100

Contractual Target

14
From Integrator to Full System Approach

Signalling

Power
Supply

Telecom

…

Integrator: The transportation system is conceived

Rolling
Stock

just assembling a certain number of technologies. It has
low performances and it’s not suitable for high technology
and complex applications

System Approach: since the beginning of design
Civil
Works

Signalling

Power
Supply

Telecom

…

phase, the Transportation System is conceived as a whole
and each technology gain benefits. The overall system
performances are higher then achievable through a simple
integration

Rolling
Stock

System/Safety Approach:
Civil
Works

Signalling

Power
Supply

Telecom

…

As AnsaldoSTS is also a leading company in the Signalling
business, the System Approach adopted by AnsaldoSTS is
more reliable, safe and with higher performance than a
generic System Approach

Rolling
Stock

Extended System Approach:
Civil
Works

Signalling

Power
Supply

Telecom

…

Rolling
Stock

O&M

The successful O&M experience achieved by AnsaldoSTS
during Copenhagen Driverless Unattended metro project,
delivered in 2002 and operated since then, gives the
opportunity to Extend the system approach, taking into
account the specific O&M needs and criticalities since
the beginning of the concept and design phase
15
From Integrator to Full System Approach

Civil
Works

Signalling

Power
Supply

Telecom

…

Rolling
Stock

External Constraints*

*

• Viability/environmental impact
• Pollution/CO2 reduction
• Eco-sustainability
• Energy saving requirements
• Extreme climatic conditions
• Particular security requirements
• Urban development needs
• Passenger/Operators needs not
strictly related to system
performances
• Video-analytics
• Alarm management
• And much more…

O&M

Full System Approach: in order to
effectively answer to all the transportation
solutions market needs, AnsaldoSTS improved its
System conception from the Extended to the Full
System Approach, taking into account all the
possible transportation system’s External
Constraints during all the project’s phases (from
design to O&M)

With this new vision the transportation systems are not just
the solutions to the traffic congestion but are a living part of
the city answering to the passenger and operators needs of
today and tomorrow

16
Copenhagen M3/M4 City Ringen
Driverless Metro
Features
Line length

17 km

Min Headway

100 sec

Stations

17

Train capacity (4p/m2)

300 pass

Line capacity

11,000 pphpd

Fleet

28 trains of 39m

Max speed

90 km/h

Third rail power supply

750 Vdc

Stopping accuracy

+/- 30cm

Operational service

24/7

Technologies

CBTC Driverless

Operation 2018

17
Honolulu Rail Transit Project
Driverless Metro
Features
The project is an elevated metro line
Line length

32 km

Min Headway

90 sec

Stations

21

Train capacity (3,2p/m2)

318 p

Required initial line capacity

7.200 pphpd

Fleet

40 2-car trains of 39 m

Max speed

105 km/h

Third rail power supply

750 Vdc

Stopping accuracy

+/- 15cm

Operational service

20h/day, 7 day/week

Operation 2017 (first segment)

18
Application in the GCC
Riyadh PNU Driverless Metro
Features
Line length

11.3 km

Min Headway

90 sec

Stations

14

Train capacity (2.5 p/m2)

110 pass

Line capacity (2.5 p/m2)

4,400 pphpd

Fleet

22 - 2 cars trains of
29m

Commercial speed

24 km/h

Max speed

60 km/h

Third rail power supply

750 Vdc

In operation since 2012

11.3
14

19
Ansaldo STS Driverless Unattended Metros
in the world
Copenhage
n M1/M2

Brescia

Thessaloni
ki

Rome
line C

Milan line
5

Taipei
(CBTC)

Riyadh
PNU

Copenhage
n
Cityringen
(CBTC)

Honolulu

Milan Line
4
(CBTC)

Riyadh

21 km
double track
double
tunnel

13.7 km
double
track
single
tunnel

9.5 km
double track
double
tunnel

25 km
(+17)
double
track
double
tunnel

12.6 km
double
track
single
tunnel

15.4 km
double
track
viaduct

11.3 km
double
track
viaduct

17 km
double track
double
tunnel

32 km
double
track
viaduct

15.2 km
double
track
double
tunnel

40.7 Km
double
track

22 stations

17 stations

13 stations

30
stations
(+12)

19
stations

14
stations

14
stations

17 stations

21
stations

21 stations

22 stations

min
headway
90 s

min
headway
90 s

min
headway
90 s

min
headway
120 s

min
headway
75 s

min
headway
90 s

min
headway
90 s

min
headway
100 s

min
headway
90 s

min
headway
75 s

min
headway
90s

12,000
pphpd
(4p/m2)

17,000
pphpd
(6p/m2)

21,000
pphpd
(6p/m2)

36,000
pphpd
(6p/m2)

28,000
pphpd
(6p/m2)

26,000
pphpd
(6p/m2)

4,400
pphpd
(2.5p/m2)

12,000
pphpd
(4 p/m2)

7,200
pphpd
(3.2 p/m2)

28,000
pphpd
(6p/m2)

5000 pphd

34 trains
3 cars per
train (39m)

21 trains
3 cars per
train (39m)

18 trains
4 cars per
train (50m)

30 (+13)
trains 6
cars per
train
(108m)

21 trains,
4 cars per
train
(50m)

17 trains
4 cars per
train
(70m)

22 trains
2 cars per
train
(29m)

28 trains
3 cars per
train (39m)

40 trains 2
cars per
train
(38.5m)

47 trains
4 cars per
train (50m)

13 + 3 years
O&M
In operation
since 2002

2 years of
operation
7 years of
maintenan
ce

3 years of
service
assistance

Local
existing
Operator
training

27 years
O&M as
member
of the
Concess.

Future
system
extension
:
52 km,
56
stations,
64 trains

3 years
O&M

5 + 3 years
O&M

12 years
O&M

25 years
O&M as
member of
the
Concess.

47 trains

10 years of
maintenace

Ansaldo STS has been developing more than 210km of Unattended Metros all over the world

20
Visual impact of Milan Tram with
overhead catenaries

21
Visual impact of Milan Tram with
TramWave

22
Visual impact of Naples Tram with
overhead catenaries

23
Visual impact of Milan Tram with
TramWave

24
TramWave
Ansaldo STS catenary-free solution

25
TramWave ground-level line module

Steel plate

Module

Negative feeder

Safety Negative
feeder

Internal contact connected
to the Positive feeder

Internal contact connected to
Safety Negative feeder
Positive Feeder

26
Operating Principle

Power Collector

When the bogie pantograph is retracted in rest position:
The power collector in the upper position is unable to activate
the power line segments; the pulling force is not enough to lift
up the belt
The vehicle can run over the line in coasting without activating
the segments
All the segments are not energized and connected to ground
27
Operating Principle

Power Collector

When the bogie pantograph is released:
The power collector is in contact with the segments and its
magnetic force attracts the flexible ferromagnetic belt, that push
up the internal movable conductive contacts, allowing the
closing of the electric circuit and so the power transmission
from the segments, in contact with the collector, and the vehicle

28
Operating Principle

Groud-level module’s steel contact plate
Veichle body

Train boogie

power collector
The steel plates in contact with the
power collector are the only one
energized

29
Operating Principle

~ 50 cm

30
Operating Principle

~ 100 cm

31
Operating Principle

32
TramWave: main benefits for sustainable
urban mobility
• Make the urban context more liveable, removing the visual impact of overhead
catenaries and poles from squares, buildings, monuments, historical areas, etc…
• Continuous power transmission from contact line to vehicles without any
interruption/charging times (for both traction and auxiliaries)
• No need of on-board big and heavy storage energy systems (supercapacitors)
• No need of electronic devices
• The closing of the traction electric circuit doesn’t foreseen the use of the tracks
no
more problem due to the effects of stray currents, preserving the underground utilities
(water and gas pipelines, electricity network underground cables, etc…) and the rails
less maintenance costs.
from electrolysis effects
• Possibility to have a mixed power-supply system, by mean having Tramwave and
traditional catenaries on the same tramway line (ex. Tramwave in the historical centres
and catenaries in the suburbs), moreover it’s possible to feed with Tramwave rubber
tired vehicles like busses
• Regenerative Breaking and energy saving
33
TramWave Safety Assessment certificate

34
Installation in Naples

35
Installation in Naples

36
AnsaldoSTS is a leader in ERTMS Level 2 and has provided more
than 50% of the Signalling Technology for all High Speed lines*
worldwide.
37
* Reference excludes Japan
Global ERTMS
& High Speed applications
France
High Speed network
LGV EST - lev. 2
Tournan-Marles en Brie - lev. 1-2
On-board - lev. 1/2
On-board - lev. 2
Cross border
Figueres-Perpignan - lev. 1/2
Paris-Brussels-CologneAmsterdam
Channel Tunnel Rail Link

Sweden / Finland / Norway
Haparandabanan - lev. 2
STM Nordic
Germany
Saarbrücken-Mannheim - lev. 2
Berlin-Rostock - lev.2
Velaro on-board - lev.2

Spain
Madrid-Lleida HSL - lev. 1/2
Madrid-Atocha HSL by-pass
On-board - lev. 1-2

Czech Republic
Poříčany-Kolín - lev. 2
Austria - Hungary
Vienna-Budapest - lev. 1
Turkey
Bogazkopru-Yenice
Mersin-Toprakkale - lev. 1
On-board - lev 1

South Korea
On-board - lev. 1
Seoul-Busan HSL

Italy
Rome-Naples HSL - lev. 2
Turin-Milan HSL - lev. 2
Milan-Bologna HSL - lev. 2
SCMT projects
On-board - lev. 1
On-board - lev. 2

Greece
On-board - lev. 1
Romania
Campina - Predeal - lev. 1

China
Zhengzhuang-Xi’an - lev. 2
Shijiazhuang-Taiyuan - lev. 1
Qinhuangdao-Shenyang DPL
On-board - lev. 1-2

UK
Cambrian Coast - lev. 2
High Speed One

Libya
Ras Ajdir - Sirt - lev. 1/2
Al-Hisha - Sabha - lev. 2

India
Chennai-Gummudipundi - lev.1
Delhi-Agra - lev. 1

UAE
Shah Habshan Ruwais - lev. 2

38
Apllication in the GCC

• SHR – Etihad Rail Stage ERTMS Level2
Stage 3

Stage 2

Stage 1

39
Global Ansaldo STS system architecture (1)
• Project

Legth: 264 km (140 km double track; 124 km single track)
RBC: 1 Balises: 400 Point Machine: 65 Axle Counter: 150
• Signalling:
– Interlocking
• Multistation ACC Technology
• 2 extended CBIs

– ETCS Level 2 signalling system
• 1 Radio Block Centre (RBC)
• SRS 2.3.0 compliant with option to update to SRS 3.0

• Telecomms:
Multi Service Network,GSM-R,PAVA, Telephony,Master Clock
• Non Vital : Traffic Management System, Train Describer, SCADA,
MMIS, BMIS, ACCES Control, Freight Asset Protection
40
Thank you …

41

Contenu connexe

Tendances

Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumarSanjeev Dyamannavar
 
India railway and green infra smart move 2018
India railway and green infra smart move 2018India railway and green infra smart move 2018
India railway and green infra smart move 2018Mahesh Chandra Manav
 
India modern rail service for public
India modern rail service for publicIndia modern rail service for public
India modern rail service for publicMahesh Chandra Manav
 
Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Shyam Raman
 
Anti Collision Railways System
Anti Collision Railways SystemAnti Collision Railways System
Anti Collision Railways SystemAnkit Singh
 
Metrolite india lrt dr namrita kalsi dmrc 2
Metrolite india lrt dr namrita kalsi dmrc 2Metrolite india lrt dr namrita kalsi dmrc 2
Metrolite india lrt dr namrita kalsi dmrc 2Dr. (Ar.) Namrita Kalsi
 
Metrolite India LRT Dr Namrita Kalsi DMRC
Metrolite India LRT Dr Namrita Kalsi DMRCMetrolite India LRT Dr Namrita Kalsi DMRC
Metrolite India LRT Dr Namrita Kalsi DMRCDr. (Ar.) Namrita Kalsi
 
Chapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingChapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingdhara dattani
 

Tendances (16)

Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumar
 
Metro Signalling Revolution in India
Metro Signalling Revolution in IndiaMetro Signalling Revolution in India
Metro Signalling Revolution in India
 
Next generation train positioning system
Next generation train positioning system  Next generation train positioning system
Next generation train positioning system
 
India railway and green infra smart move 2018
India railway and green infra smart move 2018India railway and green infra smart move 2018
India railway and green infra smart move 2018
 
India modern rail service for public
India modern rail service for publicIndia modern rail service for public
India modern rail service for public
 
The roles of ICT in driverless, automated railway operations
The roles of ICT in driverless, automated railway operationsThe roles of ICT in driverless, automated railway operations
The roles of ICT in driverless, automated railway operations
 
Cbtc brochure
Cbtc brochureCbtc brochure
Cbtc brochure
 
Train 18
Train  18Train  18
Train 18
 
Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...
 
CBTC World Congress paper on creating safe CBTC system without secondary dete...
CBTC World Congress paper on creating safe CBTC system without secondary dete...CBTC World Congress paper on creating safe CBTC system without secondary dete...
CBTC World Congress paper on creating safe CBTC system without secondary dete...
 
Anti Collision Railways System
Anti Collision Railways SystemAnti Collision Railways System
Anti Collision Railways System
 
Culver Test Track
Culver Test TrackCulver Test Track
Culver Test Track
 
velaro-Türkiye
velaro-Türkiyevelaro-Türkiye
velaro-Türkiye
 
Metrolite india lrt dr namrita kalsi dmrc 2
Metrolite india lrt dr namrita kalsi dmrc 2Metrolite india lrt dr namrita kalsi dmrc 2
Metrolite india lrt dr namrita kalsi dmrc 2
 
Metrolite India LRT Dr Namrita Kalsi DMRC
Metrolite India LRT Dr Namrita Kalsi DMRCMetrolite India LRT Dr Namrita Kalsi DMRC
Metrolite India LRT Dr Namrita Kalsi DMRC
 
Chapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingChapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlocking
 

Similaire à Innovation in gcc-railway

Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 James Nesbitt
 
Theme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLSTheme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLSBRTCoE
 
Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013BRTCoE
 
New microsoft power point presentationTraing in Railway Electrification Office
New microsoft power point presentationTraing in Railway Electrification OfficeNew microsoft power point presentationTraing in Railway Electrification Office
New microsoft power point presentationTraing in Railway Electrification OfficeShudhanshu Singh
 
City Speak XI - Is transport the solution or the enemy? Pascal Dupont of Alstom
City Speak XI - Is transport the solution or the enemy? Pascal Dupont of AlstomCity Speak XI - Is transport the solution or the enemy? Pascal Dupont of Alstom
City Speak XI - Is transport the solution or the enemy? Pascal Dupont of AlstomDesigningHongKong
 
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...Shyam Raman
 
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...DesigningHongKong
 
Seoul metropolitan rapid transit
Seoul metropolitan rapid transit Seoul metropolitan rapid transit
Seoul metropolitan rapid transit simrc
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail CorporationAnkit Chaudhary
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-RajbanshRom!el Rajbansh
 
Manual de tecnoloxia
Manual de tecnoloxiaManual de tecnoloxia
Manual de tecnoloxiaCousasdoCole
 
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRail~Volution
 
sustainable transport
sustainable transportsustainable transport
sustainable transportkarapeshivraj
 
Uncover the Technology behind Indian Railways
Uncover the Technology behind Indian RailwaysUncover the Technology behind Indian Railways
Uncover the Technology behind Indian RailwaysNikita Khanna
 
ROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR TrucksROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR TrucksEuropean Green Vehicle Initiative
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Suraj Talreja
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro raillibin paul
 

Similaire à Innovation in gcc-railway (20)

Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014
 
Theme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLSTheme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLS
 
Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013
 
New microsoft power point presentationTraing in Railway Electrification Office
New microsoft power point presentationTraing in Railway Electrification OfficeNew microsoft power point presentationTraing in Railway Electrification Office
New microsoft power point presentationTraing in Railway Electrification Office
 
City Speak XI - Is transport the solution or the enemy? Pascal Dupont of Alstom
City Speak XI - Is transport the solution or the enemy? Pascal Dupont of AlstomCity Speak XI - Is transport the solution or the enemy? Pascal Dupont of Alstom
City Speak XI - Is transport the solution or the enemy? Pascal Dupont of Alstom
 
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
Strategic Analysis of Growth Opportunities in the Western European Urban Rail...
 
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
City Speak XI - Is transport the solution or the enemy? Bruno Charade of HK T...
 
CAF Presentation
CAF PresentationCAF Presentation
CAF Presentation
 
Seoul metropolitan rapid transit
Seoul metropolitan rapid transit Seoul metropolitan rapid transit
Seoul metropolitan rapid transit
 
ETCS
ETCSETCS
ETCS
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail Corporation
 
Advance Signalling System-Rajbansh
Advance Signalling System-RajbanshAdvance Signalling System-Rajbansh
Advance Signalling System-Rajbansh
 
Manual de tecnoloxia
Manual de tecnoloxiaManual de tecnoloxia
Manual de tecnoloxia
 
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
 
sustainable transport
sustainable transportsustainable transport
sustainable transport
 
Uncover the Technology behind Indian Railways
Uncover the Technology behind Indian RailwaysUncover the Technology behind Indian Railways
Uncover the Technology behind Indian Railways
 
Ppt on DMRC
Ppt on DMRCPpt on DMRC
Ppt on DMRC
 
ROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR TrucksROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR Trucks
 
Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)Communication Based Train Control (Mobile Train Radio Communication)
Communication Based Train Control (Mobile Train Radio Communication)
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 

Plus de Ibrahim Al-Hudhaif

Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemondIbrahim Al-Hudhaif
 
Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreauIbrahim Al-Hudhaif
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerahIbrahim Al-Hudhaif
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016Ibrahim Al-Hudhaif
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsIbrahim Al-Hudhaif
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings Ibrahim Al-Hudhaif
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings CodesIbrahim Al-Hudhaif
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...Ibrahim Al-Hudhaif
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views Ibrahim Al-Hudhaif
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Ibrahim Al-Hudhaif
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesIbrahim Al-Hudhaif
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM Ibrahim Al-Hudhaif
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYIbrahim Al-Hudhaif
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiIbrahim Al-Hudhaif
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramIbrahim Al-Hudhaif
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseIbrahim Al-Hudhaif
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approachIbrahim Al-Hudhaif
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail Ibrahim Al-Hudhaif
 

Plus de Ibrahim Al-Hudhaif (20)

Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemond
 
Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreau
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerah
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega Projects
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings Codes
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
 
Saudi Talent in Mega Projects
Saudi Talent in Mega ProjectsSaudi Talent in Mega Projects
Saudi Talent in Mega Projects
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EY
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - Hitachi
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise Optram
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative Showcase
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approach
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail
 
Kuwait PPP Transport Projects
Kuwait PPP Transport ProjectsKuwait PPP Transport Projects
Kuwait PPP Transport Projects
 

Dernier

Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 

Dernier (20)

Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 

Innovation in gcc-railway

  • 1. About us: Finmeccanica Innovation in Railway and Application in the GCC. Abu Dhabi October 2013 Finmeccanica is Italy’s leading manufacturer in the high technology sector. Issam Chehimi Finmeccanica is the largest shareholder in Ansaldo STS with a 40% stake. 1
  • 2. About us: Ansaldo STS Ansaldo STS is a leading technology company operating in the global Railway & Mass Transit industries, providing signaling systems and complete turnkey solutions worldwide. 2
  • 4. About us: Ansaldo STS Listed on Milan Stock Exchange (STAR Sector) - 2012 STS.MI Revenues € 1,248 Mln Orders € 1,492 Mln Backlog € 5,683 Mln EBIT € 117 Mln NFP € (302) Mln Employees ~ 4,100 4
  • 5. Business Lines Ansaldo STS delivers a full range of Railway and Mass TransitTransportation Solutions and Signalling Systems, such as… High Speed Tramwave (catenary free) Sub-urban Main Lines Driveless UTO Metro Tramway Conventional Metro Light Rail 5
  • 6. Last decades Main Innovations in Railway Over the last 3 decades the main worldwide innovations were : • GoA 4 Driverless Metro, • Catenary less Tramway System, • Interoperable Signalling System. 6
  • 7. More than 140 USD Bn. To be invested in the GCC Railways Projects, Most advanced and innovative solutions are required : • Fully automated driverless Metro for a fast growing cities (Riyadh, Jeddah, Dubai, Doha, Abu Dhabi...) • Centenary less Tramway solution for Iconic cities (Dubai, Lusail,...) • Interoperable Cross Border Main lines (GCC line) 7
  • 8. Ansaldo STS Driverless Solutions : Copenhagen Show case 8
  • 9. Ansaldo STS Driverless Solutions : Copenhagen Show case Copenhagen Metro Winner: European Metro of the Year Winner: World Metro of the Year Winner: Driverless Metro of the Year Ansaldo STS Turnkey E&M Contractor, Operator, Maintainer 9
  • 10. Copenhagen M1/M2 Driverless Metro Features Passenger service around the clock Line length phase 1-3 21.5 km Min Headway (Day) 90 sec Min Headway (Night) 15 min Train capacity (4 p/m2) 300 pass Line capacity (4 p/m2) May 2003 December 2003 12,000 pphpd Passengers/year phase 1-3 61 millions Fleet 34 – 3 cars trains of 39m Commercial speed 39 km/h Max speed 80 km/h Third rail power supply 750Vdc In passenger service and operated by AnsaldoSTS since 2002 •Phase 1 + 2 Lenght: 17,5 Km Stops: 17 (9 underground, 8 ground level) • Phase 3 Lenght: 4 Km Stops: 5 (all ground level) October 2007 October 2002 10
  • 11. 11
  • 12. 12
  • 13. Copenhagen, a successful case: Supplier, Operator and Maintainer Supply – – – – System Design/Integration Technological systems Equipment Rolling Stock Operation & Maintenance – – – – – Mobilization Staff Operation Rules and procedures Maintenance 13
  • 14. Performance Parameters System Service Availability (Copenhagen M1/M2) 2011 Service Availability year average: 98,8% 98,0% Service Availability Formula: (1 – (missed departures / planned departures))*100 Contractual Target 14
  • 15. From Integrator to Full System Approach Signalling Power Supply Telecom … Integrator: The transportation system is conceived Rolling Stock just assembling a certain number of technologies. It has low performances and it’s not suitable for high technology and complex applications System Approach: since the beginning of design Civil Works Signalling Power Supply Telecom … phase, the Transportation System is conceived as a whole and each technology gain benefits. The overall system performances are higher then achievable through a simple integration Rolling Stock System/Safety Approach: Civil Works Signalling Power Supply Telecom … As AnsaldoSTS is also a leading company in the Signalling business, the System Approach adopted by AnsaldoSTS is more reliable, safe and with higher performance than a generic System Approach Rolling Stock Extended System Approach: Civil Works Signalling Power Supply Telecom … Rolling Stock O&M The successful O&M experience achieved by AnsaldoSTS during Copenhagen Driverless Unattended metro project, delivered in 2002 and operated since then, gives the opportunity to Extend the system approach, taking into account the specific O&M needs and criticalities since the beginning of the concept and design phase 15
  • 16. From Integrator to Full System Approach Civil Works Signalling Power Supply Telecom … Rolling Stock External Constraints* * • Viability/environmental impact • Pollution/CO2 reduction • Eco-sustainability • Energy saving requirements • Extreme climatic conditions • Particular security requirements • Urban development needs • Passenger/Operators needs not strictly related to system performances • Video-analytics • Alarm management • And much more… O&M Full System Approach: in order to effectively answer to all the transportation solutions market needs, AnsaldoSTS improved its System conception from the Extended to the Full System Approach, taking into account all the possible transportation system’s External Constraints during all the project’s phases (from design to O&M) With this new vision the transportation systems are not just the solutions to the traffic congestion but are a living part of the city answering to the passenger and operators needs of today and tomorrow 16
  • 17. Copenhagen M3/M4 City Ringen Driverless Metro Features Line length 17 km Min Headway 100 sec Stations 17 Train capacity (4p/m2) 300 pass Line capacity 11,000 pphpd Fleet 28 trains of 39m Max speed 90 km/h Third rail power supply 750 Vdc Stopping accuracy +/- 30cm Operational service 24/7 Technologies CBTC Driverless Operation 2018 17
  • 18. Honolulu Rail Transit Project Driverless Metro Features The project is an elevated metro line Line length 32 km Min Headway 90 sec Stations 21 Train capacity (3,2p/m2) 318 p Required initial line capacity 7.200 pphpd Fleet 40 2-car trains of 39 m Max speed 105 km/h Third rail power supply 750 Vdc Stopping accuracy +/- 15cm Operational service 20h/day, 7 day/week Operation 2017 (first segment) 18
  • 19. Application in the GCC Riyadh PNU Driverless Metro Features Line length 11.3 km Min Headway 90 sec Stations 14 Train capacity (2.5 p/m2) 110 pass Line capacity (2.5 p/m2) 4,400 pphpd Fleet 22 - 2 cars trains of 29m Commercial speed 24 km/h Max speed 60 km/h Third rail power supply 750 Vdc In operation since 2012 11.3 14 19
  • 20. Ansaldo STS Driverless Unattended Metros in the world Copenhage n M1/M2 Brescia Thessaloni ki Rome line C Milan line 5 Taipei (CBTC) Riyadh PNU Copenhage n Cityringen (CBTC) Honolulu Milan Line 4 (CBTC) Riyadh 21 km double track double tunnel 13.7 km double track single tunnel 9.5 km double track double tunnel 25 km (+17) double track double tunnel 12.6 km double track single tunnel 15.4 km double track viaduct 11.3 km double track viaduct 17 km double track double tunnel 32 km double track viaduct 15.2 km double track double tunnel 40.7 Km double track 22 stations 17 stations 13 stations 30 stations (+12) 19 stations 14 stations 14 stations 17 stations 21 stations 21 stations 22 stations min headway 90 s min headway 90 s min headway 90 s min headway 120 s min headway 75 s min headway 90 s min headway 90 s min headway 100 s min headway 90 s min headway 75 s min headway 90s 12,000 pphpd (4p/m2) 17,000 pphpd (6p/m2) 21,000 pphpd (6p/m2) 36,000 pphpd (6p/m2) 28,000 pphpd (6p/m2) 26,000 pphpd (6p/m2) 4,400 pphpd (2.5p/m2) 12,000 pphpd (4 p/m2) 7,200 pphpd (3.2 p/m2) 28,000 pphpd (6p/m2) 5000 pphd 34 trains 3 cars per train (39m) 21 trains 3 cars per train (39m) 18 trains 4 cars per train (50m) 30 (+13) trains 6 cars per train (108m) 21 trains, 4 cars per train (50m) 17 trains 4 cars per train (70m) 22 trains 2 cars per train (29m) 28 trains 3 cars per train (39m) 40 trains 2 cars per train (38.5m) 47 trains 4 cars per train (50m) 13 + 3 years O&M In operation since 2002 2 years of operation 7 years of maintenan ce 3 years of service assistance Local existing Operator training 27 years O&M as member of the Concess. Future system extension : 52 km, 56 stations, 64 trains 3 years O&M 5 + 3 years O&M 12 years O&M 25 years O&M as member of the Concess. 47 trains 10 years of maintenace Ansaldo STS has been developing more than 210km of Unattended Metros all over the world 20
  • 21. Visual impact of Milan Tram with overhead catenaries 21
  • 22. Visual impact of Milan Tram with TramWave 22
  • 23. Visual impact of Naples Tram with overhead catenaries 23
  • 24. Visual impact of Milan Tram with TramWave 24
  • 26. TramWave ground-level line module Steel plate Module Negative feeder Safety Negative feeder Internal contact connected to the Positive feeder Internal contact connected to Safety Negative feeder Positive Feeder 26
  • 27. Operating Principle Power Collector When the bogie pantograph is retracted in rest position: The power collector in the upper position is unable to activate the power line segments; the pulling force is not enough to lift up the belt The vehicle can run over the line in coasting without activating the segments All the segments are not energized and connected to ground 27
  • 28. Operating Principle Power Collector When the bogie pantograph is released: The power collector is in contact with the segments and its magnetic force attracts the flexible ferromagnetic belt, that push up the internal movable conductive contacts, allowing the closing of the electric circuit and so the power transmission from the segments, in contact with the collector, and the vehicle 28
  • 29. Operating Principle Groud-level module’s steel contact plate Veichle body Train boogie power collector The steel plates in contact with the power collector are the only one energized 29
  • 33. TramWave: main benefits for sustainable urban mobility • Make the urban context more liveable, removing the visual impact of overhead catenaries and poles from squares, buildings, monuments, historical areas, etc… • Continuous power transmission from contact line to vehicles without any interruption/charging times (for both traction and auxiliaries) • No need of on-board big and heavy storage energy systems (supercapacitors) • No need of electronic devices • The closing of the traction electric circuit doesn’t foreseen the use of the tracks no more problem due to the effects of stray currents, preserving the underground utilities (water and gas pipelines, electricity network underground cables, etc…) and the rails less maintenance costs. from electrolysis effects • Possibility to have a mixed power-supply system, by mean having Tramwave and traditional catenaries on the same tramway line (ex. Tramwave in the historical centres and catenaries in the suburbs), moreover it’s possible to feed with Tramwave rubber tired vehicles like busses • Regenerative Breaking and energy saving 33
  • 34. TramWave Safety Assessment certificate 34
  • 37. AnsaldoSTS is a leader in ERTMS Level 2 and has provided more than 50% of the Signalling Technology for all High Speed lines* worldwide. 37 * Reference excludes Japan
  • 38. Global ERTMS & High Speed applications France High Speed network LGV EST - lev. 2 Tournan-Marles en Brie - lev. 1-2 On-board - lev. 1/2 On-board - lev. 2 Cross border Figueres-Perpignan - lev. 1/2 Paris-Brussels-CologneAmsterdam Channel Tunnel Rail Link Sweden / Finland / Norway Haparandabanan - lev. 2 STM Nordic Germany Saarbrücken-Mannheim - lev. 2 Berlin-Rostock - lev.2 Velaro on-board - lev.2 Spain Madrid-Lleida HSL - lev. 1/2 Madrid-Atocha HSL by-pass On-board - lev. 1-2 Czech Republic Poříčany-Kolín - lev. 2 Austria - Hungary Vienna-Budapest - lev. 1 Turkey Bogazkopru-Yenice Mersin-Toprakkale - lev. 1 On-board - lev 1 South Korea On-board - lev. 1 Seoul-Busan HSL Italy Rome-Naples HSL - lev. 2 Turin-Milan HSL - lev. 2 Milan-Bologna HSL - lev. 2 SCMT projects On-board - lev. 1 On-board - lev. 2 Greece On-board - lev. 1 Romania Campina - Predeal - lev. 1 China Zhengzhuang-Xi’an - lev. 2 Shijiazhuang-Taiyuan - lev. 1 Qinhuangdao-Shenyang DPL On-board - lev. 1-2 UK Cambrian Coast - lev. 2 High Speed One Libya Ras Ajdir - Sirt - lev. 1/2 Al-Hisha - Sabha - lev. 2 India Chennai-Gummudipundi - lev.1 Delhi-Agra - lev. 1 UAE Shah Habshan Ruwais - lev. 2 38
  • 39. Apllication in the GCC • SHR – Etihad Rail Stage ERTMS Level2 Stage 3 Stage 2 Stage 1 39
  • 40. Global Ansaldo STS system architecture (1) • Project Legth: 264 km (140 km double track; 124 km single track) RBC: 1 Balises: 400 Point Machine: 65 Axle Counter: 150 • Signalling: – Interlocking • Multistation ACC Technology • 2 extended CBIs – ETCS Level 2 signalling system • 1 Radio Block Centre (RBC) • SRS 2.3.0 compliant with option to update to SRS 3.0 • Telecomms: Multi Service Network,GSM-R,PAVA, Telephony,Master Clock • Non Vital : Traffic Management System, Train Describer, SCADA, MMIS, BMIS, ACCES Control, Freight Asset Protection 40