What is a Project?
 It is a group of unique, inter-related activities that
  are planned and executed in a certain sequence to
  create a unique product and services within a
  specific time frame, scope and budget.

 The Project Management Institute (U.S.A.) has
  defined project as,
 ‘’a combination of human and non - human
  resources, pooled together in a temporary
  organization to achieve a specific purpose’’.
What is Project Management?
• Project management is a system of procedures, practices,
  technologies and know-how that enables the planning,
  organizing, staffing, directing and controlling necessary
  to successfully manage a project.

• The primary challenge of project management is to
  achieve all of the project goals and objectives while
  honoring the preconceived constraints.

• Typical constraints are scope, time and budget. The
  secondary—and more ambitious—challenge is
  to optimize the allocation and integrate the inputs
  necessary to meet pre-defined objectives.
Project Manager:
• A project manager is the person responsible for
  supervising a systems project from initiation to
  conclusion.
Project characteristics:
 Objective
 Unique activities
 Attainment of specific goal
 Specified time
 Interrelated activities
 Life-cycle
 Sequences of activities
Project Parameters:
 Scope

 Quality

 Time

 Cost

 Resources
Functions of Project
             Management:
• Scoping – setting the boundaries of the project

• Planning – identifying the tasks required to complete
  the project

• Estimating – identifying resources required to complete
  the project

• Scheduling – developing a plan to complete the project

• Organizing – making sure members understand their
  roles and responsibilities
Functions of Project
           Management:
• Directing – coordinating the project

• Controlling – monitoring progress

• Closing – assessing success and failure
Measures of project success:

 The resulting information system is acceptable
  to the customers (e.g. users, managers).

  The system was delivered ‚on time.‛
  The system was delivered ‚within budget.‛
Measures of project failure:
 Failure    to   establish upper-management
  commitment to the project
 Lack of organization’s commitment to the
  methodology
 Taking shortcuts through or around the
  methodology
 Poor Project management:
   Feature creep
   Scope creep
Project Life Cycle
What is Project Life Cycle?
• The attention that a project receives isn’t uniformly
  distributed throughout its life span but varies from
  phase to phase.

• Most projects pass through the following five phases,
  which tend to overlap at times:




   Conceptio    Definition   Planning
                                        Implementatio
                                                        Clean up
      n                                       n
Significance of Project Life
          Cycle:
It defines:

The phases of the project (time)

The work performed in each phase (work)

The input and output of each phase (result)

The milestone of each phase (end sign)
Project Life Cycle – Timeline:
Conception/Initiation Phase:
• Conception is the phase during which the project
  idea finds genesis and germinates, out of:
 the need to solve a problem,
 the observance of one’s environment,
 the drive to innovate something new.

• This phase is essential and if flawed, it may lead to
  defective and dysfunctional projects.

• A well conceived project goes a long way towards
  successful implementation and operation.
Definition Phase:
• The definition phase of the project involves
  developing the idea generated during Conception
  phase.

• It produces a document describing the project in
  sufficient detail, covering all necessary aspects
  like the manpower, materials, machinery, layout,
  utilities and feasibility.

• It clears most of the ambiguities and
  uncertainties about the formation made in the
  previous phase.
Planning Phase:
• This phase starts almost immediately after the
  conception phase and overlaps with both
  definition and implementation phases.

• This phase involves the preparation for the
  project to take – off smoothly and effects many
  decisions related to the ‘project basics’.

• It involves both Core planning and facilitating
  planning.
Core Planning:
      Scope Definition


     Activity Definition


     Activity Sequencing


 Activity Duration Estimating


   Schedule Development


     Resource Planning


       Cost Estimating


       Cost Budgeting


  Project Plan Development
Facilitating Planning:

Quality Planning

Organizational Planning

Staff Acquisition

Communications Planning
Implementation Phase:
• This phase is a period of ‘’hectic activity’’. During this
  period, the idea starts materializing physically and
  tangibly and for the first time, the project can be seen off
  the paper.

• Usually, 80-85 percent of the project work is done in this
  phase using all techniques of project management.

• The various sub – phases of this phase, which often
  overlap, are as following:

                                                Commissioni
     Engineering   Procurement   Construction
                                                   ng
Implementation Phase: (Contd)
  Project Plan Execution
  Complete Work Packages
  Information Distribution
  Scope Verification
  Quality Assurance Team Development
  Progress Meetings

  Information Distribution

  Source Selection

  Contract Administration
Controlling:
• Controls are performed to regularly measure
  project performance, to adjust project plans and
  take preventive actions in anticipation of
  possible problems.
Clean – up/Termination
              Phase:
• This is the transition phase in which the project is
  handed over to the operators and/or agencies
  responsible for maintaining it.

• This phase is a clean – up task in which all project
  accounts are closed, Outstanding payments are
  settled and dues are collected.

• All previous phases involve compartmentalized
  disposition of the project personnel and that task
  is winded - down in this phase.
Clean – up Phase: (Contd)
• Administrative Closure – generating necessary
  information to formally recognize phase or project
  completion.

• Contract Close-out – completion and delivery of
  project deliverables and resolving open issues. It
  includes:
      Purchase Audits
      Product Verification
      Formal Acceptance
      Lessons Learnt
      Update of Records
      Archives of Records
      Releasing the Project Team
Synopsis:
Presented By:




PGDBM
– Sec ‘A’
Queries:

Contenu connexe

Tendances

5 phases of project management
5 phases of project management5 phases of project management
5 phases of project managementJared C. Powell
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMarkos Mulat G
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost ManagementBhuWan Khadka
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycleSAJID ALI RUK
 
Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and ProcessMuhammad Rehman
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTAbraham Ncunge
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniquesTata Dinyuy
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Agus Suhanto
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementKris Kimmerle
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project ManagementRodolfo Siles
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager ProofHub
 
Project Management
Project ManagementProject Management
Project ManagementMark Roman
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management Yesica Adicondro
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Mena M. Eissa
 

Tendances (20)

5 phases of project management
5 phases of project management5 phases of project management
5 phases of project management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Lec 03 project life cycle
Lec 03 project life cycleLec 03 project life cycle
Lec 03 project life cycle
 
Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and Process
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENT
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project management tools and techniques
Project management tools and techniquesProject management tools and techniques
Project management tools and techniques
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
The role and responsibilities of the project manager
The role and responsibilities of the project manager The role and responsibilities of the project manager
The role and responsibilities of the project manager
 
Project Management
Project ManagementProject Management
Project Management
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1
 

En vedette

En vedette (20)

Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.
 
Project LlifeCycle
Project LlifeCycleProject LlifeCycle
Project LlifeCycle
 
Project management
Project managementProject management
Project management
 
Project cycle
Project cycleProject cycle
Project cycle
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Practical Project Management - full course
Practical Project Management - full coursePractical Project Management - full course
Practical Project Management - full course
 
project goals and objectives
 project goals and objectives project goals and objectives
project goals and objectives
 
Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Project formulation
Project formulationProject formulation
Project formulation
 
software project management Artifact set(spm)
software project management Artifact set(spm)software project management Artifact set(spm)
software project management Artifact set(spm)
 
Artifacts
ArtifactsArtifacts
Artifacts
 
Artefacts
ArtefactsArtefacts
Artefacts
 
Frequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersionFrequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersion
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Goals&Objectives
Goals&ObjectivesGoals&Objectives
Goals&Objectives
 
Project cycle
Project cycleProject cycle
Project cycle
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 

Similaire à Project Management Lifecycle

Project management master class karin rheeder
Project management master class   karin rheederProject management master class   karin rheeder
Project management master class karin rheederKarin Rheeder
 
Project life cycle
Project life cycleProject life cycle
Project life cycleAbhishek Raj
 
Project Management Process
Project Management ProcessProject Management Process
Project Management ProcessSaqib Raza
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
Module 1.pptx
Module 1.pptxModule 1.pptx
Module 1.pptxVinish P
 
Project management
Project managementProject management
Project managementMohitJaggi1
 
Project Management
Project ManagementProject Management
Project ManagementPrarthan P
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdfGourhariBiswas1
 
All about project management
All about project managementAll about project management
All about project managementTudor Bejan
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdfdinushikagunawardhan1
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptxJanak82
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training programParamjit Arora
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAndrei Crăciun
 

Similaire à Project Management Lifecycle (20)

PME- CH 1.pptx
PME- CH 1.pptxPME- CH 1.pptx
PME- CH 1.pptx
 
Project management master class karin rheeder
Project management master class   karin rheederProject management master class   karin rheeder
Project management master class karin rheeder
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
MODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptxMODULE III - M.ARCH.pptx
MODULE III - M.ARCH.pptx
 
Module 1.pptx
Module 1.pptxModule 1.pptx
Module 1.pptx
 
SPM Unit 1.pptx
SPM Unit 1.pptxSPM Unit 1.pptx
SPM Unit 1.pptx
 
Project management
Project managementProject management
Project management
 
Project Management
Project ManagementProject Management
Project Management
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdf
 
All about project management
All about project managementAll about project management
All about project management
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdf
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
PME UNIT-3.pptx
PME UNIT-3.pptxPME UNIT-3.pptx
PME UNIT-3.pptx
 
Project Management
Project ManagementProject Management
Project Management
 
Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training program
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 

Plus de Institute of Rural Management (11)

Opec Organization of Petroleum Exporting Countries
Opec Organization of Petroleum Exporting CountriesOpec Organization of Petroleum Exporting Countries
Opec Organization of Petroleum Exporting Countries
 
Talent management
Talent managementTalent management
Talent management
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
Economic System
Economic SystemEconomic System
Economic System
 
Business cycle
Business cycleBusiness cycle
Business cycle
 
3 c's 4 p's of Management
3 c's 4 p's of Management3 c's 4 p's of Management
3 c's 4 p's of Management
 
MBO and MBE
MBO and MBEMBO and MBE
MBO and MBE
 
Personality and emotions ppt marks.
Personality and emotions ppt marks.Personality and emotions ppt marks.
Personality and emotions ppt marks.
 
Research process and sampling
Research process and samplingResearch process and sampling
Research process and sampling
 
Supply
SupplySupply
Supply
 
Planning
PlanningPlanning
Planning
 

Dernier

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 

Dernier (20)

VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 

Project Management Lifecycle

  • 2. What is a Project?  It is a group of unique, inter-related activities that are planned and executed in a certain sequence to create a unique product and services within a specific time frame, scope and budget.  The Project Management Institute (U.S.A.) has defined project as, ‘’a combination of human and non - human resources, pooled together in a temporary organization to achieve a specific purpose’’.
  • 3. What is Project Management? • Project management is a system of procedures, practices, technologies and know-how that enables the planning, organizing, staffing, directing and controlling necessary to successfully manage a project. • The primary challenge of project management is to achieve all of the project goals and objectives while honoring the preconceived constraints. • Typical constraints are scope, time and budget. The secondary—and more ambitious—challenge is to optimize the allocation and integrate the inputs necessary to meet pre-defined objectives.
  • 4. Project Manager: • A project manager is the person responsible for supervising a systems project from initiation to conclusion.
  • 5. Project characteristics:  Objective  Unique activities  Attainment of specific goal  Specified time  Interrelated activities  Life-cycle  Sequences of activities
  • 6. Project Parameters:  Scope  Quality  Time  Cost  Resources
  • 7. Functions of Project Management: • Scoping – setting the boundaries of the project • Planning – identifying the tasks required to complete the project • Estimating – identifying resources required to complete the project • Scheduling – developing a plan to complete the project • Organizing – making sure members understand their roles and responsibilities
  • 8. Functions of Project Management: • Directing – coordinating the project • Controlling – monitoring progress • Closing – assessing success and failure
  • 9. Measures of project success: The resulting information system is acceptable to the customers (e.g. users, managers).  The system was delivered ‚on time.‛  The system was delivered ‚within budget.‛
  • 10. Measures of project failure:  Failure to establish upper-management commitment to the project  Lack of organization’s commitment to the methodology  Taking shortcuts through or around the methodology  Poor Project management: Feature creep Scope creep
  • 12. What is Project Life Cycle? • The attention that a project receives isn’t uniformly distributed throughout its life span but varies from phase to phase. • Most projects pass through the following five phases, which tend to overlap at times: Conceptio Definition Planning Implementatio Clean up n n
  • 13. Significance of Project Life Cycle: It defines: The phases of the project (time) The work performed in each phase (work) The input and output of each phase (result) The milestone of each phase (end sign)
  • 14. Project Life Cycle – Timeline:
  • 15. Conception/Initiation Phase: • Conception is the phase during which the project idea finds genesis and germinates, out of:  the need to solve a problem,  the observance of one’s environment,  the drive to innovate something new. • This phase is essential and if flawed, it may lead to defective and dysfunctional projects. • A well conceived project goes a long way towards successful implementation and operation.
  • 16. Definition Phase: • The definition phase of the project involves developing the idea generated during Conception phase. • It produces a document describing the project in sufficient detail, covering all necessary aspects like the manpower, materials, machinery, layout, utilities and feasibility. • It clears most of the ambiguities and uncertainties about the formation made in the previous phase.
  • 17. Planning Phase: • This phase starts almost immediately after the conception phase and overlaps with both definition and implementation phases. • This phase involves the preparation for the project to take – off smoothly and effects many decisions related to the ‘project basics’. • It involves both Core planning and facilitating planning.
  • 18. Core Planning: Scope Definition Activity Definition Activity Sequencing Activity Duration Estimating Schedule Development Resource Planning Cost Estimating Cost Budgeting Project Plan Development
  • 19. Facilitating Planning: Quality Planning Organizational Planning Staff Acquisition Communications Planning
  • 20. Implementation Phase: • This phase is a period of ‘’hectic activity’’. During this period, the idea starts materializing physically and tangibly and for the first time, the project can be seen off the paper. • Usually, 80-85 percent of the project work is done in this phase using all techniques of project management. • The various sub – phases of this phase, which often overlap, are as following: Commissioni Engineering Procurement Construction ng
  • 21. Implementation Phase: (Contd)  Project Plan Execution  Complete Work Packages  Information Distribution  Scope Verification  Quality Assurance Team Development  Progress Meetings  Information Distribution  Source Selection  Contract Administration
  • 22. Controlling: • Controls are performed to regularly measure project performance, to adjust project plans and take preventive actions in anticipation of possible problems.
  • 23. Clean – up/Termination Phase: • This is the transition phase in which the project is handed over to the operators and/or agencies responsible for maintaining it. • This phase is a clean – up task in which all project accounts are closed, Outstanding payments are settled and dues are collected. • All previous phases involve compartmentalized disposition of the project personnel and that task is winded - down in this phase.
  • 24. Clean – up Phase: (Contd) • Administrative Closure – generating necessary information to formally recognize phase or project completion. • Contract Close-out – completion and delivery of project deliverables and resolving open issues. It includes: Purchase Audits Product Verification Formal Acceptance Lessons Learnt Update of Records Archives of Records Releasing the Project Team