SlideShare une entreprise Scribd logo
1  sur  47
Télécharger pour lire hors ligne
Creating a High PerformanceCreating a High Performance
And Environmentally Sustainable Building
Michael Kuk
Director of Technical Services
Sieben Energy Associates
333 North Michigan Avenue
Chicago, IL 60601
(312) 899-1000 x 20
mkuk@siebenenergy.com
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
AgendaAgenda
• The building optimization processThe building optimization process
• Mike’s top 10’s and tips
• Resources Available
• Packaging it all together into anPackaging it all together into an
environmentally sustainable and high
performance buildingperformance building
© Sieben Energy Assoc., LLC 1
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Sieben Energy Associates ServicesSieben Energy Associates Services
• Energy Efficiency for New and Existing Buildingsgy y g g
• HVAC System Commissioning for New and
Existing BuildingsExisting Buildings
• Sustainability Consulting (LEED)
• Energy Commodity Management Services Energy
• Information Managementg
• Strategic Services
© Sieben Energy Assoc., LLC 2
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Existing Building OverviewExisting Building Overview
Click here
gaia.lbl.gov/btech/CSI_BPMAlliance/Commercial-BldgMarket.pdf
5 Milli C i l/I i i l B ildi i U S• 5 Million Commercial/Institutional Buildings in U.S.
• 70 Billion Square Feet
• Summary:• Summary:
– Lots of buildings
– Lots of SF
– Lots of Opportunity for Energy Efficiency and Environmental
Sustainability
© Sieben Energy Assoc., LLC 3
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
The Building Optimization Process
( C )(aka Retro-Commissioning)
1 Planning and Documentation1. Planning and Documentation
2. Investigation Phase (Opportunity
A )Assessment)
3. Implementation Phasep
4. Measurement and Verification Phase
© Sieben Energy Assoc., LLC 4
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
The Building Optimization Process
Planning and Documentation
© Sieben Energy Assoc., LLC 5
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
The Building Optimization Process
Planning and Documentation (Per LEED)
1. Document the current sequence of operations for the
building.
2. Develop a building operating plan that provides details on
how the building is to be operated and maintainedhow the building is to be operated and maintained.
3. Develop a systems narrative that briefly describes the
mechanical and electrical systems and equipment in the
building.
4. Create a narrative of the preventive maintenance plan for
equipment described in the systems narrative and document theequipment described in the systems narrative and document the
preventive maintenance schedule during the performance
period.
© Sieben Energy Assoc., LLC 6
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Planning and Documentation
Document the Current Sequence of Operation
– Very valuable resource
– “Challenging” to Obtain
• Might be found in controls system submittal or in original project
specifications documents (controls specification or in individual equipmentspecifications documents (controls specification, or in individual equipment
specification)
• Likely not optimized for energy efficiency
• Likely never to be found (in writing)• Likely never to be found (in writing)
• “As designed” SOO probably didn’t become “as-built” SOO
• Likely had been modified by operators or subsequent controls
t h i itechnicians
• Might have to dig deeply into programming logic of BMS
© Sieben Energy Assoc., LLC 7
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Planning and Documentation
Develop the Building Operating Plan
– Provides details on how the building is to be operated and
maintained.
– The operating plan must include, at a minimum:
• an occupancy schedule• an occupancy schedule
• equipment run-time schedule
• design set points for all HVAC equipment
• design lighting levels throughout the building.
• Identify any changes in schedules or set points for different seasons,
days of the week and times of day.
• Validate that the operating plan has been met during the performance
period.
© Sieben Energy Assoc., LLC 8
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Planning and Documentation
Develop the Building Operating Plan
© Sieben Energy Assoc., LLC 9
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Planning and Documentation
Develop a Systems Narrative
– Briefly describes the mechanical and electrical systems and
equipment in the building.
– Often referred to as the basis of design (BOD)
I l d ll th t d t t th ti diti– Include all the systems used to meet the operating conditions
stated in the operating plan, including at a minimum, heating,
cooling, ventilation, lighting and any building controls
systems.
– Requirement of LEED New Construction projects
Lik l d l d d i h d i / i– Likely was never developed during the design / construction
phase.
– May have been developed by the owner…but not likely
© Sieben Energy Assoc., LLC 10
May have been developed by the owner…but not likely
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Planning and Documentation
Develop a P&M Narrative
• Create a narrative of the preventive maintenance plan for equipment
d ib d i h i d d h i idescribed in the systems narrative and document the preventive maintenance
schedule during the performance period.
• Good resource is ASHRAE Standard 180-2008 -- Standard Practice for
I ti d M i t f C i l B ildi HVAC S tInspection and Maintenance of Commercial Building HVAC Systems
© Sieben Energy Assoc., LLC 11
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
The Building Optimization Process
S G O SINVESTIGATION PHASE
– Perform Rx process: Investigation Phasep g
1. Perform an ASHRAE Level 1, 2 Energy Audit (note: LEED
EB just requires an ASHRAE level 1)
1 Benchmarking and Utility Analysis1. Benchmarking and Utility Analysis
2. Identify where opportunities exist
3. Perform savings analysis and calculations
2 P f IEQ l i ?2. Perform an IEQ analysis?
3. Present initial opportunities and recommendations
4. Get “buy in” and commitment from owner
5. Further evaluate recommendations through testing and analysis
6. Fine tune savings and recommendations
7 Re-present and get “buy in” and commitment from owner
© Sieben Energy Assoc., LLC 12
7. Re present and get buy in and commitment from owner
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL AUDITASHRAE LEVEL AUDIT
– Good Resources:
P d f C i l B ildi A dit• Procedures for Commercial Building Audits
• Energy Efficiency Guide for Existing Commercial
Buildings: The Business Case for Building Owners andBuildings: The Business Case for Building Owners and
Managers
© Sieben Energy Assoc., LLC 13
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL AUDITASHRAE LEVEL AUDIT
In a “Nut Shell”
1. How much energy are they using?
2 Where are they using it?2. Where are they using it?
---------------------------------------------------
3. Are they using it effectively?
4 How can they use it more effectively?4. How can they use it more effectively?
© Sieben Energy Assoc., LLC 14
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL 1 AUDITASHRAE LEVEL 1 AUDIT
• Perform a brief walk-through survey of the facility to become familiar with
its construction, equipment, operation, and maintenance.
• Meet with owner/operator and occupants to learn of special problems or
needs of the facility. Determine if any maintenance problems and/or practices
may affect efficiency.
• Perform a space function analysis. Determine if efficiency may be affected
by functions that differ from the original functional intent of the building.
• Perform a rough estimate to determine the approximate breakdown of energyg pp gy
use for significant end-use categories, including weather and non-weather
related uses.
• Identify low-cost/no-cost changes to the facility or to operating andy g y p g
maintenance procedures, and determine the savings that will result from these
changes.
• Identify potential capital improvements for further study, and provide an
© Sieben Energy Assoc., LLC 15
y p p p y, p
initial estimate of potential costs and savings.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL 1 AUDIT (d li bl )ASHRAE LEVEL 1 AUDIT (deliverable)
Deliverables: The report for a Level I analysis should contain the building characteristics and
energy use summary as well as the following.
1. Quantification of savings potential from changing to a
different utility price structure.
2 Discussion of irregularities found in the monthly energy use2. Discussion of irregularities found in the monthly energy use
patterns, with suggestions about their possible causes.
3. The energy index of similar buildings. Report the source, size,
and date of the sample used in this comparison. The names of
comparable buildings should be given if known.
4 The method used to develop the target indices4. The method used to develop the target indices.
5. Total energy and demand cost by fuel type for the latest year
and preceding two years if available. Show potential savings in
© Sieben Energy Assoc., LLC 16
p g y p g
dollars using the energy index format of ASHRAE Standard 105.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL 1 AUDIT (d li bl )ASHRAE LEVEL 1 AUDIT (deliverable)
Deliverables continued:
5. The fraction of current costs that would be saved if the5. The fraction of current costs that would be saved if the
energy index were brought to the target level.
6. A summary of any special problems or needs identified during
the walkthrough survey, including possible revisions to operating
and maintenance procedures.
7 A preliminary energy use breakdown by major end uses7. A preliminary energy use breakdown by major end uses.
8. The listing of low-cost/no-cost changes with the savings for
these improvements.
9. The potential capital improvements, with an initial estimate of
potential costs and savings
© Sieben Energy Assoc., LLC 17
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL 2 AUDITASHRAE LEVEL 2 AUDIT
This analytical procedure is guided by Level I analysis and includes the following additional work:
1. Review mechanical and electrical system design, installed condition, maintenance practices,
d ti th dand operating methods.
2. Review existing operating and maintenance problems. Determine planned building changes.
3. Measure key operating parameters and compare to design levels, for example, operating
schedules, heating/cooling water temperature, supply air temperature, space temperature andg g p pp y p p p
humidity, ventilation quantities, and light level at the task. Such measurements may be taken on a
spot basis, or logged, manually or electronically.
4. Prepare a breakdown of the total annual energy use into end-use components, as illustrated
in the 1999 ASHRAE Handbook—Applications, Chapter 34, Figure 4, or as shown in the sectionin the 1999 ASHRAE Handbook Applications, Chapter 34, Figure 4, or as shown in the section
“Energy Analysis Summary and Recommendations.” A number of calculation methods are
available, ranging from simplified manual calculations to fully detailed computer simulation of
hour-by-hour building operations for a full year.
5 List all possible modifications to equipment and operations that would save energy Select5. List all possible modifications to equipment and operations that would save energy. Select
those that might be considered practical by the owner. List preliminary cost and savings
estimates.
6. Review the list of practical modifications with the owner/operator and select those that will
b l d f th P i iti th difi ti i th ti i t d d f i l t ti
© Sieben Energy Assoc., LLC 18
be analyzed further. Prioritize the modifications in the anticipated order of implementation.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL 2 AUDIT ( t )ASHRAE LEVEL 2 AUDIT (cont.)
7. For each practical measure, estimate the potential savings in energy cost and its energy index.
To account for interaction between modifications assume that modifications with the highestTo account for interaction between modifications, assume that modifications with the highest
operational priority and/or best return on investment will be implemented first. A number of
calculation methods are available, ranging from simplified manual calculations to rerunning
computer simulations, if performed in Step 4, above.
8 E ti t th t f h ti l8. Estimate the cost of each practical measure.
9. Estimate the impact of each practical measure on building operations, maintenance costs,
and non-energy operating costs.
10. Estimate the combined energy savings from implementing all of the practical measures and
compare to the potential derived in the Level I analysis. It should be clearly stated that savings
from each modification are based on the assumption that all previous modifications have already
been implemented and that the total savings account for all of the interactions between
modifications.
11. Prepare a financial evaluation of the estimated total potential investment using the owner’s
chosen techniques and criteria. These evaluations may be performed for each practical measure.
12. Following submission of the report of the Level II analysis, meet with the owner to discuss
priorities and to help select measures for implementation or further analysis
© Sieben Energy Assoc., LLC 19
priorities and to help select measures for implementation or further analysis.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL 2 AUDIT D li blASHRAE LEVEL 2 AUDIT Deliverable
Deliverables: The report for a Level II analysis should contain at
least the following.
1. A summary of energy use and cost associated with each end-use. Show calculations performed or quote the
name and version of software used and include both input and output pages. Provide interpretation of
differences between actual total energy use and calculated or simulated end-use totals.differences between actual total energy use and calculated or simulated end use totals.
2. A description of the building, including typical floor plans and inventories of major energy-using
equipment. (This information may be included as an appendix.)
3. A list of measures considered but felt to be impractical, with brief reasons for rejecting each.
4. For each practical measure, provide4. For each practical measure, provide
a) a discussion of the existing situation and why it is using excess energy;
b) an outline of the measure, including its impact on occupant health, comfort, and safety;
c) a description of any repairs that are required for a measure to be effective;
d) the impact on occupant service capabilities, such as ventilation for late occupancy or year-round cooling;
e) an outline of the impact on operating procedures, maintenance procedures, and costs;
f) expected life of new equipment, and the impact on the life of existing equipment;
g) an outline of any new skills required in operating staff and training or hiring recommendations;
h) calculations performed or provide the name and version of software used and include both input and output data.
© Sieben Energy Assoc., LLC 20
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL 2 AUDIT D li bl ( t )ASHRAE LEVEL 2 AUDIT Deliverable (cont.)
Deliverables: The report for a Level II analysis should contain at
least the following.
5. A table listing the estimated costs for all practical measures, the savings,
and financial performance indicator. For the cost of each measure, show thep ,
estimated accuracy of the value quoted. This table should spell out the
assumed sequence of implementation and state that savings may be quite
different if a different implementation sequence is followed.
6. A discussion of any differences between the savings projected in this
analysis and the estimated potential derived in the Level I analysis.
7. Overall project economic evaluation.p j
8. Recommended measurement and verification method(s) that will be
required to determine the actual effectiveness of the recommended measures.
9. Discussion of feasible capital-intensive measures that may require a
© Sieben Energy Assoc., LLC 21
9. Discussion of feasible capital intensive measures that may require a
Level III analysis.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
ASHRAE LEVEL 3 AUDITASHRAE LEVEL 3 AUDIT
1.More detailed economic analysis1.More detailed economic analysis
2.“investment grade” analysis
3 Lik l i l d t d li3. Likely include computer modeling
© Sieben Energy Assoc., LLC 22
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Building Data AnalysisBuilding Data Analysis
Slide courtesy of BOC program
– End-use ProfilesEnd-Use Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Totals
Heat 20005 12911 11410 5383 1907 198 188 131 208 3524 18095 27273 101,233
Lights 4195 3490 3170 2559 2766 2558 2369 2985 3030 3421 3708 4430 38,681
Receptacles
+ Computers 3808 3291 3170 2764 3040 2742 2589 2744 2533 2941 2970 2871 35,463
2000 Annual Consumption
Fans 4779 4441 4462 3845 4895 5393 4894 5184 4415 4607 5573 5998 58,486
DHW 575 484 459 460 499 462 340 379 402 372 400 404 5,236
Compressor 0 0 0 240 480 1680 1680 3000 1720 80 0 0 8,880
Kitchen +
Exercise 8229 6916 6692 5042 5207 4104 4004 4203 3937 4635 7880 10129 70,978
Totals 41591 31533 29363 20293 18794 17137 16064 18626 16245 19580 38626 51105 318,957
2000 Energy End-Use Breakdown
32%
22%
Heat
12%
18%
2%
3%
Heat
Lights
Receptacles + Computers
Fans
DHW
Compressor
© Sieben Energy Assoc., LLC
%
11% Kitchen + Exercise
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
BenchmarkingBenchmarking
slide courtesy of BOC program
• Baseline Profile
90 000
3 year Monthly Energy Usage vs Average
50,000
60,000
70,000
80,000
90,000
age(KWH)
10,000
20,000
30,000
40,000
EnergyUsa
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
2000 61,287 48,672 45,146 36,834 26,569 27,507 27,040 26,343 29,271 39,324 40,586 80,039
2001 65 061 55 168 52 281 40 158 35 580 29 225 28 546 30 556 26 189 36 642 50 047 74 104
-
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
2000 2001 2002 Baseline
© Sieben Energy Assoc., LLC
2001 65,061 55,168 52,281 40,158 35,580 29,225 28,546 30,556 26,189 36,642 50,047 74,104
2002 64,373 62,378 60,180 42,761 33,156 29,631 26,426 32,245 25,921 35,593 48,609 63,817
Baseline 63,574 55,406 52,536 39,918 31,768 28,788 27,337 29,715 27,127 37,186 46,414 72,653
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
• Benchmarking Tools (courtesy BOC)
– CBECS -- Commercial Buildings Energy Consumptiong gy p
Survey, from the US DOE Energy Information
Administration
– ARCH -- Building benchmarking tool based on CBECS– ARCH -- Building benchmarking tool based on CBECS
data
– Cal-Arch -- California version of above utilizing CEUS
datadata
– Oak Ridge Benchmarking Tools -- by Oak Ridge
National Laboratory. Includes customizable
spreadsheets special tools for Iowa Colorado &spreadsheets, special tools for Iowa, Colorado, &
Florida schools.
– ASHRAE (working on it)
© Sieben Energy Assoc., LLC
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Benchmarking (slide courtesy of BOC)
Portfolio ManagerPortfolio Manager
© Sieben Energy Assoc., LLC
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
BENCHMARKING AND UTILITY ANALYSISBENCHMARKING AND UTILITY ANALYSIS
– Link for sample SEA report click herep p
© Sieben Energy Assoc., LLC 27
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
PERFORM AN IEQ ANALYSIS?PERFORM AN IEQ ANALYSIS?
• IEQ = Indoor Environmental Quality
• Determine if Building Meets
– Standard 55-2004 -- Thermal Environmental Conditions for Human
Occupancyp y
– Standard 62.1-2007 -- Ventilation for Acceptable Indoor Air Quality (and
associated users manuals)
– IESNA Lighting Levels
• These standards all have direct (and indirect) impact on LEED
IEQ points
– PR1: Minimum IAQ PerformancePR1: Minimum IAQ Performance
– Credits 1.1 through 1.5
– Credits 2.1 through 2.4
• These IEQ standards also a requirement to be Energy Star
© Sieben Energy Assoc., LLC 28
• These IEQ standards also a requirement to be Energy Star
Building Rated
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
TESTING AND ANALYSISTESTING AND ANALYSIS
Key Test Equipment Toolsy q p
1. Proper safety gear
2. Temperature gun (and attachments)
3. Strobe Tach
4. Camera / Tape recorder
Sli h5. Sling Psychrometer
6. Temperature and humidity sensors and probes
7 Power meter (current voltage power quality power)7. Power meter (current, voltage, power quality, power)
8. Data Loggers
1. Temperature, Humidity
© Sieben Energy Assoc., LLC 29
2. Light levels
3. Current
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
TESTING AND ANALYSISTESTING AND ANALYSIS
Analysis Toolsy
1. Self developed Spreadsheets
2. Computer modeling tools. Co pute ode g too s
3. Vendor analysis tools
4 DOE Software tools4. DOE Software tools
Functional and Start Up Testing Forms
1 PECI1. PECI
2. Building Commissioning Association
3 FEMP / GSA / USACE
© Sieben Energy Assoc., LLC 30
3. FEMP / GSA / USACE
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
INVESTIGATION PHASE
O C i tiOwner Communication
1. Present initial opportunities and recommendationspp
2. Get “buy in” and commitment from owner
3. Further evaluate recommendations through testing3. u t e eva uate eco e dat o s t oug test g
and analysis
4. Fine tune savings and recommendationsg
5. Present again, and get “buy in” and commitment
from owner
Remember…always incorporate the OPR into your investigation
© Sieben Energy Assoc., LLC 31
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
The Building Optimization Process
O SIMPLEMENTATION PHASE
– Develop GOOD specifications
• SOO’s (as appropriate)
• Commissioning requirements (require functional tests, not just start-up
testing)
• O&M manual documentation
• Training
• System (equipment)
• Sensors and controls (as appropriate)
• Match with LEED requirements (filter, refrigerant, efficiency)
– Ensure bids actually meet specification requirementsy p q
– Monitor/trend system performance prior to replacement (to assist in
measurement and verification)
– Make sure that when evaluating systems that the maintenance staff reviews to
© Sieben Energy Assoc., LLC 32
g y
ensure ease of maintenance
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
The Building Optimization Process
Testing and Measurement and VerificationTesting and Measurement and Verification
(M&V) Phase
Note: This is just an overview. M&V is a service offering all in
itself that can be either be very complex or simple, depending
upon the needs of the owner. I’m going to focus on the
simple.simple.
– Simple M&V
• Functionally test systems (where appropriate)y y ( pp p )
– Verify sequence of operations working properly
– Damper / actuator modulation working properly
T k b d f t t t d– Take beyond manufacturers start-up procedures
• Data logging and trending
– Using BMS or data loggers
© Sieben Energy Assoc., LLC 33
g gg
– Temperature, humidity, power
• Utility Bill analysis and trending
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
The Building Optimization Process
( C )(aka Retro-Commissioning)
1 Planning and Documentation1. Planning and Documentation
2. Investigation Phase (Opportunity
A )Assessment)
3. Implementation Phasep
4. Measurement and Verification Phase
© Sieben Energy Assoc., LLC 34
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Mike’s Top 10 Control IssuesMike s Top 10 Control Issues
1. Operator not effectively trained on BMS
2. Systems have been locked out by operator
3. Scheduling is not optimized (sometime running 24/7)
4. Economizer control not optimal (too high of limit)
5 St ti tti ( i bl d) d AHU’ t5. Static pressure setting on (variable speed) pumps and AHU’s too
high. No auto reset on (variable speed) pumps and AHU’s
6. VSD’s locked out on (too high) of a minimum speed due to
perceived requirement, or due to heating/cooling coil minimum
requirements
7. Reheat being used during summerg g
8. DAT not reset to limit use of reheat
9. Exhaust fans running continuously
© Sieben Energy Assoc., LLC 35
10. Fans being run continuously instead of cycling (not recommended
for all applications)
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Mike’s Top 10 Control SolutionsMike s Top 10 Control Solutions
1. Train the operator on effective use of the BMS
2. Figure out why controls have been locked out, and find solution
3. Optimize the building and equipment schedule. (Equipment schedule does not
have to match building occupancy schedule.)
4 F ll ASHRAE 90 1 i t f i t l4. Follow ASHRAE 90.1 requirements for economizer control
5. Determine why static pressure setting on (variable speed) pumps and AHU’s too
high. Experiment with resetting. Utilize a new dynamic pressure reset sequence
on (variable speed) pumps and AHU’son (variable speed) pumps and AHU s
6. Determine if VSD minimum lockout is actually required, or just “thought to be”
required. Remove lockout in most HW/CHW coil applications unless freeze stat
is tripping in heating mode. Do not lock out all year.
7. Disable reheat during the summer. Fix specific areas being over cooled.
8. Utilize dynamic DAT reset SOO to limit use of reheat
9. Schedule exhaust fans, or interlock with associated AHU
© Sieben Energy Assoc., LLC 36
10. Change programming on BMS, or DIP switches on RTU’s / T-stats to allow
automatic operation of fans instead of continuous operation.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Mike’s Top 10 (low cost) OpportunitiesMike s Top 10 (low cost) Opportunities
1. Systems have never been commissioned
2. Economizer controls inoperative
3. Dampers and actuators inoperative or in poor condition
4. Sensors not recalibrated on regular basis (especially enthalpy
and CO2 sensors)
5 Coils not properly cleaned5. Coils not properly cleaned
6. High efficiency motors not utilized or oversized
7. Equipment in generally poor overall conditionq p g y p
8. Inlet vane dampers utilized instead of variable frequency
drives
© Sieben Energy Assoc., LLC 37
9. Pumps oversized, and throttled back instead of being trimmed
10. High efficiency lighting, or lighting controls not utilized.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Mike’s Top 10 (low cost) System and
O& SO&M Solutions
1. Perform functional performance tests on uncommissioned systems
2. Replace economizer controls. Test and calibrate annually
3. Test dampers and actuators bi-annually. Repair or replace.
4 Recalibrate CO2 and enthalpy sensors annually or greater for more4. Recalibrate CO2 and enthalpy sensors annually or greater for more
frequently on large, energy intensive AHU’s.
5. Keep coils clean
6. Do economic analysis and remove/replace with high efficiency
motors where economically. Upon burnout upgrade for others.
Do a motor load test and right-size the motor.g
7. Initiate recommended O&M procedures. Savings of 5%-10%
8. Replace inlet vanes with variable frequency drives
9 i i h i i
© Sieben Energy Assoc., LLC 38
9. Trim pumps, right-size motors as appropriate.
10. Upgrade lighting systems and controls.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Mike’s Top 10 (multi-year payback)
O t itiOpportunities
1. High efficiency motors not utilized (often a very quick payback)
2 RTU’ di l t2. RTU’s needing replacement
3. Chillers and cooling towers needing replacement
4. Boilers needing replacement4. Boilers needing replacement
5. Pneumatic control systems system being utilized
6. Need for building automation system
7. Constant volume pumping still being utilized (could often be a
very quick payback)
8 Need to convert to variable air volume system or upgrade8. Need to convert to variable air volume system or upgrade
existing VAV system
9. Building envelop upgrades required
© Sieben Energy Assoc., LLC 39
10. Lighting system and controls upgrade required.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
TIPSTIPS
• Fully understand the owners requirements, sequence of operations,
system schedules, and equipment interaction. More often than not,
they don’t know (exactly) what they need, and you need to guide them.
Most think they have no (or not economical) options.
• Determine level of detail required and desired (some are just happy
with summary table, some want detail)
• Understand the skill sets and capabilities of the operating staff• Understand the skill sets and capabilities of the operating staff.
• Proper training, and systems manuals are vital
• There is a lot of low hanging fruit.
• If you don’t solve operational issues, they will not achieve the savings
possible even with new equipment.
• Normal equipment start up procedures do not guarantee proper and
© Sieben Energy Assoc., LLC 40
Normal equipment start up procedures do not guarantee proper and
efficient equipment operation. Must do functional performance test as
well.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Auditing/Commissioning Tool Box
S SKey ASHRAE Standards
• Standard 100-2006 -- Energy Conservation in Existing Buildings
• Standard 105-2007 -- Standard Methods of Measuring, Expressing, andStandard 105 2007 Standard Methods of Measuring, Expressing, and
Comparing Building Energy Performance
• Standard 111-2008 -- Measurement, Testing, Adjusting, and Balancing of
Building HVAC Systems
• Standard 170-2008 -- Ventilation of Health Care Facilities
• Standard 180-2008 -- Standard Practice for Inspection and Maintenance of
Commercial Building HVAC Systems
• Standard 189.1-2009, Standard for the Design of High-Performance Green
Buildings
• Standard 41.1-1986 (RA 2006) -- Standard Method for Temperature
MeasurementMeasurement
• Standard 55-2004 -- Thermal Environmental Conditions for Human Occupancy
• Standard 62.1-2007 -- Ventilation for Acceptable Indoor Air Quality (and
associated users manuals)
© Sieben Energy Assoc., LLC 41
associated users manuals)
• Standard 90.1-2007 Energy Standard for Buildings Except Low-Rise Residential
Buildings (And associated User Manuals, and previous editions of the standard)
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Auditing/Commissioning Tool Box
S GKey ASHRAE Guidelines
• Guideline 0-2005 -- The Commissioning Process
• Guideline 1.1-2007 -- HVAC&R Technical Requirements for The
Commissioning Process
• Guideline 11-2009 -- Field Testing of HVAC Controls ComponentsGuideline 11 2009 Field Testing of HVAC Controls Components
• Guideline 13-2007 -- Specifying Direct Digital Control Systems
• Guideline 14-2002 -- Measurement of Energy and Demand Savings
• Guideline 16-2003 -- Selecting Outdoor, Return, and Relief
Dampers for Air-Side Economizer Systems
• Guideline 22-2008 -- Instrumentation for Monitoring CentralGuideline 22 2008 Instrumentation for Monitoring Central
Chilled-Water Plant Efficiency
• Guideline 4-2008 -- Preparation of Operating and Maintenance
Documentation for Building Systems
© Sieben Energy Assoc., LLC 42
Documentation for Building Systems
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Auditing/Commissioning Tool Box
O SOther ASHRAE Resources
• ASHRAE Energy Design Guides (free download)
1. Small Hospitals and Healthcare
2. Highway Lodging
3. Small Warehouse and Self Storage Buildings
4. K-12 School Buildings
5 S ll R t il B ildi5. Small Retail Buildings
6. Small Office Buildings
• Procedures for Commercial Building AuditsProcedures for Commercial Building Audits
• ASHRAE Green Guide
• Energy Efficiency Guide for Existing Commercial Buildings:
© Sieben Energy Assoc., LLC 43
gy y g g
The Business Case for Building Owners and Managers
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Combined Reference Guides (slide courtesy of USGBC)LEEDV3
© Sieben Energy Assoc., LLC
© Sieben Energy
Associates, LLCRESULTS, EXPERIENCE AND RELATIONSHIPS SINCE 1990.
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
Packaging It All TogetherPackaging It All Together
• Review LEED Checklist prior to analysisReview LEED Checklist prior to analysis
and incorporate into your evaluation and
opportunities to pursueopportunities to pursue.
• Link to spreadsheet
© Sieben Energy Assoc., LLC 45
Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings
I will be happy to answer
your questions.
© Sieben Energy Assoc., LLC

Contenu connexe

Tendances

Standard 90.1-2010 Update
Standard 90.1-2010 UpdateStandard 90.1-2010 Update
Standard 90.1-2010 UpdateIllinois ASHRAE
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioenergytrustor
 
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...IES VE
 
E3_Conference Energy Star Presentation
E3_Conference Energy Star PresentationE3_Conference Energy Star Presentation
E3_Conference Energy Star PresentationPaki Taylor
 
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...Shanti Pless
 
04.15.15 energy design assistance program tracker 2
04.15.15 energy design assistance program tracker 204.15.15 energy design assistance program tracker 2
04.15.15 energy design assistance program tracker 2melanie_bissonnette
 
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...Shanti Pless
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony Vitola
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Shanti Pless
 
IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)IES VE
 
Code Dread: Keeping up with ASHRAE and LEED
Code Dread: Keeping up with ASHRAE and LEEDCode Dread: Keeping up with ASHRAE and LEED
Code Dread: Keeping up with ASHRAE and LEEDScott Bowman
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate OftenScott Bowman
 
Preparing for LEED 2009
Preparing for LEED 2009Preparing for LEED 2009
Preparing for LEED 2009Brian Davie
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES VE
 
Monitoring Based Commissioning - A Must in The World of High Energy Efficiency
Monitoring Based Commissioning - A Must in The World of High Energy EfficiencyMonitoring Based Commissioning - A Must in The World of High Energy Efficiency
Monitoring Based Commissioning - A Must in The World of High Energy EfficiencyPaul Malfara
 

Tendances (20)

Besf building renewal_021815
Besf building renewal_021815Besf building renewal_021815
Besf building renewal_021815
 
Standard 90.1-2010 Update
Standard 90.1-2010 UpdateStandard 90.1-2010 Update
Standard 90.1-2010 Update
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudio
 
Envelope Design Training
Envelope Design TrainingEnvelope Design Training
Envelope Design Training
 
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
 
E3_Conference Energy Star Presentation
E3_Conference Energy Star PresentationE3_Conference Energy Star Presentation
E3_Conference Energy Star Presentation
 
Cold-Climate Research Round-Up
Cold-Climate Research Round-UpCold-Climate Research Round-Up
Cold-Climate Research Round-Up
 
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
ASHRAE Virtual Design and Construction Conference March 2021- Development of ...
 
04.15.15 energy design assistance program tracker 2
04.15.15 energy design assistance program tracker 204.15.15 energy design assistance program tracker 2
04.15.15 energy design assistance program tracker 2
 
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
 
IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)IES Faculty – Part L, EPC’s & the VE (Part 1)
IES Faculty – Part L, EPC’s & the VE (Part 1)
 
Code Dread: Keeping up with ASHRAE and LEED
Code Dread: Keeping up with ASHRAE and LEEDCode Dread: Keeping up with ASHRAE and LEED
Code Dread: Keeping up with ASHRAE and LEED
 
Optimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy EfficiencyOptimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy Efficiency
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate Often
 
Building EQ
Building EQBuilding EQ
Building EQ
 
Preparing for LEED 2009
Preparing for LEED 2009Preparing for LEED 2009
Preparing for LEED 2009
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance Gap
 
Monitoring Based Commissioning - A Must in The World of High Energy Efficiency
Monitoring Based Commissioning - A Must in The World of High Energy EfficiencyMonitoring Based Commissioning - A Must in The World of High Energy Efficiency
Monitoring Based Commissioning - A Must in The World of High Energy Efficiency
 

En vedette

An Introduction to psychology
An Introduction to psychologyAn Introduction to psychology
An Introduction to psychologyKiran Kumbar
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGeoffrey Lewis
 
Methodology to estimate energy savings in buildings within ETSAP-TIAM
Methodology to estimate energy savings in buildings within ETSAP-TIAMMethodology to estimate energy savings in buildings within ETSAP-TIAM
Methodology to estimate energy savings in buildings within ETSAP-TIAMIEA-ETSAP
 
Green building materials
Green building materialsGreen building materials
Green building materialschazza1234
 
Green building - Introduction & general ideas
Green building - Introduction & general ideasGreen building - Introduction & general ideas
Green building - Introduction & general ideasSanjay Kashyap
 
The Economics of Green Building
The Economics of Green BuildingThe Economics of Green Building
The Economics of Green Buildingnilskok
 

En vedette (9)

An Introduction to psychology
An Introduction to psychologyAn Introduction to psychology
An Introduction to psychology
 
Registered Energy Manager Slide: Energy Audit
Registered Energy Manager Slide: Energy AuditRegistered Energy Manager Slide: Energy Audit
Registered Energy Manager Slide: Energy Audit
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
 
Methodology to estimate energy savings in buildings within ETSAP-TIAM
Methodology to estimate energy savings in buildings within ETSAP-TIAMMethodology to estimate energy savings in buildings within ETSAP-TIAM
Methodology to estimate energy savings in buildings within ETSAP-TIAM
 
Green building materials
Green building materialsGreen building materials
Green building materials
 
Green building - Introduction & general ideas
Green building - Introduction & general ideasGreen building - Introduction & general ideas
Green building - Introduction & general ideas
 
The Economics of Green Building
The Economics of Green BuildingThe Economics of Green Building
The Economics of Green Building
 
Green buildings
Green buildingsGreen buildings
Green buildings
 
Ppt green
Ppt greenPpt green
Ppt green
 

Similaire à Creating a High-Performance and Environmentally Sustainable Building

ASHRAE Guidelines for Building Energy Audits.pdf
ASHRAE Guidelines for Building Energy Audits.pdfASHRAE Guidelines for Building Energy Audits.pdf
ASHRAE Guidelines for Building Energy Audits.pdfThanhLe921354
 
LEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1stLEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1stMichael Clarke
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water SupplyAlliance To Save Energy
 
Energy Use Assessment Tool
Energy Use Assessment ToolEnergy Use Assessment Tool
Energy Use Assessment Toolwateroperator
 
Energy Audit in water supply and use in public places.pptx
Energy Audit in water supply and use in public places.pptxEnergy Audit in water supply and use in public places.pptx
Energy Audit in water supply and use in public places.pptxJawaharlal37
 
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...Shanti Pless
 
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote Shanti Pless
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.LongBun1
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...Arantico Ltd
 
Utility Master Planning- National Engineers
Utility Master Planning- National EngineersUtility Master Planning- National Engineers
Utility Master Planning- National EngineersNasser Karimzadeh, P.E.
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processShanti Pless
 
NZC - Olgyay Scaling
NZC - Olgyay ScalingNZC - Olgyay Scaling
NZC - Olgyay ScalingWRONG PERSON
 
1 page facility renewal snapshot
1 page facility renewal snapshot1 page facility renewal snapshot
1 page facility renewal snapshotBarry Lynch
 

Similaire à Creating a High-Performance and Environmentally Sustainable Building (20)

ASHRAE Guidelines for Building Energy Audits.pdf
ASHRAE Guidelines for Building Energy Audits.pdfASHRAE Guidelines for Building Energy Audits.pdf
ASHRAE Guidelines for Building Energy Audits.pdf
 
LEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1stLEED Canada - Existing Building Commissioning_Mar1st
LEED Canada - Existing Building Commissioning_Mar1st
 
Energy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptxEnergy Audit 22.9.2022.pptx
Energy Audit 22.9.2022.pptx
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply
 
Energy Use Assessment Tool
Energy Use Assessment ToolEnergy Use Assessment Tool
Energy Use Assessment Tool
 
Energy Audit in water supply and use in public places.pptx
Energy Audit in water supply and use in public places.pptxEnergy Audit in water supply and use in public places.pptx
Energy Audit in water supply and use in public places.pptx
 
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
 
IGBC2014 - Stephen Selkowitz, Lawrence Berkeley National Laboratory
IGBC2014 - Stephen Selkowitz, Lawrence Berkeley National LaboratoryIGBC2014 - Stephen Selkowitz, Lawrence Berkeley National Laboratory
IGBC2014 - Stephen Selkowitz, Lawrence Berkeley National Laboratory
 
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
NREL Commercial Buildings Research Group, ASHRAE June 2013 Research Keynote
 
this is presentation on energy star in building.
this is presentation on energy star in building.this is presentation on energy star in building.
this is presentation on energy star in building.
 
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
CYS EN ISO 50001 is Proven to Generate Significant Energy Savings! (Part 2 of...
 
Utility Master Planning- National Engineers
Utility Master Planning- National EngineersUtility Master Planning- National Engineers
Utility Master Planning- National Engineers
 
Controlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build processControlling capital costs using a performance based design build process
Controlling capital costs using a performance based design build process
 
Manikandan Energy Engineer
Manikandan Energy EngineerManikandan Energy Engineer
Manikandan Energy Engineer
 
Cli Grp
Cli GrpCli Grp
Cli Grp
 
NZC - Olgyay Scaling
NZC - Olgyay ScalingNZC - Olgyay Scaling
NZC - Olgyay Scaling
 
Usgbc intro
Usgbc introUsgbc intro
Usgbc intro
 
Espcinvestmentgradeaudit
EspcinvestmentgradeauditEspcinvestmentgradeaudit
Espcinvestmentgradeaudit
 
1 page facility renewal snapshot
1 page facility renewal snapshot1 page facility renewal snapshot
1 page facility renewal snapshot
 
RE Resume YUANG LEE 2015 12 21
RE Resume YUANG LEE   2015 12 21RE Resume YUANG LEE   2015 12 21
RE Resume YUANG LEE 2015 12 21
 

Plus de Illinois ASHRAE

Assessing Your Building Energy Costs: Benefits of Energy Modeling to Owners
Assessing Your Building Energy Costs:  Benefits of Energy Modeling to OwnersAssessing Your Building Energy Costs:  Benefits of Energy Modeling to Owners
Assessing Your Building Energy Costs: Benefits of Energy Modeling to OwnersIllinois ASHRAE
 
Modeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and EnergyModeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and EnergyIllinois ASHRAE
 
Preliminary Modeling & Life Cycle Costing: Underpinnings of Integrated Design.
Preliminary Modeling & Life Cycle Costing:  Underpinnings of Integrated Design.Preliminary Modeling & Life Cycle Costing:  Underpinnings of Integrated Design.
Preliminary Modeling & Life Cycle Costing: Underpinnings of Integrated Design.Illinois ASHRAE
 
Measurement & Verification
Measurement & VerificationMeasurement & Verification
Measurement & VerificationIllinois ASHRAE
 
Chicago Energy Modeling Conference Welcome Address
Chicago Energy Modeling Conference Welcome AddressChicago Energy Modeling Conference Welcome Address
Chicago Energy Modeling Conference Welcome AddressIllinois ASHRAE
 
Chicago Energy Modeling Conference Key Note
Chicago Energy Modeling Conference Key NoteChicago Energy Modeling Conference Key Note
Chicago Energy Modeling Conference Key NoteIllinois ASHRAE
 
Illinois ASHRAE 2011 Technology Awards
Illinois ASHRAE 2011 Technology AwardsIllinois ASHRAE 2011 Technology Awards
Illinois ASHRAE 2011 Technology AwardsIllinois ASHRAE
 
Illinois ASHRAE Research Promotion
Illinois ASHRAE Research PromotionIllinois ASHRAE Research Promotion
Illinois ASHRAE Research PromotionIllinois ASHRAE
 
Net Zero Energy Buildings
Net Zero Energy BuildingsNet Zero Energy Buildings
Net Zero Energy BuildingsIllinois ASHRAE
 
High performance-chilled-water-systems ashrae-chicago
High performance-chilled-water-systems ashrae-chicagoHigh performance-chilled-water-systems ashrae-chicago
High performance-chilled-water-systems ashrae-chicagoIllinois ASHRAE
 
Waterside energy-recovery hourlong-chicago_ashrae
Waterside energy-recovery hourlong-chicago_ashraeWaterside energy-recovery hourlong-chicago_ashrae
Waterside energy-recovery hourlong-chicago_ashraeIllinois ASHRAE
 
YEA ASHRAE Kick-Off Meeting 2011
YEA ASHRAE Kick-Off Meeting 2011YEA ASHRAE Kick-Off Meeting 2011
YEA ASHRAE Kick-Off Meeting 2011Illinois ASHRAE
 
Illinois ASHRAE Kick-Off Meeting 2011
Illinois ASHRAE Kick-Off Meeting 2011Illinois ASHRAE Kick-Off Meeting 2011
Illinois ASHRAE Kick-Off Meeting 2011Illinois ASHRAE
 
ComEd Retro-Commissioning Program
ComEd Retro-Commissioning ProgramComEd Retro-Commissioning Program
ComEd Retro-Commissioning ProgramIllinois ASHRAE
 
Smart Ideas for Your Business
Smart Ideas for Your BusinessSmart Ideas for Your Business
Smart Ideas for Your BusinessIllinois ASHRAE
 
Nicor Gas Non-Residential Energy Efficiency Programs
Nicor Gas Non-Residential Energy Efficiency ProgramsNicor Gas Non-Residential Energy Efficiency Programs
Nicor Gas Non-Residential Energy Efficiency ProgramsIllinois ASHRAE
 
Solar Project Risk from the Developer’s Point of View
Solar Project Risk from the Developer’s Point of ViewSolar Project Risk from the Developer’s Point of View
Solar Project Risk from the Developer’s Point of ViewIllinois ASHRAE
 
Illinois Chapter of ASHRAE April 2011 Student Night
Illinois Chapter of ASHRAE April 2011 Student NightIllinois Chapter of ASHRAE April 2011 Student Night
Illinois Chapter of ASHRAE April 2011 Student NightIllinois ASHRAE
 

Plus de Illinois ASHRAE (20)

Assessing Your Building Energy Costs: Benefits of Energy Modeling to Owners
Assessing Your Building Energy Costs:  Benefits of Energy Modeling to OwnersAssessing Your Building Energy Costs:  Benefits of Energy Modeling to Owners
Assessing Your Building Energy Costs: Benefits of Energy Modeling to Owners
 
Modeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and EnergyModeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and Energy
 
Preliminary Modeling & Life Cycle Costing: Underpinnings of Integrated Design.
Preliminary Modeling & Life Cycle Costing:  Underpinnings of Integrated Design.Preliminary Modeling & Life Cycle Costing:  Underpinnings of Integrated Design.
Preliminary Modeling & Life Cycle Costing: Underpinnings of Integrated Design.
 
Measurement & Verification
Measurement & VerificationMeasurement & Verification
Measurement & Verification
 
Chicago Energy Modeling Conference Welcome Address
Chicago Energy Modeling Conference Welcome AddressChicago Energy Modeling Conference Welcome Address
Chicago Energy Modeling Conference Welcome Address
 
Chicago Energy Modeling Conference Key Note
Chicago Energy Modeling Conference Key NoteChicago Energy Modeling Conference Key Note
Chicago Energy Modeling Conference Key Note
 
Illinois ASHRAE 2011 Technology Awards
Illinois ASHRAE 2011 Technology AwardsIllinois ASHRAE 2011 Technology Awards
Illinois ASHRAE 2011 Technology Awards
 
Illinois ASHRAE Research Promotion
Illinois ASHRAE Research PromotionIllinois ASHRAE Research Promotion
Illinois ASHRAE Research Promotion
 
Net Zero Energy Buildings
Net Zero Energy BuildingsNet Zero Energy Buildings
Net Zero Energy Buildings
 
High performance-chilled-water-systems ashrae-chicago
High performance-chilled-water-systems ashrae-chicagoHigh performance-chilled-water-systems ashrae-chicago
High performance-chilled-water-systems ashrae-chicago
 
Waterside energy-recovery hourlong-chicago_ashrae
Waterside energy-recovery hourlong-chicago_ashraeWaterside energy-recovery hourlong-chicago_ashrae
Waterside energy-recovery hourlong-chicago_ashrae
 
YEA ASHRAE Kick-Off Meeting 2011
YEA ASHRAE Kick-Off Meeting 2011YEA ASHRAE Kick-Off Meeting 2011
YEA ASHRAE Kick-Off Meeting 2011
 
Illinois ASHRAE Kick-Off Meeting 2011
Illinois ASHRAE Kick-Off Meeting 2011Illinois ASHRAE Kick-Off Meeting 2011
Illinois ASHRAE Kick-Off Meeting 2011
 
ASHRAE Standard 189.1
ASHRAE Standard 189.1ASHRAE Standard 189.1
ASHRAE Standard 189.1
 
ComEd Retro-Commissioning Program
ComEd Retro-Commissioning ProgramComEd Retro-Commissioning Program
ComEd Retro-Commissioning Program
 
Smart Ideas for Your Business
Smart Ideas for Your BusinessSmart Ideas for Your Business
Smart Ideas for Your Business
 
Nicor Gas Non-Residential Energy Efficiency Programs
Nicor Gas Non-Residential Energy Efficiency ProgramsNicor Gas Non-Residential Energy Efficiency Programs
Nicor Gas Non-Residential Energy Efficiency Programs
 
Solar Project Risk from the Developer’s Point of View
Solar Project Risk from the Developer’s Point of ViewSolar Project Risk from the Developer’s Point of View
Solar Project Risk from the Developer’s Point of View
 
Illinois Chapter of ASHRAE April 2011 Student Night
Illinois Chapter of ASHRAE April 2011 Student NightIllinois Chapter of ASHRAE April 2011 Student Night
Illinois Chapter of ASHRAE April 2011 Student Night
 
Solar Thermal Cooling
Solar Thermal CoolingSolar Thermal Cooling
Solar Thermal Cooling
 

Dernier

HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...poojakaurpk09
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxsuhanimunjal27
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxTusharBahuguna2
 
DESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- IntroductionDESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- Introductionsivagami49
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...amitlee9823
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...nirzagarg
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funneljen_giacalone
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...home
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...nirzagarg
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...Pooja Nehwal
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...amitlee9823
 

Dernier (20)

HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptx
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
DESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- IntroductionDESIGN THINKING in architecture- Introduction
DESIGN THINKING in architecture- Introduction
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
Whitefield Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Ba...
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funnel
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 

Creating a High-Performance and Environmentally Sustainable Building

  • 1. Creating a High PerformanceCreating a High Performance And Environmentally Sustainable Building Michael Kuk Director of Technical Services Sieben Energy Associates 333 North Michigan Avenue Chicago, IL 60601 (312) 899-1000 x 20 mkuk@siebenenergy.com
  • 2. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings AgendaAgenda • The building optimization processThe building optimization process • Mike’s top 10’s and tips • Resources Available • Packaging it all together into anPackaging it all together into an environmentally sustainable and high performance buildingperformance building © Sieben Energy Assoc., LLC 1
  • 3. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Sieben Energy Associates ServicesSieben Energy Associates Services • Energy Efficiency for New and Existing Buildingsgy y g g • HVAC System Commissioning for New and Existing BuildingsExisting Buildings • Sustainability Consulting (LEED) • Energy Commodity Management Services Energy • Information Managementg • Strategic Services © Sieben Energy Assoc., LLC 2
  • 4. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Existing Building OverviewExisting Building Overview Click here gaia.lbl.gov/btech/CSI_BPMAlliance/Commercial-BldgMarket.pdf 5 Milli C i l/I i i l B ildi i U S• 5 Million Commercial/Institutional Buildings in U.S. • 70 Billion Square Feet • Summary:• Summary: – Lots of buildings – Lots of SF – Lots of Opportunity for Energy Efficiency and Environmental Sustainability © Sieben Energy Assoc., LLC 3
  • 5. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings The Building Optimization Process ( C )(aka Retro-Commissioning) 1 Planning and Documentation1. Planning and Documentation 2. Investigation Phase (Opportunity A )Assessment) 3. Implementation Phasep 4. Measurement and Verification Phase © Sieben Energy Assoc., LLC 4
  • 6. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings The Building Optimization Process Planning and Documentation © Sieben Energy Assoc., LLC 5
  • 7. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings The Building Optimization Process Planning and Documentation (Per LEED) 1. Document the current sequence of operations for the building. 2. Develop a building operating plan that provides details on how the building is to be operated and maintainedhow the building is to be operated and maintained. 3. Develop a systems narrative that briefly describes the mechanical and electrical systems and equipment in the building. 4. Create a narrative of the preventive maintenance plan for equipment described in the systems narrative and document theequipment described in the systems narrative and document the preventive maintenance schedule during the performance period. © Sieben Energy Assoc., LLC 6
  • 8. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Planning and Documentation Document the Current Sequence of Operation – Very valuable resource – “Challenging” to Obtain • Might be found in controls system submittal or in original project specifications documents (controls specification or in individual equipmentspecifications documents (controls specification, or in individual equipment specification) • Likely not optimized for energy efficiency • Likely never to be found (in writing)• Likely never to be found (in writing) • “As designed” SOO probably didn’t become “as-built” SOO • Likely had been modified by operators or subsequent controls t h i itechnicians • Might have to dig deeply into programming logic of BMS © Sieben Energy Assoc., LLC 7
  • 9. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Planning and Documentation Develop the Building Operating Plan – Provides details on how the building is to be operated and maintained. – The operating plan must include, at a minimum: • an occupancy schedule• an occupancy schedule • equipment run-time schedule • design set points for all HVAC equipment • design lighting levels throughout the building. • Identify any changes in schedules or set points for different seasons, days of the week and times of day. • Validate that the operating plan has been met during the performance period. © Sieben Energy Assoc., LLC 8
  • 10. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Planning and Documentation Develop the Building Operating Plan © Sieben Energy Assoc., LLC 9
  • 11. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Planning and Documentation Develop a Systems Narrative – Briefly describes the mechanical and electrical systems and equipment in the building. – Often referred to as the basis of design (BOD) I l d ll th t d t t th ti diti– Include all the systems used to meet the operating conditions stated in the operating plan, including at a minimum, heating, cooling, ventilation, lighting and any building controls systems. – Requirement of LEED New Construction projects Lik l d l d d i h d i / i– Likely was never developed during the design / construction phase. – May have been developed by the owner…but not likely © Sieben Energy Assoc., LLC 10 May have been developed by the owner…but not likely
  • 12. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Planning and Documentation Develop a P&M Narrative • Create a narrative of the preventive maintenance plan for equipment d ib d i h i d d h i idescribed in the systems narrative and document the preventive maintenance schedule during the performance period. • Good resource is ASHRAE Standard 180-2008 -- Standard Practice for I ti d M i t f C i l B ildi HVAC S tInspection and Maintenance of Commercial Building HVAC Systems © Sieben Energy Assoc., LLC 11
  • 13. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings The Building Optimization Process S G O SINVESTIGATION PHASE – Perform Rx process: Investigation Phasep g 1. Perform an ASHRAE Level 1, 2 Energy Audit (note: LEED EB just requires an ASHRAE level 1) 1 Benchmarking and Utility Analysis1. Benchmarking and Utility Analysis 2. Identify where opportunities exist 3. Perform savings analysis and calculations 2 P f IEQ l i ?2. Perform an IEQ analysis? 3. Present initial opportunities and recommendations 4. Get “buy in” and commitment from owner 5. Further evaluate recommendations through testing and analysis 6. Fine tune savings and recommendations 7 Re-present and get “buy in” and commitment from owner © Sieben Energy Assoc., LLC 12 7. Re present and get buy in and commitment from owner
  • 14. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL AUDITASHRAE LEVEL AUDIT – Good Resources: P d f C i l B ildi A dit• Procedures for Commercial Building Audits • Energy Efficiency Guide for Existing Commercial Buildings: The Business Case for Building Owners andBuildings: The Business Case for Building Owners and Managers © Sieben Energy Assoc., LLC 13
  • 15. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL AUDITASHRAE LEVEL AUDIT In a “Nut Shell” 1. How much energy are they using? 2 Where are they using it?2. Where are they using it? --------------------------------------------------- 3. Are they using it effectively? 4 How can they use it more effectively?4. How can they use it more effectively? © Sieben Energy Assoc., LLC 14
  • 16. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL 1 AUDITASHRAE LEVEL 1 AUDIT • Perform a brief walk-through survey of the facility to become familiar with its construction, equipment, operation, and maintenance. • Meet with owner/operator and occupants to learn of special problems or needs of the facility. Determine if any maintenance problems and/or practices may affect efficiency. • Perform a space function analysis. Determine if efficiency may be affected by functions that differ from the original functional intent of the building. • Perform a rough estimate to determine the approximate breakdown of energyg pp gy use for significant end-use categories, including weather and non-weather related uses. • Identify low-cost/no-cost changes to the facility or to operating andy g y p g maintenance procedures, and determine the savings that will result from these changes. • Identify potential capital improvements for further study, and provide an © Sieben Energy Assoc., LLC 15 y p p p y, p initial estimate of potential costs and savings.
  • 17. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL 1 AUDIT (d li bl )ASHRAE LEVEL 1 AUDIT (deliverable) Deliverables: The report for a Level I analysis should contain the building characteristics and energy use summary as well as the following. 1. Quantification of savings potential from changing to a different utility price structure. 2 Discussion of irregularities found in the monthly energy use2. Discussion of irregularities found in the monthly energy use patterns, with suggestions about their possible causes. 3. The energy index of similar buildings. Report the source, size, and date of the sample used in this comparison. The names of comparable buildings should be given if known. 4 The method used to develop the target indices4. The method used to develop the target indices. 5. Total energy and demand cost by fuel type for the latest year and preceding two years if available. Show potential savings in © Sieben Energy Assoc., LLC 16 p g y p g dollars using the energy index format of ASHRAE Standard 105.
  • 18. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL 1 AUDIT (d li bl )ASHRAE LEVEL 1 AUDIT (deliverable) Deliverables continued: 5. The fraction of current costs that would be saved if the5. The fraction of current costs that would be saved if the energy index were brought to the target level. 6. A summary of any special problems or needs identified during the walkthrough survey, including possible revisions to operating and maintenance procedures. 7 A preliminary energy use breakdown by major end uses7. A preliminary energy use breakdown by major end uses. 8. The listing of low-cost/no-cost changes with the savings for these improvements. 9. The potential capital improvements, with an initial estimate of potential costs and savings © Sieben Energy Assoc., LLC 17
  • 19. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL 2 AUDITASHRAE LEVEL 2 AUDIT This analytical procedure is guided by Level I analysis and includes the following additional work: 1. Review mechanical and electrical system design, installed condition, maintenance practices, d ti th dand operating methods. 2. Review existing operating and maintenance problems. Determine planned building changes. 3. Measure key operating parameters and compare to design levels, for example, operating schedules, heating/cooling water temperature, supply air temperature, space temperature andg g p pp y p p p humidity, ventilation quantities, and light level at the task. Such measurements may be taken on a spot basis, or logged, manually or electronically. 4. Prepare a breakdown of the total annual energy use into end-use components, as illustrated in the 1999 ASHRAE Handbook—Applications, Chapter 34, Figure 4, or as shown in the sectionin the 1999 ASHRAE Handbook Applications, Chapter 34, Figure 4, or as shown in the section “Energy Analysis Summary and Recommendations.” A number of calculation methods are available, ranging from simplified manual calculations to fully detailed computer simulation of hour-by-hour building operations for a full year. 5 List all possible modifications to equipment and operations that would save energy Select5. List all possible modifications to equipment and operations that would save energy. Select those that might be considered practical by the owner. List preliminary cost and savings estimates. 6. Review the list of practical modifications with the owner/operator and select those that will b l d f th P i iti th difi ti i th ti i t d d f i l t ti © Sieben Energy Assoc., LLC 18 be analyzed further. Prioritize the modifications in the anticipated order of implementation.
  • 20. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL 2 AUDIT ( t )ASHRAE LEVEL 2 AUDIT (cont.) 7. For each practical measure, estimate the potential savings in energy cost and its energy index. To account for interaction between modifications assume that modifications with the highestTo account for interaction between modifications, assume that modifications with the highest operational priority and/or best return on investment will be implemented first. A number of calculation methods are available, ranging from simplified manual calculations to rerunning computer simulations, if performed in Step 4, above. 8 E ti t th t f h ti l8. Estimate the cost of each practical measure. 9. Estimate the impact of each practical measure on building operations, maintenance costs, and non-energy operating costs. 10. Estimate the combined energy savings from implementing all of the practical measures and compare to the potential derived in the Level I analysis. It should be clearly stated that savings from each modification are based on the assumption that all previous modifications have already been implemented and that the total savings account for all of the interactions between modifications. 11. Prepare a financial evaluation of the estimated total potential investment using the owner’s chosen techniques and criteria. These evaluations may be performed for each practical measure. 12. Following submission of the report of the Level II analysis, meet with the owner to discuss priorities and to help select measures for implementation or further analysis © Sieben Energy Assoc., LLC 19 priorities and to help select measures for implementation or further analysis.
  • 21. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL 2 AUDIT D li blASHRAE LEVEL 2 AUDIT Deliverable Deliverables: The report for a Level II analysis should contain at least the following. 1. A summary of energy use and cost associated with each end-use. Show calculations performed or quote the name and version of software used and include both input and output pages. Provide interpretation of differences between actual total energy use and calculated or simulated end-use totals.differences between actual total energy use and calculated or simulated end use totals. 2. A description of the building, including typical floor plans and inventories of major energy-using equipment. (This information may be included as an appendix.) 3. A list of measures considered but felt to be impractical, with brief reasons for rejecting each. 4. For each practical measure, provide4. For each practical measure, provide a) a discussion of the existing situation and why it is using excess energy; b) an outline of the measure, including its impact on occupant health, comfort, and safety; c) a description of any repairs that are required for a measure to be effective; d) the impact on occupant service capabilities, such as ventilation for late occupancy or year-round cooling; e) an outline of the impact on operating procedures, maintenance procedures, and costs; f) expected life of new equipment, and the impact on the life of existing equipment; g) an outline of any new skills required in operating staff and training or hiring recommendations; h) calculations performed or provide the name and version of software used and include both input and output data. © Sieben Energy Assoc., LLC 20
  • 22. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL 2 AUDIT D li bl ( t )ASHRAE LEVEL 2 AUDIT Deliverable (cont.) Deliverables: The report for a Level II analysis should contain at least the following. 5. A table listing the estimated costs for all practical measures, the savings, and financial performance indicator. For the cost of each measure, show thep , estimated accuracy of the value quoted. This table should spell out the assumed sequence of implementation and state that savings may be quite different if a different implementation sequence is followed. 6. A discussion of any differences between the savings projected in this analysis and the estimated potential derived in the Level I analysis. 7. Overall project economic evaluation.p j 8. Recommended measurement and verification method(s) that will be required to determine the actual effectiveness of the recommended measures. 9. Discussion of feasible capital-intensive measures that may require a © Sieben Energy Assoc., LLC 21 9. Discussion of feasible capital intensive measures that may require a Level III analysis.
  • 23. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE ASHRAE LEVEL 3 AUDITASHRAE LEVEL 3 AUDIT 1.More detailed economic analysis1.More detailed economic analysis 2.“investment grade” analysis 3 Lik l i l d t d li3. Likely include computer modeling © Sieben Energy Assoc., LLC 22
  • 24. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Building Data AnalysisBuilding Data Analysis Slide courtesy of BOC program – End-use ProfilesEnd-Use Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Totals Heat 20005 12911 11410 5383 1907 198 188 131 208 3524 18095 27273 101,233 Lights 4195 3490 3170 2559 2766 2558 2369 2985 3030 3421 3708 4430 38,681 Receptacles + Computers 3808 3291 3170 2764 3040 2742 2589 2744 2533 2941 2970 2871 35,463 2000 Annual Consumption Fans 4779 4441 4462 3845 4895 5393 4894 5184 4415 4607 5573 5998 58,486 DHW 575 484 459 460 499 462 340 379 402 372 400 404 5,236 Compressor 0 0 0 240 480 1680 1680 3000 1720 80 0 0 8,880 Kitchen + Exercise 8229 6916 6692 5042 5207 4104 4004 4203 3937 4635 7880 10129 70,978 Totals 41591 31533 29363 20293 18794 17137 16064 18626 16245 19580 38626 51105 318,957 2000 Energy End-Use Breakdown 32% 22% Heat 12% 18% 2% 3% Heat Lights Receptacles + Computers Fans DHW Compressor © Sieben Energy Assoc., LLC % 11% Kitchen + Exercise
  • 25. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings BenchmarkingBenchmarking slide courtesy of BOC program • Baseline Profile 90 000 3 year Monthly Energy Usage vs Average 50,000 60,000 70,000 80,000 90,000 age(KWH) 10,000 20,000 30,000 40,000 EnergyUsa JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2000 61,287 48,672 45,146 36,834 26,569 27,507 27,040 26,343 29,271 39,324 40,586 80,039 2001 65 061 55 168 52 281 40 158 35 580 29 225 28 546 30 556 26 189 36 642 50 047 74 104 - JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2000 2001 2002 Baseline © Sieben Energy Assoc., LLC 2001 65,061 55,168 52,281 40,158 35,580 29,225 28,546 30,556 26,189 36,642 50,047 74,104 2002 64,373 62,378 60,180 42,761 33,156 29,631 26,426 32,245 25,921 35,593 48,609 63,817 Baseline 63,574 55,406 52,536 39,918 31,768 28,788 27,337 29,715 27,127 37,186 46,414 72,653
  • 26. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings • Benchmarking Tools (courtesy BOC) – CBECS -- Commercial Buildings Energy Consumptiong gy p Survey, from the US DOE Energy Information Administration – ARCH -- Building benchmarking tool based on CBECS– ARCH -- Building benchmarking tool based on CBECS data – Cal-Arch -- California version of above utilizing CEUS datadata – Oak Ridge Benchmarking Tools -- by Oak Ridge National Laboratory. Includes customizable spreadsheets special tools for Iowa Colorado &spreadsheets, special tools for Iowa, Colorado, & Florida schools. – ASHRAE (working on it) © Sieben Energy Assoc., LLC
  • 27. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Benchmarking (slide courtesy of BOC) Portfolio ManagerPortfolio Manager © Sieben Energy Assoc., LLC
  • 28. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE BENCHMARKING AND UTILITY ANALYSISBENCHMARKING AND UTILITY ANALYSIS – Link for sample SEA report click herep p © Sieben Energy Assoc., LLC 27
  • 29. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE PERFORM AN IEQ ANALYSIS?PERFORM AN IEQ ANALYSIS? • IEQ = Indoor Environmental Quality • Determine if Building Meets – Standard 55-2004 -- Thermal Environmental Conditions for Human Occupancyp y – Standard 62.1-2007 -- Ventilation for Acceptable Indoor Air Quality (and associated users manuals) – IESNA Lighting Levels • These standards all have direct (and indirect) impact on LEED IEQ points – PR1: Minimum IAQ PerformancePR1: Minimum IAQ Performance – Credits 1.1 through 1.5 – Credits 2.1 through 2.4 • These IEQ standards also a requirement to be Energy Star © Sieben Energy Assoc., LLC 28 • These IEQ standards also a requirement to be Energy Star Building Rated
  • 30. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE TESTING AND ANALYSISTESTING AND ANALYSIS Key Test Equipment Toolsy q p 1. Proper safety gear 2. Temperature gun (and attachments) 3. Strobe Tach 4. Camera / Tape recorder Sli h5. Sling Psychrometer 6. Temperature and humidity sensors and probes 7 Power meter (current voltage power quality power)7. Power meter (current, voltage, power quality, power) 8. Data Loggers 1. Temperature, Humidity © Sieben Energy Assoc., LLC 29 2. Light levels 3. Current
  • 31. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE TESTING AND ANALYSISTESTING AND ANALYSIS Analysis Toolsy 1. Self developed Spreadsheets 2. Computer modeling tools. Co pute ode g too s 3. Vendor analysis tools 4 DOE Software tools4. DOE Software tools Functional and Start Up Testing Forms 1 PECI1. PECI 2. Building Commissioning Association 3 FEMP / GSA / USACE © Sieben Energy Assoc., LLC 30 3. FEMP / GSA / USACE
  • 32. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings INVESTIGATION PHASE O C i tiOwner Communication 1. Present initial opportunities and recommendationspp 2. Get “buy in” and commitment from owner 3. Further evaluate recommendations through testing3. u t e eva uate eco e dat o s t oug test g and analysis 4. Fine tune savings and recommendationsg 5. Present again, and get “buy in” and commitment from owner Remember…always incorporate the OPR into your investigation © Sieben Energy Assoc., LLC 31
  • 33. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings The Building Optimization Process O SIMPLEMENTATION PHASE – Develop GOOD specifications • SOO’s (as appropriate) • Commissioning requirements (require functional tests, not just start-up testing) • O&M manual documentation • Training • System (equipment) • Sensors and controls (as appropriate) • Match with LEED requirements (filter, refrigerant, efficiency) – Ensure bids actually meet specification requirementsy p q – Monitor/trend system performance prior to replacement (to assist in measurement and verification) – Make sure that when evaluating systems that the maintenance staff reviews to © Sieben Energy Assoc., LLC 32 g y ensure ease of maintenance
  • 34. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings The Building Optimization Process Testing and Measurement and VerificationTesting and Measurement and Verification (M&V) Phase Note: This is just an overview. M&V is a service offering all in itself that can be either be very complex or simple, depending upon the needs of the owner. I’m going to focus on the simple.simple. – Simple M&V • Functionally test systems (where appropriate)y y ( pp p ) – Verify sequence of operations working properly – Damper / actuator modulation working properly T k b d f t t t d– Take beyond manufacturers start-up procedures • Data logging and trending – Using BMS or data loggers © Sieben Energy Assoc., LLC 33 g gg – Temperature, humidity, power • Utility Bill analysis and trending
  • 35. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings The Building Optimization Process ( C )(aka Retro-Commissioning) 1 Planning and Documentation1. Planning and Documentation 2. Investigation Phase (Opportunity A )Assessment) 3. Implementation Phasep 4. Measurement and Verification Phase © Sieben Energy Assoc., LLC 34
  • 36. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Mike’s Top 10 Control IssuesMike s Top 10 Control Issues 1. Operator not effectively trained on BMS 2. Systems have been locked out by operator 3. Scheduling is not optimized (sometime running 24/7) 4. Economizer control not optimal (too high of limit) 5 St ti tti ( i bl d) d AHU’ t5. Static pressure setting on (variable speed) pumps and AHU’s too high. No auto reset on (variable speed) pumps and AHU’s 6. VSD’s locked out on (too high) of a minimum speed due to perceived requirement, or due to heating/cooling coil minimum requirements 7. Reheat being used during summerg g 8. DAT not reset to limit use of reheat 9. Exhaust fans running continuously © Sieben Energy Assoc., LLC 35 10. Fans being run continuously instead of cycling (not recommended for all applications)
  • 37. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Mike’s Top 10 Control SolutionsMike s Top 10 Control Solutions 1. Train the operator on effective use of the BMS 2. Figure out why controls have been locked out, and find solution 3. Optimize the building and equipment schedule. (Equipment schedule does not have to match building occupancy schedule.) 4 F ll ASHRAE 90 1 i t f i t l4. Follow ASHRAE 90.1 requirements for economizer control 5. Determine why static pressure setting on (variable speed) pumps and AHU’s too high. Experiment with resetting. Utilize a new dynamic pressure reset sequence on (variable speed) pumps and AHU’son (variable speed) pumps and AHU s 6. Determine if VSD minimum lockout is actually required, or just “thought to be” required. Remove lockout in most HW/CHW coil applications unless freeze stat is tripping in heating mode. Do not lock out all year. 7. Disable reheat during the summer. Fix specific areas being over cooled. 8. Utilize dynamic DAT reset SOO to limit use of reheat 9. Schedule exhaust fans, or interlock with associated AHU © Sieben Energy Assoc., LLC 36 10. Change programming on BMS, or DIP switches on RTU’s / T-stats to allow automatic operation of fans instead of continuous operation.
  • 38. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Mike’s Top 10 (low cost) OpportunitiesMike s Top 10 (low cost) Opportunities 1. Systems have never been commissioned 2. Economizer controls inoperative 3. Dampers and actuators inoperative or in poor condition 4. Sensors not recalibrated on regular basis (especially enthalpy and CO2 sensors) 5 Coils not properly cleaned5. Coils not properly cleaned 6. High efficiency motors not utilized or oversized 7. Equipment in generally poor overall conditionq p g y p 8. Inlet vane dampers utilized instead of variable frequency drives © Sieben Energy Assoc., LLC 37 9. Pumps oversized, and throttled back instead of being trimmed 10. High efficiency lighting, or lighting controls not utilized.
  • 39. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Mike’s Top 10 (low cost) System and O& SO&M Solutions 1. Perform functional performance tests on uncommissioned systems 2. Replace economizer controls. Test and calibrate annually 3. Test dampers and actuators bi-annually. Repair or replace. 4 Recalibrate CO2 and enthalpy sensors annually or greater for more4. Recalibrate CO2 and enthalpy sensors annually or greater for more frequently on large, energy intensive AHU’s. 5. Keep coils clean 6. Do economic analysis and remove/replace with high efficiency motors where economically. Upon burnout upgrade for others. Do a motor load test and right-size the motor.g 7. Initiate recommended O&M procedures. Savings of 5%-10% 8. Replace inlet vanes with variable frequency drives 9 i i h i i © Sieben Energy Assoc., LLC 38 9. Trim pumps, right-size motors as appropriate. 10. Upgrade lighting systems and controls.
  • 40. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Mike’s Top 10 (multi-year payback) O t itiOpportunities 1. High efficiency motors not utilized (often a very quick payback) 2 RTU’ di l t2. RTU’s needing replacement 3. Chillers and cooling towers needing replacement 4. Boilers needing replacement4. Boilers needing replacement 5. Pneumatic control systems system being utilized 6. Need for building automation system 7. Constant volume pumping still being utilized (could often be a very quick payback) 8 Need to convert to variable air volume system or upgrade8. Need to convert to variable air volume system or upgrade existing VAV system 9. Building envelop upgrades required © Sieben Energy Assoc., LLC 39 10. Lighting system and controls upgrade required.
  • 41. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings TIPSTIPS • Fully understand the owners requirements, sequence of operations, system schedules, and equipment interaction. More often than not, they don’t know (exactly) what they need, and you need to guide them. Most think they have no (or not economical) options. • Determine level of detail required and desired (some are just happy with summary table, some want detail) • Understand the skill sets and capabilities of the operating staff• Understand the skill sets and capabilities of the operating staff. • Proper training, and systems manuals are vital • There is a lot of low hanging fruit. • If you don’t solve operational issues, they will not achieve the savings possible even with new equipment. • Normal equipment start up procedures do not guarantee proper and © Sieben Energy Assoc., LLC 40 Normal equipment start up procedures do not guarantee proper and efficient equipment operation. Must do functional performance test as well.
  • 42. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Auditing/Commissioning Tool Box S SKey ASHRAE Standards • Standard 100-2006 -- Energy Conservation in Existing Buildings • Standard 105-2007 -- Standard Methods of Measuring, Expressing, andStandard 105 2007 Standard Methods of Measuring, Expressing, and Comparing Building Energy Performance • Standard 111-2008 -- Measurement, Testing, Adjusting, and Balancing of Building HVAC Systems • Standard 170-2008 -- Ventilation of Health Care Facilities • Standard 180-2008 -- Standard Practice for Inspection and Maintenance of Commercial Building HVAC Systems • Standard 189.1-2009, Standard for the Design of High-Performance Green Buildings • Standard 41.1-1986 (RA 2006) -- Standard Method for Temperature MeasurementMeasurement • Standard 55-2004 -- Thermal Environmental Conditions for Human Occupancy • Standard 62.1-2007 -- Ventilation for Acceptable Indoor Air Quality (and associated users manuals) © Sieben Energy Assoc., LLC 41 associated users manuals) • Standard 90.1-2007 Energy Standard for Buildings Except Low-Rise Residential Buildings (And associated User Manuals, and previous editions of the standard)
  • 43. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Auditing/Commissioning Tool Box S GKey ASHRAE Guidelines • Guideline 0-2005 -- The Commissioning Process • Guideline 1.1-2007 -- HVAC&R Technical Requirements for The Commissioning Process • Guideline 11-2009 -- Field Testing of HVAC Controls ComponentsGuideline 11 2009 Field Testing of HVAC Controls Components • Guideline 13-2007 -- Specifying Direct Digital Control Systems • Guideline 14-2002 -- Measurement of Energy and Demand Savings • Guideline 16-2003 -- Selecting Outdoor, Return, and Relief Dampers for Air-Side Economizer Systems • Guideline 22-2008 -- Instrumentation for Monitoring CentralGuideline 22 2008 Instrumentation for Monitoring Central Chilled-Water Plant Efficiency • Guideline 4-2008 -- Preparation of Operating and Maintenance Documentation for Building Systems © Sieben Energy Assoc., LLC 42 Documentation for Building Systems
  • 44. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Auditing/Commissioning Tool Box O SOther ASHRAE Resources • ASHRAE Energy Design Guides (free download) 1. Small Hospitals and Healthcare 2. Highway Lodging 3. Small Warehouse and Self Storage Buildings 4. K-12 School Buildings 5 S ll R t il B ildi5. Small Retail Buildings 6. Small Office Buildings • Procedures for Commercial Building AuditsProcedures for Commercial Building Audits • ASHRAE Green Guide • Energy Efficiency Guide for Existing Commercial Buildings: © Sieben Energy Assoc., LLC 43 gy y g g The Business Case for Building Owners and Managers
  • 45. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Combined Reference Guides (slide courtesy of USGBC)LEEDV3 © Sieben Energy Assoc., LLC © Sieben Energy Associates, LLCRESULTS, EXPERIENCE AND RELATIONSHIPS SINCE 1990.
  • 46. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings Packaging It All TogetherPackaging It All Together • Review LEED Checklist prior to analysisReview LEED Checklist prior to analysis and incorporate into your evaluation and opportunities to pursueopportunities to pursue. • Link to spreadsheet © Sieben Energy Assoc., LLC 45
  • 47. Illinois Chapter ASHRAE- Energy Saving Designs for Existing Buildings I will be happy to answer your questions. © Sieben Energy Assoc., LLC