CERMAS 1.0
● CERMAS 1.0 is a user friendly and menu driven software designed to predict
the LCC (Life-Cycle Cost) of a system based on Reliability, Maintainability,
and Availability using appropriate methods to simulate, which would
otherwise have to be done manually and is difficult to analyze.
● The simulation tool helps to analyze the LCC based on various governing
parameters like Acquisition Cost, Operational Cost, and Maintenance Cost
etc.
● The product is developed with the applicable mathematical formulas or
routines used to develop an estimate
● Costs are derived or calculated with a given cost estimating methods
* 1
Description of CERMAS 1.0
● The system is designed to map the architecture of a system into
corresponding cost elements based on reliability, availability and
maintainability of the components.
● Each part of the system is configurable in its subcomponents and the
importance of any component in estimating the cost of system can be
identified.
● To estimate LCC of equipment, the tool accepts the cost inputs such as
acquisition, operation, maintenance and other costs of the equipment.
● The LCC of equipment is the sum of the Acquisition Cost, Operational Cost,
Maintenance Cost and Other Costs. Any revenues accrued shall be deducted
from the LCC. LCC is calculated for various parameters like operating hour
per year etc. Whereever applicable the calculations are done by considering
inflation rate
* 2
Description of CERMAS 1.0
● The system uses database for storing the information related to various cost
elements of various equipments and also provides a data base for Equipment
details.
● Generally LCC is done by a particular scientist at a given point of time, hence
data base is created with author name (scientist) as the main element to
retrieve the details of the equipment, costs etc.
● The CERMAS 1.0 software contains several modules. They can greatly enhance
the calculation the LCC of the equipment or system. Users can choose these
modules according to their needs to calculate the LCC of a system
* 3
The Main Features of CERMAS
● Equipment Tree Structure (ETS)
● Equipment Data
● Acquisition Cost
● Maintenance Cost
● Operational Cost
● Other Cost
● LCC Calculator
● Sensitivity Analysis
● Distributions
● Formulae
● Charts
● Reports
● Currency Converter
● Database Back-up
● Scientific Calculator, Help and FAQ’s
* 4
The Main Features of CERMAS
● Equipment Tree Structure (ETS)
● Equipment Tree Structure (ETS) contains the list of components to the left side of
the CERMAS 1.0 Main Screen. In particular the user is required to select
Equipment/Organization from ETS
● Equipment Data
● Equipment Data Module deals with the component details of a systems used in the
LCC Estimation. This module allows the user to input the details of the equipment,
such as name, model etc.,
● Acquisition Cost
● Acquisition Cost Form allows the user to enter acquisition cost parameters to
calculate acquisition cost. In this module the user can enter the inputs for the
various acquisition cost parameters such as Basic Cost, Up gradation Cost, Initial
Spare Cost, Packaging & Forwarding Cost etc.,
* 5
The Main Features of CERMAS
● Maintenance Cost
Maintenance Cost Form allows the user to select the type of the maintenance cost:
● Annual Maintenance Cost
Annual Maintenance Cost Form allows the user to enter maintenance cost parameters
to calculate Total Maintenance cost.
● Annual Breakdown Maintenance Cost
This form allows the user to enter breakdown maintenance cost parameters to
calculate Total Breakdown Maintenance cost
● Annual Schedule/Preventive Maintenance Cost
Annual Schedule/Preventive Maintenance Cost Form allows the user to enter
schedule/preventive maintenance cost parameters to calculate Total
Schedule/Preventive Maintenance cost.
* 6
The Main Features of CERMAS
● Variable Maintenance Cost
Variable Maintenance Cost Form allows the user to enter maintenance cost
parameters to calculate Total Maintenance cost.
● Variable Schedule/Preventive Maintenance Cost
Variable Schedule/Preventive Maintenance Cost form allows the user to
enter schedule/preventive maintenance cost parameters to calculate
variable Schedule/Preventive Maintenance cost.
● Variable Breakdown Maintenance Cost Form
Variable Breakdown Maintenance Cost form allows the user to enter
breakdown maintenance cost parameters to calculate variable Breakdown
Maintenance cost.
* 7
The Main Features of CERMAS
● Operational Cost
● Operational Cost Form allows the user to enter operational cost
parameters to calculate the Annual Operational Cost.
● Also operational cost module permits the user to enter the inputs for the
equipment based on the following sample questions:
1. How much fuel or power consumed by equipment, if applicable both?
2. How many crew and support crews needed to operate the equipment?
3. How much the cost of the crew as well supports crews?
4. How much the Operational infrastructure, training, admin cost with
respect to the equipment?
5. Any miscellaneous cost?
6. Unit of cost calculation for example: year, week.
* 8
The Main Features of CERMAS
● Other Cost
Other Cost module is useful when some of the input costs are not covered in
the above cost modules. This module allows the user to provide the details
of various cost elements such as the cost of up gradation, disposal cost etc
● LCC Calculator
LCC Calculator Form allows the user to view LCC of System (Organization)
or Equipment describing various cost parameters incorporated in various
Cost modules.
● Sensitivity Analysis
This module is used to analyse the LCC variation for selected equipment by
varying the cost percentages associated with that equipment
* 9
The Main Features of CERMAS
● Distributions
● The Distributions used for Simulation are Exponential, Triangular, Uniform
● User can select a particular distribution to simulate the various cost parameters like
Acquisition Cost, Operational Cost, Maintenance Cost and LCC based on MTBF,
MTTR and Availability values.
● Formulae
● The mathematical formulae used to estimate LCC contains the following variables:
● Availability Rate
● MTTF/MTBF
● Dormancy
● Missile Reliability
● Net Present Value (NPV)
* 10
The Main Features of CERMAS
● Currency Converter
● The Currency Converter Screen helps to exchange currency rates. It is the
value of a foreign nation’s currency in terms of the home nation’s currency
● Database Back-up
● The “CERMAS 1.0 Software” uses MySQL 5.0 as the DBMS of choice. The
DBMS software will provide a backup capability to ensure protection of
the data in the DBMS. In addition, the DBMS software provides a
transaction recording feature that can be used to keep track of all
transactions during normal operation.
● Charts
● This module helps the user to generate various types of charts like Bar,
Pie, Combination Pie and Water Fall and also to generate various reports
such as Author based, Equipment Costs, LCC of equipment and
organization and Equipment list.
* 11
The Main Features of CERMAS
● Reports
● Author Based
● Acquisition Cost
● Operational Cost
● Maintenance Cost
●Annual
●Variable
● Equipment List
● Equipment Costs
● Acquisition Cost
● Operational Cost
● Maintenance Cost
●Annual
●Variable
● Equipment Data
* 12
● LCC
● Equipment
● Organization
The Main Modules CERMAS
● User Module
● Equipment Data Module
● Acquisition Cost Module
● Maintenance Cost Module
● Other Cost Module
● LCC Calculator Module
● Output Module
● Database Management System Module
● Distributions used for Simulation Module
● Formulae Module
● Currency Converter Module
● FAQ’s and Help Modules
* 13
Sample Screens
* 14
* 15
* 16
* 17
* 18
* 19
* 20
* 21
* 22
* 23
* 24
* 25

Contenu connexe

Tendances

Life cycle cost definitions (2)
Life cycle cost definitions (2)Life cycle cost definitions (2)
Life cycle cost definitions (2)Adil Shaikh
 
Life cycle costing_calculation_tool
Life cycle costing_calculation_toolLife cycle costing_calculation_tool
Life cycle costing_calculation_toolDemid Odkhuu
 
LIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDING
LIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDINGLIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDING
LIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDINGEdge Hill University
 
Product life cycle costing
Product life cycle costingProduct life cycle costing
Product life cycle costingArchanaNargund1
 
Life cycle cost example
Life cycle cost exampleLife cycle cost example
Life cycle cost exampleHuzaifa Sajid
 
IRJET- Life Cycle Cost Analysis of a Residential Building
IRJET-  	  Life Cycle Cost Analysis of a Residential BuildingIRJET-  	  Life Cycle Cost Analysis of a Residential Building
IRJET- Life Cycle Cost Analysis of a Residential BuildingIRJET Journal
 
Target Costing and Life Cycle Costing
Target Costing and Life Cycle CostingTarget Costing and Life Cycle Costing
Target Costing and Life Cycle CostingPrachi Singla
 
Types Of Costs (Economics & Management Purpose)
Types Of Costs (Economics & Management Purpose)Types Of Costs (Economics & Management Purpose)
Types Of Costs (Economics & Management Purpose)KHORASIYA DEVANSU
 
The basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mbaThe basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mbaBabasab Patil
 
Types of costing
Types of costingTypes of costing
Types of costingArif S
 
Construction project costs
Construction project costsConstruction project costs
Construction project costsJeremy Orion
 

Tendances (14)

Project life cycle costing
Project life cycle costing Project life cycle costing
Project life cycle costing
 
Life cycle cost definitions (2)
Life cycle cost definitions (2)Life cycle cost definitions (2)
Life cycle cost definitions (2)
 
Life cycle costing_calculation_tool
Life cycle costing_calculation_toolLife cycle costing_calculation_tool
Life cycle costing_calculation_tool
 
LIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDING
LIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDINGLIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDING
LIFE CYCLE COST (LCC) FOR SUSTAINABLE BUILDING
 
Product life cycle costing
Product life cycle costingProduct life cycle costing
Product life cycle costing
 
Life cycle cost example
Life cycle cost exampleLife cycle cost example
Life cycle cost example
 
132 whole life costing (2)
132 whole life costing (2)132 whole life costing (2)
132 whole life costing (2)
 
133 whole life costing
133 whole life costing133 whole life costing
133 whole life costing
 
IRJET- Life Cycle Cost Analysis of a Residential Building
IRJET-  	  Life Cycle Cost Analysis of a Residential BuildingIRJET-  	  Life Cycle Cost Analysis of a Residential Building
IRJET- Life Cycle Cost Analysis of a Residential Building
 
Target Costing and Life Cycle Costing
Target Costing and Life Cycle CostingTarget Costing and Life Cycle Costing
Target Costing and Life Cycle Costing
 
Types Of Costs (Economics & Management Purpose)
Types Of Costs (Economics & Management Purpose)Types Of Costs (Economics & Management Purpose)
Types Of Costs (Economics & Management Purpose)
 
The basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mbaThe basics of cost analysis ppt @ mba
The basics of cost analysis ppt @ mba
 
Types of costing
Types of costingTypes of costing
Types of costing
 
Construction project costs
Construction project costsConstruction project costs
Construction project costs
 

En vedette

Life cycle costing sachin
Life cycle costing sachinLife cycle costing sachin
Life cycle costing sachinsac104
 
Website wbs target costing
Website wbs target costingWebsite wbs target costing
Website wbs target costingchandan111
 
Target,kizen costing and abc..
Target,kizen costing and abc..Target,kizen costing and abc..
Target,kizen costing and abc..Manpreet Mahal
 
Target costing presentation_final(2)
Target costing presentation_final(2)Target costing presentation_final(2)
Target costing presentation_final(2)Akshay Karnatak
 
Life cycle costing (sqm)
Life cycle costing (sqm)Life cycle costing (sqm)
Life cycle costing (sqm)Adil Shaikh
 
Life cycle costing
Life cycle costingLife cycle costing
Life cycle costingJessy Chong
 
life cycle costing
life cycle costing life cycle costing
life cycle costing Mohd Hisyam
 

En vedette (12)

Life cycle costing sachin
Life cycle costing sachinLife cycle costing sachin
Life cycle costing sachin
 
Target costing
Target costingTarget costing
Target costing
 
Website wbs target costing
Website wbs target costingWebsite wbs target costing
Website wbs target costing
 
Target costing
Target costingTarget costing
Target costing
 
Target,kizen costing and abc..
Target,kizen costing and abc..Target,kizen costing and abc..
Target,kizen costing and abc..
 
Target Costing
Target CostingTarget Costing
Target Costing
 
Target costing presentation_final(2)
Target costing presentation_final(2)Target costing presentation_final(2)
Target costing presentation_final(2)
 
Target costing
Target costingTarget costing
Target costing
 
Life cycle costing (sqm)
Life cycle costing (sqm)Life cycle costing (sqm)
Life cycle costing (sqm)
 
Life cycle costing
Life cycle costingLife cycle costing
Life cycle costing
 
Target costing
Target costingTarget costing
Target costing
 
life cycle costing
life cycle costing life cycle costing
life cycle costing
 

Similaire à Life Cycle Cost Analysis

Life Cycle Cost
Life Cycle CostLife Cycle Cost
Life Cycle Costimagstech
 
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)Shrishail Bhat
 
AVReporter v2.5 energy management
AVReporter v2.5 energy managementAVReporter v2.5 energy management
AVReporter v2.5 energy managementAvreporter KONsys
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptxRASHMIPANWAR10
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)nfra erp
 
Railway Reservation System - Software Engineering
Railway Reservation System - Software EngineeringRailway Reservation System - Software Engineering
Railway Reservation System - Software EngineeringLalit Pal
 
Operating System Seminar By Owonubi Job Sunday
Operating System Seminar By Owonubi Job SundayOperating System Seminar By Owonubi Job Sunday
Operating System Seminar By Owonubi Job SundayJob Owonubi
 
Last version of cmms brochure
Last version of cmms brochureLast version of cmms brochure
Last version of cmms brochureGhazArt1980
 
BizController User's Manual
BizController User's ManualBizController User's Manual
BizController User's ManualBizController
 
Omicron ADMO Protection Systems Management Software Datasheet Manual
Omicron ADMO Protection Systems Management Software Datasheet ManualOmicron ADMO Protection Systems Management Software Datasheet Manual
Omicron ADMO Protection Systems Management Software Datasheet ManualAngus Sankaran
 
Stock analyzer.ppt review
Stock analyzer.ppt reviewStock analyzer.ppt review
Stock analyzer.ppt reviewSree Chinni
 

Similaire à Life Cycle Cost Analysis (20)

Life cycle cost
Life cycle costLife cycle cost
Life cycle cost
 
Life Cycle Cost
Life Cycle CostLife Cycle Cost
Life Cycle Cost
 
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
Embedded Systems (18EC62) – Embedded System Design Concepts (Module 4)
 
AVReporter v2.5 energy management
AVReporter v2.5 energy managementAVReporter v2.5 energy management
AVReporter v2.5 energy management
 
eresource pms generic
eresource pms generic eresource pms generic
eresource pms generic
 
PMS.pdf
PMS.pdfPMS.pdf
PMS.pdf
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptx
 
Guidelines to OEMs IETM Code and Pixels.pdf
Guidelines to OEMs IETM Code and Pixels.pdfGuidelines to OEMs IETM Code and Pixels.pdf
Guidelines to OEMs IETM Code and Pixels.pdf
 
Maintenance 2sp
Maintenance 2spMaintenance 2sp
Maintenance 2sp
 
Cmms
CmmsCmms
Cmms
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)
 
Railway Reservation System - Software Engineering
Railway Reservation System - Software EngineeringRailway Reservation System - Software Engineering
Railway Reservation System - Software Engineering
 
OPEN CABSTER PROJECT DOC
OPEN CABSTER PROJECT DOCOPEN CABSTER PROJECT DOC
OPEN CABSTER PROJECT DOC
 
Proteus mmx overview
Proteus mmx overviewProteus mmx overview
Proteus mmx overview
 
Operating System Seminar By Owonubi Job Sunday
Operating System Seminar By Owonubi Job SundayOperating System Seminar By Owonubi Job Sunday
Operating System Seminar By Owonubi Job Sunday
 
Srs template
Srs templateSrs template
Srs template
 
Last version of cmms brochure
Last version of cmms brochureLast version of cmms brochure
Last version of cmms brochure
 
BizController User's Manual
BizController User's ManualBizController User's Manual
BizController User's Manual
 
Omicron ADMO Protection Systems Management Software Datasheet Manual
Omicron ADMO Protection Systems Management Software Datasheet ManualOmicron ADMO Protection Systems Management Software Datasheet Manual
Omicron ADMO Protection Systems Management Software Datasheet Manual
 
Stock analyzer.ppt review
Stock analyzer.ppt reviewStock analyzer.ppt review
Stock analyzer.ppt review
 

Dernier

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 

Dernier (20)

Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 

Life Cycle Cost Analysis

  • 1. CERMAS 1.0 ● CERMAS 1.0 is a user friendly and menu driven software designed to predict the LCC (Life-Cycle Cost) of a system based on Reliability, Maintainability, and Availability using appropriate methods to simulate, which would otherwise have to be done manually and is difficult to analyze. ● The simulation tool helps to analyze the LCC based on various governing parameters like Acquisition Cost, Operational Cost, and Maintenance Cost etc. ● The product is developed with the applicable mathematical formulas or routines used to develop an estimate ● Costs are derived or calculated with a given cost estimating methods * 1
  • 2. Description of CERMAS 1.0 ● The system is designed to map the architecture of a system into corresponding cost elements based on reliability, availability and maintainability of the components. ● Each part of the system is configurable in its subcomponents and the importance of any component in estimating the cost of system can be identified. ● To estimate LCC of equipment, the tool accepts the cost inputs such as acquisition, operation, maintenance and other costs of the equipment. ● The LCC of equipment is the sum of the Acquisition Cost, Operational Cost, Maintenance Cost and Other Costs. Any revenues accrued shall be deducted from the LCC. LCC is calculated for various parameters like operating hour per year etc. Whereever applicable the calculations are done by considering inflation rate * 2
  • 3. Description of CERMAS 1.0 ● The system uses database for storing the information related to various cost elements of various equipments and also provides a data base for Equipment details. ● Generally LCC is done by a particular scientist at a given point of time, hence data base is created with author name (scientist) as the main element to retrieve the details of the equipment, costs etc. ● The CERMAS 1.0 software contains several modules. They can greatly enhance the calculation the LCC of the equipment or system. Users can choose these modules according to their needs to calculate the LCC of a system * 3
  • 4. The Main Features of CERMAS ● Equipment Tree Structure (ETS) ● Equipment Data ● Acquisition Cost ● Maintenance Cost ● Operational Cost ● Other Cost ● LCC Calculator ● Sensitivity Analysis ● Distributions ● Formulae ● Charts ● Reports ● Currency Converter ● Database Back-up ● Scientific Calculator, Help and FAQ’s * 4
  • 5. The Main Features of CERMAS ● Equipment Tree Structure (ETS) ● Equipment Tree Structure (ETS) contains the list of components to the left side of the CERMAS 1.0 Main Screen. In particular the user is required to select Equipment/Organization from ETS ● Equipment Data ● Equipment Data Module deals with the component details of a systems used in the LCC Estimation. This module allows the user to input the details of the equipment, such as name, model etc., ● Acquisition Cost ● Acquisition Cost Form allows the user to enter acquisition cost parameters to calculate acquisition cost. In this module the user can enter the inputs for the various acquisition cost parameters such as Basic Cost, Up gradation Cost, Initial Spare Cost, Packaging & Forwarding Cost etc., * 5
  • 6. The Main Features of CERMAS ● Maintenance Cost Maintenance Cost Form allows the user to select the type of the maintenance cost: ● Annual Maintenance Cost Annual Maintenance Cost Form allows the user to enter maintenance cost parameters to calculate Total Maintenance cost. ● Annual Breakdown Maintenance Cost This form allows the user to enter breakdown maintenance cost parameters to calculate Total Breakdown Maintenance cost ● Annual Schedule/Preventive Maintenance Cost Annual Schedule/Preventive Maintenance Cost Form allows the user to enter schedule/preventive maintenance cost parameters to calculate Total Schedule/Preventive Maintenance cost. * 6
  • 7. The Main Features of CERMAS ● Variable Maintenance Cost Variable Maintenance Cost Form allows the user to enter maintenance cost parameters to calculate Total Maintenance cost. ● Variable Schedule/Preventive Maintenance Cost Variable Schedule/Preventive Maintenance Cost form allows the user to enter schedule/preventive maintenance cost parameters to calculate variable Schedule/Preventive Maintenance cost. ● Variable Breakdown Maintenance Cost Form Variable Breakdown Maintenance Cost form allows the user to enter breakdown maintenance cost parameters to calculate variable Breakdown Maintenance cost. * 7
  • 8. The Main Features of CERMAS ● Operational Cost ● Operational Cost Form allows the user to enter operational cost parameters to calculate the Annual Operational Cost. ● Also operational cost module permits the user to enter the inputs for the equipment based on the following sample questions: 1. How much fuel or power consumed by equipment, if applicable both? 2. How many crew and support crews needed to operate the equipment? 3. How much the cost of the crew as well supports crews? 4. How much the Operational infrastructure, training, admin cost with respect to the equipment? 5. Any miscellaneous cost? 6. Unit of cost calculation for example: year, week. * 8
  • 9. The Main Features of CERMAS ● Other Cost Other Cost module is useful when some of the input costs are not covered in the above cost modules. This module allows the user to provide the details of various cost elements such as the cost of up gradation, disposal cost etc ● LCC Calculator LCC Calculator Form allows the user to view LCC of System (Organization) or Equipment describing various cost parameters incorporated in various Cost modules. ● Sensitivity Analysis This module is used to analyse the LCC variation for selected equipment by varying the cost percentages associated with that equipment * 9
  • 10. The Main Features of CERMAS ● Distributions ● The Distributions used for Simulation are Exponential, Triangular, Uniform ● User can select a particular distribution to simulate the various cost parameters like Acquisition Cost, Operational Cost, Maintenance Cost and LCC based on MTBF, MTTR and Availability values. ● Formulae ● The mathematical formulae used to estimate LCC contains the following variables: ● Availability Rate ● MTTF/MTBF ● Dormancy ● Missile Reliability ● Net Present Value (NPV) * 10
  • 11. The Main Features of CERMAS ● Currency Converter ● The Currency Converter Screen helps to exchange currency rates. It is the value of a foreign nation’s currency in terms of the home nation’s currency ● Database Back-up ● The “CERMAS 1.0 Software” uses MySQL 5.0 as the DBMS of choice. The DBMS software will provide a backup capability to ensure protection of the data in the DBMS. In addition, the DBMS software provides a transaction recording feature that can be used to keep track of all transactions during normal operation. ● Charts ● This module helps the user to generate various types of charts like Bar, Pie, Combination Pie and Water Fall and also to generate various reports such as Author based, Equipment Costs, LCC of equipment and organization and Equipment list. * 11
  • 12. The Main Features of CERMAS ● Reports ● Author Based ● Acquisition Cost ● Operational Cost ● Maintenance Cost ●Annual ●Variable ● Equipment List ● Equipment Costs ● Acquisition Cost ● Operational Cost ● Maintenance Cost ●Annual ●Variable ● Equipment Data * 12 ● LCC ● Equipment ● Organization
  • 13. The Main Modules CERMAS ● User Module ● Equipment Data Module ● Acquisition Cost Module ● Maintenance Cost Module ● Other Cost Module ● LCC Calculator Module ● Output Module ● Database Management System Module ● Distributions used for Simulation Module ● Formulae Module ● Currency Converter Module ● FAQ’s and Help Modules * 13
  • 15. * 15
  • 16. * 16
  • 17. * 17
  • 18. * 18
  • 19. * 19
  • 20. * 20
  • 21. * 21
  • 22. * 22
  • 23. * 23
  • 24. * 24
  • 25. * 25