1) The document welcomes the Union Railway Minister and Minister of State to discuss the status of railway projects in Andhra Pradesh.
2) It provides details on the proposed expansion of the Multi-Modal Transport System (MMTS) in Hyderabad, including 6 new routes identified.
3) Many sanctioned railway projects from the 1990s are still ongoing or have yet to begin due to inadequate funding and delays in estimate approval. The document requests additional funds for ongoing works.
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
Railway Projects In Andhra pradesh : What is pending and What is Proposed
1. GOVERNMENT OF ANDHRA PRADESH
WELCOMES
Shri. DINESH TRIVEDI
Hon’ble Union Minister for Railways
Shri. K.H. MUNIYAPPA
Hon’ble Union Minister of State for Railways
&
All Members of Parliament 1
4. Multi Model Transit System
Ph-II- Hyderabad
Needs expansion and strengthening to
ease suburban traffic in Hyderabad.
6 routes identified for implementation.
Cost sharing: 2/3rd – Govt of Andhra
Pradesh.
Abstract estimate at Rs. 641 Crores
( Yr. 2006) sent to Board.
4
5. MMTS Phase-II Routes
Moula-ali ‘C’ cabin-Sanathnagar (21.85)Km)
Moulali-Malkajgiri-Sitafalmandi ( 10 Km)
Secunderabad-Bolarum-Medchal (28 Km)
Falaknuma-Umdanagar-Shamshabad (20Km)
Moulali ‘C’ cabin – Ghatkesar (12.2Km)
Telapur – Patancheru (8.75 Km)
Doubling: 60 km; Third Line:12.2 Km;
New Line:15.6Km
No. of stations: 27 (Existing:18, New: 9)
Approval of proposal is required from Railway Board in
order to commence the work in 2012-13
Additional Route
MMTS which is running upto Lingampally should be extended upto
Patancheru and also upto Sangareddy and Jadcharla of
Mahaboobnagar 5
6. Sanctioned Projects
Sanctioned Projects as old as 92-93 are
still in progress.
Projects sanctioned in 1999 is yet to
start
Funds provided are grossly inadequate
and provided funds are not utilized due
to delay in sanction of estimates.
6
8. Funds Required for 2012-13
Budget
Name of work Remarks
Crs
1 Peddapalli Nizamabad- 150 Last phase Morthad to
(92-93) 178 Km Nizamabad 45 km balance
2 Nandyal – Yerraguntla 180 Last phase Banaganapalli to
(96-97) 126 Km Nandyal 28 km balance
3 Jaggayyapet- 90 Mellacheruvu to Vishnupuram
Mellacheruvu(06-07) 45 Km link will be established
4 Devarakadra - Krishna 50 To speed up the progress
5 Kadapa-Bangalore(08-09) 50 Kadapa- Pendlamarri can be
225 Km completed. Balance Pendlamarri
to Bangarpet estimate to be
sanctioned early
Machela-Nalgonda(97-98) 82 30 To speed up the progress
6 Km
Total 550
As against the alloted budget of Rs. 365 crores in 2011-12, Railway requires
Rs. 550 crores for the year 2012-13 8
9. ESTIMATES TO BE SANCTIONED
NEW LINES
Rs. In Cr.
Year of KM Anticipa Remarks
Name of work sanction ted
Cost
1 NADIKUDI – 2011-12 308 1313 Final location survey in
SRIKALAHASTI progress. Target Jan13
2 KOTIPALLI – 2000-01 57 1047 Three Mega Bridges. Revised
NARSAPUR cost comes to Rs 20 crs per
km. Estimate pending with
Board.
3 MAHOHARABAD – 2006-07 151 784 State Govt. agreed to bear
KOTTAPALLI 50% cost and land. Railways
can sanction this estimate
without insisting for annuity.
Contd..
9
10. ESTIMATES TO BE SANCTIONED
NEW LINES
Name of work Year of KM Anticip Remarks In Cr.
Rs.
sanc. ated
Cost
4 KAKINADA – 1999-00 21 125 Estimate to be
PITHAPURAM sanctioned.
5 BHADRACHALAM ROAD 2010-11 56 337 As Rate of Return (RoR)
– SATTUPALLI is very (25%), Railways
can sanction this work
without insisting for
deposit from SSCL
6 GUDUR – 2011-12 45 283 Final location survey in
DURGARAJIPPATNAM progress. Target Jun12
Total 3889
Expeditious sanction of Estimates is required to commence
the above works. Necessary budget to be allotted by the
Railway Board 10
12. Estimate to be sanctioned
Name of work KMs Budget Justification
(Crs)
Guntur – Tenali – 25 30 Executing by RVNL. Final
1 Repalle Location survey in
progress. Target Mar12
Vijayawada – 221 100 Executing by RVNL. Final
Gudiwada – Location survey in
Bhimavaram – progress. Target Mar12
2
Narsapur –
Machillipatnam
Total 130
Estimate amounts to be sanctioned by Rail Vikas Nigam
Limited
12
13. Establishing Wagon Factory at
Kazipet
We thank the Hon’ble Union Railway Minister
for sanctioning the Wagon Factory
Land jointly identified by State and Railways
is Endowment Land.
The process for sanction of Wagon Factory
under PPP will be initiated by Railway Board.
Land is being given by the State Government
shortly and we request work to be commenced
quickly.
13
14. New Proposals for Workshop
and Loco Shed
Proposal for Workshop and Loco Shed at
Vizianagaram
Establishment of traction Loco shed at
Guntakal
Establishment of railway allied industry in
between Guntakal – Ananthapur or in and
around
Improvement to the Gooty Diesel shed
Setting up of POH Diesel/Electrical Loco
Shed at Vijayawada.
14
17. SOCIALLY DESIRABLE
SURVEYS
SANCTIONED -8
SENT TO BOARD -3
IN PROGRESS -5
17
18. SENT TO BOARD - 3NOS
Length in
Year of COST
Project km ROR% REMARKS
survey In Cr
1 2010-11 Secunderabad – 63 456 8.07 Sent to Board in
Zaheerabad 2011-12.
2 2010-11 Pandurangapuram 13 79 18.43 Sent to Board on
- Bhadrachalam 15.2.11
Town Updated on 6.7.11.
3 2010-11 Kachiguda – 87 1067 1.03 Sent to Board in
Chityal 2011-12
Decision Awaited
Hon’ble Union Minister for Railways to
instruct the Board for early sanction.
18
19. SURVEYS IN PROGRESS
Year Length
Project in km
survey
1 2010-11BhadrachalamRoad- Visakapatnam (NL) 316
Target:Jun12
2 2010-11Krishna – Vikarabad (NL) Target:Feb12 148
3 2010-11Patancheru – Adilabad (NL) Target:Jul12 316
4 2010-11Mantralayam Road – Kurnool Town (NL) 110
Target:Mar12
5 2010-11Jaggayyapeta Town – Miryalaguda (NL) 65
Target:Mar12
Hon’ble Minister for Railways to instruct
the Board for early sanction. 19
20. COST SHARING PROJECTS BY STATE GOVT
Project % Kms Cost Remarks
sharing In Crs
1 Kadapa - Bangarpet NewLine 50 257 1800 Phase I Kadapa-Pendlamarri- Land
under acquisition. Tenders under
finalisation.
2 Nadikudi – Srikalahasti NewLine 50 309 1313 Final location survey in progress.
Target DEC’12
3 Manoharabad – Kothapalli 33 151 791 State Govt to confirm condition
NewLine stipulated by Railway Board for cost
sharing and Annuity.
Three Mega Bridges. Revised cost
Kotipalli – Narsapur NewLine 25 57 695 comes to Rs 20 crs per km. Estimate
with Board.
4
5
Executing by RVNL. Final Location
Guntur - Tenali – Repalle Doubling 50 25 130
survey in progress. Target Mar12
6
Vijayawada-Gudiwada-BVRM- Executing by RVNL. Final Location
50 221 1010
Narsapur-MTM Doubling survey in progress. Target Mar12
20
21. SURVEYS SUBMITTED TO RAILWAY BOARD
Year Km Cost in ROR % Remarks
survey Project Cr
1 2008-09 Dornakal – Manuguru 104 450 24.53 Sent to Board on
DL,PETS 27.8.10
2 2006-07 Tadikalapudi – 19 119 17.94 Sent to Board on
Koyagudem RETS 24.9.10.
3 2004-05 Secunderabad – 297 534 14.00 Sent to Board on
Dronachellam DL,PETS Jan 05.
4 1974-75 Mancherial – Chinnur, 36 8 11.29 Sent to Board on
PETS May77.
5 2009-10 Bibinagar& Nallapadu 252 821 10.02 Sent to Board on
DL,PETS 12.7.10
6 1976-77 Karimnagar – Kazipet, 155 23 8.50 Sent to Board on
PETS Feb 85.
7 95-96 Sarpavaram – 11 20 6.00 Sent to Board on
Chandrampalem, PETS Aug 96.
8 2007-08 Markapur Road-Srisailam, 65 452 (-)9.25 Sent to Board on
PETS 29.9.10.
21
22. SURVEYS SUBMITTED TO RAILWAY BOARD
Year of Km Cost ROR REMARKS
survey Project in Cr %
9 2008-09 Armur-Adilabad (Updt) 136 700 (-) 10.8 Sent to Board on
16.8.10
10 2005-06 Donakonda – Bitragunta 197 818 1.24 Sent to Board on
RETS May.07
11 2009-10 Piduguralla – 32 Sent to Board on
Narsaraopet, RETS 237 (-)0.44 29.9.10.
12 2005-06 Manuguru - 199 3.01& 7.34 Sent to Board on
Ramagundam incl 1112 (50%) May-08.
TrD(RETS)
13 2005-06 Jadcherla – Nandyal RETS 182 565 (-)10.4 Sent to Board on
Sept 07.
14 2004-05 Ongole – Donakonda, 87 293 -0.36 Sent to Board on
RETS OCT97.
15 2004-05 Machilipatnam - Repalle, 45 276 1.52 Sent to Board on
RETS Jan 05.
22
23. SURVEYS SUBMITTED TO RAILWAY BOARD
Year Km Cost ROR Remarks
survey Project Cr %
16 2002-03 Donakonda – Vadarevu 113 228 (-) 6.95 Sent to Board on
Aug 03.
17 2007-08 Macherla – Gadwal 184 919 (-)4. Sent to Board on
(Tirumalgiri-Arepalli), UPDT 5.8.10 Updated
on 21.12.10.
18 00-01 Patancheru – Jogipet 44 108 (-) 3.61 Sent to Board on
Dec2000.
19 99-00 Hyderabad – Raichur 189 456 (-) 35.03Sent to Board on
Mar2000.
20 98-99 Kurnool –Kamalapurm 81 153 (-) 13.37Sent to Board on
(Kurnool – Nandyal) Mar 99.
21 98-99 Yerraguntla – Dhamavaram 105 224 (-) 1.00 Sent to Board on
Feb 09.
22 98-99 Chitoor –Bangarapet 140 356 (-) 0.43 Sent to Board on
Nov 98.
23 97-98 Kapada -Nellore 181 355 (-) 0.46 Sent to Board on
July 98.
23
24. SURVEYS SUBMITTED TO RAILWAY BOARD
Sl. Year of Km Cost in ROR Remarks
No survey Project Cr %
24 97-98 Patancheru – Akkanapet, 102 183 (-) 0.34Sent to Board on
PETS Jan 98.
25 1982-83Nidubrolu – Nizampatnam, 21 12 0.82 Sent to Board on
PETS Jun 85.
26 1980-81Patancheru – Peddapalli 300 96 3.07 Sent to Board on
& ,PETS Mar 81.
27 1972-73Gooty - Krishna - Adilabad 592 113 0.54 Sent to Board on
– Wardah,Tfc Dec74.
24
26. Important projects in Andhra Pradesh to be sanctioned
Multi Model Transit System
Ph-II- Hyderabad
New line from Nadikudi to Srikalahasti
with an anticipated cost of Rs. 1313
crores
New line from Latur to Kovur
New line from Rajam to Vizianagaram
26
27. Important projects in Andhra Pradesh to be sanctioned
Increase in supply of rakes for
procurement of rice
More passenger services
Passenger amenities to be
improved
More stoppages
27
28. Wadi – Latur - Howrah
Bombay to Latur Road railway line is existing.
If New line projects are sanctioned as
mentioned below, it will be a shortest route
from West Coast to East coast, also connects
under developed areas.
Latur Road- Bodhan, Survey is completed - To be
sanctioned
Ramagundam- Manuguru, survey done, GoAP
agreed for 50%, but RoR is only 7%, we request that
this be included in works under Extremist affected
Districts and start the work immediately.
Bhadrachalam- Kovvur, Survey done, GoAP agreed
for 50%, RoR is 28% - May be approved since it is a
viable project
28
30. NEW TRAINS PROPOSED
Secunderabad to Tirupathi Express via Kurnool –
Dhone – Guntakal – Dharmavaram – Kalikiri -
Madanapally
Nizamabad to Tirupathi overnight Express
A new intercity Express between Visakhapatnam
to Secunderabad via Vijayawada – Khammam-
Kazipet; duly delinking the present
Janmabhoomi Exp.runnig in a circutous route as
Janmabhoomi Exp. between Visakapatnam-
Tenali and as Nagarjuna Exp.between Tenali-
Sec’bad as was run earlier.
Kacheguda-Bangalore Garibrath Exp.
Contd.. 30
35. Representations from
Hon’ble MPs and Union
Ministers of State of
Andhra Pradesh
35
36. Sri Ananta Venkata Rami Reddy, MP
RoB at Anantapur to be taken up in this year’s
budget.
Guntakal – Tirupati Express Train was
announced but not started.
Guntakal Loco Shed already sanctioned, but
sufficient budget is not being allotted.
36
37. Dr.Botcha Jhansi Lakshmi, MP (LS)
Proposed New Trains:
(1) Vizianagaram to Chennai
(2) Extension of Garib Rath Express to
Vizianagaram,
Land Acquisition in Kothavalasa to Visakhapatnam
– Total land acquired 19 Acs. Actual handed over
land is 6.6 Acs.
Cheepurupalli line over bridge.
37
38. Sri Magunta Sreenivasulu Reddy, MP
Ongole – Donakonda Railway Line
- This may be taken up with 50% cost sharing, if
necessary in PPP mode. May be taken up during
this budget.
Cumbum – Proddatur and Giddalur
- Project to be taken up on cost sharing basis at the
earliest.
Guntur – Dhone
- Doubling Works to be done immediately.
38
39. Sri Mohd. Ali Khan, MP (RS)
MMTS Phase – II : To be sanctioned.
Trains to Ajmeer : To be sanctioned
39
40. Sri Manda Jagannadham, MP
Secunderabad – Mahabubnagar Doubling Works to be
taken up immediately.
Secunderabad to Srisailam via Kollapur be taken up
immediately.
MMTS to be extended upto Jedcharla of
Mahabubnagar.
40
41. Ms. M.Vijayashanti, MP (LS)
New BG Survey Line from Akkannapet – Medak to be taken up
Construction of New BG Line from Hyderabad – Gajwel - Siddipet
– Siricilla – Jagityal to be taken up.
Patancheru-Adilabad New Survey Line to be taken up.
Extension of Passenger Services between Shankerpally -
Ordnance Factory at Yeddumailaram (MOD).
41
42. Sri T.Subbarami Reddy, MP (RS)
Duronto Express from Visakhapatnam.
Electrification of Bibi Nagar – Nallapadu and Nallapadu –
Dronachalam.
More connectivity to Visakhapatnam to Sai Nagar City (Shiridi).
Visakhapatnam to Trivendrum connectivity.
42
43. Sri Anjan Kumar Yadav, MP
Lack of minimum facilities at Secunderabad,
Nampally and Kachiguda Railway Stations.
Connectivity to Samshabad Airport.
Provision of Escalators in the Railway Stations of
Secunderabad, Nampally and Kachiguda.
43
44. Sri Komati Reddy Rajagopal Reddy, MP
Lack of civic amenities in the Railway Stations of
Bhongir / Alair and Janagaon.
RoBs at two places between Bibi Nagar and
Yadagirigutta to be taken up / permitted by the GM,
SCR.
44
45. Sri Gutha Sukender Reddy, MP
Bibi Nagar and Nadikudi electrification to be completed
immediately, since it is the first project taken up after
the Independence.
Mellacheruvu – Jaggaiahpet, Mattampalli – Janpahad
to be completed early.
Kachiguda to Chittyal be extended upto Vijayawada
and Survey proposals may be furnished accordingly.
Nalgonda – Macherla – So far no funds are spent on
this.
Wagon coach factory at Kazipet to be established
immediately, for which State Govt. should hand over
the land by Coordinating with Endowments Dept.
45
46. Sri Kanumuri Bapi Raju, MP
The issue of provision of Railway Wagons to FCI
for procurement of Paddy be increased.
RUB at Shivalayam Street to be taken up.
Un-manned railway gates to be provided with
guards as announced by the then Railway
Minister.
Railway gates on Railway crossing should not be
closed permanently by the railway Authorities
unilaterally. They should consult District
Ministers / District Collector, before closing
down. 46
47. Sri Nandi Yellaiah, MP (RS)
Manoharabad to Kothapalli via Siddipet, was
announced long back but no budget has been spent
on this.
MMTS - Lingampally – Patancheru may be
extended to Sangareddy.
The District Headquarters of Medak is not
connected with Railway network and it is a long
pending demand of the people (Medak to
Sangareddy – 70 Kms.)
47
48. Sri Rayapati Sambasiva Rao, MP
Guntur RoB at Arandalpet to be expanded six feet at
both the sides.
Repalle – Tenali Electrification – Survey should be done
immediately.
48
49. Sri Kavuri Sambasiva Rao, MP
40 RoB proposals can be completed in 2 years by
releasing 50% of State share.
Bhadrachalam – Kovvur Railway line be taken up
immediately, since it connects most of tribal and
underdeveloped parts.
100 Escalators to be provided across the State.
49
50. Dr. D. Purandeswari,
Hon’ble Union Minister of State for HRD
Waltair Division should be made as a separate zone and if it is not
possible as a last option should merge in South Central Railway.
Amending the present policy - Railway lands for slum Dwellers in
Visakhapatnam to provide alternative land to railways.
To develop Tourism in that area by providing exclusive trains to
Araku Valley.
Originating trains from Visakhapatnam to Chennai, Bangalore and
Tirupati to be introduced.
50
51. Sri Lagadapati Rajagopal, MP
Vijayawada station should be upgraded to world Class
Railway Station.
Kachiguda – Chittyal to be extended to Vijayawada.
Kondapalli – Kothagudem is very important and RoR is
also good, hence to be taken up.
Permission to the local bodies to take up the civic
works. Requested the Railway Authorities to permit
without any hurdle.
51
52. Sri Sarve Satyanarayana, MP
MMTS Phase – II to be sanctioned immediately.
RoBs at Malkajgiri, Safilguda and other places to be
taken up.
Though Malkajgiri is declared as ‘Adarsh Station’, no
works on platform and civic amenities have been taken
up.
Vikarabad Hitech Railway station works to be taken up.
52
53. Sri Suresh Shetkar, MP
Bodhan – Bidar railway Line : Survey is completed, but
work is not taken up.
Patancheruvu – Sangareddy announced, but no survey
has been taken up.
Demu – Hyderabad – Vikarabad – Zaheerabad – Bidar –
is announced not taken up so far.
Bombay to Lathur via Zaheerabad and short distances to
Hyderabad to be taken up.
Progress of works at Zaheerabad ‘Adarsh Station’ are
not satisfactory.
53
54. Sri Harsha Kumar, MP
Kotipally – Amalapuram and Kotipally – Narsapur be
taken up immediately.
At Dwarakapudi Adarsh Station, no trains are stopping.
54
55. Sri Madhu Yashki, MP
Adarsh Railway Station at Nizamabad to be improved.
At Bodhan Gandhi Park Railway Station, though Rs.15
lakhs have been provided from MP Lads, the platform is
at a low level and causing inconvenience.
Narrow crossing is causing accidents, hence, expansion
of gate to be taken up immediately and RoB at a later
stage.
55
56. Sri Ponnam Prabhakar, MP
Survey work of two newly sanctioned lines in 2011-12
Railway Budget i.e. Karimnagar to Secunderabad via
Siddipeta and Karimnagar to Hasanparthy is pending.
ROB at Iammikunta is pending
Introduction of bi-weekly train from Karimnagar to
Tirupathi
Establishment of Rake siding at Jammikunta Railway
station
56
57. Sri. Porika Balram Naik, MP
New Line from Singareni Colleries to Gandhipuram to be
laid
To construct a new modern style building on the newly
constructed platform and providing general waiting hall
and improve the circulating area with Arch Gate and to
develop greenery at Dornakal Railway station categorised
as B-Class
Restoration of passenger train facility from Singareni to
Yellandu
Fixing of an online booking counter at Mulugu, Warangal
District
Stoppage of Trains
Train NO. 2705/06 at Kesamudram
Train No. 1405/1406 at Kesamudram
Train No. 12763/64 at Nekkonda
Train No. 18645/46 at Dornakal
Train No. 12727/28, 12511/12, 12615/16, 12752 at
Mahabubabad
58. Sri. M.M. Pallam Raju,
Hon’ble Union Minister of State for Defence
Commencement of work on Kakinada – Pithapuram BG
Line as the GoAP has committed to provide land free of
cost.
New Train from Hyderabad – Kakinada (in addition to
Gautami Express)
New Train from Kakinada to Mumbai and Kakinada to
Varanasi
Conversion of Bi-Weekly Shiridi Express (Train No. 17206)
as daily train
Provision of 4th Platform at Kakinada Town Railway Station
Stoppage of Nagavali Express, Lokmanya Tilak Express and
Bhuvaneswar-Chennai at Samalkot Railway Station
Stoppage of Garib Rath Express at Tuni Railway Station
Augumentation of additional bogies for Sheshadiri Express
(3AC – 2, SL Class-3 bhogies) and Circar Express
59. Sri. A. Sai Pratap, MP
In addition to Venkatadri Express one more train from
Kachiguda to Tirupati via Guntakal to be sanctioned
Conversion of Padmavati express into daily train
Stoppage of Amaravathi Express at Molakalacheruvu, CTM
Madanapalli and Vayalpad
Stoppage of Sampark Kranthi Express at Rajampet
Extension of Arkonam passenger train upto Kadapa
For Kadapa – Bangalore ongoing new project, atleast Rs.
100 crores from Railways to be released as that State
contribution will also be released (50:50 cost sharing)
At Nandaluru Station of Guntakal Division nearly 200 acres
of railway land along with 150 houses plus locomotive
shed with infrastructure is available. Request to utilize this
infrastructure and provide suitable industry connected to
railways.
61. Road Over / Under Bridges
(ROBs/RUBs) are being taken up
under cost sharing basis with State
Governments on 50:50 basis where
Train Vehicular Units (TVUs) is more
than 1.00 Lakh.
As of now 120 Nos costing Rs
2707.40 cr of ROBs/RUBs are
approved by Railway Board which
are at various stages of construction.
61
62. Further, ROBs/RUBs are taken up at
LC’s which are having less than 1.00
Lakh TVU’s with entire cost borne by
State Govt.
12 such ROBs/RUBs costing Rs 201.95
cr. are at various stages of
construction
62
63. S Stage Cost sharing State Govt. Total
l. 50:50 funds
n
Nos Cost No Cost Nos Cost
o
s
1 Works completed 48 628.8 3 34.92 51 663.75
3
2 Works in progress 36 898.0 3 21.43 39 919.48
3 Works at tender 8 5
235.2 2 45.00 10 280.20
stage 0
4 Works at estimate 9 325 4 100.5 13 425.50
stage 0
5 Investigation 19 645.3 0 0.00 19 645.32
stage 2
120 2707. 12 201.9 132 2909.3
4 5 5
The stage –I approvals for 19 works are under process
63
64. Railway zone Eligible Lcs Proposals Proposals
submitted by sent to
state Govt. to railway
Railway zones Board by
Railway
zones
South Central 41 10 6
Railways
East Coast Railways 4 2 1
South west Railways - 3 0
Total 45 15 7
64
65. Proposals submitted by state Govt. to
Railways to include in RWP:2012-13
Sl No L.C. No. Location District Remarks
SOUTH CENTRAL RAILWAYS
Processed by SCR and sent to
1 57 Ravindrakhani Adilabad Rly. Board to sanction in
RWP:2012-13.
Proposals furnished to SCR
2 30 Adilabad town limits Adilabad vide Govt. Letter
dt.07.06.2011.
Processed by SCR and sent to
3 80 Sirpur town limits Adilabad Rly. Board to sanction in
RWP:2012-13.
Ramnagar gate in Proposals furnished to SCR for
4 127 Ananthapur
Ananthapur town limits inclusion in RWP:2012-13.
Processed by SCR and sent to
5 124 NH Ananthapur Rly. Board to sanction in
RWP:2012-13.
Processed by SCR and sent to
6 102 NH Chittoor Rly. Board to sanction in
RWP:2012-13.
Proposals furnished to SCR for
7 134 Kamalapuram Kadapa inclusion in RWP:2012-13.
65
66. Proposals submitted by state Govt. to
Railways to include in RWP:2012-13
Sl No L.C. No. Location District Remarks
SOUTH CENTRAL RAILWAYS
Processed by SCR and sent to
8 33 Wangapalli Nalgonda Rly. Board to sanction in
RWP:2012-13.
Processed by SCR and sent to
9 44 Raghunathapally Warangal Rly. Board to sanction in
RWP:2012-13..
Processed by SCR and sent to
10 193 Madhavanagar Nizamabad Rly. Board to sanction in
RWP:2012-13.
EAST COAST RAILWAYS
VSKP- Proposals furnished to SCR for
1 SP-5 Waltair Marshal yard
Bhu'neswar inclusion in RWP:2012-13.
Processed by SCR and sent to
Rayapur-
2 RV-324 Manapuram(NH) Rly. Board to sanction in
VSKP
RWP:2012-13.
Proposals furnished to SCR for
SOUTH WESTERN RAILWAYS inclusion in RWP:2012-13.
66
67. Proposals submitted by state Govt. to
Railways to include in RWP:2012-13
Sl No L.C. No. Location District Remarks
SOUTH WESTERN RAILWAYS
Proposals furnished to SCR for
1 71 Chakarala palli Anantapur
inclusion in RWP:2012-13.
Proposals furnished to SCR for
2 83 Penukonda town limits Anantapur
inclusion in RWP:2012-13.
Penukonda Proposals furnished to SCR for
3 85 Anantapur
(Peddacheruvu gate) inclusion in RWP:2012-13.
Total Proposals sent to Railways = 15 Nos
Processed by the Railways
•South Central Railways = 6 Nos
•East Coast Railways = 1 Nos
•Total Processed by Railways = 7 Nos.
67
68. South Central Railways communicated a
list of 40 nos of eligible LCs for processing
the proposals for inclusion in RWP 2013-14.
New Railway guidelines communicated
by Railway board vide Lr. dated 7-10-2011
has to be followed for processing
proposals for RWP 2013-14.
69. According to new guidelines, alignment,
GAD has to be processed by R&B and
railways . Further the site has to be made
encumbrance free by acquiring land,
shifting of utilities etc., and detailed
estimate has to be sent along with
proposal for inclusion in RWP.
69
70. The Honorable Minister for Railways may
kindly consider to sanction all 15 proposals
under Railway works programme 2012-13.
The Hon’ble Minister for Railways may kindly
re-consider the Railway guidelines issued
vide Railway Board letter dt.07.10.2011, in
processing the proposals to be included in
Railway Works Programme 2013-14 onwards.
1. So as to avoid delay
2. It may be difficult to safe guard the land so
acquired from encroachments in case the
proposal is not approved in Railway Works
Programme. 70