8/28/2009 Harry Indig, PMP  Prepared for Nicole and Ret Taylor  156 Northeast 59 th  Street Seattle, WA 98105
[object Object],The customers home at 156 Ne 59 th  St in Seattle, WA has been owned by the current owners since 2005.  They were fortunate this house has had no additions and minimally invasive remodels since its construction in 1909.  Being its century year, the owners have sought to do an extensive remodel by lifting its 990 square feet main floor off its original foundation, raising it by 3 feet, upon setting it back down.  This will double it’s conditioned square footage by allowing the current basement to become livable space. Conservation measures such as passive day lighting, increased insulation, improved circulation, the addition of a heating system, and replacement of the existing hot water system, and with the possibility of adding solar electric generation will all be incorporated into the remodel.
The customer’s objective is to look into the feasibility and long-term return on investment of a roof-mounted solar photovoltaic array. The owners believe the retail expense of power in the Seattle area is relatively inexpensive.  However; both owners believe making decisions for the good of our community for the future, needs to be evaluated.  The prospect of current energy prices increasing in the near future is also of concern.  And with the incentives being offered by our government on federal and state levels coupled with the incentives being paid by the local power distribution companies for selling electricity to them; generating their own solar power becomes an attractive venture.  Over all else, the owners would like to know if they are getting a good return on investment by putting their capital towards solar power versus investing in a security such as a secured bond or growth equity.
Is Solar Right for You?  Yes, if you... Own the building where you want to install solar;  Have a roof in good shape and shade-free; and  Are interested in making a long-term investment to protect yourself from rising energy costs and want to reduce your environmental impact.
[object Object],[object Object],[object Object],Benefits and Costs Solar Energy:   Is a long-term investment that increases in value as energy costs rise.  Reduces your "carbon footprint" -- the amount of greenhouse gases produced by your home or business, which in turn lessens your overall impact on the environment.
[object Object],[object Object],To maximize the PV system investment (by purchasing as little electricity as possible) additional conservation steps will be taken to reduce electrical consumption.  Electrical conservation will be achieved primarily through the migration of thermal loads from electrical to natural gas devices.
[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
House’s East View House’s West View
North Roof South Roof East Roof  96.1%  West Roof  89.8%
[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
(8) Silicon Energy 185 Watt Modules w/ racking  $8,880 (1) Outback SmartRE 2500 Inverter  $4,440 2 strings of 4 modules, 121.2 volts, 15.8 amps SmartRE 2500 Battery Enclosure (4) Group 27 106 Ah batteries Balance of System Components  $1480 (1) Combiner box (1) Ground Fault Circuit Interruptor (1) 600 Volt DC Fused Disconnect (1) AC Fused Disconnect (1) 240 Volt Production Meter Miscellaneous conduit and fittings Labor   $1480 Grand Total $16,280 ($11 / watt installed)
Notes: 1) Meter sockets must be located near each other and outside or otherwise consistent with location allowed by  Seattle City Light Requirements for Electric Service. 2) Standard utility socket with face cover (no round sockets). Socket wired per sheet 2. 3) When production meter is removed, bottom terminals will be energized and line terminals will be de-energized (opposite of billing meter). 4) Billing meter will run backwards and subtract when energy flows to utility, production meter only runs forward. 5) Delivered energy flows from utility. 6) Received energy flows to utility.
Production Meter Wiring and New components for Net Metering per Seattle City Light
OutBack Power Products Smartre 2500 Up to 93% Inverter Efficiency
We have seen photovoltaic cells and arrays, also known as solar modules, convert sunlight into electrical energy. Now being used in a number of building applications, including shingles and fenestration, photovoltaic's are becoming a common onsite renewable energy source. Whether roof-mounted or built into the design, solar cells are connected in series to achieve proper voltages. The energy produced can either be stored in batteries or tied directly to the municipal grid. In some cases, you may qualify for tax credits or rebates when purchasing and installing photovoltaic modules. You also may be able to sell the extra energy you produce back to your local utility.  The owner’s electric power consumption of  4845  kWh per year based on the past 2 years. This is  13.27  kWh/day. Several key parameters have been evaluated at this home site, which has excellent solar access. Based on the shade analysis performed we calculated  96.1 % solar available sunlight. There is  228  square feet on the east roof for solar array layout. Application of Solar Photovoltaic
In 1980 the Solar Rating and Certification Corporation (SRCC) was incorporated as a non-profit organization with the primary purpose being the development and implementation of certification programs and national rating standards for solar energy equipment. A simple installation of several PV solar arrays on this project could use the equivalent sun hours per day based on SRCC certification data as table 1 from the Average Daily Total Solar Radiation for City of Seattle with two tilt angles. The infrastructure of the entire system on your roof needs to meet the CAM requirements of the City of Seattle. Table 1 Average Daily Total Solar Radiation for U.S. Cities City MJ/m²·day 23° Tilt MJ/m²·day 45° Tilt Btu/ft²·day 23° Tilt Btu/ft²·day 45° Tilt Seattle 11.65 11.63 1026 1024
[object Object],Energy payback time (EPBT) is the length of deployment required for a photovoltaic system to generate an amount of energy equal to the total energy that went into its production. Roof-mounted photovoltaic systems have impressively low energy payback times, as documented by recent (year 2004) engineering studies. The value of EPBT is dependent on three factors: (i) the conversion efficiency of the photovoltaic system; (ii) the amount of illumination (insolation) that the system receives (about 1700 kWh/m 2 /yr average for southern Europe and about 1800 kWh/m 2 /yr average for the United States); and (iii) the manufacturing technology that was used to make the photovoltaic (solar) cells.
[object Object],The most common array design uses flat-plate PV modules or panels. These panels can either be fixed in place or allowed to track the movement of the sun. They respond to sunlight that is either direct or diffuse. Even in clear skies, the diffuse component of sunlight accounts for between 10% and 20% of the total solar radiation on a horizontal surface. On partly sunny days, up to 50% of that radiation is diffuse. And on cloudy days, 100% of the radiation is diffuse.   One typical flat-plate module design uses a substrate of metal, glass, or plastic to provide structural support in the back; encapsulates material to protect the cells; and a transparent cover of plastic or glass.     The simplest PV array consists of flat-plate PV panels in a fixed position. The advantages of fixed arrays are that they lack moving parts, there is virtually no need for extra equipment, and they are relatively lightweight. These features make them suitable for many locations, including most residential roofs. Because the panels are fixed in place, their orientation to the sun is usually at an angle that practically speaking is less than optimal. Therefore, less energy per unit area of array is collected compared with that from a tracking array. However, this drawback must be balanced against the higher cost of the tracking system .
[object Object],[object Object],[object Object],[object Object],[object Object]
Suggested Solution of Solar
Use parallel wiring to increase current (power). This diagram shows a simple parallel circuit to increase current or power. Assume that we are using 12 volt batteries. The power of all 3 batteries add to give us the effect of a battery 3 times as powerful but the voltage stays the same at 12 volts. Parallel wiring increases current but the voltage does not change. This is the wiring used when jump starting a car for example. Use series wiring to increase voltage The voltage of all 3 batteries add to give us the effect of a battery 3 times the voltage or in this case a very large 12 volt battery. In this circuit the current is the same as the current in just 1 of the batteries. But since the 4 volt industrial batteries are very large, we have in effect created a huge 12 volt battery.
[object Object],[object Object],This diagram shows a combination series and parallel circuit to increase both the battery current and voltage level at the same time. Assume this time we are using 12 volt batteries

More Related Content

What's hot

STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)sajidpk92
 
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module Rick Borry
 
Maximizing Output Power of a Solar Panel via Combination of Sun Tracking and ...
Maximizing Output Power of a Solar Panel via Combination of Sun Tracking and ...Maximizing Output Power of a Solar Panel via Combination of Sun Tracking and ...
Maximizing Output Power of a Solar Panel via Combination of Sun Tracking and ...ijtsrd
 
Solar energy proposal by MGE
Solar energy proposal by MGESolar energy proposal by MGE
Solar energy proposal by MGEViet Ngo Thanh
 
India solar power_plant_vpc
India solar power_plant_vpcIndia solar power_plant_vpc
India solar power_plant_vpcPasu Kumar
 
Proposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transportProposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transportAnkit Singh
 
EcoOne - SolarEnergy Presentation 2014
EcoOne - SolarEnergy Presentation 2014EcoOne - SolarEnergy Presentation 2014
EcoOne - SolarEnergy Presentation 2014EcoOne Homes
 
Photovoltaic(pv) module and transparent solar panels
Photovoltaic(pv) module and transparent solar panelsPhotovoltaic(pv) module and transparent solar panels
Photovoltaic(pv) module and transparent solar panelspadamatikona swapnika
 
Study of low cost based smart home control using ppt
Study of low cost based smart home control using pptStudy of low cost based smart home control using ppt
Study of low cost based smart home control using pptShoaibAhmed340
 
Indian Scene_solar energy
Indian Scene_solar energyIndian Scene_solar energy
Indian Scene_solar energyBharath P
 
Solar photovoltaics
Solar photovoltaicsSolar photovoltaics
Solar photovoltaicsArvind Kumar
 
Scott Sklar | The Stella Group
Scott Sklar | The Stella GroupScott Sklar | The Stella Group
Scott Sklar | The Stella GroupGW Solar Institute
 
City of Ely EECBG Project Update Presentation (26-Oct-2011)
City of Ely EECBG Project Update Presentation (26-Oct-2011)City of Ely EECBG Project Update Presentation (26-Oct-2011)
City of Ely EECBG Project Update Presentation (26-Oct-2011)Daniel Herr
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging TechnologyMd Shahabuddin
 

What's hot (20)

STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)STEP(Solar Technology for Energy Production)
STEP(Solar Technology for Energy Production)
 
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
You Be the Judge: A Ratings Tool for Selecting the Best Solar Module
 
Solar cell
Solar cellSolar cell
Solar cell
 
Maximizing Output Power of a Solar Panel via Combination of Sun Tracking and ...
Maximizing Output Power of a Solar Panel via Combination of Sun Tracking and ...Maximizing Output Power of a Solar Panel via Combination of Sun Tracking and ...
Maximizing Output Power of a Solar Panel via Combination of Sun Tracking and ...
 
Solar energy proposal by MGE
Solar energy proposal by MGESolar energy proposal by MGE
Solar energy proposal by MGE
 
India solar power_plant_vpc
India solar power_plant_vpcIndia solar power_plant_vpc
India solar power_plant_vpc
 
Solar energy2013
Solar energy2013Solar energy2013
Solar energy2013
 
Proposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transportProposal for a 2MW fspv system and e-transport
Proposal for a 2MW fspv system and e-transport
 
Floating Solar PV - An Introduction
Floating Solar PV -  An Introduction Floating Solar PV -  An Introduction
Floating Solar PV - An Introduction
 
EcoOne - SolarEnergy Presentation 2014
EcoOne - SolarEnergy Presentation 2014EcoOne - SolarEnergy Presentation 2014
EcoOne - SolarEnergy Presentation 2014
 
Photovoltaic(pv) module and transparent solar panels
Photovoltaic(pv) module and transparent solar panelsPhotovoltaic(pv) module and transparent solar panels
Photovoltaic(pv) module and transparent solar panels
 
Blue birdsolar
Blue birdsolarBlue birdsolar
Blue birdsolar
 
Study of low cost based smart home control using ppt
Study of low cost based smart home control using pptStudy of low cost based smart home control using ppt
Study of low cost based smart home control using ppt
 
Introduction to Solar in the Philippines
Introduction to Solar in the Philippines Introduction to Solar in the Philippines
Introduction to Solar in the Philippines
 
Indian Scene_solar energy
Indian Scene_solar energyIndian Scene_solar energy
Indian Scene_solar energy
 
Solar photovoltaics
Solar photovoltaicsSolar photovoltaics
Solar photovoltaics
 
Scott Sklar | The Stella Group
Scott Sklar | The Stella GroupScott Sklar | The Stella Group
Scott Sklar | The Stella Group
 
RE 2022
RE 2022RE 2022
RE 2022
 
City of Ely EECBG Project Update Presentation (26-Oct-2011)
City of Ely EECBG Project Update Presentation (26-Oct-2011)City of Ely EECBG Project Update Presentation (26-Oct-2011)
City of Ely EECBG Project Update Presentation (26-Oct-2011)
 
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology1. Paper on Floating Solar Photovoltaic System An Emerging Technology
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
 

Viewers also liked

Five Design Solutions - Portfolio Case Studies
Five Design Solutions - Portfolio Case StudiesFive Design Solutions - Portfolio Case Studies
Five Design Solutions - Portfolio Case StudiesDarren Ryan
 
Fuel cells project_maree
Fuel cells project_mareeFuel cells project_maree
Fuel cells project_mareemareenotmarie
 
Interactive inverters
Interactive invertersInteractive inverters
Interactive invertersmareenotmarie
 
Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationPhotovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationLeonardo ENERGY
 
Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsConsultingSpecifyingEngineer
 
Shade Measurement Overview
Shade Measurement OverviewShade Measurement Overview
Shade Measurement Overviewphoberg
 
Mini grid design manual
Mini grid design manualMini grid design manual
Mini grid design manualSolarReference
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenanceLeonardo ENERGY
 
Photovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial AnalysisPhotovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial AnalysisLeonardo ENERGY
 
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...JLanka Technologies (Pvt) Limited
 
Electric Motor Systems: targeting and implementing efficiency improvements
Electric Motor Systems: targeting and implementing efficiency improvementsElectric Motor Systems: targeting and implementing efficiency improvements
Electric Motor Systems: targeting and implementing efficiency improvementsLeonardo ENERGY
 
Photovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpPhotovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpLeonardo ENERGY
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and StandardsSolar Reference
 
Steps to simulate grid connected solar pv project through PVSyst Software
 Steps to simulate grid connected solar pv project through PVSyst Software Steps to simulate grid connected solar pv project through PVSyst Software
Steps to simulate grid connected solar pv project through PVSyst SoftwareAshish Verma
 

Viewers also liked (20)

Five Design Solutions - Portfolio Case Studies
Five Design Solutions - Portfolio Case StudiesFive Design Solutions - Portfolio Case Studies
Five Design Solutions - Portfolio Case Studies
 
Fuel cells project_maree
Fuel cells project_mareeFuel cells project_maree
Fuel cells project_maree
 
Interactive inverters
Interactive invertersInteractive inverters
Interactive inverters
 
51 b wittmer_latest_features_of_p_vsyst
51 b wittmer_latest_features_of_p_vsyst51 b wittmer_latest_features_of_p_vsyst
51 b wittmer_latest_features_of_p_vsyst
 
CIESESE Agenda
CIESESE AgendaCIESESE Agenda
CIESESE Agenda
 
Photovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant OperationPhotovoltaic Training - Session 3 - Plant Operation
Photovoltaic Training - Session 3 - Plant Operation
 
Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into Buildings
 
Shade Measurement Overview
Shade Measurement OverviewShade Measurement Overview
Shade Measurement Overview
 
3 1 wittmer_p_vsyst_pvpmc_2016
3 1 wittmer_p_vsyst_pvpmc_20163 1 wittmer_p_vsyst_pvpmc_2016
3 1 wittmer_p_vsyst_pvpmc_2016
 
Mini grid design manual
Mini grid design manualMini grid design manual
Mini grid design manual
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 
Photovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial AnalysisPhotovoltaic Training - Session 5 - Economic and Financial Analysis
Photovoltaic Training - Session 5 - Economic and Financial Analysis
 
3 4 thevenard-pai epri-sandia 2016-05 presentation
3 4 thevenard-pai epri-sandia 2016-05 presentation3 4 thevenard-pai epri-sandia 2016-05 presentation
3 4 thevenard-pai epri-sandia 2016-05 presentation
 
2014 PV Performance Modeling Workshop: Pvsyst Updates since 2013: Bruno Wittm...
2014 PV Performance Modeling Workshop: Pvsyst Updates since 2013: Bruno Wittm...2014 PV Performance Modeling Workshop: Pvsyst Updates since 2013: Bruno Wittm...
2014 PV Performance Modeling Workshop: Pvsyst Updates since 2013: Bruno Wittm...
 
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
Grid+connect+pv+install+and+supervise+guidelines+cec+issue+9Grid-Connected So...
 
Electric Motor Systems: targeting and implementing efficiency improvements
Electric Motor Systems: targeting and implementing efficiency improvementsElectric Motor Systems: targeting and implementing efficiency improvements
Electric Motor Systems: targeting and implementing efficiency improvements
 
PVsysts new framework to simulate bifacial systems
PVsysts new framework to simulate bifacial systemsPVsysts new framework to simulate bifacial systems
PVsysts new framework to simulate bifacial systems
 
Photovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-UpPhotovoltaic Training - Session 2 - Construction and Start-Up
Photovoltaic Training - Session 2 - Construction and Start-Up
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
Steps to simulate grid connected solar pv project through PVSyst Software
 Steps to simulate grid connected solar pv project through PVSyst Software Steps to simulate grid connected solar pv project through PVSyst Software
Steps to simulate grid connected solar pv project through PVSyst Software
 

Similar to Photovoltaic Project

Photovoltaics notes from a designer, builder and inspector
Photovoltaics notes from a designer, builder and inspectorPhotovoltaics notes from a designer, builder and inspector
Photovoltaics notes from a designer, builder and inspectorjrusmisel
 
Energy Self Sufficient Housing
Energy Self Sufficient HousingEnergy Self Sufficient Housing
Energy Self Sufficient Housingbrianv34691
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxHafizAsimKhayyam
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solarmacsolar77
 
Avacos - Clean Sustainable Energy
Avacos - Clean Sustainable Energy Avacos - Clean Sustainable Energy
Avacos - Clean Sustainable Energy SBCBreakfastSessions
 
RenergyCo: Solar PV for Commercial Properties
RenergyCo: Solar PV for Commercial PropertiesRenergyCo: Solar PV for Commercial Properties
RenergyCo: Solar PV for Commercial Propertiesiandiamond
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solarmacsolar77
 
Njatc Pv Powerpoint Acte Naae
Njatc Pv Powerpoint Acte NaaeNjatc Pv Powerpoint Acte Naae
Njatc Pv Powerpoint Acte Naaervb1019
 
IRJET- Solar Energy: Potential and Policies of India
IRJET- Solar Energy: Potential and Policies of IndiaIRJET- Solar Energy: Potential and Policies of India
IRJET- Solar Energy: Potential and Policies of IndiaIRJET Journal
 
Solar Sale
Solar SaleSolar Sale
Solar SaleToronto
 
Franklin Energy $ense Seminar
Franklin Energy $ense SeminarFranklin Energy $ense Seminar
Franklin Energy $ense SeminarFranklin Matters
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solarmacsolar77
 
Alder Creek Solar February 2020 Public Information Meetings
Alder Creek Solar February 2020 Public Information MeetingsAlder Creek Solar February 2020 Public Information Meetings
Alder Creek Solar February 2020 Public Information MeetingsHeritage Wind
 
Mygen Training November 2010
Mygen Training November 2010 Mygen Training November 2010
Mygen Training November 2010 AllSystems1
 
Solarcentury Africa Hybrid Brochure 0216
Solarcentury Africa Hybrid Brochure 0216Solarcentury Africa Hybrid Brochure 0216
Solarcentury Africa Hybrid Brochure 0216Daniel Davies
 
Alpaca Solar Energy Field Study Presentation
Alpaca Solar Energy Field Study PresentationAlpaca Solar Energy Field Study Presentation
Alpaca Solar Energy Field Study PresentationDaniel Fetner
 

Similar to Photovoltaic Project (20)

Photovoltaics notes from a designer, builder and inspector
Photovoltaics notes from a designer, builder and inspectorPhotovoltaics notes from a designer, builder and inspector
Photovoltaics notes from a designer, builder and inspector
 
Energy Self Sufficient Housing
Energy Self Sufficient HousingEnergy Self Sufficient Housing
Energy Self Sufficient Housing
 
Presentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptxPresentation for Final Year Students about Solar.pptx
Presentation for Final Year Students about Solar.pptx
 
Shining Light on Photovoltaics
Shining Light on PhotovoltaicsShining Light on Photovoltaics
Shining Light on Photovoltaics
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solar
 
Avacos - Clean Sustainable Energy
Avacos - Clean Sustainable Energy Avacos - Clean Sustainable Energy
Avacos - Clean Sustainable Energy
 
RenergyCo: Solar PV for Commercial Properties
RenergyCo: Solar PV for Commercial PropertiesRenergyCo: Solar PV for Commercial Properties
RenergyCo: Solar PV for Commercial Properties
 
Avacos solar dec2009
Avacos solar dec2009Avacos solar dec2009
Avacos solar dec2009
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solar
 
Njatc Pv Powerpoint Acte Naae
Njatc Pv Powerpoint Acte NaaeNjatc Pv Powerpoint Acte Naae
Njatc Pv Powerpoint Acte Naae
 
IRJET- Solar Energy: Potential and Policies of India
IRJET- Solar Energy: Potential and Policies of IndiaIRJET- Solar Energy: Potential and Policies of India
IRJET- Solar Energy: Potential and Policies of India
 
Solar Sale
Solar SaleSolar Sale
Solar Sale
 
Franklin Energy $ense Seminar
Franklin Energy $ense SeminarFranklin Energy $ense Seminar
Franklin Energy $ense Seminar
 
Solar investment-case-mac-solar
Solar investment-case-mac-solarSolar investment-case-mac-solar
Solar investment-case-mac-solar
 
SORALITE POWER
SORALITE POWERSORALITE POWER
SORALITE POWER
 
Renewable Energy: Wind, Solar Thermal, Photovoltaics
Renewable Energy: Wind, Solar Thermal, PhotovoltaicsRenewable Energy: Wind, Solar Thermal, Photovoltaics
Renewable Energy: Wind, Solar Thermal, Photovoltaics
 
Alder Creek Solar February 2020 Public Information Meetings
Alder Creek Solar February 2020 Public Information MeetingsAlder Creek Solar February 2020 Public Information Meetings
Alder Creek Solar February 2020 Public Information Meetings
 
Mygen Training November 2010
Mygen Training November 2010 Mygen Training November 2010
Mygen Training November 2010
 
Solarcentury Africa Hybrid Brochure 0216
Solarcentury Africa Hybrid Brochure 0216Solarcentury Africa Hybrid Brochure 0216
Solarcentury Africa Hybrid Brochure 0216
 
Alpaca Solar Energy Field Study Presentation
Alpaca Solar Energy Field Study PresentationAlpaca Solar Energy Field Study Presentation
Alpaca Solar Energy Field Study Presentation
 

Recently uploaded

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 

Recently uploaded (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 

Photovoltaic Project

  • 1. 8/28/2009 Harry Indig, PMP Prepared for Nicole and Ret Taylor 156 Northeast 59 th Street Seattle, WA 98105
  • 2.
  • 3. The customer’s objective is to look into the feasibility and long-term return on investment of a roof-mounted solar photovoltaic array. The owners believe the retail expense of power in the Seattle area is relatively inexpensive. However; both owners believe making decisions for the good of our community for the future, needs to be evaluated. The prospect of current energy prices increasing in the near future is also of concern. And with the incentives being offered by our government on federal and state levels coupled with the incentives being paid by the local power distribution companies for selling electricity to them; generating their own solar power becomes an attractive venture. Over all else, the owners would like to know if they are getting a good return on investment by putting their capital towards solar power versus investing in a security such as a secured bond or growth equity.
  • 4. Is Solar Right for You? Yes, if you... Own the building where you want to install solar; Have a roof in good shape and shade-free; and Are interested in making a long-term investment to protect yourself from rising energy costs and want to reduce your environmental impact.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. House’s East View House’s West View
  • 11. North Roof South Roof East Roof 96.1% West Roof 89.8%
  • 12.
  • 13.
  • 14.
  • 15. (8) Silicon Energy 185 Watt Modules w/ racking $8,880 (1) Outback SmartRE 2500 Inverter $4,440 2 strings of 4 modules, 121.2 volts, 15.8 amps SmartRE 2500 Battery Enclosure (4) Group 27 106 Ah batteries Balance of System Components $1480 (1) Combiner box (1) Ground Fault Circuit Interruptor (1) 600 Volt DC Fused Disconnect (1) AC Fused Disconnect (1) 240 Volt Production Meter Miscellaneous conduit and fittings Labor $1480 Grand Total $16,280 ($11 / watt installed)
  • 16. Notes: 1) Meter sockets must be located near each other and outside or otherwise consistent with location allowed by Seattle City Light Requirements for Electric Service. 2) Standard utility socket with face cover (no round sockets). Socket wired per sheet 2. 3) When production meter is removed, bottom terminals will be energized and line terminals will be de-energized (opposite of billing meter). 4) Billing meter will run backwards and subtract when energy flows to utility, production meter only runs forward. 5) Delivered energy flows from utility. 6) Received energy flows to utility.
  • 17.
  • 18.
  • 19. Production Meter Wiring and New components for Net Metering per Seattle City Light
  • 20. OutBack Power Products Smartre 2500 Up to 93% Inverter Efficiency
  • 21. We have seen photovoltaic cells and arrays, also known as solar modules, convert sunlight into electrical energy. Now being used in a number of building applications, including shingles and fenestration, photovoltaic's are becoming a common onsite renewable energy source. Whether roof-mounted or built into the design, solar cells are connected in series to achieve proper voltages. The energy produced can either be stored in batteries or tied directly to the municipal grid. In some cases, you may qualify for tax credits or rebates when purchasing and installing photovoltaic modules. You also may be able to sell the extra energy you produce back to your local utility. The owner’s electric power consumption of 4845 kWh per year based on the past 2 years. This is 13.27 kWh/day. Several key parameters have been evaluated at this home site, which has excellent solar access. Based on the shade analysis performed we calculated 96.1 % solar available sunlight. There is 228 square feet on the east roof for solar array layout. Application of Solar Photovoltaic
  • 22. In 1980 the Solar Rating and Certification Corporation (SRCC) was incorporated as a non-profit organization with the primary purpose being the development and implementation of certification programs and national rating standards for solar energy equipment. A simple installation of several PV solar arrays on this project could use the equivalent sun hours per day based on SRCC certification data as table 1 from the Average Daily Total Solar Radiation for City of Seattle with two tilt angles. The infrastructure of the entire system on your roof needs to meet the CAM requirements of the City of Seattle. Table 1 Average Daily Total Solar Radiation for U.S. Cities City MJ/m²·day 23° Tilt MJ/m²·day 45° Tilt Btu/ft²·day 23° Tilt Btu/ft²·day 45° Tilt Seattle 11.65 11.63 1026 1024
  • 23.
  • 24.
  • 25.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31. Use parallel wiring to increase current (power). This diagram shows a simple parallel circuit to increase current or power. Assume that we are using 12 volt batteries. The power of all 3 batteries add to give us the effect of a battery 3 times as powerful but the voltage stays the same at 12 volts. Parallel wiring increases current but the voltage does not change. This is the wiring used when jump starting a car for example. Use series wiring to increase voltage The voltage of all 3 batteries add to give us the effect of a battery 3 times the voltage or in this case a very large 12 volt battery. In this circuit the current is the same as the current in just 1 of the batteries. But since the 4 volt industrial batteries are very large, we have in effect created a huge 12 volt battery.
  • 32.

Editor's Notes

  1. The customers home at 156 Ne 59 th St in Seattle, WA has been owned by the current owners since 2005. They were fortunate this house has had no additions and minimally invasive remodels since its construction in 1909. Being its century year, the owners have sought to do an extensive remodel by lifting its 990 square feet main floor off its original foundation, raising it by 3 feet, upon setting it back down. This will double it’s conditioned square footage by allowing the current basement to become livable space. Conservation measures such as passive day lighting, increased insulation, improved circulation, the addition of a heating system, and replacement of the existing hot water system, and with the possibility of adding solar electric generation will all be incorporated into the remodel. As a class Project Photovoltaic at Shoreline Community College has agreed to review the analyze of cost, efficiency, feasibility, and return of investment using a roof mounted solar photovoltaic module array.
  2. Objective   The customer’s objective is to look into the feasibility and long-term return on investment of a roof-mounted solar photovoltaic array. The owners believe the retail expense of power in the Seattle area is relatively inexpensive. However; both owners believe making decisions for the good of our community for the future, needs to be evaluated. The prospect of current energy prices increasing in the near future is also of concern. And with the incentives being offered by our government on federal and state levels coupled with the incentives being paid by the local power distribution companies for selling electricity to them; generating their own solar power becomes an attractive venture. Over all else, the owners would like to know if they are getting a good return on investment by putting their capital towards solar power versus investing in a security such as a secured bond or growth equity.  
  3. Submission of Plans * For new services or for rewire of existing services (including triplexes or larger multi-residential structures), the customer shall submit a plan package for SCL review and comment. The plan package shall contain the following elements: A plan set which includes: 1. A site plan including: — Any building on the property — Street designations and project address per DPD or L&I — Proposed location of service entrance, switchgear, and meter centers — “ North” and directional arrow — Property boundary designations 2. Legal description(s) (as required) 3. Elevation drawings 4. Diagram of floor plans with unit designation 5. A project schedule 6. A load summary and schedule 7. A paving plan, if applicable 8. Billing and owner information 9. Completion of SCL’s Application for Service (See end of this chapter for forms) 10. A riser diagram showing: — The size of the main disconnect or bus — A detailed sketch of the proposed route of service conductors from the service termination point to the main disconnect or bus — The size, type, and number service conductors — Provisions for metering
  4. Much more could be done to improve the over all efficiency of the home, but the upgrades detailed below represent the “low hanging fruit” that will provide the greatest energy savings for their cost.. The home’s small size allows for choices that may not be practical in a larger dwelling (gas exhaust/vent runs are shorter, smaller units feasible, etc). Some efforts made to improve the home’s heat retention will also be under taken.
  5. Increase insulation in attic space The current attic space has only a few inches of batt insulation dating back to the 1950’s. Six (6) inches of “Blow In” cellulose loose insulation (minimum R-3.2 / inch) will be added to the attic space to provide, at least, an additional R-19.2. Cost: $1,200 Incentives: $360 tax credit towards $5,000 2009 – 2010 credit cap. Savings : The additional insulation should result in 2.5 times less heat loss as without the upgrade. During the summer significantly less heat from the attic space will push down into the condition space so less cooling (via electric fans) will be required.   Replace electric space heaters The home is currently heated multiple independent electric space heaters. These units will be replaced with a high efficiency natural gas unit. This change will eliminate the electrical load for warming the house and provide a system which can deliver more heat more quickly allowing the standing over night temperature to be lower. Cost: $2,000 Incentives: $600 tax credit towards $5,000 2009 – 2010 credit cap. Savings : Replacing the electric furnace should reduce the electrical consumption by 12%.   Replace electric hot water heater with high volume tank less natural gas unit The home’s hot water needs are currently served by a 60 gallon electric hot water heater that is over 15 years old. Cost: $1,500 Incentives: $500 tax credit towards $5,000 2009 – 2010 credit cap. Savings: Replacing the electric heater should reduce electrical consumption by 10%. Switching to a tank less system will reduce the natural gas usage for maintaining water temperature by about 30% over a convention gas water heater.   Gas stove replaces electric unit An electric range/oven is used for cooking. Switching to a gas range/oven will eliminate the electrical load for food preparation. Cost : $800 Incentives: $180 tax credit towards $5,000 2009 – 2010 credit cap. Savings: Replacing the electric range/over with a gas appliance should reduce the electrical consumption by 5%. Errata
  6. I strive to obtain the best price and best technical product for our clients. Moreover, this site could be a net producer of electrical power using any of several systems. Every kilowatt-hour produced will earn at least 18 cents. If the solar modules and inverters are manufactured within the state of Washington the incentive raises to 54 cents per kilowatt-hour. Silicon Energy LLC of Arlington produces such modules, and has been self certified by National Laboratory met this requirement.
  7. The new Silicon Energy design array is highly efficient and the solar cells are encapsulated between two tempered glass plates. With 228 square feet of available roof and modules being 16 square feet each, a total of 8 panels could be installed on your roof with an output of 1.48 kW .   Panel size: Silicon Energy = 47 inches by 47 inches Power output: Silicon Energy = 0.165 kW per panel
  8. Individual project – During the course each student will select a PV installation of their choice and develop an appropriate system design, this will include a site assessment, shading analysis, load calculations, conservation opportunity assessment hardware selection, wire sizing, wiring diagrams.
  9. This diagram shows a simple parallel circuit to increase current or power. Assume that we are using 12 volt batteries. The power of all 3 batteries add to give us the effect of a battery 3 times as powerful but the voltage stays the same at 12 volts. Parallel wiring increases current but the voltage does not change. This is the wiring used when jump starting a car for example. The voltage of all 3 batteries add to give us the effect of a battery 3 times the voltage or in this case a very large 12 volt battery. In this circuit the current is the same as the current in just 1 of the batteries. But since the 4 volt industrial batteries are very large, we have in effect created a huge 12 volt battery.
  10. This diagram shows a combination series and parallel circuit to increase both the battery current and voltage level at the same time. Assume this time we are using 12 volt batteries