BUILDING
INFORMATION
MODELLING &
MANAGEMENT
26TH AUGUST 2013
PREPARED FOR
BIM SUMMIT
Case study of fast-track Design and Construct
delivered using BIM
Andrew Gutteridge
Comparative Contractor Margins
Industry Productivity
Circa CT1
• 8 storey, 14920m² GFA commercial
office building
• New relationships with all parties
• Subcontractors engaged after DD
• BIM included;
• Architecture
• Structure
• Limited mechanical
420 Flinders Street
• 7 storey, 12635m² GFA commercial office
building
• Builder and lead consultants from Circa
CT1
• Subcontractors engaged during DD
• BIM includes;
• Architecture, Structure
• Mechanical, Electrical, Hydraulics
• Fire
• Steel Fabrication
• 4D, 7D
Project Comparison
River Quay
• Traditional Tender
• Consultants carried over from a
previous project
• No contractor involvement until
after documentation
• BIM included;
• Architecture
• Structure
• Mechanical
• Quantity Surveyor
• Steel Fabrication, post
documentation
Demonstrating Certainty
River Quay, South Bank - Fabrication
Demonstrating Certainty
Demonstrating Certainty
Demonstrating Certainty
Andrew Gutteridge
Andrew Gutteridge
Andrew Gutteridge
Circa CT1
• 8 storey, 14920m² GFA commercial office building
• New relationships with all parties
• Subcontractors engaged after DD
• BIM included;
• Architecture
• Structure
• Limited mechanical
420 Flinders Street
• 7 storey, 12635m² GFA commercial office building
• Builder and lead consultants from Circa CT1
• Subcontractors engaged during DD
• BIM includes;
• Architecture, Structure
• Mechanical, Electrical, Hydraulics
• Fire
• Steel Fabrication
• 4D, 7D
Project Comparison
APR DECAUGMAY JUN JUL SEP OCT NOV
420 Flinders Street
MAR
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTATION
SCHEMATIC
DESIGN
SUBCONTRACTORS (MECH, ELEC, HYD, FIRE)
Circa CT1
CONSTRUCTION DOCUMENTATION
DESIGN
DEVELOPMENT
SUBCONTRACTORS (MECH, ELEC, HYD, FIRE)
2011
APR DECAUGMAY JUN JUL SEP OCT NOVMAR
2012
Key Differences
CONSTRUCTION
DESIGN DEVELOPMENT
CONSTRUCTION DOCUMENTATION
SCHEMATIC
DESIGN
APR DECAUGMAY JUN JUL SEP OCT NOV
SUBCONTRACTORS (MECH, ELEC, HYD, FIRE)
basement issued
for construction
basement slab poured
ground slab poured
lump sum D&C
agreement
between client
and contractor
Programme (420)
Issued for construction
29th June
Issued for construction
7th September
Issued for construction
9th November
Issued for construction
30th November
Staged Documentation
Architectural Revit Model
50% through Construction Documentation
Structural Revit Model
50% through Construction Documentation
Subcontractor Services CAD Duct / IFC Model
50% through Construction Documentation
One way digital
communication
Two way digital
communication
Traditional
communication
Legend
Cardno
(Landscape)
Hollywood
Plumbing
(Hyd Subcontractor)
Hutchinson
Builders
(Builder)
SDF Electrical
(Elec Subcontractor)
Firerite
Services
(Fire sprinklers)
Microfire
(Fire alarm)
Yong Feng
(Screen
Subcontractor)
XL Precast
(Precast Concrete
Subcontractor)
MCG
(Certifiers)
MWA
(Acoustic)
Lambert &
Rehbein
(Traffic)
FM Performance
ideas!
(Facilities Management)
BVN
(Fitout Architect)
Lancini Group
(Client/Building
Owner)
Hunter
Construction
Services
(Client Rep)
WSP
(Mech, Elec,
Fire)
Bornhorst &
Ward
(Structural & Civil)
WSP
(Hydraulic)
VAE Group
(Mech
Subcontractor)
Casa
Engineering
(Steel
Subcontractor)
Inhabit
(Façade engineer)
Arkhefield
(Project Architect
& Integrated
Delivery
Manager)
Consultant
Sub-Contractor
Contractor
Client
Facility
Management
Project Team Structure
• Major BIM collaborator
• Prior relationship equalled
TRUST
• Motivated to learn
• Integration of structural and
architectural models was a
key joint goal
• Change in communication
critical
Bornhorst + Ward
Structural Engineering
• Major BIM collaborator
• Contracted initially for
mechanical services, later
contracted to model fire
services and cable trays for
other subcontractors
• CAD Duct caused difficulties
translating model information
into BIM
• Unfamiliarity with Design
Development process
• Benefitted greatly from
prototyping process as the
mechanical services are
being fabricated in Brisbane
and shipped to Townsville.
VAE Group
Mechanical Subcontractor
• Lead services consulting
engineer
• No documentation beyond
Design Development
• Engaged by Hollywood
Plumbing (plumbing sub-
contractor) to model
hydraulics services in Revit
WSP Group
Mechanical, Electrical, Hydraulic and Fire Services Engineering
• Started in Jan 2013, after
construction documentation
was completed.
• Model has been incorporated
into both Revit and
Navisworks and checked
against existing structural
steel modelling and
architectural detailing.
CASA Engineering
Steel Fabricator
• Consultants novated to Hutchinson’s during Design Development.
• Influential in getting subcontractors to contribute to the BIM.
• Hutchinson’s Primavera construction programme was integrated into the Navisworks BIM.
• Foreman on site is making use of the Navisworks model to supplement existing documentation.
Hutchinson Builders
Contractor
Schedule comparing planned vs. actual build progress using the
Navisworks model.
Clash Detection
4D Timelining
Export for FM
Static
Documentation
Base model
‘background’
Dynamic
BVN
(Fitout
Architect)
FM Performance ideas!
(Facilities Management)
VAE Group
(Mech
Subcontractor)
Casa
Engineering
(Steel
Subcontractor)
Navisworks Model
Arkhefield
(Architect)
Bornhorst & Ward
(Structural & Civil)
WSP
(Hydraulic)
Integrated Revit Model
Hutchinson
Builders
(4D)
RVT
IFC
Model Workflow
Associate / Project
Architect
Integrated
Delivery Manager
Model Manager
/ Architect
Senior
Architectural
Technician
Architectural
Student
Principal
Interior
Designer
Architect
Senior
Architectural
Technician
Arkhefield Team Structure
BIM Execution Planning
• Initially driven by us, the Fast track, D & C compressed time frame
limited our ability develop and resolve the BIM EP fully
• Based upon NATSPEC template, the initial documents are overly
complicated and daunting
• Ideally should be managed and driven by the architect, with authority.
Index of NATSPEC BIM EP
Sections deleted shown in red.
Embracing Change
• Structural engineer modelled concrete to architects dimensional set
out requirements
• Architect used structural engineers and subcontractors services
models for integrated documentation
• Communication urgency and forward planning
• Prototyping the building rather than documenting a contract
Architecture Structure
Concrete Set Out
Architecture Structure Services
Leveraging Model Information
Leveraging Model Information
Additional set out visuals for concrete package
Project Team Action List
Contains model views, sketches and notes
Bring Decisions Forward to Reduce Time & Cost
Element Ownership Schedule
Mapping out the dates of ownership exchange
100 200 300
Briefing / Pre Design Conceptual Design Schematic Design Developed Design
400 500 600
Contract Documents Construction Post Contract
LOD: Level of Development
Specified Services Equipment
Co-ordinating services with pre-cast concrete
Specified Services Equipment
Navisworks co-ordination model, showing real equipment sizing
Revit Sun Shading Prototype
3D Sectional Study in Revit, Engineering Analysis
Integrated Revit Model
(Architectural, Structural and Services)
Integrated Revit Model
(Architectural, Structural and Services)
Sectional views through Navisworks model
Concrete set out
drawing – model
elements from
structural model,
all dimensions
provided by
architect.
Linking the structural, mechanical, hydraulic and steel fabrication models into our Revit model.
Confirm detailing
with the steel
fabrication model
in Revit during
CA
Documentation
FM Pilot
from Building Information Model to intelligent Building Information Management
Facilities Management
By considering the FM Ready modeling requirements at the initial stages, it
is possible to produce a model that is useful throughout the full building
Lifecycle.
• This is important to the client, as:
 the majority of the interoperability losses are borne by owners, and
 the majority of expenditure is incurred during the operational phase.
A Hospital's maintenance cost
is equivalent to the capital cost
every two to thee years!!
12%
22%
66%
Planning, Design, & Engineering
Construction
Operations and Maintenance
NIST GCR 04-867, Cost Analysis of Inadequate
Interoperability in the U.S. Capital Facilities Industry
• 66% of interoperability losses
are borne by owners
• $0.23/ existing SF/year
Facilities Management
• Objective:
 To pilot Facilities Management integration as a learning exercise for the
key project participants.
– Client desired an FM Ready model
– Not mandated in the Contract
– Approach freed participants to invest in innovation without contractual risk.
Facilities Management
• Process:
1. We Specified FM Ready Model requirements.
2. We Clarified throughout the project.
3. We Verified by integrating to a real FM system.
The Role of the Model in FM
The Model acts as the link between model elements and information to be loaded to the FM System.
1) COBie schedules (Construction Operations Building information exchange) contain most of the data
2) Commissioning & Handover Documentation is linked to the model
Revit + COBie Plug-in
COBie Schedules
Facility Management
System
Input from
Consultants,
Contractor and
Subcontractors
Navisworks
Commissioning
& Handover
Documentation
The Role of the Model in Commissioning & Handover for FM
The Role of the Model in Commissioning & Handover for FM
The handover information is linked to the objects, equipment systems and
major assets and is accessible easily via the model.
The Role of the Model in Commissioning & Handover for FM
E.g. Isolate the AHUs and select an object to see all linked information.
Retrieve all relevant documentation (e.g. specs, test reports, technical
information, manufacturer’s data, etc.)
The Role of the Model in FM Operations
The Model acts as the visual navigation interface for integrated FM Applications
FM iBIM Video Demonstration
Visual Navigation Interface Demonstration Scenario:
We are currently working in our FM Work Order system, checking real-time
operational performance stats - when we get a call about the air conditioner
in Retail 1.
• Before we create a work order we want to identify the unit
• Check to see if a service request is already in the system
• See if this type of unit has issues in other locations
FM iBIM Video Demonstration
Facilities Management
• Learnings
 Stakeholder and project team engagement, clarity and commitment
is key.
 Process is more about identification and management of
assets and information critical to operation.
 Remember the ultimate audience for the model and
keep naming/description conventions consistent and de-jargoned.
 Once the participants know what is required there is relatively little
ongoing overhead for them contributing to an FM Ready model.
Consultants Contractor Facility Manager
Building Asset Management
Enabling the continuity of asset information through the briefing, design, construction,
commissioning and operation phases of project delivery.
OperationsCommissioningConstructionDesignBriefing
Contractor
Sub-contractor
Consultants
Contractor
Sub-contractor
Collaborative
Design Data
As Built
Information,
Warranties
and
Certificates
Operations and
Maintenance
Data &
Performance
Analysis
Revit
ArchiCAD
Zuuse
SmartSight - iBIM
Maximo
Zuuse
Navisworks
ZuuseContractor +
Sub-contractor
Architect
Structural
Engineer
MEP Consultants
Contractor
CAD Duct
Tekla
StruCAD
• Model collaboration pushed within the limitations of Revit for a phase 2B project.
• Changes of communication processes and forward planning are key.
• Significant time investment required to manage BIM processes.
• BIM Execution Plans will become a vital document, ideally should be managed and
driven by the architect with authority.
• Design and Construct projects are conducive to the delivery of a phase 2B project.
• Principle agreements between clients, contractor, consultants and subcontractors need to
be in place early. This enables ownership and reward to motivate engagement.
Outcome Summary
Andrew Gutteridge
Andrew Gutteridge

Contenu connexe

Tendances

Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013CCT International
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction IndustryCCT International
 
Webinar: BIM for MEP engineers | 23 March 2017
Webinar: BIM for MEP engineers | 23 March 2017Webinar: BIM for MEP engineers | 23 March 2017
Webinar: BIM for MEP engineers | 23 March 2017Stabiplan
 
Cobie Challenge ONUMA, Inc.
Cobie Challenge ONUMA, Inc.Cobie Challenge ONUMA, Inc.
Cobie Challenge ONUMA, Inc.guesta50256e
 
Aec digital solutions portfolio(COBie/Level 2 BIM)
Aec digital solutions portfolio(COBie/Level 2 BIM)Aec digital solutions portfolio(COBie/Level 2 BIM)
Aec digital solutions portfolio(COBie/Level 2 BIM)AEC Digital Solutions LLC
 
BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in CaliforniaGaurav Kumar
 
BimSrv Profile
BimSrv ProfileBimSrv Profile
BimSrv ProfileDezlabs
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single projectBIM User Day
 
Ramboll - BIM - Now It's Serious
Ramboll - BIM - Now It's SeriousRamboll - BIM - Now It's Serious
Ramboll - BIM - Now It's SeriousGraham H Stewart
 
BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? CCT International
 

Tendances (20)

Using an openBim Workflow
Using an openBim WorkflowUsing an openBim Workflow
Using an openBim Workflow
 
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction Industry
 
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
 
Webinar: BIM for MEP engineers | 23 March 2017
Webinar: BIM for MEP engineers | 23 March 2017Webinar: BIM for MEP engineers | 23 March 2017
Webinar: BIM for MEP engineers | 23 March 2017
 
Cobie Challenge ONUMA, Inc.
Cobie Challenge ONUMA, Inc.Cobie Challenge ONUMA, Inc.
Cobie Challenge ONUMA, Inc.
 
Aec digital solutions portfolio(COBie/Level 2 BIM)
Aec digital solutions portfolio(COBie/Level 2 BIM)Aec digital solutions portfolio(COBie/Level 2 BIM)
Aec digital solutions portfolio(COBie/Level 2 BIM)
 
Introduction of nr bim consultant
Introduction of nr bim consultantIntroduction of nr bim consultant
Introduction of nr bim consultant
 
BIM Based Project Controls
BIM Based Project ControlsBIM Based Project Controls
BIM Based Project Controls
 
MEP Consultant
MEP ConsultantMEP Consultant
MEP Consultant
 
Pre and Post Contract BIM Execution Plans
Pre and Post Contract BIM Execution PlansPre and Post Contract BIM Execution Plans
Pre and Post Contract BIM Execution Plans
 
AEC Digital Solutions (Content Creation)
AEC Digital Solutions (Content Creation)AEC Digital Solutions (Content Creation)
AEC Digital Solutions (Content Creation)
 
BIM- Park in California
BIM- Park in CaliforniaBIM- Park in California
BIM- Park in California
 
BimSrv Profile
BimSrv ProfileBimSrv Profile
BimSrv Profile
 
Adding Intelligence to AWP
Adding Intelligence to AWPAdding Intelligence to AWP
Adding Intelligence to AWP
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project
 
Ramboll - BIM - Now It's Serious
Ramboll - BIM - Now It's SeriousRamboll - BIM - Now It's Serious
Ramboll - BIM - Now It's Serious
 
BEP
BEPBEP
BEP
 
Presentation 5-tekla
Presentation 5-teklaPresentation 5-tekla
Presentation 5-tekla
 
BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together?
 

Similaire à Andrew Gutteridge

Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryCCT International
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015Aconex
 
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...Granit Architects
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014Graham H Stewart
 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringCCT International
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwaresRuchy Lakhani
 
AB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfAB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfRavenousSolos
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models Viasys VDC
 
July 2015 Construct15_Richard Morwood_V4 (2)
July 2015 Construct15_Richard Morwood_V4 (2)July 2015 Construct15_Richard Morwood_V4 (2)
July 2015 Construct15_Richard Morwood_V4 (2)Richard Morwood
 
As Built to BIM Services | Silicon Engineering Consultants LLC.pptx
As Built to BIM Services | Silicon Engineering Consultants LLC.pptxAs Built to BIM Services | Silicon Engineering Consultants LLC.pptx
As Built to BIM Services | Silicon Engineering Consultants LLC.pptxSilicon Engineering Consultants LLC
 
Presentation 1-Official.pptx
Presentation 1-Official.pptxPresentation 1-Official.pptx
Presentation 1-Official.pptxPrabhuGurusamy2
 
BIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in USBIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in USBIM Engineering LLC U.S.
 
Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...Nicholas Macy, CCM, PMP
 
BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014Stephen Au
 

Similaire à Andrew Gutteridge (20)

Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
Alastair Gardner: BIM Overview
Alastair Gardner: BIM OverviewAlastair Gardner: BIM Overview
Alastair Gardner: BIM Overview
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
 
Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
Using BIM in Small Architectural Practices: Barriers and Benefits for Retrofi...
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
 
Spar2010murphy
Spar2010murphySpar2010murphy
Spar2010murphy
 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & Monitoring
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
AEC Digital Solutions (Scan to BIM)
AEC Digital Solutions (Scan to BIM)AEC Digital Solutions (Scan to BIM)
AEC Digital Solutions (Scan to BIM)
 
AB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdfAB114-5 BIM-based Collaboration-PPT.pdf
AB114-5 BIM-based Collaboration-PPT.pdf
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models
 
July 2015 Construct15_Richard Morwood_V4 (2)
July 2015 Construct15_Richard Morwood_V4 (2)July 2015 Construct15_Richard Morwood_V4 (2)
July 2015 Construct15_Richard Morwood_V4 (2)
 
As Built to BIM Services | Silicon Engineering Consultants LLC.pptx
As Built to BIM Services | Silicon Engineering Consultants LLC.pptxAs Built to BIM Services | Silicon Engineering Consultants LLC.pptx
As Built to BIM Services | Silicon Engineering Consultants LLC.pptx
 
final bim
final bimfinal bim
final bim
 
Presentation 1-Official.pptx
Presentation 1-Official.pptxPresentation 1-Official.pptx
Presentation 1-Official.pptx
 
BIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in USBIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in US
 
Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...Design & Construction Presentation on the New Putnam Vocational Technical Aca...
Design & Construction Presentation on the New Putnam Vocational Technical Aca...
 
BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014BIM for Building Services Engineering - HKIE seminar in 2014
BIM for Building Services Engineering - HKIE seminar in 2014
 

Plus de Informa Australia (13)

Conference Agenda
Conference AgendaConference Agenda
Conference Agenda
 
Xiangyu Wang
Xiangyu WangXiangyu Wang
Xiangyu Wang
 
Phil Davies and Tim Surgenor
Phil Davies and Tim SurgenorPhil Davies and Tim Surgenor
Phil Davies and Tim Surgenor
 
Nathan Hildebrandt
Nathan HildebrandtNathan Hildebrandt
Nathan Hildebrandt
 
Richard Archer
Richard Archer Richard Archer
Richard Archer
 
Aleks Baltovski
Aleks BaltovskiAleks Baltovski
Aleks Baltovski
 
Paul Nunn v2
Paul Nunn v2Paul Nunn v2
Paul Nunn v2
 
David Mitchell
David MitchellDavid Mitchell
David Mitchell
 
David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty
 
Ricci Piper
Ricci PiperRicci Piper
Ricci Piper
 
Rafik Abdelkaddous
Rafik AbdelkaddousRafik Abdelkaddous
Rafik Abdelkaddous
 
Chris Kane
Chris KaneChris Kane
Chris Kane
 
Paul Nunn
Paul NunnPaul Nunn
Paul Nunn
 

Dernier

Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsIntellect Design Arena Ltd
 
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...IMARC Group
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
PDT 89 - $1.4M - Seed - Plantee Innovations.pdf
PDT 89 - $1.4M - Seed - Plantee Innovations.pdfPDT 89 - $1.4M - Seed - Plantee Innovations.pdf
PDT 89 - $1.4M - Seed - Plantee Innovations.pdfHajeJanKamps
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfJohnCarloValencia4
 
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdfGraham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdfAnhNguyen97152
 
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessAPCO
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
Data skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsData skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsyasinnathani
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...Khaled Al Awadi
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)tazeenaila12
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...Brian Solis
 
Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examplesamberjiles31
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
7movierulz.uk
7movierulz.uk7movierulz.uk
7movierulz.ukaroemirsr
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfHajeJanKamps
 
Slicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinSlicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinAnton Skornyakov
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxJemalSeid25
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxWorkforce Group
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView
 

Dernier (20)

Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking Applications
 
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
Boat Trailers Market PPT: Growth, Outlook, Demand, Keyplayer Analysis and Opp...
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
PDT 89 - $1.4M - Seed - Plantee Innovations.pdf
PDT 89 - $1.4M - Seed - Plantee Innovations.pdfPDT 89 - $1.4M - Seed - Plantee Innovations.pdf
PDT 89 - $1.4M - Seed - Plantee Innovations.pdf
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
 
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdfGraham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdf
 
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
Data skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story pointsData skills for Agile Teams- Killing story points
Data skills for Agile Teams- Killing story points
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
 
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
Harvard Business Review.pptx | Navigating Labor Unrest (March-April 2024)
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
 
Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examples
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
7movierulz.uk
7movierulz.uk7movierulz.uk
7movierulz.uk
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdf
 
Slicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup BerlinSlicing Work on Business Agility Meetup Berlin
Slicing Work on Business Agility Meetup Berlin
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptx
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
 

Andrew Gutteridge

  • 2. Case study of fast-track Design and Construct delivered using BIM
  • 6. Circa CT1 • 8 storey, 14920m² GFA commercial office building • New relationships with all parties • Subcontractors engaged after DD • BIM included; • Architecture • Structure • Limited mechanical 420 Flinders Street • 7 storey, 12635m² GFA commercial office building • Builder and lead consultants from Circa CT1 • Subcontractors engaged during DD • BIM includes; • Architecture, Structure • Mechanical, Electrical, Hydraulics • Fire • Steel Fabrication • 4D, 7D Project Comparison River Quay • Traditional Tender • Consultants carried over from a previous project • No contractor involvement until after documentation • BIM included; • Architecture • Structure • Mechanical • Quantity Surveyor • Steel Fabrication, post documentation
  • 8. River Quay, South Bank - Fabrication Demonstrating Certainty
  • 14. Circa CT1 • 8 storey, 14920m² GFA commercial office building • New relationships with all parties • Subcontractors engaged after DD • BIM included; • Architecture • Structure • Limited mechanical 420 Flinders Street • 7 storey, 12635m² GFA commercial office building • Builder and lead consultants from Circa CT1 • Subcontractors engaged during DD • BIM includes; • Architecture, Structure • Mechanical, Electrical, Hydraulics • Fire • Steel Fabrication • 4D, 7D Project Comparison
  • 15. APR DECAUGMAY JUN JUL SEP OCT NOV 420 Flinders Street MAR DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTATION SCHEMATIC DESIGN SUBCONTRACTORS (MECH, ELEC, HYD, FIRE) Circa CT1 CONSTRUCTION DOCUMENTATION DESIGN DEVELOPMENT SUBCONTRACTORS (MECH, ELEC, HYD, FIRE) 2011 APR DECAUGMAY JUN JUL SEP OCT NOVMAR 2012 Key Differences
  • 16. CONSTRUCTION DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTATION SCHEMATIC DESIGN APR DECAUGMAY JUN JUL SEP OCT NOV SUBCONTRACTORS (MECH, ELEC, HYD, FIRE) basement issued for construction basement slab poured ground slab poured lump sum D&C agreement between client and contractor Programme (420)
  • 17. Issued for construction 29th June Issued for construction 7th September Issued for construction 9th November Issued for construction 30th November Staged Documentation
  • 18. Architectural Revit Model 50% through Construction Documentation
  • 19. Structural Revit Model 50% through Construction Documentation
  • 20. Subcontractor Services CAD Duct / IFC Model 50% through Construction Documentation
  • 21. One way digital communication Two way digital communication Traditional communication Legend Cardno (Landscape) Hollywood Plumbing (Hyd Subcontractor) Hutchinson Builders (Builder) SDF Electrical (Elec Subcontractor) Firerite Services (Fire sprinklers) Microfire (Fire alarm) Yong Feng (Screen Subcontractor) XL Precast (Precast Concrete Subcontractor) MCG (Certifiers) MWA (Acoustic) Lambert & Rehbein (Traffic) FM Performance ideas! (Facilities Management) BVN (Fitout Architect) Lancini Group (Client/Building Owner) Hunter Construction Services (Client Rep) WSP (Mech, Elec, Fire) Bornhorst & Ward (Structural & Civil) WSP (Hydraulic) VAE Group (Mech Subcontractor) Casa Engineering (Steel Subcontractor) Inhabit (Façade engineer) Arkhefield (Project Architect & Integrated Delivery Manager) Consultant Sub-Contractor Contractor Client Facility Management Project Team Structure
  • 22. • Major BIM collaborator • Prior relationship equalled TRUST • Motivated to learn • Integration of structural and architectural models was a key joint goal • Change in communication critical Bornhorst + Ward Structural Engineering
  • 23. • Major BIM collaborator • Contracted initially for mechanical services, later contracted to model fire services and cable trays for other subcontractors • CAD Duct caused difficulties translating model information into BIM • Unfamiliarity with Design Development process • Benefitted greatly from prototyping process as the mechanical services are being fabricated in Brisbane and shipped to Townsville. VAE Group Mechanical Subcontractor
  • 24. • Lead services consulting engineer • No documentation beyond Design Development • Engaged by Hollywood Plumbing (plumbing sub- contractor) to model hydraulics services in Revit WSP Group Mechanical, Electrical, Hydraulic and Fire Services Engineering
  • 25. • Started in Jan 2013, after construction documentation was completed. • Model has been incorporated into both Revit and Navisworks and checked against existing structural steel modelling and architectural detailing. CASA Engineering Steel Fabricator
  • 26. • Consultants novated to Hutchinson’s during Design Development. • Influential in getting subcontractors to contribute to the BIM. • Hutchinson’s Primavera construction programme was integrated into the Navisworks BIM. • Foreman on site is making use of the Navisworks model to supplement existing documentation. Hutchinson Builders Contractor Schedule comparing planned vs. actual build progress using the Navisworks model.
  • 27. Clash Detection 4D Timelining Export for FM Static Documentation Base model ‘background’ Dynamic BVN (Fitout Architect) FM Performance ideas! (Facilities Management) VAE Group (Mech Subcontractor) Casa Engineering (Steel Subcontractor) Navisworks Model Arkhefield (Architect) Bornhorst & Ward (Structural & Civil) WSP (Hydraulic) Integrated Revit Model Hutchinson Builders (4D) RVT IFC Model Workflow
  • 28. Associate / Project Architect Integrated Delivery Manager Model Manager / Architect Senior Architectural Technician Architectural Student Principal Interior Designer Architect Senior Architectural Technician Arkhefield Team Structure
  • 29. BIM Execution Planning • Initially driven by us, the Fast track, D & C compressed time frame limited our ability develop and resolve the BIM EP fully • Based upon NATSPEC template, the initial documents are overly complicated and daunting • Ideally should be managed and driven by the architect, with authority.
  • 30. Index of NATSPEC BIM EP Sections deleted shown in red.
  • 31. Embracing Change • Structural engineer modelled concrete to architects dimensional set out requirements • Architect used structural engineers and subcontractors services models for integrated documentation • Communication urgency and forward planning • Prototyping the building rather than documenting a contract
  • 34. Leveraging Model Information Additional set out visuals for concrete package
  • 35. Project Team Action List Contains model views, sketches and notes
  • 36. Bring Decisions Forward to Reduce Time & Cost
  • 37. Element Ownership Schedule Mapping out the dates of ownership exchange
  • 38. 100 200 300 Briefing / Pre Design Conceptual Design Schematic Design Developed Design 400 500 600 Contract Documents Construction Post Contract LOD: Level of Development
  • 39. Specified Services Equipment Co-ordinating services with pre-cast concrete
  • 40. Specified Services Equipment Navisworks co-ordination model, showing real equipment sizing
  • 41. Revit Sun Shading Prototype 3D Sectional Study in Revit, Engineering Analysis
  • 42. Integrated Revit Model (Architectural, Structural and Services)
  • 43. Integrated Revit Model (Architectural, Structural and Services)
  • 44. Sectional views through Navisworks model
  • 45. Concrete set out drawing – model elements from structural model, all dimensions provided by architect. Linking the structural, mechanical, hydraulic and steel fabrication models into our Revit model. Confirm detailing with the steel fabrication model in Revit during CA Documentation
  • 46. FM Pilot from Building Information Model to intelligent Building Information Management
  • 47. Facilities Management By considering the FM Ready modeling requirements at the initial stages, it is possible to produce a model that is useful throughout the full building Lifecycle. • This is important to the client, as:  the majority of the interoperability losses are borne by owners, and  the majority of expenditure is incurred during the operational phase. A Hospital's maintenance cost is equivalent to the capital cost every two to thee years!! 12% 22% 66% Planning, Design, & Engineering Construction Operations and Maintenance NIST GCR 04-867, Cost Analysis of Inadequate Interoperability in the U.S. Capital Facilities Industry • 66% of interoperability losses are borne by owners • $0.23/ existing SF/year
  • 48. Facilities Management • Objective:  To pilot Facilities Management integration as a learning exercise for the key project participants. – Client desired an FM Ready model – Not mandated in the Contract – Approach freed participants to invest in innovation without contractual risk.
  • 49. Facilities Management • Process: 1. We Specified FM Ready Model requirements. 2. We Clarified throughout the project. 3. We Verified by integrating to a real FM system.
  • 50. The Role of the Model in FM The Model acts as the link between model elements and information to be loaded to the FM System. 1) COBie schedules (Construction Operations Building information exchange) contain most of the data 2) Commissioning & Handover Documentation is linked to the model Revit + COBie Plug-in COBie Schedules Facility Management System Input from Consultants, Contractor and Subcontractors Navisworks Commissioning & Handover Documentation
  • 51. The Role of the Model in Commissioning & Handover for FM
  • 52. The Role of the Model in Commissioning & Handover for FM The handover information is linked to the objects, equipment systems and major assets and is accessible easily via the model.
  • 53. The Role of the Model in Commissioning & Handover for FM E.g. Isolate the AHUs and select an object to see all linked information. Retrieve all relevant documentation (e.g. specs, test reports, technical information, manufacturer’s data, etc.)
  • 54. The Role of the Model in FM Operations The Model acts as the visual navigation interface for integrated FM Applications
  • 55. FM iBIM Video Demonstration Visual Navigation Interface Demonstration Scenario: We are currently working in our FM Work Order system, checking real-time operational performance stats - when we get a call about the air conditioner in Retail 1. • Before we create a work order we want to identify the unit • Check to see if a service request is already in the system • See if this type of unit has issues in other locations
  • 56. FM iBIM Video Demonstration
  • 57. Facilities Management • Learnings  Stakeholder and project team engagement, clarity and commitment is key.  Process is more about identification and management of assets and information critical to operation.  Remember the ultimate audience for the model and keep naming/description conventions consistent and de-jargoned.  Once the participants know what is required there is relatively little ongoing overhead for them contributing to an FM Ready model.
  • 58. Consultants Contractor Facility Manager Building Asset Management Enabling the continuity of asset information through the briefing, design, construction, commissioning and operation phases of project delivery. OperationsCommissioningConstructionDesignBriefing Contractor Sub-contractor Consultants Contractor Sub-contractor Collaborative Design Data As Built Information, Warranties and Certificates Operations and Maintenance Data & Performance Analysis Revit ArchiCAD Zuuse SmartSight - iBIM Maximo Zuuse Navisworks ZuuseContractor + Sub-contractor Architect Structural Engineer MEP Consultants Contractor CAD Duct Tekla StruCAD
  • 59. • Model collaboration pushed within the limitations of Revit for a phase 2B project. • Changes of communication processes and forward planning are key. • Significant time investment required to manage BIM processes. • BIM Execution Plans will become a vital document, ideally should be managed and driven by the architect with authority. • Design and Construct projects are conducive to the delivery of a phase 2B project. • Principle agreements between clients, contractor, consultants and subcontractors need to be in place early. This enables ownership and reward to motivate engagement. Outcome Summary