SlideShare une entreprise Scribd logo
1  sur  94
Télécharger pour lire hors ligne
ROBTEC GOM User-Meeting


August 25, 2011

Dr. Ing. Ernst Mueller – GOM International AG

Dr. Eng. Vicente M. Massaroti - ROBTEC
Topics

                               2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2

          Breve Introducao de GOM

          ATOS TS

          GOM Inspect – Overview
          · Teaching by doing
          · I-inspect
          · VMR

          Overview de apresentacoes de Clientes feitas no GOM
            Conference in 2010
          · GeorgFischer
          · BME Swindon, UK
          · BMW Dingolfing, D
          · Motorola
          · BJB
          · Airbus

          Celulas de Medicao Automatizadas
          · Side panel
          · Rear door

                 3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 2   ROBTEC GOM User Meeting August 2011
GOM – Vendas mundiais & Rede de suporte
          Europa
                               2-Frame Setup / Frame 1                                    2-Frame Setup / Frame 2




               Vendas Mundiais e                         · 7 Escritórios GOM na Europa com o HQ em Braunschweig,
                 Rede de Suporte                           Alemanha




                 3-Frame Setup / Frame 1                        3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 3   ROBTEC GOM User Meeting August 2011
GOM – Vendas mundiais & Rede de suporte
          Mundial
                               2-Frame Setup / Frame 1                                      2-Frame Setup / Frame 2




               Vendas Mundiais e                         · 7 Escritórios GOM na Europa com o HQ em Braunschweig,
                 Rede de Suporte                           Alemanha

                                                         · Mais de 45 representantes/distribuidores no mundo

                 3-Frame Setup / Frame 1                         3-Frame Setup / Frame 2                  3-Frame Setup / Frame 3




Page 4   ROBTEC GOM User Meeting August 2011
GOM – Base de Clientes Estabelecidos
          Sistemas Instalados
                               2-Frame Setup / Frame 1                                         2-Frame Setup / Frame 2




              Base de clientes                           · Industrias Automobilística e Aeroespacial, bens de consumo, e todos
          estabelecida com mais de                         os seus fornecedores bem como instituições de pesquisa e
          3500 sistemas instalados                         universidades
                  no mundo                               · Desenvolvimento de produto, ferramentaria, inspeção de primeiras
                                                           amostras e garantia de qualidade assim como testes de materiais e
                                                           componentes
                 3-Frame Setup / Frame 1                           3-Frame Setup / Frame 2                   3-Frame Setup / Frame 3




Page 5   ROBTEC GOM User Meeting August 2011
GOM – Tecnicas de Medição Industrial 3D
          Sistema de Medição
                               2-Frame Setup / Frame 1                                       2-Frame Setup / Frame 2


                                      ATOS                 GOM é um parceiro global industrial
                            Digitalização                  para medição de coordenadas 3D óptica
                      3D campo completo
                                                           com mais de 20 anos de experiência


                                                         GOM tem amplo know-how em 3D
                             TRITOPCMM                    coordenar a medição, material e testes
                               CMM Óptico                 de componentes, controle de qualidade
                                   Móvel                  e análise, processamento digital de
                                                          imagens

                                                                   · Teste de materiais
                                 PONTOS                            · Analise de Forma 3D e inspeção
                             Fotogrametria
                                 Dinâmica                            dimensional
                                                                   · Teste de estruturas e
                                                                     componentes




                                                         TRITOPDef             ARAMIS           ARGUS
                                                         Análise               Medicao de       Anáise de
                                                         De Deformação         Deformcaoes      formabilidade
                                                         Vetorial              em Campo
                                                                               Completo
                 3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                           3-Frame Setup / Frame 3




Page 6   ROBTEC GOM User Meeting August 2011
ATOS TS
M Conference in 2010
ATOS
          Digitalizador -3D
                               2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2

          O digitalizador ATOS 3D já é estabelecido como ferramenta de
          medição em processos industriais e em toda cadeia produtiva.




                 3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 8   ROBTEC GOM User Meeting August 2011
ATOS
          Requisitos da Industria
                               2-Frame Setup / Frame 1                                  2-Frame Setup / Frame 2




                                                         · Alta Resolução

                                                         · Alta Precisão

                                                         · Medições Rápidas

                                                         · Digitalização de superfícies
                                                          complexas e com brilho

                                                         · Imune a fatores ambientais

                                                         · Uso Industrial

                                                         · Baixa Manutenção




                 3-Frame Setup / Frame 1                      3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 9   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 10   ROBTEC GOM User Meeting August 2011
ATOS Triple Scan
           Visão Geral
                                2-Frame Setup / Frame 1                                     2-Frame Setup / Frame 2


                                                             Triple Scan

                         Automação
                                                                                        Tecnologia Blue Light




           ATOS Professional                                                                              Sensor Robusto,
           Software                                                                                       compativel com
                                                                                                          ambiente Industrial




                                                                                                Scanner 3D de
                GOM Touch Probe                                                                 alta resolução
                                                                                                para pequenas e
                                                                                                grandes pecas


                                                   Sistema de Medição Portátil


                  3-Frame Setup / Frame 1                     3-Frame Setup / Frame 2                     3-Frame Setup / Frame 3




Page 11   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                       Tecnologia Blue Light

                       Imune a variações ambientais

                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 12   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2


                                                                Tecnologia Blue Light
                                                                · Iluminação LED

                                                                · Pequena largura de Banda

                                                                · Digitalização independente das condições
                                                                  de iluminação

                                                                · Menos reflexões

                                                                · Menos ruídos na imagem (speckle)

                                                                · Luz fria – menos aquecimento

                                                                ·Vida estimada 10.000 h = 1 ano em 24/7

                                                                · Menores custos de manutenção

                                                                · Tudo integrado em um cabeçote sensor




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 13   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                       ATOS Triple Scan – Uma nova tecnologia

                       Menos tomadas individuais mesmo em superfícies refletivas ou componentes
                        complexos
                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 14   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                               2-Frame Setup / Frame 2


                                                                    Triple Scan

                                                                    Nova tecnologia de medição

                                                                    Nova tecnologia de projeção

                                                                    3 sensores individuais em 1 setup

                                                                    Verificação de calibração permanente

                                                                    Melhoria na medição de superfícies brilhantes

                                                                    Mais dados em formas complexas

                                                                    Mais resolução em estruturas pequenas

                                                                    Medição mais rápida de pecas




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                   3-Frame Setup / Frame 3




Page 15   ROBTEC GOM User Meeting August 2011
Técnicas de Camera
           Câmera Simples
                                2-Frame Setup / Frame 1                                   2-Frame Setup / Frame 2
                                                                               Projetor                                  Câmera
           · Triangulação entre a câmera e o projetor
                                                                               ΦP
           · Projetor é um elemento ativo e necessita                                                                 xp           yp
             ser calibrado
                Influencia térmica (lâmpadas p.e.)
             levam a uma calibração instável
                Influencias mecânicas afetam a
             calibração do sistema

           · Determinação de coordenadas 3D:
             3 equações (xp, yp, φp) para 3 incógnitas
                não é super-determinado
                a condição da calibração não e
             conhecida

             Qualidade dos dados e sempre
                                                                                                     P
            questionável




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                        3-Frame Setup / Frame 3




Page 16   ROBTEC GOM User Meeting August 2011
Técnicas de Câmera
           Estéreo Câmeras
                                2-Frame Setup / Frame 1                                  2-Frame Setup / Frame 2
                                                                              Câmera 1       Projetor                   Câmera 2
           · Triangulação entre duas câmera
                                                                   y1p
                                                                                            ΦP
           · Projetor é um elemento passivo                                                                          x2p          y2p
                                                                            x1p
              sem efeitos térmicos
              Uso de da projeção de luz como fonte
            de iluminação e função direta do projetor

           · Determinação de coordenadas 3D :
             4 equações (x1p, y1p, x2p, y2p) para 3
             incógnitas
                super-determinado
                condição da calibração é sempre
             conhecida

                                                                                                    P
           · Estéreo Câmeras permite:
               · Verificação permanente da condição do
                 sensor
               · Informação on-line sobre a
                 movimentação da peca
               · Visualização online da área de
                 medição, guiando assim o operador

                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                       3-Frame Setup / Frame 3
             Alta confiabilidade do processo

Page 17   ROBTEC GOM User Meeting August 2011
ATOS Triple Scan
            Descrição do controle de calibração do sistema ATOS
            O angulo de medição/ Frame 1 sempre ser estável durante as medições
                         2-Frame Setup deve                          2-Frame Setup / Frame 2


                                                                   Projetor
                                                                       Triple Scan
                                       Câmera Esquerda
                                                                                                              Câmera Direita


          - ATOS controla a temperatura e
          os ângulos de medição

          - Sensores de temperatura estão
          internos ao cabeçote sensor

          - A segunda câmera controla
          online os outros ângulos de
          medição (calibração do
          sistema), por causa da
          influencia de vibrações, usuário,       Ângulo 1                                    Ângulo 2
          interferências de terceiros.            (pequeno)                                   (pequeno)
          Sistemas de uma câmera não
          podem fazer isto!!!




                                                                                          Ângulo 3
                                                                                          (grande)




                                                                     Ponto de
                                                                     scaneamento na
                    3-Frame Setup / Frame 1               3-Frame Setup / Frame 2
                                                                     superficie da peca              3-Frame Setup / Frame 3




Page 18   ROBTEC GOM User Meeting August 2011
ATOS Triple Scan
            Descrição do Triple Scan – 3 Ângulos de Medição para controle da calibração
                               2-Frame Setup / Frame 1                                           2-Frame Setup / Frame 2


                                                                        Projetor
                                                               Triple Scan

                                    Câmera Esquerda
                                                                                                                           Câmera Direita




                                                         Ângulo 1                                      Ângulo 2
                                                         (pequeno)                                     (pequeno)


          - 3 Ângulos de controle do ponto
          de scaneamento

          - Controle da calibração                                                               Ângulo 3
          possível, por conta do grande                                                          (grande)
          angulo de medição . (Ângulo 1 +
          Ângulo 2 = Ângulo 3)

          - Duas vistas distintas de                                        Ponto de
          medição, dai 2 x mais rápido                                      scaneamento na
          que os sistemasSetup /1 só 1câmera.
                     3-Frame de Frame                            3-Frame Setup / Frame 2
                                                                            superficie da peca                 3-Frame Setup / Frame 3




Page 19   ROBTEC GOM User Meeting August 2011
ATOS Triple Scan
           Comparação do Triple Scan contra competidores, que usam somente uma
           câmera e um projetor 1
                       2-Frame Setup / Frame                   2-Frame Setup / Frame 2


                                                 Projetor
                                                    Triple Scan
                  Somente Câmera
                  Esquerda                                                     Sem Câmera Direita




                               Angulo 1
                               (pequeno)

               - Somente um ângulo de
               medição, condição mínima para
               medir pontos

               - NAO e possível controlar a
               calibração, por que tem-se
               somente um angulo de medição

               - Somente uma vista de
               medição, necessita mais          Ponto de
               posições para o mesmo            scaneamento na
               resultado que o sistema Triple
                  3-Frame Setup / Frame 1            3-Frame Setup / Frame 2
                                                superficie da peca
                                                                                    3-Frame Setup / Frame 3
               Scan

Page 20   ROBTEC GOM User Meeting August 2011
ATOS Triple Scan
           Medição de superfícies complexas
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2

           · A área em verde mostra a
             superfície medida com as
             duas câmeras (E)




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 21   ROBTEC GOM User Meeting August 2011
ATOS Triple Scan
           Medição de superfícies complexas
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2

           · A área em verde mostra a
             superfície medida com as
             duas câmeras (E)

           · A área em vermelho
             mostra a superfície
             medida pela câmera 1 e o
             projetor




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 22   ROBTEC GOM User Meeting August 2011
Camera Technique
           ATOS Single-Eye: Measuring of complex structures
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2

           · A área em verde mostra a
             superfície medida com as
             duas câmeras (E)

           · A área em vermelho mostra
             a superfície medida pela
             câmera 1 e o projetor.

           · A área em vermelho mostra
             a superfície medida pela
             câmera 2 e o projetor.




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 23   ROBTEC GOM User Meeting August 2011
ATOS Triple Scan
           Medição de superfícies complexas: Resultado
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2

           · A área em verde mostra a
             superfície medida com as
             duas câmeras (E)

           · A área em vermelho
             mostra a superfície
             medida pela câmera 1 e o
             projetor.

           · A área em vermelho
             mostra a superfície
             medida pela câmera 2 e o
             projetor.

           · Resultado: A estrutura
             pode ser capturada com
             apenas 1 tomada, pois as
             áreas de interesse são
             capturadas e combinadas
             automaticamente. (OU)

           · Dai, menos movimentação
             do sensor para uma peca
             complexa
                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 24   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2


                                                             Triple Scan em superfícies
                                                              complexas

                                                             Triple Scan alcança furos profundos

                                                             Número de tomadas necessárias reduzidas
                                                               pelo fator 2

                                                             Fácil manuseio

                                                             Alta cobertura de superfícies complexas




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 25   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2


                                                               Triple Scan para superfícies
                                                                brilhantes

                                                               Triple Scan evita hotspots

                                                               Número de tomadas necessárias reduzidas
                                                                  pelo fator 2

                                                               Alta qualidade de dados em superfícies sem
                                                                  spray




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 26   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                       Cabeçote Industrial Robusto

                       Housing completamente fechado

                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 27   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2
                                                          Cabeçote Industrial Robusto

                                                          ·Housing completamente fechado

                                                          ·Compósito de Fibra de Carbono resistente a
                                                          Impactos

                                                          ·Câmeras e lentes integradas e protegidas

                                                          ·Sensor com componentes industriais

                                                          ·Controlador do Sensor integrado

                                                          ·Ventilação eficiente e muito silenciosa




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 28   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




           Scanner 3D de Alta Resolução para
           Pequenos e Grandes Objetos




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 29   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                                2-Frame Setup / Frame 2

                                                                      Scanner 3D de Alta Resolução para
                                                                      Pequenos e Grandes Objetos


                                                                      ATOS II Triple Scan: 2 x 5 Mega-Pixel

                                                                      ATOS III Triple Scan: 2 x 8 Mega-Pixel

                                                                      Áreas de medição ajustáveis de 38mm ate
                                                                      2000mm

                                                                      Alta resolução para pecas pequenas

                                                                      Digitalização Rápida para pecas grandes

                                                                      Tudo em um só equipamento




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                    3-Frame Setup / Frame 3




Page 30   ROBTEC GOM User Meeting August 2011
Scanner 3D de Alta Resolução para Pequenos e Grandes Objetos
           Quais configurações são disponíveis?
                                 2-Frame Setup / Frame 1                                 2-Frame Setup / Frame 2



           · Frame de Câmeras
               · 400mm -> pronto

           · Duas posições de câmera para frame 400mm
               · Posição 400mm
               · Posição SO

           · Ajuste do Angulo de Câmera                                                  Posição SO
               · Fixação com stopers de angulo
               · Dois stopers são possíveis para qualquer
                 posição                                                                Posição 400mm


                                                                             ATOS Triple Scan com frame 400mm




                   3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                     3-Frame Setup / Frame 3




Page 31   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2


                                                                    Triple Scan para Alta Resolução

                                                                    Melhor solução em pequenos detalhes

                                                                    Baixo nível de ruído

                                                                    Alta qualidade de dados




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 32   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




           GOM Touch Probe

           A combinação de métodos ópticos e tácteis
           em medição 3D




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 33   ROBTEC GOM User Meeting August 2011
GOM Touch Probe
           Estéreo Câmeras
                                2-Frame Setup / Frame 1                                     2-Frame Setup / Frame 2

           · Estéreo Câmeras permite:
               · Usar o ATOS como um tracker óptico

           · ATOS pode utilizar um touch probe
               · Medir geometrias regulares tais como
                 Planos, Círculos, Cilindros, Cones,
                 Furos
               · Medição contra geometrias CAD

           · ATOS pode também seguir adaptadores
             definidos




                                                                                    X,Y,Z
                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                         3-Frame Setup / Frame 3




Page 34   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                              2-Frame Setup / Frame 2




                                                               GOM Touch Probe


                                                               Medições 3D de campo completo e touch probe

                                                               Medições em áreas de difícil acesso

                                                               Comparação direta com CAD

                                                               Medição de primitivas

                                                               Medição rápida de pontos individuais

                                                               Alinhamento On-line




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                  3-Frame Setup / Frame 3




Page 35   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 36   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                                  2-Frame Setup / Frame 2




                                                                         Sistema de Medição Portátil

                                                                         Vai direto ao objeto a ser medido

                                                                         Setup Rápido

                                                                         Referencia Dinâmica

                                                                         Otimizado para ambientes e condições
                                                                           industriais




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                      3-Frame Setup / Frame 3




Page 37   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                       ATOS Inspection Cell


                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 38   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                                2-Frame Setup / Frame 2




                                                                        ATOS Inspection Cell

                                                                        Desenvolvido para Metrologia
                                                                        Automatizada
                                                                        Tecnologia de Proteção do Sensor
                                                                        Baixo custo Operacional
                                                                        Medição na produção
                                                                        Resultados de medição Precisos




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                    3-Frame Setup / Frame 3




Page 39   ROBTEC GOM User Meeting August 2011
2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 40   ROBTEC GOM User Meeting August 2011
ATOS V7 & GOM Inspect Professional
           Software de Medição e Inspeção
                                2-Frame Setup / Frame 1                                  2-Frame Setup / Frame 2




                                                          Formato de Dados Abertos




                       Automação                                                    Operação Orientada




                                                                                             Flexibilidade
                                  Rastreabilidade


                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                      3-Frame Setup / Frame 3




Page 41   ROBTEC GOM User Meeting August 2011
ATOS V7 & GOM Inspect Professional
           Conceitos
                                2-Frame Setup / Frame 1                                        2-Frame Setup / Frame 2




                                            Nova Interface
                                                                                 Inspeção Rápida



                          I-Inspect
                                                                                               Múltiplos Alinhamentos




                 Rastreabilidade
                                                                                                   Digitalização




                            Software Dedicado
                                                                                         Virtual Measuring Room


                                                          Teaching by Doing

                  3-Frame Setup / Frame 1                      3-Frame Setup / Frame 2                       3-Frame Setup / Frame 3




Page 42   ROBTEC GOM User Meeting August 2011
ATOS V7 & GOM Inspect Professional
           Teaching by Doing
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 43   ROBTEC GOM User Meeting August 2011
ATOS V7 & GOM Inspect Professional
           I-inspect
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 44   ROBTEC GOM User Meeting August 2011
ATOS V7 & GOM Inspect Professional
           I-inspect
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 45   ROBTEC GOM User Meeting August 2011
ATOS V7 & GOM Inspect Professional
           VMR
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 46   ROBTEC GOM User Meeting August 2011
ATOS V7 & GOM Inspect Professional
           o futuro...
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2

           GOM Inspect

           · Analise de Tendência/Estatistica...
                  · Cp – Cpk; Pp - Ppk

           · Módulos especiais
                · Grandes pecas
                · Pás de Turbinas
                · Injeção
                · Fundição
                · Estampados

           · E muito mais....




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 47   ROBTEC GOM User Meeting August 2011
ATOS Triple Scan
           Lançamento
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 48   ROBTEC GOM User Meeting August 2011
ATOS Triple Scan
           Lançamento
                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 49   ROBTEC GOM User Meeting August 2011
Overview on customer
presentations given at the
GOM Conference in 2010
M Conference in 2010
Georg Fischer

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 51   ROBTEC GOM User Meeting August 2011
Georg Fischer

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 52   ROBTEC GOM User Meeting August 2011
Georg Fischer

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 53   ROBTEC GOM User Meeting August 2011
Georg Fischer

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 54   ROBTEC GOM User Meeting August 2011
Georg Fischer

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 55   ROBTEC GOM User Meeting August 2011
Adam OPEL, GME

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 56   ROBTEC GOM User Meeting August 2011
Adam OPEL, GME

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 57   ROBTEC GOM User Meeting August 2011
Adam OPEL, GME

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 58   ROBTEC GOM User Meeting August 2011
Adam OPEL, GME

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 59   ROBTEC GOM User Meeting August 2011
Adam OPEL, GME

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 60   ROBTEC GOM User Meeting August 2011
Adam OPEL, GME

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 61   ROBTEC GOM User Meeting August 2011
Adam OPEL, GME

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 62   ROBTEC GOM User Meeting August 2011
Adam OPEL, GME

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 63   ROBTEC GOM User Meeting August 2011
BMW Swindon, UK

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 64   ROBTEC GOM User Meeting August 2011
BMW Swindon, UK

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 65   ROBTEC GOM User Meeting August 2011
BMW Swindon, UK

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 66   ROBTEC GOM User Meeting August 2011
BMW Swindon, UK

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 67   ROBTEC GOM User Meeting August 2011
BMW Dingolfing. Germany

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 68   ROBTEC GOM User Meeting August 2011
BMW Dingolfing. Germany

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 69   ROBTEC GOM User Meeting August 2011
BMW Dingolfing. Germany

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 70   ROBTEC GOM User Meeting August 2011
BMW Dingolfing. Germany

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 71   ROBTEC GOM User Meeting August 2011
BMW Dingolfing. Germany

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 72   ROBTEC GOM User Meeting August 2011
BMW Dingolfing. Germany

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 73   ROBTEC GOM User Meeting August 2011
Motorola

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 74   ROBTEC GOM User Meeting August 2011
Motorola

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 75   ROBTEC GOM User Meeting August 2011
Motorola

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 76   ROBTEC GOM User Meeting August 2011
Motorola

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 77   ROBTEC GOM User Meeting August 2011
Motorola

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 78   ROBTEC GOM User Meeting August 2011
Motorola

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 79   ROBTEC GOM User Meeting August 2011
BJB

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 80   ROBTEC GOM User Meeting August 2011
BJB

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 81   ROBTEC GOM User Meeting August 2011
BJB

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 82   ROBTEC GOM User Meeting August 2011
BJB

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 83   ROBTEC GOM User Meeting August 2011
BJB

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 84   ROBTEC GOM User Meeting August 2011
BJB

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                                        established at a customer




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 85   ROBTEC GOM User Meeting August 2011
Airbus

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 86   ROBTEC GOM User Meeting August 2011
Airbus

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 87   ROBTEC GOM User Meeting August 2011
Airbus

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 88   ROBTEC GOM User Meeting August 2011
Airbus

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 89   ROBTEC GOM User Meeting August 2011
Airbus

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 90   ROBTEC GOM User Meeting August 2011
Automated Measuring Cells
- side panel
- rear door Conference in
2010
Nice automated measuring cell established at a customer

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 92   ROBTEC GOM User Meeting August 2011
Nice automated measuring cell established at a customer

                                2-Frame Setup / Frame 1                             2-Frame Setup / Frame 2




                  3-Frame Setup / Frame 1                 3-Frame Setup / Frame 2                 3-Frame Setup / Frame 3




Page 93   ROBTEC GOM User Meeting August 2011
Thank you for your
attention



info@gom.com



www.gom.com

Contenu connexe

Similaire à VIII Seminário de Tecnologias Robtec - GOM

Cimatron NC CAD-CAM - FIT
Cimatron NC CAD-CAM - FITCimatron NC CAD-CAM - FIT
Cimatron NC CAD-CAM - FITFit
 
Uma aplicação da tecnologia de data matrix na rastreabilidade de peças no set...
Uma aplicação da tecnologia de data matrix na rastreabilidade de peças no set...Uma aplicação da tecnologia de data matrix na rastreabilidade de peças no set...
Uma aplicação da tecnologia de data matrix na rastreabilidade de peças no set...Alexandre Bento
 
Trabalho sobre software Vericut
Trabalho sobre software VericutTrabalho sobre software Vericut
Trabalho sobre software Vericutrbgalvao
 
Simulador Eletromagnético em um Ambiente de Grades Computacionais
Simulador Eletromagnético em um Ambiente de Grades ComputacionaisSimulador Eletromagnético em um Ambiente de Grades Computacionais
Simulador Eletromagnético em um Ambiente de Grades ComputacionaisIgor José F. Freitas
 
162 organização da manutenção
162   organização da manutenção162   organização da manutenção
162 organização da manutençãoAndré Rodrigues
 
Administração de Operações - Projeto Redes E Instalações
Administração de Operações - Projeto Redes E InstalaçõesAdministração de Operações - Projeto Redes E Instalações
Administração de Operações - Projeto Redes E InstalaçõesWeNova Consulting
 
Administração de Operações - Projeto Redes E InstalaçõEs + Tecnologias de Pro...
Administração de Operações - Projeto Redes E InstalaçõEs + Tecnologias de Pro...Administração de Operações - Projeto Redes E InstalaçõEs + Tecnologias de Pro...
Administração de Operações - Projeto Redes E InstalaçõEs + Tecnologias de Pro...WeNova Consulting
 
Administração de Operações - ExercíCios Em Sala (Metodos De Definicao Para Lo...
Administração de Operações - ExercíCios Em Sala (Metodos De Definicao Para Lo...Administração de Operações - ExercíCios Em Sala (Metodos De Definicao Para Lo...
Administração de Operações - ExercíCios Em Sala (Metodos De Definicao Para Lo...WeNova Consulting
 
Ultrason computadorizada code case 2235 asme -t-132
Ultrason computadorizada   code case 2235 asme -t-132Ultrason computadorizada   code case 2235 asme -t-132
Ultrason computadorizada code case 2235 asme -t-132Tiago Santos
 
Alma Act Cut Raihsa
Alma Act Cut RaihsaAlma Act Cut Raihsa
Alma Act Cut RaihsaRaihsa
 
Tema 10 Automação Da Engenharia
Tema 10   Automação Da EngenhariaTema 10   Automação Da Engenharia
Tema 10 Automação Da Engenhariabruno2003sp
 
Case Study IntelBras - JTAG Technologies
Case Study IntelBras - JTAG Technologies Case Study IntelBras - JTAG Technologies
Case Study IntelBras - JTAG Technologies Maria Spínola
 
Projeto-UTE-EL14
Projeto-UTE-EL14Projeto-UTE-EL14
Projeto-UTE-EL14Marco Coghi
 
Trabalho sae 2008 versao final a
Trabalho sae 2008  versao final  aTrabalho sae 2008  versao final  a
Trabalho sae 2008 versao final aSergio Gebara
 
Interfaces de Alto Desempenho Visual em sistemas de Automação
Interfaces de Alto Desempenho Visual em sistemas de AutomaçãoInterfaces de Alto Desempenho Visual em sistemas de Automação
Interfaces de Alto Desempenho Visual em sistemas de AutomaçãoRicardo Olsen
 
Alma/Raihsa: cam para corte a laser
Alma/Raihsa: cam para corte a laserAlma/Raihsa: cam para corte a laser
Alma/Raihsa: cam para corte a laserRaihsa
 
Circuito fechado de câmeras - Logística
Circuito fechado de câmeras - LogísticaCircuito fechado de câmeras - Logística
Circuito fechado de câmeras - LogísticaDeangelis | Design
 
METRÔ CURITIBANO
METRÔ CURITIBANOMETRÔ CURITIBANO
METRÔ CURITIBANOMarco Coghi
 

Similaire à VIII Seminário de Tecnologias Robtec - GOM (20)

Cimatron NC CAD-CAM - FIT
Cimatron NC CAD-CAM - FITCimatron NC CAD-CAM - FIT
Cimatron NC CAD-CAM - FIT
 
Uma aplicação da tecnologia de data matrix na rastreabilidade de peças no set...
Uma aplicação da tecnologia de data matrix na rastreabilidade de peças no set...Uma aplicação da tecnologia de data matrix na rastreabilidade de peças no set...
Uma aplicação da tecnologia de data matrix na rastreabilidade de peças no set...
 
Trabalho sobre software Vericut
Trabalho sobre software VericutTrabalho sobre software Vericut
Trabalho sobre software Vericut
 
Simulador Eletromagnético em um Ambiente de Grades Computacionais
Simulador Eletromagnético em um Ambiente de Grades ComputacionaisSimulador Eletromagnético em um Ambiente de Grades Computacionais
Simulador Eletromagnético em um Ambiente de Grades Computacionais
 
162 organização da manutenção
162   organização da manutenção162   organização da manutenção
162 organização da manutenção
 
Administração de Operações - Projeto Redes E Instalações
Administração de Operações - Projeto Redes E InstalaçõesAdministração de Operações - Projeto Redes E Instalações
Administração de Operações - Projeto Redes E Instalações
 
Administração de Operações - Projeto Redes E InstalaçõEs + Tecnologias de Pro...
Administração de Operações - Projeto Redes E InstalaçõEs + Tecnologias de Pro...Administração de Operações - Projeto Redes E InstalaçõEs + Tecnologias de Pro...
Administração de Operações - Projeto Redes E InstalaçõEs + Tecnologias de Pro...
 
Administração de Operações - ExercíCios Em Sala (Metodos De Definicao Para Lo...
Administração de Operações - ExercíCios Em Sala (Metodos De Definicao Para Lo...Administração de Operações - ExercíCios Em Sala (Metodos De Definicao Para Lo...
Administração de Operações - ExercíCios Em Sala (Metodos De Definicao Para Lo...
 
Ultrason computadorizada code case 2235 asme -t-132
Ultrason computadorizada   code case 2235 asme -t-132Ultrason computadorizada   code case 2235 asme -t-132
Ultrason computadorizada code case 2235 asme -t-132
 
Alma Act Cut Raihsa
Alma Act Cut RaihsaAlma Act Cut Raihsa
Alma Act Cut Raihsa
 
Tema 10 Automação Da Engenharia
Tema 10   Automação Da EngenhariaTema 10   Automação Da Engenharia
Tema 10 Automação Da Engenharia
 
Case Study IntelBras - JTAG Technologies
Case Study IntelBras - JTAG Technologies Case Study IntelBras - JTAG Technologies
Case Study IntelBras - JTAG Technologies
 
Projeto-UTE-EL14
Projeto-UTE-EL14Projeto-UTE-EL14
Projeto-UTE-EL14
 
Trabalho sae 2008 versao final a
Trabalho sae 2008  versao final  aTrabalho sae 2008  versao final  a
Trabalho sae 2008 versao final a
 
Mc67
Mc67Mc67
Mc67
 
Interfaces de Alto Desempenho Visual em sistemas de Automação
Interfaces de Alto Desempenho Visual em sistemas de AutomaçãoInterfaces de Alto Desempenho Visual em sistemas de Automação
Interfaces de Alto Desempenho Visual em sistemas de Automação
 
Alma/Raihsa: cam para corte a laser
Alma/Raihsa: cam para corte a laserAlma/Raihsa: cam para corte a laser
Alma/Raihsa: cam para corte a laser
 
Cots - commercial off the shelf
Cots - commercial off the shelfCots - commercial off the shelf
Cots - commercial off the shelf
 
Circuito fechado de câmeras - Logística
Circuito fechado de câmeras - LogísticaCircuito fechado de câmeras - Logística
Circuito fechado de câmeras - Logística
 
METRÔ CURITIBANO
METRÔ CURITIBANOMETRÔ CURITIBANO
METRÔ CURITIBANO
 

Plus de Robtec

3DSystems - Geomagic Freeform
3DSystems - Geomagic Freeform3DSystems - Geomagic Freeform
3DSystems - Geomagic FreeformRobtec
 
VW - Medição Óptica - Visão e Uso na Ferramentaria VW Anchieta
VW - Medição Óptica - Visão e Uso na Ferramentaria VW AnchietaVW - Medição Óptica - Visão e Uso na Ferramentaria VW Anchieta
VW - Medição Óptica - Visão e Uso na Ferramentaria VW AnchietaRobtec
 
Plasnature - Prototipagem Rápida Ajudando a Criar um Novo Produto
Plasnature - Prototipagem Rápida Ajudando a Criar um Novo ProdutoPlasnature - Prototipagem Rápida Ajudando a Criar um Novo Produto
Plasnature - Prototipagem Rápida Ajudando a Criar um Novo ProdutoRobtec
 
SIN IMPLANTES - Desenvolvimento de Embalagem para Implantes Odontológicos
SIN IMPLANTES - Desenvolvimento de Embalagem para Implantes OdontológicosSIN IMPLANTES - Desenvolvimento de Embalagem para Implantes Odontológicos
SIN IMPLANTES - Desenvolvimento de Embalagem para Implantes OdontológicosRobtec
 
3DSYSTEMS - Novidades Tecnológicas da Impressão 3D no Mundo
3DSYSTEMS - Novidades Tecnológicas da Impressão 3D no Mundo3DSYSTEMS - Novidades Tecnológicas da Impressão 3D no Mundo
3DSYSTEMS - Novidades Tecnológicas da Impressão 3D no MundoRobtec
 
R Design - Transformando ideias em realidade
R Design - Transformando ideias em realidadeR Design - Transformando ideias em realidade
R Design - Transformando ideias em realidadeRobtec
 
ROBTEC - 10º Seminário Robtec
ROBTEC - 10º Seminário RobtecROBTEC - 10º Seminário Robtec
ROBTEC - 10º Seminário RobtecRobtec
 
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...Robtec
 
MERCEDES BENZ - SLA e SLS: Um fator de sucesso na Mercedes Benz
MERCEDES BENZ - SLA e SLS: Um fator de sucesso na Mercedes BenzMERCEDES BENZ - SLA e SLS: Um fator de sucesso na Mercedes Benz
MERCEDES BENZ - SLA e SLS: Um fator de sucesso na Mercedes BenzRobtec
 
QUESTTO | NÓ - Design e tecnologia: novas fronteiras - 9º Seminário de Tecno...
QUESTTO | NÓ - Design e tecnologia: novas fronteiras -  9º Seminário de Tecno...QUESTTO | NÓ - Design e tecnologia: novas fronteiras -  9º Seminário de Tecno...
QUESTTO | NÓ - Design e tecnologia: novas fronteiras - 9º Seminário de Tecno...Robtec
 
R DESIGN STUDIO - Transformando ideias em realidade - 9º Seminário de Tecnol...
R DESIGN STUDIO - Transformando ideias em realidade -  9º Seminário de Tecnol...R DESIGN STUDIO - Transformando ideias em realidade -  9º Seminário de Tecnol...
R DESIGN STUDIO - Transformando ideias em realidade - 9º Seminário de Tecnol...Robtec
 
MATERIALISE - Inovações de software na industria de prototipagem rápida - 9º...
MATERIALISE - Inovações de software na industria de prototipagem rápida -  9º...MATERIALISE - Inovações de software na industria de prototipagem rápida -  9º...
MATERIALISE - Inovações de software na industria de prototipagem rápida - 9º...Robtec
 
GOM - Novidades 2012 - 9º Seminário de Tecnologias Robtec - 2012
GOM - Novidades 2012 -  9º Seminário de Tecnologias Robtec - 2012GOM - Novidades 2012 -  9º Seminário de Tecnologias Robtec - 2012
GOM - Novidades 2012 - 9º Seminário de Tecnologias Robtec - 2012Robtec
 
VISTEON - Benefícios do molde protótipo no desenvolvimento de novos produtos ...
VISTEON - Benefícios do molde protótipo no desenvolvimento de novos produtos ...VISTEON - Benefícios do molde protótipo no desenvolvimento de novos produtos ...
VISTEON - Benefícios do molde protótipo no desenvolvimento de novos produtos ...Robtec
 
Abertura do 9º Seminário de Tecnologias Robtec - 2012
Abertura do 9º Seminário de Tecnologias Robtec - 2012Abertura do 9º Seminário de Tecnologias Robtec - 2012
Abertura do 9º Seminário de Tecnologias Robtec - 2012Robtec
 
Apresentação Robtec no Epicentro 2 - 2012
Apresentação Robtec no Epicentro 2 - 2012Apresentação Robtec no Epicentro 2 - 2012
Apresentação Robtec no Epicentro 2 - 2012Robtec
 
VIII Seminário de Tecnologias Robtec - VW
VIII Seminário de Tecnologias Robtec - VWVIII Seminário de Tecnologias Robtec - VW
VIII Seminário de Tecnologias Robtec - VWRobtec
 
VIII Seminário de Tecnologias Robtec - R Design Studio
VIII Seminário de Tecnologias Robtec - R Design StudioVIII Seminário de Tecnologias Robtec - R Design Studio
VIII Seminário de Tecnologias Robtec - R Design StudioRobtec
 
VIII Seminário de Tecnologias Robtec - OLSA
VIII Seminário de Tecnologias Robtec - OLSAVIII Seminário de Tecnologias Robtec - OLSA
VIII Seminário de Tecnologias Robtec - OLSARobtec
 
VIII Seminário de Tecnologias Robtec - Mercedes-Benz
VIII Seminário de Tecnologias Robtec - Mercedes-BenzVIII Seminário de Tecnologias Robtec - Mercedes-Benz
VIII Seminário de Tecnologias Robtec - Mercedes-BenzRobtec
 

Plus de Robtec (20)

3DSystems - Geomagic Freeform
3DSystems - Geomagic Freeform3DSystems - Geomagic Freeform
3DSystems - Geomagic Freeform
 
VW - Medição Óptica - Visão e Uso na Ferramentaria VW Anchieta
VW - Medição Óptica - Visão e Uso na Ferramentaria VW AnchietaVW - Medição Óptica - Visão e Uso na Ferramentaria VW Anchieta
VW - Medição Óptica - Visão e Uso na Ferramentaria VW Anchieta
 
Plasnature - Prototipagem Rápida Ajudando a Criar um Novo Produto
Plasnature - Prototipagem Rápida Ajudando a Criar um Novo ProdutoPlasnature - Prototipagem Rápida Ajudando a Criar um Novo Produto
Plasnature - Prototipagem Rápida Ajudando a Criar um Novo Produto
 
SIN IMPLANTES - Desenvolvimento de Embalagem para Implantes Odontológicos
SIN IMPLANTES - Desenvolvimento de Embalagem para Implantes OdontológicosSIN IMPLANTES - Desenvolvimento de Embalagem para Implantes Odontológicos
SIN IMPLANTES - Desenvolvimento de Embalagem para Implantes Odontológicos
 
3DSYSTEMS - Novidades Tecnológicas da Impressão 3D no Mundo
3DSYSTEMS - Novidades Tecnológicas da Impressão 3D no Mundo3DSYSTEMS - Novidades Tecnológicas da Impressão 3D no Mundo
3DSYSTEMS - Novidades Tecnológicas da Impressão 3D no Mundo
 
R Design - Transformando ideias em realidade
R Design - Transformando ideias em realidadeR Design - Transformando ideias em realidade
R Design - Transformando ideias em realidade
 
ROBTEC - 10º Seminário Robtec
ROBTEC - 10º Seminário RobtecROBTEC - 10º Seminário Robtec
ROBTEC - 10º Seminário Robtec
 
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
SLM SOLUTIONS - Protótipos metálicos: novas tecnologias aplicadas ao desenvol...
 
MERCEDES BENZ - SLA e SLS: Um fator de sucesso na Mercedes Benz
MERCEDES BENZ - SLA e SLS: Um fator de sucesso na Mercedes BenzMERCEDES BENZ - SLA e SLS: Um fator de sucesso na Mercedes Benz
MERCEDES BENZ - SLA e SLS: Um fator de sucesso na Mercedes Benz
 
QUESTTO | NÓ - Design e tecnologia: novas fronteiras - 9º Seminário de Tecno...
QUESTTO | NÓ - Design e tecnologia: novas fronteiras -  9º Seminário de Tecno...QUESTTO | NÓ - Design e tecnologia: novas fronteiras -  9º Seminário de Tecno...
QUESTTO | NÓ - Design e tecnologia: novas fronteiras - 9º Seminário de Tecno...
 
R DESIGN STUDIO - Transformando ideias em realidade - 9º Seminário de Tecnol...
R DESIGN STUDIO - Transformando ideias em realidade -  9º Seminário de Tecnol...R DESIGN STUDIO - Transformando ideias em realidade -  9º Seminário de Tecnol...
R DESIGN STUDIO - Transformando ideias em realidade - 9º Seminário de Tecnol...
 
MATERIALISE - Inovações de software na industria de prototipagem rápida - 9º...
MATERIALISE - Inovações de software na industria de prototipagem rápida -  9º...MATERIALISE - Inovações de software na industria de prototipagem rápida -  9º...
MATERIALISE - Inovações de software na industria de prototipagem rápida - 9º...
 
GOM - Novidades 2012 - 9º Seminário de Tecnologias Robtec - 2012
GOM - Novidades 2012 -  9º Seminário de Tecnologias Robtec - 2012GOM - Novidades 2012 -  9º Seminário de Tecnologias Robtec - 2012
GOM - Novidades 2012 - 9º Seminário de Tecnologias Robtec - 2012
 
VISTEON - Benefícios do molde protótipo no desenvolvimento de novos produtos ...
VISTEON - Benefícios do molde protótipo no desenvolvimento de novos produtos ...VISTEON - Benefícios do molde protótipo no desenvolvimento de novos produtos ...
VISTEON - Benefícios do molde protótipo no desenvolvimento de novos produtos ...
 
Abertura do 9º Seminário de Tecnologias Robtec - 2012
Abertura do 9º Seminário de Tecnologias Robtec - 2012Abertura do 9º Seminário de Tecnologias Robtec - 2012
Abertura do 9º Seminário de Tecnologias Robtec - 2012
 
Apresentação Robtec no Epicentro 2 - 2012
Apresentação Robtec no Epicentro 2 - 2012Apresentação Robtec no Epicentro 2 - 2012
Apresentação Robtec no Epicentro 2 - 2012
 
VIII Seminário de Tecnologias Robtec - VW
VIII Seminário de Tecnologias Robtec - VWVIII Seminário de Tecnologias Robtec - VW
VIII Seminário de Tecnologias Robtec - VW
 
VIII Seminário de Tecnologias Robtec - R Design Studio
VIII Seminário de Tecnologias Robtec - R Design StudioVIII Seminário de Tecnologias Robtec - R Design Studio
VIII Seminário de Tecnologias Robtec - R Design Studio
 
VIII Seminário de Tecnologias Robtec - OLSA
VIII Seminário de Tecnologias Robtec - OLSAVIII Seminário de Tecnologias Robtec - OLSA
VIII Seminário de Tecnologias Robtec - OLSA
 
VIII Seminário de Tecnologias Robtec - Mercedes-Benz
VIII Seminário de Tecnologias Robtec - Mercedes-BenzVIII Seminário de Tecnologias Robtec - Mercedes-Benz
VIII Seminário de Tecnologias Robtec - Mercedes-Benz
 

VIII Seminário de Tecnologias Robtec - GOM

  • 1. ROBTEC GOM User-Meeting August 25, 2011 Dr. Ing. Ernst Mueller – GOM International AG Dr. Eng. Vicente M. Massaroti - ROBTEC
  • 2. Topics 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Breve Introducao de GOM ATOS TS GOM Inspect – Overview · Teaching by doing · I-inspect · VMR Overview de apresentacoes de Clientes feitas no GOM Conference in 2010 · GeorgFischer · BME Swindon, UK · BMW Dingolfing, D · Motorola · BJB · Airbus Celulas de Medicao Automatizadas · Side panel · Rear door 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 2 ROBTEC GOM User Meeting August 2011
  • 3. GOM – Vendas mundiais & Rede de suporte Europa 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Vendas Mundiais e · 7 Escritórios GOM na Europa com o HQ em Braunschweig, Rede de Suporte Alemanha 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 3 ROBTEC GOM User Meeting August 2011
  • 4. GOM – Vendas mundiais & Rede de suporte Mundial 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Vendas Mundiais e · 7 Escritórios GOM na Europa com o HQ em Braunschweig, Rede de Suporte Alemanha · Mais de 45 representantes/distribuidores no mundo 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 4 ROBTEC GOM User Meeting August 2011
  • 5. GOM – Base de Clientes Estabelecidos Sistemas Instalados 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Base de clientes · Industrias Automobilística e Aeroespacial, bens de consumo, e todos estabelecida com mais de os seus fornecedores bem como instituições de pesquisa e 3500 sistemas instalados universidades no mundo · Desenvolvimento de produto, ferramentaria, inspeção de primeiras amostras e garantia de qualidade assim como testes de materiais e componentes 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 5 ROBTEC GOM User Meeting August 2011
  • 6. GOM – Tecnicas de Medição Industrial 3D Sistema de Medição 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 ATOS GOM é um parceiro global industrial Digitalização para medição de coordenadas 3D óptica 3D campo completo com mais de 20 anos de experiência GOM tem amplo know-how em 3D TRITOPCMM coordenar a medição, material e testes CMM Óptico de componentes, controle de qualidade Móvel e análise, processamento digital de imagens · Teste de materiais PONTOS · Analise de Forma 3D e inspeção Fotogrametria Dinâmica dimensional · Teste de estruturas e componentes TRITOPDef ARAMIS ARGUS Análise Medicao de Anáise de De Deformação Deformcaoes formabilidade Vetorial em Campo Completo 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 6 ROBTEC GOM User Meeting August 2011
  • 8. ATOS Digitalizador -3D 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 O digitalizador ATOS 3D já é estabelecido como ferramenta de medição em processos industriais e em toda cadeia produtiva. 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 8 ROBTEC GOM User Meeting August 2011
  • 9. ATOS Requisitos da Industria 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 · Alta Resolução · Alta Precisão · Medições Rápidas · Digitalização de superfícies complexas e com brilho · Imune a fatores ambientais · Uso Industrial · Baixa Manutenção 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 9 ROBTEC GOM User Meeting August 2011
  • 10. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 10 ROBTEC GOM User Meeting August 2011
  • 11. ATOS Triple Scan Visão Geral 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Triple Scan Automação Tecnologia Blue Light ATOS Professional Sensor Robusto, Software compativel com ambiente Industrial Scanner 3D de GOM Touch Probe alta resolução para pequenas e grandes pecas Sistema de Medição Portátil 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 11 ROBTEC GOM User Meeting August 2011
  • 12. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Tecnologia Blue Light Imune a variações ambientais 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 12 ROBTEC GOM User Meeting August 2011
  • 13. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Tecnologia Blue Light · Iluminação LED · Pequena largura de Banda · Digitalização independente das condições de iluminação · Menos reflexões · Menos ruídos na imagem (speckle) · Luz fria – menos aquecimento ·Vida estimada 10.000 h = 1 ano em 24/7 · Menores custos de manutenção · Tudo integrado em um cabeçote sensor 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 13 ROBTEC GOM User Meeting August 2011
  • 14. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 ATOS Triple Scan – Uma nova tecnologia Menos tomadas individuais mesmo em superfícies refletivas ou componentes complexos 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 14 ROBTEC GOM User Meeting August 2011
  • 15. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Triple Scan Nova tecnologia de medição Nova tecnologia de projeção 3 sensores individuais em 1 setup Verificação de calibração permanente Melhoria na medição de superfícies brilhantes Mais dados em formas complexas Mais resolução em estruturas pequenas Medição mais rápida de pecas 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 15 ROBTEC GOM User Meeting August 2011
  • 16. Técnicas de Camera Câmera Simples 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Projetor Câmera · Triangulação entre a câmera e o projetor ΦP · Projetor é um elemento ativo e necessita xp yp ser calibrado Influencia térmica (lâmpadas p.e.) levam a uma calibração instável Influencias mecânicas afetam a calibração do sistema · Determinação de coordenadas 3D: 3 equações (xp, yp, φp) para 3 incógnitas não é super-determinado a condição da calibração não e conhecida Qualidade dos dados e sempre P questionável 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 16 ROBTEC GOM User Meeting August 2011
  • 17. Técnicas de Câmera Estéreo Câmeras 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Câmera 1 Projetor Câmera 2 · Triangulação entre duas câmera y1p ΦP · Projetor é um elemento passivo x2p y2p x1p sem efeitos térmicos Uso de da projeção de luz como fonte de iluminação e função direta do projetor · Determinação de coordenadas 3D : 4 equações (x1p, y1p, x2p, y2p) para 3 incógnitas super-determinado condição da calibração é sempre conhecida P · Estéreo Câmeras permite: · Verificação permanente da condição do sensor · Informação on-line sobre a movimentação da peca · Visualização online da área de medição, guiando assim o operador 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Alta confiabilidade do processo Page 17 ROBTEC GOM User Meeting August 2011
  • 18. ATOS Triple Scan Descrição do controle de calibração do sistema ATOS O angulo de medição/ Frame 1 sempre ser estável durante as medições 2-Frame Setup deve 2-Frame Setup / Frame 2 Projetor Triple Scan Câmera Esquerda Câmera Direita - ATOS controla a temperatura e os ângulos de medição - Sensores de temperatura estão internos ao cabeçote sensor - A segunda câmera controla online os outros ângulos de medição (calibração do sistema), por causa da influencia de vibrações, usuário, Ângulo 1 Ângulo 2 interferências de terceiros. (pequeno) (pequeno) Sistemas de uma câmera não podem fazer isto!!! Ângulo 3 (grande) Ponto de scaneamento na 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 superficie da peca 3-Frame Setup / Frame 3 Page 18 ROBTEC GOM User Meeting August 2011
  • 19. ATOS Triple Scan Descrição do Triple Scan – 3 Ângulos de Medição para controle da calibração 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Projetor Triple Scan Câmera Esquerda Câmera Direita Ângulo 1 Ângulo 2 (pequeno) (pequeno) - 3 Ângulos de controle do ponto de scaneamento - Controle da calibração Ângulo 3 possível, por conta do grande (grande) angulo de medição . (Ângulo 1 + Ângulo 2 = Ângulo 3) - Duas vistas distintas de Ponto de medição, dai 2 x mais rápido scaneamento na que os sistemasSetup /1 só 1câmera. 3-Frame de Frame 3-Frame Setup / Frame 2 superficie da peca 3-Frame Setup / Frame 3 Page 19 ROBTEC GOM User Meeting August 2011
  • 20. ATOS Triple Scan Comparação do Triple Scan contra competidores, que usam somente uma câmera e um projetor 1 2-Frame Setup / Frame 2-Frame Setup / Frame 2 Projetor Triple Scan Somente Câmera Esquerda Sem Câmera Direita Angulo 1 (pequeno) - Somente um ângulo de medição, condição mínima para medir pontos - NAO e possível controlar a calibração, por que tem-se somente um angulo de medição - Somente uma vista de medição, necessita mais Ponto de posições para o mesmo scaneamento na resultado que o sistema Triple 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 superficie da peca 3-Frame Setup / Frame 3 Scan Page 20 ROBTEC GOM User Meeting August 2011
  • 21. ATOS Triple Scan Medição de superfícies complexas 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 · A área em verde mostra a superfície medida com as duas câmeras (E) 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 21 ROBTEC GOM User Meeting August 2011
  • 22. ATOS Triple Scan Medição de superfícies complexas 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 · A área em verde mostra a superfície medida com as duas câmeras (E) · A área em vermelho mostra a superfície medida pela câmera 1 e o projetor 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 22 ROBTEC GOM User Meeting August 2011
  • 23. Camera Technique ATOS Single-Eye: Measuring of complex structures 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 · A área em verde mostra a superfície medida com as duas câmeras (E) · A área em vermelho mostra a superfície medida pela câmera 1 e o projetor. · A área em vermelho mostra a superfície medida pela câmera 2 e o projetor. 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 23 ROBTEC GOM User Meeting August 2011
  • 24. ATOS Triple Scan Medição de superfícies complexas: Resultado 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 · A área em verde mostra a superfície medida com as duas câmeras (E) · A área em vermelho mostra a superfície medida pela câmera 1 e o projetor. · A área em vermelho mostra a superfície medida pela câmera 2 e o projetor. · Resultado: A estrutura pode ser capturada com apenas 1 tomada, pois as áreas de interesse são capturadas e combinadas automaticamente. (OU) · Dai, menos movimentação do sensor para uma peca complexa 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 24 ROBTEC GOM User Meeting August 2011
  • 25. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Triple Scan em superfícies complexas Triple Scan alcança furos profundos Número de tomadas necessárias reduzidas pelo fator 2 Fácil manuseio Alta cobertura de superfícies complexas 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 25 ROBTEC GOM User Meeting August 2011
  • 26. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Triple Scan para superfícies brilhantes Triple Scan evita hotspots Número de tomadas necessárias reduzidas pelo fator 2 Alta qualidade de dados em superfícies sem spray 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 26 ROBTEC GOM User Meeting August 2011
  • 27. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Cabeçote Industrial Robusto Housing completamente fechado 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 27 ROBTEC GOM User Meeting August 2011
  • 28. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Cabeçote Industrial Robusto ·Housing completamente fechado ·Compósito de Fibra de Carbono resistente a Impactos ·Câmeras e lentes integradas e protegidas ·Sensor com componentes industriais ·Controlador do Sensor integrado ·Ventilação eficiente e muito silenciosa 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 28 ROBTEC GOM User Meeting August 2011
  • 29. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Scanner 3D de Alta Resolução para Pequenos e Grandes Objetos 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 29 ROBTEC GOM User Meeting August 2011
  • 30. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Scanner 3D de Alta Resolução para Pequenos e Grandes Objetos ATOS II Triple Scan: 2 x 5 Mega-Pixel ATOS III Triple Scan: 2 x 8 Mega-Pixel Áreas de medição ajustáveis de 38mm ate 2000mm Alta resolução para pecas pequenas Digitalização Rápida para pecas grandes Tudo em um só equipamento 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 30 ROBTEC GOM User Meeting August 2011
  • 31. Scanner 3D de Alta Resolução para Pequenos e Grandes Objetos Quais configurações são disponíveis? 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 · Frame de Câmeras · 400mm -> pronto · Duas posições de câmera para frame 400mm · Posição 400mm · Posição SO · Ajuste do Angulo de Câmera Posição SO · Fixação com stopers de angulo · Dois stopers são possíveis para qualquer posição Posição 400mm ATOS Triple Scan com frame 400mm 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 31 ROBTEC GOM User Meeting August 2011
  • 32. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Triple Scan para Alta Resolução Melhor solução em pequenos detalhes Baixo nível de ruído Alta qualidade de dados 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 32 ROBTEC GOM User Meeting August 2011
  • 33. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 GOM Touch Probe A combinação de métodos ópticos e tácteis em medição 3D 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 33 ROBTEC GOM User Meeting August 2011
  • 34. GOM Touch Probe Estéreo Câmeras 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 · Estéreo Câmeras permite: · Usar o ATOS como um tracker óptico · ATOS pode utilizar um touch probe · Medir geometrias regulares tais como Planos, Círculos, Cilindros, Cones, Furos · Medição contra geometrias CAD · ATOS pode também seguir adaptadores definidos X,Y,Z 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 34 ROBTEC GOM User Meeting August 2011
  • 35. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 GOM Touch Probe Medições 3D de campo completo e touch probe Medições em áreas de difícil acesso Comparação direta com CAD Medição de primitivas Medição rápida de pontos individuais Alinhamento On-line 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 35 ROBTEC GOM User Meeting August 2011
  • 36. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 36 ROBTEC GOM User Meeting August 2011
  • 37. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Sistema de Medição Portátil Vai direto ao objeto a ser medido Setup Rápido Referencia Dinâmica Otimizado para ambientes e condições industriais 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 37 ROBTEC GOM User Meeting August 2011
  • 38. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 ATOS Inspection Cell 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 38 ROBTEC GOM User Meeting August 2011
  • 39. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 ATOS Inspection Cell Desenvolvido para Metrologia Automatizada Tecnologia de Proteção do Sensor Baixo custo Operacional Medição na produção Resultados de medição Precisos 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 39 ROBTEC GOM User Meeting August 2011
  • 40. 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 40 ROBTEC GOM User Meeting August 2011
  • 41. ATOS V7 & GOM Inspect Professional Software de Medição e Inspeção 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Formato de Dados Abertos Automação Operação Orientada Flexibilidade Rastreabilidade 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 41 ROBTEC GOM User Meeting August 2011
  • 42. ATOS V7 & GOM Inspect Professional Conceitos 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 Nova Interface Inspeção Rápida I-Inspect Múltiplos Alinhamentos Rastreabilidade Digitalização Software Dedicado Virtual Measuring Room Teaching by Doing 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 42 ROBTEC GOM User Meeting August 2011
  • 43. ATOS V7 & GOM Inspect Professional Teaching by Doing 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 43 ROBTEC GOM User Meeting August 2011
  • 44. ATOS V7 & GOM Inspect Professional I-inspect 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 44 ROBTEC GOM User Meeting August 2011
  • 45. ATOS V7 & GOM Inspect Professional I-inspect 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 45 ROBTEC GOM User Meeting August 2011
  • 46. ATOS V7 & GOM Inspect Professional VMR 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 46 ROBTEC GOM User Meeting August 2011
  • 47. ATOS V7 & GOM Inspect Professional o futuro... 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 GOM Inspect · Analise de Tendência/Estatistica... · Cp – Cpk; Pp - Ppk · Módulos especiais · Grandes pecas · Pás de Turbinas · Injeção · Fundição · Estampados · E muito mais.... 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 47 ROBTEC GOM User Meeting August 2011
  • 48. ATOS Triple Scan Lançamento 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 48 ROBTEC GOM User Meeting August 2011
  • 49. ATOS Triple Scan Lançamento 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 49 ROBTEC GOM User Meeting August 2011
  • 50. Overview on customer presentations given at the GOM Conference in 2010 M Conference in 2010
  • 51. Georg Fischer 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 51 ROBTEC GOM User Meeting August 2011
  • 52. Georg Fischer 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 52 ROBTEC GOM User Meeting August 2011
  • 53. Georg Fischer 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 53 ROBTEC GOM User Meeting August 2011
  • 54. Georg Fischer 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 54 ROBTEC GOM User Meeting August 2011
  • 55. Georg Fischer 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 55 ROBTEC GOM User Meeting August 2011
  • 56. Adam OPEL, GME 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 56 ROBTEC GOM User Meeting August 2011
  • 57. Adam OPEL, GME 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 57 ROBTEC GOM User Meeting August 2011
  • 58. Adam OPEL, GME 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 58 ROBTEC GOM User Meeting August 2011
  • 59. Adam OPEL, GME 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 59 ROBTEC GOM User Meeting August 2011
  • 60. Adam OPEL, GME 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 60 ROBTEC GOM User Meeting August 2011
  • 61. Adam OPEL, GME 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 61 ROBTEC GOM User Meeting August 2011
  • 62. Adam OPEL, GME 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 62 ROBTEC GOM User Meeting August 2011
  • 63. Adam OPEL, GME 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 63 ROBTEC GOM User Meeting August 2011
  • 64. BMW Swindon, UK 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 64 ROBTEC GOM User Meeting August 2011
  • 65. BMW Swindon, UK 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 65 ROBTEC GOM User Meeting August 2011
  • 66. BMW Swindon, UK 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 66 ROBTEC GOM User Meeting August 2011
  • 67. BMW Swindon, UK 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 67 ROBTEC GOM User Meeting August 2011
  • 68. BMW Dingolfing. Germany 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 68 ROBTEC GOM User Meeting August 2011
  • 69. BMW Dingolfing. Germany 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 69 ROBTEC GOM User Meeting August 2011
  • 70. BMW Dingolfing. Germany 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 70 ROBTEC GOM User Meeting August 2011
  • 71. BMW Dingolfing. Germany 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 71 ROBTEC GOM User Meeting August 2011
  • 72. BMW Dingolfing. Germany 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 72 ROBTEC GOM User Meeting August 2011
  • 73. BMW Dingolfing. Germany 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 73 ROBTEC GOM User Meeting August 2011
  • 74. Motorola 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 74 ROBTEC GOM User Meeting August 2011
  • 75. Motorola 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 75 ROBTEC GOM User Meeting August 2011
  • 76. Motorola 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 76 ROBTEC GOM User Meeting August 2011
  • 77. Motorola 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 77 ROBTEC GOM User Meeting August 2011
  • 78. Motorola 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 78 ROBTEC GOM User Meeting August 2011
  • 79. Motorola 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 79 ROBTEC GOM User Meeting August 2011
  • 80. BJB 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 80 ROBTEC GOM User Meeting August 2011
  • 81. BJB 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 81 ROBTEC GOM User Meeting August 2011
  • 82. BJB 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 82 ROBTEC GOM User Meeting August 2011
  • 83. BJB 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 83 ROBTEC GOM User Meeting August 2011
  • 84. BJB 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 84 ROBTEC GOM User Meeting August 2011
  • 85. BJB 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 established at a customer 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 85 ROBTEC GOM User Meeting August 2011
  • 86. Airbus 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 86 ROBTEC GOM User Meeting August 2011
  • 87. Airbus 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 87 ROBTEC GOM User Meeting August 2011
  • 88. Airbus 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 88 ROBTEC GOM User Meeting August 2011
  • 89. Airbus 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 89 ROBTEC GOM User Meeting August 2011
  • 90. Airbus 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 90 ROBTEC GOM User Meeting August 2011
  • 91. Automated Measuring Cells - side panel - rear door Conference in 2010
  • 92. Nice automated measuring cell established at a customer 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 92 ROBTEC GOM User Meeting August 2011
  • 93. Nice automated measuring cell established at a customer 2-Frame Setup / Frame 1 2-Frame Setup / Frame 2 3-Frame Setup / Frame 1 3-Frame Setup / Frame 2 3-Frame Setup / Frame 3 Page 93 ROBTEC GOM User Meeting August 2011
  • 94. Thank you for your attention info@gom.com www.gom.com