SEWERAGE
INFRASTRUCTURE UNDER
       GREATER KUALA
  LUMPUR/KLANG VALLEY
           INITIATIVES
         River of Life & Sewerage Non River
Contents


     1        Background


     2      Scopes of Project


     3     Outcomes of Project
12 National Key Economic
Areas (NKEAs)
                                       September 21, 2010




                      Greater KL/KV Aspiration

                             20-20 by 2020
                        To be the only metropolis in Asia that
                      simultaneously achieves top-20 economic
                     growth and be among the global top-20 most
                                livable cities by 2020
10 EPPs & 2 BOs
EPP#1 – MNC Attraction
EPP#2 – Talent Attraction
EPP#3 – High Speed Rail
EPP#4 – Mass Rapid Transit
                                 TIMELINE : 2011 – 2020

                                 AGENCY : SSD

EPP#6 – Greener KL               CAPITAL
                                 COST      : RM 5.6 BIL
EPP#7 – Global Attractions
EPP#8 – Pedestrian Network       TOTAL
EPP#9 – Solid Waste Management   PROJECT : 21
EPP#10 – Property                          - ROL – 9
                                           - SNR - 12
BO#1 – Vitalizing Putrajaya
GREATER KL/KV REGIONAL CATCHMENT

                         RIVER
                        OF LIFE




                     SEWERAGE
                     NON RIVER
SEWERAGE ISSUES WITHIN
    GREATER KL/KV CATCHMENT
   Old plants which are unable to achieve DOE gazetted
    standards.

   Defective sewerlines.

   Undersized sewerlines unable to cater for rampant growth.

   Illegal discharge Issues.

   Buffer issues.

   Property Connection Issues

   Risks beyond control-Flooding, structure failures,
    landslide/erosion

   High number of private plants
                                                                Septic Tank
PROPOSED SOLUTIONS
   Refurbishment problematic plants.
                                                               Before
   Upgrading of non complying plants to meet
    Category 1 standard for nutrient removal.

   Rationalization & Regionalization programmes.

   Property connection works for premises where
    ISTs are still being used.

   Sewer investigation works to identify condition
    of existing aged sewers.
                                                                 After
   Sewer rehabilitation works for sewers in deteriorating
    condition which prior investigation works been carried
    out.

   Sewer upsizing works for sewers which are undersized
    and overloaded in the city centre due to rampant growth.
River of Life

                                   1. RATIONALISATION OF 17 STPs AT
6. UPGRADING OF 16 STPs AT         SETAPAK, KERAMAT, WANGSA
   SELAYANG ( B19 – B22 )          MELAWATI (PAKEJ 1 & PAKEJ 2)


                                   2. RATIONALISATION & UPGRADING
                                   OF STPs AT BUKIT ANTARABANGSA

7. SEWER PIPE REHABILITAITON
WORKS (G06 – G07)

                                   3. CONNECTION WORKS TO
                                   PREMISES AT AMPANG HILIR ,
                                   SEPUTEH & TITWANGSA (D39 – D42)
8. RATIONALISATION OF 19 STPs AT
   DAMANSARA
                                   4. JINJANG KEPONG STP & NETWORK



9. STUDIES ON ABANDON STPs AT
   AMPANG, SELAYANG & KUALA        5. BUNUS STP & NETWORK
   LUMPUR
Sewerage Non River


6. SEWER REHABILITATION WORKS
AT KELANG, SHAH ALAM, SUBANG
JAYA AND PETALING JAYA (F16 &
F17, G10 & G11)

7. RATIONALISATION OF 27 STPs AT
JLN KLANG LAMA                     1. SEWER NETWORK CONSTRUCITON
                                   AT JALAN KLANG LAMA, PETALING
8. RATIONALISATION OF 33 STPs AT   JAYA & SEPUTEH (D47 & D48)
PUCHONG
                                   2. CHERAS BATU 11 STP & NETWORK
9. SEWER REHABILITATION WORKS
IN SELANGOR (G08)                  3. CHERAS JAYA STP & NETWORK


10. LOT 130 STP & NETWORK
                                   4. KAJANG 2 STP & NETWORK
11 A) UPGRADING OF STPs (B23 –
     B37)                          5. KAJANG 1 & 3 STP & NETWORK
  B) UPPER KERAYONG STP &
     NETWORK


12. STUDIES ON GREEN
TECHNOLOGY APPLICATION TO
EXISTING STPs
NEW SEWER PIPE
                                      – 380.5 KM


                                          2
   CONNECTED PE
    2,060,000 PE                                                      PIPE
                            1                          3        RAHABILITATION
                                                                   – 87.3 KM




                                    OUTPUT
                                                            4          STPs
                                                                 RATIONALISATION
                                                                     – 710 nos.
  Premis Connection             6                                Public STP – 678 nos.
                                                                 Private STP – 32 nos.
  (IST) – 3,500 unit of
         houses
                                               5
** PE = Population Equivalent              UPGRADING &
                                        REFURBISHMENT STP
                                             – 87 nos.
Outcome of Project

    Will be able to reduce number of small plants
    Reduce the risk on non compliance to DOE standards.
    Reduce the pollution loading on the receiving water courses. All
     upgraded & regionalized plants will meet DOE Standard A Category
     1
    Eliminate   the    risk   of    receiving   complaints    due       to
     odour, buffer, noise & aesthetics
    Unlock land for potential redevelopment on rationalised STP sites
PROGRESS STATUS PROJECT RIVER OF LIFE
                       Implementation                                            No.
  Project Category                                      Activities                                      Remarks
                           status                                             Packages

                                                                                           Rasionalisation 17 STPs in Setapak,
                                                                                            Keramat and Wangsa Melati (Pakej
                                                                                            1)
                                                                                           G06
                       Construction stage                                     6 package
                                                                                           G07
Physical Projects                                                                          B19
(8 projects, 18                                                                            B21
packages)                                                                                  B22
                                            Tender / Evaluation
                                                                                           Rasionalisation 17 STPs in Setapak,
                                                                                            Keramat and Wangsa Melati (Pakej
                       Pre-                                                                 2)
                       Construction                                                        Rasionalisation in Bukit
                       Stage                Preparation of design / tender                  Antarabangsa
                                                                              8 package
                       (Conventional)       document                                       Property connection in Taman
                                                                                            Seputeh (D40)
                                                                                           Property connection (3 packages)**
                                                                                           Jinjang Kepong STP**
                                                                                           Bunus STP**
                                            Pre-Qualification Tender /                     Rasionalisation Damansara
                                                                              1 package
                                            Evaluation
                       Pre-
                       Construction         Tender / Evaluation               1 package    B20
                       Stage
                       (D&B)                Preparation of need statement /                Jinjang Kepong Network
                                                                              2 package    Bunus Network
                                            pre-bid document

                                                                                          Research on abandoned STPs in KL,
Non-physical Project                                                                      Selayang dan Ampang
                       Research             Research on-going                 1 package
PROGRESS STATUS PROJECT SEWERAGE NON RIVER
                              Implementation                                          No.
    Project Category                                        Activities                                      Remarks
                                  status                                           Packages

                                                                                                   Rasionalisasi 27 Loji di Jalan
                                                                                                    Klang Lama
Physical Projects                                                                                  Kajang 2 STP
(11 projects; 36 packages)   Construction stage                                    5 packages
                                                                                                   Kajang 2 Network
                                                                                                   Lot 130 STP
                                                                                                   G08

                                                                                                    G10 & G11*
                                                  Preparation of design / tender
                             Pre- Construction                                                     Kajang 1&3 STP*
                                                  document and to be tendered
                             Stage                                                 6 packages      Cheras Jaya STP*
                                                  in
                             (Conventional)                                                        Cheras Batu 11 STP*
                                                  2013
                                                                                                   Upper KerayongSTP*

                                                  Pre-Qualification Tender /                     3 Pakej B28- B30
                                                                                   4 packages
                                                  Evaluation                                     Puchong Network

                                                                                                 Seputeh & PJ Network (D47
                                                                                                  & D48)
                                                                                                 4 pakej B24 – B27
                                                                                       10
                             Pre- Construction    Tender / Evaluation                            Lot 130 Network
                                                                                    packages
                             Stage                                                               B23
                             (D&B)                                                               F16 & F17


                                                                                                   Cheras Jaya Network
                                                                                                   Cheras Batu 11 Network
                                                  Preparation of need                  11
                                                                                                   Kajang 1&3 Network*
                                                  statement / pre-bid document      packages
                                                                                                   7 Pakej B31-B37*
                                                                                                   Upper Kerayong Network*
Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives

Contenu connexe

Tendances

Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 2
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 2Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 2
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 2Joy Irman
 
Memorandum Program Sektor Sanitasi Kota Surabaya
Memorandum Program Sektor Sanitasi Kota SurabayaMemorandum Program Sektor Sanitasi Kota Surabaya
Memorandum Program Sektor Sanitasi Kota Surabayainfosanitasi
 
Informed Choices Catalogue Sanitasi Berbasis Masyarakat (2003)
Informed Choices Catalogue Sanitasi Berbasis Masyarakat (2003)Informed Choices Catalogue Sanitasi Berbasis Masyarakat (2003)
Informed Choices Catalogue Sanitasi Berbasis Masyarakat (2003)Yuyun Ismawati Drwiega
 
Marina Barrage
Marina BarrageMarina Barrage
Marina BarrageKate Tan
 
Lap akhir Jakstrada SPAM Kota Pematangsiantar
Lap akhir Jakstrada SPAM Kota PematangsiantarLap akhir Jakstrada SPAM Kota Pematangsiantar
Lap akhir Jakstrada SPAM Kota PematangsiantarRIYANNUGRAHA7
 
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 1
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 1Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 1
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 1Joy Irman
 
Eia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaEia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaKetan Wadodkar
 
Sistematika Dokumen Rencana Induk Sistem Drainase Perkotaan
Sistematika Dokumen Rencana Induk Sistem Drainase PerkotaanSistematika Dokumen Rencana Induk Sistem Drainase Perkotaan
Sistematika Dokumen Rencana Induk Sistem Drainase PerkotaanJoy Irman
 
Pola Penanganan Drainase Perkotaan
Pola Penanganan Drainase PerkotaanPola Penanganan Drainase Perkotaan
Pola Penanganan Drainase Perkotaaninfosanitasi
 
PPT DRAINASE 1 MTR MSL_KEL 4_2TPJJ1.pptx
PPT DRAINASE 1 MTR MSL_KEL 4_2TPJJ1.pptxPPT DRAINASE 1 MTR MSL_KEL 4_2TPJJ1.pptx
PPT DRAINASE 1 MTR MSL_KEL 4_2TPJJ1.pptxshanggitafarolina1
 
Tata Cara Penyusunan Studi Kelayakan Drainase Perkotaan, Bagian 1
Tata Cara Penyusunan Studi Kelayakan Drainase Perkotaan, Bagian 1Tata Cara Penyusunan Studi Kelayakan Drainase Perkotaan, Bagian 1
Tata Cara Penyusunan Studi Kelayakan Drainase Perkotaan, Bagian 1Joy Irman
 
Teknologi dan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T)
Teknologi dan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T)Teknologi dan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T)
Teknologi dan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T)Joy Irman
 
Rice Husk Ash
Rice Husk Ash Rice Husk Ash
Rice Husk Ash mujtaba313
 
Storm water benchmarking
Storm water benchmarkingStorm water benchmarking
Storm water benchmarkingRajendra Naik
 
Rencana Induk Sistem Pengelolaan Air Limbah (SPAL) - Strategi Pengembangan SPAL
Rencana Induk Sistem Pengelolaan Air Limbah (SPAL) - Strategi Pengembangan SPALRencana Induk Sistem Pengelolaan Air Limbah (SPAL) - Strategi Pengembangan SPAL
Rencana Induk Sistem Pengelolaan Air Limbah (SPAL) - Strategi Pengembangan SPALJoy Irman
 
E waste ppt
E waste pptE waste ppt
E waste pptnavi333
 

Tendances (20)

Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 2
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 2Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 2
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 2
 
Memorandum Program Sektor Sanitasi Kota Surabaya
Memorandum Program Sektor Sanitasi Kota SurabayaMemorandum Program Sektor Sanitasi Kota Surabaya
Memorandum Program Sektor Sanitasi Kota Surabaya
 
Informed Choices Catalogue Sanitasi Berbasis Masyarakat (2003)
Informed Choices Catalogue Sanitasi Berbasis Masyarakat (2003)Informed Choices Catalogue Sanitasi Berbasis Masyarakat (2003)
Informed Choices Catalogue Sanitasi Berbasis Masyarakat (2003)
 
Marina Barrage
Marina BarrageMarina Barrage
Marina Barrage
 
Lap akhir Jakstrada SPAM Kota Pematangsiantar
Lap akhir Jakstrada SPAM Kota PematangsiantarLap akhir Jakstrada SPAM Kota Pematangsiantar
Lap akhir Jakstrada SPAM Kota Pematangsiantar
 
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 1
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 1Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 1
Tata Cara Penyusunan Rencana Induk Drainase Perkotaan, Bagian 1
 
Dry River Musi and Gandipet
Dry River Musi and GandipetDry River Musi and Gandipet
Dry River Musi and Gandipet
 
Drainase
DrainaseDrainase
Drainase
 
Eia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaEia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (Nmia
 
Sistematika Dokumen Rencana Induk Sistem Drainase Perkotaan
Sistematika Dokumen Rencana Induk Sistem Drainase PerkotaanSistematika Dokumen Rencana Induk Sistem Drainase Perkotaan
Sistematika Dokumen Rencana Induk Sistem Drainase Perkotaan
 
Pola Penanganan Drainase Perkotaan
Pola Penanganan Drainase PerkotaanPola Penanganan Drainase Perkotaan
Pola Penanganan Drainase Perkotaan
 
PPT DRAINASE 1 MTR MSL_KEL 4_2TPJJ1.pptx
PPT DRAINASE 1 MTR MSL_KEL 4_2TPJJ1.pptxPPT DRAINASE 1 MTR MSL_KEL 4_2TPJJ1.pptx
PPT DRAINASE 1 MTR MSL_KEL 4_2TPJJ1.pptx
 
Tata Cara Penyusunan Studi Kelayakan Drainase Perkotaan, Bagian 1
Tata Cara Penyusunan Studi Kelayakan Drainase Perkotaan, Bagian 1Tata Cara Penyusunan Studi Kelayakan Drainase Perkotaan, Bagian 1
Tata Cara Penyusunan Studi Kelayakan Drainase Perkotaan, Bagian 1
 
Teknologi dan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T)
Teknologi dan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T)Teknologi dan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T)
Teknologi dan Sistem Pengelolaan Air Limbah Terpusat (SPAL-T)
 
Rice Husk Ash
Rice Husk Ash Rice Husk Ash
Rice Husk Ash
 
1.ppt
1.ppt1.ppt
1.ppt
 
Storm water benchmarking
Storm water benchmarkingStorm water benchmarking
Storm water benchmarking
 
Rencana Induk Sistem Pengelolaan Air Limbah (SPAL) - Strategi Pengembangan SPAL
Rencana Induk Sistem Pengelolaan Air Limbah (SPAL) - Strategi Pengembangan SPALRencana Induk Sistem Pengelolaan Air Limbah (SPAL) - Strategi Pengembangan SPAL
Rencana Induk Sistem Pengelolaan Air Limbah (SPAL) - Strategi Pengembangan SPAL
 
E waste ppt
E waste pptE waste ppt
E waste ppt
 
L&t pqc mix design
L&t pqc mix design L&t pqc mix design
L&t pqc mix design
 

En vedette

Pemantauan dan Evaluasi Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) - Pem...
Pemantauan dan Evaluasi Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) - Pem...Pemantauan dan Evaluasi Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) - Pem...
Pemantauan dan Evaluasi Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) - Pem...Joy Irman
 
Results 5th seakf 3 5 june 2016 malaysia
Results 5th seakf 3 5 june 2016 malaysiaResults 5th seakf 3 5 june 2016 malaysia
Results 5th seakf 3 5 june 2016 malaysiaemiliomerayo
 
North Port, Malaysia
North Port, MalaysiaNorth Port, Malaysia
North Port, Malaysiatnay chow
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADNorma Nun
 
Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)Firdaus Salim
 
My_Presentation_2010
My_Presentation_2010My_Presentation_2010
My_Presentation_2010keelin
 
Port of Singapore Final !!
Port of Singapore Final !!Port of Singapore Final !!
Port of Singapore Final !!Quentez Hodge
 
Structure & Infrastructure Planning
Structure & Infrastructure PlanningStructure & Infrastructure Planning
Structure & Infrastructure PlanningIr. Abdul Aziz Abas
 
Sample Complaint Letter to Landlord About Repairs - Yahoo Voices
Sample Complaint Letter to Landlord About Repairs - Yahoo VoicesSample Complaint Letter to Landlord About Repairs - Yahoo Voices
Sample Complaint Letter to Landlord About Repairs - Yahoo Voicesplantunderworld90
 
Problems and risks of sanitation in abo qir february 2013
Problems and risks of sanitation in abo qir february 2013 Problems and risks of sanitation in abo qir february 2013
Problems and risks of sanitation in abo qir february 2013 Helalley Helalley
 
Water Supply and Sewerage Design
Water Supply and Sewerage DesignWater Supply and Sewerage Design
Water Supply and Sewerage DesignJeremy Molayem
 
Letter of complaint
Letter of complaintLetter of complaint
Letter of complaintmichecaro
 
How to write a letter of complaint
How to write a letter of complaintHow to write a letter of complaint
How to write a letter of complaintPaula Gómez
 

En vedette (20)

Pemantauan dan Evaluasi Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) - Pem...
Pemantauan dan Evaluasi Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) - Pem...Pemantauan dan Evaluasi Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) - Pem...
Pemantauan dan Evaluasi Sistem Pengelolaan Air Limbah Terpusat (SPAL-T) - Pem...
 
Final.pdf
Final.pdfFinal.pdf
Final.pdf
 
Results 5th seakf 3 5 june 2016 malaysia
Results 5th seakf 3 5 june 2016 malaysiaResults 5th seakf 3 5 june 2016 malaysia
Results 5th seakf 3 5 june 2016 malaysia
 
APSNCEBU2
APSNCEBU2APSNCEBU2
APSNCEBU2
 
North Port, Malaysia
North Port, MalaysiaNorth Port, Malaysia
North Port, Malaysia
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
 
new CV
new CVnew CV
new CV
 
Port of singapore
Port of singaporePort of singapore
Port of singapore
 
Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)Maritime Challenges (SIngapore)
Maritime Challenges (SIngapore)
 
My_Presentation_2010
My_Presentation_2010My_Presentation_2010
My_Presentation_2010
 
Letterof complaint
Letterof complaintLetterof complaint
Letterof complaint
 
Port of Singapore Final !!
Port of Singapore Final !!Port of Singapore Final !!
Port of Singapore Final !!
 
Port of Singapore
Port of SingaporePort of Singapore
Port of Singapore
 
Sewerage network
Sewerage networkSewerage network
Sewerage network
 
Structure & Infrastructure Planning
Structure & Infrastructure PlanningStructure & Infrastructure Planning
Structure & Infrastructure Planning
 
Sample Complaint Letter to Landlord About Repairs - Yahoo Voices
Sample Complaint Letter to Landlord About Repairs - Yahoo VoicesSample Complaint Letter to Landlord About Repairs - Yahoo Voices
Sample Complaint Letter to Landlord About Repairs - Yahoo Voices
 
Problems and risks of sanitation in abo qir february 2013
Problems and risks of sanitation in abo qir february 2013 Problems and risks of sanitation in abo qir february 2013
Problems and risks of sanitation in abo qir february 2013
 
Water Supply and Sewerage Design
Water Supply and Sewerage DesignWater Supply and Sewerage Design
Water Supply and Sewerage Design
 
Letter of complaint
Letter of complaintLetter of complaint
Letter of complaint
 
How to write a letter of complaint
How to write a letter of complaintHow to write a letter of complaint
How to write a letter of complaint
 

Similaire à Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives

Osx project update eng_ march
Osx project update eng_ marchOsx project update eng_ march
Osx project update eng_ marchosxri
 
Conference Call Presentation 1Q11
Conference Call Presentation 1Q11Conference Call Presentation 1Q11
Conference Call Presentation 1Q11MPX_RI
 
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.sEsia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.szubeditufail
 
Osx project update eng_ february
Osx project update eng_ februaryOsx project update eng_ february
Osx project update eng_ februaryosxri
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Engyoseph prakosa S
 
LinkedIn – Engineer II at Infineon Technologies
LinkedIn – Engineer II at Infineon TechnologiesLinkedIn – Engineer II at Infineon Technologies
LinkedIn – Engineer II at Infineon TechnologiesJan Yeong Koay
 
2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance DesignSteve Lojuntin
 
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FSAiman Ali
 
20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptxDonald Jones
 
Project Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptProject Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptAkdDeshmukh
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiBhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiBhupat Kanani
 
Hard Creek Nickel Investor Presentation
Hard Creek Nickel Investor PresentationHard Creek Nickel Investor Presentation
Hard Creek Nickel Investor PresentationCompany Spotlight
 
Retro-fitting of Pre-Stressed Concrete Poles Using Carbon Fibre Reinforced Po...
Retro-fitting of Pre-Stressed Concrete Poles Using Carbon Fibre Reinforced Po...Retro-fitting of Pre-Stressed Concrete Poles Using Carbon Fibre Reinforced Po...
Retro-fitting of Pre-Stressed Concrete Poles Using Carbon Fibre Reinforced Po...IRJET Journal
 

Similaire à Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives (20)

Osx project update eng_ march
Osx project update eng_ marchOsx project update eng_ march
Osx project update eng_ march
 
Conference Call Presentation 1Q11
Conference Call Presentation 1Q11Conference Call Presentation 1Q11
Conference Call Presentation 1Q11
 
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.sEsia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
Esia of 132 kv mehmoodabad g.s and u.g transmission line from qayumabad g.s
 
Osx project update eng_ february
Osx project update eng_ februaryOsx project update eng_ february
Osx project update eng_ february
 
CV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec EngCV Yoseph Prakosa Senior Elec Eng
CV Yoseph Prakosa Senior Elec Eng
 
LinkedIn – Engineer II at Infineon Technologies
LinkedIn – Engineer II at Infineon TechnologiesLinkedIn – Engineer II at Infineon Technologies
LinkedIn – Engineer II at Infineon Technologies
 
2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design2012 07 Low Carbon Green Building Performance Design
2012 07 Low Carbon Green Building Performance Design
 
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx20121016 sev1 aee_parish-presentation_mio-awi-pptx
20121016 sev1 aee_parish-presentation_mio-awi-pptx
 
02 decc ukccsc_winter_school_2012_updated
02 decc ukccsc_winter_school_2012_updated02 decc ukccsc_winter_school_2012_updated
02 decc ukccsc_winter_school_2012_updated
 
Project Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.pptProject Review Meeting - 14.02.23.ppt
Project Review Meeting - 14.02.23.ppt
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
Real Estate Sustainability
Real Estate SustainabilityReal Estate Sustainability
Real Estate Sustainability
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
ONGC Offshore Projects
ONGC Offshore ProjectsONGC Offshore Projects
ONGC Offshore Projects
 
Hard Creek Nickel Investor Presentation
Hard Creek Nickel Investor PresentationHard Creek Nickel Investor Presentation
Hard Creek Nickel Investor Presentation
 
Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15Vijayakanth CV_ 27 Oct 15
Vijayakanth CV_ 27 Oct 15
 
Retro-fitting of Pre-Stressed Concrete Poles Using Carbon Fibre Reinforced Po...
Retro-fitting of Pre-Stressed Concrete Poles Using Carbon Fibre Reinforced Po...Retro-fitting of Pre-Stressed Concrete Poles Using Carbon Fibre Reinforced Po...
Retro-fitting of Pre-Stressed Concrete Poles Using Carbon Fibre Reinforced Po...
 

Plus de infosanitasi

Permen pupr24 2014
Permen pupr24 2014Permen pupr24 2014
Permen pupr24 2014infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...infosanitasi
 
Permen PUPR pupr26 2014
Permen PUPR pupr26 2014Permen PUPR pupr26 2014
Permen PUPR pupr26 2014infosanitasi
 
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019infosanitasi
 
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program SanitasiUsulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasiinfosanitasi
 
Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019infosanitasi
 
Pengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang KesehatanPengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang Kesehataninfosanitasi
 
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015infosanitasi
 
Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015infosanitasi
 
Kesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBMKesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBMinfosanitasi
 
Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019infosanitasi
 
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan SanitasiPeraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasiinfosanitasi
 
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...infosanitasi
 
Tahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi PermukimanTahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi Permukimaninfosanitasi
 
Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015infosanitasi
 
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...infosanitasi
 

Plus de infosanitasi (20)

Permen pupr24 2014
Permen pupr24 2014Permen pupr24 2014
Permen pupr24 2014
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
Permen PUPR 26 2014 tentang Prosedur Operasional Standar Pengelolaan Sistem A...
 
Permen PUPR pupr26 2014
Permen PUPR pupr26 2014Permen PUPR pupr26 2014
Permen PUPR pupr26 2014
 
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
Aspek Kelembagaan dan Pendanaan Sanitasi dalam Program PPSP 2015-2019
 
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program SanitasiUsulan Program dan Kegiatan dalam Memorandum Program Sanitasi
Usulan Program dan Kegiatan dalam Memorandum Program Sanitasi
 
Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019Target Pembangunan Sanitasi Nasional 2015-2019
Target Pembangunan Sanitasi Nasional 2015-2019
 
Pengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang KesehatanPengalokasian Pendanaan Sanitasi bidang Kesehatan
Pengalokasian Pendanaan Sanitasi bidang Kesehatan
 
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
Pendampingan Pokja dalam Pengelolaan Program PPSP 2015
 
Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015Pelaksanaan Program PPSP tahun 2015
Pelaksanaan Program PPSP tahun 2015
 
Kesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBMKesiapan Pelaksanaan Studi Primer dan IPP STBM
Kesiapan Pelaksanaan Studi Primer dan IPP STBM
 
Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019Arah Kebijakan Program PPSP 2015 2019
Arah Kebijakan Program PPSP 2015 2019
 
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan SanitasiPeraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
Peraturan Presiden tentang Percepatan Pembangunan Air Minum dan Sanitasi
 
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
Strategi, Kebijakan, Target dan Sasaran Pembangunan Sanitasi (Air Limbah dan ...
 
Tahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi PermukimanTahap Implementasi Pembangunan Sanitasi Permukiman
Tahap Implementasi Pembangunan Sanitasi Permukiman
 
Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015Daftar Kabupaten/Kota Peserta Program PPSP 2015
Daftar Kabupaten/Kota Peserta Program PPSP 2015
 
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
Permen PU 01 2014 Standar Pelayanan Minimal Bidang Pekerjaan Umum dan Penataa...
 

Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives

  • 1. SEWERAGE INFRASTRUCTURE UNDER GREATER KUALA LUMPUR/KLANG VALLEY INITIATIVES River of Life & Sewerage Non River
  • 2. Contents 1 Background 2 Scopes of Project 3 Outcomes of Project
  • 3. 12 National Key Economic Areas (NKEAs) September 21, 2010 Greater KL/KV Aspiration 20-20 by 2020 To be the only metropolis in Asia that simultaneously achieves top-20 economic growth and be among the global top-20 most livable cities by 2020
  • 4. 10 EPPs & 2 BOs EPP#1 – MNC Attraction EPP#2 – Talent Attraction EPP#3 – High Speed Rail EPP#4 – Mass Rapid Transit TIMELINE : 2011 – 2020 AGENCY : SSD EPP#6 – Greener KL CAPITAL COST : RM 5.6 BIL EPP#7 – Global Attractions EPP#8 – Pedestrian Network TOTAL EPP#9 – Solid Waste Management PROJECT : 21 EPP#10 – Property - ROL – 9 - SNR - 12 BO#1 – Vitalizing Putrajaya
  • 5. GREATER KL/KV REGIONAL CATCHMENT RIVER OF LIFE SEWERAGE NON RIVER
  • 6. SEWERAGE ISSUES WITHIN GREATER KL/KV CATCHMENT  Old plants which are unable to achieve DOE gazetted standards.  Defective sewerlines.  Undersized sewerlines unable to cater for rampant growth.  Illegal discharge Issues.  Buffer issues.  Property Connection Issues  Risks beyond control-Flooding, structure failures, landslide/erosion  High number of private plants Septic Tank
  • 7. PROPOSED SOLUTIONS  Refurbishment problematic plants. Before  Upgrading of non complying plants to meet Category 1 standard for nutrient removal.  Rationalization & Regionalization programmes.  Property connection works for premises where ISTs are still being used.  Sewer investigation works to identify condition of existing aged sewers. After  Sewer rehabilitation works for sewers in deteriorating condition which prior investigation works been carried out.  Sewer upsizing works for sewers which are undersized and overloaded in the city centre due to rampant growth.
  • 8. River of Life 1. RATIONALISATION OF 17 STPs AT 6. UPGRADING OF 16 STPs AT SETAPAK, KERAMAT, WANGSA SELAYANG ( B19 – B22 ) MELAWATI (PAKEJ 1 & PAKEJ 2) 2. RATIONALISATION & UPGRADING OF STPs AT BUKIT ANTARABANGSA 7. SEWER PIPE REHABILITAITON WORKS (G06 – G07) 3. CONNECTION WORKS TO PREMISES AT AMPANG HILIR , SEPUTEH & TITWANGSA (D39 – D42) 8. RATIONALISATION OF 19 STPs AT DAMANSARA 4. JINJANG KEPONG STP & NETWORK 9. STUDIES ON ABANDON STPs AT AMPANG, SELAYANG & KUALA 5. BUNUS STP & NETWORK LUMPUR
  • 9. Sewerage Non River 6. SEWER REHABILITATION WORKS AT KELANG, SHAH ALAM, SUBANG JAYA AND PETALING JAYA (F16 & F17, G10 & G11) 7. RATIONALISATION OF 27 STPs AT JLN KLANG LAMA 1. SEWER NETWORK CONSTRUCITON AT JALAN KLANG LAMA, PETALING 8. RATIONALISATION OF 33 STPs AT JAYA & SEPUTEH (D47 & D48) PUCHONG 2. CHERAS BATU 11 STP & NETWORK 9. SEWER REHABILITATION WORKS IN SELANGOR (G08) 3. CHERAS JAYA STP & NETWORK 10. LOT 130 STP & NETWORK 4. KAJANG 2 STP & NETWORK 11 A) UPGRADING OF STPs (B23 – B37) 5. KAJANG 1 & 3 STP & NETWORK B) UPPER KERAYONG STP & NETWORK 12. STUDIES ON GREEN TECHNOLOGY APPLICATION TO EXISTING STPs
  • 10. NEW SEWER PIPE – 380.5 KM 2 CONNECTED PE 2,060,000 PE PIPE 1 3 RAHABILITATION – 87.3 KM OUTPUT 4 STPs RATIONALISATION – 710 nos. Premis Connection 6 Public STP – 678 nos. Private STP – 32 nos. (IST) – 3,500 unit of houses 5 ** PE = Population Equivalent UPGRADING & REFURBISHMENT STP – 87 nos.
  • 11. Outcome of Project  Will be able to reduce number of small plants  Reduce the risk on non compliance to DOE standards.  Reduce the pollution loading on the receiving water courses. All upgraded & regionalized plants will meet DOE Standard A Category 1  Eliminate the risk of receiving complaints due to odour, buffer, noise & aesthetics  Unlock land for potential redevelopment on rationalised STP sites
  • 12. PROGRESS STATUS PROJECT RIVER OF LIFE Implementation No. Project Category Activities Remarks status Packages  Rasionalisation 17 STPs in Setapak, Keramat and Wangsa Melati (Pakej 1)  G06 Construction stage 6 package  G07 Physical Projects  B19 (8 projects, 18  B21 packages)  B22 Tender / Evaluation  Rasionalisation 17 STPs in Setapak, Keramat and Wangsa Melati (Pakej Pre- 2) Construction  Rasionalisation in Bukit Stage Preparation of design / tender Antarabangsa 8 package (Conventional) document  Property connection in Taman Seputeh (D40)  Property connection (3 packages)**  Jinjang Kepong STP**  Bunus STP** Pre-Qualification Tender /  Rasionalisation Damansara 1 package Evaluation Pre- Construction Tender / Evaluation 1 package  B20 Stage (D&B) Preparation of need statement /  Jinjang Kepong Network 2 package  Bunus Network pre-bid document Research on abandoned STPs in KL, Non-physical Project Selayang dan Ampang Research Research on-going 1 package
  • 13. PROGRESS STATUS PROJECT SEWERAGE NON RIVER Implementation No. Project Category Activities Remarks status Packages  Rasionalisasi 27 Loji di Jalan Klang Lama Physical Projects  Kajang 2 STP (11 projects; 36 packages) Construction stage 5 packages  Kajang 2 Network  Lot 130 STP  G08  G10 & G11* Preparation of design / tender Pre- Construction  Kajang 1&3 STP* document and to be tendered Stage 6 packages  Cheras Jaya STP* in (Conventional)  Cheras Batu 11 STP* 2013  Upper KerayongSTP* Pre-Qualification Tender /  3 Pakej B28- B30 4 packages Evaluation  Puchong Network  Seputeh & PJ Network (D47 & D48)  4 pakej B24 – B27 10 Pre- Construction Tender / Evaluation  Lot 130 Network packages Stage  B23 (D&B)  F16 & F17  Cheras Jaya Network  Cheras Batu 11 Network Preparation of need 11  Kajang 1&3 Network* statement / pre-bid document packages  7 Pakej B31-B37*  Upper Kerayong Network*