An Investigation into Building Functional Failures in Delta State
(A Case Study of Warri Metropolis)
E.O. Aiyewalehinmi
Department of Civil Engineering, Federal University of Technology, Akure
ABSTRACT: This paper presents the results of a study of 150 commissioned residential buildings in Warri
ranging from 3million to 30million Naira. The study has identified factors influencing building functional
failures. While others factors are more visible, building functional failures remainundetectedproblem by the
building owners and the industry. Building owners and Real Estate Agents affected, do not perceive the amount
of money being wasted each year onmaintenance.The data used for this study were collected through the use of
questionnaires. All questionnaires were sent and also delivered by hand to the Real Estate managers and
building owners. The findings showed that none of the buildings investigated fully met the expectation of
occupiers. The study has also identified that Artisans in Warri are not professionally skilled to handle
professional jobs.Therefore the study recommends that Artisans in Warri be retrained to be able to handle
professional jobs.
Keywords: Functional failure, Industry, Owner & Agents, Qualified Professionals and Artisans.
Background
Warri Metropolitan (Delta State)
Delta State is a state in Nigeria, named afterRiver Niger. It was carved out of the former Bendel State
in 1991. The state has 25 local government areas. The State capital city is Asaba. Warri is the biggest
commercial city in the state. Other major towns are Agbor, Ughelli, Oghara, Sapele and Ogwashi-uku. The
figure below shows the map Delta States and its Local Governments.
Figure 1 The map of Warri Delta State.
I. INTRODUCTION
The panorama of building functional failures is not a topic that most engineers, builders and building
contractors aspire to acknowledge or discuss. In building and construction industry, building functional failures
is a physical reality and possibility. The complexity and fragmented nature of the industry and its highly casual
employment of labour makes it sensitive to building functional failures. Building and construction industry is
unique in characteristics, the uniqueness of the industry kept this problem under the red carpet. Moreover, it has
created a continuous serviceable maintenance economic glitch which the industry and building owners cannot
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 35 | Page
manage and at the same time the industry stakeholders do not know how to document the problem of building
functional failure for future reference. Mistakes of a lawyer or a Doctors can be covered up but problems but
created by an engineer cannot be covered up; they would be seen as National and International tragedy, a
professional failure which smears the reputation of the industry and engineering professions. Without crossing
the border of knowledge, to develop, improve and manage the industry successfully, the industry will continue
to face different challengesin Warri Delta State. Considering the line of previous studies, building functional
failure is associated with building collapsing, risk factors and project costs and time frame. In citation of
previous studies, little attention is being paid to building functional failure factors. The impact of building
functional failure factors have long been existing without being recognized. Building functional failures can be
described as economic taxing imposedon building owners by the industry or contractors. In this context, the
study will attempt to define investigate and identify the roles of artisans and other professionals contribution to
building functional failures in Warri Delta State.
Building Deficiency and Failure
Lee, (1987), showed that building defects can occur in one or more of the three subdivisions of a
building, foundation, wall and roof. According to this author construction industry defect is inherent in the
building and construction industry. In reality building and construction industry accommodate mistakes when
visible, it becomes human error and it can be corrected. Roddis (1993) described building failure as
imperfection, deficiency or fault found in a building element or component which adversely affects its
functional performance or appearance. Fakoalde (1994) investigated building failures factors. He found that the
major factor influencing building failures were inability of engineers’ failure to make right engineering
decisions and judgment. Normally the aim of most engineers is that faults and defect will be found before a
project is completed. If detected will be evident at the completion of the contract, if not, will be revealed some
time after completion (latent defects). Latent defects can be categorized into two ways the products and the
process of design and construction. Building Functional failure is worse than latent defects. Building Functional
failure is more related to performance failures, crime committed under building and construction contracts
which are not binding under any legislative building codes. Failure to make engineering decision does not create
building functional failures. Building functional failure is being created by their inability to control the work of
Artisans. Dovkaminetzky,(1991). Identified that the great liability of the engineers compared to men of other
profession is that they work out in the open where all men can see them. He/she cannot argue them into thin air
or blame the judge like lawyers; he cannot cover his failure with trees and vines like the architects, he cannot
screen his shortcomings by blaming his opponents and hope the people will forget like the politicians. The
engineers simply cannot deny he did it, if his works do not work. Building functional failures is being created
and transferred to building owners, Estate Agents and their tenants by local subcontractors or Artisans
supervised by engineers. Engineers cannot walkaway it is their duty to control Artisan’s work.
Causes of Failures
Failure is a human act and is defined as omission of occurrence or performance, lack of success, non-
performance, insufficiency, loss of strength and cessation of proper functioning of performance.The four
essential elements of a construction project include concept, design, performance and use of a successful
project. These elements are essentially defined as Knowledgeable (Training and Education), Competence
(Experience) and Care (Control). Nearly all construction failures are traceable to human errors; which are
unintended deviations from correct and acceptable practice and thus are avoidable. Human errors are associated
with Errors of performance (carelessness and negligence), Errors of intent (greed) and Errors of knowledge
(ignorance). Carelessness and negligence includes errors in calculations and detailing, incorrect reading of
drawings and specifications and defective construction. There are other errors like execution and lack of
care.Greed is another error committed with full a knowledge the offender deliberately using Worn-out and sub-
standard material, equipment and tools for construction just to reduce cost, taking short cuts and risk; accepting
work of poor standard to accelerate construction work.Ignorance is often the result of insufficient educations,
training and experience; lack of communication is another form of ignorance. Ignorance is also evidence when
we use bold new deigns on large-scale projects without thorough preparation, study and testing.
Maintenance of Building Functional Failures
The Industry has no statistically valid and proven method that accurately assessing the actual cost of
maintenance relating to building functional failures. A conservative estimate of maintenance cost imposed on
the building owners, Estate Agents and Occupiers on an annual basis may be run over to be more than a billion
of Naira. Building functional failure is not under legislative building code, hard data not available the extent of
costs of building functional failures cannot be analysed or estimated by mere observation. Building functional
Failure has become a problem for the industry, building owners, Restate Agents and occupiers. The purpose of
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 36 | Page
this study is to create awareness to alert building Industry and suggest a new guidelines for future
documentations specifically agreements between/among contractual parties (Owners, Builders/Artisans,
Designers and Project Managers). Also to devise effective systems to deliver quality projects on time and within
budget to meet owner’s needs.
Overview of Major Causes of Building Function Failure
Thirty two variables were developed, investigated and analysed. The analysis showed that only 13
variables were cleared to be majorly responsible for building functional failures in Warri Delta State. All
variables identified are listed in Table 1 blow and none of these variable scored less than 50% and above, except
Damp which scored 49.1%. Moreover, other variables that were not included in the Table none scored less than
40%, this indicates that all these variables were equally significant.
II. RESEARCH APPROACH
The study is limited to Warri Metropolis Business districts whereits commercial/residential buildings
were investigated. 150 questionnaires were mailed/ delivered by hand to commercial/residential buildings
owners and Real Estate Agents in Warri Metropolis in which 70 responses were collected and analysed using a
standard statistical package Microsoft Excel. Mail questionnaires were selected as a means of data collection
because of financial constraint and problems of distribution and follow up questionnaires, harassments at the
security post is very common in this area.
Data Analysis / Results
Table 1 shows the relative weight of 13 major factors identified in this study. Clearly these are the most
significant factors responsible for building functional failures in Warri. Of these factors there are other factors
not included in this table that are equally significant? However, the analysis of these factors reveals other
category of building functional failures.
Table 1: Factors of Functional Failures
Damp 49.1% Roof Defect 51.4% Roof gutter 60% Ventilation
problems 51.4%
Cracks 57.1%
Inadequate
maintenance 86%
Plumbing 70% Electrical Wiring
64.3%
Timber Defective
54%
Pest 70%
Interior defect 53% Windows 54.3% Doors 66%
Figure 1-13 present the variable lines. The Figure 1 shows the total number of participants responded to
the question of Damp. There were different views among building owners and Real Estate Agents respondents
(Importance to Highly Significant). However, the Figure 1 shows that 49.1% of the building owners Real Estate
Agency participants have indicated Damp contributed to the functional failure of their buildings. According to
respondentsmost of these buildings are newly completed buildings probably two to three years old but duration
of the buildings was not declared during the cause of the study. Most of building owners complained about the
skill quality of Artisans available in the job market during the time of the study. Nearly 50% of participants
complained about skill problems andcommented that is creating problems for building and construction industry
in the area. This problem may not be limited to Warri is yet to discover.
III. RESULTS
Figure 1 shows that 49.1% of respondents indicate that their buildings are experiencing Damp related
glitches. Both Building owners and Real Estate Agents in Warri indicated that DAMP related problems are
problems commonly found in residential buildings in Warri. As can be seen in the figure1 there are significance
differences in percentage scores indicating that the problem is spread all over Warri Metropolis. Plate 1&2
illustrate the extent of the problem.
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 37 | Page
Figure 1 Damp
Plate 1: Damp in the sitting room
Plate 2 Damp in the kitchen
Figure 2 show that only 51.4% of building owners and Real Estate indicated importance to highly
significant about roof defect related glitches. This problem may be linked skill artisans or material, it is beyond
this research boundary. The researcher was only given permission to verify their complaints and reproduce
images of the affected areas of the roof buildings. As can be seen in plate 3 & 4 below show the extent of the
glitch. However, the researcher was unable to validate whether it was human error or materials used.
0
1
2
3
4
5
1 4 7 101316192225283134374043464952555861646770
DAMP
DAMP
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 38 | Page
Figure 2 Roof Defect
Plate 3 Roof Defect
Plate 4 Roof defect
Figure 3 shows that only 60% of respondents indicate minor importance to highly significance of Roof
Gutter related problem, most of the roof gutters are not discharging rainwater as they supposed to discharge.
Specifically Flat Roofs if wrong Artisans and materials are used, the problem of retaining rainwater will surface.
The researcher was not given permission to examine this further.
0
1
2
3
4
5
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69
ROOF DEFECT
ROOF DEFECT
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 39 | Page
Figure 3: Gutter
Figure 4 shows that 51.4% of the building owners participated in the study indicated minor Importance
to highly significance for ventilation related problems. This indicates that the problem is well spread.
Figure 4: Ventilation
Figure 5 shows pest related problems. From the figure 5 below it can be deduced that about 70% of
participants in the study complained on pest related glitch. It shows that most of the buildings in Warri have pest
problems.
Figure 5: Pest
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
1 4 7 101316192225283134374043464952555861646770
GUTTER
GUTTER
0
1
2
3
4
5
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69
VENTILATION
VENTILATION
0
1
2
3
4
5
1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70
PEST
PEST
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 40 | Page
Figure 6 shows that about 70% of building owners and Real Estate Agents have specified plumbing
problems. It shows that there are common plumbing problems in Warri Metropolis. Plates 5-7 demonstrate the
extent of these problems.
Figure 6: Plumbing
Plate 5. Plumbing
Plate 6 Plumbing Toilet
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69
PLUMBING
PLUMBING
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 41 | Page
Plate 7 Plumbing
Figure 7 shows about 64.3% of building owners and Real Estate Agents complained about electrical
wiring of their buildings. It shows that the problem is distributed over Warri. Plate 8 shows the extent of the
problem. Most of wall sockets in most buildings in the area not functioning.
Figure 7: Electrical Wiring
Plate 8 Electrical Wiring
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69
ELECTRICAL WIRING
ELECTRICAL
WIRING
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 42 | Page
Figure 8 shows that 51.4 building owners and Real Estate Agents grumbled about storm water. As can
be seen from the figures, there are different opinions relating to Storm water showing from minor importance to
highly Significance.
Figure 8: Storm Water
Figure 9 presents the frequency distribution of complaints by the respondents. The figure shows the
spread of opinions from Minor Importance to Highly Significance. However, there are about 53% appellants.
This shows that majority of buildings investigated, appeared to have common problems of Interior defects. Note
that not all defects associated with the age of the buildings. Plates 9 and 10 showed the extent of Interior
Defect/ damage.
Figure 9: Interior Defect
Plate 10 Interior defect
0
1
2
3
4
5
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69
STORM WATER
STORM WATER
0
1
2
3
4
5
1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69
INTERIOR DEFECT
INTERIORDEFECT
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 43 | Page
Plate 11 Interior defect
Figure 10 shows that about 66% of building owners and Real Estate Agents protested against the extent
of building doors defect in Warri (Delta state). As can been seen it seems to be a major problems as a big
population of about 66% of building owners and Real Estate Agents indicated this. The analysis shows that they
are not happy with the situation; however, the problem may be associated with both Artisans, Materials and
weather. Plate 12 shows the extent of the problems.
Figure 10: Doors
Plate 12 Damaged Doors
0
1
2
3
4
5
1 4 7 101316192225283134374043464952555861646770
DOORS
DOORS
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 44 | Page
Figure 11 presents the frequency distribution of problems relating to building windows. The figure 11
showed from Minor Importance to Highly Significant, indicating that about 54.3% of both Building Owners and
Real Estate Agents are highly affected. This problem may be associated with Artisans, Weather or Materials.
However, the researcher was not given the chance to explore further.
Figure 11: Window
Figure 12 shows that about 57.1% of building owners and Real Estate Agents indicated from Minor
Importance to Highly Significance. This shows that building owners are facing problems relating to cracks. This
problem may or not related to as design problems or contractorsincompetence but lack site investigations. Plate
13-15, show the extent of cracks damage in building in Warri Metropolitan.
Figure 12: Cracks
Plate 13 Building crack
0
1
2
3
4
5
1 4 7 101316192225283134374043464952555861646770
WINDOWS
WINDOWS
0
1
2
3
4
5
1 4 7 101316192225283134374043464952555861646770
CRACKS
CRACKS
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 45 | Page
Plate 14 Building Cracks
Plate 15 Acceptable Cracks.
Figure 13 shows inadequate maintenance as a major problem facing the industry in Warri Delta State.
The Figure 13 shows about 86% of both Building Owners and Real Estate Agents that inadequate maintenance
as common problem in Warri. This problem is associated with Nigerian maintenance attitudes to maintenance.
Most Nigerians do not care about their own properties, provided they are there to serve his/her needs. However,
maintenance of properties is very important. As it can be seen from the figure the respondents indicated from
minor importance to highly significant. As observed this a common all over the country it is not limited to
Warri.
Figure 13: Inadequate Maintenance
0
1
2
3
4
5
1 4 7 101316192225283134374043464952555861646770
INAD. MAINTENANCE
INAD.
MAINTENANCE
An Investigation Into Building Functional Failures In Delta State...
www.ijesi.org 46 | Page
III. CONCLUSION AND RECOMMENDATION CONCLUSION
There are various factors contributing to building functional failures in Warri, Delta State, predominant
factors are indicated in the Table 1 and Figures 1-13. At the same time there other factors that are not included
in the analysis that cannot be ignored, they also have direct impact to building functional failures. Most of these
factors are associated withArtisan professional skills, contractor professional skills and inadequate maintenance.
Cracks can be associated foundation underground movement or differential settlement andpredominantly poor
quality works.Roof failures are of two dimensions in Warri. It is either deterioration of roof members due to
defective overlong or total destruction under the effect of wind. Buildings that are mostly affected are those that
are badly handled by inexperience contractors and lacked maintenance.. The study also identifiedthat poor
design, poor supervision, poor workmanship, the use of substandard materials contribute to building functional
failures in Warri.
IV. RECOMMENDATION
The study has identified that Para-professional and contractorspoorly handling of the various building
construction projects has been the major cause of building functional failures in Warri Delta State. It is therefore
recommended that all building and construction projects works be undertaken by qualified engineers and other
related qualified professionals. Politically motivated economic contractors, or unqualified emergency
contractors, they are inexperienced they should be stopped. Furthermore, thosedraughtspersons claimed to be
engineers and handling professional structural designs, be stopped.The Design of proposed building project
should be adequately established including the functionality of the building before embarking on construction.
Finally, the study therefore recommends that construction industry should adopt and encouragedapprenticeship
to occupy certain percentages of their staff strength so that effective technical knowledge may be adequately
obtained.
REFERENCES
[1]. DovKaninctzy, D. (1991): Design and construction failure “Lessons from forensic
[2]. Investigation” McGraw-Hill Inc. USA.
[3]. Fakolade, A(1994): The Need to sensitize the public on the causes of failure in Nigeria,
[4]. (Published on Line).
[5]. Lee, R. (1987): Building Maintenance Management, London Crosby Lockwood Staples.
[6]. Roddis, W.M. K. (1993): Structural Failures and Engineering Ethics, American Society of Civil Engineers

Contenu connexe

Tendances

BIM based organizational learning
BIM based organizational learningBIM based organizational learning
BIM based organizational learningIJRES Journal
 
Engineering as social experimentation
Engineering as social experimentation Engineering as social experimentation
Engineering as social experimentation Dhilsath Fathima
 
Engineers in society
Engineers in societyEngineers in society
Engineers in societyAzlin lolin
 
Chapter 2 : RESPONSIBILITY IN ENGINEERING
Chapter 2 : RESPONSIBILITY IN ENGINEERING Chapter 2 : RESPONSIBILITY IN ENGINEERING
Chapter 2 : RESPONSIBILITY IN ENGINEERING Muhammad AR
 
L&C Enterprises-USA: 4 Barriers Threatening Fencing Companies
L&C Enterprises-USA: 4 Barriers Threatening Fencing CompaniesL&C Enterprises-USA: 4 Barriers Threatening Fencing Companies
L&C Enterprises-USA: 4 Barriers Threatening Fencing Companieslcenterprisesusa
 
GENN001 FALL2013 Session #7 the engineer as a professional
GENN001 FALL2013 Session #7 the engineer as a professionalGENN001 FALL2013 Session #7 the engineer as a professional
GENN001 FALL2013 Session #7 the engineer as a professionalEsmail Bialy
 
Professional Ethics Module 4 Notes
Professional Ethics Module 4 NotesProfessional Ethics Module 4 Notes
Professional Ethics Module 4 NotesBella Meraki
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Alexander Decker
 
Project management chapter 3
Project management chapter 3Project management chapter 3
Project management chapter 3VancityInstitute
 
Reasons for Delaying the Constriction Projects in Iraq
Reasons for Delaying the Constriction Projects in IraqReasons for Delaying the Constriction Projects in Iraq
Reasons for Delaying the Constriction Projects in IraqDr. Amarjeet Singh
 
IRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From HeightIRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From HeightIRJET Journal
 
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET Journal
 
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...Dr. Amarjeet Singh
 
Ethical and Legal Analysis Essay
Ethical and Legal Analysis EssayEthical and Legal Analysis Essay
Ethical and Legal Analysis EssayTerrell Williams
 

Tendances (20)

BIM based organizational learning
BIM based organizational learningBIM based organizational learning
BIM based organizational learning
 
2012 ieee pes lunch ethics 020112
2012 ieee pes lunch ethics 0201122012 ieee pes lunch ethics 020112
2012 ieee pes lunch ethics 020112
 
Engineering as social experimentation
Engineering as social experimentation Engineering as social experimentation
Engineering as social experimentation
 
Engineers in society
Engineers in societyEngineers in society
Engineers in society
 
Chapter 2 : RESPONSIBILITY IN ENGINEERING
Chapter 2 : RESPONSIBILITY IN ENGINEERING Chapter 2 : RESPONSIBILITY IN ENGINEERING
Chapter 2 : RESPONSIBILITY IN ENGINEERING
 
Soft Skills For Engineers
Soft Skills For EngineersSoft Skills For Engineers
Soft Skills For Engineers
 
1153 3330-1-pb
1153 3330-1-pb1153 3330-1-pb
1153 3330-1-pb
 
L&C Enterprises-USA: 4 Barriers Threatening Fencing Companies
L&C Enterprises-USA: 4 Barriers Threatening Fencing CompaniesL&C Enterprises-USA: 4 Barriers Threatening Fencing Companies
L&C Enterprises-USA: 4 Barriers Threatening Fencing Companies
 
GENN001 FALL2013 Session #7 the engineer as a professional
GENN001 FALL2013 Session #7 the engineer as a professionalGENN001 FALL2013 Session #7 the engineer as a professional
GENN001 FALL2013 Session #7 the engineer as a professional
 
Professional Ethics Module 4 Notes
Professional Ethics Module 4 NotesProfessional Ethics Module 4 Notes
Professional Ethics Module 4 Notes
 
Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...Prospects of building information modeling (bim) in malaysian construction in...
Prospects of building information modeling (bim) in malaysian construction in...
 
Project management chapter 3
Project management chapter 3Project management chapter 3
Project management chapter 3
 
Reasons for Delaying the Constriction Projects in Iraq
Reasons for Delaying the Constriction Projects in IraqReasons for Delaying the Constriction Projects in Iraq
Reasons for Delaying the Constriction Projects in Iraq
 
IRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From HeightIRJET- Safety Management in Construction Sites – Fall From Height
IRJET- Safety Management in Construction Sites – Fall From Height
 
ACH 216 Lecture 01 (Intro To CM)
ACH 216 Lecture 01 (Intro To CM)ACH 216 Lecture 01 (Intro To CM)
ACH 216 Lecture 01 (Intro To CM)
 
Social Experimentation
Social ExperimentationSocial Experimentation
Social Experimentation
 
Who Is An Engineer
Who Is An EngineerWho Is An Engineer
Who Is An Engineer
 
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature Review
 
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
Rate of Occurrence of Fatal Accidents in Malaysian Construction Industry afte...
 
Ethical and Legal Analysis Essay
Ethical and Legal Analysis EssayEthical and Legal Analysis Essay
Ethical and Legal Analysis Essay
 

En vedette

En vedette (9)

Mc bride, aundrea tribal habitat conference 2010 final
Mc bride, aundrea tribal habitat conference 2010 finalMc bride, aundrea tribal habitat conference 2010 final
Mc bride, aundrea tribal habitat conference 2010 final
 
5 ss sheets assembly animation
5 ss sheets assembly animation5 ss sheets assembly animation
5 ss sheets assembly animation
 
Fluid Machanics
Fluid MachanicsFluid Machanics
Fluid Machanics
 
Parameter Driven G-Code
Parameter Driven G-CodeParameter Driven G-Code
Parameter Driven G-Code
 
Northwest Indian Fisheries Commission Annual Report 2015
Northwest Indian Fisheries Commission Annual Report 2015Northwest Indian Fisheries Commission Annual Report 2015
Northwest Indian Fisheries Commission Annual Report 2015
 
Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...
Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...
Beyond GAP/Walking Together: Advancing Tribal-EPA Partnerships for the 21st C...
 
Refinery process-description
Refinery process-descriptionRefinery process-description
Refinery process-description
 
Tribal Natural Resources Management 2016
Tribal Natural Resources Management 2016Tribal Natural Resources Management 2016
Tribal Natural Resources Management 2016
 
The other guys nh cfd_aa
The other guys nh cfd_aaThe other guys nh cfd_aa
The other guys nh cfd_aa
 

Similaire à E253446

11.the adequacy of contractual provisions in managing construction failure in...
11.the adequacy of contractual provisions in managing construction failure in...11.the adequacy of contractual provisions in managing construction failure in...
11.the adequacy of contractual provisions in managing construction failure in...Alexander Decker
 
The adequacy of contractual provisions in managing construction failure in ma...
The adequacy of contractual provisions in managing construction failure in ma...The adequacy of contractual provisions in managing construction failure in ma...
The adequacy of contractual provisions in managing construction failure in ma...Alexander Decker
 
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...IRJET Journal
 
IRJET- Analysis of Contractual Communication among Parties to the Contract wi...
IRJET- Analysis of Contractual Communication among Parties to the Contract wi...IRJET- Analysis of Contractual Communication among Parties to the Contract wi...
IRJET- Analysis of Contractual Communication among Parties to the Contract wi...IRJET Journal
 
The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...Dr. Amarjeet Singh
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET Journal
 
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...IRJET Journal
 
PAPER ID 109 Presentation.pptx
PAPER ID 109 Presentation.pptxPAPER ID 109 Presentation.pptx
PAPER ID 109 Presentation.pptxsaeedahmed433704
 
A forensic view to structural failure analysis article
A forensic view to structural failure analysis   articleA forensic view to structural failure analysis   article
A forensic view to structural failure analysis articleSayyad Wajed Ali
 
FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS
   FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS   FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS
FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTSIAEME Publication
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction ProjectIRJET Journal
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghanaAlexander Decker
 
Construction industry before and after pandemic
Construction industry before and after pandemicConstruction industry before and after pandemic
Construction industry before and after pandemicvivatechijri
 
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...IRJET Journal
 
Quality &Amp; Risk Management In Construction Industry
Quality &Amp; Risk Management In Construction IndustryQuality &Amp; Risk Management In Construction Industry
Quality &Amp; Risk Management In Construction IndustryMichelle Madero
 
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksakCOTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak2cd
 
Construction Standards of Residential Buildings Post Handover
Construction Standards of Residential Buildings Post HandoverConstruction Standards of Residential Buildings Post Handover
Construction Standards of Residential Buildings Post HandoverIRJET Journal
 

Similaire à E253446 (20)

L012238891
L012238891L012238891
L012238891
 
11.the adequacy of contractual provisions in managing construction failure in...
11.the adequacy of contractual provisions in managing construction failure in...11.the adequacy of contractual provisions in managing construction failure in...
11.the adequacy of contractual provisions in managing construction failure in...
 
The adequacy of contractual provisions in managing construction failure in ma...
The adequacy of contractual provisions in managing construction failure in ma...The adequacy of contractual provisions in managing construction failure in ma...
The adequacy of contractual provisions in managing construction failure in ma...
 
Ijmet 10 02_034
Ijmet 10 02_034Ijmet 10 02_034
Ijmet 10 02_034
 
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...IRJET -  	  Causes, Effects and Minimizing Methods of Construction Projects D...
IRJET - Causes, Effects and Minimizing Methods of Construction Projects D...
 
IRJET- Analysis of Contractual Communication among Parties to the Contract wi...
IRJET- Analysis of Contractual Communication among Parties to the Contract wi...IRJET- Analysis of Contractual Communication among Parties to the Contract wi...
IRJET- Analysis of Contractual Communication among Parties to the Contract wi...
 
The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...The Identification of Risks and its Criticality in the Nigeria Construction I...
The Identification of Risks and its Criticality in the Nigeria Construction I...
 
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure ProjectIRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
IRJET- Study & Analysis of Subcontracting Practices in Infrastructure Project
 
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
IRJET- Assessing the Major Factors for Construction Material Wastage and thei...
 
PAPER ID 109 Presentation.pptx
PAPER ID 109 Presentation.pptxPAPER ID 109 Presentation.pptx
PAPER ID 109 Presentation.pptx
 
A forensic view to structural failure analysis article
A forensic view to structural failure analysis   articleA forensic view to structural failure analysis   article
A forensic view to structural failure analysis article
 
FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS
   FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS   FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS
FACTORS EFFECTING THE FAILURE ANALYSIS OF CONSTRUCTION PROJECTS
 
IRJET- To Study the Causes and Effects of Delays in Construction Project
IRJET-  	  To Study the Causes and Effects of Delays in Construction ProjectIRJET-  	  To Study the Causes and Effects of Delays in Construction Project
IRJET- To Study the Causes and Effects of Delays in Construction Project
 
Management of government funded construction projects in ghana
Management of government funded construction projects in ghanaManagement of government funded construction projects in ghana
Management of government funded construction projects in ghana
 
Construction industry before and after pandemic
Construction industry before and after pandemicConstruction industry before and after pandemic
Construction industry before and after pandemic
 
33 article text-127-1-10-20181005
33 article text-127-1-10-2018100533 article text-127-1-10-20181005
33 article text-127-1-10-20181005
 
Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...Study on the analysis and evaluation of delays in public sector construction ...
Study on the analysis and evaluation of delays in public sector construction ...
 
Quality &Amp; Risk Management In Construction Industry
Quality &Amp; Risk Management In Construction IndustryQuality &Amp; Risk Management In Construction Industry
Quality &Amp; Risk Management In Construction Industry
 
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksakCOTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
COTM (1).ppt gwremejjjedhdwfwqoijfkskjlksak
 
Construction Standards of Residential Buildings Post Handover
Construction Standards of Residential Buildings Post HandoverConstruction Standards of Residential Buildings Post Handover
Construction Standards of Residential Buildings Post Handover
 

Dernier

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 

Dernier (20)

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 

E253446

  • 1. International Journal of Engineering Science Invention ISSN (Online): 2319 – 6734, ISSN (Print): 2319 – 6726 www.ijesi.org Volume 2 Issue 5 ǁ May. 2013 ǁ PP.34-46 www.ijesi.org 34 | Page An Investigation into Building Functional Failures in Delta State (A Case Study of Warri Metropolis) E.O. Aiyewalehinmi Department of Civil Engineering, Federal University of Technology, Akure ABSTRACT: This paper presents the results of a study of 150 commissioned residential buildings in Warri ranging from 3million to 30million Naira. The study has identified factors influencing building functional failures. While others factors are more visible, building functional failures remainundetectedproblem by the building owners and the industry. Building owners and Real Estate Agents affected, do not perceive the amount of money being wasted each year onmaintenance.The data used for this study were collected through the use of questionnaires. All questionnaires were sent and also delivered by hand to the Real Estate managers and building owners. The findings showed that none of the buildings investigated fully met the expectation of occupiers. The study has also identified that Artisans in Warri are not professionally skilled to handle professional jobs.Therefore the study recommends that Artisans in Warri be retrained to be able to handle professional jobs. Keywords: Functional failure, Industry, Owner & Agents, Qualified Professionals and Artisans. Background Warri Metropolitan (Delta State) Delta State is a state in Nigeria, named afterRiver Niger. It was carved out of the former Bendel State in 1991. The state has 25 local government areas. The State capital city is Asaba. Warri is the biggest commercial city in the state. Other major towns are Agbor, Ughelli, Oghara, Sapele and Ogwashi-uku. The figure below shows the map Delta States and its Local Governments. Figure 1 The map of Warri Delta State. I. INTRODUCTION The panorama of building functional failures is not a topic that most engineers, builders and building contractors aspire to acknowledge or discuss. In building and construction industry, building functional failures is a physical reality and possibility. The complexity and fragmented nature of the industry and its highly casual employment of labour makes it sensitive to building functional failures. Building and construction industry is unique in characteristics, the uniqueness of the industry kept this problem under the red carpet. Moreover, it has created a continuous serviceable maintenance economic glitch which the industry and building owners cannot
  • 2. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 35 | Page manage and at the same time the industry stakeholders do not know how to document the problem of building functional failure for future reference. Mistakes of a lawyer or a Doctors can be covered up but problems but created by an engineer cannot be covered up; they would be seen as National and International tragedy, a professional failure which smears the reputation of the industry and engineering professions. Without crossing the border of knowledge, to develop, improve and manage the industry successfully, the industry will continue to face different challengesin Warri Delta State. Considering the line of previous studies, building functional failure is associated with building collapsing, risk factors and project costs and time frame. In citation of previous studies, little attention is being paid to building functional failure factors. The impact of building functional failure factors have long been existing without being recognized. Building functional failures can be described as economic taxing imposedon building owners by the industry or contractors. In this context, the study will attempt to define investigate and identify the roles of artisans and other professionals contribution to building functional failures in Warri Delta State. Building Deficiency and Failure Lee, (1987), showed that building defects can occur in one or more of the three subdivisions of a building, foundation, wall and roof. According to this author construction industry defect is inherent in the building and construction industry. In reality building and construction industry accommodate mistakes when visible, it becomes human error and it can be corrected. Roddis (1993) described building failure as imperfection, deficiency or fault found in a building element or component which adversely affects its functional performance or appearance. Fakoalde (1994) investigated building failures factors. He found that the major factor influencing building failures were inability of engineers’ failure to make right engineering decisions and judgment. Normally the aim of most engineers is that faults and defect will be found before a project is completed. If detected will be evident at the completion of the contract, if not, will be revealed some time after completion (latent defects). Latent defects can be categorized into two ways the products and the process of design and construction. Building Functional failure is worse than latent defects. Building Functional failure is more related to performance failures, crime committed under building and construction contracts which are not binding under any legislative building codes. Failure to make engineering decision does not create building functional failures. Building functional failure is being created by their inability to control the work of Artisans. Dovkaminetzky,(1991). Identified that the great liability of the engineers compared to men of other profession is that they work out in the open where all men can see them. He/she cannot argue them into thin air or blame the judge like lawyers; he cannot cover his failure with trees and vines like the architects, he cannot screen his shortcomings by blaming his opponents and hope the people will forget like the politicians. The engineers simply cannot deny he did it, if his works do not work. Building functional failures is being created and transferred to building owners, Estate Agents and their tenants by local subcontractors or Artisans supervised by engineers. Engineers cannot walkaway it is their duty to control Artisan’s work. Causes of Failures Failure is a human act and is defined as omission of occurrence or performance, lack of success, non- performance, insufficiency, loss of strength and cessation of proper functioning of performance.The four essential elements of a construction project include concept, design, performance and use of a successful project. These elements are essentially defined as Knowledgeable (Training and Education), Competence (Experience) and Care (Control). Nearly all construction failures are traceable to human errors; which are unintended deviations from correct and acceptable practice and thus are avoidable. Human errors are associated with Errors of performance (carelessness and negligence), Errors of intent (greed) and Errors of knowledge (ignorance). Carelessness and negligence includes errors in calculations and detailing, incorrect reading of drawings and specifications and defective construction. There are other errors like execution and lack of care.Greed is another error committed with full a knowledge the offender deliberately using Worn-out and sub- standard material, equipment and tools for construction just to reduce cost, taking short cuts and risk; accepting work of poor standard to accelerate construction work.Ignorance is often the result of insufficient educations, training and experience; lack of communication is another form of ignorance. Ignorance is also evidence when we use bold new deigns on large-scale projects without thorough preparation, study and testing. Maintenance of Building Functional Failures The Industry has no statistically valid and proven method that accurately assessing the actual cost of maintenance relating to building functional failures. A conservative estimate of maintenance cost imposed on the building owners, Estate Agents and Occupiers on an annual basis may be run over to be more than a billion of Naira. Building functional failure is not under legislative building code, hard data not available the extent of costs of building functional failures cannot be analysed or estimated by mere observation. Building functional Failure has become a problem for the industry, building owners, Restate Agents and occupiers. The purpose of
  • 3. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 36 | Page this study is to create awareness to alert building Industry and suggest a new guidelines for future documentations specifically agreements between/among contractual parties (Owners, Builders/Artisans, Designers and Project Managers). Also to devise effective systems to deliver quality projects on time and within budget to meet owner’s needs. Overview of Major Causes of Building Function Failure Thirty two variables were developed, investigated and analysed. The analysis showed that only 13 variables were cleared to be majorly responsible for building functional failures in Warri Delta State. All variables identified are listed in Table 1 blow and none of these variable scored less than 50% and above, except Damp which scored 49.1%. Moreover, other variables that were not included in the Table none scored less than 40%, this indicates that all these variables were equally significant. II. RESEARCH APPROACH The study is limited to Warri Metropolis Business districts whereits commercial/residential buildings were investigated. 150 questionnaires were mailed/ delivered by hand to commercial/residential buildings owners and Real Estate Agents in Warri Metropolis in which 70 responses were collected and analysed using a standard statistical package Microsoft Excel. Mail questionnaires were selected as a means of data collection because of financial constraint and problems of distribution and follow up questionnaires, harassments at the security post is very common in this area. Data Analysis / Results Table 1 shows the relative weight of 13 major factors identified in this study. Clearly these are the most significant factors responsible for building functional failures in Warri. Of these factors there are other factors not included in this table that are equally significant? However, the analysis of these factors reveals other category of building functional failures. Table 1: Factors of Functional Failures Damp 49.1% Roof Defect 51.4% Roof gutter 60% Ventilation problems 51.4% Cracks 57.1% Inadequate maintenance 86% Plumbing 70% Electrical Wiring 64.3% Timber Defective 54% Pest 70% Interior defect 53% Windows 54.3% Doors 66% Figure 1-13 present the variable lines. The Figure 1 shows the total number of participants responded to the question of Damp. There were different views among building owners and Real Estate Agents respondents (Importance to Highly Significant). However, the Figure 1 shows that 49.1% of the building owners Real Estate Agency participants have indicated Damp contributed to the functional failure of their buildings. According to respondentsmost of these buildings are newly completed buildings probably two to three years old but duration of the buildings was not declared during the cause of the study. Most of building owners complained about the skill quality of Artisans available in the job market during the time of the study. Nearly 50% of participants complained about skill problems andcommented that is creating problems for building and construction industry in the area. This problem may not be limited to Warri is yet to discover. III. RESULTS Figure 1 shows that 49.1% of respondents indicate that their buildings are experiencing Damp related glitches. Both Building owners and Real Estate Agents in Warri indicated that DAMP related problems are problems commonly found in residential buildings in Warri. As can be seen in the figure1 there are significance differences in percentage scores indicating that the problem is spread all over Warri Metropolis. Plate 1&2 illustrate the extent of the problem.
  • 4. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 37 | Page Figure 1 Damp Plate 1: Damp in the sitting room Plate 2 Damp in the kitchen Figure 2 show that only 51.4% of building owners and Real Estate indicated importance to highly significant about roof defect related glitches. This problem may be linked skill artisans or material, it is beyond this research boundary. The researcher was only given permission to verify their complaints and reproduce images of the affected areas of the roof buildings. As can be seen in plate 3 & 4 below show the extent of the glitch. However, the researcher was unable to validate whether it was human error or materials used. 0 1 2 3 4 5 1 4 7 101316192225283134374043464952555861646770 DAMP DAMP
  • 5. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 38 | Page Figure 2 Roof Defect Plate 3 Roof Defect Plate 4 Roof defect Figure 3 shows that only 60% of respondents indicate minor importance to highly significance of Roof Gutter related problem, most of the roof gutters are not discharging rainwater as they supposed to discharge. Specifically Flat Roofs if wrong Artisans and materials are used, the problem of retaining rainwater will surface. The researcher was not given permission to examine this further. 0 1 2 3 4 5 1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 ROOF DEFECT ROOF DEFECT
  • 6. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 39 | Page Figure 3: Gutter Figure 4 shows that 51.4% of the building owners participated in the study indicated minor Importance to highly significance for ventilation related problems. This indicates that the problem is well spread. Figure 4: Ventilation Figure 5 shows pest related problems. From the figure 5 below it can be deduced that about 70% of participants in the study complained on pest related glitch. It shows that most of the buildings in Warri have pest problems. Figure 5: Pest 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 1 4 7 101316192225283134374043464952555861646770 GUTTER GUTTER 0 1 2 3 4 5 1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 VENTILATION VENTILATION 0 1 2 3 4 5 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 61 64 67 70 PEST PEST
  • 7. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 40 | Page Figure 6 shows that about 70% of building owners and Real Estate Agents have specified plumbing problems. It shows that there are common plumbing problems in Warri Metropolis. Plates 5-7 demonstrate the extent of these problems. Figure 6: Plumbing Plate 5. Plumbing Plate 6 Plumbing Toilet 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 PLUMBING PLUMBING
  • 8. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 41 | Page Plate 7 Plumbing Figure 7 shows about 64.3% of building owners and Real Estate Agents complained about electrical wiring of their buildings. It shows that the problem is distributed over Warri. Plate 8 shows the extent of the problem. Most of wall sockets in most buildings in the area not functioning. Figure 7: Electrical Wiring Plate 8 Electrical Wiring 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 ELECTRICAL WIRING ELECTRICAL WIRING
  • 9. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 42 | Page Figure 8 shows that 51.4 building owners and Real Estate Agents grumbled about storm water. As can be seen from the figures, there are different opinions relating to Storm water showing from minor importance to highly Significance. Figure 8: Storm Water Figure 9 presents the frequency distribution of complaints by the respondents. The figure shows the spread of opinions from Minor Importance to Highly Significance. However, there are about 53% appellants. This shows that majority of buildings investigated, appeared to have common problems of Interior defects. Note that not all defects associated with the age of the buildings. Plates 9 and 10 showed the extent of Interior Defect/ damage. Figure 9: Interior Defect Plate 10 Interior defect 0 1 2 3 4 5 1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 STORM WATER STORM WATER 0 1 2 3 4 5 1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 INTERIOR DEFECT INTERIORDEFECT
  • 10. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 43 | Page Plate 11 Interior defect Figure 10 shows that about 66% of building owners and Real Estate Agents protested against the extent of building doors defect in Warri (Delta state). As can been seen it seems to be a major problems as a big population of about 66% of building owners and Real Estate Agents indicated this. The analysis shows that they are not happy with the situation; however, the problem may be associated with both Artisans, Materials and weather. Plate 12 shows the extent of the problems. Figure 10: Doors Plate 12 Damaged Doors 0 1 2 3 4 5 1 4 7 101316192225283134374043464952555861646770 DOORS DOORS
  • 11. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 44 | Page Figure 11 presents the frequency distribution of problems relating to building windows. The figure 11 showed from Minor Importance to Highly Significant, indicating that about 54.3% of both Building Owners and Real Estate Agents are highly affected. This problem may be associated with Artisans, Weather or Materials. However, the researcher was not given the chance to explore further. Figure 11: Window Figure 12 shows that about 57.1% of building owners and Real Estate Agents indicated from Minor Importance to Highly Significance. This shows that building owners are facing problems relating to cracks. This problem may or not related to as design problems or contractorsincompetence but lack site investigations. Plate 13-15, show the extent of cracks damage in building in Warri Metropolitan. Figure 12: Cracks Plate 13 Building crack 0 1 2 3 4 5 1 4 7 101316192225283134374043464952555861646770 WINDOWS WINDOWS 0 1 2 3 4 5 1 4 7 101316192225283134374043464952555861646770 CRACKS CRACKS
  • 12. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 45 | Page Plate 14 Building Cracks Plate 15 Acceptable Cracks. Figure 13 shows inadequate maintenance as a major problem facing the industry in Warri Delta State. The Figure 13 shows about 86% of both Building Owners and Real Estate Agents that inadequate maintenance as common problem in Warri. This problem is associated with Nigerian maintenance attitudes to maintenance. Most Nigerians do not care about their own properties, provided they are there to serve his/her needs. However, maintenance of properties is very important. As it can be seen from the figure the respondents indicated from minor importance to highly significant. As observed this a common all over the country it is not limited to Warri. Figure 13: Inadequate Maintenance 0 1 2 3 4 5 1 4 7 101316192225283134374043464952555861646770 INAD. MAINTENANCE INAD. MAINTENANCE
  • 13. An Investigation Into Building Functional Failures In Delta State... www.ijesi.org 46 | Page III. CONCLUSION AND RECOMMENDATION CONCLUSION There are various factors contributing to building functional failures in Warri, Delta State, predominant factors are indicated in the Table 1 and Figures 1-13. At the same time there other factors that are not included in the analysis that cannot be ignored, they also have direct impact to building functional failures. Most of these factors are associated withArtisan professional skills, contractor professional skills and inadequate maintenance. Cracks can be associated foundation underground movement or differential settlement andpredominantly poor quality works.Roof failures are of two dimensions in Warri. It is either deterioration of roof members due to defective overlong or total destruction under the effect of wind. Buildings that are mostly affected are those that are badly handled by inexperience contractors and lacked maintenance.. The study also identifiedthat poor design, poor supervision, poor workmanship, the use of substandard materials contribute to building functional failures in Warri. IV. RECOMMENDATION The study has identified that Para-professional and contractorspoorly handling of the various building construction projects has been the major cause of building functional failures in Warri Delta State. It is therefore recommended that all building and construction projects works be undertaken by qualified engineers and other related qualified professionals. Politically motivated economic contractors, or unqualified emergency contractors, they are inexperienced they should be stopped. Furthermore, thosedraughtspersons claimed to be engineers and handling professional structural designs, be stopped.The Design of proposed building project should be adequately established including the functionality of the building before embarking on construction. Finally, the study therefore recommends that construction industry should adopt and encouragedapprenticeship to occupy certain percentages of their staff strength so that effective technical knowledge may be adequately obtained. REFERENCES [1]. DovKaninctzy, D. (1991): Design and construction failure “Lessons from forensic [2]. Investigation” McGraw-Hill Inc. USA. [3]. Fakolade, A(1994): The Need to sensitize the public on the causes of failure in Nigeria, [4]. (Published on Line). [5]. Lee, R. (1987): Building Maintenance Management, London Crosby Lockwood Staples. [6]. Roddis, W.M. K. (1993): Structural Failures and Engineering Ethics, American Society of Civil Engineers