SUMMARY:
I’m control and protection engineer. I’m working as electrical design engineer and
coordinator in engineering department for Power System Projects (PSP) Company. I have
five years of experience in M.V and H.V fields. My experience related to power plant, GIS
and AIS substation and industrial fields starting from basic design till detailed design. I’m
seeking to have a position which allows providing new ways and ideas in the design
management of power stations and different types of sub-stations.
EDUCATION:
Master's Degree, Electrical Power and Machines Engineering.
Dissertation titled “Implementation of Variable Frequency Transformers to Stabilize
Electric Power Systems.”, 2/2015. Faculty of Engineering, Cairo University”.
B.Sc. in electrical power and machines engineering, Menoufia University, 2009.
EXPERIENCE RECORD
TIME : From December 2011 To : Present
EMPLOYER : Power System Projects “PSP” – Subsidiary of El-Sewedy Electric.
POSITION : Senior Design Engineer (Control and Protection Engineer)
RES. :
Prepare specifications and RFQ’s.
Prepare protection relay list.
Review Substation Control System (SCS/SAS) architecture.
Prepare main SLD, relaying& metering SLD.
Prepare I/O list for SOER, alarm annunciator and SCS. Prepare
exchange list for dispatch center (NCC& RCC).
Prepare interlocking logic diagram.
Prepare local, remote control panels & protection panels (schematics)
for power plants & substations by E3 program.
Prepare CT/VT adequacy calculation.
Prepare control & protection panels B.O.Q (Bill Of Quantity), panel’s
internal connection list and internal & external panel arrangement.
Prepare cable interconnections and termination charts.
Design auxiliary DC system includes DC SLD, DC load list, load
profile, battery and battery charger calculations, DC short circuit
calculation and DC system philosophy of operation. Review DC
system schematics and preparing required DC interconnections
between battery chargers, DC switchboard, battery monitoring system
(BMS), inverter and AC/DC distribution boards.
Design auxiliary AC system includes AC SLD, AC load list. Review L.V
switchboard wiring.
MCC setting.
Review M.V SWGRs to satisfy specification and owner requirements.
2. 2/ 3
Review supplier’s technical offers and provide technical support for
manufacturers during all project’s stages.
Provide technical support for tender project studies.
Cable sizing calculation for DC & AC systems based on IEC and
supplier catalogues.
Working as a technical office engineer for L’Oreal factory site for six
months in L.V and light current fields from September-2013 to March-
2014 in systems: fire alarm, access, intrusion, CCTV, technical alarm
system, cable routing and cable sizing calculation.
Project coordinator for GIZA CP 117A, Module III project and for Suez
super critical CP-106 contract.
Currently, I’m a control and project coordinator for Mahmoudia 330
MW Simple Cycle Power Plant and for Suez super critical power plant
CP-106 Contract (Turbine, generator and those auxiliaries).
PROJECTS :
Banha Power Station, 750 MW Combines Cycle, Contract No. 10064-
CP-117
Giza North Power Station, 1500 MW Combined Cycle Power Project,
Contract No. 10063-CP-117
El Ain El Sokhna Supercritical Thermal Power Plant Units 1 & 2,
Contract No. 10056-CP-117
West Damietta 500 MW Simple Cycle Power Plant, Contract No.
10069-CP-101.
Al-Diwanyia power plant including 400kV substation (IRAQ Republic).
Lina 66/22 kV double bus single breaker AIS Substation.
L’Oreal Cosmetic Industry.
Kafer El-Noor and Kafer Moheet Al-Zaghlool Pumping Station.
Manshiet Naser 220/66/11 kV GIS Substation.
Attaqa 650 MW Simple Cycle Power Plant.
Mahmoudia 330 MW Simple Cycle Power Plant
TIME : From April 2010 To : December 2011
EMPLOYER : Advanced Chemicals and Technology “AC&T”
POSITION : Technical Office Engineer
RES. :
Sizing calculation for electrical motors and power cables. Preparing
power cables accessories B.O.Q and the required tools for cable
installation.
Design Low Voltage panel Schedule. Program different types of
inverter and soft starter. Maintenance Electrical Power Motors,
Instruments, Control panels and PLC “Allen Bradley” installed in the
company.
Integrated control devices and instruments with DCS System”
YokoGawa, Centuim CS3000 R3”.
3. 3/ 3
PROFESSIONAL ACTIVITIES:
AutoCAD
E3.Series
:
:
(2-Diemension), Course from (Cairo University) in July 2008.
Zuken E3 GmbH Program for design Schematics.
Matlab 7 : (SIMULINK)& (SIM Power System), Course from (Cairo
University) in August 2008.-The main tool for preparing master
degree-.
COMPUTER SKILLS:
Word, Power Point, Excel and Outlook.
E-Tap Program (Fundamentals).
Battery Sizing Programs (SAFT, ALCAD & HBL)
SCADA: (Basics with I-FIX Program Training), Course from (Cairo University) in
August 2008.
ADDITIONAL INFORMATION:
Student of the year in the academic housing, 2004-2005.
Training course in Ashmoun Electrical Distribution Station 7/2008.
Employee of the month, PSP Company, 8/2014.
PERSONAL DATA:
August 29th 1987.:Date of Birth
Married:Marital status
Temporary Exemption.:Military Status
Arabic (Native) – English (Fluent).:Working Languages
Eng_ise@yahoo.com:Email
Senior Design Engineer.:Profession
REFERENCE:
Dr. Khairy Farahat Helwa “Professor at Cairo University”.
Dr. Mohamed Abu-El Azm “Doctor at Tanta University”.