WORK BREAKDOWN STRUCTURE
SOFTWARE PROJECT MANAGEMENT (SPM)




Work Breakdown Structure of Insurance Survey Portal (ISP)



                    Submitted To:


                    Madam Aasma Abid



                     Submitted By:


                    Abdul-Rehman Aslam
                           (9998)

                      Yasir Mehmood
                           (9994)
Introduction
The Work Breakdown Structure presented here represents all the work required to complete
this project. It helps to easily communicate the work and processes involved to execute the
project. The Project Manager and project team use the WBS to develop the project schedule,
resource requirements and costs




Outline View


1. Insurance Survey Portal

  1.1 Initiation
    1.1.1 Evaluation & Recommendations

    1.1.2 Develop Project Charter

    1.1.3 Deliverable: Submit Project Charter

    1.1.4 Project Sponsor Reviews Project Charter

    1.1.5 Project Charter Signed/Approved

  1.2 Planning
    1.2.1 Create Preliminary Scope Statement

    1.2.2 Determine Project Team

    1.2.3 Project Team Kickoff Meeting

    1.2.4 Develop Project Plan

    1.2.5 Submit Project Plan

    1.2.6 Milestone: Project Plan Approval
1.3 Execution
   1.3.1 Project Kickoff Meeting

   1.3.2 Verify & Validate User Requirements

   1.3.3 Design System

   1.3.4 Procure Hardware/Software

   1.3.5 Install Development System

   1.3.6 Testing Phase

   1.3.7 Install Live System

   1.3.8 User Training

   1.3.9 Go Live

  1.4 Control
   1.4.1 Project Management

   1.4.2 Project Status Meetings

   1.4.3 Risk Management

   1.4.4 Update Project Management Plan

  1.5 Closeout
   1.5.1 Audit Procurement

   1.5.2 Document Lessons Learned

   1.5.3 Update Files/Records

   1.5.4 Gain Formal Acceptance

   1.5.5 Archive Files/Documents
Tabular View


Level 1              Level 2          Level 3
1 Insurance Survey   1.1 Initiation   1.1.1 Evaluation & Recommendations
  Portal                              1.1.2 Develop Project Charter
                                      1.1.3 Deliverable: Submit Project Charter
                                      1.1.4 Project Sponsor Reviews Project Charter
                                      1.1.5 Project Charter Signed/Approved
                     1.2 Planning     1.2.1 Create Preliminary Scope Statement
                                      1.2.2 Determine Project Team
                                      1.2.3 Project Team Kickoff Meeting
                                      1.2.4 Develop Project Plan
                                      1.2.5 Submit Project Plan
                                      1.2.6 Milestone: Project Plan Approval
                     1.3 Execution    1.3.1 Project Kickoff Meeting
                                      1.3.2 Verify & Validate User Requirements
                                      1.3.3 Design System
                                      1.3.4 Procure Hardware/Software
                                      1.3.5 Install Development System
                                      1.3.6 Testing Phase
                                      1.3.7 Install Live System
                                      1.3.8 User Training
                                      1.3.9 Go Live
                     1.4 Control      1.4.1 Project Management
                                      1.4.2 Project Status Meetings
                                      1.4.3 Risk Management
                                      1.4.4 Update Project Management Plan
                     1.5 Closeout     1.5.1 Audit Procurement
                                      1.5.2 Document Lessons Learned
                                      1.5.3 Update Files/Records
                                      1.5.4 Gain Formal Acceptance
                                      1.5.5 Archive Files/Documents
Tree Structure View

Contenu connexe

Tendances

Inter-process communication of Android
Inter-process communication of AndroidInter-process communication of Android
Inter-process communication of AndroidTetsuyuki Kobayashi
 
Kanban for Software Engineering
Kanban for Software EngineeringKanban for Software Engineering
Kanban for Software EngineeringCraig Donnelly
 
Presentazione Linux
Presentazione LinuxPresentazione Linux
Presentazione LinuxMatteo
 
Android's Multimedia Framework
Android's Multimedia FrameworkAndroid's Multimedia Framework
Android's Multimedia FrameworkOpersys inc.
 
Behind the Performance of Quake 3 Engine: Fast Inverse Square Root
Behind the Performance of Quake 3 Engine: Fast Inverse Square RootBehind the Performance of Quake 3 Engine: Fast Inverse Square Root
Behind the Performance of Quake 3 Engine: Fast Inverse Square RootMaksym Zavershynskyi
 
Overview of Android binder IPC implementation
Overview of Android binder IPC implementationOverview of Android binder IPC implementation
Overview of Android binder IPC implementationChethan Pchethan
 
Git 입문자를 위한 가이드
Git 입문자를 위한 가이드Git 입문자를 위한 가이드
Git 입문자를 위한 가이드chandler0201
 
Artes escénicas en RD.pdf
Artes escénicas en RD.pdfArtes escénicas en RD.pdf
Artes escénicas en RD.pdfCiprielLora
 
Introduction to Version Control and Configuration Management
Introduction to Version Control and Configuration ManagementIntroduction to Version Control and Configuration Management
Introduction to Version Control and Configuration ManagementPhilip Johnson
 
Phing - A PHP Build Tool (An Introduction)
Phing - A PHP Build Tool (An Introduction)Phing - A PHP Build Tool (An Introduction)
Phing - A PHP Build Tool (An Introduction)Michiel Rook
 
Robots and Automations: Experiences of use with Zabbix
Robots and Automations: Experiences of use with ZabbixRobots and Automations: Experiences of use with Zabbix
Robots and Automations: Experiences of use with ZabbixGuido Mascelani Silverio
 
JS Fest 2019. Ryan Dahl. Deno, a new way to JavaScript
JS Fest 2019. Ryan Dahl. Deno, a new way to JavaScriptJS Fest 2019. Ryan Dahl. Deno, a new way to JavaScript
JS Fest 2019. Ryan Dahl. Deno, a new way to JavaScriptJSFestUA
 
Git and GitHub | Concept about Git and GitHub Process | Git Process overview
Git and GitHub | Concept about Git and GitHub Process | Git Process overviewGit and GitHub | Concept about Git and GitHub Process | Git Process overview
Git and GitHub | Concept about Git and GitHub Process | Git Process overviewRueful Robin
 
오픈소스 GIS 개요
오픈소스 GIS 개요오픈소스 GIS 개요
오픈소스 GIS 개요slhead1
 
버전관리를 들어본적 없는 사람들을 위한 DVCS - Git
버전관리를 들어본적 없는 사람들을 위한 DVCS - Git버전관리를 들어본적 없는 사람들을 위한 DVCS - Git
버전관리를 들어본적 없는 사람들을 위한 DVCS - Git민태 김
 

Tendances (20)

Applied Computer Science Concepts in Android
Applied Computer Science Concepts in AndroidApplied Computer Science Concepts in Android
Applied Computer Science Concepts in Android
 
Inter-process communication of Android
Inter-process communication of AndroidInter-process communication of Android
Inter-process communication of Android
 
Kanban for Software Engineering
Kanban for Software EngineeringKanban for Software Engineering
Kanban for Software Engineering
 
Presentazione Linux
Presentazione LinuxPresentazione Linux
Presentazione Linux
 
Introduction to Git
Introduction to GitIntroduction to Git
Introduction to Git
 
Android's Multimedia Framework
Android's Multimedia FrameworkAndroid's Multimedia Framework
Android's Multimedia Framework
 
Behind the Performance of Quake 3 Engine: Fast Inverse Square Root
Behind the Performance of Quake 3 Engine: Fast Inverse Square RootBehind the Performance of Quake 3 Engine: Fast Inverse Square Root
Behind the Performance of Quake 3 Engine: Fast Inverse Square Root
 
Overview of Android binder IPC implementation
Overview of Android binder IPC implementationOverview of Android binder IPC implementation
Overview of Android binder IPC implementation
 
Git 입문자를 위한 가이드
Git 입문자를 위한 가이드Git 입문자를 위한 가이드
Git 입문자를 위한 가이드
 
Artes escénicas en RD.pdf
Artes escénicas en RD.pdfArtes escénicas en RD.pdf
Artes escénicas en RD.pdf
 
Introduction to Version Control and Configuration Management
Introduction to Version Control and Configuration ManagementIntroduction to Version Control and Configuration Management
Introduction to Version Control and Configuration Management
 
Phing - A PHP Build Tool (An Introduction)
Phing - A PHP Build Tool (An Introduction)Phing - A PHP Build Tool (An Introduction)
Phing - A PHP Build Tool (An Introduction)
 
Robots and Automations: Experiences of use with Zabbix
Robots and Automations: Experiences of use with ZabbixRobots and Automations: Experiences of use with Zabbix
Robots and Automations: Experiences of use with Zabbix
 
Low Level View of Android System Architecture
Low Level View of Android System ArchitectureLow Level View of Android System Architecture
Low Level View of Android System Architecture
 
JS Fest 2019. Ryan Dahl. Deno, a new way to JavaScript
JS Fest 2019. Ryan Dahl. Deno, a new way to JavaScriptJS Fest 2019. Ryan Dahl. Deno, a new way to JavaScript
JS Fest 2019. Ryan Dahl. Deno, a new way to JavaScript
 
Git and GitHub | Concept about Git and GitHub Process | Git Process overview
Git and GitHub | Concept about Git and GitHub Process | Git Process overviewGit and GitHub | Concept about Git and GitHub Process | Git Process overview
Git and GitHub | Concept about Git and GitHub Process | Git Process overview
 
ArgoUML.ppt
ArgoUML.pptArgoUML.ppt
ArgoUML.ppt
 
Modernización de Aplicaciones
Modernización de AplicacionesModernización de Aplicaciones
Modernización de Aplicaciones
 
오픈소스 GIS 개요
오픈소스 GIS 개요오픈소스 GIS 개요
오픈소스 GIS 개요
 
버전관리를 들어본적 없는 사람들을 위한 DVCS - Git
버전관리를 들어본적 없는 사람들을 위한 DVCS - Git버전관리를 들어본적 없는 사람들을 위한 DVCS - Git
버전관리를 들어본적 없는 사람들을 위한 DVCS - Git
 

En vedette

Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessWork Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessDhawal Thakkar PMP
 
Plan 06 perencanaan manajemen proyek2
Plan 06 perencanaan manajemen proyek2Plan 06 perencanaan manajemen proyek2
Plan 06 perencanaan manajemen proyek2Anggunara Thea
 
El aguila de wilmar ivan G L
El aguila de wilmar ivan G LEl aguila de wilmar ivan G L
El aguila de wilmar ivan G Lwilmar gonzalez
 
E 12 bsp1779_pankajkumarvisualcv
E 12 bsp1779_pankajkumarvisualcvE 12 bsp1779_pankajkumarvisualcv
E 12 bsp1779_pankajkumarvisualcvPankaj Kumar
 
Tugas plkj
Tugas plkjTugas plkj
Tugas plkjhanif003
 
Presentazione Tweetaliano Erasmus/EILC
Presentazione Tweetaliano Erasmus/EILCPresentazione Tweetaliano Erasmus/EILC
Presentazione Tweetaliano Erasmus/EILCg0bb1
 
Hindi kavita laal tamatar
Hindi kavita  laal tamatarHindi kavita  laal tamatar
Hindi kavita laal tamatarRakhi Sharma
 
SMX Melbourne 2012 - Auditing PPC Campaigns - Leigh Hanney
SMX Melbourne 2012 - Auditing PPC Campaigns - Leigh HanneySMX Melbourne 2012 - Auditing PPC Campaigns - Leigh Hanney
SMX Melbourne 2012 - Auditing PPC Campaigns - Leigh HanneyLeigh Hanney
 
ดนตรีสากล
ดนตรีสากลดนตรีสากล
ดนตรีสากลKan Directioner
 

En vedette (20)

Work Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management ProcessWork Breakdown Structure ( WBS) : For a Project Management Process
Work Breakdown Structure ( WBS) : For a Project Management Process
 
Pm Student Ho
Pm Student HoPm Student Ho
Pm Student Ho
 
Plan 06 perencanaan manajemen proyek2
Plan 06 perencanaan manajemen proyek2Plan 06 perencanaan manajemen proyek2
Plan 06 perencanaan manajemen proyek2
 
WBS PROJECT
WBS PROJECTWBS PROJECT
WBS PROJECT
 
Ravi tiwari
Ravi tiwariRavi tiwari
Ravi tiwari
 
Ihm2
Ihm2Ihm2
Ihm2
 
El aguila de wilmar ivan G L
El aguila de wilmar ivan G LEl aguila de wilmar ivan G L
El aguila de wilmar ivan G L
 
Sec Presentation
Sec  PresentationSec  Presentation
Sec Presentation
 
Реализация мероприятий развития государственных программ города Москвы в 2013...
Реализация мероприятий развития государственных программ города Москвы в 2013...Реализация мероприятий развития государственных программ города Москвы в 2013...
Реализация мероприятий развития государственных программ города Москвы в 2013...
 
E 12 bsp1779_pankajkumarvisualcv
E 12 bsp1779_pankajkumarvisualcvE 12 bsp1779_pankajkumarvisualcv
E 12 bsp1779_pankajkumarvisualcv
 
Стимулирование органов местного самоуправления в Москве по итогам первого пол...
Стимулирование органов местного самоуправления в Москве по итогам первого пол...Стимулирование органов местного самоуправления в Москве по итогам первого пол...
Стимулирование органов местного самоуправления в Москве по итогам первого пол...
 
Tugas plkj
Tugas plkjTugas plkj
Tugas plkj
 
T pack presentation
T pack presentationT pack presentation
T pack presentation
 
Presentazione Tweetaliano Erasmus/EILC
Presentazione Tweetaliano Erasmus/EILCPresentazione Tweetaliano Erasmus/EILC
Presentazione Tweetaliano Erasmus/EILC
 
Spm report
Spm reportSpm report
Spm report
 
Radhin 4+
Radhin 4+Radhin 4+
Radhin 4+
 
Hindi kavita laal tamatar
Hindi kavita  laal tamatarHindi kavita  laal tamatar
Hindi kavita laal tamatar
 
SMX Melbourne 2012 - Auditing PPC Campaigns - Leigh Hanney
SMX Melbourne 2012 - Auditing PPC Campaigns - Leigh HanneySMX Melbourne 2012 - Auditing PPC Campaigns - Leigh Hanney
SMX Melbourne 2012 - Auditing PPC Campaigns - Leigh Hanney
 
Kumpulan 1
Kumpulan 1Kumpulan 1
Kumpulan 1
 
ดนตรีสากล
ดนตรีสากลดนตรีสากล
ดนตรีสากล
 

Similaire à Work BreakDown Structure

Work Breakdown Structure Template(1).docx
Work Breakdown Structure Template(1).docxWork Breakdown Structure Template(1).docx
Work Breakdown Structure Template(1).docxShahid Farooq, PMP
 
Implementation-Plan_X_Corp
Implementation-Plan_X_CorpImplementation-Plan_X_Corp
Implementation-Plan_X_CorpJared Bourne
 
Iso12207:2008 standard
Iso12207:2008 standardIso12207:2008 standard
Iso12207:2008 standardMaria Akther
 
Work Breakdown Structure (WBS) TemplateThis Project WB.docx
Work Breakdown Structure (WBS) TemplateThis Project WB.docxWork Breakdown Structure (WBS) TemplateThis Project WB.docx
Work Breakdown Structure (WBS) TemplateThis Project WB.docxambersalomon88660
 
Project Work Breakdown Structure
Project Work Breakdown StructureProject Work Breakdown Structure
Project Work Breakdown StructureDemand Metric
 
Project mgmt life cycle origination
Project mgmt life cycle originationProject mgmt life cycle origination
Project mgmt life cycle originationMujtaba Masood
 
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...Oleg Zhuravlev
 
MSF Process model
MSF Process modelMSF Process model
MSF Process modelunruliness
 
Project Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxProject Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxKareemBullard1
 
project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)Eric Wang
 
Software proposal sample_project_2-_mobile_application_development_by_swpropo...
Software proposal sample_project_2-_mobile_application_development_by_swpropo...Software proposal sample_project_2-_mobile_application_development_by_swpropo...
Software proposal sample_project_2-_mobile_application_development_by_swpropo...Oleg Zhuravlev
 

Similaire à Work BreakDown Structure (20)

Work Breakdown Structure Template(1).docx
Work Breakdown Structure Template(1).docxWork Breakdown Structure Template(1).docx
Work Breakdown Structure Template(1).docx
 
Implementation-Plan_X_Corp
Implementation-Plan_X_CorpImplementation-Plan_X_Corp
Implementation-Plan_X_Corp
 
Iso12207:2008 standard
Iso12207:2008 standardIso12207:2008 standard
Iso12207:2008 standard
 
Work Breakdown Structure (WBS) TemplateThis Project WB.docx
Work Breakdown Structure (WBS) TemplateThis Project WB.docxWork Breakdown Structure (WBS) TemplateThis Project WB.docx
Work Breakdown Structure (WBS) TemplateThis Project WB.docx
 
2nd meeting
2nd meeting2nd meeting
2nd meeting
 
Project Work Breakdown Structure
Project Work Breakdown StructureProject Work Breakdown Structure
Project Work Breakdown Structure
 
PgM ITTOs
PgM ITTOsPgM ITTOs
PgM ITTOs
 
Pmt 01
Pmt 01Pmt 01
Pmt 01
 
Training Report
Training ReportTraining Report
Training Report
 
Iss 05
Iss 05Iss 05
Iss 05
 
Project mgmt life cycle origination
Project mgmt life cycle originationProject mgmt life cycle origination
Project mgmt life cycle origination
 
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
Software proposal sample_project_1-_web_site_development_by_zx_7_of_november_...
 
MSF Process model
MSF Process modelMSF Process model
MSF Process model
 
Archive Documents
Archive DocumentsArchive Documents
Archive Documents
 
Maximo project approach using prince2
Maximo project approach using prince2Maximo project approach using prince2
Maximo project approach using prince2
 
Project Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptxProject Scope Management Chapter 05.pptx
Project Scope Management Chapter 05.pptx
 
project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)
 
Peer Review
Peer ReviewPeer Review
Peer Review
 
Trn 04
Trn 04Trn 04
Trn 04
 
Software proposal sample_project_2-_mobile_application_development_by_swpropo...
Software proposal sample_project_2-_mobile_application_development_by_swpropo...Software proposal sample_project_2-_mobile_application_development_by_swpropo...
Software proposal sample_project_2-_mobile_application_development_by_swpropo...
 

Plus de Abdul Aslam

Challenges of cloud final
Challenges of cloud finalChallenges of cloud final
Challenges of cloud finalAbdul Aslam
 
Star ,Snow and Fact-Constullation Schemas??
Star ,Snow and  Fact-Constullation Schemas??Star ,Snow and  Fact-Constullation Schemas??
Star ,Snow and Fact-Constullation Schemas??Abdul Aslam
 
Job analysis of a reporter
Job analysis of a reporterJob analysis of a reporter
Job analysis of a reporterAbdul Aslam
 
Project Progress Report
Project Progress ReportProject Progress Report
Project Progress ReportAbdul Aslam
 
Components of a Data-Warehouse
Components of a Data-WarehouseComponents of a Data-Warehouse
Components of a Data-WarehouseAbdul Aslam
 
Difference between ER-Modeling and Dimensional Modeling
Difference between ER-Modeling and Dimensional ModelingDifference between ER-Modeling and Dimensional Modeling
Difference between ER-Modeling and Dimensional ModelingAbdul Aslam
 
Transaction Processing System
Transaction Processing SystemTransaction Processing System
Transaction Processing SystemAbdul Aslam
 
Final Year Project (ISP),Project Demo
Final Year Project (ISP),Project DemoFinal Year Project (ISP),Project Demo
Final Year Project (ISP),Project DemoAbdul Aslam
 
Distributed Operating System,Network OS and Middle-ware.??
Distributed Operating System,Network OS and Middle-ware.??Distributed Operating System,Network OS and Middle-ware.??
Distributed Operating System,Network OS and Middle-ware.??Abdul Aslam
 
Software Testing Tool Report
Software Testing Tool ReportSoftware Testing Tool Report
Software Testing Tool ReportAbdul Aslam
 
Cloud Computing
 Cloud Computing Cloud Computing
Cloud ComputingAbdul Aslam
 
Erd For Gift Shop
Erd For Gift ShopErd For Gift Shop
Erd For Gift ShopAbdul Aslam
 

Plus de Abdul Aslam (12)

Challenges of cloud final
Challenges of cloud finalChallenges of cloud final
Challenges of cloud final
 
Star ,Snow and Fact-Constullation Schemas??
Star ,Snow and  Fact-Constullation Schemas??Star ,Snow and  Fact-Constullation Schemas??
Star ,Snow and Fact-Constullation Schemas??
 
Job analysis of a reporter
Job analysis of a reporterJob analysis of a reporter
Job analysis of a reporter
 
Project Progress Report
Project Progress ReportProject Progress Report
Project Progress Report
 
Components of a Data-Warehouse
Components of a Data-WarehouseComponents of a Data-Warehouse
Components of a Data-Warehouse
 
Difference between ER-Modeling and Dimensional Modeling
Difference between ER-Modeling and Dimensional ModelingDifference between ER-Modeling and Dimensional Modeling
Difference between ER-Modeling and Dimensional Modeling
 
Transaction Processing System
Transaction Processing SystemTransaction Processing System
Transaction Processing System
 
Final Year Project (ISP),Project Demo
Final Year Project (ISP),Project DemoFinal Year Project (ISP),Project Demo
Final Year Project (ISP),Project Demo
 
Distributed Operating System,Network OS and Middle-ware.??
Distributed Operating System,Network OS and Middle-ware.??Distributed Operating System,Network OS and Middle-ware.??
Distributed Operating System,Network OS and Middle-ware.??
 
Software Testing Tool Report
Software Testing Tool ReportSoftware Testing Tool Report
Software Testing Tool Report
 
Cloud Computing
 Cloud Computing Cloud Computing
Cloud Computing
 
Erd For Gift Shop
Erd For Gift ShopErd For Gift Shop
Erd For Gift Shop
 

Dernier

Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 

Dernier (20)

LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 

Work BreakDown Structure

  • 2. SOFTWARE PROJECT MANAGEMENT (SPM) Work Breakdown Structure of Insurance Survey Portal (ISP) Submitted To: Madam Aasma Abid Submitted By: Abdul-Rehman Aslam (9998) Yasir Mehmood (9994)
  • 3. Introduction The Work Breakdown Structure presented here represents all the work required to complete this project. It helps to easily communicate the work and processes involved to execute the project. The Project Manager and project team use the WBS to develop the project schedule, resource requirements and costs Outline View 1. Insurance Survey Portal 1.1 Initiation 1.1.1 Evaluation & Recommendations 1.1.2 Develop Project Charter 1.1.3 Deliverable: Submit Project Charter 1.1.4 Project Sponsor Reviews Project Charter 1.1.5 Project Charter Signed/Approved 1.2 Planning 1.2.1 Create Preliminary Scope Statement 1.2.2 Determine Project Team 1.2.3 Project Team Kickoff Meeting 1.2.4 Develop Project Plan 1.2.5 Submit Project Plan 1.2.6 Milestone: Project Plan Approval
  • 4. 1.3 Execution 1.3.1 Project Kickoff Meeting 1.3.2 Verify & Validate User Requirements 1.3.3 Design System 1.3.4 Procure Hardware/Software 1.3.5 Install Development System 1.3.6 Testing Phase 1.3.7 Install Live System 1.3.8 User Training 1.3.9 Go Live 1.4 Control 1.4.1 Project Management 1.4.2 Project Status Meetings 1.4.3 Risk Management 1.4.4 Update Project Management Plan 1.5 Closeout 1.5.1 Audit Procurement 1.5.2 Document Lessons Learned 1.5.3 Update Files/Records 1.5.4 Gain Formal Acceptance 1.5.5 Archive Files/Documents
  • 5. Tabular View Level 1 Level 2 Level 3 1 Insurance Survey 1.1 Initiation 1.1.1 Evaluation & Recommendations Portal 1.1.2 Develop Project Charter 1.1.3 Deliverable: Submit Project Charter 1.1.4 Project Sponsor Reviews Project Charter 1.1.5 Project Charter Signed/Approved 1.2 Planning 1.2.1 Create Preliminary Scope Statement 1.2.2 Determine Project Team 1.2.3 Project Team Kickoff Meeting 1.2.4 Develop Project Plan 1.2.5 Submit Project Plan 1.2.6 Milestone: Project Plan Approval 1.3 Execution 1.3.1 Project Kickoff Meeting 1.3.2 Verify & Validate User Requirements 1.3.3 Design System 1.3.4 Procure Hardware/Software 1.3.5 Install Development System 1.3.6 Testing Phase 1.3.7 Install Live System 1.3.8 User Training 1.3.9 Go Live 1.4 Control 1.4.1 Project Management 1.4.2 Project Status Meetings 1.4.3 Risk Management 1.4.4 Update Project Management Plan 1.5 Closeout 1.5.1 Audit Procurement 1.5.2 Document Lessons Learned 1.5.3 Update Files/Records 1.5.4 Gain Formal Acceptance 1.5.5 Archive Files/Documents