COMPLETE STREETS
    TOOLBOX



Source: Cascade Bicycle Club

                                   Prepared for:
                                Macomb County, MI
                                         by
          William Tardy, Diana Flora, Jonathan Moore, and Isaac Gilman
                     University of Michigan, Taubman College
                                    April, 2011
Acknowledgements                                                     Table of Contents
            Thank you:
             John Paul Rea      Executive Summary…………………………………… .i

           Dr. Susan Charles
                                Introduction …………………………………………......1
         Meagan Masson-Minock
                                Vision, Goals, and Objectives………………………....2
              Julie Stieff

              Paul Coseo        Background……………………………………………..3

             John Crumm         Definition and Benefits………………………………...6

             Bob Hoepfner
                                Design Guidelines………….…………………………..8
             Timothy Kniga
                                Preliminary Plans……………………………..……….15
             Norman Cox

              Eli Cooper        Implementation Tools..………………………………..25

             Luke Forrest       Conclusion………………………………………….....34

            Suzanne Schluz
                                Appendix

                                	     Case Studies..............................................A - 1

                                	     Interviews...................................................B - 1

                                	     Traffic Statistics.........................................C - 1

                                	     Implementation Tools................................D - 1




Page i                          MACOMB COUNTY COMPLETE STREETS TOOLBOX
Executive Summary
Since the first National City Planning Conference in May 1909, the au-          to add non-motorized, Complete Streets, and traffic-calming language.
tomobile has been the centerpiece of American transportation planning.          Public Act 135 amended Public Act 51 of 1951, the Michigan Transporta-
Supported by low energy costs and abundant open space for develop-              tion Fund Act, by requiring that all entities receiving funding from state
ment, this emphasis helped to tie the United States together and facili-        trunkline highway systems allocate 1% of that funding to non-motorized
tate economic growth. In the future, however, reduced natural resource          infrastructure.
availability and increased population density threaten the efficiency of        In response to these policy changes, thirty-five Michigan municipalities
automobile-focused transportation systems. To compensate for these              have adopted Complete Streets resolutions (more than any state in the
changes, planners, engineers, and policy makers must experiment with            country). In the hopes of deepening their commitment to the Complete
a more diverse portfolio of transportation services. As a holistic frame-       Streets agenda, six localities have built upon their resolutions by pro-
work that illustrates how public transit, pedestrian, and cyclist infrastruc-   ducing Complete Street ordinances. Despite this strong environment of
ture can be integrated into new and existing infrastructure, the Complete       progress throughout the state, Macomb County lacks its own organized
Streets system can assist towns, cities, and counties in engaging this          effort.
task.
                                                                                In order to integrate the Complete Streets systems into Macomb County
With regard to the physical parameters of transportation planning, Com-         or any region, it is important to consider the types of design standards
plete Streets is a set of design templates which can be used to create          available. Although the strict nature of these standards change to ac-
safe, convenient multi-modal (automobile, pedestrian, public transit, and       commodate the context of the site, their subjects are consistent; they
cyclist) transportation infrastructure. With respect to the social nature       include:
of transportation planning, Complete Streets also serves as a means to                    •	   Sidewalk design: width, lighting, seating, vegetation, and
assure equitable access to all community members, regardless of eco-                           trash bins
nomic status, age, or physical capacity. To take advantage of these ser-                  •	   Transit rider facilities: shelters, stop signage, maps, trash
vices, in June 2009 the State of Michigan initiated the process of drafting                    bins, and benches
state-wide Complete Streets policy. In addition to the efforts of state                   •	   Pedestrian crossing facilities: signage, signaling, midblock
lawmakers, this development was empowered by the support of advoca-                            crossings, and pedestrian islands
cy groups like the League of Michigan Bicyclists. In August of 2010 the                   •	   Streetscape structure: building setback, building height, and
Michigan legislature passed Public Act 134 and 135 into law. Public Act                        façade design
134 amends the Michigan Planning Enabling Act, allowing municipalities                    •	   Cyclist facilities: bike lanes, bike parking, and recreational

            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                                 Page ii
Executive Summary
           bike paths                                                        existing corridor regulations. The recommendations for each study area
When applying Complete Streets design standards, it is not essential         are as follows:
to apply each and every parameter. In many cases, in fact, issues like              •	   Van Dyke Avenue
heavy traffic or narrow road widths make the application of some stan-                         ◦◦   Phase 1
dards problematic or unsafe. As a consequence, it is helpful to concep-                                ▪▪   Midblock crossings with pedestrian islands
tualize Complete Streets as both an analytic process as well as a set                                       near high foot traffic locations
of design standards. To help illustrate how this process of analysis can                               ▪▪   Additional transit shelters
be executed, this report contains site analyses and design recommen-                           ◦◦   Phase 2
dations for two study areas within Macomb County: Van Dyke Avenue                                      ▪▪   A 7’ on-street parking lane and a 5’ bicycle
between 8 Mile Road and 10 Mile Road, Garfield Road between 17 Mile                                         lane in place of the outer two lanes
Road and Hall Road.                                                                                    ▪▪   Sidewalk bike parking
                                                                                                       ▪▪   Sidewalk extensions across parking lane at
In both study areas, a mix of commercial, institutional, and residential                                    transit stops
areas provide the basic assortment of land uses needed to incentivize               •	   Garfield Road
alternative transportation. In both areas, however, conditions like infre-                     ◦◦   Phase 1
quent pedestrian crossings and transit shelters represent aspects that                                 ▪▪   Pedestrian lighting and street trees
could be strengthened and improved. To address these issues in a politi-                               ▪▪   Sidewalk bike parking
cally and fiscally responsible fashion, this report grouped preliminary                                ▪▪   Additional transit shelters
improvements into two phases along a Complete Streets development                                      ▪▪   Sidewalk extensions across the grassy shoul-
timeline. Phase 1 of this timeline includes improvements which can be                                       der at transit stops
made without interfering with existing patterns of automobile traffic or                       ◦◦   Phase 2
altering standing engineering standards. Phase 2 of this timeline focuses                              ▪▪   Recreational bike path along existing sidewalk
on improvements which can accommodate and facilitate maximum                                           ▪▪   Midblock crossing with pedestrian island
mode shift from automobiles to alternative transportation systems. As        In addition to physical amenities and structures, it is also important to
a result, Phase 2 is conceptualized as a set of initiatives to be applied    conceptualize the Complete Streets system as a set of policy and fi-
when changes in automobile use or political sentiment demands greater        nancial implementation tools. Indeed, without implementation strategies
support for alternative transportation, and often requires deviations from   in place, physical modifications cannot be made. Generally, Complete

     Page iii                                                                MACOMB COUNTY COMPLETE STREETS TOOLBOX
Executive Summary
Streets implementation tools can be broken down into three categories:
public outreach, financial mechanisms, and policy initiatives.


Public outreach tools for Complete Streets focus on investigating com-
munity transportation needs and facilitating public education. For many
communities, Complete Street workshops are the easiest way to ad-
dress both of these needs. When the time and resources permit, con-
ducting walking tours and field visits can be another great option. A
special workshop for business owners highlighting the specific economic
benefits of Complete Streets is a highly recommended way to generate
community buy-in.


Financing tools for Complete Streets can be generally classified as
either direct funding mechanisms or indirect funding mechanisms. Com-
mon direct funding mechanisms include use taxes, sales taxes, and tax-
increment financing. Indirect funding mechanisms are typically federal
and state grants, sidewalk improvement ordinances, and private sector
“adopt a bikeway” campaigns.


Finally, municipalities and Macomb County can enact Complete Streets
resolutions, policies, and ordinances that illustrate the importance of
non-motorized transportation. An implementation timeline serves as a
useful tool from the county perspective on how to engage municipal and
community leaders. The process includes the key players – the county,
the municipality, and the community, including advocacy groups and
constituents. This process is flexible, and there are many ways to reach
a Complete Streets policy.

            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                        Page iv
Introduction
	       In transportation planning, a design framework known as Complete
Streets is a popular system for conceptualizing non-motorized and transit-
focused infrastructure. In addition to serving as a design framework, the
Complete Streets system is also a social framework, integrating all users of the
street – pedestrians, cyclists, transit riders, and drivers. In this way, all ages and
abilities can utilize the street in a safe manner, whether traveling for practical or
recreational purposes.
	
	       In 2010, the Michigan state legislature passed Public Acts 134 and
135, which incorporate Complete Streets design components into existing
transportation legislation. More importantly, the new legislation requires that all
municipalities allocate 1% of their annual transportation budget toward non-
motorized transportation.
	
	       This document is intended to educate Macomb County officials and
decision makers on Complete Streets philosophies and best practices. To reach
this goal, the document includes a series of chapters, reviewing the following
concepts:
        •	   Vision, goals, and objectives for county-wide Complete Streets.
        •	   Summaries and assessments of relevant Complete Street case
             studies.
        •	   Collection of Complete Streets design standards and planning
             policies.
        •	   Model of preliminary Complete Streets plans on Van Dyke Avenue
             (8 to 10 Mile) and Garfield Road (17 Mile to Hall Road).
        •	   Analyses of current Complete Streets policies, practices, and
             procedures.

      Page 1                                                                             MACOMB COUNTY COMPLETE STREETS TOOLBOX
Vision, Goals, and Objectives

                                                                         Vision:
          To equip Macomb County planners and policy makers with the information and tools necessary to plan and design Complete Streets.




                              Goal:                                                                                Goal:
Identify current Complete Streets policy and design standards.                                    Conduct government employee workshops.

                                                                         Goal:
                                                 Identify pertinent local, state, and federal resources.



Objectives:                                                                                                Objectives:
                                                       Objectives:
To be completed by 2011:                                                                                   To be completed by 2011:
                                                      To be completed by 2011:
1. Identify four case study sites with similar
                                                       1. Create a matrix of associated state              1. Create a presentation for county officials
  physical environments and political infra-
                                                          and federal funding sources.                       to take to local planning offices.
  structures.                                                                                              2. Generate preliminary plans on Van Dyke
                                                       2. Produce an annotated map of gov-
2. Draft a template Complete Streets policy                                                                  Avenue between 8 and 10 Mile Road and
                                                          ernmental Complete Streets programs
  for local governmental officials.                                                                          on Garfield Road between 17 Mile and
                                                          in Michigan.
3. Create a Complete Streets policy time-                                                                    Hall Road to illustrate the integration of
                                                       3. Create a list of policy and financing al-
  line.                                                                                                      Complete Streets within Macomb County.
                                                          ternatives complimentary to the Com-
4. Create a physical amenity and design                                                                    To be completed by 2015:
                                                          plete Streets mission.
  timeline.                                                                                                3. Conduct workshops for all municipal
                                                       Ongoing:
Ongoing:                                                                                                     planning entities within Macomb County.
                                                       4. Conduct an annual review of available
5. Conduct an annual review of
                                                          resources and programmatic needs.
  best practices.


              MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                       Page 2
Background
	      Michigan’s effort to create a state-wide Complete Streets               Streets, and traffic-calming language.5 In June 2010, the House
policy began in June of 2009 when Complete Streets language was                Transportation Committee unanimously passed both bills, and by the
first introduced into a transportation bill.1 Although state lawmakers         end of the month, the Michigan House of Representatives passed the
contributed to this development, a central motivating factor was pressure      legislation with an overwhelming majority.6
from advocacy groups to create safer and more accessible streets for
pedestrians and cyclists. The League of Michigan Bicyclists (LMB) in           On July 21, 2010, the Senate Transportation Committee unanimously
particular advocated for Complete Streets policies in order to promote         voted to pass the Complete Streets legislation for a formal vote in
walkability and an active lifestyle. The LMB’s stance developed after          the Senate.7 Seven days later, the Senate approved the Complete
a 2009 national report by the Trust for America’s Health, which found          Streets legislation, passing both bills into Michigan law.8 Public Act 134
Michigan to be the ninth most obese state.2                                    enables municipalities to create master plans that support “a system of
                                                                               transportation to lessen congestion on streets and provide for safe and
	      Because state officials began to see the success of Complete            efficient movement of people and goods by motor vehicles, pedestrians,
Streets at local levels of government, the legislature included Complete       and other legal users.”9
Streets language into its 2010 transportation budget. The bill stated,
“the department [the Michigan Department of Transportation (MDOT)]             Subsequently, Public Act 135 amended Public Act 51, which governs the
shall provide assistance to and coordinate with local road agencies            expenditures of state transportation funding.10 First, the bill classified
and metropolitan planning organizations in developing Complete Street          “all public roads, streets and highways” in Michigan.11 Next, the bill set
policies, including the development of model complete street policies.”3       up a transportation fund for Michigan to draw money from a specific tax
Although this policy did not result in a legislative requirement, it created   on automobile fuel.12 From this transportation fund, 1% of resources
a foundation for continued Complete Streets efforts.                           “shall be expended for construction or improvement of non-motorized
                                                                               transportation services and facilities.”13 Finally, the bill defined Complete
By May 2010, the State House voted on the Complete Streets legislation         Streets and arranged for the Michigan Transportation Commission to set
in the form of two separate transportation bills.4 One bill (Public Act        up a Complete Streets policy within two years of the bills’ adoption. This
135) focused on MDOT’s financial appropriations for Complete Streets           policy would promote best practices and philosophies when building new
policies, and the other bill (Public Act 134) focused on reforming the         infrastructure.14
Michigan Planning Enabling Act to add non-motorized, Complete
                                                                               Since the passage of the first Complete Streets ordinance and the major

     Page 3                                                                    MACOMB COUNTY COMPLETE STREETS TOOLBOX
Background
Complete Streets and non-motorized bills, Michigan has strived to make
streets as accessible, safe, and active as possible. Currently, thirty-          State-wide locations of Complete Streets Laws, Policies,
five Michigan municipalities – from the Upper Peninsula to Ann Arbor                              Resolutions, and Plans
– adopted Complete Streets resolutions, more than any other state in
America.15 In addition, six localities have produced Complete Street
ordinances since Lansing passed its ordinance in 2009.


Although the state of Michigan continues with its fantastic success
promoting Complete Streets policies, Macomb County lacks its own
organized effort as of 2011 (See Figure 2). Despite overall population
decline in Southeast Michigan, Macomb County’s population is projected
to grow in the coming decades. To assure adequate transportation
services for this new constituent base, developing non-motorized and
public transportation services is necessary.



                                                                                          Legend

                                                                                 Statewide Complete Streets Law

                                                                                 Complete Streets Ordinances

                                                                                 Non-motorized Plan

                                                                                 Complete Streets Resolutions



                                                                          Figure 1. Locations of Complete Streets Resolutions, Policies and Laws in Michi-
                                                                          gan.     Source:Google Maps and Complete Streets Coalition




            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                               Page 4
Background
                                                                                   REFERENCES:
         SE Michigan locations of Complete Streets Laws,                           1.League of Michigan Bicyclists. (2009, June 22). House Transportation
                Policies, Resolutions, and Plans                                   Appropriations Subcommittee Passes Complete Streets in Funding Bill. In
                                                                                   Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www.
                                                                                   micompletestreets.org.
                                                                                   2.League of Michigan Bicyclists. (2009, July 9). F as in Fat 2009. In
                                                                                   Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www.
                                                                                   micompletestreets.org.
                                                                                   3.League of Michigan Bicyclists (2009, Nov. 4).Transportation Budget Includes
                                                                                   Complete Streets. In Michigan Complete Streets Coalition. Retrieved
                                                                                   4/15/2011, from http://www.micompletestreets.org.
                                                                                   4.League of Michigan Bicyclists, (2010, May 7). Complete Streets Legislation
                                                                                   Introduced in Michigan House. In Michigan Complete Streets Coalition.
                                                                                   Retrieved 4/15/2011, from http://www.micompletestreets.org.
                                                                                   5.Ibid. Complete Streets Legislation Introduced in Michigan House.
                                                                                   6.Rappj2. (2010, June 24).Complete Streets Success! In Michigan Complete
                                                                                   Streets Coalition. Retrieved 4/15/2011, from http://www.micompletestreets.
                                                                                   org.; Emily, Theresa. (2010, June 29). On to the Senate! In Michigan Complete
                                                                                   Streets Coalition. Retrieved 4/15/2011, from http://www.micompletestreets.org.
                                                                                   7.Emily, Theresa. (2010, July 21). Onto the Senate Floor! In Michigan Complete
                                                                                   Streets Coalition. Retrieved 4/15/2011, from http://www.micompletestreets.org.
                                                                                   8.League of Michigan Bicyclists. (2010, July 28). Senate Approves Complete
                                                                                   Streets Legislation. In Michigan Complete Streets Coalition. Retrieved
                                                                                   4/15/2011, from http://www.micompletestreets.org.
                                                                                   9.Michigan Planning Enabling Act. 2010 PA 134. (MCL § 125).
             Legend                                                                10.State Trunk Line Highway System. 2010 PA 135. (MCL § 247).
                                                                                   11.Ibid. 2010 PA 135.
                                                                                   12.Ibid. 2010 PA 135.
    Statewide Complete Streets Law
                                                                                   13.Ibid. 2010 PA 135.
                                                                                   14.Ibid. 2010 PA 135.
    Complete Streets Ordinances
                                                                                   15.League of Michigan Bicyclists. (2011, April 4). Union Township Passes
                                                                                   Complete Streets Resolution. In Michigan Complete Streets Coalition.
    Non-motorized Plan
                                                                                   Retrieved 4/15/2011, from http://www.micompletestreets.org.
    Complete Streets Resolutions

Figure 2. Locations of Complete Streets Resolutions, Policies and Laws in South-
east Michigan. Source:Google Maps and Complete Streets Coalition




      Page 5                                                                       MACOMB COUNTY COMPLETE STREETS TOOLBOX
Definition and Benefits
Complete Streets attempts to better integrate all users of the street –             crashes and other injuries caused by poorly-maintained
pedestrians, cyclists, transit riders, and drivers - so that all ages and           infrastructure.2
abilities are able to utilize the street in a safe manner, whether traveling   •	   For residents with safe places to walk within ten minutes of
for practical or recreational purposes.                                             their home, 43% met recommended activity levels.3
                                                                               •	   Using public transit reduces the amount of congestion and
Over the past seventy years, towns, cities, and counties interpreted                can save individuals $9,581 each year.4
transportation planning as trying to get one person from point A to            •	   Reducing one car trip each month cuts, 3,764 tons of CO2
point B as fast as possible. The car created a culture where people                 each year.5
expected to drive everywhere instead of relying on other methods of            •	   By shifting traffic from automobiles to alternative modes,
transportation. Roads became the focal point for all transportation                 Complete Streets road projects can diminish costs by
planners and engineers. When congestion became a problem, more                      reducing the need to widen roads for additional traffic.6
roads were built or current roads were widened. Today, with limited
space and resources, auto-centric planning is becoming more difficult.


Complete Streets offers an alternative to auto-centric planning and
allows for better transportation options for a variety of users. According
to Eli Cooper, the Transportation Manager of the City of Ann Arbor
Planning Department, “‘We must go back to good old-fashioned
planning.”1 Before the automobile culture took hold in American cities,
planners accounted for pedestrians, trolleys, cars, and cyclists. All of
those factors led to the busy street life seen in historic photographs of
New York City, Chicago, and Detroit (See Figure 3).


The Complete Streets approach also offers economic, social,
environmental, and health benefits.
       •	   A well-integrated street can improve safety by reducing
            pedestrian risk by up to 28%, including pedestrian-vehicle

            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                    Page 6
Definition and Benefits
                                                               REFERENCES:
                                                               1.Gilman, Isaac. (2011, March 14). Interview with E. Cooper, Transportation
                                                               Project Manager for the City of Ann Arbor, MI.
                                                               2.Benefits. In National Complete Streets Coalition. Retrieved 4/15/2011,
                                                               from http://www.completestreets.org/complete-streets-fundamentals/
                                                               factsheets/#benefits.
                                                               3.Complete Streets FAQ. In National Complete Streets Coalition. Retrieved
                                                               4/15/2011, from http://www.completestreets.org/complete-streets-fundamentals/
                                                               complete-streets-faq/
                                                               4.Benefits. In National Complete Streets Coalition. Retrieved 4/15/2011, from
                                                               http://www.completestreets.org/complete-streets-fundamentals/complete-
                                                               streets-faq/
                                                               5.Benefits. In National Complete Streets Coalition. Retrieved 4/15/2011,
                                                               from http://www.completestreets.org/complete-streets-fundamentals/
                                                               factsheets/#benefits.
                                                               6.Benefits. In National Complete Streets Coalition. Retrieved 4/15/2011,
                                                               from http://www.completestreets.org/complete-streets-fundamentals/
                                                               factsheets/#benefits.




Figure 3. Picture of Detroit’s Woodward Street, Circa 1930’s
Source:At Detroit




      Page 7                                                   MACOMB COUNTY COMPLETE STREETS TOOLBOX
Design Guidelines
The main concept of Complete Streets seems simple at first: make                           hour (mph) or less, typically with four or more lanes of traffic

streets accessible to all types of users. There are, however, many                    •	   Avenues: roads with speeds of 25 to 35 mph, not exceeding

elements that go into Complete Streets design. The physical expression                     four lanes of traffic.

of the Complete Streets concept is different for each street. This set of             •	   Streets: roadways with speeds of 25 mph or less typically

guidelines is a sampling of some of the basic and crucial elements for a                   with two lanes of traffic.1

complete street.                                                             SIDEWALK SETBACKS:
                                                                             Sidewalk setbacks regulate the distance between the start of the

These guidelines are presented in their ideal form. Transportation           building and the sidewalk (. Recommended building setback distances

planning seldom occurs in an ideal world with no physical or fiscal          vary according to density and land use, but are uniform across the

constraints. Therefore, these guidelines are not an exhaustive list of all   Boulevard, Avenue, and Street roadway types (See Table 1).2

the possible improvements. They are a flexible starter kit for designing     Table 1: Recommened setback width for different areas
Complete Streets in a community.                                                                       Suburban          General Urban      Urban Core
                                                                                Residential              20 feet            15 feet            10 feet
                                                                                Commercial                5 feet             0 feet             0 feet
This chapter uses road type definitions from the Institute of
                                                                             Streetside Elements:
Transportation Engineers’ book, “Designing Walkable Urban                    The streetside encompasses all of the potential elements from the side-
Thoroughfares: A Context Sensitive Approach”. The authors recommend          walk to the curb, including sidewalks, landscaping between the sidewalk
                                                                             and curb, lighting, transit stops, and street furniture amenities (See Table
practices on three basic roadway types: Boulevards, Avenues, and
                                                                             2-4).3
Streets.



       •	   Boulevards: long corridors with travel speeds of 35 miles per


            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                            Page 8
Design Guidelines
Table 2:Recommended sidewalk widths - Suburban Areas
                           Residential           Commercial
      Boulevard               6 feet                6 feet
       Avenue                 6 feet                6 feet
        Street                6 feet                6 feet

Table 3:Recommended sidewalk widths - General Urban Areas
                           Residential           Commercial
      Boulevard             10 feet                10 feet
       Avenue                9 feet                9 feet
        Street               6 feet                6 feet

Table 4:Recommended sidewalk widths - Urban Core Areas        Figure 4. Example of a shared-use sidewalk with a dedicated bike lane on the left and
                                                              pedestrian lane on the right.
                            Residential          Commercial
      Boulevard              10 feet               10 feet    Source:Burbank Bus

       Avenue                 9 feet                9 feet
        Street                6 feet               6 feet     Shared-Use Sidewalk:
                                                              A shared-use sidewalk allows for a bicycle lane alongside the pedestrian
                                                              sidewalk (See Figure 4). An on-street bicycle lane is preferred, because
                                                              shared-use sidewalks can lead to more bike/car conflict at intersections
                                                              as well as bike/pedestrian conflict on the sidewalk. However, this option
                                                              gives cyclists separate space from pedestrians and traffics in places
                                                              with significantly larger setbacks or in places where alterations to the
                                                              roadway are less desirable. The recommended width of the bicycle lane
                                                              is 4.5 feet to 5.5 feet.4




    Page 9                                                    MACOMB COUNTY COMPLETE STREETS TOOLBOX
Design Guidelines

                                                                                 Table 6: Widths of pedestrian buffers - General Urban Areas
                                                                                                            Residential               Commercial
                                                                                 Boulevard                  8 feet                    7 feet
                                                                                 Avenue                     8 feet                    6 feet
                                                                                 Street                     6 feet                    6 feet


                                                                                 Table 7: Widths of pedestrian buffers - Urban Core Areas
                                                                                                            Residential               Commercial
                                                                                 Boulevard                  7 feet                    7 feet
                                                                                 Avenue                     6 feet                    6 feet
                                                                                 Street                     6 feet                    6 feet


                                                                                 Streetside Furnishings:
                                                                                 Streetside furnishing, such as benches, lighting, transit shelters, utilities,
 	     Figure 5. Example of a sidewalk and setback section. Source: Planetizen   and landscaping, should go in a designated area of the pedestrian
                                                                                 buffer, located between the curb and the pedestrian throughway (See
Pedestrian Buffers:                                                              Figure 6).
Pedestrian buffers, usually landscaped strips, separate sidewalk users
from traffic (See Figure 5). There should be at least 1.5 feet of space          Utilities should be underground where possible to avoid clutter and
between the buffer and the curb, to allow for vehicle overhangs and              potential conflict with trees. The placement and frequency of streetside
opening doors (See Table 5-7).5,6                                                furnishing varies depending on the context of the street. Some features
                                                                                 can even have multiple uses; for example, a raised planter can also
Table 5: Widths of pedestrian buffers - Suburban Areas                           provide a place to sit. Street furniture like trash receptacles and benches
                            Residential                  Commercial
                                                                                 should be placed in high-priority locations, such as:
Boulevard                   8 feet                       7 feet
                                                                                         •	   High-use bus stops.
Avenue                      6 to 8 feet                  6 feet
Street                      5 feet                       6 feet                          •	   Major buildings.



            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                              Page 10
Design Guidelines
         •	   Main streets.                                                   •	   Proximity to major destinations and pedestrian areas.
         •	   Areas with a mix of uses like retail and dining.7               •	   Presence of street crossing options.
                                                                              •	   Proximity to major route transfer points.
                                                                              •	   Average of 400 to 500 feet between stops.
                                                                              •	   Up to 2,000 feet for rapid transit and express lines.


                                                                       Form principles:	
                                                                              •	   Elements in furnishing zone that do not block sight lines to
                                                                                   and from buses.
                                                                              •	   Adequate space for deployment of wheelchair lifts and other
                                                                                   boarding aids.
                                                                              •	   All-weather surface at all stops for boarding/exiting.
                                                                              •	   Close proximity to street lighting or own source of
                                                                                   illumination.
                                                                              •	   An 80-foot no-parking zone around bus stops in areas where
                                                                                   on-street parking is present.
                                                                              •	   Highly-visible signs detailing route number(s), bus company
                                                                                   contact information, and no-parking zones.
Figure 6. Example of streetside furnishing elements.
Source:Oregon Live                                                            •	   Shelters present at high-volume stops capable of serving the
                                                                                   expected number of users (See Figure 7).8
Bus Stop Locations and Form:
Many factors go into deciding where to place bus stops and shelters,
such as ridership patterns and local budgets. The following general
principles dealing with location and form ensure that bus stops help
make transit accessible and useful to the most users possible.
	
Location principles:

     Page 11                                                           MACOMB COUNTY COMPLETE STREETS TOOLBOX
Design Guidelines
                                                                                  •	   Shoulders should be at least 4 feet wide for cyclists and up to
                                                                                       5 feet wide in areas with traffic speeds of 50 mph or greater.


                                                                           Wide Curb Lanes:
                                                                                  •	   Curb-side lanes that are at least 14 feet wide can
                                                                                       accommodate cyclists. Under these conditions, motorists do
                                                                                       not have to change lanes to pass cyclists.
                                                                                  •	   Shared-roadway street markings (“sharrow”) can make
                                                                                       drivers more aware of cyclists sharing the roadways.


                                                                           Bike Lane and On-Street Parking:
                                                                                  •	   The combined width of a bike lane with on-street parking
                                                                                       should be at least 12 feet, due to the dangers present of
                                                                                       parked and moving cars.
                                                                                  •	   The bike lane itself should be 5 feet wide.
                                                                                  •	   Do not place bike lanes between parking and the curb.
Figure 7. Example of a transit shelter.
Source:GenenTech Headquarters, San Francisco
                                                                           Dedicated Bike Lanes:
On-Street Bicycle Lane Options:                                                   •	   The minimum width from curb or guardrail to the striping edge
Ideally, cyclists should be off the sidewalk for safety reasons. The                   of the bike lane should be at least 4 feet; 5 feet is the optimal
following elements are options for accommodating bicycle travel in the                 width (See Figure 8).
roadway.                                                                          •	   A 6 to 8 inch white line should separate the bike lane from the
                                                                                       traffic lane. An additional 4-inch line is useful for separating
Paved Shoulders:                                                                       the on-street parking from the bike lane.
        •	   In rural areas or areas without a sidewalk, paving the road          •	   Bike lanes should usually stop at signalized crossings.9
             shoulder provides a place for cyclists out of traffic.


             MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                       Page 12
Design Guidelines
                                                                                       crossing opportunities to 200 to 300 feet.
                                                                                  •	   Near major pedestrian destinations, such as schools, retail
                                                                                       centers and parks.
                                                                                  •	   100 feet from nearest driveway or side street, if possible.
                                                                                  •	   On roadways with 12,000 or less average daily traffic volume
                                                                                       (ADT), if possible.
                                                                                  •	   Where pedestrian and driver sightlines allow ample time to
                                                                                       make an appropriate decisions.
                                                                                  •	   Signalize crossings in areas where pedestrians wait more
                                                                                       than 60 seconds for a gap in traffic.


                                                                           Pedestrian Refuge Island:


                                                                           Pedestrian refuge islands are placed in the center of a midblock crossing

Figure 8. Example of a bike lane with on-street parking                    to give pedestrians a safe place to stop halfway if necessary.
Source:SFGate                                                                     •	   Place a refuge island on roadways with 12,000 to 15,000
                                                                                       ADT.
Mid-Block Crossings:                                                              •	   Pedestrian refuge islands should also be considered for
In areas with long blocks and great distances between crossings,                       roads wider than 60 feet or with more than four lanes of
midblock crossings allow pedestrians to cross the street safely. Without               traffic.
midblock crossings, pedestrians often walk farther than necessary (See            •	   Place pedestrian islands in midblock crossings where the
Figure 9).                                                                             average pedestrian is likely to walk slower than 3.5 feet per
                                                                                       second (e.g., areas with a lot of schoolchildren, elderly or
Place midblock crossings at the following locations:                                   disabled people).
         •	   When signalized intersections are greater than 400 feet             •	   Pedestrian islands should have a minimum width of 6 feet
              apart.                                                                   and a minimum length of 20 feet.
         •	   When midblock crossings will decrease distance between


     Page 13                                                               MACOMB COUNTY COMPLETE STREETS TOOLBOX
Design Guidelines
Midblock Crossing Form:                                                                  REFERENCES:
         •	   Conform to guidelines for the disabled.                                    1.Institute of Transportation Engineers. (2010). Designing Walkable Urban Thorough-
                                                                                         fares: A Context Sensitive Approach. Washington, DC: Institute of Transportation
         •	   Use ramps or channels to and from sidewalk (and refuge                     Engineers. Pg. 52.
              island if applicable).                                                     2.Ibid. Pg. 70-71.
                                                                                         3.Ibid.
         •	   Use overhead safety lighting on approach sides of both ends                4.City of Ann Arbor Planning and Development Services
              of the crossing.                                                           and the Alternative Transportation Program. (2007). Ann Arbor Non-motorized
                                                                                         Transportation Plan 2007. Pg. 24-28. Retrieved 4/15/2011, from http://www.a2gov.org/
         •	   Use high-visibility crossing markings and consider adding                  government/communityservices/planninganddevelopment/planning/Documents/Mas-
              yield markers.                                                             ter%20Plans
                                                                                            /AANoMo_MasterPlan_2007.pdf.>
         •	   Use a “Z” crossing configuration with crossings at medians to              5.Institute of Transportation Engineers. (2010). Designing Walkable Urban Thorough-
              encourage pedestrians to look for oncoming traffic.10                      fares: A Context Sensitive Approach. Washington, DC: Institute of Transportation
                                                                                         Engineers. Pg. 124.
                                                                                         6.Ibid. Pg. 70-71.
                                                                                         7.Ibid. Pg. 126.
                                                                                         8.Ibid. Pg. 162-165.
                                                                                         9.AASHTO Task Force on Geometric Design. (1990). Guide for the Development of
                                                                                         Bicycle Facilities. Washington, DC: American Association of Highway and Transporta-
                                                                                         tion Officials. Pg. 16-26.
                                                                                         Institute of Transportation Engineers. (2010). Designing Walkable Urban Thoroughfares:
                                                                                         A Context Sensitive Approach. Washington, DC: Institute of Transportation Engineers.
                                                                                         Pg 124.




Figure 9. Example of a midblock crossing with pedestrian island and “z” configuration.
Source:Southwest Neighborhoods Inc.




               MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                                         Page 14
Preliminary Plans
Purpose:                                                                                              foundation for future incremental change within
In areas where large amounts of new development are occurring, the                                    the project area.
Complete Streets design standards from the previous chapter could                   •	   Phase 2 includes a set of design recommendations that
be applied in a strict, literal fashion. Given resource and financial                    significantly improve the resources available for alternative
restrictions, however, the redevelopment of existing infrastructure is                   transportation and in some cases significantly change current
likely to overshadow new development. To be applied in these common                      patterns of automobile traffic.
scenarios, Complete Streets tenets must be broken into individual                                ◦◦   Goal: To build upon the momentum established
elements that can be implemented based on the needs of the project                                    in Phase I and integrate all major transportation
area.                                                                                                 groups.


To help illustrate this process, this chapter shows how Complete Streets
                                                                            Van Dyke Avenue: 8 Mile Rd. to 10 Mile Rd.
programs can be applied within Macomb County. The study areas used
                                                                            Existing Conidtions:
in this illustration are Van Dyke Avenue between 8 Mile Road to 10 Mile
                                                                            Van Dyke Avenue is a major surface road that runs north through
Road, and Garfield Road between 17 Mile Road and Hall Road. Both
                                                                            Macomb County from Lynch Road to 27 Mile Road. For the portion
hypothetical plans begin with a short review of current use patterns,
                                                                            included in the study area, Van Dyke Avenue consists of three
existing roadway design, and surrounding patterns of land use. Based
                                                                            northbound lanes, three southbound lanes, and one middle turning lane
on these issues, each plan then progresses to two alternative designs
                                                                            (approximately 77.5 feet). Either side of Van Dyke Avenue is bordered
that represent two phases on a Complete Streets development timeline.
                                                                            by 10 feet of sidewalk, creating a total right-of-way width of about 110
These plans follow the recommended guidelines when possible,
                                                                            feet (See figure 10).
illustrating how Complete Streets elements can adapt to the existing site
characteristics.
        •	   Phase 1 of this timeline emphasizes design changes that can
             be implemented with few changes to the existing patterns
             of automobile use and no alterations to current traffic
             engineering guidelines.
                                                                                                      12’   11’    11’ 9’6”     11’   11’       12’
                    ◦◦   Goal: To establish a physical and social
                                                                            Figure 10. Cross Section of Van Dyke Avenue Created by Will Tardy



     Page 15                                                                MACOMB COUNTY COMPLETE STREETS TOOLBOX
Preliminary Plans
According to SEMCOG’s latest 24-hour traffic counts (6/29/2010), the
two-mile Van Dyke study area carries approximately 30,000 vehicles
per day.1 Over the course of the day, traffic is heaviest from 11am to 12
am (approx. 1740 vehicles/hour), and from 3 pm to 6 pm (approx. 2136
vehicles/hour).2 The distribution of traffic between travel directions is
very even with only a slight advantage of northbound over southbound
in the later morning.3 The posted speed limit within the Van Dyke study
area is 35 mph. To see more information on current traffic statistics
                                                                                        Legend
within the Van Dyke study area, please see Appendix: Traffic Statistics.
                                                                                Deciduous Woodlands

                                                                                Open Space, Developed
The pedestrian facilities within the Van Dyke study area consist of
                                                                                Developed, Low Intensity
signalized crossings at stoplights, abundant pedestrian lighting, small
                                                                                Developed, Med Intensity
commercial setbacks, and trash bins. Available amenities for transit
                                                                                Developed, High Intensity
riders include signed bus stops and a transit shelter at the 9 Mile Road-
Van Dyke stop. Currently no facilities exist for cyclists.

                                                                            Figure 11. Land Use Map of Van Dyke Corridor Created by Will Tardy
Land use along the Van Dyke study area is predominately light
                                                                            Source: 2006 USGS NLDC Land Cover Survey
commercial, backed by residential land uses (see Figure 11). Typical
businesses include automobile service stations, used car dealers, fast-
                                                                            Analysis:
food restaurants, and small retail shops. The neighboring residential
                                                                            With a wide variety of land uses, small commercial setbacks, and
areas are predominately single-family homes. The nearest industrial
                                                                            continuous sidewalks, the Van Dyke study area has many of the
land uses are located a mile west on Mound Road. The public land uses
                                                                            underlying infrastructural components of Complete Streets design.
within a mile of the Van Dyke study area include three parks and Lincoln
                                                                            Planners and engineers can build on this foundation by increasing
High School.
                                                                            the number of amenities for users of non-motorized and public
                                                                            transportation. Key issues to be addressed by these amenities include:




            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                               Page 16
Preliminary Plans
       •	   Increasing the availability of safe street crossings,             Phase 1 also recommends increasing the number of transit shelters
       •	   Incentivizing the use of public transit, and                      available. To educate riders on the availability of buses, schedules
       •	   Creating spaces where the community residents, particularly       should be posted within each shelter.
            the area’s school-aged youth, feel comfortable cycling.
                                                                              Table 8. SWOT Analysis for Van Dyke Phase 1

As a complete system of built space and lifestyles, the current design of
                                                                                                              Pros                    Cons
                                                                                                           STRENGTHS               WEAKNESSES
Van Dyke represents huge investments of financial and social capital.
As a result, initiatives that threaten these investments would likely be                                  Minimal Impact          Minimal Service
politically imprudent and fiscally wasteful. Therefore, the introduction of                              of Existing Traffic        Provision for
these amenities should be incremental and thoroughly vetted through                   Present                Patterns                   Cyclists
                                                                                                                                 Facilitates midblock
public meetings.
                                                                                                                                  crossing in high
                                                                                                                                      traffic area
Implementation:
Phase 1: The first step proposed within the Van Dyke study area is                                       OPPORTUNITIES                THREATS
the installation of pedestrian islands within the middle turning lane. To
                                                                                                          Creates a base            Generates
facilitate safe and convenient street crossings, these islands should                 Future
                                                                                                          for incremental            additional
be located at block midpoints. To assure that these structures draw                                         investment           maintenance costs
in pedestrians and alert drivers, islands should be accompanied by
signage and crosswalk striping (see Figure 12). On some segments              Note: SWOT (Strength, Weakness, Opportunity, and Threats) analysis
                                                                              is used to provide a holistic and transparent review of planning
of Van Dyke, existing driveway locations will make the installation of        recommendations
pedestrian islands problematic. In these cases, because there are a
limited number of viable businesses, planners should place midblock
                                                                              Phase 2: To complete the conversion of the Van Dyke study area into
crossings to accommodate established business interests. In locations
                                                                              a Complete Streets corridor, Phase 2 proposes the conversion of both
of close proximity (1 mile) to schools, parks, and other public spaces,
                                                                              outer two driving lanes into a curbside 7-foot parking lane and a 5-foot
however, priority should be granted to the placement of pedestrian
                                                                              bicycle lane. Since this change in vehicular traffic pushes buses away
crossing amenities (see the Proposed Plan Maps section in the
                                                                              from the curb, this phase also includes 7-foot sidewalk extensions at
appendix for more details). To incentivize the use of public transit,

     Page 17                                                                  MACOMB COUNTY COMPLETE STREETS TOOLBOX
Preliminary Plans
intersections and in the middle of large blocks to assure transit riders do
not need to step off the curb to board (see Figure 13).
                                                                              Table 9. SWOT Analysis for Van Dyke Phase 2
The goal of Phase 2 is to maximize and accommodate the shift of users                                        Pros                   Cons
from automobile traffic to alternate transportation means. However,                                       STRENGTHS              WEAKNESSES
planners and engineers will drastically redefine the structure of the
corridor and likely encounter negative public response. To accommodate
                                                                                                          Maximizes the        Requires significant
                                                                                                           likelihood of        changes in traffic
and perhaps prevent these concerns from arising, establishing public                 Present
                                                                                                             mode shift              patterns
support through education and design charrettes is essential.                                                                   Likely to generate
                                                                                                                                  public protest

                                                                                                        OPPORTUNITIES               THREATS

                                                                                                           Creates the        Requires similar and
                                                                                                          opportunity to      concurrent efforts in
                                                                                      Future            radically redefine    neighboring areas to
                                                                                                        the character and      reach full potential
                                                                                                         perception of the
                                                                                                          neighborhood

                                                                              Note: SWOT analysis is used to provide a holistic and transparent
                                                                              review of planning recommendations




            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                      Page 18
Preliminary Plans


                                                       Figure 12. Phase 1 of Van Dyke
                                                       Ave. Created by Jonathan Moore

                                                       1.Mid-Block Crossing with
                                                       Road Striping

                                                       2.Transit Shelters




                                                 2     Figure 13. Phase 2 of Van Dyke
                                                       Ave. Created by Jonathan Moore

                                                       1.On Street Parking with
                                                       Bicycle Lane
                       1
                                                       2.Bike Parking

                                                       3.Sidewalk Extensions



                3



Page 19                    MACOMB COUNTY COMPLETE STREETS TOOLBOX
Preliminary Plans
Garfield Road: 17 Mile Rd. to Hall Mile Rd.
Existing Conidtions:
Garfield Road is a principal arterial that runs north through Macomb
County from 14 Mile Road to 22 Mile Road. The portion of roadway
included in the study area (17 Mile to Hall Road) consists of two
northbound lanes, two southbound lanes, and one middle turning lane                   6’        25’          12’   11’ 9’6” 11’ 12’          25’       6’
(approx. 55.5 feet). Either side of Garfield Road is bordered by 25 feet    Figure 14. Cross Section of Garfield Rd. Created by Will Tardy
of grassy shoulder and 10 feet of sidewalk, creating a total right-of-
way width of about 120 feet (see Figure 14). According to SEMCOG’s          The existing pedestrian facilities within the Garfield study area consist
latest 24-hour traffic counts (3/25/2009), this three-mile segment of       of signalized crossing at stoplights and non-continuous sidewalks.
                                                       4
road carries approximately 20,000 vehicles per day. The concentration       For transit riders, the available amenities consist of signed bus stops.
of traffic within the Garfield study area peaks between 11am and 12         Currently no facilities exist for cyclists.
am (approx. 2600 vehicles/hour) and from 2 pm to 5 pm (approx 2576
vehicles/hour).5 The distribution of traffic between travel directions is   Land use within the Garfield study area is predominately commercial
generally heavier in the northbound lanes. In the section of Garfield
                                              6
                                                                            and institutional, with residential land uses behind (see Fig 15). Typical
between19 Mile Road and Hall Road, however, northbound traffic was          commercial land uses include small banks, restaurants, department
one-quarter of the daily southbound traffic (presumably because of          stores, and strip mall developments. The institutional land uses on
people exiting Garfield for Macomb Community College).7 The posted          Garfield include the extensive campus of Macomb County Community
speed limit within the Garfield study area is 45 MPH. To see more           College (MCCC), Henry Ford Macomb Hospital, and Wyandot Middle
information on current traffic statistics within the Van Dyke study area,   School. Residential areas within the study area are predominately
please see Appendix # : Traffic Statistics.                                 single-family homes. Along Garfield there are a few multi-unit residential
                                                                            developments, particularly near MCCC. Within a half-mile radius of the
                                                                            Garfield study area, there are no parks or public land uses other than
                                                                            Wyandot Middle School.




            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                                 Page 20
Preliminary Plans
                                                                           development, and reduced setbacks to resolve this issue.8,9 In the
                                                                           immediate future, however, public support for low-density development
                                                                           reduces the political effectiveness of zoning initiatives.10 As an
                                                                           alternative, planners and engineers can support Complete Streets by
                                                                           focusing on improving pedestrian, cyclist, and transit rider amenities.
                                                                           In the non-motorized section of its Long Range Plan, the Macomb
                                                                           County Road Commission creates a convenient base for this initiative by
                                                                           showcasing the regional recreational bike-pedestrian paths developing
         Legend                                                            within the county.11
     Deciduous Woodlands                                                   	
     Open Space, Developed                                                 Phase 1: The first step proposed for the Garfield study area is the
     Developed, Low Intensity                                              installation of four key pedestrian and transit rider amenities (See Figure
    Developed, Med Intensity                                               16). The most critical of these amenities is pedestrian lighting. With

     Developed, High Intensity
                                                                           Wyandot Middle School located directly on Garfield, this investment
                                                                           will not only increase safety for the general public, but also support
                                                                           the ability of students to walk to school. The second most critical
                                                                           infrastructure investment is extending the sidewalks through the grassy
Figure 15. Land Use Map of Garfield Corridor. Created by Will Tardy
                                                                           shoulder at transit stops. For able-bodied transit riders, the existing
Source: 2006 USGS NLDC Land Cover Survey
                                                                           25-foot grassy buffer between the sidewalk and the curb poses only
                                                                           a small inconvenience. For the elderly and handicapped, however,
Analysis:
                                                                           uneven terrain can create a major impediment to boarding the bus.
With a mix of commercial, institutional, and residential areas, the
                                                                           To make the use of public transportation more comfortable and safe,
Garfield study area has the right mix of land uses to attract pedestrian
                                                                           the third initiative integrated into Phase 1 is the installation of more
and cyclist traffic. Due to its suburban character, however, the land
                                                                           transit shelters. To create an inviting pedestrian environment, the final
use density is not high enough to make regular non-motorized and
                                                                           recommendation of Phase 1 is to plant street trees along the existing
public transportation convenient. In the long term, local planners could
                                                                           sidewalk.
use zoning regulations that incentivize increased density, mixed use


     Page 21                                                               MACOMB COUNTY COMPLETE STREETS TOOLBOX
Preliminary Plans
                                                                           pedestrian activity, but existing crossing systems are inconvenient. The
Table 10. SWOT Analysis for Garfield Phase 1                               area around Wyandot Middle School is a prime example of this sort of
                                    Pros                Cons               condition (see Appendix: Proposed Plan Maps for more details).
                                 STRENGTHS           WEAKNESSES
                                                                           Table 11. SWOT Analysis for Garfield Phase 2
                             Supports alternative   Does not provide                                           Pros                Cons
         Present               transportation       infrastructure for
                                                                                                            STRENGTHS           WEAKNESSES
                              without impeding           cyclists
                               existing traffic
                                                                                                        Supports alternative    Does not address
                                                                                    Present               transportation         land use issues
                              OPPORTUNITIES             THREATS                                          without impeding
                                                                                                          existing traffic
                                Creates a base         Generates
          Future
                                for incremental         additional
                                                                                                         OPPORTUNITIES             THREATS
                                  investment        maintenance costs
                                                                                                          Facilitates public      Generates
Note: SWOT analysis is used to provide a holistic and transparent
                                                                                                             awareness             additional
review of planning recommendations
                                                                                     Future                 of alternative     maintenance costs
                                                                                                           transportation
Phase 2: To complete the conversion of the Garfield Road study area
                                                                                                             options and       Reduced population
into a Complete Streets corridor, a portion of the grassy shoulder can                                   associated benefits        density
be converted into a bicycle path (See Figure 17). Located adjacent to
the existing sidewalk, this improvement creates a safe and comfortable     Note: SWOT analysis is used to provide a holistic and transparent
                                                                           review of planning recommendations
riding environment without creating conflicts with automobiles. In
addition, additional trash bins and benches should be installed to
complement the recreational path.


To support safe and convenient pedestrian crossings, Phase 2
recommends the installation of midblock crossings. To be most effective,
the crossings should be placed where a mix of land uses support


             MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                   Page 22
Preliminary Plans


                                                       Figure 16. Phase 1 of Garfield
                                                       Rd. Created by Jonathan Moore.
                       3
                            4                          1. Pedestrain Lighting & Street
                                                       Trees,

                                                       2.Bike Parking
          1
                                                       3.Transit Shelters

                                                       4.Sidewalk Extensions
              2




                                                       Figure 17. Phase 2 of Garfield
                                                       Rd. Created by Jonathan Moore

                                                       1. Recreational Bike Path
                                2
              1                                        2.Midblock Crossing with Road
                                                       Striping




Page 23                    MACOMB COUNTY COMPLETE STREETS TOOLBOX
Preliminary Plans

REFERENCES:
1.Southeast Michigan Council of Governments (SEMCOG). (2010, June 29). Volume
Count Report: Van Dyke Avenue. Retrieved 4/2/2011, from the SEMCOG’s Traffic
Count Database, from http://www.semcog.org/data/Apps/trafficcounts.cfm.
2.Ibid. Volume Count Report: Van Dyke Avenue.
3.Ibid. Volume Count Report: Van Dyke Avenue.
4.Southeast Michigan Council of Governments (SEMCOG). (2009, March 25).Volume
Count Report: Garfield Road. Retrieved 4/2/2011, from the SEMCOG’s Traffic Count
Database, from http://www.semcog.org/data/Apps/trafficcounts.cfm.
5.Ibid. Volume Count Report: Garfield Road.
6.Ibid. Volume Count Report: Garfield Road.
7.Ibid. Volume Count Report: Garfield Road.
8.Marwedel, James. (1998, November). Opting for Performance: An Alternative to
Conventional Zoning for Land Use Regulation. Journal of Planning Literature, 13(2),
220-231.
9.Shoup, Donald. (2008). Graduated Density Zoning. Journal of Planning Education and
Research, 28, 161-179.
10.Talen, Emily. (2001, Spring). Traditional Urbanism Meets Residential Affluence. Jour-
nal of the American Planning Association, 67(2), 199-216.
11.Parsons Brinckerhoff Michigan, Inc. (2005, April). Road Commission of Macomb
County Long Range Master Plan 2004 – 2030 Final Report. P. 46-48. Retrieved 4/2/2011,
from www.rcmcweb.org.




              MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                     Page 24
Implementation Tools
Though design improvements to the roadway are a key element to Com-           who have varying work schedules.
plete Streets, without implementation strategies in place, these modifica-
tions cannot be made. Some of the most important of these strategies          Physical and Virtual Tours:
include public outreach models, financing mechanisms, and policy initia-      For those who learn visually, seeing something firsthand may have a
tives. In accordance with this document’s goal of identifying local, state,   powerful impact. When the time and resources permit, taking people into
and federal resources, the following section highlights some of the most      the field can be a great learning tool. If possible, participants should see
successful implementation strategies from around the country.                 examples of both incomplete and complete streets. For audiences on
                                                                              tight time constraints, virtual tours may also be a viable outreach strat-
Public Outreach and Stakeholder Identification                                egy.
Tools:
“A more engaged and collaborative approach that includes as many              Complete Streets Business Sessions:
stakeholders and implementers as possible tends to be more broadly            Business owners might initially be wary of a change that takes automo-
            1
supported.” – Minnesota Complete Streets Coalition                            bile traffic away from their stores. A special workshop for business own-
                                                                              ers highlighting the specific economic benefits of Complete Streets help
As the quote suggests, public participation is critical to the success of     to secure the support of these key stakeholders. Studies show that hav-
any Complete Streets initiative, because the concept requires a funda-        ing more transit and non-motorized options can lead to visitors staying
mental change in thinking about roadway design. Useful participation-         an extra three or four hours in the area, which can lead to an increase
based programming for Complete Streets includes workshops, street             in sales.2,3 These sessions should emphasize how the Complete Streets
tours, and Complete Streets business meetings.                                approach creates a lively and successful commercial environment.


Complete Streets Workshops:                                                   The activities outlined above represent only a small sample of the
In order to garner support from local stakeholders, many municipali-          unique ways planners can adapt public participation to the needs of
ties have implemented Complete Streets workshops. These workshops             Complete Streets. The Portland Public Participation Manual, can be
serve as visionary sessions that not only define Complete Streets,            seen at their website (http://www.pdc.us/public-participation/default.asp).
but also provide advocacy tools for local leaders to bring back to their
constituencies. While workshops typically occur during the evening, a         Financing Tools:
Complete Streets afternoon session may be more appropriate for those          Currently, state legislation requires that one percent of municipal fund-

     Page 25                                                                  MACOMB COUNTY COMPLETE STREETS TOOLBOX
Implementation Tools
ing derived from the Michigan transportation fund must be used for                        •	   $10 Million Parks and Recreation Funding: capitalized on
non-motorized transportation.4 However, because municipal funding is                           Metro Parks, which at the time planned to spend approxi-
limited, Macomb County must think creatively to make Complete Streets                          mately $2,500,000 in 2008 for land acquisition, design, and
a priority. Below is a list of tools utilized by other municipalities in similar               construction in Central Ohio.6
financial constraints.                                                                    •	   $15 Million Funding from Other State and Other Local
                                                                                               Sources: utilized other public and private resources, includ-
Columbus, OH: Federal, State, and Local Combination                                            ing allocations set aside for land conservation, public transit,
In 2008, the Columbus City Council adopted the Bicentennial Bikeways                           utilities, environmental mitigation, health and physical activity,
Plan, which acted as a thorough, step-by-step strategy for expanding                           and education.
bike infrastructure in Columbus. Like many municipalities, Columbus did            A more detailed list of funding resources for the Bicentennial Bikeways
not have a dedicated funding stream for such improvements. Further-                Plan can be found in the Appendix.
more, Columbus was at the mercy of the federal funding structure, which
often requires municipalities to seek many federal resources to fund               Macomb County could try to duplicate Columbus’s example. Columbus
one project.5 The plan acknowledged the variety of resources that the              benefited from an extensive search into resources that promoted public
city would have to target for funding, including federal, state, and local         health, environmental sustainability, conservation, and transit. Further-
resources. Below is a brief list of the primary recommendations:                   more, due to the nature of the Columbus bikeways plan, the city could
	                                                                                  tap into federal parks and recreation funding. A potential challenge is the
        •	   Bicentennial Bikeways Bonds (“B3” Bonds): called for the city         amount of staff energy it takes to search and apply for resources.
             to include the Bikeways Plan improvements in the 2008 bond
             package.                                                              Michigan: Corridor Improvement Authorities
        •	   $25 Million Federal Transportation ‘Green Tea’ Demonstration          The Corridor Improvement Authority (CIA), or Public Act 280, was ap-
             Project Funding: used a significant amount of money coming            proved on the state level in 2005.7 CIAs assist municipalities in provid-
             from the federal SAFETEA transportation legislation.                  ing funding improvements outside of downtowns or normal business
        •	   $10 Million Private Sector ‘Adopt a Bikeway’ Endowment                corridors.8 Very similar to a Downtown Development Authority (DDA),
             Campaign: created a campaign where key private sector and             a CIA can hire a director, establish a tax-increment financing plan, and
             philanthropic partners would engage in a fundraising effort to        levy special taxes or issue bonds.9 The only regulations imposed by the
             adopt a mile of the bikeway system.                                   legislation require that a participating corridor must be:

             MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                               Page 26
Implementation Tools
       •	   51% first-floor commercial.                                     by local businesses.14 The PPRTA use tax complements the sales tax
       •	   In existence for more than 30 years.                            and “is due on the use, storage, or consumption of any tangible personal
       •	   Adjacent to a road classified as an arterial or collector ac-   property or tax- able service, purchased at retail, upon which no sales
            cording to the Federal Highway Administration.                  tax was paid.”15 Furthermore, the PPRTA received funding from a $4
       •	   At least five contiguous acres.                                 excise tax since 1998 that was levied on new bicycles purchased in the
       •	   Zoned to allow for mixed-use and high-density residential.10    city.16 Records show that in 2006, this excise tax generated more than
                                                                            $111,000 from over 31,000 bikes purchased.17
Finally, a participating municipality must allow for an expedited permit-
ting and licensing process for developments along the corridor and must     This financing tool, which is also used in other areas, including San
make non-motorized transportation a priority.11 Several municipalities in   Diego, would be the most difficult to implement in Macomb County. At
Michigan have taken advantage of CIAs, including East Lansing, Grand        the same time, it would mean lasting change. Because regional transit
Rapids, Waterford Township, and St. Clair Shores. Van Dyke Avenue           authorities that levy taxes are not legal on the state level in Michigan,
and Garfield Road are excellent opportunities for CIAs, meeting all of      pursuing an authority similar to the PPRTA requires lobbying for leg-
the regulations. Though businesses may not be open to additional taxes,     islative change. Further challenges with the sales and use tax include
they may be enticed with an expedited navigation through the permit-        potential pushback from businesses, arguing that their customers might
ting process. Furthermore, funds from tax-increment financing, although     spend less with an additional tax. Finally, putting such a proposal before
limited in tough economic times, could be used to leverage other federal    the voters in Macomb County is risky. Voters might not approve the tax
and state funds for Complete Streets conversions.                           or the regional authority. However, this option creates a direct funding
                                                                            source for roadway improvement. It would demonstrate the county’s
Colorado Springs, CO: Sales and Use Tax                                     commitment to Complete Streets, and it would indicate that residents
In 2004, voters in the Colorado Springs area approved the creation of       also believe in the principles set by the county.
the Pikes Peak Rural Transportation Authority (PPRTA), which is a re-
gional authority that provides capital improvements and maintenance for     Policy Recommendations:
both auto-oriented and non-motorized transportation projects.12 Shortly     Though Michigan recently passed Complete Streets legislation that illus-
after the creation of the PPRTA, voters also approved a 1% sales and        trates the importance of non-motorized transportation on a state level, a
use tax that would help fund the work of the authority.13 The sales tax     municipality and a county can enact certain policy measures on a more
is collected similarly to the State of Colorado sales tax and is remitted   local level. These include non-motorized plans, resolutions, and more

     Page 27                                                                MACOMB COUNTY COMPLETE STREETS TOOLBOX
Implementation Tools
formal ordinances. Below are examples of policy changes that prioritize      Ann Arbor, MI: Non-Motorized Plan
Complete Streets.                                                            The City of Ann Arbor Non-motorized Plan 2007 contains much of the
                                                                             reasoning and guidelines behind making the roads safe for pedestrians
Columbus, OH: Subdivision Ordinance                                          and cyclists, a critical part of a complete street. The plan’s vision state-
Until 1999, Columbus, Ohio lacked a comprehensive sidewalk law. New-         ment describes the envisioned community as one that is safe and acces-
ly elected City Councilmember Maryellen O’Shaughnessy advocated              sible to pedestrians and cyclists as well as one that promotes a culture
that the City Council address this issue by first updating the subdivision   where people choose alternative transportation over cars.21 To that end,
ordinance to require sidewalks for private development.18 The current        it describes objectives, strategies, and design tools:
subdivision law states that private developers must build sidewalks and             •	   Educating the Ann Arbor community at various levels on the
bikeways in accordance with the Bicentennial Bikeways Plan.19 The or-                    benefits of non-motorized transit, the existing options avail-
dinance also “authorizes an in-lieu fee program modeled after the city’s                 able and the safety concerns of this kind of travel (Pg. 7).
parkland dedication fund. If a particular development cannot provide                •	   Site design checklists for bicycle parking, pedestrian and
site-adjacent bicycle or pedestrian improvements due to site constraints,                transit facilities, etc. (Pg. 92-94).
the developer can pay a fee, and the improvements will be built offsite             •	   Cross-sections and guidelines for different road types and
                                                                 20
but within the same community planning area at a later date.”                            bike and pedestrian facilities (Ch. 2)


This ordinance reduces the burden of municipalities to construct side-       A non-motorized plan like Ann Arbor’s can help to further prioritize Com-
walks, and it creates incentives for private developers to contribute to     plete Streets, while giving advocacy groups a political tool.
the Complete Streets philosophy. Having such an ordinance could be a
first step for municipalities that are looking for innovative cost-sharing   Lansing, MI and Columbus, OH: Complete Streets Resolutions and
implementation tools, as well as methods for generating stakeholder          Ordinances
buy-in.                                                                      In 2008, the Columbus City Council approved a resolution that illus-
                                                                             trated the city’s commitment to Complete Streets.23 The resolution was
                                                                             a result of many different stakeholders coming together, including the
                                                                             city attorney, police, biking and health advocates, and legislative ana-
                                                                             lysts. More than anything, city officials cited the resolution as a psycho-
                                                                             logical change. On March 2, 2009, the City Council adopted an official

            MACOMB COUNTY COMPLETE STREETS TOOLBOX                                                                                           Page 28
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report
Complete Streets Report

More Related Content

What's hot

East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...Crosstown TO
 
Creating a Complete Street Active Transportation Network - Marita Roos
Creating a Complete Street Active Transportation Network - Marita RoosCreating a Complete Street Active Transportation Network - Marita Roos
Creating a Complete Street Active Transportation Network - Marita RoosBikeTexas
 
HIGHWAY ENGINEERING
HIGHWAY ENGINEERINGHIGHWAY ENGINEERING
HIGHWAY ENGINEERINGUditGour5
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineeringAavani Thampi
 
Environmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeEnvironmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeZuhair Ahmed Kowshik
 
Location controls and highway classification
Location controls and highway classificationLocation controls and highway classification
Location controls and highway classificationRana Ibrahim
 
Designing & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian LordDesigning & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian LordDesign South East
 
Highway engineering section 1
Highway engineering section 1Highway engineering section 1
Highway engineering section 1vhjadhav
 
Roadspace Allocation for Better Streets
Roadspace Allocation for Better StreetsRoadspace Allocation for Better Streets
Roadspace Allocation for Better StreetsDesign South East
 
Gateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguGateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguTEGA ODOGU
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineeringKHUSHBU SHAH
 
Multi-modal Final
Multi-modal FinalMulti-modal Final
Multi-modal FinalJuan Migone
 
Seven50 Draft Scenario Report 2
Seven50 Draft Scenario Report 2Seven50 Draft Scenario Report 2
Seven50 Draft Scenario Report 2Roar Media
 
Scenario report July V2
Scenario report July V2Scenario report July V2
Scenario report July V2Roar Media
 

What's hot (20)

November 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual WorkshopNovember 3, 2021 CTAC Virtual Workshop
November 3, 2021 CTAC Virtual Workshop
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
 
Creating a Complete Street Active Transportation Network - Marita Roos
Creating a Complete Street Active Transportation Network - Marita RoosCreating a Complete Street Active Transportation Network - Marita Roos
Creating a Complete Street Active Transportation Network - Marita Roos
 
HIGHWAY ENGINEERING
HIGHWAY ENGINEERINGHIGHWAY ENGINEERING
HIGHWAY ENGINEERING
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
 
Highway planning
Highway planningHighway planning
Highway planning
 
Environmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridgeEnvironmental impact assessment of padma multipurpose bridge
Environmental impact assessment of padma multipurpose bridge
 
Final report
Final reportFinal report
Final report
 
Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street  Level of Service F for Grade A Streets--Cesar Chavez Street
Level of Service F for Grade A Streets--Cesar Chavez Street
 
Location controls and highway classification
Location controls and highway classificationLocation controls and highway classification
Location controls and highway classification
 
Designing & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian LordDesigning & Planning for Cycling, Phil Jones & Adrian Lord
Designing & Planning for Cycling, Phil Jones & Adrian Lord
 
Highway engineering section 1
Highway engineering section 1Highway engineering section 1
Highway engineering section 1
 
Roadspace Allocation for Better Streets
Roadspace Allocation for Better StreetsRoadspace Allocation for Better Streets
Roadspace Allocation for Better Streets
 
Gateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.OdoguGateway ASP_letter_print_Hews.Kalhori.Odogu
Gateway ASP_letter_print_Hews.Kalhori.Odogu
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
 
Multi-modal Final
Multi-modal FinalMulti-modal Final
Multi-modal Final
 
Seven50 Draft Scenario Report 2
Seven50 Draft Scenario Report 2Seven50 Draft Scenario Report 2
Seven50 Draft Scenario Report 2
 
Scenario report July V2
Scenario report July V2Scenario report July V2
Scenario report July V2
 
transportation
transportationtransportation
transportation
 

Viewers also liked

Updated Traffic Analysis Tools for Complete Streets
Updated Traffic Analysis Tools for Complete StreetsUpdated Traffic Analysis Tools for Complete Streets
Updated Traffic Analysis Tools for Complete StreetsWSP
 
Transportation 2040 Presentation to City Council May 29 2012
Transportation 2040 Presentation to City Council May 29 2012Transportation 2040 Presentation to City Council May 29 2012
Transportation 2040 Presentation to City Council May 29 2012CoV Transportation Plan
 
Yonge Street Planning
Yonge Street PlanningYonge Street Planning
Yonge Street Planningward27news
 
Keep it moving - construction phase transport planning
Keep it moving - construction phase  transport planningKeep it moving - construction phase  transport planning
Keep it moving - construction phase transport planningJumpingJaq
 
Transport planning - looking to studies of science to reveal why it matters
Transport planning - looking to studies of science to reveal why it mattersTransport planning - looking to studies of science to reveal why it matters
Transport planning - looking to studies of science to reveal why it mattersInstitute for Transport Studies (ITS)
 
Targets for Resilient Cities
Targets for Resilient CitiesTargets for Resilient Cities
Targets for Resilient CitiesKym Lennox
 
Indiana Complete Streets
Indiana Complete StreetsIndiana Complete Streets
Indiana Complete StreetsNikki Davis
 
Complete Streets workshop presentation
Complete Streets workshop presentationComplete Streets workshop presentation
Complete Streets workshop presentationKittelson Slides
 
Participative Transport Planning and Social Exclusion: Where do we begin? Und...
Participative Transport Planning and Social Exclusion: Where do we begin? Und...Participative Transport Planning and Social Exclusion: Where do we begin? Und...
Participative Transport Planning and Social Exclusion: Where do we begin? Und...Institute for Transport Studies (ITS)
 
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Promoting community health
Promoting community healthPromoting community health
Promoting community healthRiza Jean Larino
 
Accessibility in an Urban Area: Alcântara, Lisboa, Presentation part 2
Accessibility in an Urban Area: Alcântara, Lisboa, Presentation part 2Accessibility in an Urban Area: Alcântara, Lisboa, Presentation part 2
Accessibility in an Urban Area: Alcântara, Lisboa, Presentation part 2Luis Neto
 
A study for: (Public transport demand and requirement in 2020 for Kajang-Bang...
A study for: (Public transport demand and requirement in 2020 for Kajang-Bang...A study for: (Public transport demand and requirement in 2020 for Kajang-Bang...
A study for: (Public transport demand and requirement in 2020 for Kajang-Bang...p71089
 
New Approach to Urban Movement
New Approach to Urban MovementNew Approach to Urban Movement
New Approach to Urban MovementDr Colin Black
 
Sherry Ryan Transportation Systems Presentation
Sherry Ryan  Transportation Systems PresentationSherry Ryan  Transportation Systems Presentation
Sherry Ryan Transportation Systems Presentationguest1356e0
 
Transport planning opportunities
Transport planning opportunitiesTransport planning opportunities
Transport planning opportunitiesNathan Taylor
 
Transport planning things you need to know rev 1
Transport planning   things you need to know rev 1Transport planning   things you need to know rev 1
Transport planning things you need to know rev 1Ronan Kearns
 

Viewers also liked (20)

Updated Traffic Analysis Tools for Complete Streets
Updated Traffic Analysis Tools for Complete StreetsUpdated Traffic Analysis Tools for Complete Streets
Updated Traffic Analysis Tools for Complete Streets
 
Transportation 2040 Presentation to City Council May 29 2012
Transportation 2040 Presentation to City Council May 29 2012Transportation 2040 Presentation to City Council May 29 2012
Transportation 2040 Presentation to City Council May 29 2012
 
1997 Transportation Plan
1997 Transportation Plan1997 Transportation Plan
1997 Transportation Plan
 
Yonge Street Planning
Yonge Street PlanningYonge Street Planning
Yonge Street Planning
 
Keep it moving - construction phase transport planning
Keep it moving - construction phase  transport planningKeep it moving - construction phase  transport planning
Keep it moving - construction phase transport planning
 
Transport planning - looking to studies of science to reveal why it matters
Transport planning - looking to studies of science to reveal why it mattersTransport planning - looking to studies of science to reveal why it matters
Transport planning - looking to studies of science to reveal why it matters
 
Targets for Resilient Cities
Targets for Resilient CitiesTargets for Resilient Cities
Targets for Resilient Cities
 
Indiana Complete Streets
Indiana Complete StreetsIndiana Complete Streets
Indiana Complete Streets
 
Complete Streets workshop presentation
Complete Streets workshop presentationComplete Streets workshop presentation
Complete Streets workshop presentation
 
BRT in Challenging Environments
BRT in Challenging Environments   BRT in Challenging Environments
BRT in Challenging Environments
 
Participative Transport Planning and Social Exclusion: Where do we begin? Und...
Participative Transport Planning and Social Exclusion: Where do we begin? Und...Participative Transport Planning and Social Exclusion: Where do we begin? Und...
Participative Transport Planning and Social Exclusion: Where do we begin? Und...
 
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
Bus 16 (Transportation Engineering Dr.Lina Shbeeb)
 
Promoting community health
Promoting community healthPromoting community health
Promoting community health
 
Accessibility in an Urban Area: Alcântara, Lisboa, Presentation part 2
Accessibility in an Urban Area: Alcântara, Lisboa, Presentation part 2Accessibility in an Urban Area: Alcântara, Lisboa, Presentation part 2
Accessibility in an Urban Area: Alcântara, Lisboa, Presentation part 2
 
Urban and transport planning related exposures and mortality
Urban and transport planning related exposures and mortalityUrban and transport planning related exposures and mortality
Urban and transport planning related exposures and mortality
 
A study for: (Public transport demand and requirement in 2020 for Kajang-Bang...
A study for: (Public transport demand and requirement in 2020 for Kajang-Bang...A study for: (Public transport demand and requirement in 2020 for Kajang-Bang...
A study for: (Public transport demand and requirement in 2020 for Kajang-Bang...
 
New Approach to Urban Movement
New Approach to Urban MovementNew Approach to Urban Movement
New Approach to Urban Movement
 
Sherry Ryan Transportation Systems Presentation
Sherry Ryan  Transportation Systems PresentationSherry Ryan  Transportation Systems Presentation
Sherry Ryan Transportation Systems Presentation
 
Transport planning opportunities
Transport planning opportunitiesTransport planning opportunities
Transport planning opportunities
 
Transport planning things you need to know rev 1
Transport planning   things you need to know rev 1Transport planning   things you need to know rev 1
Transport planning things you need to know rev 1
 

Similar to Complete Streets Report

Burlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public ForumBurlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public Forumchapinspencer
 
Municipal Perspectives on Compete Streets
Municipal Perspectives on Compete StreetsMunicipal Perspectives on Compete Streets
Municipal Perspectives on Compete StreetsAngela Vincent, AICP
 
architecture and transportation
architecture and transportationarchitecture and transportation
architecture and transportationSheena Llare
 
Corrine Drive Phase 2 Report
Corrine Drive Phase 2 ReportCorrine Drive Phase 2 Report
Corrine Drive Phase 2 ReportBrendan O'Connor
 
A Study on Traffic Management along EDSA in Metro Manila
A Study on Traffic Management along EDSA in Metro ManilaA Study on Traffic Management along EDSA in Metro Manila
A Study on Traffic Management along EDSA in Metro Manilaharoldtaylor1113
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Toronto Public Consultation Unit
 
Complete Streets in New Jersey - Sheree Davis
Complete Streets in New Jersey - Sheree DavisComplete Streets in New Jersey - Sheree Davis
Complete Streets in New Jersey - Sheree Davisnjbikeped
 
Honolulu land use ordinance amendment
Honolulu land use ordinance amendmentHonolulu land use ordinance amendment
Honolulu land use ordinance amendmentHonolulu Civil Beat
 
Ithaca Bicycle Transportation Blueprint 12-19-2015
Ithaca Bicycle Transportation Blueprint 12-19-2015Ithaca Bicycle Transportation Blueprint 12-19-2015
Ithaca Bicycle Transportation Blueprint 12-19-2015Imani Hall
 
North East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development PlanNorth East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development PlanPaul Vernon
 
Neighborhood Greenways
Neighborhood GreenwaysNeighborhood Greenways
Neighborhood GreenwaysTrailnet
 
WalkBoston - Low Cost Pedestrian Improvements
WalkBoston - Low Cost Pedestrian ImprovementsWalkBoston - Low Cost Pedestrian Improvements
WalkBoston - Low Cost Pedestrian ImprovementsJanna Shub
 
Transportation as Revitalization Strategy
Transportation as Revitalization StrategyTransportation as Revitalization Strategy
Transportation as Revitalization StrategyJohn-Mark Palacios
 
Micro Urbana Communities- Creating and Implementing Livable Transportatino So...
Micro Urbana Communities- Creating and Implementing Livable Transportatino So...Micro Urbana Communities- Creating and Implementing Livable Transportatino So...
Micro Urbana Communities- Creating and Implementing Livable Transportatino So...Cynthia Hoyle
 

Similar to Complete Streets Report (20)

Portsmouth transport and health seminar, October 2014
Portsmouth transport and health seminar, October 2014Portsmouth transport and health seminar, October 2014
Portsmouth transport and health seminar, October 2014
 
Burlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public ForumBurlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public Forum
 
CWSC Chairs' Presentation to Planning Board
CWSC Chairs' Presentation to Planning BoardCWSC Chairs' Presentation to Planning Board
CWSC Chairs' Presentation to Planning Board
 
Safer People, Safer Streets, and Safer Policies at USDOT--Dan Goodman
Safer People, Safer Streets, and Safer Policies at USDOT--Dan GoodmanSafer People, Safer Streets, and Safer Policies at USDOT--Dan Goodman
Safer People, Safer Streets, and Safer Policies at USDOT--Dan Goodman
 
Municipal Perspectives on Compete Streets
Municipal Perspectives on Compete StreetsMunicipal Perspectives on Compete Streets
Municipal Perspectives on Compete Streets
 
UTP.pptx
UTP.pptxUTP.pptx
UTP.pptx
 
architecture and transportation
architecture and transportationarchitecture and transportation
architecture and transportation
 
Corrine Drive Phase 2 Report
Corrine Drive Phase 2 ReportCorrine Drive Phase 2 Report
Corrine Drive Phase 2 Report
 
A Study on Traffic Management along EDSA in Metro Manila
A Study on Traffic Management along EDSA in Metro ManilaA Study on Traffic Management along EDSA in Metro Manila
A Study on Traffic Management along EDSA in Metro Manila
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
 
SSC2011_Barbara McCann PPT
SSC2011_Barbara McCann PPTSSC2011_Barbara McCann PPT
SSC2011_Barbara McCann PPT
 
Sustainable Urban Mobility Planning
Sustainable Urban Mobility PlanningSustainable Urban Mobility Planning
Sustainable Urban Mobility Planning
 
Complete Streets in New Jersey - Sheree Davis
Complete Streets in New Jersey - Sheree DavisComplete Streets in New Jersey - Sheree Davis
Complete Streets in New Jersey - Sheree Davis
 
Honolulu land use ordinance amendment
Honolulu land use ordinance amendmentHonolulu land use ordinance amendment
Honolulu land use ordinance amendment
 
Ithaca Bicycle Transportation Blueprint 12-19-2015
Ithaca Bicycle Transportation Blueprint 12-19-2015Ithaca Bicycle Transportation Blueprint 12-19-2015
Ithaca Bicycle Transportation Blueprint 12-19-2015
 
North East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development PlanNorth East Maryland Transit Oriented Development Plan
North East Maryland Transit Oriented Development Plan
 
Neighborhood Greenways
Neighborhood GreenwaysNeighborhood Greenways
Neighborhood Greenways
 
WalkBoston - Low Cost Pedestrian Improvements
WalkBoston - Low Cost Pedestrian ImprovementsWalkBoston - Low Cost Pedestrian Improvements
WalkBoston - Low Cost Pedestrian Improvements
 
Transportation as Revitalization Strategy
Transportation as Revitalization StrategyTransportation as Revitalization Strategy
Transportation as Revitalization Strategy
 
Micro Urbana Communities- Creating and Implementing Livable Transportatino So...
Micro Urbana Communities- Creating and Implementing Livable Transportatino So...Micro Urbana Communities- Creating and Implementing Livable Transportatino So...
Micro Urbana Communities- Creating and Implementing Livable Transportatino So...
 

More from jadamsm

Digital portfolio
Digital portfolioDigital portfolio
Digital portfoliojadamsm
 
Memorandum 3
Memorandum 3Memorandum 3
Memorandum 3jadamsm
 
Digital Portfolio
Digital PortfolioDigital Portfolio
Digital Portfoliojadamsm
 
Resume_Jonathan Moore
Resume_Jonathan MooreResume_Jonathan Moore
Resume_Jonathan Moorejadamsm
 
Yongsan Way Boards
Yongsan Way BoardsYongsan Way Boards
Yongsan Way Boardsjadamsm
 
Yongsan way michigan_team_b
Yongsan way michigan_team_bYongsan way michigan_team_b
Yongsan way michigan_team_bjadamsm
 
Feed report
Feed report Feed report
Feed report jadamsm
 
Hanok City Masterplan
Hanok City MasterplanHanok City Masterplan
Hanok City Masterplanjadamsm
 
Yongsan way michigan_team_b
Yongsan way michigan_team_bYongsan way michigan_team_b
Yongsan way michigan_team_bjadamsm
 
Portfolio lite
Portfolio litePortfolio lite
Portfolio litejadamsm
 

More from jadamsm (11)

Digital portfolio
Digital portfolioDigital portfolio
Digital portfolio
 
Memorandum 3
Memorandum 3Memorandum 3
Memorandum 3
 
BCU
BCUBCU
BCU
 
Digital Portfolio
Digital PortfolioDigital Portfolio
Digital Portfolio
 
Resume_Jonathan Moore
Resume_Jonathan MooreResume_Jonathan Moore
Resume_Jonathan Moore
 
Yongsan Way Boards
Yongsan Way BoardsYongsan Way Boards
Yongsan Way Boards
 
Yongsan way michigan_team_b
Yongsan way michigan_team_bYongsan way michigan_team_b
Yongsan way michigan_team_b
 
Feed report
Feed report Feed report
Feed report
 
Hanok City Masterplan
Hanok City MasterplanHanok City Masterplan
Hanok City Masterplan
 
Yongsan way michigan_team_b
Yongsan way michigan_team_bYongsan way michigan_team_b
Yongsan way michigan_team_b
 
Portfolio lite
Portfolio litePortfolio lite
Portfolio lite
 

Recently uploaded

Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 

Recently uploaded (20)

Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 

Complete Streets Report

  • 1. COMPLETE STREETS TOOLBOX Source: Cascade Bicycle Club Prepared for: Macomb County, MI by William Tardy, Diana Flora, Jonathan Moore, and Isaac Gilman University of Michigan, Taubman College April, 2011
  • 2. Acknowledgements Table of Contents Thank you: John Paul Rea Executive Summary…………………………………… .i Dr. Susan Charles Introduction …………………………………………......1 Meagan Masson-Minock Vision, Goals, and Objectives………………………....2 Julie Stieff Paul Coseo Background……………………………………………..3 John Crumm Definition and Benefits………………………………...6 Bob Hoepfner Design Guidelines………….…………………………..8 Timothy Kniga Preliminary Plans……………………………..……….15 Norman Cox Eli Cooper Implementation Tools..………………………………..25 Luke Forrest Conclusion………………………………………….....34 Suzanne Schluz Appendix Case Studies..............................................A - 1 Interviews...................................................B - 1 Traffic Statistics.........................................C - 1 Implementation Tools................................D - 1 Page i MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 3. Executive Summary Since the first National City Planning Conference in May 1909, the au- to add non-motorized, Complete Streets, and traffic-calming language. tomobile has been the centerpiece of American transportation planning. Public Act 135 amended Public Act 51 of 1951, the Michigan Transporta- Supported by low energy costs and abundant open space for develop- tion Fund Act, by requiring that all entities receiving funding from state ment, this emphasis helped to tie the United States together and facili- trunkline highway systems allocate 1% of that funding to non-motorized tate economic growth. In the future, however, reduced natural resource infrastructure. availability and increased population density threaten the efficiency of In response to these policy changes, thirty-five Michigan municipalities automobile-focused transportation systems. To compensate for these have adopted Complete Streets resolutions (more than any state in the changes, planners, engineers, and policy makers must experiment with country). In the hopes of deepening their commitment to the Complete a more diverse portfolio of transportation services. As a holistic frame- Streets agenda, six localities have built upon their resolutions by pro- work that illustrates how public transit, pedestrian, and cyclist infrastruc- ducing Complete Street ordinances. Despite this strong environment of ture can be integrated into new and existing infrastructure, the Complete progress throughout the state, Macomb County lacks its own organized Streets system can assist towns, cities, and counties in engaging this effort. task. In order to integrate the Complete Streets systems into Macomb County With regard to the physical parameters of transportation planning, Com- or any region, it is important to consider the types of design standards plete Streets is a set of design templates which can be used to create available. Although the strict nature of these standards change to ac- safe, convenient multi-modal (automobile, pedestrian, public transit, and commodate the context of the site, their subjects are consistent; they cyclist) transportation infrastructure. With respect to the social nature include: of transportation planning, Complete Streets also serves as a means to • Sidewalk design: width, lighting, seating, vegetation, and assure equitable access to all community members, regardless of eco- trash bins nomic status, age, or physical capacity. To take advantage of these ser- • Transit rider facilities: shelters, stop signage, maps, trash vices, in June 2009 the State of Michigan initiated the process of drafting bins, and benches state-wide Complete Streets policy. In addition to the efforts of state • Pedestrian crossing facilities: signage, signaling, midblock lawmakers, this development was empowered by the support of advoca- crossings, and pedestrian islands cy groups like the League of Michigan Bicyclists. In August of 2010 the • Streetscape structure: building setback, building height, and Michigan legislature passed Public Act 134 and 135 into law. Public Act façade design 134 amends the Michigan Planning Enabling Act, allowing municipalities • Cyclist facilities: bike lanes, bike parking, and recreational MACOMB COUNTY COMPLETE STREETS TOOLBOX Page ii
  • 4. Executive Summary bike paths existing corridor regulations. The recommendations for each study area When applying Complete Streets design standards, it is not essential are as follows: to apply each and every parameter. In many cases, in fact, issues like • Van Dyke Avenue heavy traffic or narrow road widths make the application of some stan- ◦◦ Phase 1 dards problematic or unsafe. As a consequence, it is helpful to concep- ▪▪ Midblock crossings with pedestrian islands tualize Complete Streets as both an analytic process as well as a set near high foot traffic locations of design standards. To help illustrate how this process of analysis can ▪▪ Additional transit shelters be executed, this report contains site analyses and design recommen- ◦◦ Phase 2 dations for two study areas within Macomb County: Van Dyke Avenue ▪▪ A 7’ on-street parking lane and a 5’ bicycle between 8 Mile Road and 10 Mile Road, Garfield Road between 17 Mile lane in place of the outer two lanes Road and Hall Road. ▪▪ Sidewalk bike parking ▪▪ Sidewalk extensions across parking lane at In both study areas, a mix of commercial, institutional, and residential transit stops areas provide the basic assortment of land uses needed to incentivize • Garfield Road alternative transportation. In both areas, however, conditions like infre- ◦◦ Phase 1 quent pedestrian crossings and transit shelters represent aspects that ▪▪ Pedestrian lighting and street trees could be strengthened and improved. To address these issues in a politi- ▪▪ Sidewalk bike parking cally and fiscally responsible fashion, this report grouped preliminary ▪▪ Additional transit shelters improvements into two phases along a Complete Streets development ▪▪ Sidewalk extensions across the grassy shoul- timeline. Phase 1 of this timeline includes improvements which can be der at transit stops made without interfering with existing patterns of automobile traffic or ◦◦ Phase 2 altering standing engineering standards. Phase 2 of this timeline focuses ▪▪ Recreational bike path along existing sidewalk on improvements which can accommodate and facilitate maximum ▪▪ Midblock crossing with pedestrian island mode shift from automobiles to alternative transportation systems. As In addition to physical amenities and structures, it is also important to a result, Phase 2 is conceptualized as a set of initiatives to be applied conceptualize the Complete Streets system as a set of policy and fi- when changes in automobile use or political sentiment demands greater nancial implementation tools. Indeed, without implementation strategies support for alternative transportation, and often requires deviations from in place, physical modifications cannot be made. Generally, Complete Page iii MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 5. Executive Summary Streets implementation tools can be broken down into three categories: public outreach, financial mechanisms, and policy initiatives. Public outreach tools for Complete Streets focus on investigating com- munity transportation needs and facilitating public education. For many communities, Complete Street workshops are the easiest way to ad- dress both of these needs. When the time and resources permit, con- ducting walking tours and field visits can be another great option. A special workshop for business owners highlighting the specific economic benefits of Complete Streets is a highly recommended way to generate community buy-in. Financing tools for Complete Streets can be generally classified as either direct funding mechanisms or indirect funding mechanisms. Com- mon direct funding mechanisms include use taxes, sales taxes, and tax- increment financing. Indirect funding mechanisms are typically federal and state grants, sidewalk improvement ordinances, and private sector “adopt a bikeway” campaigns. Finally, municipalities and Macomb County can enact Complete Streets resolutions, policies, and ordinances that illustrate the importance of non-motorized transportation. An implementation timeline serves as a useful tool from the county perspective on how to engage municipal and community leaders. The process includes the key players – the county, the municipality, and the community, including advocacy groups and constituents. This process is flexible, and there are many ways to reach a Complete Streets policy. MACOMB COUNTY COMPLETE STREETS TOOLBOX Page iv
  • 6. Introduction In transportation planning, a design framework known as Complete Streets is a popular system for conceptualizing non-motorized and transit- focused infrastructure. In addition to serving as a design framework, the Complete Streets system is also a social framework, integrating all users of the street – pedestrians, cyclists, transit riders, and drivers. In this way, all ages and abilities can utilize the street in a safe manner, whether traveling for practical or recreational purposes. In 2010, the Michigan state legislature passed Public Acts 134 and 135, which incorporate Complete Streets design components into existing transportation legislation. More importantly, the new legislation requires that all municipalities allocate 1% of their annual transportation budget toward non- motorized transportation. This document is intended to educate Macomb County officials and decision makers on Complete Streets philosophies and best practices. To reach this goal, the document includes a series of chapters, reviewing the following concepts: • Vision, goals, and objectives for county-wide Complete Streets. • Summaries and assessments of relevant Complete Street case studies. • Collection of Complete Streets design standards and planning policies. • Model of preliminary Complete Streets plans on Van Dyke Avenue (8 to 10 Mile) and Garfield Road (17 Mile to Hall Road). • Analyses of current Complete Streets policies, practices, and procedures. Page 1 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 7. Vision, Goals, and Objectives Vision: To equip Macomb County planners and policy makers with the information and tools necessary to plan and design Complete Streets. Goal: Goal: Identify current Complete Streets policy and design standards. Conduct government employee workshops. Goal: Identify pertinent local, state, and federal resources. Objectives: Objectives: Objectives: To be completed by 2011: To be completed by 2011: To be completed by 2011: 1. Identify four case study sites with similar 1. Create a matrix of associated state 1. Create a presentation for county officials physical environments and political infra- and federal funding sources. to take to local planning offices. structures. 2. Generate preliminary plans on Van Dyke 2. Produce an annotated map of gov- 2. Draft a template Complete Streets policy Avenue between 8 and 10 Mile Road and ernmental Complete Streets programs for local governmental officials. on Garfield Road between 17 Mile and in Michigan. 3. Create a Complete Streets policy time- Hall Road to illustrate the integration of 3. Create a list of policy and financing al- line. Complete Streets within Macomb County. ternatives complimentary to the Com- 4. Create a physical amenity and design To be completed by 2015: plete Streets mission. timeline. 3. Conduct workshops for all municipal Ongoing: Ongoing: planning entities within Macomb County. 4. Conduct an annual review of available 5. Conduct an annual review of resources and programmatic needs. best practices. MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 2
  • 8. Background Michigan’s effort to create a state-wide Complete Streets Streets, and traffic-calming language.5 In June 2010, the House policy began in June of 2009 when Complete Streets language was Transportation Committee unanimously passed both bills, and by the first introduced into a transportation bill.1 Although state lawmakers end of the month, the Michigan House of Representatives passed the contributed to this development, a central motivating factor was pressure legislation with an overwhelming majority.6 from advocacy groups to create safer and more accessible streets for pedestrians and cyclists. The League of Michigan Bicyclists (LMB) in On July 21, 2010, the Senate Transportation Committee unanimously particular advocated for Complete Streets policies in order to promote voted to pass the Complete Streets legislation for a formal vote in walkability and an active lifestyle. The LMB’s stance developed after the Senate.7 Seven days later, the Senate approved the Complete a 2009 national report by the Trust for America’s Health, which found Streets legislation, passing both bills into Michigan law.8 Public Act 134 Michigan to be the ninth most obese state.2 enables municipalities to create master plans that support “a system of transportation to lessen congestion on streets and provide for safe and Because state officials began to see the success of Complete efficient movement of people and goods by motor vehicles, pedestrians, Streets at local levels of government, the legislature included Complete and other legal users.”9 Streets language into its 2010 transportation budget. The bill stated, “the department [the Michigan Department of Transportation (MDOT)] Subsequently, Public Act 135 amended Public Act 51, which governs the shall provide assistance to and coordinate with local road agencies expenditures of state transportation funding.10 First, the bill classified and metropolitan planning organizations in developing Complete Street “all public roads, streets and highways” in Michigan.11 Next, the bill set policies, including the development of model complete street policies.”3 up a transportation fund for Michigan to draw money from a specific tax Although this policy did not result in a legislative requirement, it created on automobile fuel.12 From this transportation fund, 1% of resources a foundation for continued Complete Streets efforts. “shall be expended for construction or improvement of non-motorized transportation services and facilities.”13 Finally, the bill defined Complete By May 2010, the State House voted on the Complete Streets legislation Streets and arranged for the Michigan Transportation Commission to set in the form of two separate transportation bills.4 One bill (Public Act up a Complete Streets policy within two years of the bills’ adoption. This 135) focused on MDOT’s financial appropriations for Complete Streets policy would promote best practices and philosophies when building new policies, and the other bill (Public Act 134) focused on reforming the infrastructure.14 Michigan Planning Enabling Act to add non-motorized, Complete Since the passage of the first Complete Streets ordinance and the major Page 3 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 9. Background Complete Streets and non-motorized bills, Michigan has strived to make streets as accessible, safe, and active as possible. Currently, thirty- State-wide locations of Complete Streets Laws, Policies, five Michigan municipalities – from the Upper Peninsula to Ann Arbor Resolutions, and Plans – adopted Complete Streets resolutions, more than any other state in America.15 In addition, six localities have produced Complete Street ordinances since Lansing passed its ordinance in 2009. Although the state of Michigan continues with its fantastic success promoting Complete Streets policies, Macomb County lacks its own organized effort as of 2011 (See Figure 2). Despite overall population decline in Southeast Michigan, Macomb County’s population is projected to grow in the coming decades. To assure adequate transportation services for this new constituent base, developing non-motorized and public transportation services is necessary. Legend Statewide Complete Streets Law Complete Streets Ordinances Non-motorized Plan Complete Streets Resolutions Figure 1. Locations of Complete Streets Resolutions, Policies and Laws in Michi- gan. Source:Google Maps and Complete Streets Coalition MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 4
  • 10. Background REFERENCES: SE Michigan locations of Complete Streets Laws, 1.League of Michigan Bicyclists. (2009, June 22). House Transportation Policies, Resolutions, and Plans Appropriations Subcommittee Passes Complete Streets in Funding Bill. In Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www. micompletestreets.org. 2.League of Michigan Bicyclists. (2009, July 9). F as in Fat 2009. In Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www. micompletestreets.org. 3.League of Michigan Bicyclists (2009, Nov. 4).Transportation Budget Includes Complete Streets. In Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www.micompletestreets.org. 4.League of Michigan Bicyclists, (2010, May 7). Complete Streets Legislation Introduced in Michigan House. In Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www.micompletestreets.org. 5.Ibid. Complete Streets Legislation Introduced in Michigan House. 6.Rappj2. (2010, June 24).Complete Streets Success! In Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www.micompletestreets. org.; Emily, Theresa. (2010, June 29). On to the Senate! In Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www.micompletestreets.org. 7.Emily, Theresa. (2010, July 21). Onto the Senate Floor! In Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www.micompletestreets.org. 8.League of Michigan Bicyclists. (2010, July 28). Senate Approves Complete Streets Legislation. In Michigan Complete Streets Coalition. Retrieved 4/15/2011, from http://www.micompletestreets.org. 9.Michigan Planning Enabling Act. 2010 PA 134. (MCL § 125). Legend 10.State Trunk Line Highway System. 2010 PA 135. (MCL § 247). 11.Ibid. 2010 PA 135. 12.Ibid. 2010 PA 135. Statewide Complete Streets Law 13.Ibid. 2010 PA 135. 14.Ibid. 2010 PA 135. Complete Streets Ordinances 15.League of Michigan Bicyclists. (2011, April 4). Union Township Passes Complete Streets Resolution. In Michigan Complete Streets Coalition. Non-motorized Plan Retrieved 4/15/2011, from http://www.micompletestreets.org. Complete Streets Resolutions Figure 2. Locations of Complete Streets Resolutions, Policies and Laws in South- east Michigan. Source:Google Maps and Complete Streets Coalition Page 5 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 11. Definition and Benefits Complete Streets attempts to better integrate all users of the street – crashes and other injuries caused by poorly-maintained pedestrians, cyclists, transit riders, and drivers - so that all ages and infrastructure.2 abilities are able to utilize the street in a safe manner, whether traveling • For residents with safe places to walk within ten minutes of for practical or recreational purposes. their home, 43% met recommended activity levels.3 • Using public transit reduces the amount of congestion and Over the past seventy years, towns, cities, and counties interpreted can save individuals $9,581 each year.4 transportation planning as trying to get one person from point A to • Reducing one car trip each month cuts, 3,764 tons of CO2 point B as fast as possible. The car created a culture where people each year.5 expected to drive everywhere instead of relying on other methods of • By shifting traffic from automobiles to alternative modes, transportation. Roads became the focal point for all transportation Complete Streets road projects can diminish costs by planners and engineers. When congestion became a problem, more reducing the need to widen roads for additional traffic.6 roads were built or current roads were widened. Today, with limited space and resources, auto-centric planning is becoming more difficult. Complete Streets offers an alternative to auto-centric planning and allows for better transportation options for a variety of users. According to Eli Cooper, the Transportation Manager of the City of Ann Arbor Planning Department, “‘We must go back to good old-fashioned planning.”1 Before the automobile culture took hold in American cities, planners accounted for pedestrians, trolleys, cars, and cyclists. All of those factors led to the busy street life seen in historic photographs of New York City, Chicago, and Detroit (See Figure 3). The Complete Streets approach also offers economic, social, environmental, and health benefits. • A well-integrated street can improve safety by reducing pedestrian risk by up to 28%, including pedestrian-vehicle MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 6
  • 12. Definition and Benefits REFERENCES: 1.Gilman, Isaac. (2011, March 14). Interview with E. Cooper, Transportation Project Manager for the City of Ann Arbor, MI. 2.Benefits. In National Complete Streets Coalition. Retrieved 4/15/2011, from http://www.completestreets.org/complete-streets-fundamentals/ factsheets/#benefits. 3.Complete Streets FAQ. In National Complete Streets Coalition. Retrieved 4/15/2011, from http://www.completestreets.org/complete-streets-fundamentals/ complete-streets-faq/ 4.Benefits. In National Complete Streets Coalition. Retrieved 4/15/2011, from http://www.completestreets.org/complete-streets-fundamentals/complete- streets-faq/ 5.Benefits. In National Complete Streets Coalition. Retrieved 4/15/2011, from http://www.completestreets.org/complete-streets-fundamentals/ factsheets/#benefits. 6.Benefits. In National Complete Streets Coalition. Retrieved 4/15/2011, from http://www.completestreets.org/complete-streets-fundamentals/ factsheets/#benefits. Figure 3. Picture of Detroit’s Woodward Street, Circa 1930’s Source:At Detroit Page 7 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 13. Design Guidelines The main concept of Complete Streets seems simple at first: make hour (mph) or less, typically with four or more lanes of traffic streets accessible to all types of users. There are, however, many • Avenues: roads with speeds of 25 to 35 mph, not exceeding elements that go into Complete Streets design. The physical expression four lanes of traffic. of the Complete Streets concept is different for each street. This set of • Streets: roadways with speeds of 25 mph or less typically guidelines is a sampling of some of the basic and crucial elements for a with two lanes of traffic.1 complete street. SIDEWALK SETBACKS: Sidewalk setbacks regulate the distance between the start of the These guidelines are presented in their ideal form. Transportation building and the sidewalk (. Recommended building setback distances planning seldom occurs in an ideal world with no physical or fiscal vary according to density and land use, but are uniform across the constraints. Therefore, these guidelines are not an exhaustive list of all Boulevard, Avenue, and Street roadway types (See Table 1).2 the possible improvements. They are a flexible starter kit for designing Table 1: Recommened setback width for different areas Complete Streets in a community. Suburban General Urban Urban Core Residential 20 feet 15 feet 10 feet Commercial 5 feet 0 feet 0 feet This chapter uses road type definitions from the Institute of Streetside Elements: Transportation Engineers’ book, “Designing Walkable Urban The streetside encompasses all of the potential elements from the side- Thoroughfares: A Context Sensitive Approach”. The authors recommend walk to the curb, including sidewalks, landscaping between the sidewalk and curb, lighting, transit stops, and street furniture amenities (See Table practices on three basic roadway types: Boulevards, Avenues, and 2-4).3 Streets. • Boulevards: long corridors with travel speeds of 35 miles per MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 8
  • 14. Design Guidelines Table 2:Recommended sidewalk widths - Suburban Areas Residential Commercial Boulevard 6 feet 6 feet Avenue 6 feet 6 feet Street 6 feet 6 feet Table 3:Recommended sidewalk widths - General Urban Areas Residential Commercial Boulevard 10 feet 10 feet Avenue 9 feet 9 feet Street 6 feet 6 feet Table 4:Recommended sidewalk widths - Urban Core Areas Figure 4. Example of a shared-use sidewalk with a dedicated bike lane on the left and pedestrian lane on the right. Residential Commercial Boulevard 10 feet 10 feet Source:Burbank Bus Avenue 9 feet 9 feet Street 6 feet 6 feet Shared-Use Sidewalk: A shared-use sidewalk allows for a bicycle lane alongside the pedestrian sidewalk (See Figure 4). An on-street bicycle lane is preferred, because shared-use sidewalks can lead to more bike/car conflict at intersections as well as bike/pedestrian conflict on the sidewalk. However, this option gives cyclists separate space from pedestrians and traffics in places with significantly larger setbacks or in places where alterations to the roadway are less desirable. The recommended width of the bicycle lane is 4.5 feet to 5.5 feet.4 Page 9 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 15. Design Guidelines Table 6: Widths of pedestrian buffers - General Urban Areas Residential Commercial Boulevard 8 feet 7 feet Avenue 8 feet 6 feet Street 6 feet 6 feet Table 7: Widths of pedestrian buffers - Urban Core Areas Residential Commercial Boulevard 7 feet 7 feet Avenue 6 feet 6 feet Street 6 feet 6 feet Streetside Furnishings: Streetside furnishing, such as benches, lighting, transit shelters, utilities, Figure 5. Example of a sidewalk and setback section. Source: Planetizen and landscaping, should go in a designated area of the pedestrian buffer, located between the curb and the pedestrian throughway (See Pedestrian Buffers: Figure 6). Pedestrian buffers, usually landscaped strips, separate sidewalk users from traffic (See Figure 5). There should be at least 1.5 feet of space Utilities should be underground where possible to avoid clutter and between the buffer and the curb, to allow for vehicle overhangs and potential conflict with trees. The placement and frequency of streetside opening doors (See Table 5-7).5,6 furnishing varies depending on the context of the street. Some features can even have multiple uses; for example, a raised planter can also Table 5: Widths of pedestrian buffers - Suburban Areas provide a place to sit. Street furniture like trash receptacles and benches Residential Commercial should be placed in high-priority locations, such as: Boulevard 8 feet 7 feet • High-use bus stops. Avenue 6 to 8 feet 6 feet Street 5 feet 6 feet • Major buildings. MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 10
  • 16. Design Guidelines • Main streets. • Proximity to major destinations and pedestrian areas. • Areas with a mix of uses like retail and dining.7 • Presence of street crossing options. • Proximity to major route transfer points. • Average of 400 to 500 feet between stops. • Up to 2,000 feet for rapid transit and express lines. Form principles: • Elements in furnishing zone that do not block sight lines to and from buses. • Adequate space for deployment of wheelchair lifts and other boarding aids. • All-weather surface at all stops for boarding/exiting. • Close proximity to street lighting or own source of illumination. • An 80-foot no-parking zone around bus stops in areas where on-street parking is present. • Highly-visible signs detailing route number(s), bus company contact information, and no-parking zones. Figure 6. Example of streetside furnishing elements. Source:Oregon Live • Shelters present at high-volume stops capable of serving the expected number of users (See Figure 7).8 Bus Stop Locations and Form: Many factors go into deciding where to place bus stops and shelters, such as ridership patterns and local budgets. The following general principles dealing with location and form ensure that bus stops help make transit accessible and useful to the most users possible. Location principles: Page 11 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 17. Design Guidelines • Shoulders should be at least 4 feet wide for cyclists and up to 5 feet wide in areas with traffic speeds of 50 mph or greater. Wide Curb Lanes: • Curb-side lanes that are at least 14 feet wide can accommodate cyclists. Under these conditions, motorists do not have to change lanes to pass cyclists. • Shared-roadway street markings (“sharrow”) can make drivers more aware of cyclists sharing the roadways. Bike Lane and On-Street Parking: • The combined width of a bike lane with on-street parking should be at least 12 feet, due to the dangers present of parked and moving cars. • The bike lane itself should be 5 feet wide. • Do not place bike lanes between parking and the curb. Figure 7. Example of a transit shelter. Source:GenenTech Headquarters, San Francisco Dedicated Bike Lanes: On-Street Bicycle Lane Options: • The minimum width from curb or guardrail to the striping edge Ideally, cyclists should be off the sidewalk for safety reasons. The of the bike lane should be at least 4 feet; 5 feet is the optimal following elements are options for accommodating bicycle travel in the width (See Figure 8). roadway. • A 6 to 8 inch white line should separate the bike lane from the traffic lane. An additional 4-inch line is useful for separating Paved Shoulders: the on-street parking from the bike lane. • In rural areas or areas without a sidewalk, paving the road • Bike lanes should usually stop at signalized crossings.9 shoulder provides a place for cyclists out of traffic. MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 12
  • 18. Design Guidelines crossing opportunities to 200 to 300 feet. • Near major pedestrian destinations, such as schools, retail centers and parks. • 100 feet from nearest driveway or side street, if possible. • On roadways with 12,000 or less average daily traffic volume (ADT), if possible. • Where pedestrian and driver sightlines allow ample time to make an appropriate decisions. • Signalize crossings in areas where pedestrians wait more than 60 seconds for a gap in traffic. Pedestrian Refuge Island: Pedestrian refuge islands are placed in the center of a midblock crossing Figure 8. Example of a bike lane with on-street parking to give pedestrians a safe place to stop halfway if necessary. Source:SFGate • Place a refuge island on roadways with 12,000 to 15,000 ADT. Mid-Block Crossings: • Pedestrian refuge islands should also be considered for In areas with long blocks and great distances between crossings, roads wider than 60 feet or with more than four lanes of midblock crossings allow pedestrians to cross the street safely. Without traffic. midblock crossings, pedestrians often walk farther than necessary (See • Place pedestrian islands in midblock crossings where the Figure 9). average pedestrian is likely to walk slower than 3.5 feet per second (e.g., areas with a lot of schoolchildren, elderly or Place midblock crossings at the following locations: disabled people). • When signalized intersections are greater than 400 feet • Pedestrian islands should have a minimum width of 6 feet apart. and a minimum length of 20 feet. • When midblock crossings will decrease distance between Page 13 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 19. Design Guidelines Midblock Crossing Form: REFERENCES: • Conform to guidelines for the disabled. 1.Institute of Transportation Engineers. (2010). Designing Walkable Urban Thorough- fares: A Context Sensitive Approach. Washington, DC: Institute of Transportation • Use ramps or channels to and from sidewalk (and refuge Engineers. Pg. 52. island if applicable). 2.Ibid. Pg. 70-71. 3.Ibid. • Use overhead safety lighting on approach sides of both ends 4.City of Ann Arbor Planning and Development Services of the crossing. and the Alternative Transportation Program. (2007). Ann Arbor Non-motorized Transportation Plan 2007. Pg. 24-28. Retrieved 4/15/2011, from http://www.a2gov.org/ • Use high-visibility crossing markings and consider adding government/communityservices/planninganddevelopment/planning/Documents/Mas- yield markers. ter%20Plans /AANoMo_MasterPlan_2007.pdf.> • Use a “Z” crossing configuration with crossings at medians to 5.Institute of Transportation Engineers. (2010). Designing Walkable Urban Thorough- encourage pedestrians to look for oncoming traffic.10 fares: A Context Sensitive Approach. Washington, DC: Institute of Transportation Engineers. Pg. 124. 6.Ibid. Pg. 70-71. 7.Ibid. Pg. 126. 8.Ibid. Pg. 162-165. 9.AASHTO Task Force on Geometric Design. (1990). Guide for the Development of Bicycle Facilities. Washington, DC: American Association of Highway and Transporta- tion Officials. Pg. 16-26. Institute of Transportation Engineers. (2010). Designing Walkable Urban Thoroughfares: A Context Sensitive Approach. Washington, DC: Institute of Transportation Engineers. Pg 124. Figure 9. Example of a midblock crossing with pedestrian island and “z” configuration. Source:Southwest Neighborhoods Inc. MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 14
  • 20. Preliminary Plans Purpose: foundation for future incremental change within In areas where large amounts of new development are occurring, the the project area. Complete Streets design standards from the previous chapter could • Phase 2 includes a set of design recommendations that be applied in a strict, literal fashion. Given resource and financial significantly improve the resources available for alternative restrictions, however, the redevelopment of existing infrastructure is transportation and in some cases significantly change current likely to overshadow new development. To be applied in these common patterns of automobile traffic. scenarios, Complete Streets tenets must be broken into individual ◦◦ Goal: To build upon the momentum established elements that can be implemented based on the needs of the project in Phase I and integrate all major transportation area. groups. To help illustrate this process, this chapter shows how Complete Streets Van Dyke Avenue: 8 Mile Rd. to 10 Mile Rd. programs can be applied within Macomb County. The study areas used Existing Conidtions: in this illustration are Van Dyke Avenue between 8 Mile Road to 10 Mile Van Dyke Avenue is a major surface road that runs north through Road, and Garfield Road between 17 Mile Road and Hall Road. Both Macomb County from Lynch Road to 27 Mile Road. For the portion hypothetical plans begin with a short review of current use patterns, included in the study area, Van Dyke Avenue consists of three existing roadway design, and surrounding patterns of land use. Based northbound lanes, three southbound lanes, and one middle turning lane on these issues, each plan then progresses to two alternative designs (approximately 77.5 feet). Either side of Van Dyke Avenue is bordered that represent two phases on a Complete Streets development timeline. by 10 feet of sidewalk, creating a total right-of-way width of about 110 These plans follow the recommended guidelines when possible, feet (See figure 10). illustrating how Complete Streets elements can adapt to the existing site characteristics. • Phase 1 of this timeline emphasizes design changes that can be implemented with few changes to the existing patterns of automobile use and no alterations to current traffic engineering guidelines. 12’ 11’ 11’ 9’6” 11’ 11’ 12’ ◦◦ Goal: To establish a physical and social Figure 10. Cross Section of Van Dyke Avenue Created by Will Tardy Page 15 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 21. Preliminary Plans According to SEMCOG’s latest 24-hour traffic counts (6/29/2010), the two-mile Van Dyke study area carries approximately 30,000 vehicles per day.1 Over the course of the day, traffic is heaviest from 11am to 12 am (approx. 1740 vehicles/hour), and from 3 pm to 6 pm (approx. 2136 vehicles/hour).2 The distribution of traffic between travel directions is very even with only a slight advantage of northbound over southbound in the later morning.3 The posted speed limit within the Van Dyke study area is 35 mph. To see more information on current traffic statistics Legend within the Van Dyke study area, please see Appendix: Traffic Statistics. Deciduous Woodlands Open Space, Developed The pedestrian facilities within the Van Dyke study area consist of Developed, Low Intensity signalized crossings at stoplights, abundant pedestrian lighting, small Developed, Med Intensity commercial setbacks, and trash bins. Available amenities for transit Developed, High Intensity riders include signed bus stops and a transit shelter at the 9 Mile Road- Van Dyke stop. Currently no facilities exist for cyclists. Figure 11. Land Use Map of Van Dyke Corridor Created by Will Tardy Land use along the Van Dyke study area is predominately light Source: 2006 USGS NLDC Land Cover Survey commercial, backed by residential land uses (see Figure 11). Typical businesses include automobile service stations, used car dealers, fast- Analysis: food restaurants, and small retail shops. The neighboring residential With a wide variety of land uses, small commercial setbacks, and areas are predominately single-family homes. The nearest industrial continuous sidewalks, the Van Dyke study area has many of the land uses are located a mile west on Mound Road. The public land uses underlying infrastructural components of Complete Streets design. within a mile of the Van Dyke study area include three parks and Lincoln Planners and engineers can build on this foundation by increasing High School. the number of amenities for users of non-motorized and public transportation. Key issues to be addressed by these amenities include: MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 16
  • 22. Preliminary Plans • Increasing the availability of safe street crossings, Phase 1 also recommends increasing the number of transit shelters • Incentivizing the use of public transit, and available. To educate riders on the availability of buses, schedules • Creating spaces where the community residents, particularly should be posted within each shelter. the area’s school-aged youth, feel comfortable cycling. Table 8. SWOT Analysis for Van Dyke Phase 1 As a complete system of built space and lifestyles, the current design of Pros Cons STRENGTHS WEAKNESSES Van Dyke represents huge investments of financial and social capital. As a result, initiatives that threaten these investments would likely be Minimal Impact Minimal Service politically imprudent and fiscally wasteful. Therefore, the introduction of of Existing Traffic Provision for these amenities should be incremental and thoroughly vetted through Present Patterns Cyclists Facilitates midblock public meetings. crossing in high traffic area Implementation: Phase 1: The first step proposed within the Van Dyke study area is OPPORTUNITIES THREATS the installation of pedestrian islands within the middle turning lane. To Creates a base Generates facilitate safe and convenient street crossings, these islands should Future for incremental additional be located at block midpoints. To assure that these structures draw investment maintenance costs in pedestrians and alert drivers, islands should be accompanied by signage and crosswalk striping (see Figure 12). On some segments Note: SWOT (Strength, Weakness, Opportunity, and Threats) analysis is used to provide a holistic and transparent review of planning of Van Dyke, existing driveway locations will make the installation of recommendations pedestrian islands problematic. In these cases, because there are a limited number of viable businesses, planners should place midblock Phase 2: To complete the conversion of the Van Dyke study area into crossings to accommodate established business interests. In locations a Complete Streets corridor, Phase 2 proposes the conversion of both of close proximity (1 mile) to schools, parks, and other public spaces, outer two driving lanes into a curbside 7-foot parking lane and a 5-foot however, priority should be granted to the placement of pedestrian bicycle lane. Since this change in vehicular traffic pushes buses away crossing amenities (see the Proposed Plan Maps section in the from the curb, this phase also includes 7-foot sidewalk extensions at appendix for more details). To incentivize the use of public transit, Page 17 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 23. Preliminary Plans intersections and in the middle of large blocks to assure transit riders do not need to step off the curb to board (see Figure 13). Table 9. SWOT Analysis for Van Dyke Phase 2 The goal of Phase 2 is to maximize and accommodate the shift of users Pros Cons from automobile traffic to alternate transportation means. However, STRENGTHS WEAKNESSES planners and engineers will drastically redefine the structure of the corridor and likely encounter negative public response. To accommodate Maximizes the Requires significant likelihood of changes in traffic and perhaps prevent these concerns from arising, establishing public Present mode shift patterns support through education and design charrettes is essential. Likely to generate public protest OPPORTUNITIES THREATS Creates the Requires similar and opportunity to concurrent efforts in Future radically redefine neighboring areas to the character and reach full potential perception of the neighborhood Note: SWOT analysis is used to provide a holistic and transparent review of planning recommendations MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 18
  • 24. Preliminary Plans Figure 12. Phase 1 of Van Dyke Ave. Created by Jonathan Moore 1.Mid-Block Crossing with Road Striping 2.Transit Shelters 2 Figure 13. Phase 2 of Van Dyke Ave. Created by Jonathan Moore 1.On Street Parking with Bicycle Lane 1 2.Bike Parking 3.Sidewalk Extensions 3 Page 19 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 25. Preliminary Plans Garfield Road: 17 Mile Rd. to Hall Mile Rd. Existing Conidtions: Garfield Road is a principal arterial that runs north through Macomb County from 14 Mile Road to 22 Mile Road. The portion of roadway included in the study area (17 Mile to Hall Road) consists of two northbound lanes, two southbound lanes, and one middle turning lane 6’ 25’ 12’ 11’ 9’6” 11’ 12’ 25’ 6’ (approx. 55.5 feet). Either side of Garfield Road is bordered by 25 feet Figure 14. Cross Section of Garfield Rd. Created by Will Tardy of grassy shoulder and 10 feet of sidewalk, creating a total right-of- way width of about 120 feet (see Figure 14). According to SEMCOG’s The existing pedestrian facilities within the Garfield study area consist latest 24-hour traffic counts (3/25/2009), this three-mile segment of of signalized crossing at stoplights and non-continuous sidewalks. 4 road carries approximately 20,000 vehicles per day. The concentration For transit riders, the available amenities consist of signed bus stops. of traffic within the Garfield study area peaks between 11am and 12 Currently no facilities exist for cyclists. am (approx. 2600 vehicles/hour) and from 2 pm to 5 pm (approx 2576 vehicles/hour).5 The distribution of traffic between travel directions is Land use within the Garfield study area is predominately commercial generally heavier in the northbound lanes. In the section of Garfield 6 and institutional, with residential land uses behind (see Fig 15). Typical between19 Mile Road and Hall Road, however, northbound traffic was commercial land uses include small banks, restaurants, department one-quarter of the daily southbound traffic (presumably because of stores, and strip mall developments. The institutional land uses on people exiting Garfield for Macomb Community College).7 The posted Garfield include the extensive campus of Macomb County Community speed limit within the Garfield study area is 45 MPH. To see more College (MCCC), Henry Ford Macomb Hospital, and Wyandot Middle information on current traffic statistics within the Van Dyke study area, School. Residential areas within the study area are predominately please see Appendix # : Traffic Statistics. single-family homes. Along Garfield there are a few multi-unit residential developments, particularly near MCCC. Within a half-mile radius of the Garfield study area, there are no parks or public land uses other than Wyandot Middle School. MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 20
  • 26. Preliminary Plans development, and reduced setbacks to resolve this issue.8,9 In the immediate future, however, public support for low-density development reduces the political effectiveness of zoning initiatives.10 As an alternative, planners and engineers can support Complete Streets by focusing on improving pedestrian, cyclist, and transit rider amenities. In the non-motorized section of its Long Range Plan, the Macomb County Road Commission creates a convenient base for this initiative by showcasing the regional recreational bike-pedestrian paths developing Legend within the county.11 Deciduous Woodlands Open Space, Developed Phase 1: The first step proposed for the Garfield study area is the Developed, Low Intensity installation of four key pedestrian and transit rider amenities (See Figure Developed, Med Intensity 16). The most critical of these amenities is pedestrian lighting. With Developed, High Intensity Wyandot Middle School located directly on Garfield, this investment will not only increase safety for the general public, but also support the ability of students to walk to school. The second most critical infrastructure investment is extending the sidewalks through the grassy Figure 15. Land Use Map of Garfield Corridor. Created by Will Tardy shoulder at transit stops. For able-bodied transit riders, the existing Source: 2006 USGS NLDC Land Cover Survey 25-foot grassy buffer between the sidewalk and the curb poses only a small inconvenience. For the elderly and handicapped, however, Analysis: uneven terrain can create a major impediment to boarding the bus. With a mix of commercial, institutional, and residential areas, the To make the use of public transportation more comfortable and safe, Garfield study area has the right mix of land uses to attract pedestrian the third initiative integrated into Phase 1 is the installation of more and cyclist traffic. Due to its suburban character, however, the land transit shelters. To create an inviting pedestrian environment, the final use density is not high enough to make regular non-motorized and recommendation of Phase 1 is to plant street trees along the existing public transportation convenient. In the long term, local planners could sidewalk. use zoning regulations that incentivize increased density, mixed use Page 21 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 27. Preliminary Plans pedestrian activity, but existing crossing systems are inconvenient. The Table 10. SWOT Analysis for Garfield Phase 1 area around Wyandot Middle School is a prime example of this sort of Pros Cons condition (see Appendix: Proposed Plan Maps for more details). STRENGTHS WEAKNESSES Table 11. SWOT Analysis for Garfield Phase 2 Supports alternative Does not provide Pros Cons Present transportation infrastructure for STRENGTHS WEAKNESSES without impeding cyclists existing traffic Supports alternative Does not address Present transportation land use issues OPPORTUNITIES THREATS without impeding existing traffic Creates a base Generates Future for incremental additional OPPORTUNITIES THREATS investment maintenance costs Facilitates public Generates Note: SWOT analysis is used to provide a holistic and transparent awareness additional review of planning recommendations Future of alternative maintenance costs transportation Phase 2: To complete the conversion of the Garfield Road study area options and Reduced population into a Complete Streets corridor, a portion of the grassy shoulder can associated benefits density be converted into a bicycle path (See Figure 17). Located adjacent to the existing sidewalk, this improvement creates a safe and comfortable Note: SWOT analysis is used to provide a holistic and transparent review of planning recommendations riding environment without creating conflicts with automobiles. In addition, additional trash bins and benches should be installed to complement the recreational path. To support safe and convenient pedestrian crossings, Phase 2 recommends the installation of midblock crossings. To be most effective, the crossings should be placed where a mix of land uses support MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 22
  • 28. Preliminary Plans Figure 16. Phase 1 of Garfield Rd. Created by Jonathan Moore. 3 4 1. Pedestrain Lighting & Street Trees, 2.Bike Parking 1 3.Transit Shelters 4.Sidewalk Extensions 2 Figure 17. Phase 2 of Garfield Rd. Created by Jonathan Moore 1. Recreational Bike Path 2 1 2.Midblock Crossing with Road Striping Page 23 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 29. Preliminary Plans REFERENCES: 1.Southeast Michigan Council of Governments (SEMCOG). (2010, June 29). Volume Count Report: Van Dyke Avenue. Retrieved 4/2/2011, from the SEMCOG’s Traffic Count Database, from http://www.semcog.org/data/Apps/trafficcounts.cfm. 2.Ibid. Volume Count Report: Van Dyke Avenue. 3.Ibid. Volume Count Report: Van Dyke Avenue. 4.Southeast Michigan Council of Governments (SEMCOG). (2009, March 25).Volume Count Report: Garfield Road. Retrieved 4/2/2011, from the SEMCOG’s Traffic Count Database, from http://www.semcog.org/data/Apps/trafficcounts.cfm. 5.Ibid. Volume Count Report: Garfield Road. 6.Ibid. Volume Count Report: Garfield Road. 7.Ibid. Volume Count Report: Garfield Road. 8.Marwedel, James. (1998, November). Opting for Performance: An Alternative to Conventional Zoning for Land Use Regulation. Journal of Planning Literature, 13(2), 220-231. 9.Shoup, Donald. (2008). Graduated Density Zoning. Journal of Planning Education and Research, 28, 161-179. 10.Talen, Emily. (2001, Spring). Traditional Urbanism Meets Residential Affluence. Jour- nal of the American Planning Association, 67(2), 199-216. 11.Parsons Brinckerhoff Michigan, Inc. (2005, April). Road Commission of Macomb County Long Range Master Plan 2004 – 2030 Final Report. P. 46-48. Retrieved 4/2/2011, from www.rcmcweb.org. MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 24
  • 30. Implementation Tools Though design improvements to the roadway are a key element to Com- who have varying work schedules. plete Streets, without implementation strategies in place, these modifica- tions cannot be made. Some of the most important of these strategies Physical and Virtual Tours: include public outreach models, financing mechanisms, and policy initia- For those who learn visually, seeing something firsthand may have a tives. In accordance with this document’s goal of identifying local, state, powerful impact. When the time and resources permit, taking people into and federal resources, the following section highlights some of the most the field can be a great learning tool. If possible, participants should see successful implementation strategies from around the country. examples of both incomplete and complete streets. For audiences on tight time constraints, virtual tours may also be a viable outreach strat- Public Outreach and Stakeholder Identification egy. Tools: “A more engaged and collaborative approach that includes as many Complete Streets Business Sessions: stakeholders and implementers as possible tends to be more broadly Business owners might initially be wary of a change that takes automo- 1 supported.” – Minnesota Complete Streets Coalition bile traffic away from their stores. A special workshop for business own- ers highlighting the specific economic benefits of Complete Streets help As the quote suggests, public participation is critical to the success of to secure the support of these key stakeholders. Studies show that hav- any Complete Streets initiative, because the concept requires a funda- ing more transit and non-motorized options can lead to visitors staying mental change in thinking about roadway design. Useful participation- an extra three or four hours in the area, which can lead to an increase based programming for Complete Streets includes workshops, street in sales.2,3 These sessions should emphasize how the Complete Streets tours, and Complete Streets business meetings. approach creates a lively and successful commercial environment. Complete Streets Workshops: The activities outlined above represent only a small sample of the In order to garner support from local stakeholders, many municipali- unique ways planners can adapt public participation to the needs of ties have implemented Complete Streets workshops. These workshops Complete Streets. The Portland Public Participation Manual, can be serve as visionary sessions that not only define Complete Streets, seen at their website (http://www.pdc.us/public-participation/default.asp). but also provide advocacy tools for local leaders to bring back to their constituencies. While workshops typically occur during the evening, a Financing Tools: Complete Streets afternoon session may be more appropriate for those Currently, state legislation requires that one percent of municipal fund- Page 25 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 31. Implementation Tools ing derived from the Michigan transportation fund must be used for • $10 Million Parks and Recreation Funding: capitalized on non-motorized transportation.4 However, because municipal funding is Metro Parks, which at the time planned to spend approxi- limited, Macomb County must think creatively to make Complete Streets mately $2,500,000 in 2008 for land acquisition, design, and a priority. Below is a list of tools utilized by other municipalities in similar construction in Central Ohio.6 financial constraints. • $15 Million Funding from Other State and Other Local Sources: utilized other public and private resources, includ- Columbus, OH: Federal, State, and Local Combination ing allocations set aside for land conservation, public transit, In 2008, the Columbus City Council adopted the Bicentennial Bikeways utilities, environmental mitigation, health and physical activity, Plan, which acted as a thorough, step-by-step strategy for expanding and education. bike infrastructure in Columbus. Like many municipalities, Columbus did A more detailed list of funding resources for the Bicentennial Bikeways not have a dedicated funding stream for such improvements. Further- Plan can be found in the Appendix. more, Columbus was at the mercy of the federal funding structure, which often requires municipalities to seek many federal resources to fund Macomb County could try to duplicate Columbus’s example. Columbus one project.5 The plan acknowledged the variety of resources that the benefited from an extensive search into resources that promoted public city would have to target for funding, including federal, state, and local health, environmental sustainability, conservation, and transit. Further- resources. Below is a brief list of the primary recommendations: more, due to the nature of the Columbus bikeways plan, the city could tap into federal parks and recreation funding. A potential challenge is the • Bicentennial Bikeways Bonds (“B3” Bonds): called for the city amount of staff energy it takes to search and apply for resources. to include the Bikeways Plan improvements in the 2008 bond package. Michigan: Corridor Improvement Authorities • $25 Million Federal Transportation ‘Green Tea’ Demonstration The Corridor Improvement Authority (CIA), or Public Act 280, was ap- Project Funding: used a significant amount of money coming proved on the state level in 2005.7 CIAs assist municipalities in provid- from the federal SAFETEA transportation legislation. ing funding improvements outside of downtowns or normal business • $10 Million Private Sector ‘Adopt a Bikeway’ Endowment corridors.8 Very similar to a Downtown Development Authority (DDA), Campaign: created a campaign where key private sector and a CIA can hire a director, establish a tax-increment financing plan, and philanthropic partners would engage in a fundraising effort to levy special taxes or issue bonds.9 The only regulations imposed by the adopt a mile of the bikeway system. legislation require that a participating corridor must be: MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 26
  • 32. Implementation Tools • 51% first-floor commercial. by local businesses.14 The PPRTA use tax complements the sales tax • In existence for more than 30 years. and “is due on the use, storage, or consumption of any tangible personal • Adjacent to a road classified as an arterial or collector ac- property or tax- able service, purchased at retail, upon which no sales cording to the Federal Highway Administration. tax was paid.”15 Furthermore, the PPRTA received funding from a $4 • At least five contiguous acres. excise tax since 1998 that was levied on new bicycles purchased in the • Zoned to allow for mixed-use and high-density residential.10 city.16 Records show that in 2006, this excise tax generated more than $111,000 from over 31,000 bikes purchased.17 Finally, a participating municipality must allow for an expedited permit- ting and licensing process for developments along the corridor and must This financing tool, which is also used in other areas, including San make non-motorized transportation a priority.11 Several municipalities in Diego, would be the most difficult to implement in Macomb County. At Michigan have taken advantage of CIAs, including East Lansing, Grand the same time, it would mean lasting change. Because regional transit Rapids, Waterford Township, and St. Clair Shores. Van Dyke Avenue authorities that levy taxes are not legal on the state level in Michigan, and Garfield Road are excellent opportunities for CIAs, meeting all of pursuing an authority similar to the PPRTA requires lobbying for leg- the regulations. Though businesses may not be open to additional taxes, islative change. Further challenges with the sales and use tax include they may be enticed with an expedited navigation through the permit- potential pushback from businesses, arguing that their customers might ting process. Furthermore, funds from tax-increment financing, although spend less with an additional tax. Finally, putting such a proposal before limited in tough economic times, could be used to leverage other federal the voters in Macomb County is risky. Voters might not approve the tax and state funds for Complete Streets conversions. or the regional authority. However, this option creates a direct funding source for roadway improvement. It would demonstrate the county’s Colorado Springs, CO: Sales and Use Tax commitment to Complete Streets, and it would indicate that residents In 2004, voters in the Colorado Springs area approved the creation of also believe in the principles set by the county. the Pikes Peak Rural Transportation Authority (PPRTA), which is a re- gional authority that provides capital improvements and maintenance for Policy Recommendations: both auto-oriented and non-motorized transportation projects.12 Shortly Though Michigan recently passed Complete Streets legislation that illus- after the creation of the PPRTA, voters also approved a 1% sales and trates the importance of non-motorized transportation on a state level, a use tax that would help fund the work of the authority.13 The sales tax municipality and a county can enact certain policy measures on a more is collected similarly to the State of Colorado sales tax and is remitted local level. These include non-motorized plans, resolutions, and more Page 27 MACOMB COUNTY COMPLETE STREETS TOOLBOX
  • 33. Implementation Tools formal ordinances. Below are examples of policy changes that prioritize Ann Arbor, MI: Non-Motorized Plan Complete Streets. The City of Ann Arbor Non-motorized Plan 2007 contains much of the reasoning and guidelines behind making the roads safe for pedestrians Columbus, OH: Subdivision Ordinance and cyclists, a critical part of a complete street. The plan’s vision state- Until 1999, Columbus, Ohio lacked a comprehensive sidewalk law. New- ment describes the envisioned community as one that is safe and acces- ly elected City Councilmember Maryellen O’Shaughnessy advocated sible to pedestrians and cyclists as well as one that promotes a culture that the City Council address this issue by first updating the subdivision where people choose alternative transportation over cars.21 To that end, ordinance to require sidewalks for private development.18 The current it describes objectives, strategies, and design tools: subdivision law states that private developers must build sidewalks and • Educating the Ann Arbor community at various levels on the bikeways in accordance with the Bicentennial Bikeways Plan.19 The or- benefits of non-motorized transit, the existing options avail- dinance also “authorizes an in-lieu fee program modeled after the city’s able and the safety concerns of this kind of travel (Pg. 7). parkland dedication fund. If a particular development cannot provide • Site design checklists for bicycle parking, pedestrian and site-adjacent bicycle or pedestrian improvements due to site constraints, transit facilities, etc. (Pg. 92-94). the developer can pay a fee, and the improvements will be built offsite • Cross-sections and guidelines for different road types and 20 but within the same community planning area at a later date.” bike and pedestrian facilities (Ch. 2) This ordinance reduces the burden of municipalities to construct side- A non-motorized plan like Ann Arbor’s can help to further prioritize Com- walks, and it creates incentives for private developers to contribute to plete Streets, while giving advocacy groups a political tool. the Complete Streets philosophy. Having such an ordinance could be a first step for municipalities that are looking for innovative cost-sharing Lansing, MI and Columbus, OH: Complete Streets Resolutions and implementation tools, as well as methods for generating stakeholder Ordinances buy-in. In 2008, the Columbus City Council approved a resolution that illus- trated the city’s commitment to Complete Streets.23 The resolution was a result of many different stakeholders coming together, including the city attorney, police, biking and health advocates, and legislative ana- lysts. More than anything, city officials cited the resolution as a psycho- logical change. On March 2, 2009, the City Council adopted an official MACOMB COUNTY COMPLETE STREETS TOOLBOX Page 28