1. RESUME of JAIME N. ESPIRITU
Flat 732, Salmiya Building, Al Rigga Deira, Dubai UAE
Mobile # +971-259-0310
OBJECTIVE:
To obtain a position with a well established organization with a stable environment, wherein I can
maximize my management skills, quality assurance, and training experience that will lead to a lasting
relationship in the field of construction.
QUALIFICATIONS & FIELD OF EXPERIENCE:
More than twenty two years of experience in the Construction Industry, both local and foreign projects.
Well experienced and has acquired high level of proficiency in Engineering concepts, construction
standards, methodology, planning, and budgetary cost estimate. Well verse on electro-mechanical
related works on building construction, (HVAC, Plumbing & Fire Protection works). Familiar in the
implementation construction quality procedures, method statement and inspection test plan.
Senior E&M QA/QC Engineer for construction of underground railway project in Dubai UAE. Mechanical
Works Engineer in a prestigious Construction Management firm, from which I had an involvement to its
various high rise office & residential condominium projects, commercial complex and renovation of
existing BSP-Security Plant Complex in Metro Manila. Project In-Charge on various high-end two-storey
residential buildings around Metro Manila’s exclusive sub-divisions. Assistant Engineer for the
construction of Petrochemical Plants in Jubail, KSA and Sheetmetal & Plumbing Supervisor for the
construction of US Military Facility Buildings at US Naval Base in the Philippines.
ELIGIBILITY:
Passed the Professional Licensure Examination for Mechanical Engineers given by Philippines Regulation
Commission on October 1986 and acquired Professional License No.: 034730, July 1987.
EMPLOYMENT HISTORY:
OBAYASHI CORPORATION – P.O. Box 182845 Deira Dubai, UAE
As Senior Quality Engineer – Inclusive Date: Feb 23, 2008 to Present
PROJECT INVOLVED:
Dubai Metro Project - The project is a driverless, fully automated metro network in the United Arab
Emirates city of Dubai. The railway has two lines, the Redline which has a total length of 52.1km [32.5-
mile] and has 29 stations, four of which are underground, while the Green line has also a total length of
22.5km [14-mile] and has 20 stations, eight of which are also underground. The Construction Team is a
consortium of four Japanese companies and one Turkish company, headed by general contractor
Obayashi Corp. The other Japanese consortium members are general contractor Kajima Corp, Turkey's
Yapi Merkezi Insaat Ve Sanati AS, Japan's Mitsubishi Heavy Industries Ltd and trading house Mitsubishi
Corp.
DUTIES & RESPONSIBILITIES:
Administer QC inspection staff activities of the E & M works under the delegation of the QA/QC Manager.
Coordinate with construction team for Electro-mechanical related activities and ensure the proper
implementation of inspection and testing procedure, project quality control procedures, method
statement and inspection testing plans; thru surveillance monitoring of the related site inspection E&M
activities at underground and over ground stations of the Red line and Green line Phase.
Review draft NCR identified by QC Inspectors and evaluates the NCR proposal of preventive and
corrective action prior to the final approval of the QA/QC Manager. Maintain registers of inspection test
report, non-compliance report and material submittal status.
Jaime N. Espiritu Page 1
2. Review, evaluate and process the approval of material submittals of the sub-contractors. Conduct Site
internal Auditing on records and documents of E&M section on their activities as per company policy as
requirements of being an ISO 9001:2000 member.
JOSE ALILING & ASSOCIATES - #38 Xavierville Avenue, Loyola Heights, Quezon City, Philippines
As Mechanical Works Engineer – Inclusive Date: July 10, 2001 to Feb 15, 2008
PROJECT INVOLVED:
The Residences at Greenbelt – San Lorenzo Tower, [form September 2007 to February 2008] - The
project is located at Esperanza Drive, Legaspi’ Village, Makati City. It is one of the tallest skyscrapers in
the Philippines with a height of 204.5 meters from ground to its architectural spire. The building has 57
floors above ground, which include a 4-level podium with commercial establishments, and 3 basements
parking level. The residential unit includes 1, 2 & 3 bedroom units, bi-leveled units and penthouses.
Equipped with split type air-conditioning system, CCTV, PA/BGM, automatic fire sprinkler system,
constant pressure pump system and four elevators.
TriNoma, formerly North Triangle Commercial Complex [form February 2007 to September 2007]
- The project is located at North Avenue corner EDSA, Quezon City. It is a 4 level regional shopping
centre building with 8.3 hectares footprint. Build on top of the existing depot of Metro Rail Transit and
has direct connection to the concourse of MRT Station. The shopping mall is the first in the Philippines to
adopt the Ice Thermal Plant for its air-conditioning system; substation equipment has 18MVA power,
equipped with modern security system, and dedicated sewage treatment plant with capacity of 400 m 3
and 600 m3 each.
Bangko Sentral ng Pilipinas Security Complex Buildings [from January 2005 to January 2007] -
The project is located at Central Bank of the Philippines, East Avenue, Quezon City. The buildings are
constructed and rehabilitated per modules which includes, Skywalk, Security Holding Area, Additional
Parking, Security-Related Facilities, Bullet Proof Security Doors and Windows, Security Equipment and
Devices, Three Storey Cash Management Centre, Dining-Cum- Assembly Hall, Additional Structures as
Multi-Purpose Warehouse, Utility Building, Motor pool Facilities and Armored Truck/Car Parking and
Building Upgrades.
The Shang Grand Tower [July 2003 – December 2004] - The project is located at De La Rosa Street,
Makati City. It is a 46-storey 180 meters (630ft) residential condominium building with four basement
and three-above ground parking floors, elegantly designed 1, 2, 3 & 4 bedroom units. It has Amenity
Floor, Clubhouse and Swimming Pool. The building is equipped with split-type air-conditioning system,
automatic fire sprinkler system, constant pressure pump system, four elevators and high-tech security
system.
Immaculate Conception Academy [from January 2003 to July 2003] - The project is two Storey
Student Council Building with Mini-Olympic Swimming Pool and Bath House located at West Greenhills,
San Juan, Metro Manila, Philippines
Union Bank Plaza, formerly World Finance Tower [from July 2001 to December 2003] – The
project is an office skyscraper located in Pasig City, Philippines. It rises 206 meters [676 ft.] from
ground level to roof top helipad. The building has 49 levels above ground, and 6 basement levels,
equipped with 15 elevators, CCTV, BMS system and centralized air-conditioning system located at Onyx
corner Sapphire Streets, Ortigas Complex Pasig City Philippines.
DUTIES & RESPONSIBILITIES
Pre-Construction Phase - Reviews Plans and Documents for Bidding and Construction, identify items
on the plan for possible value engineering without sacrificing the design concept and functionality,
prepares Budgetary Cost Estimate for Mechanical, Plumbing & Fire Protection Works and assists in the
preparation of contract documents and attend bidding process together with the pre-con manager.
Construction Phase - Manage and Monitor each phase of mechanical, sanitary/plumbing and fire
protection works and see to it that the approved construction plan and technical specification is properly
implemented. Conduct on-site inspections and check the works if in compliance with approved
Jaime N. Espiritu Page 2
3. specifications and contract requirements. Monitor if the CQC Groups is strictly implementing the
approved contractors’ Quality Plan and witness all test of materials and equipments and secure test
results evidencing that it is in accordance with plans and specifications. Evaluate progress billing and
variation orders of the contractors. Attend Project Team Meeting, Coordination Meeting, CQC Meeting
and Plan Review Meeting together with the Owner, Construction Manager, Designers and the
Contractors.
Post Construction Phase - Prepare a final punch list showing the items that needs corrections,
conduct final inspection with the Owner and Consultants upon completion of the items in the punch list.
Assist the MEP contractors in the final testing and commissioning of equipments; evaluate T&C reports
prior to final hand-over to the owner and review as-built drawings, equipment’s operations &
maintenance manual submitted by the contractors and suppliers for final hand over to the owner.
PRIMEHOLDINGS CONSTRUCTION & TRADING INC.
#183 4th St., Riverside Village Ortigas Ave. Ext. Sta. Lucia, Pasig City, Philippines
As Mechanical Works Supervisor – Inclusive date: From February 15, 1999 to June 30, 2001
Project Involved - Twins Plaza Commercial Complex, Malolos Bulacan, Philippines
DUTIES & RESPONSIBILITIES
Supervise the following Mechanical Works; Installation Air-conditioning System, installation of sewer and
waste piping system, water distribution system, cistern water tank pumping system. Perform manpower
distribution and conduct daily tool box meeting and disseminate instruction to the crew for proper and
efficient execution of the works designated to them. Monitor each phase of work and see to it that the
construction schedule is on path and the approved construction plan, and technical specification is
properly followed.
VORTEX CONSTRUCTION CORPORATION
Lot 5, Block 3, Maligaya St., Gruar II Cainta, Rizal, Philippines
As Project In-Charge – Inclusive Date: From July 15, 1993 to January 30, 1999
PROJECT INVOLVED:
High end Residential Buildings at Exclusive subdivisions around Metro Manila. Mass housing project at
Antipolo City, Kimberly Warehouse at San Pablo City, Chemical Storage Warehouse at Wyeth Philippines
Canlubang Laguna, Administration Building & Cabanas at Splash Island at Carmona Cavite
DUTIES & RESPONSIBILITIES
Handle the construction of class residential buildings, warehouses, commercial buildings and mass
housing project. Coordinate to the owner and discuss matters regarding the development of the project.
Prepare construction schedule and discuss it to the owner for proper implementation. Directly supervise
the implementation of the construction plan and see to it that it is strictly implemented and followed.
Monitor the accomplishment of the work and prepares monthly progress billing.
TAISEI SAUDI ARABIA CO. LTD
P.O Box 90, Alkhobar 31952, Kingdom of Saudi Arabia
As Assistant Engineer – Inclusive Date: From December 16, 1991 to June 21, 1993
PROJECT INVOLVED:
Sharq Petrochemical Expansion Project
Jubail, Kingdom of Saudi Arabia
DUTIES & RESPONSIBILITIES:
Supervise and monitor the layout and installation of 2mØ underground Ameron Pipe, 2mØ meter
butterfly valve and its fabrication and installation of supports, chemical piping system and exterior
drainage system which involves heavy equipments and see to it that all coordinates is strictly
maintained by the surveyor involved. Supervise the tapping of piping system to the existing utilities,
installation of split type air-conditioning system. Perform office works regarding accomplishment report,
Jaime N. Espiritu Page 3
4. monitoring report and facilitates work permits. Conduct material inspection upon delivery on site and
see to it that it conforms to approved plans and specifications. Routinely reminds the workers regarding
safety precautions during implementation of the works inside the existing plant, in order to get rid of
mistakes and accidents.
CAPITOL INDUSTRIAL CONSTRUCTION GROUPS INC.
116 Herrera St., Legaspi’ Village, Makati, Metro Manila, Philippines
As Sheet Metal and Plumbing Supervisor – Inclusive Date: From March 6, 1986 to July 15, 1991
PROJECT INVOLVED:
Enlisted Marine Barracks – Four (4) Storey Building Project (1986-1988) U.S. Naval Base, Subic Bay,
Philippines Temporary Lodging Facility – Three (3) Storey Building Project (1988-1889) U.S. Naval Base,
Subic Bay, Philippines
Construct Consolidated Club Project – (1989-1991), USNAVCOMSTAPHIL, San Miguel Base, San Antonio,
Zambs, Phil.
DUTIES & RESPONSIBILITIES:
Supervise the fabrication and installation of HVAC system, centralized air-conditioning ductworks up to
testing and commissioning stage. Supervise the layout and installation of sewer and waste piping
system, Water distribution system, automatic fire sprinkler system and dry chemical fire suppression
system. Perform manpower distribution and conduct daily tool box meeting and disseminate instruction
to the crew for proper and efficient execution of the works designated to them. Interpret construction
plans and coordinates to other trades whenever there are conflicts and interference in the
implementation of the works.
EDUCATION:
National University, Manila, PH
B.S. Mechanical Engineering, 1985
TRAININGS & SEMINARS:
Air-conditioning and Instrumentation - Conducted by PSME, 1985
Air Distribution System - Conducted by PSME, 1985
Construction Safety Briefing & Seminar - Conducted by CICG, 1987
Air-conditioning Efficiency - Conducted by PSVARE 2002
Passive Fire Protection System - Conducted by HILTI Philippines, 2004
Ice Thermal Storage System - Conducted by Dunham-Bush Malaysia, 2007
Construction Railway Orientation & Seminar – Conducted by Mitsubishi-Dubai Metro, 2008
Testing & Commissioning, Operations & Maintenance Procedures [TCOMP] - Conducted by Mitsubishi-
Dubai Metro, 2009
PERSONAL INFORMATION:
Permanent Address: Namatacan San Narciso, Zambales, Philippines
Date of Birth: May 29, 1961
Place of Birth: San Narciso, Zambales
Passport No.: TT0940358, Expiration Date: 2011/10/13
Nationality: Filipino
UAE Labor Card No.: 35212188, Expiration Date: 2011/2/20
Civil Status: Married
Spouse: Rebecca F. Espiritu
Descendants: Arlowe, Jamie, Aldreen & Ashley
References:
Available upon request.