SlideShare une entreprise Scribd logo
1  sur  8
Télécharger pour lire hors ligne
434   Chapter 8
Exam Questions
1. Which of the following is NOT a part of quality?
A.	 Fitness for use
B.	 Conformance to requirements
Value to the sponsorC.	
Customer satisfactionD.	
2. A project manager is using a histogram to analyze defects found by the team during
inspection activities. What process is being performed?
Plan QualityA.	
B.	 Perform Quality Control
Perform Quality AssuranceC.	
Verify ScopeD.	
3. Which of the following is NOT an example of Cost of Quality?
Having team members spend extra time reviewing requirements with the stakeholdersA.	
Paying extra programmers to help meet a deadlineB.	
Hiring extra inspectors to look for defectsC.	
Sending a crew to repair a defective product that was delivered to the clientD.	
4. You’re working with an audit team to check that your company’s projects all meet the
same quality standards. What process is being performed?
A.	 Plan Quality
Perform Quality ControlB.	
Perform Quality AssuranceC.	
Perform Quality ManagementD.	
5. You’re managing a project to deliver 10,000 units of custom parts to a manufacturer
that uses Just In Time management. Which of the following constraints is most important
to your client?
The parts must be delivered on timeA.	
The parts must be delivered in a specific orderB.	
The parts must conform to ISO specificationsC.	
The parts must be packaged separatelyD.	
exam questions
Download at Boykma.Com
you are here 4   435
quality management
Exam Questions
6. Which of the following is NOT part of the quality management plan?
Strategies for handling defects and other quality problemsA.	
Guidance on how the project team will implement the company’s quality policyB.	
Metrics for measuring your project’s qualityC.	
A description of which deliverables don’t have to be inspectedD.	
7. Which of the following tools and techniques is used to show which categories of
defects are most common?
Control chartsA.	
B.	 Pareto charts
C.	 Run charts
D.	 Flowcharts
8. You’re managing a highway construction project. The foreman of your building team
alerts you to a problem that the inspection team found with one of the pylons, so you
use an Ishikawa diagram to try to figure out the root cause of the defect. What process is
being performed?
Quality ManagementA.	
Plan QualityB.	
Perform Quality ControlC.	
Perform Quality AssuranceD.	
9. Which tool or technique is used to analyze trends?
Scatter chartA.	
Run chartB.	
ChecklistC.	
Flow chartD.	
10. When is inspection performed?
At the beginning of the projectA.	
Any time a project deliverable is producedB.	
Just before the final product is deliveredC.	
At the end of the projectD.	
Download at Boykma.Com
436   Chapter 8
Exam Questions
11. What’s the difference between Quality Control and Verify Scope?
Quality Control is done at the end of the project, while Verify Scope is done throughout the projectA.	
Quality Control is performed by the project manager, while Verify Scope is done by the sponsorB.	
Quality Control is performed by the sponsor, while Verify Scope is done by the project managerC.	
Quality Control means looking for defects in deliverables, while Verify Scope means verifying that theD.	
product is acceptable to the stakeholders
12. You’re a project manager at a wedding planning company. You’re working on a large wedding for a
wealthy client, and your company has done several weddings in the past that were very similar to the one
you’re working on. You want to use the results of those weddings as a guideline to make sure that your
current project’s quality is up to your company’s standards. Which tool or technique are you using?
ChecklistsA.	
B.	 Benchmarking
Design of ExperimentsC.	
Cost-Benefit AnalysisD.	
13. You are using a control chart to analyze defects, when something on the chart causes you to realize
that you have a serious quality problem. What is the MOST likely reason for this?
TheA.	 rule of seven
Upper control limitsB.	
Lower control limitsC.	
D.	 Plan-Do-Check-Act
14. Which of the following BEST describes defect repair review?
Reviewing the repaired defect with the stakeholder to make sure it’s acceptableA.	
Reviewing the repaired defect with the team to make sure they document lessons learnedB.	
Reviewing the repaired defect to make sure it was fixed properlyC.	
Reviewing the repaired defect to make sure it’s within the control limitsD.	
15. The project team working on a project printing 3,500 technical manuals for a hardware manufacturer
can’t inspect every single manual, so they take a random sample and verify that they have been printed
correctly. This is an example of:
Root cause analysisA.	
B.	 Cost benefit analysis
BenchmarkingC.	
D.	 Statistical sampling
exam questions
Download at Boykma.Com
you are here 4   437
quality management
Exam Questions
16. What’s the difference between Perform Quality Control and Perform Quality Assurance?
Perform Quality Control involves charts like histograms and control charts, while PerformA.	
Quality Assurance doesn’t use those charts
Perform Quality Control and Perform Quality Assurance mean the same thingB.	
Perform Quality Control means inspecting for defects in deliverables, while Perform QualityC.	
Assurance means auditing a project to check the overall process
Perform Quality Assurance means looking for defects in deliverables, while Perform QualityD.	
Control means auditing a project to check the overall process
17. Which Quality Control tool is used to analyze processes by visualizing them graphically?
ChecklistsA.	
FlowchartsB.	
C.	 Pareto charts
D.	 Histograms
18. You are looking at a control chart to figure out if the way you are doing your project is fitting
into your company’s standards. Which process are you using ?
A.	 Plan Quality
Quality AssuranceB.	
Quality ControlC.	
Quality ManagementD.	
19. Which of the following is associated with the 80/20 rule ?
Scatter chartA.	
HistogramB.	
Control chartC.	
Pareto chartD.	
20. Validated defect repair is an output of which process ?
Integrated Change ControlA.	
Plan QualityB.	
Perform Quality ControlC.	
Perform Quality AssuranceD.	
Download at Boykma.Com
438   Chapter 8
Exam Questions
Answers
1. Answer: C
It’s important for projects to produce a valuable product, but value isn’t really a part of quality. That’s why
earned value is part of Cost Management, not Quality Management.
2. Answer: B
In the Perform Quality Control process, the team inspects the product for defects and uses the seven basic
tools to analyze them. Since the defects came from inspection, you know it’s Perform Quality Control.
3. Answer: B
Cost of Quality is the time and money that you spend to prevent, find, or repair defects.
4. Answer: C
The Perform Quality Assurance process is all about how well your company meets its overall quality goals.
5. Answer: A
A manufacturer that uses Just In Time management is relying on its suppliers to deliver parts exactly when
they’re needed. This saves costs, because they don’t have to warehouse a lot of spare parts.
6. Answer: D
Your project team needs to inspect ALL of the deliverables! That means every single thing that gets produced
needs to be reviewed by team members, so they can find and repair defects.
7. Answer: B
A Pareto chart divides your defects into categories, and shows you the percentage of the total defects each
of those categories represents. It’s really useful when you have a limited budget for Plan Quality and want to
spend it where it’s most effective!
But those parts had better not have a lot of
defects, because there aren’t a lot of spare
parts lying around to do repairs!
Don’t forget that ALL deliverables need to be
inspected, including the stuff you create—like
the schedule, WBS, and project management plan.
So you’ll get defects for them, too!
exam answers
Keep an eye out for fake process
names like Perform Quality
Management.
Download at Boykma.Com
you are here 4   439
quality management
Don’t assume that just because
you’re using a fishbone diagram,
you’re always doing quality control!
It’s also used in Risk Management; you’ll see
that in Chapter 11. The key thing to watch for
here is that the fishbone diagram is being used to find the
root cause of a DEFECT, not a risk or something else.
Exam Questions
Answers
8. Answer: C
Keep your eye out for questions
asking you about Ishikawa or
fishbone diagrams. When you use
those tools to analyze defects,
you’re in quality control.
OK, so I can use a run
chart to figure out whether
quality is getting better or worse
over the course of my project.
11. Answer: D
A lot of people get Quality Control and Verify Scope confused because they seem really similar. Both
of them involve looking closely at deliverables to make sure that they meet requirements. But they
serve really different purposes! You use Quality Control to find defects that you’re going to repair. Verify
Scope happens at the very end of the Executing phase; it’s when you work with the stakeholder to get
their formal acceptance for the deliverables.
12. Answer: B
Benchmarking is when you use previous projects to set quality guidelines for your current project. You
can always find the results of the past projects in the Organizational Process Assets.
You’d better have found all the
defects before you take the
product to the customer!
9. Answer: B
A run chart is one of the seven
basic tools of quality. It’s a long
line graph that shows you the
total number of defects that were
found over time.
10. Answer: B
Inspection is when your team examines something that they produced for
defects… and every single deliverable needs to be inspected! That’s what
“prevention over inspection” means: if you produce a deliverable that’s
needed later in the project today, it’s a lot cheaper to fix defects in it now
than it will be when that deliverable is used later on in the project.
Download at Boykma.Com
440   Chapter 8
Exam Questions
Answers
13. Answer: A
The rule of seven tells you that when seven consecutive data points on your control chart come out on the
same side of the mean, you’ve got a process problem. That sounds a little complicated, but it’s actually
pretty straightforward. Defects tend to be scattered around pretty randomly; in any project that makes a lot
of parts, even if they’re all within the specification, you’ll get a couple of parts that are a little bigger, and a
couple that are a little smaller. But if you have a bunch of them in a row that all run a little big, that’s a good
indication that something’s gone wrong on your assembly line!
14. Answer: C
Going back and repairing defects can be a pretty risky activity, because it’s really easy to introduce new
defects or not fully understand why the defect happened in the first place. Answer C says exactly that: you
go back and review the defects to make sure they’re fixed.
15. Answer: D
A lot of times it’s impractical to check every single product that rolls off of your assembly line. Statistical
sampling is a great tool for that; that’s when you pull out a small, random sample of the products and
inspect each of them. If they’re all correct, then there’s a very good chance that your whole product is
acceptable!
16. Answer: C
A lot of people get confused about the difference between Perform Quality Control and Perform Quality
Assurance. Quality Control is where you inspect deliverables for defects, while Quality Assurance is where
you audit the project to make sure the quality activities were performed properly.
You inspect products for defects, and you can
remember that because you’ll find an “inspected
by #8” tag in a product. You audit processes,
and you can remember that because when you
get audited, they’re making sure you did your
taxes correctly—they’re auditing your actions,
not a product.
exam answers
Download at Boykma.Com
you are here 4   441
quality management
Exam Questions
Answers
Just because you see a Perform Quality
Control tool, that doesn’t mean you’re
in the Perform Quality Control process...
because they’re also tools used in Perform
Quality Assurance! You always need to figure
out what you’re using them for.
17. Answer: B
A flowchart is one of the seven basic tools of quality. You use it to analyze processes that are part of
your project in order to look for quality problems and inefficiencies.
18. Answer: B
You’re analyzing the process, so you are using Perform Quality Assurance.
19. Answer: D
Pareto charts are based on the 80/20 rule. They sort your defects in descending order by root cause.
So you always know which 20% of root causes are responsible for 80% of defects on your project.
20. Answer: C
Perform Quality Control is where you inspect your work, including your repairs!
Download at Boykma.Com

Contenu connexe

Tendances (20)

04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management exam
 
Exam1
Exam1Exam1
Exam1
 
09 pmp human resource management exam
09 pmp human resource  management exam09 pmp human resource  management exam
09 pmp human resource management exam
 
1
11
1
 
Pmp6
Pmp6Pmp6
Pmp6
 
Pmp3
Pmp3Pmp3
Pmp3
 
Pmp exam q&a
Pmp exam q&aPmp exam q&a
Pmp exam q&a
 
12 pmp procurement management exam
12 pmp procurement management exam12 pmp procurement management exam
12 pmp procurement management exam
 
Pmp5
Pmp5Pmp5
Pmp5
 
04 pmp integration management exam
04 pmp integration management exam04 pmp integration management exam
04 pmp integration management exam
 
Pmp1
Pmp1Pmp1
Pmp1
 
01 pmp introduct to project management exam
01 pmp introduct to project management exam01 pmp introduct to project management exam
01 pmp introduct to project management exam
 
13 pmp professional responsibility exam
13 pmp professional responsibility exam13 pmp professional responsibility exam
13 pmp professional responsibility exam
 
02 pmp project life cycle exam
02 pmp project life cycle exam02 pmp project life cycle exam
02 pmp project life cycle exam
 
Pmp test 01
Pmp test 01Pmp test 01
Pmp test 01
 
Pmp test 02
Pmp test 02Pmp test 02
Pmp test 02
 
Pmp test 03
Pmp test 03Pmp test 03
Pmp test 03
 
150 PMP Questions
150 PMP Questions 150 PMP Questions
150 PMP Questions
 
Ppsi pertemuan-5-scope-management
Ppsi pertemuan-5-scope-managementPpsi pertemuan-5-scope-management
Ppsi pertemuan-5-scope-management
 
PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360PMP 1600 Questions by TechFAQ360
PMP 1600 Questions by TechFAQ360
 

En vedette (11)

Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
Project quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge AreaProject quality management - PMI PMBOK Knowledge Area
Project quality management - PMI PMBOK Knowledge Area
 
quiz
quizquiz
quiz
 
Quality management statement
Quality management statementQuality management statement
Quality management statement
 
Jamil pmp Certificate 2020
Jamil pmp Certificate 2020Jamil pmp Certificate 2020
Jamil pmp Certificate 2020
 
Pmp quality management questions
Pmp quality management questionsPmp quality management questions
Pmp quality management questions
 
Session 13 4th edition PMP
Session 13 4th edition PMPSession 13 4th edition PMP
Session 13 4th edition PMP
 
Jamil Hassan, PMP lessons learned.
Jamil Hassan, PMP lessons learned.Jamil Hassan, PMP lessons learned.
Jamil Hassan, PMP lessons learned.
 
Quality risk management tools
Quality risk management toolsQuality risk management tools
Quality risk management tools
 
Pmp Formula Pocket_Guide
Pmp Formula Pocket_GuidePmp Formula Pocket_Guide
Pmp Formula Pocket_Guide
 
Capm exam prep-questions_2010_ol
Capm exam prep-questions_2010_olCapm exam prep-questions_2010_ol
Capm exam prep-questions_2010_ol
 

Similaire à 08 pmp quality management exam

PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfProject Cubicle
 
APMP More MC Questions
APMP More MC QuestionsAPMP More MC Questions
APMP More MC QuestionsMonica Waters
 
Methodologies for quality management
Methodologies for quality managementMethodologies for quality management
Methodologies for quality managementAsamHussain3
 
Laura Ewing-Pearle: The Quality Puzzle
Laura Ewing-Pearle: The Quality PuzzleLaura Ewing-Pearle: The Quality Puzzle
Laura Ewing-Pearle: The Quality PuzzleLaura Ewing-Pearle
 
Service Encounters Grading Rubric  Must be attached .docx
Service Encounters Grading Rubric   Must be attached .docxService Encounters Grading Rubric   Must be attached .docx
Service Encounters Grading Rubric  Must be attached .docxlesleyryder69361
 
1440 pmp exam question bank
1440 pmp exam question bank1440 pmp exam question bank
1440 pmp exam question bankBaskar El
 
Istqb interview questions By H2KInfosys
Istqb interview questions By H2KInfosysIstqb interview questions By H2KInfosys
Istqb interview questions By H2KInfosysH2kInfosys
 
ISTQB Foundation level Sample Paper - Part 3
ISTQB Foundation level Sample Paper - Part 3 ISTQB Foundation level Sample Paper - Part 3
ISTQB Foundation level Sample Paper - Part 3 Parul Chotalia
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfMoncefMakni1
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaGlobalSkillup
 
Software testing concepts
Software testing conceptsSoftware testing concepts
Software testing conceptssatyatwrmca
 
Top Software Certifications CABA Exam Questions
Top Software Certifications CABA Exam QuestionsTop Software Certifications CABA Exam Questions
Top Software Certifications CABA Exam Questionsteena timmy
 
Ctfl 001 q&a-demo-exam-area
Ctfl 001 q&a-demo-exam-areaCtfl 001 q&a-demo-exam-area
Ctfl 001 q&a-demo-exam-areaSamanthaGreen16
 
Istqb question-paper-dump-9
Istqb question-paper-dump-9Istqb question-paper-dump-9
Istqb question-paper-dump-9TestingGeeks
 
Quality Management-KA.pptx
Quality Management-KA.pptxQuality Management-KA.pptx
Quality Management-KA.pptxssuser2ec65a
 

Similaire à 08 pmp quality management exam (20)

PMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdfPMP-Prep-Exam-Test-200_Questions.pdf
PMP-Prep-Exam-Test-200_Questions.pdf
 
APMP More MC Questions
APMP More MC QuestionsAPMP More MC Questions
APMP More MC Questions
 
Methodologies for quality management
Methodologies for quality managementMethodologies for quality management
Methodologies for quality management
 
Laura Ewing-Pearle: The Quality Puzzle
Laura Ewing-Pearle: The Quality PuzzleLaura Ewing-Pearle: The Quality Puzzle
Laura Ewing-Pearle: The Quality Puzzle
 
Service Encounters Grading Rubric  Must be attached .docx
Service Encounters Grading Rubric   Must be attached .docxService Encounters Grading Rubric   Must be attached .docx
Service Encounters Grading Rubric  Must be attached .docx
 
1440 pmp exam question bank
1440 pmp exam question bank1440 pmp exam question bank
1440 pmp exam question bank
 
Istqb interview questions By H2KInfosys
Istqb interview questions By H2KInfosysIstqb interview questions By H2KInfosys
Istqb interview questions By H2KInfosys
 
Quality - An Introduction-170715
Quality - An Introduction-170715Quality - An Introduction-170715
Quality - An Introduction-170715
 
Session 4 gdas pmp study group presentation
Session 4   gdas pmp study group presentationSession 4   gdas pmp study group presentation
Session 4 gdas pmp study group presentation
 
ISTQB Foundation level Sample Paper - Part 3
ISTQB Foundation level Sample Paper - Part 3 ISTQB Foundation level Sample Paper - Part 3
ISTQB Foundation level Sample Paper - Part 3
 
Chap5
Chap5Chap5
Chap5
 
PMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdfPMP Lite Mock Exam2.pdf
PMP Lite Mock Exam2.pdf
 
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge AreaOnline PMP Training Material for PMP Exam - Quality Management Knowledge Area
Online PMP Training Material for PMP Exam - Quality Management Knowledge Area
 
Software testing concepts
Software testing conceptsSoftware testing concepts
Software testing concepts
 
DISA 3-qbank with exp.docx
DISA 3-qbank with exp.docxDISA 3-qbank with exp.docx
DISA 3-qbank with exp.docx
 
DISA 3-qbank with exp.docx
DISA 3-qbank with exp.docxDISA 3-qbank with exp.docx
DISA 3-qbank with exp.docx
 
Top Software Certifications CABA Exam Questions
Top Software Certifications CABA Exam QuestionsTop Software Certifications CABA Exam Questions
Top Software Certifications CABA Exam Questions
 
Ctfl 001 q&a-demo-exam-area
Ctfl 001 q&a-demo-exam-areaCtfl 001 q&a-demo-exam-area
Ctfl 001 q&a-demo-exam-area
 
Istqb question-paper-dump-9
Istqb question-paper-dump-9Istqb question-paper-dump-9
Istqb question-paper-dump-9
 
Quality Management-KA.pptx
Quality Management-KA.pptxQuality Management-KA.pptx
Quality Management-KA.pptx
 

Plus de Jamil Faraj , PMP

Plus de Jamil Faraj , PMP (8)

Corona-virus PMP study plan
Corona-virus PMP study planCorona-virus PMP study plan
Corona-virus PMP study plan
 
PMP Study Plan by Jamil Faraj, PMP
PMP Study Plan by Jamil Faraj, PMPPMP Study Plan by Jamil Faraj, PMP
PMP Study Plan by Jamil Faraj, PMP
 
Jamil Faraj CV 2020
Jamil Faraj CV 2020Jamil Faraj CV 2020
Jamil Faraj CV 2020
 
Jamil faraj hassan CV
Jamil faraj hassan CVJamil faraj hassan CV
Jamil faraj hassan CV
 
PMP ITTOs Quick Review
PMP ITTOs Quick Review PMP ITTOs Quick Review
PMP ITTOs Quick Review
 
2
22
2
 
Jamil Faraj CV- English
Jamil Faraj CV- EnglishJamil Faraj CV- English
Jamil Faraj CV- English
 
دورة وظيفة العمر
دورة وظيفة العمردورة وظيفة العمر
دورة وظيفة العمر
 

Dernier

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 

Dernier (20)

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 

08 pmp quality management exam

  • 1. 434   Chapter 8 Exam Questions 1. Which of the following is NOT a part of quality? A. Fitness for use B. Conformance to requirements Value to the sponsorC. Customer satisfactionD. 2. A project manager is using a histogram to analyze defects found by the team during inspection activities. What process is being performed? Plan QualityA. B. Perform Quality Control Perform Quality AssuranceC. Verify ScopeD. 3. Which of the following is NOT an example of Cost of Quality? Having team members spend extra time reviewing requirements with the stakeholdersA. Paying extra programmers to help meet a deadlineB. Hiring extra inspectors to look for defectsC. Sending a crew to repair a defective product that was delivered to the clientD. 4. You’re working with an audit team to check that your company’s projects all meet the same quality standards. What process is being performed? A. Plan Quality Perform Quality ControlB. Perform Quality AssuranceC. Perform Quality ManagementD. 5. You’re managing a project to deliver 10,000 units of custom parts to a manufacturer that uses Just In Time management. Which of the following constraints is most important to your client? The parts must be delivered on timeA. The parts must be delivered in a specific orderB. The parts must conform to ISO specificationsC. The parts must be packaged separatelyD. exam questions Download at Boykma.Com
  • 2. you are here 4   435 quality management Exam Questions 6. Which of the following is NOT part of the quality management plan? Strategies for handling defects and other quality problemsA. Guidance on how the project team will implement the company’s quality policyB. Metrics for measuring your project’s qualityC. A description of which deliverables don’t have to be inspectedD. 7. Which of the following tools and techniques is used to show which categories of defects are most common? Control chartsA. B. Pareto charts C. Run charts D. Flowcharts 8. You’re managing a highway construction project. The foreman of your building team alerts you to a problem that the inspection team found with one of the pylons, so you use an Ishikawa diagram to try to figure out the root cause of the defect. What process is being performed? Quality ManagementA. Plan QualityB. Perform Quality ControlC. Perform Quality AssuranceD. 9. Which tool or technique is used to analyze trends? Scatter chartA. Run chartB. ChecklistC. Flow chartD. 10. When is inspection performed? At the beginning of the projectA. Any time a project deliverable is producedB. Just before the final product is deliveredC. At the end of the projectD. Download at Boykma.Com
  • 3. 436   Chapter 8 Exam Questions 11. What’s the difference between Quality Control and Verify Scope? Quality Control is done at the end of the project, while Verify Scope is done throughout the projectA. Quality Control is performed by the project manager, while Verify Scope is done by the sponsorB. Quality Control is performed by the sponsor, while Verify Scope is done by the project managerC. Quality Control means looking for defects in deliverables, while Verify Scope means verifying that theD. product is acceptable to the stakeholders 12. You’re a project manager at a wedding planning company. You’re working on a large wedding for a wealthy client, and your company has done several weddings in the past that were very similar to the one you’re working on. You want to use the results of those weddings as a guideline to make sure that your current project’s quality is up to your company’s standards. Which tool or technique are you using? ChecklistsA. B. Benchmarking Design of ExperimentsC. Cost-Benefit AnalysisD. 13. You are using a control chart to analyze defects, when something on the chart causes you to realize that you have a serious quality problem. What is the MOST likely reason for this? TheA. rule of seven Upper control limitsB. Lower control limitsC. D. Plan-Do-Check-Act 14. Which of the following BEST describes defect repair review? Reviewing the repaired defect with the stakeholder to make sure it’s acceptableA. Reviewing the repaired defect with the team to make sure they document lessons learnedB. Reviewing the repaired defect to make sure it was fixed properlyC. Reviewing the repaired defect to make sure it’s within the control limitsD. 15. The project team working on a project printing 3,500 technical manuals for a hardware manufacturer can’t inspect every single manual, so they take a random sample and verify that they have been printed correctly. This is an example of: Root cause analysisA. B. Cost benefit analysis BenchmarkingC. D. Statistical sampling exam questions Download at Boykma.Com
  • 4. you are here 4   437 quality management Exam Questions 16. What’s the difference between Perform Quality Control and Perform Quality Assurance? Perform Quality Control involves charts like histograms and control charts, while PerformA. Quality Assurance doesn’t use those charts Perform Quality Control and Perform Quality Assurance mean the same thingB. Perform Quality Control means inspecting for defects in deliverables, while Perform QualityC. Assurance means auditing a project to check the overall process Perform Quality Assurance means looking for defects in deliverables, while Perform QualityD. Control means auditing a project to check the overall process 17. Which Quality Control tool is used to analyze processes by visualizing them graphically? ChecklistsA. FlowchartsB. C. Pareto charts D. Histograms 18. You are looking at a control chart to figure out if the way you are doing your project is fitting into your company’s standards. Which process are you using ? A. Plan Quality Quality AssuranceB. Quality ControlC. Quality ManagementD. 19. Which of the following is associated with the 80/20 rule ? Scatter chartA. HistogramB. Control chartC. Pareto chartD. 20. Validated defect repair is an output of which process ? Integrated Change ControlA. Plan QualityB. Perform Quality ControlC. Perform Quality AssuranceD. Download at Boykma.Com
  • 5. 438   Chapter 8 Exam Questions Answers 1. Answer: C It’s important for projects to produce a valuable product, but value isn’t really a part of quality. That’s why earned value is part of Cost Management, not Quality Management. 2. Answer: B In the Perform Quality Control process, the team inspects the product for defects and uses the seven basic tools to analyze them. Since the defects came from inspection, you know it’s Perform Quality Control. 3. Answer: B Cost of Quality is the time and money that you spend to prevent, find, or repair defects. 4. Answer: C The Perform Quality Assurance process is all about how well your company meets its overall quality goals. 5. Answer: A A manufacturer that uses Just In Time management is relying on its suppliers to deliver parts exactly when they’re needed. This saves costs, because they don’t have to warehouse a lot of spare parts. 6. Answer: D Your project team needs to inspect ALL of the deliverables! That means every single thing that gets produced needs to be reviewed by team members, so they can find and repair defects. 7. Answer: B A Pareto chart divides your defects into categories, and shows you the percentage of the total defects each of those categories represents. It’s really useful when you have a limited budget for Plan Quality and want to spend it where it’s most effective! But those parts had better not have a lot of defects, because there aren’t a lot of spare parts lying around to do repairs! Don’t forget that ALL deliverables need to be inspected, including the stuff you create—like the schedule, WBS, and project management plan. So you’ll get defects for them, too! exam answers Keep an eye out for fake process names like Perform Quality Management. Download at Boykma.Com
  • 6. you are here 4   439 quality management Don’t assume that just because you’re using a fishbone diagram, you’re always doing quality control! It’s also used in Risk Management; you’ll see that in Chapter 11. The key thing to watch for here is that the fishbone diagram is being used to find the root cause of a DEFECT, not a risk or something else. Exam Questions Answers 8. Answer: C Keep your eye out for questions asking you about Ishikawa or fishbone diagrams. When you use those tools to analyze defects, you’re in quality control. OK, so I can use a run chart to figure out whether quality is getting better or worse over the course of my project. 11. Answer: D A lot of people get Quality Control and Verify Scope confused because they seem really similar. Both of them involve looking closely at deliverables to make sure that they meet requirements. But they serve really different purposes! You use Quality Control to find defects that you’re going to repair. Verify Scope happens at the very end of the Executing phase; it’s when you work with the stakeholder to get their formal acceptance for the deliverables. 12. Answer: B Benchmarking is when you use previous projects to set quality guidelines for your current project. You can always find the results of the past projects in the Organizational Process Assets. You’d better have found all the defects before you take the product to the customer! 9. Answer: B A run chart is one of the seven basic tools of quality. It’s a long line graph that shows you the total number of defects that were found over time. 10. Answer: B Inspection is when your team examines something that they produced for defects… and every single deliverable needs to be inspected! That’s what “prevention over inspection” means: if you produce a deliverable that’s needed later in the project today, it’s a lot cheaper to fix defects in it now than it will be when that deliverable is used later on in the project. Download at Boykma.Com
  • 7. 440   Chapter 8 Exam Questions Answers 13. Answer: A The rule of seven tells you that when seven consecutive data points on your control chart come out on the same side of the mean, you’ve got a process problem. That sounds a little complicated, but it’s actually pretty straightforward. Defects tend to be scattered around pretty randomly; in any project that makes a lot of parts, even if they’re all within the specification, you’ll get a couple of parts that are a little bigger, and a couple that are a little smaller. But if you have a bunch of them in a row that all run a little big, that’s a good indication that something’s gone wrong on your assembly line! 14. Answer: C Going back and repairing defects can be a pretty risky activity, because it’s really easy to introduce new defects or not fully understand why the defect happened in the first place. Answer C says exactly that: you go back and review the defects to make sure they’re fixed. 15. Answer: D A lot of times it’s impractical to check every single product that rolls off of your assembly line. Statistical sampling is a great tool for that; that’s when you pull out a small, random sample of the products and inspect each of them. If they’re all correct, then there’s a very good chance that your whole product is acceptable! 16. Answer: C A lot of people get confused about the difference between Perform Quality Control and Perform Quality Assurance. Quality Control is where you inspect deliverables for defects, while Quality Assurance is where you audit the project to make sure the quality activities were performed properly. You inspect products for defects, and you can remember that because you’ll find an “inspected by #8” tag in a product. You audit processes, and you can remember that because when you get audited, they’re making sure you did your taxes correctly—they’re auditing your actions, not a product. exam answers Download at Boykma.Com
  • 8. you are here 4   441 quality management Exam Questions Answers Just because you see a Perform Quality Control tool, that doesn’t mean you’re in the Perform Quality Control process... because they’re also tools used in Perform Quality Assurance! You always need to figure out what you’re using them for. 17. Answer: B A flowchart is one of the seven basic tools of quality. You use it to analyze processes that are part of your project in order to look for quality problems and inefficiencies. 18. Answer: B You’re analyzing the process, so you are using Perform Quality Assurance. 19. Answer: D Pareto charts are based on the 80/20 rule. They sort your defects in descending order by root cause. So you always know which 20% of root causes are responsible for 80% of defects on your project. 20. Answer: C Perform Quality Control is where you inspect your work, including your repairs! Download at Boykma.Com