NTR-Enhanced Lunar-Base
Supply Using Existing
Launch Fleet Capabilities

John Bess
Idaho National Laboratory
Emily Colvin
Georgia Institute of Technology
Paul Cummings
University of Michigan

Nuclear and Emerging Technologies for Space
ANS Annual Meeting, Atlanta, GA
June 14-19, 2009
Objective

Assess the feasibility of
 employing current Earth-to-orbit
 launch vehicles and a nuclear
 thermal rocket engine to deliver a
 21 metric ton payload to the lunar
 surface



                                      2
Mission Characterization
                                                             LSAM Burns to
                  LEO                                         Achieve LLO
                          EDS Detaches from
Launch                      CaLV; Burns to
on CaLV                    Circularize Orbit &
                              Achieve LEO
           Earth                                         Moon
                                                                  LSAM
                                   LSAM Burns to
                                                                  Lands
                                  Descend to Lunar
                                                       LLO
                                      Surface
            TLI
EDS Burns to
 Achieve TLI LSAM Detaches             Delivery of 21 metric tons in
               from EDS                  support of a lunar base

                    NASA’s Exploration Systems Architecture Study Final
                    Report. NASA-TM-2005-214062, November 2005
NTR-Enhanced ESAS Architecture

Substitution of
 the chemical EDS
 with a NTR
Increase lunar
 surface payload
 by 36.2%
 or
Reduce IMLEO by
 24.1%

         Using a Nuclear Thermal Rocket to Support a Lunar
         Outpost: Is It Cost Effective? STAIF 2007.
What Makes This Study Different?

Assume that the Ares rockets and
 other proposed earth-to-orbit
 launch systems will be unavailable
 for use
Use only existing launch vehicles
 coupled with a NTR to provide
 lunar support
Launch Fleet Characterization

Assessed characteristics of various
 foreign and domestic launch vehicles
Limitations were based on volume and
 not mass restraints for delivery to LEO
  ¤ Liquid hydrogen propellant
Launch vehicles and facilities within
 the United States were preferred
  ¤ Reduce security and handling concerns
Delta IV Heavy
                  Boeing
                  Launch Facilities
                    ¤ Space Launch Complex
                      37B, Cape Canaveral Air
                      Force Station, FL
                    ¤ Space Launch Complex
                      6, Vandenberg Air Force
                      Base, CA
                  Characteristics
                    ¤ 5-m ID, 13.8-m long
                      faring
                    ¤ 50,800 lb LEO
                    ¤ $253 M (2004) per launch
Atlas V Heavy
                 Lockheed Martin
                 Launch Facilities
                   ¤ Space Launch Complex
                     41, Cape Canaveral Air
                     Force Station, FL
                   ¤ Space Launch Complex
                     3-East, Vandenberg Air
                     Force Base, CA
                 Characteristics
                   ¤ 4.6-m ID, 12.2-m long
                     faring
                   ¤ 27,500 lb LEO
                   ¤ $138 M (2004) per launch
Rendezvous with Orbital Assembly
Six rockets needed
  ¤ 1 – reactor,
    shielding, structural
  ¤ 1 – payload, LSAM
  ¤ 4 – liquid hydrogen
    propellant
  ¤ NTR specific
    impulse of 850 s
An Isp of 950 s
 would require only
 four launch vehicles
Nuclear Thermal Rocket Engine
                 650 MW
                  tungsten-cermet
                  reactor
                 93%-enriched
                  HEU-O2
                 45-cm-thick ZrH
                  shadow shield
                 H2 flow rate:
                   ¤ 18.0 kg/s (850 s)
                   ¤ 16.1 kg/s (950 s)
Assembly Logistics

In-orbit infrastructure
  ¤ Independent orbital space garage
  ¤ Expansion of the International Space
    Station
Multi-launch coordination and timely
 construction
  ¤ Mitigate H2 boil-off concerns
  ¤ Development of in-space machining and
    welding that have already been
    demonstrated
Evaluation of Launch Costs
Reported launch cost estimates for the Ares
 rockets are ~$3K/lb (~$7K/kg) to LEO
  ¤ $875M to place 125 metric tons in LEO
~$12K/kg for Delta IV and Atlas V rockets
  ¤ $1.4B to launch 6 rockets
The Ares rockets use “economy of scale”
 for reduced launch cost
  ¤ Delta II and Atlas 2AS launch costs were still
    ~$12K/kg
  ¤ Similarly, a Ares V rocket would cost $1.5B
Additional Launch Costs
NTR engine
  ¤ ~$3B for contained test facility
  ¤ $1B for SAFE testing
In-orbit assembly
  ¤ Dominated by transportation costs, which are
    sensitive to demand
  ¤ Human assembly with associated infrastructure
    to cost ~10% of total ($140M)
Extra structural materials and assembly
  ¤ Assumed ~$140M
Cost Estimate for Lunar Base Supply ($B)

              ESAS       Fleet of    Fleet of
   Cost
              Mission   6 rockets   4 rockets
  Mission      1.50      1.40        1.14
 Assembly      0.00      0.14        0.11
 Structural    0.00      0.14        0.11

NTR Engine     0.00      1.00        1.00

 Total Cost    1.50      2.68        2.37
Additional Cost and Logistics Needs

Upgrade costs for new vehicle development
 and expansion of launch facilities are
 unknown
Launch costs heavily influenced by supply
 and demand
Additional costs may exist for coordinating
 multiple launches, especially near the ISS
Current launch systems are not man-rated
 and usable only for material transport
Developing Space Exploration Capabilities

Establishing NTR propulsion capabilities for
 other missions
  ¤ Mars and beyond, reusable rockets, fast transit
    capabilities
In-orbit construction allows for use of any
 launch vehicle system to “build” the rocket
 size of choice
  ¤ Not limited to a single quantized vehicle type
  ¤ Loss of a single launch vehicle does not
    jeopardize the entire mission
Extraterrestrial assembly and repair
 techniques
Recent Developments in the News
The Orlando Sentinel (4/2/09) – Cost for
 Constellation has “Ballooned” to $44 Billion
Parabolic Arc (4/4/09) – Space Frontier
 Foundation Will Campaign to “Kill” Ares
  ¤ Fund cheapest medium-lift vehicle launcher
The Orlando Sentinel (4/23/09) – NASA’s
 Internal Ares V Launch Date May Be Delayed
 by Two Years
Space News (5/9/09) – ULA Considering
 Ways to Alleviate “Launch Bottlenecks.”
  ¤ Build additional Atlas 5 launch infrastructure
  ¤ Purchase multiple vehicles at a time
The Aerospace Daily and Defense Report
 (6/15/09) – Delta IV Cheaper than Ares (for
 ISS) but at the Cost of Time
Conclusions
Costs have been estimated for the use
 of existing launch vehicles and a NTR
 to deliver 21 metric tons to the lunar
 surface
  ¤ ~ 60-80% greater than the estimated $1.5B
    cost for an Ares V rocket
  ¤ Development costs have not been fully
    assessed for either systems
  ¤ Benefits of developing in-space
    construction allows for the development
    of a more robust, lower risk exploration
    architecture

                                            18
Acknowledgments

Center for Space Nuclear
 Research
 ¤ Director Steve Howe
 ¤ 2006 CSNR Summer Fellows
Idaho National Laboratory
 ¤ Jim Werner
This work was performed by the Center for Space Nuclear Research under the direction of Battelle
 Energy Alliance, LLC (subcontract 43238) under Contract No. DE-AC07-05ID14517 with the U.S.
                                     Department of Energy

Contenu connexe

Tendances

Reusable Launch Vehicle
Reusable Launch VehicleReusable Launch Vehicle
Reusable Launch VehicleShranik Jain
 
Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014David Chato
 
Isro’s advanced technology vehicle (atv) – light rockets for many experiments
Isro’s advanced technology vehicle (atv) – light rockets for many experimentsIsro’s advanced technology vehicle (atv) – light rockets for many experiments
Isro’s advanced technology vehicle (atv) – light rockets for many experimentshindujudaic
 
Julie.webster
Julie.websterJulie.webster
Julie.websterNASAPMC
 
Conceptual Design of a Crewed Lunar Lander
Conceptual Design of a Crewed Lunar LanderConceptual Design of a Crewed Lunar Lander
Conceptual Design of a Crewed Lunar Landerguinness
 
Advanced systemconceptjun01
Advanced systemconceptjun01Advanced systemconceptjun01
Advanced systemconceptjun01Clifford Stone
 
Launch Services Program
Launch Services ProgramLaunch Services Program
Launch Services ProgramNASA Kennedy
 
Paper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management ChallengesPaper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management ChallengesDave Callen
 
Vertol drones for Cargo? Next-generation helicopters can achieve higher perfo...
Vertol drones for Cargo? Next-generation helicopters can achieve higher perfo...Vertol drones for Cargo? Next-generation helicopters can achieve higher perfo...
Vertol drones for Cargo? Next-generation helicopters can achieve higher perfo...rhetoricalmosai86
 
SpaceX's Falcon 9 Reusable Launch Vehicle
SpaceX's Falcon 9 Reusable Launch VehicleSpaceX's Falcon 9 Reusable Launch Vehicle
SpaceX's Falcon 9 Reusable Launch VehicleC Saravana kumar
 
IGARSS_2016_SPC_OP_asSubmitted
IGARSS_2016_SPC_OP_asSubmittedIGARSS_2016_SPC_OP_asSubmitted
IGARSS_2016_SPC_OP_asSubmittedomkarpradhan
 

Tendances (20)

Reusable Launch Vehicle
Reusable Launch VehicleReusable Launch Vehicle
Reusable Launch Vehicle
 
Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014Chato refueling with in situ produced propellants 2014
Chato refueling with in situ produced propellants 2014
 
Isro’s advanced technology vehicle (atv) – light rockets for many experiments
Isro’s advanced technology vehicle (atv) – light rockets for many experimentsIsro’s advanced technology vehicle (atv) – light rockets for many experiments
Isro’s advanced technology vehicle (atv) – light rockets for many experiments
 
FINAL PAPER
FINAL PAPERFINAL PAPER
FINAL PAPER
 
Reusable launch vehicle
Reusable launch vehicleReusable launch vehicle
Reusable launch vehicle
 
Robotic Refueling Mission
Robotic Refueling MissionRobotic Refueling Mission
Robotic Refueling Mission
 
Julie.webster
Julie.websterJulie.webster
Julie.webster
 
Conceptual Design of a Crewed Lunar Lander
Conceptual Design of a Crewed Lunar LanderConceptual Design of a Crewed Lunar Lander
Conceptual Design of a Crewed Lunar Lander
 
Advanced systemconceptjun01
Advanced systemconceptjun01Advanced systemconceptjun01
Advanced systemconceptjun01
 
GPS II F12
GPS II F12GPS II F12
GPS II F12
 
X-69
X-69X-69
X-69
 
Launch Services Program
Launch Services ProgramLaunch Services Program
Launch Services Program
 
Paper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management ChallengesPaper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management Challenges
 
Manuscript7
Manuscript7Manuscript7
Manuscript7
 
4_Moon_Missions
4_Moon_Missions4_Moon_Missions
4_Moon_Missions
 
Vertol drones for Cargo? Next-generation helicopters can achieve higher perfo...
Vertol drones for Cargo? Next-generation helicopters can achieve higher perfo...Vertol drones for Cargo? Next-generation helicopters can achieve higher perfo...
Vertol drones for Cargo? Next-generation helicopters can achieve higher perfo...
 
SpaceX's Falcon 9 Reusable Launch Vehicle
SpaceX's Falcon 9 Reusable Launch VehicleSpaceX's Falcon 9 Reusable Launch Vehicle
SpaceX's Falcon 9 Reusable Launch Vehicle
 
IGARSS_2016_SPC_OP_asSubmitted
IGARSS_2016_SPC_OP_asSubmittedIGARSS_2016_SPC_OP_asSubmitted
IGARSS_2016_SPC_OP_asSubmitted
 
Goddard 2015: Pamela Melroy, DARPA
Goddard 2015: Pamela Melroy, DARPAGoddard 2015: Pamela Melroy, DARPA
Goddard 2015: Pamela Melroy, DARPA
 
Spaceplanes
SpaceplanesSpaceplanes
Spaceplanes
 

En vedette

A presentation on working of nuclear power plants by Tushar gupta
A presentation on working of nuclear power plants by Tushar guptaA presentation on working of nuclear power plants by Tushar gupta
A presentation on working of nuclear power plants by Tushar guptaTushar Gupta
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energyZhong Yuan
 
Types of Nuclear Reactor
Types of Nuclear ReactorTypes of Nuclear Reactor
Types of Nuclear ReactorNishit Desai
 
Chapter 8 –
Chapter 8 –Chapter 8 –
Chapter 8 –DSO
 
Mechanical Engineering Project: Rocket Fuels
Mechanical Engineering Project: Rocket FuelsMechanical Engineering Project: Rocket Fuels
Mechanical Engineering Project: Rocket FuelsJJ Technical Solutions
 
Advantages and disadvantages of nuclear power
Advantages and disadvantages of nuclear power Advantages and disadvantages of nuclear power
Advantages and disadvantages of nuclear power Sajjadul Ponni
 
Nuclear Energy
Nuclear EnergyNuclear Energy
Nuclear EnergyDSO
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energyDholas
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plantDr. Ramesh B
 
Components of nuclear reactor
Components of nuclear reactorComponents of nuclear reactor
Components of nuclear reactorB.k. Das
 
Nuclear energy powerpoint.
Nuclear energy powerpoint.Nuclear energy powerpoint.
Nuclear energy powerpoint.Enigmatic You
 

En vedette (15)

A presentation on working of nuclear power plants by Tushar gupta
A presentation on working of nuclear power plants by Tushar guptaA presentation on working of nuclear power plants by Tushar gupta
A presentation on working of nuclear power plants by Tushar gupta
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energy
 
Types of Nuclear Reactor
Types of Nuclear ReactorTypes of Nuclear Reactor
Types of Nuclear Reactor
 
Nuclear Reactor
Nuclear Reactor Nuclear Reactor
Nuclear Reactor
 
Chapter 8 –
Chapter 8 –Chapter 8 –
Chapter 8 –
 
Mechanical Engineering Project: Rocket Fuels
Mechanical Engineering Project: Rocket FuelsMechanical Engineering Project: Rocket Fuels
Mechanical Engineering Project: Rocket Fuels
 
Advantages and disadvantages of nuclear power
Advantages and disadvantages of nuclear power Advantages and disadvantages of nuclear power
Advantages and disadvantages of nuclear power
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energy
 
Nuclear Energy
Nuclear EnergyNuclear Energy
Nuclear Energy
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energy
 
Nuclear energy
Nuclear energyNuclear energy
Nuclear energy
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Components of nuclear reactor
Components of nuclear reactorComponents of nuclear reactor
Components of nuclear reactor
 
nuclear reactors
nuclear reactors nuclear reactors
nuclear reactors
 
Nuclear energy powerpoint.
Nuclear energy powerpoint.Nuclear energy powerpoint.
Nuclear energy powerpoint.
 

Similaire à NTR - NETS 2009

Perspectives onpropulsion
Perspectives onpropulsionPerspectives onpropulsion
Perspectives onpropulsionClifford Stone
 
Ralph.basilio
Ralph.basilioRalph.basilio
Ralph.basilioNASAPMC
 
Ralph.basilio
Ralph.basilioRalph.basilio
Ralph.basilioNASAPMC
 
Internship Poster Session Lorenz Mosser _Lorenz Edit2
Internship Poster Session Lorenz Mosser _Lorenz Edit2Internship Poster Session Lorenz Mosser _Lorenz Edit2
Internship Poster Session Lorenz Mosser _Lorenz Edit2Colton Mosser
 
Embry Riddle Final
Embry Riddle FinalEmbry Riddle Final
Embry Riddle Finaljschrell
 
XCOR Exploration Alternatives - Jeff Greason
XCOR Exploration Alternatives - Jeff GreasonXCOR Exploration Alternatives - Jeff Greason
XCOR Exploration Alternatives - Jeff GreasonNewSpace 2014
 
Mission Opportunies to Trans Neptunian Objects 3
Mission Opportunies to Trans Neptunian Objects 3Mission Opportunies to Trans Neptunian Objects 3
Mission Opportunies to Trans Neptunian Objects 3Jordan Kreitzman
 
Jeff Greason NewSpace 2014
Jeff Greason NewSpace 2014Jeff Greason NewSpace 2014
Jeff Greason NewSpace 2014XCORAerospace
 
Rust.randy
Rust.randyRust.randy
Rust.randyNASAPMC
 
Airships as an Earth and Space Science Platform - Jason Rhodes
Airships as an Earth and Space Science Platform - Jason RhodesAirships as an Earth and Space Science Platform - Jason Rhodes
Airships as an Earth and Space Science Platform - Jason RhodesAdvanced-Concepts-Team
 
Challenger final release
Challenger final releaseChallenger final release
Challenger final releasemickmonte
 

Similaire à NTR - NETS 2009 (20)

GSFC_Servicing_Workshop
GSFC_Servicing_WorkshopGSFC_Servicing_Workshop
GSFC_Servicing_Workshop
 
Perspectives onpropulsion
Perspectives onpropulsionPerspectives onpropulsion
Perspectives onpropulsion
 
Ralph.basilio
Ralph.basilioRalph.basilio
Ralph.basilio
 
Ralph.basilio
Ralph.basilioRalph.basilio
Ralph.basilio
 
Internship Poster Session Lorenz Mosser _Lorenz Edit2
Internship Poster Session Lorenz Mosser _Lorenz Edit2Internship Poster Session Lorenz Mosser _Lorenz Edit2
Internship Poster Session Lorenz Mosser _Lorenz Edit2
 
Embry Riddle Final
Embry Riddle FinalEmbry Riddle Final
Embry Riddle Final
 
ISS Servicing for NASA
ISS Servicing for NASAISS Servicing for NASA
ISS Servicing for NASA
 
Astronaut hotelsjun01
Astronaut hotelsjun01Astronaut hotelsjun01
Astronaut hotelsjun01
 
A One Way Trip To Mars
A One Way Trip To MarsA One Way Trip To Mars
A One Way Trip To Mars
 
XCOR Exploration Alternatives - Jeff Greason
XCOR Exploration Alternatives - Jeff GreasonXCOR Exploration Alternatives - Jeff Greason
XCOR Exploration Alternatives - Jeff Greason
 
Mission Opportunies to Trans Neptunian Objects 3
Mission Opportunies to Trans Neptunian Objects 3Mission Opportunies to Trans Neptunian Objects 3
Mission Opportunies to Trans Neptunian Objects 3
 
Visits tomarsjun02
Visits tomarsjun02Visits tomarsjun02
Visits tomarsjun02
 
Jeff Greason NewSpace 2014
Jeff Greason NewSpace 2014Jeff Greason NewSpace 2014
Jeff Greason NewSpace 2014
 
Rust.randy
Rust.randyRust.randy
Rust.randy
 
Airships as an Earth and Space Science Platform - Jason Rhodes
Airships as an Earth and Space Science Platform - Jason RhodesAirships as an Earth and Space Science Platform - Jason Rhodes
Airships as an Earth and Space Science Platform - Jason Rhodes
 
Expo Poster Final
Expo Poster FinalExpo Poster Final
Expo Poster Final
 
PellegrinoHonorsThesis
PellegrinoHonorsThesisPellegrinoHonorsThesis
PellegrinoHonorsThesis
 
Challenger final release
Challenger final releaseChallenger final release
Challenger final release
 
Goddard 2015: Greg Williams, NASA
Goddard 2015: Greg Williams, NASAGoddard 2015: Greg Williams, NASA
Goddard 2015: Greg Williams, NASA
 
the space elevator
the space elevatorthe space elevator
the space elevator
 

Plus de jdbess

Benchmark Tutorial -- IV - Participation
Benchmark Tutorial -- IV - ParticipationBenchmark Tutorial -- IV - Participation
Benchmark Tutorial -- IV - Participationjdbess
 
Benchmark Tutorial -- III - Report
Benchmark Tutorial -- III - ReportBenchmark Tutorial -- III - Report
Benchmark Tutorial -- III - Reportjdbess
 
Benchmark Tutorial -- II - Availability
Benchmark Tutorial -- II - AvailabilityBenchmark Tutorial -- II - Availability
Benchmark Tutorial -- II - Availabilityjdbess
 
Benchmark Tutorial -- I - Introduction
Benchmark Tutorial -- I - IntroductionBenchmark Tutorial -- I - Introduction
Benchmark Tutorial -- I - Introductionjdbess
 
NRAD - ANS 2012
NRAD - ANS 2012NRAD - ANS 2012
NRAD - ANS 2012jdbess
 
GROTESQUE - ANS 2012
GROTESQUE - ANS 2012GROTESQUE - ANS 2012
GROTESQUE - ANS 2012jdbess
 
NRAD Reactor Benchmark Update
NRAD Reactor Benchmark UpdateNRAD Reactor Benchmark Update
NRAD Reactor Benchmark Updatejdbess
 
Benchmark Education
Benchmark EducationBenchmark Education
Benchmark Educationjdbess
 
MIRTE 2010
MIRTE 2010MIRTE 2010
MIRTE 2010jdbess
 
IRPhEP 2011
IRPhEP 2011IRPhEP 2011
IRPhEP 2011jdbess
 
ICSBEP 2010
ICSBEP 2010ICSBEP 2010
ICSBEP 2010jdbess
 
Development Of An ICSBEP Benchmark 2011
Development Of An ICSBEP Benchmark 2011Development Of An ICSBEP Benchmark 2011
Development Of An ICSBEP Benchmark 2011jdbess
 
FSP-Be - NETS2011
FSP-Be - NETS2011FSP-Be - NETS2011
FSP-Be - NETS2011jdbess
 
IRPhEP - ICAPP2010
IRPhEP - ICAPP2010IRPhEP - ICAPP2010
IRPhEP - ICAPP2010jdbess
 
FFTF - PHYSOR2010
FFTF - PHYSOR2010FFTF - PHYSOR2010
FFTF - PHYSOR2010jdbess
 
HTTR - PHYSOR2010
HTTR - PHYSOR2010HTTR - PHYSOR2010
HTTR - PHYSOR2010jdbess
 
HTTR - ANSWM 2009
HTTR - ANSWM 2009HTTR - ANSWM 2009
HTTR - ANSWM 2009jdbess
 
ICSBEP - YPC2009
ICSBEP - YPC2009ICSBEP - YPC2009
ICSBEP - YPC2009jdbess
 
UO2F2 - ANSWM 2009
UO2F2 - ANSWM 2009UO2F2 - ANSWM 2009
UO2F2 - ANSWM 2009jdbess
 
CSNR - YPC 2009
CSNR - YPC 2009CSNR - YPC 2009
CSNR - YPC 2009jdbess
 

Plus de jdbess (20)

Benchmark Tutorial -- IV - Participation
Benchmark Tutorial -- IV - ParticipationBenchmark Tutorial -- IV - Participation
Benchmark Tutorial -- IV - Participation
 
Benchmark Tutorial -- III - Report
Benchmark Tutorial -- III - ReportBenchmark Tutorial -- III - Report
Benchmark Tutorial -- III - Report
 
Benchmark Tutorial -- II - Availability
Benchmark Tutorial -- II - AvailabilityBenchmark Tutorial -- II - Availability
Benchmark Tutorial -- II - Availability
 
Benchmark Tutorial -- I - Introduction
Benchmark Tutorial -- I - IntroductionBenchmark Tutorial -- I - Introduction
Benchmark Tutorial -- I - Introduction
 
NRAD - ANS 2012
NRAD - ANS 2012NRAD - ANS 2012
NRAD - ANS 2012
 
GROTESQUE - ANS 2012
GROTESQUE - ANS 2012GROTESQUE - ANS 2012
GROTESQUE - ANS 2012
 
NRAD Reactor Benchmark Update
NRAD Reactor Benchmark UpdateNRAD Reactor Benchmark Update
NRAD Reactor Benchmark Update
 
Benchmark Education
Benchmark EducationBenchmark Education
Benchmark Education
 
MIRTE 2010
MIRTE 2010MIRTE 2010
MIRTE 2010
 
IRPhEP 2011
IRPhEP 2011IRPhEP 2011
IRPhEP 2011
 
ICSBEP 2010
ICSBEP 2010ICSBEP 2010
ICSBEP 2010
 
Development Of An ICSBEP Benchmark 2011
Development Of An ICSBEP Benchmark 2011Development Of An ICSBEP Benchmark 2011
Development Of An ICSBEP Benchmark 2011
 
FSP-Be - NETS2011
FSP-Be - NETS2011FSP-Be - NETS2011
FSP-Be - NETS2011
 
IRPhEP - ICAPP2010
IRPhEP - ICAPP2010IRPhEP - ICAPP2010
IRPhEP - ICAPP2010
 
FFTF - PHYSOR2010
FFTF - PHYSOR2010FFTF - PHYSOR2010
FFTF - PHYSOR2010
 
HTTR - PHYSOR2010
HTTR - PHYSOR2010HTTR - PHYSOR2010
HTTR - PHYSOR2010
 
HTTR - ANSWM 2009
HTTR - ANSWM 2009HTTR - ANSWM 2009
HTTR - ANSWM 2009
 
ICSBEP - YPC2009
ICSBEP - YPC2009ICSBEP - YPC2009
ICSBEP - YPC2009
 
UO2F2 - ANSWM 2009
UO2F2 - ANSWM 2009UO2F2 - ANSWM 2009
UO2F2 - ANSWM 2009
 
CSNR - YPC 2009
CSNR - YPC 2009CSNR - YPC 2009
CSNR - YPC 2009
 

Dernier

Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 

Dernier (20)

Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 

NTR - NETS 2009

  • 1. NTR-Enhanced Lunar-Base Supply Using Existing Launch Fleet Capabilities John Bess Idaho National Laboratory Emily Colvin Georgia Institute of Technology Paul Cummings University of Michigan Nuclear and Emerging Technologies for Space ANS Annual Meeting, Atlanta, GA June 14-19, 2009
  • 2. Objective Assess the feasibility of employing current Earth-to-orbit launch vehicles and a nuclear thermal rocket engine to deliver a 21 metric ton payload to the lunar surface 2
  • 3. Mission Characterization LSAM Burns to LEO Achieve LLO EDS Detaches from Launch CaLV; Burns to on CaLV Circularize Orbit & Achieve LEO Earth Moon LSAM LSAM Burns to Lands Descend to Lunar LLO Surface TLI EDS Burns to Achieve TLI LSAM Detaches Delivery of 21 metric tons in from EDS support of a lunar base NASA’s Exploration Systems Architecture Study Final Report. NASA-TM-2005-214062, November 2005
  • 4. NTR-Enhanced ESAS Architecture Substitution of the chemical EDS with a NTR Increase lunar surface payload by 36.2% or Reduce IMLEO by 24.1% Using a Nuclear Thermal Rocket to Support a Lunar Outpost: Is It Cost Effective? STAIF 2007.
  • 5. What Makes This Study Different? Assume that the Ares rockets and other proposed earth-to-orbit launch systems will be unavailable for use Use only existing launch vehicles coupled with a NTR to provide lunar support
  • 6. Launch Fleet Characterization Assessed characteristics of various foreign and domestic launch vehicles Limitations were based on volume and not mass restraints for delivery to LEO ¤ Liquid hydrogen propellant Launch vehicles and facilities within the United States were preferred ¤ Reduce security and handling concerns
  • 7. Delta IV Heavy  Boeing  Launch Facilities ¤ Space Launch Complex 37B, Cape Canaveral Air Force Station, FL ¤ Space Launch Complex 6, Vandenberg Air Force Base, CA  Characteristics ¤ 5-m ID, 13.8-m long faring ¤ 50,800 lb LEO ¤ $253 M (2004) per launch
  • 8. Atlas V Heavy  Lockheed Martin  Launch Facilities ¤ Space Launch Complex 41, Cape Canaveral Air Force Station, FL ¤ Space Launch Complex 3-East, Vandenberg Air Force Base, CA  Characteristics ¤ 4.6-m ID, 12.2-m long faring ¤ 27,500 lb LEO ¤ $138 M (2004) per launch
  • 9. Rendezvous with Orbital Assembly Six rockets needed ¤ 1 – reactor, shielding, structural ¤ 1 – payload, LSAM ¤ 4 – liquid hydrogen propellant ¤ NTR specific impulse of 850 s An Isp of 950 s would require only four launch vehicles
  • 10. Nuclear Thermal Rocket Engine 650 MW tungsten-cermet reactor 93%-enriched HEU-O2 45-cm-thick ZrH shadow shield H2 flow rate: ¤ 18.0 kg/s (850 s) ¤ 16.1 kg/s (950 s)
  • 11. Assembly Logistics In-orbit infrastructure ¤ Independent orbital space garage ¤ Expansion of the International Space Station Multi-launch coordination and timely construction ¤ Mitigate H2 boil-off concerns ¤ Development of in-space machining and welding that have already been demonstrated
  • 12. Evaluation of Launch Costs Reported launch cost estimates for the Ares rockets are ~$3K/lb (~$7K/kg) to LEO ¤ $875M to place 125 metric tons in LEO ~$12K/kg for Delta IV and Atlas V rockets ¤ $1.4B to launch 6 rockets The Ares rockets use “economy of scale” for reduced launch cost ¤ Delta II and Atlas 2AS launch costs were still ~$12K/kg ¤ Similarly, a Ares V rocket would cost $1.5B
  • 13. Additional Launch Costs NTR engine ¤ ~$3B for contained test facility ¤ $1B for SAFE testing In-orbit assembly ¤ Dominated by transportation costs, which are sensitive to demand ¤ Human assembly with associated infrastructure to cost ~10% of total ($140M) Extra structural materials and assembly ¤ Assumed ~$140M
  • 14. Cost Estimate for Lunar Base Supply ($B) ESAS Fleet of Fleet of Cost Mission 6 rockets 4 rockets Mission 1.50 1.40 1.14 Assembly 0.00 0.14 0.11 Structural 0.00 0.14 0.11 NTR Engine 0.00 1.00 1.00 Total Cost 1.50 2.68 2.37
  • 15. Additional Cost and Logistics Needs Upgrade costs for new vehicle development and expansion of launch facilities are unknown Launch costs heavily influenced by supply and demand Additional costs may exist for coordinating multiple launches, especially near the ISS Current launch systems are not man-rated and usable only for material transport
  • 16. Developing Space Exploration Capabilities Establishing NTR propulsion capabilities for other missions ¤ Mars and beyond, reusable rockets, fast transit capabilities In-orbit construction allows for use of any launch vehicle system to “build” the rocket size of choice ¤ Not limited to a single quantized vehicle type ¤ Loss of a single launch vehicle does not jeopardize the entire mission Extraterrestrial assembly and repair techniques
  • 17. Recent Developments in the News The Orlando Sentinel (4/2/09) – Cost for Constellation has “Ballooned” to $44 Billion Parabolic Arc (4/4/09) – Space Frontier Foundation Will Campaign to “Kill” Ares ¤ Fund cheapest medium-lift vehicle launcher The Orlando Sentinel (4/23/09) – NASA’s Internal Ares V Launch Date May Be Delayed by Two Years Space News (5/9/09) – ULA Considering Ways to Alleviate “Launch Bottlenecks.” ¤ Build additional Atlas 5 launch infrastructure ¤ Purchase multiple vehicles at a time The Aerospace Daily and Defense Report (6/15/09) – Delta IV Cheaper than Ares (for ISS) but at the Cost of Time
  • 18. Conclusions Costs have been estimated for the use of existing launch vehicles and a NTR to deliver 21 metric tons to the lunar surface ¤ ~ 60-80% greater than the estimated $1.5B cost for an Ares V rocket ¤ Development costs have not been fully assessed for either systems ¤ Benefits of developing in-space construction allows for the development of a more robust, lower risk exploration architecture 18
  • 19. Acknowledgments Center for Space Nuclear Research ¤ Director Steve Howe ¤ 2006 CSNR Summer Fellows Idaho National Laboratory ¤ Jim Werner
  • 20. This work was performed by the Center for Space Nuclear Research under the direction of Battelle Energy Alliance, LLC (subcontract 43238) under Contract No. DE-AC07-05ID14517 with the U.S. Department of Energy