What is it?

 BV Engineering comprises the values,
 principles and practices that enable us to
 deliver more and more Business Value [from a
 given team] as we improve.

 A learning and incremental improvement
 approach to giving customers more of what
 they really want, looking at the whole process,
 end-to-end.



                                    © Joseph Little 2010

                       2
Do we do it now?

 Well, kind of.....

 Some businesses and business areas already
 have lots of discipline for parts of this. (Think:
 Proctor & Gamble.) In fact, I believe some
 people are actually doing this pretty
 rigorously, but I have not actually found any.




                                       © Joseph Little 2010

                         3
Call to action

 We have a serious need for action. IMO.

 Starting basic action is quite simple and easy
 to do. And will yield good results almost
 surely.

 In this talk, we barely start with the practices




                                      © Joseph Little 2010

                        4
Why do I call it BVE?

 Scrum: Continuous Improvement

 Engineering rigor




                                 © Joseph Little 2010

                     5
Attributions

 Some people who directly or indirectly
 contributed: Ken Schwaber, Jeff Sutherland,
 Kent Beck, Peter Drucker, Takeuchi & Nonaka,
 Jim York, Chris Mats, Kent McDonald, Womack
 & Jones, Mary & Tom Poppendieck, Taiichi
 Ohno, some friends at “a large financial
 institution in Virginia”, and many others.




                                  © Joseph Little 2010

                      6
Joe Little, CST & MBA

Agile Coach & Trainer
20+ years in senior level consulting to well-known firms in New York,
London and Charlotte
Focus on delivery of Business Value
CST, CSP, CSM
Was Senior Manager in Big 6 consulting
Head of Kitty Hawk Consulting, Inc. since 1991
Head of LeanAgileTraining.com
Started trying to do [Agile] before reading The Mythical Man-Month

–   http://agileconsortium.blogspot.com
–   jhlittle@kittyhawkconsulting.com




                                                   © Joseph Little 2010
                                                                      7
A Start

 “You’ve got to be very careful if you don’t
 know where you’re going, because you might
 not get there.”    Yogi Berra




                                  © Joseph Little 2010
                                                     8
6 Blind men and an elephant
                              © Joseph Little 2010
                                                 9
My main stance

 “I’m mad as hell and I’m not going to take it
 anymore.” (movie quote)



 “The biggest thing to fix is how we do BV
 Engineering.”




                                     © Joseph Little 2010
                                                       10
What are the numbers for your
team?

 Cost per year

 NPV delivered per year

 Derive: “The multiple”




                          © Joseph Little 2010
                                            11
Let’s do the math...

 Assume team costs $1,000,000 per year
 Assume normal multiple is 3x (ie, delivers
 $3,000,000 in BV)
 Assume the “real work” itself does NOT get
 any faster




                                   © Joseph Little 2010
                                                     12
Could a better Product Owner make
a difference?

 We make the stories 20% better
 We use Pareto’s “85-33” rule to get more done
 in less time
 We identify more high value epics
 We motivate the team, so that they are more
 productive
 We assure that we actually hit the mark,
 rather than just say that we did

 What’s that worth? 3X more BV?
                                   © Joseph Little 2010
                                                     13
One version....
                                  Year 1        Year 2           Year 3

Cost of Team                    $1,000,000    $1,000,000      $1,000,000


Orig Value Delivered per Year   $3,000,000    $3,000,000      $3,000,000

NPV                             $7,460,556

ID Better Stories (+20%)        $3,600,000

Deliver Top 33% (85% of BV)     $3,060,000

Deliver Top 33% again           $3,060,000

Deliver Top 33% again           $3,060,000

TOTAL FIRST YEAR                $9,180,000    $9,180,000      $9,180,000

Better NPV                      $22,829,301

Better/Original                     3.1

                                                           © Joseph Little 2010
                                                                             14
BVE

 Is a basic framework, like Scrum
   A bit of process flow
   Make basic assumptions visible
   Fight and argument and move on
   Always improve. Always. Always.
   Add to the framework
   ‘Show me the money’ frequently
   Do it as a Team
   Very limited on prescriptive solutions
                                            © Joseph Little 2010
                                                              15
Now let’s change subjects...

 To think practically, let’s use this framework...




                                      © Joseph Little 2010
                                                        16
© Joseph Little 2010
                  17
Scrum is a Simple Framework

Product
Backlog                Scrum                             Product
                                                         Owner
Sprint
Backlog
           Artifacts              Roles      ScrumMaster
Burndown
Chart
                                                         Team
Imped                  Meetings
List
           Sprint      Daily      Sprint            Retro-
           Planning    Scrum      Review            spective
                                           © Joseph Little 2010
                                                             18
Lean

 Value stream mapping

   Do it quickly.
   Identify the single stupidest thing
   Use it to make one improvement at a time

 Like Taiichi Ohno’s idea of having the team
 write up and continuously improve their
 process

                                         © Joseph Little 2010
                                                           19
Toyota Way: Learn by Doing
                       Fujio Cho, Board Chairman

•   We place the highest value on actual implementation
    and taking action. Agile Principle #1
•   There are many things one doesn’t understand, and
    therefore we ask them why don’t you just go ahead and
    take action; try to do something? Agile Principle #3, #11
•   You realize how little you know and you face your own
    failures and redo it again and at the second trial you
    realize another mistake … so you can redo it once
    again. Agile Principle #11, #12
•   So by constant improvement … one can rise to the
    higher level of practice and knowledge. Agile Principle #3

    "Anyone who has never made a mistake has never tried
    anything new." Albert Einstein          © Joseph Little 2010
                                                              20
The biggest problem

 People don’t want to admit stupidity



 People don’t want to make visible their
 inability to predict how the business will work




                                     © Joseph Little 2010
                                                       21
BVE: First Guess
 BV Engineering

   Customers      The Business
    External      Customer facing
                      people


       &
                                           The Team


     Internal
                  Internal groups
                  (Firm oriented)

                                    Content © Joseph Little 2008
Some problems

 We set up the telephone game

 Customers are not consistent

 The needs of the customers and of the firm are
 sometimes in contradiction (or at least
 somewhat antagonistic)

 It is difficult to accurately measure success




                                     © Joseph Little 2010
                                                       23
Some more problems

 La donne e mobile
    The customer is always changing his mind & who the
    customers are is always changing
 Stuff is happening out there
   Everything in the environment, both for the customers
   and for us, is changing
 Wow, this technology stuff is always changing
    A brilliant product today is yesterday’s news tomorrow
 “I know it when I see it”
    The customers can’t tell you what they want
 “What we’ve got here is a failure to communicate”
    It is impossible to accurately convey what you want
                                            © Joseph Little 2010
                                                              24
The other big problem

         Thinking
        in the sky

                                       Useful
                                      thoughts



In theory there is no difference between theory & practice. In
practice, there is. (Yogi Berra)

To know and not to do is not to know. (A martial arts master)

                                             © Joseph Little 2010
                                                               25
Is it better this way?

   Customers   The Business
    External   Customer facing
                   people


      &
                                        The Team


    Internal
               Internal groups
               (Firm oriented)

                                 Content © Joseph Little 2008
The Deming Cycle
 Plan (the experiment)
 Do (the experiment)
 Check (the results)
 Act (think about what you’ve learned and
  act)

   AKA -- The PDCA Cycle


                                 Content © Joseph Little 2008
Hallmarks of real BV Engineering!

1. The process is visible and articulated &
   improved
2. Failures in BV communication are identified
   and corrected frequently, quickly
3. There is a theory, and a concerted attempt to
   prove out the theory
4. There is appropriate dynamism and change
5. Business & Technology are partners
6. Success is forecast and also measured after
   the fact
7. Human judgment is involved (it’s not just the
   numbers)                             © Joseph Little 2010
                                                        28
BVE is simple

 Yes, in its basics, like all important things, very
 simple.

 And VERY hard to do well.




                                       © Joseph Little 2010
                                                         29
Stopping Point...

 Any questions now??




                       © Joseph Little 2010
                                         30
Two opposite approaches

 Proctor & Gamble: A ‘traditional’ but highly
 disciplined approach. “What does the customer
 want?” “How do we advertise our product?”

 Google: A new (or old?) approach. Let’s try
 something, and see if they like it. If so, then
 we’ll build on it.




                                      © Joseph Little 2010
                                                        31
Proctor & Gamble

 Full marketing program
 Focus groups, customer interviews,
 observation, customer segmentation (& lots of
 other tools)
 Financial (& other numeric) forecasts
 Multiple experiments, high rigor
 Advertising




                                   © Joseph Little 2010
                                                     32
Google

 Let employees create what they want
 Get a prototype out there “in the real world”
 See who bites
 Develop product incrementally based on
 customer input
 Monetize later (after we have a real product
 that a bunch of people really want)
 Get more “at bats”



                                     © Joseph Little 2010
                                                       33
How do I start to act on this?




                             © Joseph Little 2010
                                               34
In the Workshop: Exercise #1

 What is Business Value for us?



 First pass at the BV Model.




                                  © Joseph Little 2010
                                                    35
BV Model: Simple definition

 Function(s) (Var-1, Var-2,....) = Key BV Result

 Typically, the Result is NPV (ie, $$$)
 Or could be: Change in Net Promoter Score.
 Or could be: Other....



 A way of measuring learning (or failure)



                                     © Joseph Little 2010
                                                       36
The BV process is visible and
articulated

 Do you understand your’s, end-to-end?
  Customers        The Business
   External        Customer facing
                       people


     &
                                               The Team


   Internal
                    Internal groups
                    (Firm oriented)
                                      © Joseph Little 2010
                                                        37
In the Workshop: Exercise #2

 Map out the BVE process is your specific
 area....

   Identify people involved
   Make plain the theories used (some very stupid)
   Make plain the assumptions
   Make plain the BV Model (second pass)
   See the single biggest thing to improve


                                        © Joseph Little 2010
                                                          38
The process is always being
improved

 Is your process always being improved?
 Does everyone know that?
 What is the approach to improvement?

 Small example: Which stakeholders are
 involved? Do we have the right ones? Are we
 making the most use of them? Are we
 overweighted in compliance, legal, regulatory
 input? How good is our process of engaging
 them, and getting the most with the least effort?
 Are we creating knowledge just-in-time?
                                      © Joseph Little 2010
                                                        39
Where do you check for
communication failures?



                          And are there other
                          points or methods?




                             © Joseph Little 2010
                                               40
A theory, that is being proved out

 Is the theory stated as such, or is it assumed
 to be right?
 How it is being proved out?
 What happens when (not if) it is (somewhat)
 wrong?




                                     © Joseph Little 2010
                                                       41
Dynamism and change

 The appropriate amount of dynamism and
 change will vary by situation.
 In general, my experience is that we are
 adapting too slowly.




                                  © Joseph Little 2010
                                                    42
Business & Technology are partners

 In fact, there is minimal distinction. Anyone
 can help a partner learn. Can question. Can
 propose
   Remember: There is no technical success
 The Technologists often know more about the
 customers than you’d think
 Should we talk about the failure modes here?
 Everyone on the Team understands what real
 success would be


                                     © Joseph Little 2010
                                                       43
Success is measured

 1 to 3 key “end” metrics. Identified. Forecast.
 Then the real results are obtained.
   Perhaps not perfectly, but reasonably
 And learned from. (Was the product wrong?
 Was the theory wrong?)
 And communicated back to the Team




                                    © Joseph Little 2010
                                                      44
Human judgment

 Yes, stuff often happens that makes one
 question whether the “scientific” experiment
 was fair
 Yes, one can still have a hunch that the
 product will succeed later (if not now)



 So, metrics do not absolve managers from
 tough human judgment about the actuals and
 other information they get back

                                   © Joseph Little 2010
                                                     45
The unbearable lightness of metrics

 We use metrics (about the past) to take
 forward-looking action
 Metrics help us see how bad we were at
 predicting the future
 Metrics help us learn (perhaps first, by helping
 us see how much we don’t know)




                                     © Joseph Little 2010
                                                       46
Multiple Steps are important

 Some firms focus too much on one or two
 steps (eg, initial focus group, user story
 creation, the PO review of completed stories,
 the product launch)
 It is not one play; it is the culmination of plays
 that wins the game

 Examples: Understand the customer better and
 spend more time to assure that the Team
 understands the customer’s problem better
 and better
                                       © Joseph Little 2010
                                                         47
It is not one play...



  Customers       The Business
   External       Customer facing
                      people


     &
                                             The Team


   Internal
                  Internal groups
                  (Firm oriented)
                                    © Joseph Little 2010
                                                      48
The BVE Framework is very simple

 But all of BV Engineering is not simple.
 And BV Engineering in your specific case will
 not be simple.




                                    © Joseph Little 2010
                                                      49
RESULT: Another practical use

 When you hear people talking about the new
 BVE “tool” or solution....

 You now have a framework to put that tool or
 solution into a context.

 And you now know to ask, at least: “Is that the
 part of BVE for us that is the most FUBAR?”



                                    © Joseph Little 2010
                                                      50
The next 6 slides show some of the
rich detail




                           © Joseph Little 2010
                                             51
Elements of BV Engineering 1

1. PO Team
2. Product Backlog
3. PB prioritized by BV
4. Priority Poker
5. Story Points (proxy for cost, for cost-benefit
   analysis)
6. Minimum Marketable Feature Set
7. Reprioritize before each Sprint
8. Increase velocity (remove impediments)

                                       © Joseph Little 2010
                                                         52
Elements of BV Engineering 2

1. Making the stories smaller
2. Value Stream mapping
3. Kano Analysis
4. Voice of the Customer
5. Having the team live with the customers
6. Pareto chart (eg, of causes of customer
   problems)
7. Process charts or high level use cases
8. Other Lean, Six Sigma, or TQM tools

                                     © Joseph Little 2010
                                                       53
Elements of BV Engineering 3

1. Understanding the importance of minimizing
   technical debt
2. Agile portfolio management
3. What quality means to the customer and why
   it is ‘free’
4. Just-in-time knowledge creation
5. Modifying the BV model frequently (& the
   values in the model)
6. Removing impediments
7. Comparing our BV Engineering to theirs
    We’re different; what does it mean?
                                          © Joseph Little 2010
                                                            54
Elements of BV Engineering 4

1. Identifying better sources for good user
   stories (eg, observation, “living with”, experts,
   user interaction, “prototypes”, etc)
2. Identifying good user stories
3. Fleshing out good user stories with an Agile
   specification
4. Improving the monetization of User Stories (or
   themes)
5. Improving the conversations around the user
   stories
6. Getting better feedback faster
                                       © Joseph Little 2010
                                                         55
Some metrics I like

1. NPV (net present value)
2. ROI (return on investment)
3. Faster end-to-end cycle time
4. Increased sales
5. Increased market share
6. More eyeballs (on a webpage)
7. Improved eyeball demographics
8. Reduced costs



                                   © Joseph Little 2010
                                                     56
More metrics I like

1. Reduced risk (although I prefer if this is made
   more concrete by being monetized...see
   underwriting)
2. Net promoter score
3. Any specific metric showing higher customer
   satisfaction
4. Others??




                                       © Joseph Little 2010
                                                         57
Lies, damn lies & statistics

 It is not having numbers...
 It is making good use of numbers (that are
 reasonably accurate)




                                   © Joseph Little 2010
                                                     58
The End




          For now....




                        © Joseph Little 2010
                                          59
Retrospective

 What do you remember?

 What will you act on tomorrow?

 What thing(s) will you do to improve your BV
 Engineering?




                                   © Joseph Little 2010
                                                     60

More Related Content

What's hot

Learnings from founding a Computer Vision startup: Chapter 10: Competition & ...
Learnings from founding a Computer Vision startup: Chapter 10: Competition & ...Learnings from founding a Computer Vision startup: Chapter 10: Competition & ...
Learnings from founding a Computer Vision startup: Chapter 10: Competition & ...Till Quack
 
Learnings from founding a Computer Vision startup: Chapter 8 Software Enginee...
Learnings from founding a Computer Vision startup: Chapter 8 Software Enginee...Learnings from founding a Computer Vision startup: Chapter 8 Software Enginee...
Learnings from founding a Computer Vision startup: Chapter 8 Software Enginee...Till Quack
 
Expanding Business Engagement webmeeting printout
Expanding Business Engagement webmeeting printout Expanding Business Engagement webmeeting printout
Expanding Business Engagement webmeeting printout Kristin Wolff
 
Consulting toolkit defining the question
Consulting toolkit   defining the questionConsulting toolkit   defining the question
Consulting toolkit defining the questionchrisdoran
 
Consulting toolkit root cause analysis
Consulting toolkit   root cause analysisConsulting toolkit   root cause analysis
Consulting toolkit root cause analysischrisdoran
 
"Creating a testing culture" by Mark Striebeck
"Creating a testing culture" by Mark Striebeck"Creating a testing culture" by Mark Striebeck
"Creating a testing culture" by Mark StriebeckOperae Partners
 
Learnings from founding a Computer Vision Startup: Chapter 0 Introduction
Learnings from founding a Computer Vision Startup: Chapter 0 IntroductionLearnings from founding a Computer Vision Startup: Chapter 0 Introduction
Learnings from founding a Computer Vision Startup: Chapter 0 IntroductionTill Quack
 
Learnings from founding a Computer Vision Startup: Chapter 1 & 2: Why a startup?
Learnings from founding a Computer Vision Startup: Chapter 1 & 2: Why a startup?Learnings from founding a Computer Vision Startup: Chapter 1 & 2: Why a startup?
Learnings from founding a Computer Vision Startup: Chapter 1 & 2: Why a startup?Till Quack
 
Great Webinars (ASTD PS)
Great Webinars (ASTD PS)Great Webinars (ASTD PS)
Great Webinars (ASTD PS)Cynthia Clay
 
Learnings from founding a Computer Vision startup: Chapter 5 funding
Learnings from founding a Computer Vision startup: Chapter 5 fundingLearnings from founding a Computer Vision startup: Chapter 5 funding
Learnings from founding a Computer Vision startup: Chapter 5 fundingTill Quack
 
Mary Poppendieck: Agile under contract
Mary Poppendieck: Agile under contractMary Poppendieck: Agile under contract
Mary Poppendieck: Agile under contractAgile Lietuva
 
ASTD 2012 ICE: Great Webinars
ASTD 2012 ICE: Great WebinarsASTD 2012 ICE: Great Webinars
ASTD 2012 ICE: Great WebinarsCynthia Clay
 
Mary Poppendieck “It’s Not About Software”
Mary Poppendieck  “It’s Not About Software”Mary Poppendieck  “It’s Not About Software”
Mary Poppendieck “It’s Not About Software”Agileee
 
Towards a Push-Button Release
Towards a Push-Button ReleaseTowards a Push-Button Release
Towards a Push-Button ReleaseChris Sterling
 
Consulting toolkit creating a workplan
Consulting toolkit   creating a workplanConsulting toolkit   creating a workplan
Consulting toolkit creating a workplanchrisdoran
 
Great Webinars (Pfeiffer)
Great Webinars (Pfeiffer)Great Webinars (Pfeiffer)
Great Webinars (Pfeiffer)Cynthia Clay
 
Consulting toolkit process mapping
Consulting toolkit   process mappingConsulting toolkit   process mapping
Consulting toolkit process mappingchrisdoran
 

What's hot (20)

Learnings from founding a Computer Vision startup: Chapter 10: Competition & ...
Learnings from founding a Computer Vision startup: Chapter 10: Competition & ...Learnings from founding a Computer Vision startup: Chapter 10: Competition & ...
Learnings from founding a Computer Vision startup: Chapter 10: Competition & ...
 
Learnings from founding a Computer Vision startup: Chapter 8 Software Enginee...
Learnings from founding a Computer Vision startup: Chapter 8 Software Enginee...Learnings from founding a Computer Vision startup: Chapter 8 Software Enginee...
Learnings from founding a Computer Vision startup: Chapter 8 Software Enginee...
 
Expanding Business Engagement webmeeting printout
Expanding Business Engagement webmeeting printout Expanding Business Engagement webmeeting printout
Expanding Business Engagement webmeeting printout
 
Consulting toolkit defining the question
Consulting toolkit   defining the questionConsulting toolkit   defining the question
Consulting toolkit defining the question
 
Consulting toolkit root cause analysis
Consulting toolkit   root cause analysisConsulting toolkit   root cause analysis
Consulting toolkit root cause analysis
 
"Creating a testing culture" by Mark Striebeck
"Creating a testing culture" by Mark Striebeck"Creating a testing culture" by Mark Striebeck
"Creating a testing culture" by Mark Striebeck
 
Learnings from founding a Computer Vision Startup: Chapter 0 Introduction
Learnings from founding a Computer Vision Startup: Chapter 0 IntroductionLearnings from founding a Computer Vision Startup: Chapter 0 Introduction
Learnings from founding a Computer Vision Startup: Chapter 0 Introduction
 
Learnings from founding a Computer Vision Startup: Chapter 1 & 2: Why a startup?
Learnings from founding a Computer Vision Startup: Chapter 1 & 2: Why a startup?Learnings from founding a Computer Vision Startup: Chapter 1 & 2: Why a startup?
Learnings from founding a Computer Vision Startup: Chapter 1 & 2: Why a startup?
 
Great Webinars (ASTD PS)
Great Webinars (ASTD PS)Great Webinars (ASTD PS)
Great Webinars (ASTD PS)
 
Learnings from founding a Computer Vision startup: Chapter 5 funding
Learnings from founding a Computer Vision startup: Chapter 5 fundingLearnings from founding a Computer Vision startup: Chapter 5 funding
Learnings from founding a Computer Vision startup: Chapter 5 funding
 
Mary Poppendieck: Agile under contract
Mary Poppendieck: Agile under contractMary Poppendieck: Agile under contract
Mary Poppendieck: Agile under contract
 
ASTD 2012 ICE: Great Webinars
ASTD 2012 ICE: Great WebinarsASTD 2012 ICE: Great Webinars
ASTD 2012 ICE: Great Webinars
 
Great Webinars
Great WebinarsGreat Webinars
Great Webinars
 
Mary Poppendieck “It’s Not About Software”
Mary Poppendieck  “It’s Not About Software”Mary Poppendieck  “It’s Not About Software”
Mary Poppendieck “It’s Not About Software”
 
Towards a Push-Button Release
Towards a Push-Button ReleaseTowards a Push-Button Release
Towards a Push-Button Release
 
Technical debt
Technical debtTechnical debt
Technical debt
 
Consulting toolkit creating a workplan
Consulting toolkit   creating a workplanConsulting toolkit   creating a workplan
Consulting toolkit creating a workplan
 
Value stream mapping
Value stream mapping  Value stream mapping
Value stream mapping
 
Great Webinars (Pfeiffer)
Great Webinars (Pfeiffer)Great Webinars (Pfeiffer)
Great Webinars (Pfeiffer)
 
Consulting toolkit process mapping
Consulting toolkit   process mappingConsulting toolkit   process mapping
Consulting toolkit process mapping
 

Viewers also liked

Viewers also liked (6)

The Long March
The Long MarchThe Long March
The Long March
 
Organisation-pedagogique-2016
Organisation-pedagogique-2016Organisation-pedagogique-2016
Organisation-pedagogique-2016
 
Scrum, Self-Organization, Engagement
Scrum, Self-Organization, EngagementScrum, Self-Organization, Engagement
Scrum, Self-Organization, Engagement
 
Scrum101
Scrum101Scrum101
Scrum101
 
ScrumButt: What it is, how to avoid it
ScrumButt: What it is, how to avoid itScrumButt: What it is, how to avoid it
ScrumButt: What it is, how to avoid it
 
Le bim
Le bimLe bim
Le bim
 

Similar to Intro to BV Engineering Montreal

Workshop BV Engineering SFA July 2010
Workshop BV Engineering SFA July 2010Workshop BV Engineering SFA July 2010
Workshop BV Engineering SFA July 2010LeanAgileTraining
 
Workshop BV Engineering SFA July 2010
Workshop BV Engineering SFA July 2010Workshop BV Engineering SFA July 2010
Workshop BV Engineering SFA July 2010LeanAgileTraining
 
Bv Eng & Agile Specs For Scrum U.Key
Bv Eng & Agile Specs For Scrum U.KeyBv Eng & Agile Specs For Scrum U.Key
Bv Eng & Agile Specs For Scrum U.KeyLeanAgileTraining
 
Making Your PO Better Now - 9 Ideas
Making Your PO Better Now - 9 IdeasMaking Your PO Better Now - 9 Ideas
Making Your PO Better Now - 9 IdeasLeanAgileTraining
 
3 formorebusinessvaluenow agilertp
3 formorebusinessvaluenow agilertp3 formorebusinessvaluenow agilertp
3 formorebusinessvaluenow agilertpLeanAgileTraining
 
3 formorebusinessvaluenow agilertp
3 formorebusinessvaluenow agilertp3 formorebusinessvaluenow agilertp
3 formorebusinessvaluenow agilertpLeanAgileTraining
 
Lean within scrum montreal oct 2010
Lean within scrum montreal oct 2010Lean within scrum montreal oct 2010
Lean within scrum montreal oct 2010LeanAgileTraining
 
BV Engineering Agile Tour RTP, Oct 2010
BV Engineering Agile Tour RTP, Oct 2010BV Engineering Agile Tour RTP, Oct 2010
BV Engineering Agile Tour RTP, Oct 2010LeanAgileTraining
 
Joe Little - What's Lean got to do with it - The Lean within Scrum
Joe Little - What's Lean got to do with it - The Lean within ScrumJoe Little - What's Lean got to do with it - The Lean within Scrum
Joe Little - What's Lean got to do with it - The Lean within ScrumSFA
 
Lean within Scrum @ Charlotte SFA July 2010
Lean within Scrum @ Charlotte SFA July 2010Lean within Scrum @ Charlotte SFA July 2010
Lean within Scrum @ Charlotte SFA July 2010LeanAgileTraining
 
Degrees of Freedom
Degrees of FreedomDegrees of Freedom
Degrees of FreedomBrian Dooley
 
Project Management experiences, do's and don'ts
Project Management experiences, do's and don'tsProject Management experiences, do's and don'ts
Project Management experiences, do's and don'tsTapio Järvenpää
 
PDCA - Learning Along the Way
PDCA - Learning Along the WayPDCA - Learning Along the Way
PDCA - Learning Along the WayMike Rother
 
Strategic Planning For Compliance
Strategic Planning For ComplianceStrategic Planning For Compliance
Strategic Planning For ComplianceAnn Oglanian
 
Slides Mx 2008 Cordell Ratzlaff
Slides Mx 2008 Cordell RatzlaffSlides Mx 2008 Cordell Ratzlaff
Slides Mx 2008 Cordell RatzlaffNathalie Mendonca
 
A New Way To Work Authorized Work
A New Way To Work Authorized WorkA New Way To Work Authorized Work
A New Way To Work Authorized WorkDouglas Arndt
 
New ways of working & knowledge sharing - Dirk W. Bijl
New ways of working & knowledge sharing - Dirk W. BijlNew ways of working & knowledge sharing - Dirk W. Bijl
New ways of working & knowledge sharing - Dirk W. BijlVlerick Business School
 
Bovo tighe seminar 9-2010 v12b[1]
Bovo tighe seminar 9-2010 v12b[1]Bovo tighe seminar 9-2010 v12b[1]
Bovo tighe seminar 9-2010 v12b[1]Bovo-Tighe LLC
 

Similar to Intro to BV Engineering Montreal (20)

Workshop BV Engineering SFA July 2010
Workshop BV Engineering SFA July 2010Workshop BV Engineering SFA July 2010
Workshop BV Engineering SFA July 2010
 
Workshop BV Engineering SFA July 2010
Workshop BV Engineering SFA July 2010Workshop BV Engineering SFA July 2010
Workshop BV Engineering SFA July 2010
 
Bv Eng & Agile Specs For Scrum U.Key
Bv Eng & Agile Specs For Scrum U.KeyBv Eng & Agile Specs For Scrum U.Key
Bv Eng & Agile Specs For Scrum U.Key
 
Making Your PO Better Now - 9 Ideas
Making Your PO Better Now - 9 IdeasMaking Your PO Better Now - 9 Ideas
Making Your PO Better Now - 9 Ideas
 
3 formorebusinessvaluenow agilertp
3 formorebusinessvaluenow agilertp3 formorebusinessvaluenow agilertp
3 formorebusinessvaluenow agilertp
 
3 formorebusinessvaluenow agilertp
3 formorebusinessvaluenow agilertp3 formorebusinessvaluenow agilertp
3 formorebusinessvaluenow agilertp
 
Lean within scrum montreal oct 2010
Lean within scrum montreal oct 2010Lean within scrum montreal oct 2010
Lean within scrum montreal oct 2010
 
BV Engineering Agile Tour RTP, Oct 2010
BV Engineering Agile Tour RTP, Oct 2010BV Engineering Agile Tour RTP, Oct 2010
BV Engineering Agile Tour RTP, Oct 2010
 
Joe Little - What's Lean got to do with it - The Lean within Scrum
Joe Little - What's Lean got to do with it - The Lean within ScrumJoe Little - What's Lean got to do with it - The Lean within Scrum
Joe Little - What's Lean got to do with it - The Lean within Scrum
 
Lean within Scrum @ Charlotte SFA July 2010
Lean within Scrum @ Charlotte SFA July 2010Lean within Scrum @ Charlotte SFA July 2010
Lean within Scrum @ Charlotte SFA July 2010
 
Scrum Hates Technical Debt
Scrum Hates Technical DebtScrum Hates Technical Debt
Scrum Hates Technical Debt
 
Degrees of Freedom
Degrees of FreedomDegrees of Freedom
Degrees of Freedom
 
Project Management experiences, do's and don'ts
Project Management experiences, do's and don'tsProject Management experiences, do's and don'ts
Project Management experiences, do's and don'ts
 
PDCA - Learning Along the Way
PDCA - Learning Along the WayPDCA - Learning Along the Way
PDCA - Learning Along the Way
 
Involvement of software companies in oss - serli-jerome petit - f os-sa2011
Involvement of software companies in oss - serli-jerome petit - f os-sa2011Involvement of software companies in oss - serli-jerome petit - f os-sa2011
Involvement of software companies in oss - serli-jerome petit - f os-sa2011
 
Strategic Planning For Compliance
Strategic Planning For ComplianceStrategic Planning For Compliance
Strategic Planning For Compliance
 
Slides Mx 2008 Cordell Ratzlaff
Slides Mx 2008 Cordell RatzlaffSlides Mx 2008 Cordell Ratzlaff
Slides Mx 2008 Cordell Ratzlaff
 
A New Way To Work Authorized Work
A New Way To Work Authorized WorkA New Way To Work Authorized Work
A New Way To Work Authorized Work
 
New ways of working & knowledge sharing - Dirk W. Bijl
New ways of working & knowledge sharing - Dirk W. BijlNew ways of working & knowledge sharing - Dirk W. Bijl
New ways of working & knowledge sharing - Dirk W. Bijl
 
Bovo tighe seminar 9-2010 v12b[1]
Bovo tighe seminar 9-2010 v12b[1]Bovo tighe seminar 9-2010 v12b[1]
Bovo tighe seminar 9-2010 v12b[1]
 

More from LeanAgileTraining

Intro to our Agile Release Planning workshop
Intro to our Agile Release Planning workshopIntro to our Agile Release Planning workshop
Intro to our Agile Release Planning workshopLeanAgileTraining
 
Intro to our CSM Course & Agile Release Planning workshop
Intro to our CSM Course & Agile Release Planning workshopIntro to our CSM Course & Agile Release Planning workshop
Intro to our CSM Course & Agile Release Planning workshopLeanAgileTraining
 
Short Intro to Agile-Scrum for NCA-CPA
Short Intro to Agile-Scrum for NCA-CPAShort Intro to Agile-Scrum for NCA-CPA
Short Intro to Agile-Scrum for NCA-CPALeanAgileTraining
 
Webinar: A Real Team + A Better Sprint Planning Meeting
Webinar: A Real Team + A Better Sprint Planning MeetingWebinar: A Real Team + A Better Sprint Planning Meeting
Webinar: A Real Team + A Better Sprint Planning MeetingLeanAgileTraining
 
Agile Transformation - 4 Suggestions & Discussion
Agile Transformation - 4 Suggestions & Discussion Agile Transformation - 4 Suggestions & Discussion
Agile Transformation - 4 Suggestions & Discussion LeanAgileTraining
 
Scaling: Old ideas & some new ones....
Scaling: Old ideas & some new ones....Scaling: Old ideas & some new ones....
Scaling: Old ideas & some new ones....LeanAgileTraining
 
Changing Culture v10 (Change, Scrum, Culture)
Changing Culture v10 (Change, Scrum, Culture)Changing Culture v10 (Change, Scrum, Culture)
Changing Culture v10 (Change, Scrum, Culture)LeanAgileTraining
 
Executive Briefing on Agile-Scrum apr2014 v3.key
Executive Briefing on Agile-Scrum apr2014 v3.keyExecutive Briefing on Agile-Scrum apr2014 v3.key
Executive Briefing on Agile-Scrum apr2014 v3.keyLeanAgileTraining
 
Exec Overview to Agile-Scrum
Exec Overview to Agile-ScrumExec Overview to Agile-Scrum
Exec Overview to Agile-ScrumLeanAgileTraining
 
Culture & Agile & Change - NYC Scrum Users Group
Culture & Agile & Change - NYC Scrum Users GroupCulture & Agile & Change - NYC Scrum Users Group
Culture & Agile & Change - NYC Scrum Users GroupLeanAgileTraining
 
Joe's release planning Nashville Feb 2013
Joe's release planning Nashville Feb 2013Joe's release planning Nashville Feb 2013
Joe's release planning Nashville Feb 2013LeanAgileTraining
 

More from LeanAgileTraining (19)

Intro to our Agile Release Planning workshop
Intro to our Agile Release Planning workshopIntro to our Agile Release Planning workshop
Intro to our Agile Release Planning workshop
 
Intro to our CSM Course & Agile Release Planning workshop
Intro to our CSM Course & Agile Release Planning workshopIntro to our CSM Course & Agile Release Planning workshop
Intro to our CSM Course & Agile Release Planning workshop
 
Short Intro to Agile-Scrum for NCA-CPA
Short Intro to Agile-Scrum for NCA-CPAShort Intro to Agile-Scrum for NCA-CPA
Short Intro to Agile-Scrum for NCA-CPA
 
Webinar: A Real Team + A Better Sprint Planning Meeting
Webinar: A Real Team + A Better Sprint Planning MeetingWebinar: A Real Team + A Better Sprint Planning Meeting
Webinar: A Real Team + A Better Sprint Planning Meeting
 
Full-time ScrumMaster - How
Full-time ScrumMaster - HowFull-time ScrumMaster - How
Full-time ScrumMaster - How
 
Agile Transformation - 4 Suggestions & Discussion
Agile Transformation - 4 Suggestions & Discussion Agile Transformation - 4 Suggestions & Discussion
Agile Transformation - 4 Suggestions & Discussion
 
Agile, Culture & Change
Agile, Culture & ChangeAgile, Culture & Change
Agile, Culture & Change
 
Scaling: Old ideas & some new ones....
Scaling: Old ideas & some new ones....Scaling: Old ideas & some new ones....
Scaling: Old ideas & some new ones....
 
The ScrumButt Test
The ScrumButt TestThe ScrumButt Test
The ScrumButt Test
 
Scaling aug 2014 6.key
Scaling aug 2014 6.keyScaling aug 2014 6.key
Scaling aug 2014 6.key
 
Scaling july 2014 4.key
Scaling july 2014 4.keyScaling july 2014 4.key
Scaling july 2014 4.key
 
Changing Culture v10 (Change, Scrum, Culture)
Changing Culture v10 (Change, Scrum, Culture)Changing Culture v10 (Change, Scrum, Culture)
Changing Culture v10 (Change, Scrum, Culture)
 
Changing Culture v9 RDU
Changing Culture v9 RDUChanging Culture v9 RDU
Changing Culture v9 RDU
 
Executive Briefing on Agile-Scrum apr2014 v3.key
Executive Briefing on Agile-Scrum apr2014 v3.keyExecutive Briefing on Agile-Scrum apr2014 v3.key
Executive Briefing on Agile-Scrum apr2014 v3.key
 
Exec Overview to Agile-Scrum
Exec Overview to Agile-ScrumExec Overview to Agile-Scrum
Exec Overview to Agile-Scrum
 
Culture & Agile & Change - NYC Scrum Users Group
Culture & Agile & Change - NYC Scrum Users GroupCulture & Agile & Change - NYC Scrum Users Group
Culture & Agile & Change - NYC Scrum Users Group
 
Changing culture v4
Changing culture v4Changing culture v4
Changing culture v4
 
Changing culture sfa2013
Changing culture sfa2013Changing culture sfa2013
Changing culture sfa2013
 
Joe's release planning Nashville Feb 2013
Joe's release planning Nashville Feb 2013Joe's release planning Nashville Feb 2013
Joe's release planning Nashville Feb 2013
 

Recently uploaded

Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 

Recently uploaded (20)

Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 

Intro to BV Engineering Montreal

  • 1. AN INTRODUCTION TO BUSINESS VALUE ENGINEERING Montreal, June 30, 2010 © Joseph Little 2010 1
  • 2. What is it? BV Engineering comprises the values, principles and practices that enable us to deliver more and more Business Value [from a given team] as we improve. A learning and incremental improvement approach to giving customers more of what they really want, looking at the whole process, end-to-end. © Joseph Little 2010 2
  • 3. Do we do it now? Well, kind of..... Some businesses and business areas already have lots of discipline for parts of this. (Think: Proctor & Gamble.) In fact, I believe some people are actually doing this pretty rigorously, but I have not actually found any. © Joseph Little 2010 3
  • 4. Call to action We have a serious need for action. IMO. Starting basic action is quite simple and easy to do. And will yield good results almost surely. In this talk, we barely start with the practices © Joseph Little 2010 4
  • 5. Why do I call it BVE? Scrum: Continuous Improvement Engineering rigor © Joseph Little 2010 5
  • 6. Attributions Some people who directly or indirectly contributed: Ken Schwaber, Jeff Sutherland, Kent Beck, Peter Drucker, Takeuchi & Nonaka, Jim York, Chris Mats, Kent McDonald, Womack & Jones, Mary & Tom Poppendieck, Taiichi Ohno, some friends at “a large financial institution in Virginia”, and many others. © Joseph Little 2010 6
  • 7. Joe Little, CST & MBA Agile Coach & Trainer 20+ years in senior level consulting to well-known firms in New York, London and Charlotte Focus on delivery of Business Value CST, CSP, CSM Was Senior Manager in Big 6 consulting Head of Kitty Hawk Consulting, Inc. since 1991 Head of LeanAgileTraining.com Started trying to do [Agile] before reading The Mythical Man-Month – http://agileconsortium.blogspot.com – jhlittle@kittyhawkconsulting.com © Joseph Little 2010 7
  • 8. A Start “You’ve got to be very careful if you don’t know where you’re going, because you might not get there.” Yogi Berra © Joseph Little 2010 8
  • 9. 6 Blind men and an elephant © Joseph Little 2010 9
  • 10. My main stance “I’m mad as hell and I’m not going to take it anymore.” (movie quote) “The biggest thing to fix is how we do BV Engineering.” © Joseph Little 2010 10
  • 11. What are the numbers for your team? Cost per year NPV delivered per year Derive: “The multiple” © Joseph Little 2010 11
  • 12. Let’s do the math... Assume team costs $1,000,000 per year Assume normal multiple is 3x (ie, delivers $3,000,000 in BV) Assume the “real work” itself does NOT get any faster © Joseph Little 2010 12
  • 13. Could a better Product Owner make a difference? We make the stories 20% better We use Pareto’s “85-33” rule to get more done in less time We identify more high value epics We motivate the team, so that they are more productive We assure that we actually hit the mark, rather than just say that we did What’s that worth? 3X more BV? © Joseph Little 2010 13
  • 14. One version.... Year 1 Year 2 Year 3 Cost of Team $1,000,000 $1,000,000 $1,000,000 Orig Value Delivered per Year $3,000,000 $3,000,000 $3,000,000 NPV $7,460,556 ID Better Stories (+20%) $3,600,000 Deliver Top 33% (85% of BV) $3,060,000 Deliver Top 33% again $3,060,000 Deliver Top 33% again $3,060,000 TOTAL FIRST YEAR $9,180,000 $9,180,000 $9,180,000 Better NPV $22,829,301 Better/Original 3.1 © Joseph Little 2010 14
  • 15. BVE Is a basic framework, like Scrum A bit of process flow Make basic assumptions visible Fight and argument and move on Always improve. Always. Always. Add to the framework ‘Show me the money’ frequently Do it as a Team Very limited on prescriptive solutions © Joseph Little 2010 15
  • 16. Now let’s change subjects... To think practically, let’s use this framework... © Joseph Little 2010 16
  • 17. © Joseph Little 2010 17
  • 18. Scrum is a Simple Framework Product Backlog Scrum Product Owner Sprint Backlog Artifacts Roles ScrumMaster Burndown Chart Team Imped Meetings List Sprint Daily Sprint Retro- Planning Scrum Review spective © Joseph Little 2010 18
  • 19. Lean Value stream mapping Do it quickly. Identify the single stupidest thing Use it to make one improvement at a time Like Taiichi Ohno’s idea of having the team write up and continuously improve their process © Joseph Little 2010 19
  • 20. Toyota Way: Learn by Doing Fujio Cho, Board Chairman • We place the highest value on actual implementation and taking action. Agile Principle #1 • There are many things one doesn’t understand, and therefore we ask them why don’t you just go ahead and take action; try to do something? Agile Principle #3, #11 • You realize how little you know and you face your own failures and redo it again and at the second trial you realize another mistake … so you can redo it once again. Agile Principle #11, #12 • So by constant improvement … one can rise to the higher level of practice and knowledge. Agile Principle #3 "Anyone who has never made a mistake has never tried anything new." Albert Einstein © Joseph Little 2010 20
  • 21. The biggest problem People don’t want to admit stupidity People don’t want to make visible their inability to predict how the business will work © Joseph Little 2010 21
  • 22. BVE: First Guess BV Engineering Customers The Business External Customer facing people & The Team Internal Internal groups (Firm oriented) Content © Joseph Little 2008
  • 23. Some problems We set up the telephone game Customers are not consistent The needs of the customers and of the firm are sometimes in contradiction (or at least somewhat antagonistic) It is difficult to accurately measure success © Joseph Little 2010 23
  • 24. Some more problems La donne e mobile The customer is always changing his mind & who the customers are is always changing Stuff is happening out there Everything in the environment, both for the customers and for us, is changing Wow, this technology stuff is always changing A brilliant product today is yesterday’s news tomorrow “I know it when I see it” The customers can’t tell you what they want “What we’ve got here is a failure to communicate” It is impossible to accurately convey what you want © Joseph Little 2010 24
  • 25. The other big problem Thinking in the sky Useful thoughts In theory there is no difference between theory & practice. In practice, there is. (Yogi Berra) To know and not to do is not to know. (A martial arts master) © Joseph Little 2010 25
  • 26. Is it better this way? Customers The Business External Customer facing people & The Team Internal Internal groups (Firm oriented) Content © Joseph Little 2008
  • 27. The Deming Cycle  Plan (the experiment)  Do (the experiment)  Check (the results)  Act (think about what you’ve learned and act)  AKA -- The PDCA Cycle Content © Joseph Little 2008
  • 28. Hallmarks of real BV Engineering! 1. The process is visible and articulated & improved 2. Failures in BV communication are identified and corrected frequently, quickly 3. There is a theory, and a concerted attempt to prove out the theory 4. There is appropriate dynamism and change 5. Business & Technology are partners 6. Success is forecast and also measured after the fact 7. Human judgment is involved (it’s not just the numbers) © Joseph Little 2010 28
  • 29. BVE is simple Yes, in its basics, like all important things, very simple. And VERY hard to do well. © Joseph Little 2010 29
  • 30. Stopping Point... Any questions now?? © Joseph Little 2010 30
  • 31. Two opposite approaches Proctor & Gamble: A ‘traditional’ but highly disciplined approach. “What does the customer want?” “How do we advertise our product?” Google: A new (or old?) approach. Let’s try something, and see if they like it. If so, then we’ll build on it. © Joseph Little 2010 31
  • 32. Proctor & Gamble Full marketing program Focus groups, customer interviews, observation, customer segmentation (& lots of other tools) Financial (& other numeric) forecasts Multiple experiments, high rigor Advertising © Joseph Little 2010 32
  • 33. Google Let employees create what they want Get a prototype out there “in the real world” See who bites Develop product incrementally based on customer input Monetize later (after we have a real product that a bunch of people really want) Get more “at bats” © Joseph Little 2010 33
  • 34. How do I start to act on this? © Joseph Little 2010 34
  • 35. In the Workshop: Exercise #1 What is Business Value for us? First pass at the BV Model. © Joseph Little 2010 35
  • 36. BV Model: Simple definition Function(s) (Var-1, Var-2,....) = Key BV Result Typically, the Result is NPV (ie, $$$) Or could be: Change in Net Promoter Score. Or could be: Other.... A way of measuring learning (or failure) © Joseph Little 2010 36
  • 37. The BV process is visible and articulated Do you understand your’s, end-to-end? Customers The Business External Customer facing people & The Team Internal Internal groups (Firm oriented) © Joseph Little 2010 37
  • 38. In the Workshop: Exercise #2 Map out the BVE process is your specific area.... Identify people involved Make plain the theories used (some very stupid) Make plain the assumptions Make plain the BV Model (second pass) See the single biggest thing to improve © Joseph Little 2010 38
  • 39. The process is always being improved Is your process always being improved? Does everyone know that? What is the approach to improvement? Small example: Which stakeholders are involved? Do we have the right ones? Are we making the most use of them? Are we overweighted in compliance, legal, regulatory input? How good is our process of engaging them, and getting the most with the least effort? Are we creating knowledge just-in-time? © Joseph Little 2010 39
  • 40. Where do you check for communication failures? And are there other points or methods? © Joseph Little 2010 40
  • 41. A theory, that is being proved out Is the theory stated as such, or is it assumed to be right? How it is being proved out? What happens when (not if) it is (somewhat) wrong? © Joseph Little 2010 41
  • 42. Dynamism and change The appropriate amount of dynamism and change will vary by situation. In general, my experience is that we are adapting too slowly. © Joseph Little 2010 42
  • 43. Business & Technology are partners In fact, there is minimal distinction. Anyone can help a partner learn. Can question. Can propose Remember: There is no technical success The Technologists often know more about the customers than you’d think Should we talk about the failure modes here? Everyone on the Team understands what real success would be © Joseph Little 2010 43
  • 44. Success is measured 1 to 3 key “end” metrics. Identified. Forecast. Then the real results are obtained. Perhaps not perfectly, but reasonably And learned from. (Was the product wrong? Was the theory wrong?) And communicated back to the Team © Joseph Little 2010 44
  • 45. Human judgment Yes, stuff often happens that makes one question whether the “scientific” experiment was fair Yes, one can still have a hunch that the product will succeed later (if not now) So, metrics do not absolve managers from tough human judgment about the actuals and other information they get back © Joseph Little 2010 45
  • 46. The unbearable lightness of metrics We use metrics (about the past) to take forward-looking action Metrics help us see how bad we were at predicting the future Metrics help us learn (perhaps first, by helping us see how much we don’t know) © Joseph Little 2010 46
  • 47. Multiple Steps are important Some firms focus too much on one or two steps (eg, initial focus group, user story creation, the PO review of completed stories, the product launch) It is not one play; it is the culmination of plays that wins the game Examples: Understand the customer better and spend more time to assure that the Team understands the customer’s problem better and better © Joseph Little 2010 47
  • 48. It is not one play... Customers The Business External Customer facing people & The Team Internal Internal groups (Firm oriented) © Joseph Little 2010 48
  • 49. The BVE Framework is very simple But all of BV Engineering is not simple. And BV Engineering in your specific case will not be simple. © Joseph Little 2010 49
  • 50. RESULT: Another practical use When you hear people talking about the new BVE “tool” or solution.... You now have a framework to put that tool or solution into a context. And you now know to ask, at least: “Is that the part of BVE for us that is the most FUBAR?” © Joseph Little 2010 50
  • 51. The next 6 slides show some of the rich detail © Joseph Little 2010 51
  • 52. Elements of BV Engineering 1 1. PO Team 2. Product Backlog 3. PB prioritized by BV 4. Priority Poker 5. Story Points (proxy for cost, for cost-benefit analysis) 6. Minimum Marketable Feature Set 7. Reprioritize before each Sprint 8. Increase velocity (remove impediments) © Joseph Little 2010 52
  • 53. Elements of BV Engineering 2 1. Making the stories smaller 2. Value Stream mapping 3. Kano Analysis 4. Voice of the Customer 5. Having the team live with the customers 6. Pareto chart (eg, of causes of customer problems) 7. Process charts or high level use cases 8. Other Lean, Six Sigma, or TQM tools © Joseph Little 2010 53
  • 54. Elements of BV Engineering 3 1. Understanding the importance of minimizing technical debt 2. Agile portfolio management 3. What quality means to the customer and why it is ‘free’ 4. Just-in-time knowledge creation 5. Modifying the BV model frequently (& the values in the model) 6. Removing impediments 7. Comparing our BV Engineering to theirs We’re different; what does it mean? © Joseph Little 2010 54
  • 55. Elements of BV Engineering 4 1. Identifying better sources for good user stories (eg, observation, “living with”, experts, user interaction, “prototypes”, etc) 2. Identifying good user stories 3. Fleshing out good user stories with an Agile specification 4. Improving the monetization of User Stories (or themes) 5. Improving the conversations around the user stories 6. Getting better feedback faster © Joseph Little 2010 55
  • 56. Some metrics I like 1. NPV (net present value) 2. ROI (return on investment) 3. Faster end-to-end cycle time 4. Increased sales 5. Increased market share 6. More eyeballs (on a webpage) 7. Improved eyeball demographics 8. Reduced costs © Joseph Little 2010 56
  • 57. More metrics I like 1. Reduced risk (although I prefer if this is made more concrete by being monetized...see underwriting) 2. Net promoter score 3. Any specific metric showing higher customer satisfaction 4. Others?? © Joseph Little 2010 57
  • 58. Lies, damn lies & statistics It is not having numbers... It is making good use of numbers (that are reasonably accurate) © Joseph Little 2010 58
  • 59. The End For now.... © Joseph Little 2010 59
  • 60. Retrospective What do you remember? What will you act on tomorrow? What thing(s) will you do to improve your BV Engineering? © Joseph Little 2010 60