SlideShare a Scribd company logo
1 of 15
Download to read offline
RETROFIT FOR NGL RECOVERY PERFORMANCE
USING A NOVEL STRIPPING GAS REFRIGERATION SCHEME

Lily Bai, Roger Chen, Jame Yao, Douglas Elliot
IPSI LLC
Houston, Texas U.S.A.

ABSTRACT
The NGL recovery business in North America is frequently referred to as a “Mature Business”.
While this seems to be an understatement when describing the prospects for new grass-roots cryogenic
plants, there are opportunities for upgrading the performance of existing plants where the consolidation
of old processing facilities and/or new gas production dictates. In cases where the feed gas capacity
increases or the feed gas becomes richer over time, additional refrigeration is generally required to
maintain C2 or C3 recovery levels.
This paper presents a novel design for the retrofit of such plants that’s simple, inexpensive, and
can be done using surplus equipment. This novel design could increase plant capacity up to 20 percent
at original or higher recovery levels without adding additional recompression horsepower. It not only
reduces or eliminates the need for inlet gas cooling via external refrigeration, but also eliminates the
need for external reboiler heat.

-1-
RETROFIT FOR NGL RECOVERY PERFORMANCE
USING A NOVEL STRIPPING GAS REFRIGERATION SCHEME
INTRODUCTION
Recovery of natural gas liquids (NGL) components in gas not only may be required for
hydrocarbon dew point control in a natural gas stream, but also yields a source of revenue, e.g., natural
gas may include up to about fifty percent by volume of heavier hydrocarbons recovered as NGL. When
market demand for ethane is high, high recovery of ethane needs to be achieved in the gas plants.
Most of the gas plants in operation today use conventional single-stage turboexpander
technology for moderately high ethane recovery [1]. This process could utilize the particular
advantages of an expander producing useable work normally used to recompress residue gas. Figure 1
illustrates the flow diagram for a 1970-vintage turbo expander process for ethane recovery [2]. After
the inlet gas is treated to remove water and other contaminants, it’s cooled by cold residue gas in
gas/gas exchangers and cold column internal liquid in the reboilers. Propane refrigeration is often
required to help in condensing the heavy components for a rich gas. Liquid condensed from the inlet
gas is separated and fed to the tower for further fractionation after being flashed to the tower pressure.
The remaining non-condensed vapor portion is subject to turbo-expansion to the top section of the demethanizer, with the cold liquids acting as the top reflux to enhance recovery of heavier hydrocarbon
components. In most cases, inlet gas is used to provide the reboiler duty due to the low temperature
profile in the column.
RESIDUE GAS
TO PIPELINE
B/L

Warm
Gas/Gas
Exchanger

Expander
Compressor

Recompressor

Cold Gas/
Gas
Exchanger

Separator

Inlet Gas

LC

Bottom
Reboiler
Side
Reboiler

Demethanizer

PROPANE
REFRIGERATION

LC

NGL PRODUCT
B/L

Figure 1- 1970’s Vintage Expander Process

-2-
NGL recovery plant design is highly dependent on the operating pressure of de-methanizer. At
medium to low pressure (i.e., 400 psia or lower), relative volatility of the key components is more
favorable for the separation process, but the recompression horsepower, generally accounting for
25~50% of a gas plant’s cost, would be so high that the process becomes less economical. While at
high pressure (i.e., higher than 400 psia), the recompression horsepower could be reduced, but relative
volatility decreases, making separation more difficult.
Technology developments for high NGL recovery plants have been directed to compensate the
reduction in relative volatility with high column pressure in the past decades [2]. Since the recovery of
hydrocarbon liquids is governed by the phase equilibrium at the top stage of de-methanizer, it can be
enhanced by the combination of a higher, colder, or leaner top reflux. Many processes focus on
improving the reflux stream by making it colder or leaner in ethane or propane (Figure 2). However,
the temperature profile in the column rises with high column pressure, making the heat integration
more difficult. Therefore, external heat resource is often required to provide additional reboiler duty.
Besides, propane refrigeration is also required to achieve certain C2 recovery level.
RESIDUE GAS TO
PIPELINE
B/L

Expander
Compressor

Inlet Gas FC

Warm
Gas/Gas
Exchanger

Residue Gas
Compressor

Cold Gas/Gas
Exchanger
Separator
LC

Bottom
Side
Reboiler Reboiler

Demethanizer

PROPANE
REFRIGERATION

LC

Reboiler
HEAT
MEDIUM

NGL PRODUCT
B/L

Figure 2 - Process Development with Reflux Scheme
While those processes focus on improving the reflux stream, IPSI LLC developed Stripping
Gas Refrigeration Scheme (Enhanced NGL Recovery Process SM) that focuses on the bottom of the demethanizer [3]. This scheme can offer significant enhancements to the state-of–the-art NGL recovery
process developed over the past two decades. Figure 3 is the flow diagram for this scheme (the box
with dashed line at the bottom). It utilizes a slipstream from the de-methanizer bottom. This stream is
totally or partially vaporized, providing additional refrigeration for inlet gas cooling. The flashed vapor
generated from the self-refrigeration cycle is recycled back to the column, where it serves as stripping
gas. Stripping gas increases the critical pressure thus enhancing the relative volatility. Alternatively, it

-3-
maintains or increases NGL recovery levels at higher column pressure. Besides, it lowers the
temperature profile in the column and makes the heat integration easier. This self-refrigeration design
can augment to almost any leading NGL-recovery technology. It enhances the operational efficiency
and reduces capital and operating costs of NGL recovery plants.

Figure 3 - Simplified Flow Diagram of Stripping Gas Refrigeration Scheme
The stripping gas refrigeration scheme is widely applicable not only for new, grass-root plants
but for revamping old, existing plants. For new plant, stripping gas refrigeration scheme was selected
by Enterprise for their second 300 MMcfd NGL recovery train at the Neptune plant in St. Mary Parish,
LA [4].
This paper focuses on revamping existing plants using the stripping gas refrigeration scheme.
In many cases, the economic return on retrofit investment is much more attractive as plant
infrastructure and most of the existing equipments could be reused. There are opportunities for
upgrading the performance of existing plants, e.g., plant capacity increases and/or the feed gas
becomes richer over time. In these cases, additional refrigeration is generally required to maintain
NGL recovery levels using conventional approach. Moreover, external heat resource is also required
due to the high column pressure.
Retrofit design using the stripping gas refrigeration scheme could increase plant capacity up to
20 percent at original or higher recovery levels without adding additional recompression horsepower.
It not only reduces or eliminates the need for inlet gas cooling via external refrigeration, but also
reduces or eliminates the need for external reboiler heat. This design can upgrade the performance of
the existing plant using surplus equipment, which is simple and inexpensive. This paper presents the
retrofit design for an existing gas plant using stripping gas refrigeration scheme to show these benefits.

-4-
FEATURES OF STRIPPING GAS REFRIGERATON SCHEME
When the plant capacity increases, generally it requires additional refrigeration to maintain
NGL recovery levels. Besides, more recompression horsepower and additional reboiler duty are also
required in the plant retrofit. Recompression horsepower can be reduced by increasing the column
operating pressure. However, as the column operating pressure gets closer to the critical pressure, the
separation is more difficult and NGL recovery levels have to be sacrificed. Moreover, higher column
pressure reduces the expansion ratio across the expander and raises the temperature profile in the
column, making the heat integration to the process more difficult. The plant has to use more external
refrigeration and heat resource to meet the refrigeration and heat loads.
The stripping gas refrigeration scheme replaces conventional propane refrigeration with a selfrefrigeration system that allows up to 20% more processing capacity at original or higher recovery
levels without adding additional recompression horsepower. It generates internal refrigeration by
expanding a liquid stream from the bottom of the de-methanizer. This stream is then heated by indirect
heat exchange with inlet gas to generate a two-phase stream. The two-phase stream is flashed in a
separator. The flashed vapor is compressed and recycled to the de-methanizer as a stripping gas, which
increases the ethane and propane concentration in the column. The flashed liquid stream is pumped and
mixed with other NGL product streams. The main features of this novel design are as follows:
• Stripping gas increases relative volatility and allows higher column pressure at original or
higher NGL recovery levels
Figure 4 is the Methane/Ethane binary K chart. It shows that as the pressure is increased toward
the critical pressure, the relative volatility (vertical dashed line) decreases, making fractionation more
difficult. Figure 5 is the critical locus for Methane/Ethane/Propane system, which shows that critical
pressure is highly dependent on C2 and/or C3 concentration. In result, the critical pressure of the
system increases. Stripping gas mainly contains C2 and C3, which increase C2 and C3 concentration in
the column. In result, the stripping gas increases the critical pressure of the system, thus increasing
relative volatility and making the separation easier. Alternatively, the stripping gas refrigeration
scheme allows higher column pressure with original or higher NGL recovery levels.
• Stripping gas refrigeration scheme lowers column temperature profile and makes heat
integration easier
When column pressure is increased, generally the temperature profile in the column increases,
making the heat integration difficult. However, stripping gas generated in the stripping gas
refrigeration scheme recycles ethane and propane back to the de-methanizer. Therefore, it reduces the
temperature profile within the column, especially for the trays in the middle of the column.
The significant temperature reduction makes the heat integration inside the reboiler much easier
and maximizes the use of inlet gas for providing reboiler duty. On the other hand, the temperature
reduction in the column also enhances the ability to cool the inlet gas via side reboiler, thus eliminating
the need for inlet gas cooling via external refrigeration.
In summary, stripping gas refrigeration scheme generates refrigeration internally, providing
additional refrigeration for inlet gas cooling due to plant capacity increase. Besides, the recycled
stripping gas also reduces or eliminates the need for external reboiler heat. The warmer the stripping
gas, the less demand is placed upon the bottom reboiler, thereby saving fuel and energy cost.

-5-
100
8
6
4

Temperature (°F)
2

-200

10
8
6

-150

Kc1

0
-100

2

0

8

Kc2 6
4

-150

-200

-100

2

8
6
4
2
.01

1

5

10

30

50

100

300

1,000

Pressure (Psia)

Figure 4 - Methane /Ethane Binary K Chart [5]

Critical pressure, psia

K = y/x

4

1600

1100

600

C1
100
-250

C3

C2
-150

-50

50

150

250

Temperature, degree F

Figure 5- Critical Locus for Methane, Ethane and Propane System [5]

-6-
The stripping gas refrigeration scheme allows higher capacity without adding additional
recompression horsepower
Another significant advantage achieved by the stripping gas refrigeration scheme is reducing
the horsepower. Reduction of recompression horsepower can be achieved by operating de-methanizer
column at high operating pressure while maintaining the NGL recovery levels. As a result of its ability
to maintain high NGL recovery levels at higher operating pressure, it’s expected plant capacity can be
increased as much as 20% without adding additional recompression horsepower, thus increasing
product revenue by the same percentage.
• The stripping gas refrigeration scheme provides same advantages to the existing plant in
ethane rejection mode
It’s noteworthy that the stripping gas refrigeration scheme also provides same advantages to the
plant in ethane rejection mode. Again, because the concentration of ethane and propane in deethanizer column is increased, the temperature profile of the trays is significantly reduced. It makes
heat integration inside the reboiler much easier and maximizes the use of inlet gas for providing
reboiler duty. Therefore, the refrigeration and heating loads could be reduced. Besides, the relative
volatility of ethane/propane is also increased, thus the separation efficiency inside the tower is
increased. The advantages that stripping gas refrigeration scheme provides to both ethane recovery and
ethane rejection mode improve the plant operating flexibility and profitability.
All the above advantages could be further improved at higher operating pressure or with richer
inlet gas. At higher column pressure which is closer to the critical pressure, the critical pressure
increase by introducing stripping gas has more effect on the relative volatility. Generally the degree of
enhancement increase is proportional to the operating pressure. Also the richer the inlet gas, the more
improvement to the column performance as the stripping gas increases C2 and C3 concentration in the
column more significantly.
•

EXAMPLE OF USING STRIPPING GAS REFRIGERATION SCHEME
Next we will use an existing plant to demonstrate the benefits of applying stripping gas
refrigeration scheme.
Original Plant Design
Figure 6 provides a schematic illustration of an existing gas plant, which is a single-stage
expander plant. The inlet gas is cooled by indirect heat exchange with column overhead vapors and
reboilers as explained below. The raw gas is produced at 823 psia and 85.0°F with a capacity of 125
MMSCFD (Dry basis). After the raw gas feed is filtered, cleaned and dehydrated, it is split into 2 parts:
One part is directed to gas/gas heat exchanger where the temperature of the feed stream is reduced by
indirect heat exchange with the overhead vapors from de-methanizer. The other part is directed to a
series of reboilers where the temperature of the feed stream is reduced by indirect heat exchange with
the drawoff liquids from de-methanizer. The combined stream flows to the expander feed separator
where it is separated into vapor and liquid. The liquid flows to the de-methanizer, while the vapor
produced is split to reflux exchanger, to J-T valve and to expander respectively. Gas passing through
the reflux exchanger is cooled and totally condensed by indirect heat exchange with the overhead
vapor phase from de-methanizer, and then directed to the top tray of the column. Gases passing
through the J-T valve and the expander are directed to the tray next to the top one. Overhead vapors
produced in de-methanizer flow to reflux exchanger and gas/gas heat exchanger where they provide
indirect heat exchange to cool the inlet gas. The heated overhead vapors then flow to expandercompressor and residue gas recompressor where they are compressed to the desired pipeline pressure
of 730 psia.

-7-
Figure 6 - Simplified Flow Diagram of the Existing Plant
There is no external refrigeration and external heat resource. The inlet gas provides the full
reboiler heat. The existing plant provides C2 recovery at 65.1% and C3 recovery at 98.7% with column
operating pressure at 250 psia. The column design pressure is 350 psia. The operating parameters for
the existing plant are summarized in Table 1.
This plant has an incentive to process 20% more gas over the original design. It requires retrofit
design shall be able to keep or increase the original C2 and C3 recovery levels without adding
additional recompression power. Besides, the retrofit design shall reuse existing equipments to the
maximum extent.
Plant Retrofit Options
The column in the existing plant has design pressure of 350 psia and operating pressure of 250
psia, so it’s feasible to increase column operating pressure to retain same recompression horsepower in
the retrofit.
This work studied the process of plant retrofit using stripping gas refrigeration scheme and
conventional method. Process comparison of these two methods from simulation is listed in Table 2.
All simulations in this work are performed using HYSYS. The simulation procedure is summarized to
the following:
I. Simulated the original plant design with current operating parameters shown in Table 1.
II. Simulated the retrofit plant with plant capacity increase using conventional method and stripping
gas refrigeration scheme at the conditions listed below:
• Plant capacity is increased to 150 MMSCFD (20% increase over the existing plant).
• Column operating pressure is increased to 310 psia to retain roughly same recompression HP
of 6265 HP as the existing plant

-8-
•
•
•
•

C2 recovery of the plant can achieve 74.4% versus 65.1% of the existing plant. Recoveries of
C3 and C4+ are roughly the same as the existing plant.
Keep the same efficiency for expander, expander compressor and residue gas compressors.
Keep the same UA for all existing heat exchangers
Keep the same inlet gas condition and delivery pressure.

A. Retrofit using Conventional Approach
In the plant retrofit, the column pressure is increased to 310 psia to maintain same
recompression horsepower. It requires external refrigeration to get C2 recovery of 74.4% in the
conventional approach. As the temperature profile in the column is high due to the high column
pressure, the reboiler duty provided by inlet gas is not enough any more. Therefore, external heat
resource is required to provide additional reboiler duty.
Table 2 lists the external refrigeration gas power requirement. For a two stage propane
compressor, the compressor horsepower is about 1208. External refrigeration package for the above
retrofit includes two stage compressors, condensers, refrigerant accumulators, economizers and
refrigerant storage, which is not cost effective. Besides, it also requires external heat resources to
provide reboiler duty of 2.46 MM BTU/hr.
Table 1 - Operating Parameters of the Existing Plant
Existing Plant
Inlet gas temperature
Inlet gas pressure
Plant capacity
De-methanizer design pressure
De-methanizer operating pressure
Send-out gas temperature
Send-out gas pressure
Components
Nitrogen
CO2
Methane
Ethane
Propane
i-Butane
n-Butane
i-Pentane
n-Pentane
n-Hexane
n-Heptane
n-Octane
n-Nonane
C2 + GPM
Ambient temperature
C1/C2 mole ratio in NGL product

85.0°F
823 psia
125 MMSCFD (dry)
350 psia
250 psia
120.0°F
730 psia
Mole Percent
0.2356
0.0035
85.4774
8.4127
3.6167
0.7069
0.8197
0.2254
0.2049
0.1783
0.0743
0.0297
0.0149
3.9
85.0°F
0.02

-9-
B. Retrofit using Stripping Gas Refrigeration Scheme
Figure 3 in previous section shows the retrofit design for the above existing plant using
stripping gas refrigeration scheme. This scheme generates refrigeration internally to provide additional
refrigeration, which eliminates the external refrigeration required by conventional method. Warm
stripping gas recycled to the column provides additional reboiler duty, which eliminates the external
heat resource.
Compared to conventional method, the advantages of stripping gas retrofit design are:
•
•
•

No propane refrigeration is required. Therefore, refrigeration supply and makeup is no
longer a concern.
No external heat resource is required, thus saving fuel and energy.
Stripping gas compression HP is about 25% less than external refrigeration gas power.

Table 2 - Process Comparison: Conventional Method vs. Stripping Gas Refrigeration Scheme

Description
Dry Feed Gas, MMSCFD
DeC1 Pressure, psia
Liquid Recovery , %
Ethane
Propane
Residue Gas, MMSCFD
Expander, MMSCFD
Compression HP
Recompression
External Refrigeration Gas
Power
Stripping Gas Compression
Total HP

Existing
Plant
125
250

Retrofit using
Conventional
Method
150.0
310

Retrofit using
Stripping Gas
Refrigeration
Scheme
150.0
310

65.1
98.7
110.7
80.5

74.4
98.8
131.7
92.4

74.4
98.8
131.7
92.4

6,265

6,213

6,140

1,208
7,421
YES

NO

2.46

6,265

External heat
resource
required
Duty, MM
Btu/hr

908
7,048

0

Besides, stripping gas refrigeration scheme also has better column performance than
conventional method. At column pressure of 310 psia, Figure 7 shows a tray-to-tray critical pressure
increase by stripping gas refrigeration scheme compared to conventional method. Figure 8 shows a
tray-to-tray relative volatility percentage increase by stripping gas refrigeration scheme compared to
conventional method. Figure 9 shows a tray-to-tray temperature reduction profile by stripping gas
refrigeration scheme compared to conventional method.

- 10 -
Critical pressure increase, psi

As shown in the figures, the stripping gas refrigeration scheme offers better improvement to
bottom column performance. e.g., the critical pressure in the middle of column (tray 11-13), where the
side reboiler is located, is up to 21 psi higher than that in conventional method. In result, these trays
have higher relative volatilities in the stripping gas refrigeration scheme (up to 7% compared to
external refrigeration). Better relative volatility means an easier C1-C2 separation. The stripping gas
refrigeration scheme also has a lower temperature profile in the middle of column (up to 10°F). A
lower column temperature means better heat integration. Because the C2 recoveries are the same, the
top and bottom temperatures or relative volatilities are also almost identical in both designs.

35.00

25.00

15.00

5.00

Feed
-5.00
0

2

4

6

8

10

12

14

16

18

20

22

Tray Number

Bottom

24

Top

Percent Increase, % (Relative
volatility C1/C2)

Figure 7 - The Increased Tray Critical Pressure at Column Pressure of 310 psia
(Stripping Gas Refrigeration Scheme vs. Conventional Method)

10.00

5.00

0.00

Feed
-5.00
0

Bottom

2

4

6

8

10

12

14

Tray Number

16

18

20

22

24

Top

Figure 8 - The Increased Tray Relative Volatility at Column Pressure of 310 psia
(Stripping Gas Refrigeration Scheme vs. Conventional Method)

- 11 -
Temperature Reduction, F

15.00

10.00

5.00

0.00

Feed
-5.00
0

Bottom

2

4

6

8

10

12

14

Tray Number

16

18

20

22

24

Top

Figure 9 - Reduction of Tray Temperature at Column Pressure of 310 psia
(Stripping Gas Refrigeration Scheme vs. Conventional Method)
Retrofit Design Considerations:
Since the retrofit design specifies same UA for the exchangers and same recompression
horsepower, all the existing exchangers and recompressor can be reused without modification.
However, like other retrofit designs, the following critical equipments need to be checked in the
retrofit design:
1. De-methanizer sizing margin needs to be checked. The retrofit design will operate the column
at higher pressure. Although higher pressure could reduce the vapor volume flow caused by
throughput increase, the existing plant usually has a sizing margin for the column.
2. Expander feed separator separation capacity and liquid surge time needs to be checked. With
stripping gas refrigeration scheme, the temperature in the expander feed separator is lower than
that in the original design, which makes the vapor density increased. It has the effect to reduce
the vapor volume rate.
3. Expander frame size needs to be checked.
Preliminary calculation shows that the above critical items in the existing plant are appropriate
for the retrofit design.
Equipment Used in Stripping Gas Refrigeration Scheme:
Table 3 summarizes the equipments used in stripping gas refrigeration scheme for the above
retrofit design, which include one enhancement vapor compressor, one brazed aluminum exchanger,
one suction K.O. drum, one air cooler and one pump. The novel design package could be done using
the surplus equipment, which is simple and inexpensive. It can be configured into a simple add-on
skid particularly suitable for retrofitting some existing gas plants, regardless of the original licensor.
The installation of the retrofit package is simple and interruption of plant production is minimal.

- 12 -
Table 3 - Equipment Used in Stripping Gas Refrigeration Scheme
Stripping Gas Refrigeration
Scheme Package
1. Stripping gas compressor , HP
2. BA Exchanger UA,MMBtu/Hr-°F
3. Suction K.O. Drum
4. Stripping gas air cooler, MMBtu/hr
5. HC Liquid Pump

908
0.53
5'-0"x10'-0", CS, 200 psig
5.6
15 GPM, 5 HP

Since the modification to the existing plant is not significant, operators only need to learn
several pieces of equipment in the enhancement package and would require minimum training to
become familiar with new plant’s start-up and operation.
Cost Comparison
The study compared the relative cost using the two methods for upgrading the above existing
plant (Table 4). Total Installation Costs (TIC) for small changes in feed rate are estimated using sixtenths rule.
Table 4 - Economic Comparison for the Retrofit Design

Existing
Plant
125

Retrofit using
conventional
approach
150
1208 HP

Retrofit using
stripping gas
refrigeration scheme
150
908 HP

Description
Dry Feed Gas, MMSCFD
Add’l Compression
External Reboiler Duty,
MMBtu/hr
2.46
0
Estimated TIC, $MM
3.1
1.9
Operating cost saving
using stripping gas
refrigeration scheme,
$MM/year
0.32
Note: Fuel gas price $7.2 /MM Btu is based on Henry Hub Spot price, July 2005
Operating cost is based on 350 days/year.

Tables 4 shows that stripping gas refrigeration scheme has lower installation cost. Besides,
since it has less horsepower requirement and eliminates the external heat resource for the retrofit, it
saves operating cost of 0.32 MM $/year compared to conventional approach.
Cases with Richer Gas and Higher Column Pressure
It’s noteworthy that the stripping gas refrigeration scheme has even more advantages with
richer gas or with higher column pressure. This work studied a richer case (4.7gpm) and a case with
350 psia column operating pressure. With 150 MMSCFD inlet gas capacity, process comparison of

- 13 -
stripping gas refrigeration scheme and conventional method is listed in Table 5. Base case is the case
discussed in the previous section. It shows that stripping gas refrigeration scheme offers more
significant improvement to the process with richer gas or higher column pressure.
Table 5 - Process Comparison with Richer Gas and Higher Column Pressure (150 MMSCFD)
Stripping Gas Refrigeration
Scheme
Column pressure, psia
C2 + gpm
HP saving vs. conventional
method
Relative volatility increase in
the middle trays vs. the
conventional method

Base case

Rich case

310
3.9
25%

High column
pressure case
350
3.9
29%

7.0%

9.5%

9.6%

310
4.7
30%

CONCLUSIONS
Stripping gas refrigeration scheme provides overall energy integration and completely replaces
propane refrigeration system. It can be configured into a simple add-on skid particularly suitable for
retrofitting some gas plants, regardless of the original licensor.
For the plant retrofit with (a)
additional capacity, (b) same or higher NGL recovery levels, (c) same recompression HP, it provides
more advantages than the conventional approach such as:
• No propane refrigeration is required
• No external heat resource is required
• Stripping gas compression horsepower is less than external refrigeration gas power.
• Lower operating cost
• Lower installation cost and less impact to the existing equipment.
Stripping gas refrigeration scheme provides even better improvement to the process with richer gas or
higher column operating pressure.

ACKNOWLEDGMENT
We take this opportunity to thank Dr. Stanley Huang from ChevronTexaco for his assistance in
this paper.

REFERENCES
1. Gulsby, J.G., “Options for Ethane Rejection in the Cryogenic Expander Plant”, Houston
Regional GPA Meeting, November 18, 1982.
2. R. J. Lee, Jame Yao, Douglas Elliot, IPSI LLC, “Flexibility, Efficiency to Characterize
Gas-processing Technologies in the Next Century”, Oil & Gas Journal, December 12, 1999
3. Yao, J., Chen, J. J., and Elliot, D. G., "Enhanced NGL Recovery Processes," US Patent No.
5,992,175. November 30, 1999

- 14 -
4. Pervaiz Nasir, Enterprise Products Operating, LP; Welby Sweet, Marathon Oil Company;
and Douglas Elliot, Roger Chen, R.J. Lee, IPSI LLC, “Enhanced NGL Recovery Process SM
Selected for Neptune Gas Plant Expansion”, Oil & Gas Journal, July 21, 2003.
5. GPA Engineering Data Book, 12th Edition, published by Gas Processors Association, OK
2004

- 15 -

More Related Content

What's hot

A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...Saikat Halder
 
IRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler TechnologyIRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler TechnologyIRJET Journal
 
Internally heat integrated distillation column for close boiling mixure
Internally heat integrated distillation column for close boiling mixure Internally heat integrated distillation column for close boiling mixure
Internally heat integrated distillation column for close boiling mixure Shahbaz khan
 
Thermosyphon Reboiler & its type with operational parameter.
Thermosyphon  Reboiler & its type with operational parameter.Thermosyphon  Reboiler & its type with operational parameter.
Thermosyphon Reboiler & its type with operational parameter.Govind Keshavrao Patil
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Scienceinventy
 
Fertilizer international heat-exchanger
Fertilizer international heat-exchangerFertilizer international heat-exchanger
Fertilizer international heat-exchangerrajeshkumar elango
 
Kettle reboilers
Kettle reboilersKettle reboilers
Kettle reboilersAtif Khan
 
HRSG,S knowledge
HRSG,S knowledgeHRSG,S knowledge
HRSG,S knowledgeumar farooq
 
The jet pump cycle-a low cost refrigerator
The jet pump cycle-a low cost refrigeratorThe jet pump cycle-a low cost refrigerator
The jet pump cycle-a low cost refrigeratorMark Murray
 
Condenser and Cooling Tower Power Plant Engineering
Condenser and Cooling Tower Power Plant EngineeringCondenser and Cooling Tower Power Plant Engineering
Condenser and Cooling Tower Power Plant EngineeringAjaypalsinh Barad
 
Cih taco3-calc flow---web-bill
Cih taco3-calc flow---web-billCih taco3-calc flow---web-bill
Cih taco3-calc flow---web-billMazhar Sheikh
 
Paper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmizationPaper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmizationCANDHARE
 
Experimental Investigation of a Household Refrigerator Using Evaporative-Cool...
Experimental Investigation of a Household Refrigerator Using Evaporative-Cool...Experimental Investigation of a Household Refrigerator Using Evaporative-Cool...
Experimental Investigation of a Household Refrigerator Using Evaporative-Cool...inventy
 
High performance-chilled-water-systems ashrae-chicago
High performance-chilled-water-systems ashrae-chicagoHigh performance-chilled-water-systems ashrae-chicago
High performance-chilled-water-systems ashrae-chicagoIllinois ASHRAE
 
reboiler in process industry.
reboiler in process industry.reboiler in process industry.
reboiler in process industry.JayJawalge
 
Determining the Best Heat Recovery System to Maximize Boiler Efficiency
Determining the Best Heat Recovery System to Maximize Boiler EfficiencyDetermining the Best Heat Recovery System to Maximize Boiler Efficiency
Determining the Best Heat Recovery System to Maximize Boiler EfficiencyCleaver-Brooks
 

What's hot (20)

A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
A STUDY ON ROLE OF CONDENSER AND NATURAL DRAFT COOLING TOWER ON THE PERFORMAN...
 
IRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler TechnologyIRJET-Case Study of Supercritical Boiler Technology
IRJET-Case Study of Supercritical Boiler Technology
 
Condenser performance test
Condenser performance testCondenser performance test
Condenser performance test
 
Internally heat integrated distillation column for close boiling mixure
Internally heat integrated distillation column for close boiling mixure Internally heat integrated distillation column for close boiling mixure
Internally heat integrated distillation column for close boiling mixure
 
Thermosyphon Reboiler & its type with operational parameter.
Thermosyphon  Reboiler & its type with operational parameter.Thermosyphon  Reboiler & its type with operational parameter.
Thermosyphon Reboiler & its type with operational parameter.
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Science
 
Fertilizer international heat-exchanger
Fertilizer international heat-exchangerFertilizer international heat-exchanger
Fertilizer international heat-exchanger
 
Kettle reboilers
Kettle reboilersKettle reboilers
Kettle reboilers
 
HRSG,S knowledge
HRSG,S knowledgeHRSG,S knowledge
HRSG,S knowledge
 
The jet pump cycle-a low cost refrigerator
The jet pump cycle-a low cost refrigeratorThe jet pump cycle-a low cost refrigerator
The jet pump cycle-a low cost refrigerator
 
Condenser and Cooling Tower Power Plant Engineering
Condenser and Cooling Tower Power Plant EngineeringCondenser and Cooling Tower Power Plant Engineering
Condenser and Cooling Tower Power Plant Engineering
 
Cih taco3-calc flow---web-bill
Cih taco3-calc flow---web-billCih taco3-calc flow---web-bill
Cih taco3-calc flow---web-bill
 
Paper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmizationPaper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmization
 
Experimental Investigation of a Household Refrigerator Using Evaporative-Cool...
Experimental Investigation of a Household Refrigerator Using Evaporative-Cool...Experimental Investigation of a Household Refrigerator Using Evaporative-Cool...
Experimental Investigation of a Household Refrigerator Using Evaporative-Cool...
 
Hp heater ch-8.3
Hp heater ch-8.3Hp heater ch-8.3
Hp heater ch-8.3
 
CONDENSATE RECOVERY SYSTEMS
CONDENSATE RECOVERY SYSTEMSCONDENSATE RECOVERY SYSTEMS
CONDENSATE RECOVERY SYSTEMS
 
High performance-chilled-water-systems ashrae-chicago
High performance-chilled-water-systems ashrae-chicagoHigh performance-chilled-water-systems ashrae-chicago
High performance-chilled-water-systems ashrae-chicago
 
reboiler in process industry.
reboiler in process industry.reboiler in process industry.
reboiler in process industry.
 
Determining the Best Heat Recovery System to Maximize Boiler Efficiency
Determining the Best Heat Recovery System to Maximize Boiler EfficiencyDetermining the Best Heat Recovery System to Maximize Boiler Efficiency
Determining the Best Heat Recovery System to Maximize Boiler Efficiency
 
6
66
6
 

Similar to 139876717 retrofit-for-ngl-recovery-performance

Improvement of rankine efficinecy of steam power plants
Improvement of rankine efficinecy of steam power plantsImprovement of rankine efficinecy of steam power plants
Improvement of rankine efficinecy of steam power plantsDhilip Pugalenthi
 
Condensing economizer heat recovery_case_study_sept_2012
Condensing economizer heat recovery_case_study_sept_2012Condensing economizer heat recovery_case_study_sept_2012
Condensing economizer heat recovery_case_study_sept_2012bizarrop
 
A Systemic Optimization Approach for the Design of Natural Gas Dehydration Plant
A Systemic Optimization Approach for the Design of Natural Gas Dehydration PlantA Systemic Optimization Approach for the Design of Natural Gas Dehydration Plant
A Systemic Optimization Approach for the Design of Natural Gas Dehydration PlantIJRES Journal
 
Saving energy with cooling towers
Saving energy with cooling towersSaving energy with cooling towers
Saving energy with cooling towersAbdelrahim Ramadan
 
lecture 3 - COMPRESSED AIR ENERGY STORAGE.pdf
lecture 3 - COMPRESSED AIR ENERGY STORAGE.pdflecture 3 - COMPRESSED AIR ENERGY STORAGE.pdf
lecture 3 - COMPRESSED AIR ENERGY STORAGE.pdfDinaSaad22
 
Heat Exchanger recuperators
Heat Exchanger  recuperators  Heat Exchanger  recuperators
Heat Exchanger recuperators Ali Abdullah
 
Using coolant modulation and pre cooling to avoid turbine blade
Using coolant modulation and pre cooling to avoid turbine bladeUsing coolant modulation and pre cooling to avoid turbine blade
Using coolant modulation and pre cooling to avoid turbine bladeRakesh Rauth
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET Journal
 
Improved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaImproved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaRazin Sazzad Molla
 
Gas turbines working ppt
Gas turbines working pptGas turbines working ppt
Gas turbines working pptluckyvarsha
 
Textile Companies(EID Intern, GE Power & Water (RGM) Industrial System )
Textile Companies(EID Intern, GE Power & Water (RGM) Industrial System )Textile Companies(EID Intern, GE Power & Water (RGM) Industrial System )
Textile Companies(EID Intern, GE Power & Water (RGM) Industrial System )Mostafa Elmeshad
 
Academic project report
Academic project reportAcademic project report
Academic project reportravi wankhede
 
Performance Analysis of Power Plant Systems
Performance Analysis of Power Plant SystemsPerformance Analysis of Power Plant Systems
Performance Analysis of Power Plant SystemsAddisu Dagne Zegeye
 

Similar to 139876717 retrofit-for-ngl-recovery-performance (20)

Liquid recovery
Liquid recoveryLiquid recovery
Liquid recovery
 
lecture 4.pdf
lecture 4.pdflecture 4.pdf
lecture 4.pdf
 
Improvement of rankine efficinecy of steam power plants
Improvement of rankine efficinecy of steam power plantsImprovement of rankine efficinecy of steam power plants
Improvement of rankine efficinecy of steam power plants
 
Condensing economizer heat recovery_case_study_sept_2012
Condensing economizer heat recovery_case_study_sept_2012Condensing economizer heat recovery_case_study_sept_2012
Condensing economizer heat recovery_case_study_sept_2012
 
A Systemic Optimization Approach for the Design of Natural Gas Dehydration Plant
A Systemic Optimization Approach for the Design of Natural Gas Dehydration PlantA Systemic Optimization Approach for the Design of Natural Gas Dehydration Plant
A Systemic Optimization Approach for the Design of Natural Gas Dehydration Plant
 
Article - 2012 PTQ Q1
Article - 2012 PTQ Q1Article - 2012 PTQ Q1
Article - 2012 PTQ Q1
 
Saving energy with cooling towers
Saving energy with cooling towersSaving energy with cooling towers
Saving energy with cooling towers
 
lecture 3 - COMPRESSED AIR ENERGY STORAGE.pdf
lecture 3 - COMPRESSED AIR ENERGY STORAGE.pdflecture 3 - COMPRESSED AIR ENERGY STORAGE.pdf
lecture 3 - COMPRESSED AIR ENERGY STORAGE.pdf
 
Heat Exchanger recuperators
Heat Exchanger  recuperators  Heat Exchanger  recuperators
Heat Exchanger recuperators
 
Recupretor
RecupretorRecupretor
Recupretor
 
Using coolant modulation and pre cooling to avoid turbine blade
Using coolant modulation and pre cooling to avoid turbine bladeUsing coolant modulation and pre cooling to avoid turbine blade
Using coolant modulation and pre cooling to avoid turbine blade
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power Plant
 
Improved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad MollaImproved efficiency of gas turbine by Razin Sazzad Molla
Improved efficiency of gas turbine by Razin Sazzad Molla
 
Gas turbines working ppt
Gas turbines working pptGas turbines working ppt
Gas turbines working ppt
 
Textile Companies(EID Intern, GE Power & Water (RGM) Industrial System )
Textile Companies(EID Intern, GE Power & Water (RGM) Industrial System )Textile Companies(EID Intern, GE Power & Water (RGM) Industrial System )
Textile Companies(EID Intern, GE Power & Water (RGM) Industrial System )
 
Ganesh final report
Ganesh final reportGanesh final report
Ganesh final report
 
Gas cycles-3
Gas cycles-3Gas cycles-3
Gas cycles-3
 
Chapter 10 lecture
Chapter 10 lectureChapter 10 lecture
Chapter 10 lecture
 
Academic project report
Academic project reportAcademic project report
Academic project report
 
Performance Analysis of Power Plant Systems
Performance Analysis of Power Plant SystemsPerformance Analysis of Power Plant Systems
Performance Analysis of Power Plant Systems
 

Recently uploaded

Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examplesamberjiles31
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxJemalSeid25
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Reportamberjiles31
 
Tata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakTata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakEditores1
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfChicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfSourav Sikder
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...Brian Solis
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Winbusinessin
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfJohnCarloValencia4
 
NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023Steve Rader
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfCharles Cotter, PhD
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView
 
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessAPCO
 
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptxHELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptxHelene Heckrotte
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003believeminhh
 
Mihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZMihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZKanakChauhan5
 
Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsIntellect Design Arena Ltd
 
Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..dlewis191
 

Recently uploaded (20)

Intellectual Property Licensing Examples
Intellectual Property Licensing ExamplesIntellectual Property Licensing Examples
Intellectual Property Licensing Examples
 
Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024Borderless Access - Global B2B Panel book-unlock 2024
Borderless Access - Global B2B Panel book-unlock 2024
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptx
 
Project Brief & Information Architecture Report
Project Brief & Information Architecture ReportProject Brief & Information Architecture Report
Project Brief & Information Architecture Report
 
Tata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerakTata Kelola Bisnis perushaan yang bergerak
Tata Kelola Bisnis perushaan yang bergerak
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdfChicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
Chicago Medical Malpractice Lawyer Chicago Medical Malpractice Lawyer.pdf
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
 
Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024Ethical stalking by Mark Williams. UpliftLive 2024
Ethical stalking by Mark Williams. UpliftLive 2024
 
Investment Opportunity for Thailand's Automotive & EV Industries
Investment Opportunity for Thailand's Automotive & EV IndustriesInvestment Opportunity for Thailand's Automotive & EV Industries
Investment Opportunity for Thailand's Automotive & EV Industries
 
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdfAMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
AMAZON SELLER VIRTUAL ASSISTANT PRODUCT RESEARCH .pdf
 
NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023
 
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdfTalent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
Talent Management research intelligence_13 paradigm shifts_20 March 2024.pdf
 
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
TalentView Webinar: Empowering the Modern Workforce_ Redefininig Success from...
 
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
 
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptxHELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
 
Mihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZMihir Menda - Member of Supervisory Board at RMZ
Mihir Menda - Member of Supervisory Board at RMZ
 
Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking Applications
 
Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..Team B Mind Map for Organizational Chg..
Team B Mind Map for Organizational Chg..
 

139876717 retrofit-for-ngl-recovery-performance

  • 1. RETROFIT FOR NGL RECOVERY PERFORMANCE USING A NOVEL STRIPPING GAS REFRIGERATION SCHEME Lily Bai, Roger Chen, Jame Yao, Douglas Elliot IPSI LLC Houston, Texas U.S.A. ABSTRACT The NGL recovery business in North America is frequently referred to as a “Mature Business”. While this seems to be an understatement when describing the prospects for new grass-roots cryogenic plants, there are opportunities for upgrading the performance of existing plants where the consolidation of old processing facilities and/or new gas production dictates. In cases where the feed gas capacity increases or the feed gas becomes richer over time, additional refrigeration is generally required to maintain C2 or C3 recovery levels. This paper presents a novel design for the retrofit of such plants that’s simple, inexpensive, and can be done using surplus equipment. This novel design could increase plant capacity up to 20 percent at original or higher recovery levels without adding additional recompression horsepower. It not only reduces or eliminates the need for inlet gas cooling via external refrigeration, but also eliminates the need for external reboiler heat. -1-
  • 2. RETROFIT FOR NGL RECOVERY PERFORMANCE USING A NOVEL STRIPPING GAS REFRIGERATION SCHEME INTRODUCTION Recovery of natural gas liquids (NGL) components in gas not only may be required for hydrocarbon dew point control in a natural gas stream, but also yields a source of revenue, e.g., natural gas may include up to about fifty percent by volume of heavier hydrocarbons recovered as NGL. When market demand for ethane is high, high recovery of ethane needs to be achieved in the gas plants. Most of the gas plants in operation today use conventional single-stage turboexpander technology for moderately high ethane recovery [1]. This process could utilize the particular advantages of an expander producing useable work normally used to recompress residue gas. Figure 1 illustrates the flow diagram for a 1970-vintage turbo expander process for ethane recovery [2]. After the inlet gas is treated to remove water and other contaminants, it’s cooled by cold residue gas in gas/gas exchangers and cold column internal liquid in the reboilers. Propane refrigeration is often required to help in condensing the heavy components for a rich gas. Liquid condensed from the inlet gas is separated and fed to the tower for further fractionation after being flashed to the tower pressure. The remaining non-condensed vapor portion is subject to turbo-expansion to the top section of the demethanizer, with the cold liquids acting as the top reflux to enhance recovery of heavier hydrocarbon components. In most cases, inlet gas is used to provide the reboiler duty due to the low temperature profile in the column. RESIDUE GAS TO PIPELINE B/L Warm Gas/Gas Exchanger Expander Compressor Recompressor Cold Gas/ Gas Exchanger Separator Inlet Gas LC Bottom Reboiler Side Reboiler Demethanizer PROPANE REFRIGERATION LC NGL PRODUCT B/L Figure 1- 1970’s Vintage Expander Process -2-
  • 3. NGL recovery plant design is highly dependent on the operating pressure of de-methanizer. At medium to low pressure (i.e., 400 psia or lower), relative volatility of the key components is more favorable for the separation process, but the recompression horsepower, generally accounting for 25~50% of a gas plant’s cost, would be so high that the process becomes less economical. While at high pressure (i.e., higher than 400 psia), the recompression horsepower could be reduced, but relative volatility decreases, making separation more difficult. Technology developments for high NGL recovery plants have been directed to compensate the reduction in relative volatility with high column pressure in the past decades [2]. Since the recovery of hydrocarbon liquids is governed by the phase equilibrium at the top stage of de-methanizer, it can be enhanced by the combination of a higher, colder, or leaner top reflux. Many processes focus on improving the reflux stream by making it colder or leaner in ethane or propane (Figure 2). However, the temperature profile in the column rises with high column pressure, making the heat integration more difficult. Therefore, external heat resource is often required to provide additional reboiler duty. Besides, propane refrigeration is also required to achieve certain C2 recovery level. RESIDUE GAS TO PIPELINE B/L Expander Compressor Inlet Gas FC Warm Gas/Gas Exchanger Residue Gas Compressor Cold Gas/Gas Exchanger Separator LC Bottom Side Reboiler Reboiler Demethanizer PROPANE REFRIGERATION LC Reboiler HEAT MEDIUM NGL PRODUCT B/L Figure 2 - Process Development with Reflux Scheme While those processes focus on improving the reflux stream, IPSI LLC developed Stripping Gas Refrigeration Scheme (Enhanced NGL Recovery Process SM) that focuses on the bottom of the demethanizer [3]. This scheme can offer significant enhancements to the state-of–the-art NGL recovery process developed over the past two decades. Figure 3 is the flow diagram for this scheme (the box with dashed line at the bottom). It utilizes a slipstream from the de-methanizer bottom. This stream is totally or partially vaporized, providing additional refrigeration for inlet gas cooling. The flashed vapor generated from the self-refrigeration cycle is recycled back to the column, where it serves as stripping gas. Stripping gas increases the critical pressure thus enhancing the relative volatility. Alternatively, it -3-
  • 4. maintains or increases NGL recovery levels at higher column pressure. Besides, it lowers the temperature profile in the column and makes the heat integration easier. This self-refrigeration design can augment to almost any leading NGL-recovery technology. It enhances the operational efficiency and reduces capital and operating costs of NGL recovery plants. Figure 3 - Simplified Flow Diagram of Stripping Gas Refrigeration Scheme The stripping gas refrigeration scheme is widely applicable not only for new, grass-root plants but for revamping old, existing plants. For new plant, stripping gas refrigeration scheme was selected by Enterprise for their second 300 MMcfd NGL recovery train at the Neptune plant in St. Mary Parish, LA [4]. This paper focuses on revamping existing plants using the stripping gas refrigeration scheme. In many cases, the economic return on retrofit investment is much more attractive as plant infrastructure and most of the existing equipments could be reused. There are opportunities for upgrading the performance of existing plants, e.g., plant capacity increases and/or the feed gas becomes richer over time. In these cases, additional refrigeration is generally required to maintain NGL recovery levels using conventional approach. Moreover, external heat resource is also required due to the high column pressure. Retrofit design using the stripping gas refrigeration scheme could increase plant capacity up to 20 percent at original or higher recovery levels without adding additional recompression horsepower. It not only reduces or eliminates the need for inlet gas cooling via external refrigeration, but also reduces or eliminates the need for external reboiler heat. This design can upgrade the performance of the existing plant using surplus equipment, which is simple and inexpensive. This paper presents the retrofit design for an existing gas plant using stripping gas refrigeration scheme to show these benefits. -4-
  • 5. FEATURES OF STRIPPING GAS REFRIGERATON SCHEME When the plant capacity increases, generally it requires additional refrigeration to maintain NGL recovery levels. Besides, more recompression horsepower and additional reboiler duty are also required in the plant retrofit. Recompression horsepower can be reduced by increasing the column operating pressure. However, as the column operating pressure gets closer to the critical pressure, the separation is more difficult and NGL recovery levels have to be sacrificed. Moreover, higher column pressure reduces the expansion ratio across the expander and raises the temperature profile in the column, making the heat integration to the process more difficult. The plant has to use more external refrigeration and heat resource to meet the refrigeration and heat loads. The stripping gas refrigeration scheme replaces conventional propane refrigeration with a selfrefrigeration system that allows up to 20% more processing capacity at original or higher recovery levels without adding additional recompression horsepower. It generates internal refrigeration by expanding a liquid stream from the bottom of the de-methanizer. This stream is then heated by indirect heat exchange with inlet gas to generate a two-phase stream. The two-phase stream is flashed in a separator. The flashed vapor is compressed and recycled to the de-methanizer as a stripping gas, which increases the ethane and propane concentration in the column. The flashed liquid stream is pumped and mixed with other NGL product streams. The main features of this novel design are as follows: • Stripping gas increases relative volatility and allows higher column pressure at original or higher NGL recovery levels Figure 4 is the Methane/Ethane binary K chart. It shows that as the pressure is increased toward the critical pressure, the relative volatility (vertical dashed line) decreases, making fractionation more difficult. Figure 5 is the critical locus for Methane/Ethane/Propane system, which shows that critical pressure is highly dependent on C2 and/or C3 concentration. In result, the critical pressure of the system increases. Stripping gas mainly contains C2 and C3, which increase C2 and C3 concentration in the column. In result, the stripping gas increases the critical pressure of the system, thus increasing relative volatility and making the separation easier. Alternatively, the stripping gas refrigeration scheme allows higher column pressure with original or higher NGL recovery levels. • Stripping gas refrigeration scheme lowers column temperature profile and makes heat integration easier When column pressure is increased, generally the temperature profile in the column increases, making the heat integration difficult. However, stripping gas generated in the stripping gas refrigeration scheme recycles ethane and propane back to the de-methanizer. Therefore, it reduces the temperature profile within the column, especially for the trays in the middle of the column. The significant temperature reduction makes the heat integration inside the reboiler much easier and maximizes the use of inlet gas for providing reboiler duty. On the other hand, the temperature reduction in the column also enhances the ability to cool the inlet gas via side reboiler, thus eliminating the need for inlet gas cooling via external refrigeration. In summary, stripping gas refrigeration scheme generates refrigeration internally, providing additional refrigeration for inlet gas cooling due to plant capacity increase. Besides, the recycled stripping gas also reduces or eliminates the need for external reboiler heat. The warmer the stripping gas, the less demand is placed upon the bottom reboiler, thereby saving fuel and energy cost. -5-
  • 6. 100 8 6 4 Temperature (°F) 2 -200 10 8 6 -150 Kc1 0 -100 2 0 8 Kc2 6 4 -150 -200 -100 2 8 6 4 2 .01 1 5 10 30 50 100 300 1,000 Pressure (Psia) Figure 4 - Methane /Ethane Binary K Chart [5] Critical pressure, psia K = y/x 4 1600 1100 600 C1 100 -250 C3 C2 -150 -50 50 150 250 Temperature, degree F Figure 5- Critical Locus for Methane, Ethane and Propane System [5] -6-
  • 7. The stripping gas refrigeration scheme allows higher capacity without adding additional recompression horsepower Another significant advantage achieved by the stripping gas refrigeration scheme is reducing the horsepower. Reduction of recompression horsepower can be achieved by operating de-methanizer column at high operating pressure while maintaining the NGL recovery levels. As a result of its ability to maintain high NGL recovery levels at higher operating pressure, it’s expected plant capacity can be increased as much as 20% without adding additional recompression horsepower, thus increasing product revenue by the same percentage. • The stripping gas refrigeration scheme provides same advantages to the existing plant in ethane rejection mode It’s noteworthy that the stripping gas refrigeration scheme also provides same advantages to the plant in ethane rejection mode. Again, because the concentration of ethane and propane in deethanizer column is increased, the temperature profile of the trays is significantly reduced. It makes heat integration inside the reboiler much easier and maximizes the use of inlet gas for providing reboiler duty. Therefore, the refrigeration and heating loads could be reduced. Besides, the relative volatility of ethane/propane is also increased, thus the separation efficiency inside the tower is increased. The advantages that stripping gas refrigeration scheme provides to both ethane recovery and ethane rejection mode improve the plant operating flexibility and profitability. All the above advantages could be further improved at higher operating pressure or with richer inlet gas. At higher column pressure which is closer to the critical pressure, the critical pressure increase by introducing stripping gas has more effect on the relative volatility. Generally the degree of enhancement increase is proportional to the operating pressure. Also the richer the inlet gas, the more improvement to the column performance as the stripping gas increases C2 and C3 concentration in the column more significantly. • EXAMPLE OF USING STRIPPING GAS REFRIGERATION SCHEME Next we will use an existing plant to demonstrate the benefits of applying stripping gas refrigeration scheme. Original Plant Design Figure 6 provides a schematic illustration of an existing gas plant, which is a single-stage expander plant. The inlet gas is cooled by indirect heat exchange with column overhead vapors and reboilers as explained below. The raw gas is produced at 823 psia and 85.0°F with a capacity of 125 MMSCFD (Dry basis). After the raw gas feed is filtered, cleaned and dehydrated, it is split into 2 parts: One part is directed to gas/gas heat exchanger where the temperature of the feed stream is reduced by indirect heat exchange with the overhead vapors from de-methanizer. The other part is directed to a series of reboilers where the temperature of the feed stream is reduced by indirect heat exchange with the drawoff liquids from de-methanizer. The combined stream flows to the expander feed separator where it is separated into vapor and liquid. The liquid flows to the de-methanizer, while the vapor produced is split to reflux exchanger, to J-T valve and to expander respectively. Gas passing through the reflux exchanger is cooled and totally condensed by indirect heat exchange with the overhead vapor phase from de-methanizer, and then directed to the top tray of the column. Gases passing through the J-T valve and the expander are directed to the tray next to the top one. Overhead vapors produced in de-methanizer flow to reflux exchanger and gas/gas heat exchanger where they provide indirect heat exchange to cool the inlet gas. The heated overhead vapors then flow to expandercompressor and residue gas recompressor where they are compressed to the desired pipeline pressure of 730 psia. -7-
  • 8. Figure 6 - Simplified Flow Diagram of the Existing Plant There is no external refrigeration and external heat resource. The inlet gas provides the full reboiler heat. The existing plant provides C2 recovery at 65.1% and C3 recovery at 98.7% with column operating pressure at 250 psia. The column design pressure is 350 psia. The operating parameters for the existing plant are summarized in Table 1. This plant has an incentive to process 20% more gas over the original design. It requires retrofit design shall be able to keep or increase the original C2 and C3 recovery levels without adding additional recompression power. Besides, the retrofit design shall reuse existing equipments to the maximum extent. Plant Retrofit Options The column in the existing plant has design pressure of 350 psia and operating pressure of 250 psia, so it’s feasible to increase column operating pressure to retain same recompression horsepower in the retrofit. This work studied the process of plant retrofit using stripping gas refrigeration scheme and conventional method. Process comparison of these two methods from simulation is listed in Table 2. All simulations in this work are performed using HYSYS. The simulation procedure is summarized to the following: I. Simulated the original plant design with current operating parameters shown in Table 1. II. Simulated the retrofit plant with plant capacity increase using conventional method and stripping gas refrigeration scheme at the conditions listed below: • Plant capacity is increased to 150 MMSCFD (20% increase over the existing plant). • Column operating pressure is increased to 310 psia to retain roughly same recompression HP of 6265 HP as the existing plant -8-
  • 9. • • • • C2 recovery of the plant can achieve 74.4% versus 65.1% of the existing plant. Recoveries of C3 and C4+ are roughly the same as the existing plant. Keep the same efficiency for expander, expander compressor and residue gas compressors. Keep the same UA for all existing heat exchangers Keep the same inlet gas condition and delivery pressure. A. Retrofit using Conventional Approach In the plant retrofit, the column pressure is increased to 310 psia to maintain same recompression horsepower. It requires external refrigeration to get C2 recovery of 74.4% in the conventional approach. As the temperature profile in the column is high due to the high column pressure, the reboiler duty provided by inlet gas is not enough any more. Therefore, external heat resource is required to provide additional reboiler duty. Table 2 lists the external refrigeration gas power requirement. For a two stage propane compressor, the compressor horsepower is about 1208. External refrigeration package for the above retrofit includes two stage compressors, condensers, refrigerant accumulators, economizers and refrigerant storage, which is not cost effective. Besides, it also requires external heat resources to provide reboiler duty of 2.46 MM BTU/hr. Table 1 - Operating Parameters of the Existing Plant Existing Plant Inlet gas temperature Inlet gas pressure Plant capacity De-methanizer design pressure De-methanizer operating pressure Send-out gas temperature Send-out gas pressure Components Nitrogen CO2 Methane Ethane Propane i-Butane n-Butane i-Pentane n-Pentane n-Hexane n-Heptane n-Octane n-Nonane C2 + GPM Ambient temperature C1/C2 mole ratio in NGL product 85.0°F 823 psia 125 MMSCFD (dry) 350 psia 250 psia 120.0°F 730 psia Mole Percent 0.2356 0.0035 85.4774 8.4127 3.6167 0.7069 0.8197 0.2254 0.2049 0.1783 0.0743 0.0297 0.0149 3.9 85.0°F 0.02 -9-
  • 10. B. Retrofit using Stripping Gas Refrigeration Scheme Figure 3 in previous section shows the retrofit design for the above existing plant using stripping gas refrigeration scheme. This scheme generates refrigeration internally to provide additional refrigeration, which eliminates the external refrigeration required by conventional method. Warm stripping gas recycled to the column provides additional reboiler duty, which eliminates the external heat resource. Compared to conventional method, the advantages of stripping gas retrofit design are: • • • No propane refrigeration is required. Therefore, refrigeration supply and makeup is no longer a concern. No external heat resource is required, thus saving fuel and energy. Stripping gas compression HP is about 25% less than external refrigeration gas power. Table 2 - Process Comparison: Conventional Method vs. Stripping Gas Refrigeration Scheme Description Dry Feed Gas, MMSCFD DeC1 Pressure, psia Liquid Recovery , % Ethane Propane Residue Gas, MMSCFD Expander, MMSCFD Compression HP Recompression External Refrigeration Gas Power Stripping Gas Compression Total HP Existing Plant 125 250 Retrofit using Conventional Method 150.0 310 Retrofit using Stripping Gas Refrigeration Scheme 150.0 310 65.1 98.7 110.7 80.5 74.4 98.8 131.7 92.4 74.4 98.8 131.7 92.4 6,265 6,213 6,140 1,208 7,421 YES NO 2.46 6,265 External heat resource required Duty, MM Btu/hr 908 7,048 0 Besides, stripping gas refrigeration scheme also has better column performance than conventional method. At column pressure of 310 psia, Figure 7 shows a tray-to-tray critical pressure increase by stripping gas refrigeration scheme compared to conventional method. Figure 8 shows a tray-to-tray relative volatility percentage increase by stripping gas refrigeration scheme compared to conventional method. Figure 9 shows a tray-to-tray temperature reduction profile by stripping gas refrigeration scheme compared to conventional method. - 10 -
  • 11. Critical pressure increase, psi As shown in the figures, the stripping gas refrigeration scheme offers better improvement to bottom column performance. e.g., the critical pressure in the middle of column (tray 11-13), where the side reboiler is located, is up to 21 psi higher than that in conventional method. In result, these trays have higher relative volatilities in the stripping gas refrigeration scheme (up to 7% compared to external refrigeration). Better relative volatility means an easier C1-C2 separation. The stripping gas refrigeration scheme also has a lower temperature profile in the middle of column (up to 10°F). A lower column temperature means better heat integration. Because the C2 recoveries are the same, the top and bottom temperatures or relative volatilities are also almost identical in both designs. 35.00 25.00 15.00 5.00 Feed -5.00 0 2 4 6 8 10 12 14 16 18 20 22 Tray Number Bottom 24 Top Percent Increase, % (Relative volatility C1/C2) Figure 7 - The Increased Tray Critical Pressure at Column Pressure of 310 psia (Stripping Gas Refrigeration Scheme vs. Conventional Method) 10.00 5.00 0.00 Feed -5.00 0 Bottom 2 4 6 8 10 12 14 Tray Number 16 18 20 22 24 Top Figure 8 - The Increased Tray Relative Volatility at Column Pressure of 310 psia (Stripping Gas Refrigeration Scheme vs. Conventional Method) - 11 -
  • 12. Temperature Reduction, F 15.00 10.00 5.00 0.00 Feed -5.00 0 Bottom 2 4 6 8 10 12 14 Tray Number 16 18 20 22 24 Top Figure 9 - Reduction of Tray Temperature at Column Pressure of 310 psia (Stripping Gas Refrigeration Scheme vs. Conventional Method) Retrofit Design Considerations: Since the retrofit design specifies same UA for the exchangers and same recompression horsepower, all the existing exchangers and recompressor can be reused without modification. However, like other retrofit designs, the following critical equipments need to be checked in the retrofit design: 1. De-methanizer sizing margin needs to be checked. The retrofit design will operate the column at higher pressure. Although higher pressure could reduce the vapor volume flow caused by throughput increase, the existing plant usually has a sizing margin for the column. 2. Expander feed separator separation capacity and liquid surge time needs to be checked. With stripping gas refrigeration scheme, the temperature in the expander feed separator is lower than that in the original design, which makes the vapor density increased. It has the effect to reduce the vapor volume rate. 3. Expander frame size needs to be checked. Preliminary calculation shows that the above critical items in the existing plant are appropriate for the retrofit design. Equipment Used in Stripping Gas Refrigeration Scheme: Table 3 summarizes the equipments used in stripping gas refrigeration scheme for the above retrofit design, which include one enhancement vapor compressor, one brazed aluminum exchanger, one suction K.O. drum, one air cooler and one pump. The novel design package could be done using the surplus equipment, which is simple and inexpensive. It can be configured into a simple add-on skid particularly suitable for retrofitting some existing gas plants, regardless of the original licensor. The installation of the retrofit package is simple and interruption of plant production is minimal. - 12 -
  • 13. Table 3 - Equipment Used in Stripping Gas Refrigeration Scheme Stripping Gas Refrigeration Scheme Package 1. Stripping gas compressor , HP 2. BA Exchanger UA,MMBtu/Hr-°F 3. Suction K.O. Drum 4. Stripping gas air cooler, MMBtu/hr 5. HC Liquid Pump 908 0.53 5'-0"x10'-0", CS, 200 psig 5.6 15 GPM, 5 HP Since the modification to the existing plant is not significant, operators only need to learn several pieces of equipment in the enhancement package and would require minimum training to become familiar with new plant’s start-up and operation. Cost Comparison The study compared the relative cost using the two methods for upgrading the above existing plant (Table 4). Total Installation Costs (TIC) for small changes in feed rate are estimated using sixtenths rule. Table 4 - Economic Comparison for the Retrofit Design Existing Plant 125 Retrofit using conventional approach 150 1208 HP Retrofit using stripping gas refrigeration scheme 150 908 HP Description Dry Feed Gas, MMSCFD Add’l Compression External Reboiler Duty, MMBtu/hr 2.46 0 Estimated TIC, $MM 3.1 1.9 Operating cost saving using stripping gas refrigeration scheme, $MM/year 0.32 Note: Fuel gas price $7.2 /MM Btu is based on Henry Hub Spot price, July 2005 Operating cost is based on 350 days/year. Tables 4 shows that stripping gas refrigeration scheme has lower installation cost. Besides, since it has less horsepower requirement and eliminates the external heat resource for the retrofit, it saves operating cost of 0.32 MM $/year compared to conventional approach. Cases with Richer Gas and Higher Column Pressure It’s noteworthy that the stripping gas refrigeration scheme has even more advantages with richer gas or with higher column pressure. This work studied a richer case (4.7gpm) and a case with 350 psia column operating pressure. With 150 MMSCFD inlet gas capacity, process comparison of - 13 -
  • 14. stripping gas refrigeration scheme and conventional method is listed in Table 5. Base case is the case discussed in the previous section. It shows that stripping gas refrigeration scheme offers more significant improvement to the process with richer gas or higher column pressure. Table 5 - Process Comparison with Richer Gas and Higher Column Pressure (150 MMSCFD) Stripping Gas Refrigeration Scheme Column pressure, psia C2 + gpm HP saving vs. conventional method Relative volatility increase in the middle trays vs. the conventional method Base case Rich case 310 3.9 25% High column pressure case 350 3.9 29% 7.0% 9.5% 9.6% 310 4.7 30% CONCLUSIONS Stripping gas refrigeration scheme provides overall energy integration and completely replaces propane refrigeration system. It can be configured into a simple add-on skid particularly suitable for retrofitting some gas plants, regardless of the original licensor. For the plant retrofit with (a) additional capacity, (b) same or higher NGL recovery levels, (c) same recompression HP, it provides more advantages than the conventional approach such as: • No propane refrigeration is required • No external heat resource is required • Stripping gas compression horsepower is less than external refrigeration gas power. • Lower operating cost • Lower installation cost and less impact to the existing equipment. Stripping gas refrigeration scheme provides even better improvement to the process with richer gas or higher column operating pressure. ACKNOWLEDGMENT We take this opportunity to thank Dr. Stanley Huang from ChevronTexaco for his assistance in this paper. REFERENCES 1. Gulsby, J.G., “Options for Ethane Rejection in the Cryogenic Expander Plant”, Houston Regional GPA Meeting, November 18, 1982. 2. R. J. Lee, Jame Yao, Douglas Elliot, IPSI LLC, “Flexibility, Efficiency to Characterize Gas-processing Technologies in the Next Century”, Oil & Gas Journal, December 12, 1999 3. Yao, J., Chen, J. J., and Elliot, D. G., "Enhanced NGL Recovery Processes," US Patent No. 5,992,175. November 30, 1999 - 14 -
  • 15. 4. Pervaiz Nasir, Enterprise Products Operating, LP; Welby Sweet, Marathon Oil Company; and Douglas Elliot, Roger Chen, R.J. Lee, IPSI LLC, “Enhanced NGL Recovery Process SM Selected for Neptune Gas Plant Expansion”, Oil & Gas Journal, July 21, 2003. 5. GPA Engineering Data Book, 12th Edition, published by Gas Processors Association, OK 2004 - 15 -