Your Scrum Checklist
      The Hard Facts:
     Roles. Artefacts. All Meetings.




      Wien. New York. Recife. Baden-Baden.
      Text by Boris Gloger | Scrumlies by Jo Legat | Realization by Katrin Dietze
      Version 2/10 © Boris Gloger

      ISBN 978-3-000-28201-0
Scrum                  is a framework with simple rules.
     Scrum Checklists will help you to remember these simple rules in
                                                                            General Meeting Rules
                                                                            Basics:
     the heat of daily work and stress. Scrum Checklists enable you to
                                                                            Every meeting starts on time and ends on time.
     create an enjoyable and productive work environment with your
                                                                            Every meeting is an open meeting. Everyone can attend.
     Scrum-Team.
                                                                            Every meeting is time-boxed.


                                                                            Preparation:
                    For Scrum Beginners - Follow the Checklists, do
                                                                            1. Invite everybody who is necessary ahead of time so that
                    Scrum by the book.This will enable you to run you
                                                                               they can prepare.
                    first 3 to 4 Sprints very successfully. Your success
                                                                            2. Send out an agenda with goal and purpose of the meeting.
                    will facilitate to spread Scrum in your organization.
                                                                            3. Book all resources for the meeting:
                   For Scrum Intermediates - Use your common sense             room, data projector, flip charts, facilitation equipment and
                   to tweak your processes guided by these Scrum               anything else you will need for your meeting
                   Checklists.                                              4. Send a reminder 24 hrs before the meeting.
                   As an experienced ScrumMaster - Use Scrum Check-         5. Prepare a flip chart with meeting rules.
                   lists as your safety belt in stressful situations.
                                                                            Facilitation of the Meeting:
                                                                            1. The facilitator has to be present during the discussion. He is not
     Scrum Checklists do not replace experience and practice.                  allowed to be involved in the discussion but he needs to follow
     Scrum Checklists are not procedures that you have to follow.              and bring the discussion back to the topic in case the partici-
     Scrum Checklists help to run a successful Scrum in a demanding            pants lose focus.
     environment.                                                           2. He presents the meeting goal and agenda.
                                                                            3. He agrees on a person who will write the meeting minutes
                                                                               if necessary.
                                                                            4. He will be the scribe for the Team or teach them how to do the
     Keep alive 10 Basic Practices:
                                                                               documentation themselves and might record what is said on a
                                                                               flip chart to visualize the conversation.
      1.   A clear and catching Vision                                      5. He keeps the focus of the meeting by using tools like the Park-
      2.   A maintained Product Backlog                                        ing Lot to capture issues or questions that aren‘t related to the
      3.   A sorted Product Backlog based on business value                    meeting‘s purpose so that they may be addressed later.
      4.   Backlog Items are sized by the Team                              6. He ends the meeting with a wrap–up and a very short retro-
      5.   Daily Scrums                                                        spective (5 minutes only).
      6.   Burn Down Charts
      7.   The Sprint is not disturbed by management and/or customers       Output:
      8.   The software the Team delivers is “done”                         • Document using scribbles or flip chart notes.
      9.   A collaborative Sprint Review                                      Take some photographs of your boards and flip charts.
     10.   Sprint Retrospectives with focus on improvement in               • Meeting minutes and a clear understanding of the meeting
           the work process of the Team and the organization                  result must be communicated.




1|                                                                                                                                                  | 2
HOW to do - Sprint Planning 2                                                                           CHECK it - Daily Scrum
     Estimation Meeting                                                          WHAT to do - Sprint Planning 1
                   The
     Purpose: Scrum                                                                    PB
                                                                                                                                                                           Procedure:

                   Flow
     1. For strategic planning you need to know the size of the Backlog
        Items. It is a necessary input for release planning and for gaining
                                                                                                                                                                           1. The Product Owner presents the Product Backlog Items she
                                                                                                                                                                              wants to have estimated.
                   ©
        an understanding of how much a Team might be able to develop
                     2009                                                                                                                                                  2. The Team plays Planning Poker for those Backlog Items.
        in a Sprint.                                                                                                                                                       3. In case the Backlog Item is large but needs to go into the next
     2. It enables the team members to see what will happen in the                                                                                                            or subsequent Sprints, the Team will split the Backlog Item into
        following phases of the project.                                                                                                                                      smaller Backlog Items. Re-size the new Backlog Item by playing
     3. Grooming Backlog Items: Get better understanding for Sprint # 1
                                                             Backlog                                                                                                          Planning Poker for it again.
                                                                                                                                                                                   Sprint # 2                           Sprint # 3
        Items by decomposing them if appropriate.                                                                                                                          4. Re-size Backlog Items that are not done but likely to be a
                                                                             9:00
                                                                                                                                                                              request for the next three Sprints.
                                                                                  .......                                                                                  5. Identify Backlog Items that need to be clarified for the next
                                                                                                                                                                                               .......                               .......




                                                                                                 Sprint Planning 1




                                                                                                                                                                    Sprint Planning 1




                                                                                                                                                                                                                                               Sprint Planning 1




                                                                                                                                                                                                                                                                                                                                         Sprint Planning 1
     Basics:                  CU
                                   STO MER
                                                                                                                                                                              Estimation Meeting.
                                                            Do your Daily Scrum every day!                                                                                                Do your Daily Scrum every day!                                           Do your Daily Scrum every day!
     Only the Team estimates. A Product Owner needs to be present
                                               M
                                                   ANAGER
     to help to decide when a story can be broken into smaller stories.
                         Product Idea
                                                                                                                                                                                                      Duration:




                                                                                                                                                                                                                                                                     Estimation Meeting
     Ingredients:                                                                                                                                                                                     Time-box this meeting to 90 min or less.
                                                                            12:00                                                                                                                     If the Sprint is longer than a week, a desirable
                                                                                                                                                                                   90 min             frequency of Estimation Meetings is two meetings
                                                • The Product Backlog that is prioritized                                                                                                             per Sprint.




                                                                                                                                                   Review




                                                                                                                                                                                                                          Review




                                                                                                                                                                                                                                                                                                            Review
                                                                                                                                                   Sprint




                                                                                                                                                                                                                          Sprint




                                                                                                                                                                                                                                                                                                            Sprint
                                                  according to business value by the
                                                                                                 Sprint Planning 2




                                                                                                                                                                    Sprint Planning 2




                                                                                                                                                                                                                                               Sprint Planning 2




                                                                                                                                                                                                                                                                                                                                         Sprint Planning 2
                                                  Product Owner.
                                                                                                                                                                           Output:                                                                             InsiderTip:business value
                                             VISION
                                               • Planning Poker Cards                                                                                                                                                                                          Try also meetings for
                                                                                                                                                                           • Estimated Product Backlog
                                                                                                                                                                                                                                                               estimation Owner(s) on a
                                                                                                                                             spective




                                                                                                                                                                                                                     spective




                                                                                                                                                                                                                                                                                                       spective
                                                                                                                                             Retro-                        • Smaller Backlog Items                                                              Product asis.




                                                                                                                                                                                                                     Retro-




                                                                                                                                                                                                                                                                                                       Retro-
                    PR




                                     ER




                                                                                                                                             Sprint




                                                                                                                                                                                                                     Sprint




                                                                                                                                                                                                                                                                                                       Sprint
                     O                N
                         DU
                              CT OW
                                                Colored icon = mandatory participant                                                                                       • Issues that need to be clarified                                                   weekly b
                                                Grey icon = optional participant
                                               SC




                                                                  R




                                                   R                  E
                                                       UM         T
                                                            MAS
                                                                            18:00

                                                                                                                                                                                        Scrum Flow
                                     TEAM

                                                                                  Day 1                                                                                                                                                                                                                                              Release



                     Product Backlog
                                                                          Estimation




                                                                                                          Estimation




                                                                                                                                      Estimation




                                                                                                                                                                                         Estimation




                                                                                                                                                                                                             Estimation




                                                                                                                                                                                                                                                       Estimation




                                                                                                                                                                                                                                                                                               Estimation




                                                                                                                                                                                                                                                                                                                                         Estimation
                                prioritized
                                                                          Meeting




                                                                                                          Meeting




                                                                                                                                      Meeting




                                                                                                                                                                                         Meeting




                                                                                                                                                                                                             Meeting




                                                                                                                                                                                                                                                       Meeting




                                                                                                                                                                                                                                                                                               Meeting




                                                                                                                                                                                                                                                                                                                                         Meeting
                 Don‘ts PB                                                                                                      PB                             PB                                                                  PB                                                     PB                         PB
                 1. Do not size effort - only the Team does!
                 2. The Product Owner does not size.
                 3. Do not do this activity as part of the Sprint
                    Planning Meeting #1.
                                                                                                                                                                                                                                                                                                                      1
                                                                                                                                                                                                                                                                                                                          20   100
                                                                                                                                                                                                                                                                                                                          ?
                                                                                                                                                                                                                                                                                                                         5 2
                                                                                                                                                                                                                                                                                                                     Planning
                                                                                                                                                                                                                                                                                                                      Poker
                                                                                            M
                                                                                                ANAGER
                                                                                                                       CU
                                                                                                                            STO MER          USER
                                                                                                                                                                                 CU
                                                                                                                                                                                        STO MER
                                                                                                                                                                                                        M
                                                                                                                                                                                                            ANAGER                      USER                                                                         13 30
                                                                                                                                                                                                                                                                                                                     40         8    Play!


                                                                                                                                                                                                                                                                                                                                     3
                              Releaseplan                                                                                                                   Releaseplan Update                                                                                                             5
3|                                                                                                                                                                                                                                                                                                                                   | 4
                                                                                                                                                                                                                                                                                                                                     20
                                                                                                                                                                                                                                                                                           8
                                                                                                                                                                                                                                                                                                                                     8
Sprint Planning Meeting - Part 1
                                                                              Procedure:
     Purpose:                                                                 1. Start with the first Product Backlog Item (Story).
     Metaphor for this meeting: Analysis. The goal of this meeting is         2. Understand this Product Backlog Item by discussing its
     to understand in detail what the End User wants. This meeting               requirements.
     will enable the product development team to get a clear picture          3. Clarify the user acceptance tests.
     of what is needed by the End User. At the end of this meeting the        4. Find the aspects (performance, stability, ...).
     Team will be able to decide what they are able to deliver.               5. Find the acceptance criteria.
                                                                              6. Figure out what its level of done is.
                                                                              7. Get a clear picture about every Backlog Item.
     Basics:                                                                  8. Draw pictures about what needs to be delivered
                                                                                 (flow charts, UML diagrams, scribbles, screen designs).
     Only the team members decide how many Backlog Items the
                                                                              9. Go back to step 1 - take the next Backlog Item.
     Team can take on for the Sprint.
                                                                              Process Check:
     Ingredients:
                                                                              Ask the Team if they can quickly answer the following question,
                               • Estimated and sorted Product                 only as a rough guess: "Can we do the first Backlog Item in this
                                 Backlog                                      Sprint?“ If the answer is "Yes“ keep asking until the last Backlog
                               • Flip charts, markers, scissors, glue,        Item you have analyzed so far.
                                 sticky notes, whiteboards, pencils,
                                 crayons                                      Next - Take a break.
                               • Vacation planner, contact details of
                                 important persons                            After the break:
                                                                              Start with the process above for the next Backlog Item.
                                                                      r:
                                                              ct Ownes king
                                                   the Produ
                                        erTip for e of urge n cy by atheir
                                  Insid a sens                                Ending this Process:
                                                                on of
                                  Create m for sy nchronizatie verybody       1. Stop 20 min before the end of the Sprint Planning #1.
                                  the T hes or by telli ng are.
                                         ea                                   2. Ask again - this time more seriously:
                                   wristwatce emergency exits                    "Can you do the first Backlog Item, ..., the second, ...?“
                                   where th                                   3. Stop if they do not believe they can do any more Backlog Items.
                                                                              4. Now - a very important step: Send out the Product Owner.
                                                                                 She really must go! Everyone, except the Team and the Scrum
                Duration/Location:                                               Master, goes away. Customer, End User, everyone else – out!
                60 min per week of the Sprint. Run this meeting in            5. Ask the Team after everyone else left the room:
                the morning - to be able to have the Sprint Planning             "Very seriously - Is this the list you believe you can do?“
      60 min/   Meeting #2 on the same day.                                   6. Hopefully they will now hold a short discussion to find out what
      SprintW
                                                                                 they really think they can do.
                                                                              7. Communicate the answer to the Product Owner and End Users.
                                                                                 No discussion allowed!
     Output:
     • Selected Product Backlog
                                                                                         Don‘ts
     • Requirements for each Backlog Item
                                                                                         1. Do not resize the Backlog Items.
     • User Acceptance Test for each Backlog Item
                                                                                         2. Do not estimate tasks.

5|                                                                                                                                                  | 6
Sprint Planning Meeting - Part 2
     Purpose:                                                                                                              Procedure:
     Metaphor for this meeting: Design. The product development                                                            1. Go to Backlog Item 1.
     team has the chance to create the design for the solution they                                                        2. Confirm your understanding of what is wanted by looking at
     want to implement. At the end of this meeting, the Team knows                                                            your flip charts.
     how to build the functionality they will develop in that Sprint.                                                      3. Run your design session around this backlog item based on
     ( see Sprint Planning Meeting #1).                                                                                       questions like:
                                                                                                                                     • What interfaces do we need to write?
                                                                                                                           	                        HOW to do - Sprint Planning 2
                                                                                                                                     •			What	architecture	do	we	need	to	create?                                                                   CHECK it
                                                                                                      WHAT to do - Sprint Planning 1
     Ingredients:
                                          The                                                                              	
                                                                                                                           	
                                                                                                                                     •			What	tables	do	we	need	to	update?
                                                                                                                                     •			What	components	do	we	need	to	update	or	write?
                                          Scrum
                                • People who can help the Team to
                                  build the solution during the Sprint,                                    PB
                                                                                                                                             When the Team has a clear understanding about the way it
                                          Flow
                                  e.g. vendors or people from other                                                                          wants to build that feature, it can move to the next Backlog Item.
                                                                                                                                             In the last 10 min of the meeting the team members use sticky-
                                  teams. ©2009
                                                                                                                                             notes to write initial tasks. This helps the team members
                                • Selected Product Backlog                                                                                   to know where to start the next day. Put it on the task board.
                                                                                                                                             Do not estimate these tasks.
                                • Flip charts, markers, scissors, glue,
                                                                                                                                      Sprint # 1                                       Sprint # 2                          Sprint #
                                  sticky notes, whiteboards, pencils,
                                  crayons...                                                       9:00
                                                                                                                                                                  Duration/Location:
                                                                                                                                                                  60 min per week of the Sprint. Run this meeting right
                                                                                                                                                          ....... after the Sprint Planning Meeting #1, e.g. have lunch
                                                                                                                                                                                                       .......




                                                                                                                Sprint Planning 1




                                                                                                                                                                         Sprint Planning 1




                                                                                                                                                                                                                        Sprint Planning 1
                                                       CU
                                                            STO MER
                                                                                                                                                 60 min/ as
                                                                                                                                    Do your Daily Scrum every day! a greater break, butDaily the Sprint Planning #2 on Do your Daily Scr
                                                                                                                                                                                    Do your do Scrum every day!
     Basics:                                                           M
                                                                           ANAGER                                                                SprintW the same day.
     Only the product development team defines the solution.
                                             Product Idea
     Architects or other people outside the Team are only invited to




                                                                                                                                                                                                                                            Estimation Meeting
     help the Team. They are not allowed to make design decisions for                                                                           Scrum Flow
     the Team. The role of these people in the meeting will be defined
     by the team members only.                                       12:00




                                                                                                                                                            Review




                                                                                                                                                                                                               Review
                                                                                                                                                            Sprint




                                                                                                                                                                                                               Sprint
                 Don‘ts:
                                                                                                                Sprint Planning 2




                                                                                                                                                                        Sprint Planning 2




                                                                                                                                                                                                                        Sprint Planning 2
                 1. Do not estimate tasks.
                 2. Do not assign tasks.
                                                                      VISION
                                                                                                                                                       spective




                                                                                                                                                                                                          spective
                                                                                                                                                       Retro-




                                                                                                                                                                                                          Retro-
                                             PR




                                                              ER




                                                                                                                                                       Sprint




                                                                                                                                                                                                          Sprint
                                              O
     Output:                                      DU           N
                                                       CT OW


     • Design of your application
                                                                       SC




                                                                                          R




                                                                           R                  E
                                                                               UM         T
                                                                                    MAS

     • Architecture diagrams, charts, drawings                      18:00
     • Some tasks                                             TEAM


     • Ensure that the Team has a clear understanding of how to do it! Day 1

                                              Product Backlog
7|                                                                                                                                                                                                                                                     | 8
                                                                                                   ation




                                                                                                                          ation




                                                                                                                                                    ation




                                                                                                                                                                                              ation




                                                                                                                                                                                                       ation




                                                                                                                                                                                                                                 ation
                                                       prioritized
                                                                                                  ing




                                                                                                                         ing




                                                                                                                                                   ing




                                                                                                                                                                                             ing




                                                                                                                                                                                                      ing




                                                                                                                                                                                                                                ing
Task board
     The task board is a combined visual representation of the Selected                                               3. Work in Progress
     Product Backlog and the Sprint Backlog.                                                                          • When a team member starts a
                                                                                                                        task, he moves the card of this
     • The task board is maintained by                                                                                  task into the 'Work in Progress'
       the Team only.                                                                                                   column.
     • Try to have a big white board.                                                                                 • A task that has not been finished
       If you have a distributed Team,                                                                                  since the last Daily Scrum stays
       you may use software.                                                                                            in this column and gets a mark
       Check the 'Scrum tools list' on                                                                                  (usually a red dot) on it.
       www.borisgloger.com and                                                                                        • Try to split the task in smaller
       choose one that fits your needs.                                                                                 pieces when it stays longer than
       Keep things simple, a Scrum tool                                                                                 a day in 'Tasks to Do'. Then put
       will not solve problems. It helps                                                                                the new tasks into that column,
       you to communicate over distances.                                                                               remove the parent card.Take a
       Talk about your work, not about                                                                                  new task and start working on it.
       your tool.                                                                                                     • If a task can not be completed
                                                                                                                        because of an impediment, it
                                                                                                                        gets a red dot and the Scrum-
                                                                                                                        Master notes down an impedi-
                                                                                                                        ment.
                                       The task board has 4 columns:
                                                                                                                      4. Done
                                       1. Selected Product Backlog (Stories)
                                                                                                                      When a task card is finished then
                                       Put all Product Backlog Items / Stories                                        it is put into the 'Done' column by
                                       the Team wants to do in this Sprint in                                         the team member who worked on
                                       prioritized order into this column.                                            it. Start to work on the next card.

                                                                                 Definition of Done
                                                                                 Clearify what “Done” means for your Team by making it visible
                                                                                 to the organization. A very good idea is to run a short brain-
                                                                                 storming session. Create a list that describes in detail what
                                       2. Tasks To Do                            “Done” means for your Team.*
                                       To complete a story you usually need
                                       to have some tasks done. Collect all      • Brainstorm about the items in your Team.
                                       necessary new tasks you find for this     • Categorize the items (Story, Sprint, Release to Integration,
                                       specific Backlog Item either in the         Release to Production).
                                       Sprint Planning Meeting or while per-     • Sort the items and refine it.
                                       forming the Sprint in this column.        • Publish that list to your organization.

                                                                                 Follow this list.



9|                                                                               * I got this idea from Mitch Lacey                                         | 10
HOW to do - Sprint Planning 2                                                                                 CHECK it - Daily Scrum
                                                                  WHAT to do - Sprint Planning 1
The
Scrum                                                                   PB



Flow
©
    2009                                                                                                                                                                                                                                                                                                                                                   Tactical
                                                                                                                                                                                                                                                                                                                                                           Level

                                                                                                            Sprint # 1                                                               Sprint # 2                                                                         Sprint # 3                                                                          Sprint # 4
                                                              9:00

                                                                                                                                  .......                                                                       .......                                                                            .......                                                                   .......
                                                                                      Sprint Planning 1




                                                                                                                                                           Sprint Planning 1




                                                                                                                                                                                                                                           Sprint Planning 1




                                                                                                                                                                                                                                                                                                                                       Sprint Planning 1
              CU
                   STO MER
                                                                                                          Do your Daily Scrum every day!                                         Do your Daily Scrum every day!                                                Do your Daily Scrum every day!
                                M
                                    ANAGER



         Product Idea




                                                                                                                                                                                                                                                                 Estimation Meeting
                                                             12:00




                                                                                                                                         Review




                                                                                                                                                                                                                      Review




                                                                                                                                                                                                                                                                                                         Review
                                                                                                                                         Sprint




                                                                                                                                                                                                                      Sprint




                                                                                                                                                                                                                                                                                                         Sprint




                                                                                                                                                                                                                                                                                                                                                                                  Sprint
                                                                                      Sprint Planning 2




                                                                                                                                                          Sprint Planning 2




                                                                                                                                                                                                                                           Sprint Planning 2




                                                                                                                                                                                                                                                                                                                                       Sprint Planning 2
                               VISION
                                                                                                                                   spective




                                                                                                                                                                                                                 spective




                                                                                                                                                                                                                                                                                                    spective
                                                                                                                                   Retro-




                                                                                                                                                                                                                 Retro-




                                                                                                                                                                                                                                                                                                    Retro-




                                                                                                                                                                                                                                                                                                                                                                             Retro-
    PR




                     ER




                                                                                                                                   Sprint




                                                                                                                                                                                                                 Sprint




                                                                                                                                                                                                                                                                                                    Sprint




                                                                                                                                                                                                                                                                                                                                                                             Sprint
     O                N
         DU
              CT OW
                                SC




                                                   R




                                    R                  E
                                        UM
                                             MAS
                                                   T                                                                                                                                                                                                                                                                                                           Version 1.2
                                                             18:00
                     TEAM

                                                                   Day 1                                                                                                                                                                                                                                                          Release



     Product Backlog
                                                           Estimation




                                                                                               Estimation




                                                                                                                            Estimation




                                                                                                                                                                                Estimation




                                                                                                                                                                                                        Estimation




                                                                                                                                                                                                                                                   Estimation




                                                                                                                                                                                                                                                                                            Estimation




                                                                                                                                                                                                                                                                                                                                      Estimation
              prioritized
                                                           Meeting




                                                                                               Meeting




                                                                                                                            Meeting




                                                                                                                                                                                Meeting




                                                                                                                                                                                                        Meeting




                                                                                                                                                                                                                                                   Meeting




                                                                                                                                                                                                                                                                                            Meeting




                                                                                                                                                                                                                                                                                                                                      Meeting
                          PB                                                                                          PB                             PB                                                                        PB                                                     PB                          PB                                          PB




                                                                                                                                                                                                                                                                                                                   1
                                                                                                                                                                                                                                                                                                                       20   100
                                                                                                                                                                                                                                                                                                                       ?
                                                                                                                                                                                                                                                                                                                      5 2


                                                                                                                                                                                                                                                                                                                                                           Strategic
                                                                                                                                                                                                                                                                                                                  Planning
                                                                                                                                                                                                                                                                                                                   Poker
                                                                                 M
                                                                                     ANAGER
                                                                                                             CU
                                                                                                                  STO MER          USER
                                                                                                                                                                       CU
                                                                                                                                                                               STO MER
                                                                                                                                                                                                  M
                                                                                                                                                                                                       ANAGER                       USER                                                                          13 30
                                                                                                                                                                                                                                                                                                                  40         8    Play!


                                                                                                                                                                                                                                                                                                                                  3
                                                                                                                                                                                                                                                                                                                                                           Level
              Releaseplan                                                                                                                         Releaseplan Update                                                                                                                   5
                                                                                                                                                                                                                                                                                                                                  20
                                                                                                                                                                                                                                                                                       8
                                                                                                                                                                                                                                                                                                                                  8
                                                   version 0.0               version 1.0                    version 1.3     version 2.0             version 0.0                          version 1.0      version 1.2           version 2.0                                            13     TEAM
                                                                                                                                                                                                                                                                                                                                  5

                                                                                                                                                                                                                                                                             SIZE it - Estimation Meeting
proudly in
                                   We




                                               tro
                                                  duce
                                  THE
                                  SCRUMLIES



       Scrum Roles
       Metaphor: We run a movie!
       ScrumMaster - The Film Director                     Customer - The Producer
       The ScrumMaster protects the Team from all          The Customer is the requestor of the product
       external disturbances. He is not part of the        from the Scrum-Team. She contracts organiza-
       Team and is its leader and a facilitator. He im-    tions for developing products. Typically these
       proves the productivity of the Scrum-Team           are executive Managers in organizations who
       and controls the “inspect and adapt” cycles of      buy software development from external
       Scrum. He protects the Team and works with          software development companies. In an internal
       the Product Owner to maximize the return            product development organization the person
       on investment. He makes sure that the agile         who is responsible for approving the budget for
       ideals are understood and respected by all          a project is in the customer role.
       stakeholders. However he is not responsible
       for the delivery of the product.
                                                           Product Owner -The Storywriter
                                                           The Product Owner drives the project from
       Team - The Actors                                   the business point of view. She communicates
       The Team delivers the product and is respon-        a clear Vision of the product and she defines
       sible for its quality. The Team works with all      its main characteristics. She also accepts the
       the requestors - the Customers and the End          product at the end of a Sprint. The Product
       Users - to create the Product Backlog.              Owner‘s main responsibility is to ensure that the
       The Team analyses the Product Backlog Items         Team only works on the most important Backlog
       so that its members will have the necessary         Items needed by the organization. She has the
       information in order to build it. The Team          same goals as the Team and she helps the Team
       creates the design of the functionality, it tests   to do its work during a Sprint by not disturbing
       the Backlog Items and delivers the product as       its members and by giving them all necessary
       agreed. The Team performs its commitment            information promptly. The Product Owner is
       voluntarily. It is accountable for its work and     responsible for the return on investment.
       has to consider the nature of its organization
       and of the project. The Team also works con-
       tinuously together with the Product Owner to        End User - The Audience
       define the strategic direction of the product       The End User is a role which can be played by a
       development project.                                lot of people, for example a marketing depart-
                                                           ment person, the real End User, the best domain
                                                           expert you have or maybe consultants that have
       Manager - The Studio Boss                           been hired because of their knowledge. The End
       Management is essential in a Scrum organiza-        User is the requester With his business know-
       tion. The Management enables the Team to            ledge he defines the product by telling the Team
       work by building the right environment for          what he expects.
       Scrum-Teams. Managers create structures
       and stability. They also work with the Scrum-
       Master to refactor the structures and guidelines
       when necessary.
13 |                                                                                                           | 14
Artefacts                                                                          Burn Down Chart
       Scrum-Teams use Scrum Artefacts to run Scrum successfully.                          Remember: Tracking of progress is done by the Team.
       They are tools and intermediate work products that enable                           You have to have a Sprint Burn Down Chart!
       professional work in challenging environments.

                      Metaphor: We run a movie!                              100


                      Impediment Backlog - The Error List
                      The ultimative risk action board. A ScrumMaster
                      uses this list to visualize impediments to the         75

                      productivity of the Scrum-Team. It also reflects his
                      action items as he needs to remove these blocking
                      issues as fast as possible.                            50


                      Product Backlog - The Screen-play
                      The Product Backlog is a list. This list contains
                      so called Product Backlog Items (words, stories,       25

            PB        requirements, features, functionality, etc.) a
                      Scrum-Team wants to deliver in future. All the
                      Product Backlog Items in this list are sorted based     0

                      on business value and return on investment.                  Day 1    2   3   4   5   6   7   8   9   10   11   12   13   14   15   16   17   18   19   20   21


                      Selected Product Backlog -The Scenes
                      The sorted list of Product Backlog Items the
                      Scrum-Team wants to build till the end of a Sprint.                  • The Burn Down Chart shows burned Story Points not hours.

                      Potentially Shippable Product Increment                              • The vertical axis shows Story Points, the horizontal axis shows
                       - An Episode                                                          days of the current Sprint.
                      At the end of the Sprint the Scrum-Team delivers
                      a Potentially Shippable Product Increment. A piece                   • The Team updates the Burn Down Chart on a daily basis.
                      of the product that you would not need to work
                      on again. If development stops right now, it is in a                 • In the example above you see on the right the themes the Team
                      shape that it could be used as it is.                                  wants to tackle in this Sprint.

                      Sprint Backlog - The Actual Shot                                     • A Burn Down Chart needs to be easy to update by the Team.
                      A list of tasks that enables the development team                      Do not make it fancy or complicated to maintain.
                      to visualize its activities. It helps to synchronize
                      the activities of the development team. It is only
                      useful for the development team. It does not
                      reflect progress but shows the current situation of
                      the Team to everybody.



15 |                                                                                                                                                                                    | 16
Daily Scrum
          Purpose:                                                                           Procedure:
          Metaphor for this meeting: Time Out. The Team plans and coordi-                    1. The Team gathers around the task board.
          nates its daily activities and reports and discusses impediments.                     A circle is a good shape.
          The task board helps to focus the Team on its daily activities.                    2. The person on the left side starts to explain to his teammates
          Update the task board and the Burn Down Chart now!                                    what he has achieved by now.
                                                                                             3. Now the person moves the tasks on the task board into the
                                                                                                correct column.
          Ingredients:                                                                       4. The person picks a new task if appropriate and puts it into
                                                                                                "Work in Progress“.
                                                                                             5. If the person has a problem/impediment he reports this to the
                                    • Task board                                                ScrumMaster.
                                    • Sticky notes                                           6. Repeat Step 1 to 5 for each team member.
                                    • Markers

                                                                                                       Don‘ts:
                                       InsiderTip:     - do not stand
                                       ScrumMaster e Team or beside                                    1. The ScrumMaster does not ask the questions.
                                       in fron t of th                                                 2. Do not report to the ScrumMaster or a Manager.
                                                         Don't create
                                       the task board. of pupil and                                    3. Do not sidetrack the meeting.
                                        the atmosphe re                                                4. Do not show up late.
                                        teacher.                                                       5. Do not overrun the timebox.
                                                                                                       6. Do not discuss technical issues.
                                                                                                       7. The ScrumMaster does not move the tasks for
                                                                                                          the team members.
                                                                                                       8. The ScrumMaster does not update the Burn
                                                                                                          Down Chart for the Team.
          Basics:                                                                                      9. Do not show up unprepared.
          • The whole Team must be present.                                                            10. Do not do a 'no show' on the Daily Scrum. Inform
          • A team member not able to be present needs to be represented                                   the Team and have a representative for you.
            by a teammate.

                                                                                                 Scrum Flow
                     Duration/Location:                          HOW to do - Sprint Planning 2             CHECK it - Daily Scrum
                      WHAT to do - Sprint Planning 1
he
                     15 min, same time, same location every day.


crum                                                           :
                                                     InsiderTip m member
                           PB



 ow Output: into who does what!                      Ever y tea listening, think
    • Clear insight                                  should, whilequestion: "How                                                             Tactical
          • Input for the Impediment Backlog          about the p him/her to
          • Input for the Team Backlog                can I hel?"                                                                            Level
                                                      be faster

                                      Sprint # 1                              Sprint # 2                   Sprint # 3                           Sprint # 4
   17 |                                                                                                                                                          | 18
                    9:00
Your Scrum Checklist: Scrum Hard Facts: Roles. Artefacts. All Meetings
Your Scrum Checklist: Scrum Hard Facts: Roles. Artefacts. All Meetings
Your Scrum Checklist: Scrum Hard Facts: Roles. Artefacts. All Meetings

More Related Content

What's hot

Scrum Reference Card
Scrum Reference CardScrum Reference Card
Scrum Reference Cardenderturan
 
SCRUM on a page - by Axon Active Vietnam
SCRUM on a page - by Axon Active VietnamSCRUM on a page - by Axon Active Vietnam
SCRUM on a page - by Axon Active VietnamAxon Active Vietnam
 
Edwin Ritter NJ 2015
Edwin Ritter NJ 2015Edwin Ritter NJ 2015
Edwin Ritter NJ 2015Edwin Ritter
 
23339110 scrum-checklists
23339110 scrum-checklists23339110 scrum-checklists
23339110 scrum-checklistssansahib
 
Introduction to Scrum
Introduction to ScrumIntroduction to Scrum
Introduction to Scrumbarrst
 
3. Agile Tour at be2 - Ani Mkrtchyan
3. Agile Tour at be2 - Ani Mkrtchyan3. Agile Tour at be2 - Ani Mkrtchyan
3. Agile Tour at be2 - Ani MkrtchyanArevik Harutyunyan
 
Scrum referencecard
Scrum referencecardScrum referencecard
Scrum referencecardSuresh Kumar
 
Scrum in 15 Minutes
Scrum in 15 MinutesScrum in 15 Minutes
Scrum in 15 MinutesSerge Rehem
 
Learn scrum in half an hour
Learn scrum in half an hourLearn scrum in half an hour
Learn scrum in half an hourAbhay Kumar
 
Managing Agile Projects using Scrum Framework
Managing Agile Projects using Scrum FrameworkManaging Agile Projects using Scrum Framework
Managing Agile Projects using Scrum FrameworkYasmeen Od
 
Introduction to Scrum
Introduction to ScrumIntroduction to Scrum
Introduction to Scrumtimmcowan
 
Scrum and Devops - Workshop & Handson
Scrum and Devops - Workshop & HandsonScrum and Devops - Workshop & Handson
Scrum and Devops - Workshop & HandsonDony Riyanto
 

What's hot (18)

Scrum cheatsheet
Scrum cheatsheetScrum cheatsheet
Scrum cheatsheet
 
Scrum Reference Card
Scrum Reference CardScrum Reference Card
Scrum Reference Card
 
SCRUM on a page - by Axon Active Vietnam
SCRUM on a page - by Axon Active VietnamSCRUM on a page - by Axon Active Vietnam
SCRUM on a page - by Axon Active Vietnam
 
Edwin Ritter NJ 2015
Edwin Ritter NJ 2015Edwin Ritter NJ 2015
Edwin Ritter NJ 2015
 
Agile Checklist
Agile ChecklistAgile Checklist
Agile Checklist
 
23339110 scrum-checklists
23339110 scrum-checklists23339110 scrum-checklists
23339110 scrum-checklists
 
Introduction to Scrum
Introduction to ScrumIntroduction to Scrum
Introduction to Scrum
 
Scrum Checklist
Scrum ChecklistScrum Checklist
Scrum Checklist
 
Agile processes scrum
Agile processes scrumAgile processes scrum
Agile processes scrum
 
3. Agile Tour at be2 - Ani Mkrtchyan
3. Agile Tour at be2 - Ani Mkrtchyan3. Agile Tour at be2 - Ani Mkrtchyan
3. Agile Tour at be2 - Ani Mkrtchyan
 
Scrum training
Scrum trainingScrum training
Scrum training
 
Scrum checklist
Scrum checklistScrum checklist
Scrum checklist
 
Scrum referencecard
Scrum referencecardScrum referencecard
Scrum referencecard
 
Scrum in 15 Minutes
Scrum in 15 MinutesScrum in 15 Minutes
Scrum in 15 Minutes
 
Learn scrum in half an hour
Learn scrum in half an hourLearn scrum in half an hour
Learn scrum in half an hour
 
Managing Agile Projects using Scrum Framework
Managing Agile Projects using Scrum FrameworkManaging Agile Projects using Scrum Framework
Managing Agile Projects using Scrum Framework
 
Introduction to Scrum
Introduction to ScrumIntroduction to Scrum
Introduction to Scrum
 
Scrum and Devops - Workshop & Handson
Scrum and Devops - Workshop & HandsonScrum and Devops - Workshop & Handson
Scrum and Devops - Workshop & Handson
 

Similar to Your Scrum Checklist: Scrum Hard Facts: Roles. Artefacts. All Meetings

Similar to Your Scrum Checklist: Scrum Hard Facts: Roles. Artefacts. All Meetings (20)

Uplifting Scrum Master Services
Uplifting Scrum Master ServicesUplifting Scrum Master Services
Uplifting Scrum Master Services
 
Scrum checklists
Scrum checklistsScrum checklists
Scrum checklists
 
PSPO(Scrum Product Owner) Preparation Quick Guide.pdf
PSPO(Scrum Product Owner) Preparation Quick Guide.pdfPSPO(Scrum Product Owner) Preparation Quick Guide.pdf
PSPO(Scrum Product Owner) Preparation Quick Guide.pdf
 
The Scrum Model
The Scrum ModelThe Scrum Model
The Scrum Model
 
Presentation on agile methodology
Presentation on agile methodologyPresentation on agile methodology
Presentation on agile methodology
 
Scrum wall images by tobias mayer
Scrum wall images by tobias mayerScrum wall images by tobias mayer
Scrum wall images by tobias mayer
 
Introduction to Agile software testing
Introduction to Agile software testingIntroduction to Agile software testing
Introduction to Agile software testing
 
Intro to scrum webinar
Intro to scrum webinarIntro to scrum webinar
Intro to scrum webinar
 
Beginners Guide to Scrum
Beginners Guide to ScrumBeginners Guide to Scrum
Beginners Guide to Scrum
 
Beginning SCRUM for Startups
Beginning SCRUM for StartupsBeginning SCRUM for Startups
Beginning SCRUM for Startups
 
professional scrum master
professional scrum master professional scrum master
professional scrum master
 
Introduction To Scrum
Introduction To ScrumIntroduction To Scrum
Introduction To Scrum
 
PSPO 1 Roadmap by Vladimir Raykov
PSPO 1 Roadmap by Vladimir RaykovPSPO 1 Roadmap by Vladimir Raykov
PSPO 1 Roadmap by Vladimir Raykov
 
Scrum overview
Scrum overviewScrum overview
Scrum overview
 
Scrum
ScrumScrum
Scrum
 
Agile philosophy
Agile philosophyAgile philosophy
Agile philosophy
 
Benefit of scrum ceremonies presentation
Benefit of scrum ceremonies presentationBenefit of scrum ceremonies presentation
Benefit of scrum ceremonies presentation
 
Zen of Scrum
Zen of ScrumZen of Scrum
Zen of Scrum
 
Introduction to agile scrum
Introduction to agile scrumIntroduction to agile scrum
Introduction to agile scrum
 
Introduction to Agile & Scrum
Introduction to Agile & ScrumIntroduction to Agile & Scrum
Introduction to Agile & Scrum
 

Recently uploaded

Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 

Recently uploaded (20)

YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 

Your Scrum Checklist: Scrum Hard Facts: Roles. Artefacts. All Meetings

  • 1. Your Scrum Checklist The Hard Facts: Roles. Artefacts. All Meetings. Wien. New York. Recife. Baden-Baden. Text by Boris Gloger | Scrumlies by Jo Legat | Realization by Katrin Dietze Version 2/10 © Boris Gloger ISBN 978-3-000-28201-0
  • 2. Scrum is a framework with simple rules. Scrum Checklists will help you to remember these simple rules in General Meeting Rules Basics: the heat of daily work and stress. Scrum Checklists enable you to Every meeting starts on time and ends on time. create an enjoyable and productive work environment with your Every meeting is an open meeting. Everyone can attend. Scrum-Team. Every meeting is time-boxed. Preparation: For Scrum Beginners - Follow the Checklists, do 1. Invite everybody who is necessary ahead of time so that Scrum by the book.This will enable you to run you they can prepare. first 3 to 4 Sprints very successfully. Your success 2. Send out an agenda with goal and purpose of the meeting. will facilitate to spread Scrum in your organization. 3. Book all resources for the meeting: For Scrum Intermediates - Use your common sense room, data projector, flip charts, facilitation equipment and to tweak your processes guided by these Scrum anything else you will need for your meeting Checklists. 4. Send a reminder 24 hrs before the meeting. As an experienced ScrumMaster - Use Scrum Check- 5. Prepare a flip chart with meeting rules. lists as your safety belt in stressful situations. Facilitation of the Meeting: 1. The facilitator has to be present during the discussion. He is not Scrum Checklists do not replace experience and practice. allowed to be involved in the discussion but he needs to follow Scrum Checklists are not procedures that you have to follow. and bring the discussion back to the topic in case the partici- Scrum Checklists help to run a successful Scrum in a demanding pants lose focus. environment. 2. He presents the meeting goal and agenda. 3. He agrees on a person who will write the meeting minutes if necessary. 4. He will be the scribe for the Team or teach them how to do the Keep alive 10 Basic Practices: documentation themselves and might record what is said on a flip chart to visualize the conversation. 1. A clear and catching Vision 5. He keeps the focus of the meeting by using tools like the Park- 2. A maintained Product Backlog ing Lot to capture issues or questions that aren‘t related to the 3. A sorted Product Backlog based on business value meeting‘s purpose so that they may be addressed later. 4. Backlog Items are sized by the Team 6. He ends the meeting with a wrap–up and a very short retro- 5. Daily Scrums spective (5 minutes only). 6. Burn Down Charts 7. The Sprint is not disturbed by management and/or customers Output: 8. The software the Team delivers is “done” • Document using scribbles or flip chart notes. 9. A collaborative Sprint Review Take some photographs of your boards and flip charts. 10. Sprint Retrospectives with focus on improvement in • Meeting minutes and a clear understanding of the meeting the work process of the Team and the organization result must be communicated. 1| | 2
  • 3. HOW to do - Sprint Planning 2 CHECK it - Daily Scrum Estimation Meeting WHAT to do - Sprint Planning 1 The Purpose: Scrum PB Procedure: Flow 1. For strategic planning you need to know the size of the Backlog Items. It is a necessary input for release planning and for gaining 1. The Product Owner presents the Product Backlog Items she wants to have estimated. © an understanding of how much a Team might be able to develop 2009 2. The Team plays Planning Poker for those Backlog Items. in a Sprint. 3. In case the Backlog Item is large but needs to go into the next 2. It enables the team members to see what will happen in the or subsequent Sprints, the Team will split the Backlog Item into following phases of the project. smaller Backlog Items. Re-size the new Backlog Item by playing 3. Grooming Backlog Items: Get better understanding for Sprint # 1 Backlog Planning Poker for it again. Sprint # 2 Sprint # 3 Items by decomposing them if appropriate. 4. Re-size Backlog Items that are not done but likely to be a 9:00 request for the next three Sprints. ....... 5. Identify Backlog Items that need to be clarified for the next ....... ....... Sprint Planning 1 Sprint Planning 1 Sprint Planning 1 Sprint Planning 1 Basics: CU STO MER Estimation Meeting. Do your Daily Scrum every day! Do your Daily Scrum every day! Do your Daily Scrum every day! Only the Team estimates. A Product Owner needs to be present M ANAGER to help to decide when a story can be broken into smaller stories. Product Idea Duration: Estimation Meeting Ingredients: Time-box this meeting to 90 min or less. 12:00 If the Sprint is longer than a week, a desirable 90 min frequency of Estimation Meetings is two meetings • The Product Backlog that is prioritized per Sprint. Review Review Review Sprint Sprint Sprint according to business value by the Sprint Planning 2 Sprint Planning 2 Sprint Planning 2 Sprint Planning 2 Product Owner. Output: InsiderTip:business value VISION • Planning Poker Cards Try also meetings for • Estimated Product Backlog estimation Owner(s) on a spective spective spective Retro- • Smaller Backlog Items Product asis. Retro- Retro- PR ER Sprint Sprint Sprint O N DU CT OW Colored icon = mandatory participant • Issues that need to be clarified weekly b Grey icon = optional participant SC R R E UM T MAS 18:00 Scrum Flow TEAM Day 1 Release Product Backlog Estimation Estimation Estimation Estimation Estimation Estimation Estimation Estimation prioritized Meeting Meeting Meeting Meeting Meeting Meeting Meeting Meeting Don‘ts PB PB PB PB PB PB 1. Do not size effort - only the Team does! 2. The Product Owner does not size. 3. Do not do this activity as part of the Sprint Planning Meeting #1. 1 20 100 ? 5 2 Planning Poker M ANAGER CU STO MER USER CU STO MER M ANAGER USER 13 30 40 8 Play! 3 Releaseplan Releaseplan Update 5 3| | 4 20 8 8
  • 4. Sprint Planning Meeting - Part 1 Procedure: Purpose: 1. Start with the first Product Backlog Item (Story). Metaphor for this meeting: Analysis. The goal of this meeting is 2. Understand this Product Backlog Item by discussing its to understand in detail what the End User wants. This meeting requirements. will enable the product development team to get a clear picture 3. Clarify the user acceptance tests. of what is needed by the End User. At the end of this meeting the 4. Find the aspects (performance, stability, ...). Team will be able to decide what they are able to deliver. 5. Find the acceptance criteria. 6. Figure out what its level of done is. 7. Get a clear picture about every Backlog Item. Basics: 8. Draw pictures about what needs to be delivered (flow charts, UML diagrams, scribbles, screen designs). Only the team members decide how many Backlog Items the 9. Go back to step 1 - take the next Backlog Item. Team can take on for the Sprint. Process Check: Ingredients: Ask the Team if they can quickly answer the following question, • Estimated and sorted Product only as a rough guess: "Can we do the first Backlog Item in this Backlog Sprint?“ If the answer is "Yes“ keep asking until the last Backlog • Flip charts, markers, scissors, glue, Item you have analyzed so far. sticky notes, whiteboards, pencils, crayons Next - Take a break. • Vacation planner, contact details of important persons After the break: Start with the process above for the next Backlog Item. r: ct Ownes king the Produ erTip for e of urge n cy by atheir Insid a sens Ending this Process: on of Create m for sy nchronizatie verybody 1. Stop 20 min before the end of the Sprint Planning #1. the T hes or by telli ng are. ea 2. Ask again - this time more seriously: wristwatce emergency exits "Can you do the first Backlog Item, ..., the second, ...?“ where th 3. Stop if they do not believe they can do any more Backlog Items. 4. Now - a very important step: Send out the Product Owner. She really must go! Everyone, except the Team and the Scrum Duration/Location: Master, goes away. Customer, End User, everyone else – out! 60 min per week of the Sprint. Run this meeting in 5. Ask the Team after everyone else left the room: the morning - to be able to have the Sprint Planning "Very seriously - Is this the list you believe you can do?“ 60 min/ Meeting #2 on the same day. 6. Hopefully they will now hold a short discussion to find out what SprintW they really think they can do. 7. Communicate the answer to the Product Owner and End Users. No discussion allowed! Output: • Selected Product Backlog Don‘ts • Requirements for each Backlog Item 1. Do not resize the Backlog Items. • User Acceptance Test for each Backlog Item 2. Do not estimate tasks. 5| | 6
  • 5. Sprint Planning Meeting - Part 2 Purpose: Procedure: Metaphor for this meeting: Design. The product development 1. Go to Backlog Item 1. team has the chance to create the design for the solution they 2. Confirm your understanding of what is wanted by looking at want to implement. At the end of this meeting, the Team knows your flip charts. how to build the functionality they will develop in that Sprint. 3. Run your design session around this backlog item based on ( see Sprint Planning Meeting #1). questions like: • What interfaces do we need to write? HOW to do - Sprint Planning 2 • What architecture do we need to create? CHECK it WHAT to do - Sprint Planning 1 Ingredients: The • What tables do we need to update? • What components do we need to update or write? Scrum • People who can help the Team to build the solution during the Sprint, PB When the Team has a clear understanding about the way it Flow e.g. vendors or people from other wants to build that feature, it can move to the next Backlog Item. In the last 10 min of the meeting the team members use sticky- teams. ©2009 notes to write initial tasks. This helps the team members • Selected Product Backlog to know where to start the next day. Put it on the task board. Do not estimate these tasks. • Flip charts, markers, scissors, glue, Sprint # 1 Sprint # 2 Sprint # sticky notes, whiteboards, pencils, crayons... 9:00 Duration/Location: 60 min per week of the Sprint. Run this meeting right ....... after the Sprint Planning Meeting #1, e.g. have lunch ....... Sprint Planning 1 Sprint Planning 1 Sprint Planning 1 CU STO MER 60 min/ as Do your Daily Scrum every day! a greater break, butDaily the Sprint Planning #2 on Do your Daily Scr Do your do Scrum every day! Basics: M ANAGER SprintW the same day. Only the product development team defines the solution. Product Idea Architects or other people outside the Team are only invited to Estimation Meeting help the Team. They are not allowed to make design decisions for Scrum Flow the Team. The role of these people in the meeting will be defined by the team members only. 12:00 Review Review Sprint Sprint Don‘ts: Sprint Planning 2 Sprint Planning 2 Sprint Planning 2 1. Do not estimate tasks. 2. Do not assign tasks. VISION spective spective Retro- Retro- PR ER Sprint Sprint O Output: DU N CT OW • Design of your application SC R R E UM T MAS • Architecture diagrams, charts, drawings 18:00 • Some tasks TEAM • Ensure that the Team has a clear understanding of how to do it! Day 1 Product Backlog 7| | 8 ation ation ation ation ation ation prioritized ing ing ing ing ing ing
  • 6. Task board The task board is a combined visual representation of the Selected 3. Work in Progress Product Backlog and the Sprint Backlog. • When a team member starts a task, he moves the card of this • The task board is maintained by task into the 'Work in Progress' the Team only. column. • Try to have a big white board. • A task that has not been finished If you have a distributed Team, since the last Daily Scrum stays you may use software. in this column and gets a mark Check the 'Scrum tools list' on (usually a red dot) on it. www.borisgloger.com and • Try to split the task in smaller choose one that fits your needs. pieces when it stays longer than Keep things simple, a Scrum tool a day in 'Tasks to Do'. Then put will not solve problems. It helps the new tasks into that column, you to communicate over distances. remove the parent card.Take a Talk about your work, not about new task and start working on it. your tool. • If a task can not be completed because of an impediment, it gets a red dot and the Scrum- Master notes down an impedi- ment. The task board has 4 columns: 4. Done 1. Selected Product Backlog (Stories) When a task card is finished then Put all Product Backlog Items / Stories it is put into the 'Done' column by the Team wants to do in this Sprint in the team member who worked on prioritized order into this column. it. Start to work on the next card. Definition of Done Clearify what “Done” means for your Team by making it visible to the organization. A very good idea is to run a short brain- storming session. Create a list that describes in detail what 2. Tasks To Do “Done” means for your Team.* To complete a story you usually need to have some tasks done. Collect all • Brainstorm about the items in your Team. necessary new tasks you find for this • Categorize the items (Story, Sprint, Release to Integration, specific Backlog Item either in the Release to Production). Sprint Planning Meeting or while per- • Sort the items and refine it. forming the Sprint in this column. • Publish that list to your organization. Follow this list. 9| * I got this idea from Mitch Lacey | 10
  • 7. HOW to do - Sprint Planning 2 CHECK it - Daily Scrum WHAT to do - Sprint Planning 1 The Scrum PB Flow © 2009 Tactical Level Sprint # 1 Sprint # 2 Sprint # 3 Sprint # 4 9:00 ....... ....... ....... ....... Sprint Planning 1 Sprint Planning 1 Sprint Planning 1 Sprint Planning 1 CU STO MER Do your Daily Scrum every day! Do your Daily Scrum every day! Do your Daily Scrum every day! M ANAGER Product Idea Estimation Meeting 12:00 Review Review Review Sprint Sprint Sprint Sprint Sprint Planning 2 Sprint Planning 2 Sprint Planning 2 Sprint Planning 2 VISION spective spective spective Retro- Retro- Retro- Retro- PR ER Sprint Sprint Sprint Sprint O N DU CT OW SC R R E UM MAS T Version 1.2 18:00 TEAM Day 1 Release Product Backlog Estimation Estimation Estimation Estimation Estimation Estimation Estimation Estimation prioritized Meeting Meeting Meeting Meeting Meeting Meeting Meeting Meeting PB PB PB PB PB PB PB 1 20 100 ? 5 2 Strategic Planning Poker M ANAGER CU STO MER USER CU STO MER M ANAGER USER 13 30 40 8 Play! 3 Level Releaseplan Releaseplan Update 5 20 8 8 version 0.0 version 1.0 version 1.3 version 2.0 version 0.0 version 1.0 version 1.2 version 2.0 13 TEAM 5 SIZE it - Estimation Meeting
  • 8. proudly in We tro duce THE SCRUMLIES Scrum Roles Metaphor: We run a movie! ScrumMaster - The Film Director Customer - The Producer The ScrumMaster protects the Team from all The Customer is the requestor of the product external disturbances. He is not part of the from the Scrum-Team. She contracts organiza- Team and is its leader and a facilitator. He im- tions for developing products. Typically these proves the productivity of the Scrum-Team are executive Managers in organizations who and controls the “inspect and adapt” cycles of buy software development from external Scrum. He protects the Team and works with software development companies. In an internal the Product Owner to maximize the return product development organization the person on investment. He makes sure that the agile who is responsible for approving the budget for ideals are understood and respected by all a project is in the customer role. stakeholders. However he is not responsible for the delivery of the product. Product Owner -The Storywriter The Product Owner drives the project from Team - The Actors the business point of view. She communicates The Team delivers the product and is respon- a clear Vision of the product and she defines sible for its quality. The Team works with all its main characteristics. She also accepts the the requestors - the Customers and the End product at the end of a Sprint. The Product Users - to create the Product Backlog. Owner‘s main responsibility is to ensure that the The Team analyses the Product Backlog Items Team only works on the most important Backlog so that its members will have the necessary Items needed by the organization. She has the information in order to build it. The Team same goals as the Team and she helps the Team creates the design of the functionality, it tests to do its work during a Sprint by not disturbing the Backlog Items and delivers the product as its members and by giving them all necessary agreed. The Team performs its commitment information promptly. The Product Owner is voluntarily. It is accountable for its work and responsible for the return on investment. has to consider the nature of its organization and of the project. The Team also works con- tinuously together with the Product Owner to End User - The Audience define the strategic direction of the product The End User is a role which can be played by a development project. lot of people, for example a marketing depart- ment person, the real End User, the best domain expert you have or maybe consultants that have Manager - The Studio Boss been hired because of their knowledge. The End Management is essential in a Scrum organiza- User is the requester With his business know- tion. The Management enables the Team to ledge he defines the product by telling the Team work by building the right environment for what he expects. Scrum-Teams. Managers create structures and stability. They also work with the Scrum- Master to refactor the structures and guidelines when necessary. 13 | | 14
  • 9. Artefacts Burn Down Chart Scrum-Teams use Scrum Artefacts to run Scrum successfully. Remember: Tracking of progress is done by the Team. They are tools and intermediate work products that enable You have to have a Sprint Burn Down Chart! professional work in challenging environments. Metaphor: We run a movie! 100 Impediment Backlog - The Error List The ultimative risk action board. A ScrumMaster uses this list to visualize impediments to the 75 productivity of the Scrum-Team. It also reflects his action items as he needs to remove these blocking issues as fast as possible. 50 Product Backlog - The Screen-play The Product Backlog is a list. This list contains so called Product Backlog Items (words, stories, 25 PB requirements, features, functionality, etc.) a Scrum-Team wants to deliver in future. All the Product Backlog Items in this list are sorted based 0 on business value and return on investment. Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Selected Product Backlog -The Scenes The sorted list of Product Backlog Items the Scrum-Team wants to build till the end of a Sprint. • The Burn Down Chart shows burned Story Points not hours. Potentially Shippable Product Increment • The vertical axis shows Story Points, the horizontal axis shows - An Episode days of the current Sprint. At the end of the Sprint the Scrum-Team delivers a Potentially Shippable Product Increment. A piece • The Team updates the Burn Down Chart on a daily basis. of the product that you would not need to work on again. If development stops right now, it is in a • In the example above you see on the right the themes the Team shape that it could be used as it is. wants to tackle in this Sprint. Sprint Backlog - The Actual Shot • A Burn Down Chart needs to be easy to update by the Team. A list of tasks that enables the development team Do not make it fancy or complicated to maintain. to visualize its activities. It helps to synchronize the activities of the development team. It is only useful for the development team. It does not reflect progress but shows the current situation of the Team to everybody. 15 | | 16
  • 10. Daily Scrum Purpose: Procedure: Metaphor for this meeting: Time Out. The Team plans and coordi- 1. The Team gathers around the task board. nates its daily activities and reports and discusses impediments. A circle is a good shape. The task board helps to focus the Team on its daily activities. 2. The person on the left side starts to explain to his teammates Update the task board and the Burn Down Chart now! what he has achieved by now. 3. Now the person moves the tasks on the task board into the correct column. Ingredients: 4. The person picks a new task if appropriate and puts it into "Work in Progress“. 5. If the person has a problem/impediment he reports this to the • Task board ScrumMaster. • Sticky notes 6. Repeat Step 1 to 5 for each team member. • Markers Don‘ts: InsiderTip: - do not stand ScrumMaster e Team or beside 1. The ScrumMaster does not ask the questions. in fron t of th 2. Do not report to the ScrumMaster or a Manager. Don't create the task board. of pupil and 3. Do not sidetrack the meeting. the atmosphe re 4. Do not show up late. teacher. 5. Do not overrun the timebox. 6. Do not discuss technical issues. 7. The ScrumMaster does not move the tasks for the team members. 8. The ScrumMaster does not update the Burn Down Chart for the Team. Basics: 9. Do not show up unprepared. • The whole Team must be present. 10. Do not do a 'no show' on the Daily Scrum. Inform • A team member not able to be present needs to be represented the Team and have a representative for you. by a teammate. Scrum Flow Duration/Location: HOW to do - Sprint Planning 2 CHECK it - Daily Scrum WHAT to do - Sprint Planning 1 he 15 min, same time, same location every day. crum : InsiderTip m member PB ow Output: into who does what! Ever y tea listening, think • Clear insight should, whilequestion: "How Tactical • Input for the Impediment Backlog about the p him/her to • Input for the Team Backlog can I hel?" Level be faster Sprint # 1 Sprint # 2 Sprint # 3 Sprint # 4 17 | | 18 9:00