2. Meeting Objectives
• Obtain consensus on
Automation/Business information
standards (the Roadmap)
• Show Benefits and Cost Savings of the
LSI Project methodology as applied to HB
Fuller global manufacturing
3. Benefits of the LSI Approach
There will be the foundation in place for a world class
manufacturing operation if the methodologies presented
are adopted
Ability to proactively analyze and correct production
delays and quality issues though standard reporting tools
and KPI’s
Scalable solutions to fit both the individual plant needs
and the needs of the entire enterprise
Up to 50% less time and money spent on commissioning
and having new/upgraded systems in full production in
70% less time
4. Vision
ERP
MES
Common Data Platform
and Reporting (OEE,
Trending, Batch Reports,
etc.)
PLC or DCS
Field Devices, Field Busses, etc.
6. LSI Project Methodology
World Class
Manufacturing
Engineering Global Standards
Platforms
Common
Standard
Software
Process
7. Summary of Benefits of the LSI
Approach
Up to 50% less time spent on commissioning and the plant is
in full production in less time. Startup support is currently
estimated at $2-4MM for HB Fuller transformational project.
Roadmap adoption will result in savings of $1-2MM
Startup to full production in 70% less time
30% less hardware required for spares for individual plants
50% less control software development time and
implementation
Up to a 40% reduction in MES and SCADA level software
development and deployment costs
Common “language” for talking production performance and
KPI’s
Foundation in place for a world class manufacturing operation
11. Engineering Process
Scope and Specifications clearly defined and written:
Business requirements defined and agreed upon
Functional and Operational requirements defined and
agreed upon
Hardware and Software Design and implementation built
around the agreed upon requirements
Appropriate simulation techniques used based on agreed
upon requirements
Factory acceptance testing completed based on agreed upon
requirements
Benefit: Faster, smoother startups. “Eliminate the white knuckle
ride of startups” – Up to 50% less time spent on commissioning
and the plant is in full production in less time.
Back
15. Standard PLC Hardware Platforms
and Tools
Limited number of select hardware vendors and select products
chosen within product vendor’s portfolios for automation projects
Common hardware platform reduces spare parts requirements
across the enterprise
Common software tools can be used to reduce software
development costs
Appropriate vendors chosen by region based on support models
and available spare parts and product support (i.e. Siemens
strong in Europe, Rockwell Automation in North America). LSI is
a solution partner for both companies
Vendors will be standardized at each facility for both process
and packaging
Benefit: 30% less hardware required for spares for individual plants,
50% less software control development and implementation time Back
16. Common SCADA/MES Software
Platform
Common software and data platform to reduce development and
deployments costs
Object based data structures (i.e. mixers, reactors, etc.) for HMI
and for reporting
MES functionality such as OEE, Process Historians, Production
reporting, etc.
Ability to give plant wide and enterprise wide views via a web
interface
Ability to give and “Executive” view and a “Plant view” as
required
Software objects are built independent of the hardware platform
and simply “tied to” objects in the appropriate control system
Worldwide acceptance and support
LSI is a solution provider for Wonderware and for Intellution
Benefit: Up to a 40% reduction in SCADA and MES software
development and deployment costs
Back
17. Reporting Capabilities
The common set of reporting tools will allow HB Fuller to
speak a “common language” across all plants (i.e. OEE to
track reporting in packaging, batch reports like the one below,
etc.)
Back
18. What is OEE?
OEE (Overall Equipment
Effectiveness) = Availability x
Performance x Quality
Where:
1. Availability = Available Time
/ Scheduled Time
2. Performance = (Parts
Produced * Ideal Cycle
Time) / Available Time
3. Quality = Good Units / Units
Started
Back
20. Standard Packaging Vendors and
MES/OEE Strategy
Where new packaging machines will be installed, the following will be
recommended by region:
Common PLC vendors
Common motion control vendors
Common field device vendors
Common reporting interface specified by LSI through a standard set
of tags: Running/Stopped, Automatic/Manual, Package Count, Faults
(where they can be automatically detected), etc.
Where packaging equipment will be retained and vendors will not be
changed, the common reporting interface as detailed above will be
developed
Back
Editor's Notes
Make sure we understand their expectations for this meeting, and we tailor it to them. Dan to comment
Make sure we understand their expectations for this meeting, and we tailor it to them. Dan to comment
Make sure we understand their expectations for this meeting, and we tailor it to them. Dan to comment