Vietnam Bus System Ho Chi Minh City
1. Technical Assistance For Consolidation
And Development Of A Bus System In
Ho Chi Minh City, Vietnam
Task 2A BRT Network Sketch Plan
1
2. Bus Rapid Transit (BRT)
Bus Rapid Transit, or BRT, is an urban mass
transportation service using buses (instead of rail
cars) running on separate rights-of-way
BRT is characterised by
– Large, high-capacity, high-frequency bus services
– Segregated bus lanes or ‘busways’
– Rail-style bus stations with sheltered waiting areas
– Multi-door buses and pre-board ticketing at bus stations to
allow rapid boarding and alighting
2
3. Bus Rapid Transit (BRT)
Implementation of BRT in HCMC should involve
– Engineering and construction of infrastructure
– Procurement of a suitable bus fleet
– Installation of traffic signal systems to promote bus
priority and minimise overall delay
– Upgrading of all public transport to smart card ticketing
– Reorganisation of institutional structures to better manage
public transport and encourage private sector participation
3
4. Proposed BRT Network for HCMC
Gò Vấp
An Sương
Sân bay
Miền
Đông
Bến
Thành
Miền
Tây Key:
BRT
Nguyễn Văn Linh
2nd Ring Road
4
5. Proposed BRT Network for HCMC
An Sương Gò Vấp Quốc lộ 13
Sân bay
Miền
Đông
Xa lộ
Hà Nội
Bến
Thành
Miền
Tây
Key: Nguyễn Văn Linh
BRT
MRT
5
6. City Centre Alignment
Võ Thị Sáu
Nam Kỳ Nguyễn
Điện Biên Phủ Hữu Cảnh
Khởi
Nghĩa
Pasteur
Tôn Đức
Thắng
Nam Kỳ
Khởi
Nghĩa Nguyễn
Huệ
Bến
Thành
Hàm Nghi
Nguyễn
Trần Tất
Hưng Thành
Đạo
6
7. Preferred Minimum Corridor Width for BRT
At BRT Stations Between BRT Stations
1.0m median
with
pedestrian
guardrail
0.2m
kerb
3.5 3.5 3.2 3.5 3.2 3.5 3.5 3.5 3.5 4.2 4.2 3.5 3.5
23.9m 22.4m
Note: these treatments are suitable for long sections of corridor
7
8. Preferred Minimum Corridor Width for BRT
MVA PREFERRED MINIMUM CORRIDOR
Proposed Cross Section at BRT Stations
8
9. Preferred Minimum Corridor Width for BRT
MVA PREFERRED MINIMUM CORRIDOR
Proposed Cross Section between BRT Stations
9
10. Absolute Minimum Corridor Width for BRT
At BRT Stations Between BRT Stations
1.0m median
with
pedestrian
guardrail
0.2m
kerb
5.0 3.2 3.5 3.2 5.0 5.0 4.2 4.2 5.0
19.9m 18.4m
Note: these treatments are not recommended for long sections of corridor
10
11. Existing Narrow Corridors in HCMC
16m MVA
Quang Trung
Hành lang assumes
Đông Tây these
narrow
corridors
Hoàng Văn Thụ Bạch Đằng will be
widened to
14m
18m support
BRT by
16m
10m year 2020
Cầu
Lý Thường Kiệt 12m
Rạch
Chiếc
14m
Nguyễn Tất Thành
14m
Key:
Quốc lộ 50
BRT
MRT
8m 14m
Nguyễn Văn Linh
Narrow
Corridors
11
12. BRT in One Way Streets
ONE WAY STREETS
Side BRT Alignment Central BRT Alignment
12
13. Pedestrian Access to BRT Stations
Pedestrian access to BRT
stations can be at road
level using traffic signals
or separated from road
traffic using escalators
and foot bridges
Grade Separated
At Grade
Pedestrian access to BRT
stations along the road
corridor is also important to
encourage use of BRT
13
14. BRT in Nguyen Kiem
Existing Situation Proposed with BRT
Nguyễn Oanh All traffic Nguyễn Oanh All traffic
movements movements
allowed allowed
Quang Trung Quang Trung
Phạm
BRT busway with Ngũ
local access to Lão
Nguyễn Kiệm residents and
businesses. No
through- traffic
Other south- movements Nguyễn
bound 4-wheeled Thái
traffic uses Sơn
Only bus
alternative routes
and motor- Hoàng Minh Giám
cycles
allowed Nguyễn Kiệm
south-
bound
Hồ Văn Huê
Phan
Phan
Đăng
Đăng
Lưu
Lưu
Hoàng Văn Thụ Hoàng Văn Thụ
14
15. BRT in Ngo Gia Tu
Nga Sau to Nga Bay
NGO GIA TU
Northern Section
Proposed Cross Section with Widened Corridor
15
16. BRT in Ngo Gia Tu
Hung Vuong to Nga Sau
NGO GIA TU
Southern Section
West East
Proposed Cross Section
16
17. BRT in Ton Duc Thang
Nguyen Huu Canh to Saigon River
TON DUC THANG
Northern Section
South North
Proposed Cross Section
17
18. BRT in Ton Duc Thang
Beside Saigon River
TON DUC THANG
Central Section
West East
Posible
Riverside Saigon
Footway River
Proposed Cross Section
18
19. BRT Pilot Plan
An Sương
Bến
Thành
Key:
BRT
BRT Pilot Plan
2nd Ring Road
19