- 5. ©OpenHydro2015–Allrightsreserved
EMEC
OpenHydro has been testing at the European Marine Energy
Centre (EMEC) since 2006; grid connected in 2008.
2014/2015 testing focused on new power convertor (ABB)
and in-house developed control system:
‒ Over 3,000 hours generating onto the grid.
‒ 16% improvement in turbine efficiency.
Technology Development
21st May 20155 Thetis Presentation
- 7. ©OpenHydro2015–Allrightsreserved
Installation & Recovery
OpenHydro recognised early that the key constraint in the
development of the tidal industry is the deployment system.
Patented installation and recovery
system demonstrated in Scotland,
Canada and France.
Technology Development
21st May 20157 Thetis Presentation
- 8. ©OpenHydro2015–Allrightsreserved
Demonstration Arrays
21st May 20158 Thetis Presentation
Demonstration Arrays Technology
Development
Demonstration
Arrays
Industrialisation
Commercial
Arrays
Customer: Emera
Location: Bay of Fundy
Installation: 2015
Scale: 2 x 16m
Turbine Rating: 2MW
Customer: EDF
Location: Paimpol-Bréhat
Installation: 2015
Scale: 2 x 16m
Turbine Rating: 2MW
- 9. ©OpenHydro2015–Allrightsreserved
Demonstration Array
21st May 20159 Thetis Presentation
France | EDF
During 2015 OpenHydro will install 2 x 16m Pre-Series turbines at EDF’s Paimpol-Bréhat tidal site.
This follows the successful testing of a prototype 16m turbine at the site over the winder of 2013/2014.
- 10. ©OpenHydro2015–Allrightsreserved
Industrialisation
Industrialisation
OpenHydro is targeting a
competitive Levelised Cost of Energy (LCoE).
OpenHydro’s industrial strategy is based on a model with
industrial capacity in-market.
21st May 201510 Thetis Presentation
Pre-Series
Standard
Product
20162015 2017 2018 2019 2020
Cost
Time
Current Pre-Series Design
Cost Reduction - Design / Value Engineering
Supply Chain / Make or Buy Effect
Volume Effect ‘S’ Curve
Technology
Development
Demonstration
Arrays
Industrialisation
Commercial
Arrays
- 12. ©OpenHydro2015–Allrightsreserved
Commercial Arrays
Emera | Canada
Joint Venture with Emera for
300MW tidal farm.
− Phase 1 (2015): 4MW
− Phase 2 (2017): 12MW
− Phase 3 (2019): 34MW
− Phase 4 (2020+): 100MW
per annum to 300MW
Brookfield | Northern Ireland
100MW Joint Venture in Northern Ireland.
− Phase 1 (2018): 30MW
− Phase 2 (2019+): 70MW
SSE Renewables | Scotland
200MW Joint Venture in Scotland.
− Phase 1 (2019): 30MW
− Phase 2 (2021): 170MW
ARE | Channel Islands
Joint Venture to develop a 300MW
project.
Separately, ARE are progressing
FABLink; an interconnector between
France, Alderney and the UK (available
from 2020).
− Installation of 50MW per annum
(initially) from 2021.
EDF | Paimpol-Brehat
Demonstration array of 2 x 16m
turbines.
EDF EN | France
Development of 14MW project in
the Raz Blanchard off the coast
of Normandy.
Commercial Pipeline
21st May 201512 Thetis Presentation
Project Portfolio
During 2014 OpenHydro’s
development portfolio
grew from 300MW to
919MW.