NYC Office of Emergency Managament
                                                                                                                                                 Project 10003578
                                                                                                                                        Certification Level: Silver
                            LEED for New Construction v2.0/2.1                                                                                            3/1/2007

34 Points Achieved                                                                                                                                                Possible Points: 69
    Certified 26 to 32 points        Silver 33 to 38 points    Gold 39 to 51 points   Platinum 52 or more points
9   Sustainable Sites                                                Possible Points: 14         4   Materials & Resources                                        Possible Points: 13
Y                                                                                                Y

Y   Prereq 1      Erosion & Sedimentation Control                                                Y   Prereq 1     Storage & Collection of Recyclables
1   Credit 1      Site Selection                                                          1          Credit 1.1   Building Reuse , Maintain 75% of Existing Shell                  1
1   Credit 2      Development Density                                                     1          Credit 1.2   Building Reuse , Maintain 100% of Shell                          1
1   Credit 3      Brownfield Redevelopment                                                1          Credit 1.3   Building Reuse , Maintain 100% Shell & 50% Non-Shell             1
1   Credit 4.1    Alternative Transportation, Public Transportation Access                1      1   Credit 2.1   Construction Waste Management , Divert 50%                       1
1   Credit 4.2    Alternative Transportation, Bicycle Storage & Changing Rooms            1          Credit 2.2   Construction Waste Management , Divert 75%                       1
1   Credit 4.3    Alternative Transportation, Alternative Fuel Vehicles                   1          Credit 3.1   Resource Reuse , Specify 5%                                      1
1   Credit 4.4    Alternative Transportation, Parking Capacity & Carpooling               1          Credit 3.2   Resource Reuse , Specify 10%                                     1
    Credit 5.1    Reduced Site Disturbance , Protect or Restore Open Space                1      1   Credit 4.1   Recycled Content, Specify 10%                                    1
    Credit 5.2    Reduced Site Disturbance , Development Footprint                        1      1   Credit 4.2   Recycled Content, Specify 20%                                    1
    Credit 6.1    Stormwater Management , Rate & Quantity                                 1      1   Credit 5.1   Local/Regional Materials , 20% Manufactured Locally              1
    Credit 6.2    Stormwater Management , Treatment                                       1          Credit 5.2   Local/Regional Materials , of 20% Above, 50% Harvested Locally   1
1   Credit 7.1    Landscape & Exterior Design to Reduce Heat Islands , Non-Roof           1          Credit 6     Rapidly Renewable Materials                                      1
1   Credit 7.2    Landscape & Exterior Design to Reduce Heat Islands , Roof               1          Credit 7     Certified Wood                                                   1
    Credit 8      Light Pollution Reduction                                               1
                                                                                                10   Indoor Environmental Quality                                 Possible Points: 15
4   Water Efficiency                                                 Possible Points:    5       Y
Y                                                                                                Y   Prereq 1     Minimum IAQ Performance
1   Credit 1.1    Water Efficient Landscaping , Reduce by 50%                             1      Y   Prereq 2     Environmental Tobacco Smoke (ETS) Control
1   Credit 1.2    Water Efficient Landscaping , No Potable Use or No Irrigation           1      1   Credit 1     Carbon Dioxide Monitoring                                        1
    Credit 2      Innovative Wastewater Technologies                                      1      1   Credit 2     Ventilation Effectiveness                                        1
1   Credit 3.1    Water Use Reduction , 20% Reduction                                     1      1   Credit 3.1   Construction IAQ Management Plan , During Construction           1
1   Credit 3.2    Water Use Reduction , 30% Reduction                                     1      1   Credit 3.2   Construction IAQ Management Plan , Before Occupancy              1
                                                                                                 1   Credit 4.1   Low-Emitting Materials , Adhesives & Sealants                    1
2   Energy & Atmosphere                                              Possible Points: 17         1   Credit 4.2   Low-Emitting Materials , Paints                                  1
Y                                                                                                1   Credit 4.3   Low-Emitting Materials , Carpet                                  1
Y   Prereq 1      Fundamental Building Systems Commissioning                                         Credit 4.4   Low-Emitting Materials , Composite Wood & Agrifiber Products     1
Y   Prereq 2      Minimum Energy Performance                                                     1   Credit 5     Indoor Chemical & Pollutant Source Control                       1
Y   Prereq 3      CFC Reduction in HVAC&R Equipment                                                  Credit 6.1   Controllability of Systems, Perimeter                            1
    Credit 1.1    Optimize Energy Performance , 15% New / 5% Existing                     1          Credit 6.2   Controllability of Systems, Non-Perimeter                        1
    Credit 1.2    Optimize Energy Performance , 20% New / 10% Existing                    1      1   Credit 7.1   Thermal Comfort , Comply with ASHRAE 55-1992                     1
    Credit 1.3    Optimize Energy Performance , 25% New / 15% Existing                    1      1   Credit 7.2   Thermal Comfort , Permanent Monitoring System                    1
    Credit 1.4    Optimize Energy Performance , 30% New / 20% Existing                    1          Credit 8.1   Daylight & Views, Daylight 75% of Spaces                         1
    Credit 1.5    Optimize Energy Performance , 35% New / 25% Existing                    1          Credit 8.2   Daylight & Views, Views for 90% of Spaces                        1
    Credit 1.6    Optimize Energy Performance , 40% New / 30% Existing                    1
    Credit 1.7    Optimize Energy Performance , 45% New / 35% Existing                    1      5   Innovation & Design Process                                  Possible Points: 5
    Credit 1.8    Optimize Energy Performance , 50% New / 40% Existing                    1      Y
    Credit 1.9    Optimize Energy Performance , 55% New / 45% Existing                    1      1   Credit 1.1   Innovation in Design                                             1
    Credit 1.10   Optimize Energy Performance , 60% New / 50% Existing                    1      1   Credit 1.2   Innovation in Design                                             1
    Credit 2.1    Renewable Energy, 5%                                                    1      1   Credit 1.3   Innovation in Design                                             1
    Credit 2.2    Renewable Energy, 10%                                                   1      1   Credit 1.4   Innovation in Design                                             1
    Credit 2.3    Renewable Energy, 15%                                                   1      1   Credit 2     LEED® Accredited Professional                                    1
    Credit 3      Additional Commissioning                                                1
1   Credit 4      Ozone Depletion                                                         1
    Credit 5      Measurement & Verification                                              1
1   Credit 6      Green Power                                                             1

Contenu connexe

Tendances

Final presentation draft 1
Final presentation draft 1Final presentation draft 1
Final presentation draft 1djk447
 
Yale red ox presentation draft 1
Yale red ox presentation draft 1Yale red ox presentation draft 1
Yale red ox presentation draft 1djk447
 
Presentation kuwait 24.05.12
Presentation kuwait 24.05.12Presentation kuwait 24.05.12
Presentation kuwait 24.05.12greenbuilding
 
LEED Sustainable Projects
LEED Sustainable ProjectsLEED Sustainable Projects
LEED Sustainable Projectsjpetr0s
 
Measuring More than Pipes and Pumps: The Evolution towards Levels of Service...
Measuring More than Pipes and Pumps:  The Evolution towards Levels of Service...Measuring More than Pipes and Pumps:  The Evolution towards Levels of Service...
Measuring More than Pipes and Pumps: The Evolution towards Levels of Service...IRC
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010PENTA
 
Draft report Grandview District Plan, Dec. 9, 2011
Draft report Grandview District Plan, Dec. 9, 2011Draft report Grandview District Plan, Dec. 9, 2011
Draft report Grandview District Plan, Dec. 9, 2011Wigley and Associates
 
Greensburg | The Green Rebirth of a Kansas Community
Greensburg | The Green Rebirth of a Kansas CommunityGreensburg | The Green Rebirth of a Kansas Community
Greensburg | The Green Rebirth of a Kansas CommunityBNIM
 
MENA Water and Wastewater Infrastructure Market
MENA Water and Wastewater Infrastructure MarketMENA Water and Wastewater Infrastructure Market
MENA Water and Wastewater Infrastructure MarketTanuChopra
 
Sustainable Living In the Hampton Roads, Virginia
Sustainable Living In the Hampton Roads, VirginiaSustainable Living In the Hampton Roads, Virginia
Sustainable Living In the Hampton Roads, VirginiaFlanna489y
 

Tendances (20)

Final presentation draft 1
Final presentation draft 1Final presentation draft 1
Final presentation draft 1
 
Yale red ox presentation draft 1
Yale red ox presentation draft 1Yale red ox presentation draft 1
Yale red ox presentation draft 1
 
GREEN BUILDINGS
GREEN BUILDINGSGREEN BUILDINGS
GREEN BUILDINGS
 
Presentation kuwait 24.05.12
Presentation kuwait 24.05.12Presentation kuwait 24.05.12
Presentation kuwait 24.05.12
 
The Cost of Building Green
The Cost of Building GreenThe Cost of Building Green
The Cost of Building Green
 
LEED Sustainable Projects
LEED Sustainable ProjectsLEED Sustainable Projects
LEED Sustainable Projects
 
Skanska presentation
Skanska presentationSkanska presentation
Skanska presentation
 
Skanska Profile
Skanska ProfileSkanska Profile
Skanska Profile
 
Greening the Gray - NYWEA 2012
Greening the Gray - NYWEA 2012Greening the Gray - NYWEA 2012
Greening the Gray - NYWEA 2012
 
Jonathan Braddick - Architect Devon
Jonathan Braddick - Architect DevonJonathan Braddick - Architect Devon
Jonathan Braddick - Architect Devon
 
Measuring More than Pipes and Pumps: The Evolution towards Levels of Service...
Measuring More than Pipes and Pumps:  The Evolution towards Levels of Service...Measuring More than Pipes and Pumps:  The Evolution towards Levels of Service...
Measuring More than Pipes and Pumps: The Evolution towards Levels of Service...
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010
 
Savannah Harbor Expansion Project Update - March 14, 2013
Savannah Harbor Expansion Project Update - March 14, 2013Savannah Harbor Expansion Project Update - March 14, 2013
Savannah Harbor Expansion Project Update - March 14, 2013
 
Draft report Grandview District Plan, Dec. 9, 2011
Draft report Grandview District Plan, Dec. 9, 2011Draft report Grandview District Plan, Dec. 9, 2011
Draft report Grandview District Plan, Dec. 9, 2011
 
Greensburg | The Green Rebirth of a Kansas Community
Greensburg | The Green Rebirth of a Kansas CommunityGreensburg | The Green Rebirth of a Kansas Community
Greensburg | The Green Rebirth of a Kansas Community
 
Analyzing water treatment start-ups
Analyzing water treatment start-upsAnalyzing water treatment start-ups
Analyzing water treatment start-ups
 
MENA Water and Wastewater Infrastructure Market
MENA Water and Wastewater Infrastructure MarketMENA Water and Wastewater Infrastructure Market
MENA Water and Wastewater Infrastructure Market
 
Sustainable Living In the Hampton Roads, Virginia
Sustainable Living In the Hampton Roads, VirginiaSustainable Living In the Hampton Roads, Virginia
Sustainable Living In the Hampton Roads, Virginia
 
Portfolio
PortfolioPortfolio
Portfolio
 
Setawwa 2010, 1-29 choules
Setawwa   2010, 1-29 choulesSetawwa   2010, 1-29 choules
Setawwa 2010, 1-29 choules
 

Similaire à NYC Office of Emergency Managament Silver LEED Certification

Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklistJ C
 
Eb Healthcare & Leed
Eb Healthcare & LeedEb Healthcare & Leed
Eb Healthcare & LeedAndrej_M
 
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...Congress for the New Urbanism
 
Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated ManualTom_Pritscher
 
Structure engineers and green building
Structure engineers and green buildingStructure engineers and green building
Structure engineers and green buildingMamdooh Amin
 
45502553 construction-project-checklist
45502553 construction-project-checklist45502553 construction-project-checklist
45502553 construction-project-checklistimaduddin91
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excelimaduddin91
 
Materials & resources presentation(final version may 2012)
Materials & resources presentation(final version may 2012)Materials & resources presentation(final version may 2012)
Materials & resources presentation(final version may 2012)greenbuilding
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGeoffrey Lewis
 
Dolphin Mission Critical Story
Dolphin Mission Critical StoryDolphin Mission Critical Story
Dolphin Mission Critical StoryDolphinMC
 
Contribution of Bondera Tile Mat Set to the Leed 2009 Green Building Rating S...
Contribution of Bondera Tile Mat Set to the Leed 2009 Green Building Rating S...Contribution of Bondera Tile Mat Set to the Leed 2009 Green Building Rating S...
Contribution of Bondera Tile Mat Set to the Leed 2009 Green Building Rating S...thelinkgroup
 
Presentation On Sustainability April 2009 Final
Presentation On Sustainability April 2009 FinalPresentation On Sustainability April 2009 Final
Presentation On Sustainability April 2009 FinalAndy Rayner
 
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...Blake Morgan
 
Multi stakeholder risk management in small-scaled water resources project
Multi stakeholder risk management in small-scaled water resources projectMulti stakeholder risk management in small-scaled water resources project
Multi stakeholder risk management in small-scaled water resources projectPiriya Uraiwong
 
Marriott team presentation_for_linked_in
Marriott team presentation_for_linked_inMarriott team presentation_for_linked_in
Marriott team presentation_for_linked_inNaian Chang
 
Specifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risksSpecifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risksVikki Jacobs
 

Similaire à NYC Office of Emergency Managament Silver LEED Certification (20)

Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Eb Healthcare & Leed
Eb Healthcare & LeedEb Healthcare & Leed
Eb Healthcare & Leed
 
LEED Project Case Studies
LEED Project Case StudiesLEED Project Case Studies
LEED Project Case Studies
 
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
 
Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated Manual
 
Structure engineers and green building
Structure engineers and green buildingStructure engineers and green building
Structure engineers and green building
 
45502553 construction-project-checklist
45502553 construction-project-checklist45502553 construction-project-checklist
45502553 construction-project-checklist
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excel
 
LEED
LEEDLEED
LEED
 
City Council May 15, 2012 Hickory Update
City Council May 15, 2012 Hickory UpdateCity Council May 15, 2012 Hickory Update
City Council May 15, 2012 Hickory Update
 
Materials & resources presentation(final version may 2012)
Materials & resources presentation(final version may 2012)Materials & resources presentation(final version may 2012)
Materials & resources presentation(final version may 2012)
 
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating SystemsGunnar Hubbard- LEED vs Three Star Green Building Rating Systems
Gunnar Hubbard- LEED vs Three Star Green Building Rating Systems
 
Dolphin Mission Critical Story
Dolphin Mission Critical StoryDolphin Mission Critical Story
Dolphin Mission Critical Story
 
Contribution of Bondera Tile Mat Set to the Leed 2009 Green Building Rating S...
Contribution of Bondera Tile Mat Set to the Leed 2009 Green Building Rating S...Contribution of Bondera Tile Mat Set to the Leed 2009 Green Building Rating S...
Contribution of Bondera Tile Mat Set to the Leed 2009 Green Building Rating S...
 
Presentation On Sustainability April 2009 Final
Presentation On Sustainability April 2009 FinalPresentation On Sustainability April 2009 Final
Presentation On Sustainability April 2009 Final
 
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
Blake Lapthorn South Coast green breakfast - carbon neutral world class event...
 
Multi stakeholder risk management in small-scaled water resources project
Multi stakeholder risk management in small-scaled water resources projectMulti stakeholder risk management in small-scaled water resources project
Multi stakeholder risk management in small-scaled water resources project
 
Boston Architectural College CEU Weekend 2007
Boston Architectural College CEU Weekend 2007Boston Architectural College CEU Weekend 2007
Boston Architectural College CEU Weekend 2007
 
Marriott team presentation_for_linked_in
Marriott team presentation_for_linked_inMarriott team presentation_for_linked_in
Marriott team presentation_for_linked_in
 
Specifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risksSpecifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risks
 

Plus de jpetr0s

Time Signatures
Time SignaturesTime Signatures
Time Signaturesjpetr0s
 
CF Drum Corp drumbook
CF Drum Corp drumbookCF Drum Corp drumbook
CF Drum Corp drumbookjpetr0s
 
New 08 development map bklyn navy yard
New 08 development map bklyn navy yardNew 08 development map bklyn navy yard
New 08 development map bklyn navy yardjpetr0s
 
Brooklyn greenway-map-0910
Brooklyn greenway-map-0910Brooklyn greenway-map-0910
Brooklyn greenway-map-0910jpetr0s
 
Ice Stone LEED USGBC
Ice Stone LEED USGBCIce Stone LEED USGBC
Ice Stone LEED USGBCjpetr0s
 
BWG Stormwater-Study
BWG Stormwater-StudyBWG Stormwater-Study
BWG Stormwater-Studyjpetr0s
 
Brooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-PrinciplesBrooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-Principlesjpetr0s
 
Prattfolio spring 2010
Prattfolio spring 2010Prattfolio spring 2010
Prattfolio spring 2010jpetr0s
 
USGBC Green Building Research
USGBC  Green Building ResearchUSGBC  Green Building Research
USGBC Green Building Researchjpetr0s
 
LEED for Homes
LEED for HomesLEED for Homes
LEED for Homesjpetr0s
 
Stillwell Avenue Train Station
Stillwell Avenue Train StationStillwell Avenue Train Station
Stillwell Avenue Train Stationjpetr0s
 
Remsen Yard Project
Remsen Yard ProjectRemsen Yard Project
Remsen Yard Projectjpetr0s
 
Pspd newsletter spring_2010
Pspd newsletter spring_2010Pspd newsletter spring_2010
Pspd newsletter spring_2010jpetr0s
 
Pspd fall2010 course_schedule
Pspd fall2010 course_schedulePspd fall2010 course_schedule
Pspd fall2010 course_schedulejpetr0s
 
Nyc green training_inventory
Nyc green training_inventoryNyc green training_inventory
Nyc green training_inventoryjpetr0s
 
K+c projects letter_may2010
K+c projects letter_may2010K+c projects letter_may2010
K+c projects letter_may2010jpetr0s
 
Green map icons_v3_2pages
Green map icons_v3_2pagesGreen map icons_v3_2pages
Green map icons_v3_2pagesjpetr0s
 
Green map icons_v3_deficons
Green map icons_v3_deficonsGreen map icons_v3_deficons
Green map icons_v3_deficonsjpetr0s
 
Bushwick park project
Bushwick park projectBushwick park project
Bushwick park projectjpetr0s
 
Brooklyn greenway-map-0910
Brooklyn greenway-map-0910Brooklyn greenway-map-0910
Brooklyn greenway-map-0910jpetr0s
 

Plus de jpetr0s (20)

Time Signatures
Time SignaturesTime Signatures
Time Signatures
 
CF Drum Corp drumbook
CF Drum Corp drumbookCF Drum Corp drumbook
CF Drum Corp drumbook
 
New 08 development map bklyn navy yard
New 08 development map bklyn navy yardNew 08 development map bklyn navy yard
New 08 development map bklyn navy yard
 
Brooklyn greenway-map-0910
Brooklyn greenway-map-0910Brooklyn greenway-map-0910
Brooklyn greenway-map-0910
 
Ice Stone LEED USGBC
Ice Stone LEED USGBCIce Stone LEED USGBC
Ice Stone LEED USGBC
 
BWG Stormwater-Study
BWG Stormwater-StudyBWG Stormwater-Study
BWG Stormwater-Study
 
Brooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-PrinciplesBrooklyn Greenway-Design-Principles
Brooklyn Greenway-Design-Principles
 
Prattfolio spring 2010
Prattfolio spring 2010Prattfolio spring 2010
Prattfolio spring 2010
 
USGBC Green Building Research
USGBC  Green Building ResearchUSGBC  Green Building Research
USGBC Green Building Research
 
LEED for Homes
LEED for HomesLEED for Homes
LEED for Homes
 
Stillwell Avenue Train Station
Stillwell Avenue Train StationStillwell Avenue Train Station
Stillwell Avenue Train Station
 
Remsen Yard Project
Remsen Yard ProjectRemsen Yard Project
Remsen Yard Project
 
Pspd newsletter spring_2010
Pspd newsletter spring_2010Pspd newsletter spring_2010
Pspd newsletter spring_2010
 
Pspd fall2010 course_schedule
Pspd fall2010 course_schedulePspd fall2010 course_schedule
Pspd fall2010 course_schedule
 
Nyc green training_inventory
Nyc green training_inventoryNyc green training_inventory
Nyc green training_inventory
 
K+c projects letter_may2010
K+c projects letter_may2010K+c projects letter_may2010
K+c projects letter_may2010
 
Green map icons_v3_2pages
Green map icons_v3_2pagesGreen map icons_v3_2pages
Green map icons_v3_2pages
 
Green map icons_v3_deficons
Green map icons_v3_deficonsGreen map icons_v3_deficons
Green map icons_v3_deficons
 
Bushwick park project
Bushwick park projectBushwick park project
Bushwick park project
 
Brooklyn greenway-map-0910
Brooklyn greenway-map-0910Brooklyn greenway-map-0910
Brooklyn greenway-map-0910
 

NYC Office of Emergency Managament Silver LEED Certification

  • 1. NYC Office of Emergency Managament Project 10003578 Certification Level: Silver LEED for New Construction v2.0/2.1 3/1/2007 34 Points Achieved Possible Points: 69 Certified 26 to 32 points Silver 33 to 38 points Gold 39 to 51 points Platinum 52 or more points 9 Sustainable Sites Possible Points: 14 4 Materials & Resources Possible Points: 13 Y Y Y Prereq 1 Erosion & Sedimentation Control Y Prereq 1 Storage & Collection of Recyclables 1 Credit 1 Site Selection 1 Credit 1.1 Building Reuse , Maintain 75% of Existing Shell 1 1 Credit 2 Development Density 1 Credit 1.2 Building Reuse , Maintain 100% of Shell 1 1 Credit 3 Brownfield Redevelopment 1 Credit 1.3 Building Reuse , Maintain 100% Shell & 50% Non-Shell 1 1 Credit 4.1 Alternative Transportation, Public Transportation Access 1 1 Credit 2.1 Construction Waste Management , Divert 50% 1 1 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1 Credit 2.2 Construction Waste Management , Divert 75% 1 1 Credit 4.3 Alternative Transportation, Alternative Fuel Vehicles 1 Credit 3.1 Resource Reuse , Specify 5% 1 1 Credit 4.4 Alternative Transportation, Parking Capacity & Carpooling 1 Credit 3.2 Resource Reuse , Specify 10% 1 Credit 5.1 Reduced Site Disturbance , Protect or Restore Open Space 1 1 Credit 4.1 Recycled Content, Specify 10% 1 Credit 5.2 Reduced Site Disturbance , Development Footprint 1 1 Credit 4.2 Recycled Content, Specify 20% 1 Credit 6.1 Stormwater Management , Rate & Quantity 1 1 Credit 5.1 Local/Regional Materials , 20% Manufactured Locally 1 Credit 6.2 Stormwater Management , Treatment 1 Credit 5.2 Local/Regional Materials , of 20% Above, 50% Harvested Locally 1 1 Credit 7.1 Landscape & Exterior Design to Reduce Heat Islands , Non-Roof 1 Credit 6 Rapidly Renewable Materials 1 1 Credit 7.2 Landscape & Exterior Design to Reduce Heat Islands , Roof 1 Credit 7 Certified Wood 1 Credit 8 Light Pollution Reduction 1 10 Indoor Environmental Quality Possible Points: 15 4 Water Efficiency Possible Points: 5 Y Y Y Prereq 1 Minimum IAQ Performance 1 Credit 1.1 Water Efficient Landscaping , Reduce by 50% 1 Y Prereq 2 Environmental Tobacco Smoke (ETS) Control 1 Credit 1.2 Water Efficient Landscaping , No Potable Use or No Irrigation 1 1 Credit 1 Carbon Dioxide Monitoring 1 Credit 2 Innovative Wastewater Technologies 1 1 Credit 2 Ventilation Effectiveness 1 1 Credit 3.1 Water Use Reduction , 20% Reduction 1 1 Credit 3.1 Construction IAQ Management Plan , During Construction 1 1 Credit 3.2 Water Use Reduction , 30% Reduction 1 1 Credit 3.2 Construction IAQ Management Plan , Before Occupancy 1 1 Credit 4.1 Low-Emitting Materials , Adhesives & Sealants 1 2 Energy & Atmosphere Possible Points: 17 1 Credit 4.2 Low-Emitting Materials , Paints 1 Y 1 Credit 4.3 Low-Emitting Materials , Carpet 1 Y Prereq 1 Fundamental Building Systems Commissioning Credit 4.4 Low-Emitting Materials , Composite Wood & Agrifiber Products 1 Y Prereq 2 Minimum Energy Performance 1 Credit 5 Indoor Chemical & Pollutant Source Control 1 Y Prereq 3 CFC Reduction in HVAC&R Equipment Credit 6.1 Controllability of Systems, Perimeter 1 Credit 1.1 Optimize Energy Performance , 15% New / 5% Existing 1 Credit 6.2 Controllability of Systems, Non-Perimeter 1 Credit 1.2 Optimize Energy Performance , 20% New / 10% Existing 1 1 Credit 7.1 Thermal Comfort , Comply with ASHRAE 55-1992 1 Credit 1.3 Optimize Energy Performance , 25% New / 15% Existing 1 1 Credit 7.2 Thermal Comfort , Permanent Monitoring System 1 Credit 1.4 Optimize Energy Performance , 30% New / 20% Existing 1 Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1 Credit 1.5 Optimize Energy Performance , 35% New / 25% Existing 1 Credit 8.2 Daylight & Views, Views for 90% of Spaces 1 Credit 1.6 Optimize Energy Performance , 40% New / 30% Existing 1 Credit 1.7 Optimize Energy Performance , 45% New / 35% Existing 1 5 Innovation & Design Process Possible Points: 5 Credit 1.8 Optimize Energy Performance , 50% New / 40% Existing 1 Y Credit 1.9 Optimize Energy Performance , 55% New / 45% Existing 1 1 Credit 1.1 Innovation in Design 1 Credit 1.10 Optimize Energy Performance , 60% New / 50% Existing 1 1 Credit 1.2 Innovation in Design 1 Credit 2.1 Renewable Energy, 5% 1 1 Credit 1.3 Innovation in Design 1 Credit 2.2 Renewable Energy, 10% 1 1 Credit 1.4 Innovation in Design 1 Credit 2.3 Renewable Energy, 15% 1 1 Credit 2 LEED® Accredited Professional 1 Credit 3 Additional Commissioning 1 1 Credit 4 Ozone Depletion 1 Credit 5 Measurement & Verification 1 1 Credit 6 Green Power 1