DROWNING OF A MINE
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

3
Crisis Management
Introduction
An emergency can be defined as an unforeseen incident /
accident requiring prompt action. Mine emergencies occur
unscheduled and include events such as fires, explosions,
entrapments, and inundations. Familiarization with a contingency
plan for emergency operations is important to ensure effective
emergency operations. This plan has been developed to prepare
mining and
engineering and other personnel of BCCL to
effectively carry out their role in the event of a mine emergency.
The extent that this plan will be implemented will depend on the
nature and scope of the emergency. Primary purpose of Crisis
Management Plan is to ensure that mine rescue and recovery
activities are conducted safely while providing for:
· the protection of personnel involved in rescue and recovery,
· the rescue of survivors, and
· the recovery of the victim or victims.

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

4
Need of Emergency Organisation
(MMR 1961)/(CMR 1957) has required under Reg.190A /Reg.199A
and directed to draw up a standard operating procedure to be
followed in the event of an emergency in the mine so as to ensure
that a timely and effective action was taken in case of a major
under ground accident (Disaster) in the mine. It has been
suggested in this connection that the standing Orders should
include instruction for different category of staff and officers who
would take action in the manner indicated in the Standing Orders.
The instruction should be kept up to date at all times and be made
available to the mine officials concerned and to the local rescue
station.
It has been the experience in most major disasters that
immediate reaction is chaotic, and it has taken some time to sort
out and put into operation a systematic method of procedure. The
need for having a proper scheme which is put in to operation as
quickly and smoothly as possible is, therefore, obvious. Many lives
may be saved if all who are to be concerned with rescue work
know exactly what part they have to play in the scheme.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

5
Important Consideration in drawing up a
scheme of emergency organisation
In the event of a mine explosion or fire or inundation etc
the work done in the first few hours is of vital
importance. This applies as much to do the organisation
of the operations as it does to the efforts of the rescue
teams.
Each member of the organisation should be given duties,
with which he is generally familiar so that he will not
have to “learn” the part he will have to play in an
emergency.
In preparing any emergency organisation, the manager
should envisage the circumstances in which he himself
may be involved in the incident.
At the time of an accident the manager should exercise
his discretion in adopting a plan according to the nature
and scale of the emergency.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

6
Continued
It may be that the accident is confined to one district or
part of district, and if so, considerable help may be possible
from those who are in the pit but not affected by the
incident. Nevertheless since the availability of this help can
not be considered certain it may not be allowed in the
scheme, but such a help would of course be a very valuable
’extra’.
It may not be possible for a plan to be prepared for those
in the pit or near the mouth of the incline. Such persons
will therefore have to act according to their own knowledge
and initiative whilst the major scheme is coming in to
operation.
Every person involved in the emergency organisation must
clearly understand in advance his particular role.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

7
Continued
An important point to stress is that, if operations are going
to be prolonged, it is necessary at an early stage to work
out a system of relief. There is no need to stress the
arduous nature of rescue work following a disaster, and it
should be borne in mind that tired men can not be of much
assistance, and in addition are capable of making wrong
decisions. Therefore, no matter how great the desire of an
official to remain on the job, he must be compelled to leave
the pit and go and rest after he has done a reasonable
amount of duty. He would then be able to come back later
on and make a further valuable contribution.
Details of the scheme must be worked out in advance in
the fullest possible details, and include the ‘ Action
Messages’ and ‘ Warning Messages’ appropriate to each
individual colliery.
The scheme must be capable of immediate operations by a
responsible official.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

8
First Information of Disaster /
Emergency
Any under ground official, the on-setter or
other person realizing that something
serious has happened, should telephone to
the surface, if there is telephonic
communication between under ground and
surface. However, where there is no
telephone or the telephone is not working,
he shall send a special messenger to the
attendance clerk / telephone operator at
the surface or send the information of the
emergency through a special code of
signals.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

9
Duties of Banksman / Fan
Attendant / Attendance Clerk
Duties of Banksman / Fan Attendant
When the Banksman or the attendant to Mechanical
Ventilator or any other person sees or hears any unusual
happening e.g. the sound of an explosion, smoke or
flame, which may indicate that a disaster has occurred
under ground, he should immediately inform the
attendance clerk on duty.
Duties of attendance Clerk (Emergency Siren)
The attendance clerk or other designated person should
on getting information of major accident either from
under ground or surface, sound a hooter or a siren
immediately declaring a state of emergency at the mine.

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

10
Duties of Telephone Operator
Duties of Telephone Operator
When a Siren is sounded on the surface
declaring the state of emergency, the telephone
operator at the surface should first contact the
manager and on his advice to call key personnel
using the information listed in the Emergency
Organisation Chart.
It is important that all telephone calls are
recorded in a telephone log book. The record
should also include the incoming calls which
deal with the emergency. The telephone calls
may be tabulated as follows:
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

11
Tabulation of Telephonic Call
Date

Time

Call
in or out

Persons
Called /
Calling

Telephone
Nos. for
outgoing
Calls

Message

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

Name /
Signature
of
Operator

Remarks

12
Mode of Calling
The telephone operator must give the message clearly
and concisely and should not spend any time discussing the
circumstances. For example the messages can be given in
following format:
To the Manger / Assistant Manager
X speaking. Urgent Call.
Report received from Shri ------------------- that explosion /
fire / inundation / other incident has occurred in the
-------------Seam
------------------------------District.
Please give authority to operate immediate Action Message.
To Rescue Station
This is ------------- colliery. Telephone No. X (Locality).
Urgent Call.
An explosion / fire / inundation / other incident has
occurred in the ------- seam--------- District. Workmen
are / are not involved. Rescue Station is being notified.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

13
Duties of Other Officials
Duties of Other Officials should be clearly
written and handed over to all concerned.
Copy the same should be kept at Pit /
Manager’s Office for ready reference.
This should not be kept under lock & key
The place should be readily and always
approachable at any time.
It should be made known to all concerned.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

14
Crisis Management Committee
Name

Office
Residence
Telphone Telephone
Sri ………….
……………
………
Sri ………….
…………..

DT (OP)
- CHAIRMAN
DIG, CISF
- MEMBER
………
CGM(S&R)
- MEMBER
Sri ………….
…………..
……..
CGM (F)
- MEMBER
Sri ………….
…………..
……..
CGM (E&M) - MEMBER
Sri ………….
…………..
……..
CGM (MM)
- MEMBER
Sri ………….
…………..
………
CGM (ENV) - MEMBER
Sri ..........
...........
.......
GM (P&IR)
- MEMBER
Sri ..........
...........
.......
CMS
- MEMBER
Sri ..........
...........
.......
PRO
- MEMBER
Sri ………….
…………..
………
TRADE UNION REPRESENTATIVES
K.D.Prasad B.Tech (Mining) ISM, Dhanbad
FOR SAFETY AT BCCL LEVEL
- MEMBER Names and Phone Numbers

15
Establishment of Control Room
Control Room will be established at
Unit Level, Area Level and Company
Level

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

16
Control Room
Control Room at the Site of Disaster will
be Headed by CGM/GM of the area and
will be equipped with following–
–
–
–
–
–
–

Dedicated Land Line (Telephone)
Two Mobile Phones
Dedicated Fax Line
Computer (for e-mailing) with Printer
Lap Top Computer for working during power failure
Control Room will be manned round the clock
Two Vehicles along with Drivers for emergency duty

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

17
Control Room

– Telephone/Mobile Numbers and e-mail addresses of the following
Control room at Area and at Company Level
DGMS Offices in Concerned Zone
Ministry of Concern
Head Office of the Company
Coal Mines Authorities of Other Companies such as TISCO,
IISCO / SAIL
District Administration
Central Hospital of the Company, Govt. Hospitals in Nearby
Localities, Private Nursing Homes of Localities
HOD’s of Company Head Quarter
All Mines Rescue Stations, Rescue Rooms and Rescue Roomscum- Refresher Training Centres
All Central Workshops in the Company
Major Indigenous Manufacturers of Pumps and Rescue
Appliances and Their Offices in Dhanbad
Company wise List of Major Inventories like Pumps, Pipes,
Electricals, Safety Equipments, Large Dia. Boring Machine,
Mobile Winders etc with their location will be maintained in a
register in the Control Room.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

18
Operations Control Room

After establishment of Control Room and information to all
concerned Core Group for action will be formed with following as
members(i) Director General of Mines Safety or his Representative
(ii) Chairman of the Company or his Representative
(iii) Director Technical of Company
(iv) DC of concerned district or his Representative
Core group will be headed by one of the member depending on
the nature of the disaster. All the decisions will be taken by the
Core Group
Task Force comprising of
Members of Crisis Management
Committee
GM(Rescue),GM(P&P),GM(Safety),CGM/GM
of
Neighboring Area, GM(MM), Dy.CPM of the area, Agent of the
Mine,
Local Police Inspector, CISF officers, Rescue
Superintendent, Rescue Trained Managers / Engineers / Doctors
and Rescue Trained Staff /workmen will be formed.
All action of Rescue and Recovery will be carried out by the Task
Force
Support Logistics will be arranged by the Task Force
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

19
The official designated to control the
operations should include the following provisions among
his principal duties:

1. Check of Missing men – Make early check of the
number of men missing under ground and obtain
casualty list from the Medical Officer.
2. Duty Roster – In order to provide adequate supervision
and control at all times – at surface and underground –
prepare duty roster covering 24 hours so as to ensure
continuity of officials in charge. This should be posted in
the Control Room for reference.
3. Additional Rescue Teams – These should be called
from neighboring collieries only after consultation with
the Rescue Station Superintendent and a roaster of
teams should be drawn up to cover prolonged operations.
4. Authorisations – An authorization system should be put
in to operation at once for persons required to operate in
the pit (i) to obtain a cap lamp (ii) to proceed
underground.
All Authorisations Cards should be printed for this purpose and
they
should be issued from the operations control room on
the authority
of a senior official. Clerical assistance may be
provided to ensure of
these cards.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

20
Contd.
5. Operations Book for Record of Events – As a matter
of routine, a running record should be kept of all
important events as they occur. This would serve the
double purpose of enabling senior officials coming on
duty to see what has transpired and of providing
materials for a connected report on the incident and the
action taken to deal with it.
6. Materials and Equipment – Check reports regarding
materials and equipments immediately available at the
following places for dealing with the incident:
1.
2.
3.

In the Pit;
At the Rescue Station;
At the Colliery Stores.

5. Persons available for assistance in recovery work –
obtain a register of names, address and occupation of
workmen available to assist in recovery work.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

21
Items to be kept available in the
Operations Control Room –
Copies of Emergency Operations Plan
Supply of Duty Cards indicating
principal duties of key personnel
Telephone Log Books
Authorization Cards
Message Forms with duplicate pages

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

22
Mine Rescue Coordinator
(DGMS Official)
Mine Rescue Coordinator (DGMS Official)
· Provide assistance to the DGMS Official regarding mine rescue and
recovery activities.
· Coordinate briefings and debriefings of mine rescue personnel.
· Assist mine rescue teams to ensure they follow appropriate mine
rescue procedures,particularly when teams are located at or in bye the
fresh air base or other strategic locations of rescue activity.
· Maintain an accurate and up-to-date record of activities performed by
the mine rescue teams.
· Maintain open communication lines with other command center
personnel and provide advice on potential unsafe mine conditions and
locations, when appropriate.
· Clear all dangerous areas of the mine of all unnecessary personnel
when determined appropriate.
· Obtain DGMS’s technical assistance as needed for the mine rescue and
recovery operations.
· Coordinate with the Command Center Coordinator or other appropriate
company official, the Company’s Public Relations Manager, and DGMS
representatives to ensure regular briefings are provided to families of
mine accident victims as circumstances dictate.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

23
Surface Coordinator
(Company official)
· Coordinate security functions at identified strategic locations
on site.
· Establish a check-in/check-out system to log and track all
authorized personnel entering and exiting the emergency scene
and keep open line of communication between checkpoints and
the command center.
· Maintain communications with strategic locations on rescue
and recovery progress and other related information.
Communicate information to the designated company
spokesperson.
· Maintain comprehensive records, in a logbook, of all activities
underground (if appropriate) and at the surface throughout the
emergency. Record discussions and decisions pertinent to the
coordination of rescue and recovery activities.
· Assist the Command Center Coordinator in maintaining an
accurate and up-to-date mine map of all rescue and recovery
activities.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

24
Underground Coordinator
(Company official)
To provide adequate supervision and control underground at all times, a
continuity of officials and assistants should be arranged to operate as
follows:1. Officials in General Control: One man / each shift
(manager rank official)
2. Officials in Charge of Fresh Air Base: one man in each
shift
a) Pit Officials, being Safety Officer or other experienced
official, to take Charge of pit personnel and equipment
and also water supplies for fire fighting etc..
b) Rescue Station Superintendent (or other officer) to
Supervise rescue men, apparatus and procedure of team;
one on
each shift.
C) First – Aid men: one in each shift.
3. On setter: To control pit bottom and verbally direct operating
personnel towards affected district.

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

25
4. Transport Officials: one on each shift.
1. To organize conveyance of materials in bye.
2. To supervise transport of injured in bye.
4. Electricians: To check telephone requirements. Reliable
operators will be needed to man in bye telephones (if
installed)
6. Assistant Surveyor or Chainman: To signpost route to
Fresh air Base for speedy guidance of helpers from other
pits.
7. Additional First Aid Men: A supplement number should
be readily available underground whenever required.
8. Food for Persons Underground: Responsible person
to take supplies of food and hot drinks in bye at fixed
times to rescue teams and other personnel. Proper
control of distribution is important.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

26
Logistics Coordinator
(Company official)
•
•
•
•
•

Obtain equipment and supplies requested by the
Command
Center
Coordinator
or
Mine
Rescue
Coordinator.
Coordinate the placement of rescue and recovery
supplies, emergency vehicles, rescue and recovery
personnel, media, and other authorized persons.
Locate and secure equipment and supplies if more than
what is available at the mine site is needed.
Coordinate victim and family assistance services such as
providing facilities for family and victim privacy, stress
counseling, Red Cross notification and other as needed.
Maintain an open line of communication with the
command center.

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

27
Technical Specialist Coordinator
(Company official)
•
•

•
•
•
•
•

•

Coordinate technical support services.
Provide or secure expertise relative to mine ventilation, roof
control, electrical installations, explosives, and ground control,
as deemed necessary by the emergency. Assist and advise the
command center on technical matters.
Supervise atmosphere-monitoring stations.
Ensure mine maps are provided with known air quantities,
location of ventilation controls, direction of airflow, and
updated pertinent information as rescue/recovery progresses.
Provide and maintain electrical power to areas designated by
the command center.
Maintain and monitor electrical installations including
substations, hoists, elevators, emergency, mine fans, and
escape facilities.
Disconnect electrical power, except as needed to maintain
ventilation, from the affected area. Maintain power outside the
affected area only when necessary for equipment use and
communications.
Maintain open communication lines with the command center.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

28
Ventilation Coordinator underground only (Company official)
• Monitor and maintain continual operation of the mine
fans.
• Establish sampling stations to monitor mine atmosphere
at preselected locations.
• Maintain an accurate and up-to-date log of fan pressure,
air quality, and air quantity a regular predetermined
intervals. Gases monitored at the mine fan should include
carbon monoxide, methane, and oxygen.
• Communicate air quality and quantity measurements,
significant changes, and unusual occurrences to the
command center.
• Ensure that mine fans are operating: except that
inoperable fans should not be restarted before consulting
with responsible agencies and company officials and that
ventilation to non-explored areas should not be altered.

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

29
Communication Coordinator
(Company Official)
· Establish a secure communication area
between all strategic locations and key
personnel in the command center.
· Ensure all emergency service and assistance
agencies have been notified.
· Monitor communications with rescue teams
and emergency services personnel relating to
the emergency. Coordinate communication
systems between agencies and relay necessary
information directly to the command center.
· Secure a phone line, which allows private
communications by the
Mine Rescue
Coordinator to the DGMS office.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

30
Company Spokesperson
(Company Official)
· Establish a location for media briefings and
introduce himself to the media as the official
spokesperson for the company.
· Maintain an open line of communication with
the command center and relay appropriate
information to the media at predetermined
selected intervals.
· Establish contact with the Company’s Public
Relations Manager and DGMS Office of
Information and Public Affairs personnel for
assistance and
coordination of released
information as the situation warrants.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

31
Mock Rehearsal
– A mock disaster is a simulation of an
actual mine rescue operation. It requires
setting
up
a
command
center,
establishing a fresh air base, and
deploying teams on a rotation schedule.
– The idea is not new. A number of
companies already use a mock disaster
training session as part of their total
emergency preparedness training.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

32
Description and Arrangements:
The preparation necessary for putting on a
mock disaster training session include:
Preparing areas for a command center and fresh air
base (both with necessary communications)
An underground area the team will be working in
(placards can be used to indicate various conditions).
You will need to have maps of the underground area.
A briefing and team assignments
A team rotation schedule
An area set aside for teams to prepare and clean
their apparatus.

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

33
personnel needed to carry out the
mock disaster
The personnel needed to carry out the mock
disaster include:
Mine rescue teams (at least three, although four is
probably the optimum number for a single days
training session)
Appropriate safety and management people to man
the command center and fresh air base
It’s also important to involve the other surface
personnel who should be called in on a real rescue
situation.
For instance, you can have guards checking people
as they come on property, a supply clerk, lamp man,
mine electrician, mechanical foreman, and so on.
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

34
personnel needed to carry out the
mock disaster

Additionally, you may want to invite DGMS
and (where applicable) state officials to
observe or participate in the mock disaster.
And, you’ll need equipment and food for all
people.
 Obviously, a mock disaster training session
requires the participation of quite a few people,
particularly, Management-level people. While it
can be a significant outlay of money and time,
a mock disaster training session can also be an
extremely valuable training experience.
 For the teams, its realistic training session, and
for the people in charge, its an opportunity to
practice coordinating and directing rescue
work.


K.D.Prasad B.Tech (Mining) ISM, Dhanbad

35
Evaluation
of Mock Rehearsal
Evaluation
– Use the following
checklist to aid you
in evaluating the
team’s performance.
Be sure to list and
discuss
any
problems the team
encountered.

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

36
Evaluation
1. Problems in organization – did people know where to go when they arrived?
2. Flow of information – was necessary information transmitted smoothly
between command center, the fresh air base, and the teams?
Were all communications recorded at the fresh air base and the command
center?
3. Decsison making – at the command center – were the necessary people
available to provide needed information and to assist in decision-making?
4. Were briefings and debriefings effective?
5. Did team rotation changes go smoothly?
6. Did teams perform adequately?
7. Were conditions at the fresh air base and command center appropriate? (too
much noise, too many people, too few?)
8. Did people stationed on the surface outside the command center (i.e. guards,
supply clerk, etc.) have any problems carrying out their jobs? Did they have
access to the information they needed?
Comments/Problems:
Recommendations for future training:
K.D.Prasad B.Tech (Mining) ISM, Dhanbad

37
THANK
YOU

K.D.Prasad B.Tech (Mining) ISM, Dhanbad

38

Contenu connexe

Tendances

Tendances (20)

Blasting
BlastingBlasting
Blasting
 
Shaft sinking
Shaft sinking Shaft sinking
Shaft sinking
 
Explosives and accesories
Explosives and accesoriesExplosives and accesories
Explosives and accesories
 
Oc mechanical excavation
Oc mechanical excavationOc mechanical excavation
Oc mechanical excavation
 
Mining hazards
Mining hazardsMining hazards
Mining hazards
 
Dangers from surface & Underground water
Dangers from surface & Underground water  Dangers from surface & Underground water
Dangers from surface & Underground water
 
Open pit mining
Open pit miningOpen pit mining
Open pit mining
 
Safety in mines
Safety in minesSafety in mines
Safety in mines
 
Flame safety lamp fsl
Flame safety lamp fslFlame safety lamp fsl
Flame safety lamp fsl
 
Blasting concepts (1)
Blasting concepts (1)Blasting concepts (1)
Blasting concepts (1)
 
Side discharge loader
Side discharge loaderSide discharge loader
Side discharge loader
 
Mine Opening and Development
Mine Opening and DevelopmentMine Opening and Development
Mine Opening and Development
 
Rock blasting for mining
Rock blasting  for miningRock blasting  for mining
Rock blasting for mining
 
Danger due to fire & innundation
Danger due to fire & innundationDanger due to fire & innundation
Danger due to fire & innundation
 
Thin seam mining
Thin seam miningThin seam mining
Thin seam mining
 
Mine hazards(2162294)
Mine hazards(2162294)Mine hazards(2162294)
Mine hazards(2162294)
 
Extraction of developed pillars by opencast mine: acase study
Extraction of developed pillars by opencast mine:   acase studyExtraction of developed pillars by opencast mine:   acase study
Extraction of developed pillars by opencast mine: acase study
 
Accidents in coal mines
Accidents in coal minesAccidents in coal mines
Accidents in coal mines
 
Mine explosions
Mine explosionsMine explosions
Mine explosions
 
Explosives & safety
Explosives & safetyExplosives & safety
Explosives & safety
 

En vedette

En vedette (20)

Disaster Preparedness
Disaster PreparednessDisaster Preparedness
Disaster Preparedness
 
Chile Miners Rescue Mission
Chile Miners Rescue MissionChile Miners Rescue Mission
Chile Miners Rescue Mission
 
Incident investigation and Root Cause Analysis
Incident investigation and Root Cause AnalysisIncident investigation and Root Cause Analysis
Incident investigation and Root Cause Analysis
 
Root Cause Analysis - methods and best practice
Root Cause Analysis - methods and best practiceRoot Cause Analysis - methods and best practice
Root Cause Analysis - methods and best practice
 
Lessons from chile
Lessons from chileLessons from chile
Lessons from chile
 
The Ministry In The Mine: Rescued!
The Ministry In The Mine: Rescued! The Ministry In The Mine: Rescued!
The Ministry In The Mine: Rescued!
 
Katie and Brooke Period 4
Katie and Brooke Period 4Katie and Brooke Period 4
Katie and Brooke Period 4
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Disaster management
Disaster management Disaster management
Disaster management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Mine Engineering project
Mine Engineering projectMine Engineering project
Mine Engineering project
 
Mining Disaster (Silkstone)
Mining Disaster (Silkstone)Mining Disaster (Silkstone)
Mining Disaster (Silkstone)
 
Davis Final Project
Davis Final ProjectDavis Final Project
Davis Final Project
 
Emergency Response Training
Emergency Response TrainingEmergency Response Training
Emergency Response Training
 
Leadership 1122
Leadership 1122Leadership 1122
Leadership 1122
 
Buried Alive
Buried AliveBuried Alive
Buried Alive
 
Simulated Emergency Response Training Programme
Simulated Emergency Response Training ProgrammeSimulated Emergency Response Training Programme
Simulated Emergency Response Training Programme
 
incident analysis - procedure and approach
incident analysis - procedure and approachincident analysis - procedure and approach
incident analysis - procedure and approach
 
Karan Bansal - cv (1)
Karan Bansal - cv (1)Karan Bansal - cv (1)
Karan Bansal - cv (1)
 
RSMML training report
RSMML  training report RSMML  training report
RSMML training report
 

Similaire à Emergency preparedness plan for mines

L7 - Emergency Response.ppt
L7 - Emergency Response.pptL7 - Emergency Response.ppt
L7 - Emergency Response.pptPRACHI DESSAI
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfsursh2
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfsursh2
 
Overview of PRefChem Emergency Response Plan.pptx v3.pptx
Overview of PRefChem Emergency Response Plan.pptx v3.pptxOverview of PRefChem Emergency Response Plan.pptx v3.pptx
Overview of PRefChem Emergency Response Plan.pptx v3.pptxShahrulnizamShahMohd2
 
Cd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-planCd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-plangotpowerinc
 
Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...NITESH SHAH STUDENT AT IITBHU
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINALMelissa Spencer
 
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdfAIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdfMATSNorthpack
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...Arber Dogani
 
Question 6 lesson 2 asses 9 ca
Question 6 lesson 2 asses 9 caQuestion 6 lesson 2 asses 9 ca
Question 6 lesson 2 asses 9 caBluecare
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management PlanPhilip Hà
 
A Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryA Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryIRJET Journal
 
Accident and Safety
Accident and SafetyAccident and Safety
Accident and Safetyssuser654fbe
 
EmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureEmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureShaileshPal24
 
IW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.docIW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.docJohn Gibso
 

Similaire à Emergency preparedness plan for mines (20)

RUI ERP Workshop.pptx
RUI ERP Workshop.pptxRUI ERP Workshop.pptx
RUI ERP Workshop.pptx
 
Unit7 disaster mgmt plan
Unit7 disaster mgmt planUnit7 disaster mgmt plan
Unit7 disaster mgmt plan
 
L7 - Emergency Response.ppt
L7 - Emergency Response.pptL7 - Emergency Response.ppt
L7 - Emergency Response.ppt
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
 
Emergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdfEmergency Preparedness Presentation.pdf
Emergency Preparedness Presentation.pdf
 
Overview of PRefChem Emergency Response Plan.pptx v3.pptx
Overview of PRefChem Emergency Response Plan.pptx v3.pptxOverview of PRefChem Emergency Response Plan.pptx v3.pptx
Overview of PRefChem Emergency Response Plan.pptx v3.pptx
 
Cd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-planCd and-power-disaster-recovery-plan
Cd and-power-disaster-recovery-plan
 
Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...Emergency organization in underground coal mine with indian case studies IITB...
Emergency organization in underground coal mine with indian case studies IITB...
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINAL
 
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdfAIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
AIGA 039_06 Road transport emergency preparedness_reformated Jan 12.pdf
 
Specific method of statmeents risk assessment -job hazard analysis for land ...
Specific method of statmeents  risk assessment -job hazard analysis for land ...Specific method of statmeents  risk assessment -job hazard analysis for land ...
Specific method of statmeents risk assessment -job hazard analysis for land ...
 
Question 6 lesson 2 asses 9 ca
Question 6 lesson 2 asses 9 caQuestion 6 lesson 2 asses 9 ca
Question 6 lesson 2 asses 9 ca
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management Plan
 
A Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryA Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement Industry
 
emergency plan.ppt
emergency plan.pptemergency plan.ppt
emergency plan.ppt
 
Accident and Safety
Accident and SafetyAccident and Safety
Accident and Safety
 
EmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secureEmergencyPlan-On-SiteAndOff-Site plan for secure
EmergencyPlan-On-SiteAndOff-Site plan for secure
 
IW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.docIW7 - Site Induction Rev3.doc
IW7 - Site Induction Rev3.doc
 
disaster drill
disaster drilldisaster drill
disaster drill
 
Disaster plan
Disaster planDisaster plan
Disaster plan
 

Plus de Krishna Deo Prasad

Objective, Importance & Need of Frontline Supervisors Training.pptx
Objective, Importance & Need of Frontline Supervisors Training.pptxObjective, Importance & Need of Frontline Supervisors Training.pptx
Objective, Importance & Need of Frontline Supervisors Training.pptxKrishna Deo Prasad
 
Environmental Management - Coal Mining
Environmental Management - Coal MiningEnvironmental Management - Coal Mining
Environmental Management - Coal MiningKrishna Deo Prasad
 
Sustainability challenges before coal india
Sustainability challenges before coal indiaSustainability challenges before coal india
Sustainability challenges before coal indiaKrishna Deo Prasad
 
Code of practice for mine surveyors
Code of practice for mine surveyorsCode of practice for mine surveyors
Code of practice for mine surveyorsKrishna Deo Prasad
 
Blasting inprovement techniques
Blasting inprovement techniquesBlasting inprovement techniques
Blasting inprovement techniquesKrishna Deo Prasad
 
Transport & digging capacity calculation
Transport & digging capacity calculationTransport & digging capacity calculation
Transport & digging capacity calculationKrishna Deo Prasad
 
Formation & Role of Internal Safety Organisation(ISO)
Formation & Role of Internal Safety Organisation(ISO)Formation & Role of Internal Safety Organisation(ISO)
Formation & Role of Internal Safety Organisation(ISO)Krishna Deo Prasad
 
Salient features of mines act, rules and regulation
Salient features of mines act, rules and regulationSalient features of mines act, rules and regulation
Salient features of mines act, rules and regulationKrishna Deo Prasad
 

Plus de Krishna Deo Prasad (11)

Objective, Importance & Need of Frontline Supervisors Training.pptx
Objective, Importance & Need of Frontline Supervisors Training.pptxObjective, Importance & Need of Frontline Supervisors Training.pptx
Objective, Importance & Need of Frontline Supervisors Training.pptx
 
Environmental Management - Coal Mining
Environmental Management - Coal MiningEnvironmental Management - Coal Mining
Environmental Management - Coal Mining
 
UG Explosives and Blasting
UG Explosives and BlastingUG Explosives and Blasting
UG Explosives and Blasting
 
Sustainability challenges before coal india
Sustainability challenges before coal indiaSustainability challenges before coal india
Sustainability challenges before coal india
 
highwall mining know - how
highwall mining know - howhighwall mining know - how
highwall mining know - how
 
Code of practice for mine surveyors
Code of practice for mine surveyorsCode of practice for mine surveyors
Code of practice for mine surveyors
 
Blasting inprovement techniques
Blasting inprovement techniquesBlasting inprovement techniques
Blasting inprovement techniques
 
What is Rock Mass Rating?
What is Rock Mass Rating?What is Rock Mass Rating?
What is Rock Mass Rating?
 
Transport & digging capacity calculation
Transport & digging capacity calculationTransport & digging capacity calculation
Transport & digging capacity calculation
 
Formation & Role of Internal Safety Organisation(ISO)
Formation & Role of Internal Safety Organisation(ISO)Formation & Role of Internal Safety Organisation(ISO)
Formation & Role of Internal Safety Organisation(ISO)
 
Salient features of mines act, rules and regulation
Salient features of mines act, rules and regulationSalient features of mines act, rules and regulation
Salient features of mines act, rules and regulation
 

Dernier

Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...Wes McKinney
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...AliaaTarek5
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 

Dernier (20)

Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
The Future Roadmap for the Composable Data Stack - Wes McKinney - Data Counci...
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
(How to Program) Paul Deitel, Harvey Deitel-Java How to Program, Early Object...
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 

Emergency preparedness plan for mines

  • 1. Disaster & Emergency Preparedness Mock Trial K.D.Prasad B.Tech (Mining) ISM, Dhanbad 1
  • 2. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 2
  • 3. DROWNING OF A MINE K.D.Prasad B.Tech (Mining) ISM, Dhanbad 3
  • 4. Crisis Management Introduction An emergency can be defined as an unforeseen incident / accident requiring prompt action. Mine emergencies occur unscheduled and include events such as fires, explosions, entrapments, and inundations. Familiarization with a contingency plan for emergency operations is important to ensure effective emergency operations. This plan has been developed to prepare mining and engineering and other personnel of BCCL to effectively carry out their role in the event of a mine emergency. The extent that this plan will be implemented will depend on the nature and scope of the emergency. Primary purpose of Crisis Management Plan is to ensure that mine rescue and recovery activities are conducted safely while providing for: · the protection of personnel involved in rescue and recovery, · the rescue of survivors, and · the recovery of the victim or victims. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 4
  • 5. Need of Emergency Organisation (MMR 1961)/(CMR 1957) has required under Reg.190A /Reg.199A and directed to draw up a standard operating procedure to be followed in the event of an emergency in the mine so as to ensure that a timely and effective action was taken in case of a major under ground accident (Disaster) in the mine. It has been suggested in this connection that the standing Orders should include instruction for different category of staff and officers who would take action in the manner indicated in the Standing Orders. The instruction should be kept up to date at all times and be made available to the mine officials concerned and to the local rescue station. It has been the experience in most major disasters that immediate reaction is chaotic, and it has taken some time to sort out and put into operation a systematic method of procedure. The need for having a proper scheme which is put in to operation as quickly and smoothly as possible is, therefore, obvious. Many lives may be saved if all who are to be concerned with rescue work know exactly what part they have to play in the scheme. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 5
  • 6. Important Consideration in drawing up a scheme of emergency organisation In the event of a mine explosion or fire or inundation etc the work done in the first few hours is of vital importance. This applies as much to do the organisation of the operations as it does to the efforts of the rescue teams. Each member of the organisation should be given duties, with which he is generally familiar so that he will not have to “learn” the part he will have to play in an emergency. In preparing any emergency organisation, the manager should envisage the circumstances in which he himself may be involved in the incident. At the time of an accident the manager should exercise his discretion in adopting a plan according to the nature and scale of the emergency. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 6
  • 7. Continued It may be that the accident is confined to one district or part of district, and if so, considerable help may be possible from those who are in the pit but not affected by the incident. Nevertheless since the availability of this help can not be considered certain it may not be allowed in the scheme, but such a help would of course be a very valuable ’extra’. It may not be possible for a plan to be prepared for those in the pit or near the mouth of the incline. Such persons will therefore have to act according to their own knowledge and initiative whilst the major scheme is coming in to operation. Every person involved in the emergency organisation must clearly understand in advance his particular role. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 7
  • 8. Continued An important point to stress is that, if operations are going to be prolonged, it is necessary at an early stage to work out a system of relief. There is no need to stress the arduous nature of rescue work following a disaster, and it should be borne in mind that tired men can not be of much assistance, and in addition are capable of making wrong decisions. Therefore, no matter how great the desire of an official to remain on the job, he must be compelled to leave the pit and go and rest after he has done a reasonable amount of duty. He would then be able to come back later on and make a further valuable contribution. Details of the scheme must be worked out in advance in the fullest possible details, and include the ‘ Action Messages’ and ‘ Warning Messages’ appropriate to each individual colliery. The scheme must be capable of immediate operations by a responsible official. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 8
  • 9. First Information of Disaster / Emergency Any under ground official, the on-setter or other person realizing that something serious has happened, should telephone to the surface, if there is telephonic communication between under ground and surface. However, where there is no telephone or the telephone is not working, he shall send a special messenger to the attendance clerk / telephone operator at the surface or send the information of the emergency through a special code of signals. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 9
  • 10. Duties of Banksman / Fan Attendant / Attendance Clerk Duties of Banksman / Fan Attendant When the Banksman or the attendant to Mechanical Ventilator or any other person sees or hears any unusual happening e.g. the sound of an explosion, smoke or flame, which may indicate that a disaster has occurred under ground, he should immediately inform the attendance clerk on duty. Duties of attendance Clerk (Emergency Siren) The attendance clerk or other designated person should on getting information of major accident either from under ground or surface, sound a hooter or a siren immediately declaring a state of emergency at the mine. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 10
  • 11. Duties of Telephone Operator Duties of Telephone Operator When a Siren is sounded on the surface declaring the state of emergency, the telephone operator at the surface should first contact the manager and on his advice to call key personnel using the information listed in the Emergency Organisation Chart. It is important that all telephone calls are recorded in a telephone log book. The record should also include the incoming calls which deal with the emergency. The telephone calls may be tabulated as follows: K.D.Prasad B.Tech (Mining) ISM, Dhanbad 11
  • 12. Tabulation of Telephonic Call Date Time Call in or out Persons Called / Calling Telephone Nos. for outgoing Calls Message K.D.Prasad B.Tech (Mining) ISM, Dhanbad Name / Signature of Operator Remarks 12
  • 13. Mode of Calling The telephone operator must give the message clearly and concisely and should not spend any time discussing the circumstances. For example the messages can be given in following format: To the Manger / Assistant Manager X speaking. Urgent Call. Report received from Shri ------------------- that explosion / fire / inundation / other incident has occurred in the -------------Seam ------------------------------District. Please give authority to operate immediate Action Message. To Rescue Station This is ------------- colliery. Telephone No. X (Locality). Urgent Call. An explosion / fire / inundation / other incident has occurred in the ------- seam--------- District. Workmen are / are not involved. Rescue Station is being notified. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 13
  • 14. Duties of Other Officials Duties of Other Officials should be clearly written and handed over to all concerned. Copy the same should be kept at Pit / Manager’s Office for ready reference. This should not be kept under lock & key The place should be readily and always approachable at any time. It should be made known to all concerned. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 14
  • 15. Crisis Management Committee Name Office Residence Telphone Telephone Sri …………. …………… ……… Sri …………. ………….. DT (OP) - CHAIRMAN DIG, CISF - MEMBER ……… CGM(S&R) - MEMBER Sri …………. ………….. …….. CGM (F) - MEMBER Sri …………. ………….. …….. CGM (E&M) - MEMBER Sri …………. ………….. …….. CGM (MM) - MEMBER Sri …………. ………….. ……… CGM (ENV) - MEMBER Sri .......... ........... ....... GM (P&IR) - MEMBER Sri .......... ........... ....... CMS - MEMBER Sri .......... ........... ....... PRO - MEMBER Sri …………. ………….. ……… TRADE UNION REPRESENTATIVES K.D.Prasad B.Tech (Mining) ISM, Dhanbad FOR SAFETY AT BCCL LEVEL - MEMBER Names and Phone Numbers 15
  • 16. Establishment of Control Room Control Room will be established at Unit Level, Area Level and Company Level K.D.Prasad B.Tech (Mining) ISM, Dhanbad 16
  • 17. Control Room Control Room at the Site of Disaster will be Headed by CGM/GM of the area and will be equipped with following– – – – – – – Dedicated Land Line (Telephone) Two Mobile Phones Dedicated Fax Line Computer (for e-mailing) with Printer Lap Top Computer for working during power failure Control Room will be manned round the clock Two Vehicles along with Drivers for emergency duty K.D.Prasad B.Tech (Mining) ISM, Dhanbad 17
  • 18. Control Room – Telephone/Mobile Numbers and e-mail addresses of the following Control room at Area and at Company Level DGMS Offices in Concerned Zone Ministry of Concern Head Office of the Company Coal Mines Authorities of Other Companies such as TISCO, IISCO / SAIL District Administration Central Hospital of the Company, Govt. Hospitals in Nearby Localities, Private Nursing Homes of Localities HOD’s of Company Head Quarter All Mines Rescue Stations, Rescue Rooms and Rescue Roomscum- Refresher Training Centres All Central Workshops in the Company Major Indigenous Manufacturers of Pumps and Rescue Appliances and Their Offices in Dhanbad Company wise List of Major Inventories like Pumps, Pipes, Electricals, Safety Equipments, Large Dia. Boring Machine, Mobile Winders etc with their location will be maintained in a register in the Control Room. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 18
  • 19. Operations Control Room After establishment of Control Room and information to all concerned Core Group for action will be formed with following as members(i) Director General of Mines Safety or his Representative (ii) Chairman of the Company or his Representative (iii) Director Technical of Company (iv) DC of concerned district or his Representative Core group will be headed by one of the member depending on the nature of the disaster. All the decisions will be taken by the Core Group Task Force comprising of Members of Crisis Management Committee GM(Rescue),GM(P&P),GM(Safety),CGM/GM of Neighboring Area, GM(MM), Dy.CPM of the area, Agent of the Mine, Local Police Inspector, CISF officers, Rescue Superintendent, Rescue Trained Managers / Engineers / Doctors and Rescue Trained Staff /workmen will be formed. All action of Rescue and Recovery will be carried out by the Task Force Support Logistics will be arranged by the Task Force K.D.Prasad B.Tech (Mining) ISM, Dhanbad 19
  • 20. The official designated to control the operations should include the following provisions among his principal duties: 1. Check of Missing men – Make early check of the number of men missing under ground and obtain casualty list from the Medical Officer. 2. Duty Roster – In order to provide adequate supervision and control at all times – at surface and underground – prepare duty roster covering 24 hours so as to ensure continuity of officials in charge. This should be posted in the Control Room for reference. 3. Additional Rescue Teams – These should be called from neighboring collieries only after consultation with the Rescue Station Superintendent and a roaster of teams should be drawn up to cover prolonged operations. 4. Authorisations – An authorization system should be put in to operation at once for persons required to operate in the pit (i) to obtain a cap lamp (ii) to proceed underground. All Authorisations Cards should be printed for this purpose and they should be issued from the operations control room on the authority of a senior official. Clerical assistance may be provided to ensure of these cards. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 20
  • 21. Contd. 5. Operations Book for Record of Events – As a matter of routine, a running record should be kept of all important events as they occur. This would serve the double purpose of enabling senior officials coming on duty to see what has transpired and of providing materials for a connected report on the incident and the action taken to deal with it. 6. Materials and Equipment – Check reports regarding materials and equipments immediately available at the following places for dealing with the incident: 1. 2. 3. In the Pit; At the Rescue Station; At the Colliery Stores. 5. Persons available for assistance in recovery work – obtain a register of names, address and occupation of workmen available to assist in recovery work. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 21
  • 22. Items to be kept available in the Operations Control Room – Copies of Emergency Operations Plan Supply of Duty Cards indicating principal duties of key personnel Telephone Log Books Authorization Cards Message Forms with duplicate pages K.D.Prasad B.Tech (Mining) ISM, Dhanbad 22
  • 23. Mine Rescue Coordinator (DGMS Official) Mine Rescue Coordinator (DGMS Official) · Provide assistance to the DGMS Official regarding mine rescue and recovery activities. · Coordinate briefings and debriefings of mine rescue personnel. · Assist mine rescue teams to ensure they follow appropriate mine rescue procedures,particularly when teams are located at or in bye the fresh air base or other strategic locations of rescue activity. · Maintain an accurate and up-to-date record of activities performed by the mine rescue teams. · Maintain open communication lines with other command center personnel and provide advice on potential unsafe mine conditions and locations, when appropriate. · Clear all dangerous areas of the mine of all unnecessary personnel when determined appropriate. · Obtain DGMS’s technical assistance as needed for the mine rescue and recovery operations. · Coordinate with the Command Center Coordinator or other appropriate company official, the Company’s Public Relations Manager, and DGMS representatives to ensure regular briefings are provided to families of mine accident victims as circumstances dictate. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 23
  • 24. Surface Coordinator (Company official) · Coordinate security functions at identified strategic locations on site. · Establish a check-in/check-out system to log and track all authorized personnel entering and exiting the emergency scene and keep open line of communication between checkpoints and the command center. · Maintain communications with strategic locations on rescue and recovery progress and other related information. Communicate information to the designated company spokesperson. · Maintain comprehensive records, in a logbook, of all activities underground (if appropriate) and at the surface throughout the emergency. Record discussions and decisions pertinent to the coordination of rescue and recovery activities. · Assist the Command Center Coordinator in maintaining an accurate and up-to-date mine map of all rescue and recovery activities. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 24
  • 25. Underground Coordinator (Company official) To provide adequate supervision and control underground at all times, a continuity of officials and assistants should be arranged to operate as follows:1. Officials in General Control: One man / each shift (manager rank official) 2. Officials in Charge of Fresh Air Base: one man in each shift a) Pit Officials, being Safety Officer or other experienced official, to take Charge of pit personnel and equipment and also water supplies for fire fighting etc.. b) Rescue Station Superintendent (or other officer) to Supervise rescue men, apparatus and procedure of team; one on each shift. C) First – Aid men: one in each shift. 3. On setter: To control pit bottom and verbally direct operating personnel towards affected district. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 25
  • 26. 4. Transport Officials: one on each shift. 1. To organize conveyance of materials in bye. 2. To supervise transport of injured in bye. 4. Electricians: To check telephone requirements. Reliable operators will be needed to man in bye telephones (if installed) 6. Assistant Surveyor or Chainman: To signpost route to Fresh air Base for speedy guidance of helpers from other pits. 7. Additional First Aid Men: A supplement number should be readily available underground whenever required. 8. Food for Persons Underground: Responsible person to take supplies of food and hot drinks in bye at fixed times to rescue teams and other personnel. Proper control of distribution is important. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 26
  • 27. Logistics Coordinator (Company official) • • • • • Obtain equipment and supplies requested by the Command Center Coordinator or Mine Rescue Coordinator. Coordinate the placement of rescue and recovery supplies, emergency vehicles, rescue and recovery personnel, media, and other authorized persons. Locate and secure equipment and supplies if more than what is available at the mine site is needed. Coordinate victim and family assistance services such as providing facilities for family and victim privacy, stress counseling, Red Cross notification and other as needed. Maintain an open line of communication with the command center. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 27
  • 28. Technical Specialist Coordinator (Company official) • • • • • • • • Coordinate technical support services. Provide or secure expertise relative to mine ventilation, roof control, electrical installations, explosives, and ground control, as deemed necessary by the emergency. Assist and advise the command center on technical matters. Supervise atmosphere-monitoring stations. Ensure mine maps are provided with known air quantities, location of ventilation controls, direction of airflow, and updated pertinent information as rescue/recovery progresses. Provide and maintain electrical power to areas designated by the command center. Maintain and monitor electrical installations including substations, hoists, elevators, emergency, mine fans, and escape facilities. Disconnect electrical power, except as needed to maintain ventilation, from the affected area. Maintain power outside the affected area only when necessary for equipment use and communications. Maintain open communication lines with the command center. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 28
  • 29. Ventilation Coordinator underground only (Company official) • Monitor and maintain continual operation of the mine fans. • Establish sampling stations to monitor mine atmosphere at preselected locations. • Maintain an accurate and up-to-date log of fan pressure, air quality, and air quantity a regular predetermined intervals. Gases monitored at the mine fan should include carbon monoxide, methane, and oxygen. • Communicate air quality and quantity measurements, significant changes, and unusual occurrences to the command center. • Ensure that mine fans are operating: except that inoperable fans should not be restarted before consulting with responsible agencies and company officials and that ventilation to non-explored areas should not be altered. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 29
  • 30. Communication Coordinator (Company Official) · Establish a secure communication area between all strategic locations and key personnel in the command center. · Ensure all emergency service and assistance agencies have been notified. · Monitor communications with rescue teams and emergency services personnel relating to the emergency. Coordinate communication systems between agencies and relay necessary information directly to the command center. · Secure a phone line, which allows private communications by the Mine Rescue Coordinator to the DGMS office. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 30
  • 31. Company Spokesperson (Company Official) · Establish a location for media briefings and introduce himself to the media as the official spokesperson for the company. · Maintain an open line of communication with the command center and relay appropriate information to the media at predetermined selected intervals. · Establish contact with the Company’s Public Relations Manager and DGMS Office of Information and Public Affairs personnel for assistance and coordination of released information as the situation warrants. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 31
  • 32. Mock Rehearsal – A mock disaster is a simulation of an actual mine rescue operation. It requires setting up a command center, establishing a fresh air base, and deploying teams on a rotation schedule. – The idea is not new. A number of companies already use a mock disaster training session as part of their total emergency preparedness training. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 32
  • 33. Description and Arrangements: The preparation necessary for putting on a mock disaster training session include: Preparing areas for a command center and fresh air base (both with necessary communications) An underground area the team will be working in (placards can be used to indicate various conditions). You will need to have maps of the underground area. A briefing and team assignments A team rotation schedule An area set aside for teams to prepare and clean their apparatus. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 33
  • 34. personnel needed to carry out the mock disaster The personnel needed to carry out the mock disaster include: Mine rescue teams (at least three, although four is probably the optimum number for a single days training session) Appropriate safety and management people to man the command center and fresh air base It’s also important to involve the other surface personnel who should be called in on a real rescue situation. For instance, you can have guards checking people as they come on property, a supply clerk, lamp man, mine electrician, mechanical foreman, and so on. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 34
  • 35. personnel needed to carry out the mock disaster Additionally, you may want to invite DGMS and (where applicable) state officials to observe or participate in the mock disaster. And, you’ll need equipment and food for all people.  Obviously, a mock disaster training session requires the participation of quite a few people, particularly, Management-level people. While it can be a significant outlay of money and time, a mock disaster training session can also be an extremely valuable training experience.  For the teams, its realistic training session, and for the people in charge, its an opportunity to practice coordinating and directing rescue work.  K.D.Prasad B.Tech (Mining) ISM, Dhanbad 35
  • 36. Evaluation of Mock Rehearsal Evaluation – Use the following checklist to aid you in evaluating the team’s performance. Be sure to list and discuss any problems the team encountered. K.D.Prasad B.Tech (Mining) ISM, Dhanbad 36
  • 37. Evaluation 1. Problems in organization – did people know where to go when they arrived? 2. Flow of information – was necessary information transmitted smoothly between command center, the fresh air base, and the teams? Were all communications recorded at the fresh air base and the command center? 3. Decsison making – at the command center – were the necessary people available to provide needed information and to assist in decision-making? 4. Were briefings and debriefings effective? 5. Did team rotation changes go smoothly? 6. Did teams perform adequately? 7. Were conditions at the fresh air base and command center appropriate? (too much noise, too many people, too few?) 8. Did people stationed on the surface outside the command center (i.e. guards, supply clerk, etc.) have any problems carrying out their jobs? Did they have access to the information they needed? Comments/Problems: Recommendations for future training: K.D.Prasad B.Tech (Mining) ISM, Dhanbad 37