PROJECT 
DATE 
CLIENT 
9TH SEPTEMBER 2014 
INTRODUCTION TO CONSTRUCTION INDUSTRY & DRAWING 
ABDULLAH MAMODE . AMANDA CHIOG . BRIDGET HSU . CHAU XET NEE . CHIN KHANG WEI . NURAFIQAH ZARIFUL 
TAYLOR’S UNIVERSITY
Bring together the design and budgetary requirements set by the client Restrains of a site Need of the building’s users Limitations of materials into a unique Balance design solution
Ancient Egypt (3,050BC - 900BC) 
Classical (850BC - 476AD) 
Romanesque (800AD - 1,200AD) 
Gothic Architecture (1,100AD - 1,450AD) 
Renaissance Architecture (1,400AD - 1,600AD) 
Rococo Architecture (1,650AD - 1,790AD) 
Neoclassicism in Architecture (1,650AD - 1,790AD) 
Art Nouveau Architect (1,890AD - 1,914AD) 
Beaux Arts Architecture (1,895AD - 1,925AD) 
Neo-Gothic Architecture (1,905AD - 1,930AD) 
Art Deco Architecture (1,925AD - 1,937AD) 
Modernist Styles in Architecture (1,900AD - ?) 
Postmodernism in Architecture (1,972AD - ?)
Degree 
Master 
Register as graduate member with Pertubuhan Arkitek Malaysia (PAM) and Register as graduate architect with Lembaga Arkitek Malaysia (LAM) 
LAM Part III Examination 
Register as an Architect 
Working experience
RESPONSIBILITIES OF AN ARCHITECT
Agrees variation to the contract document, normally alterations to the design & specification Attend site meeting, discuss delays & other problems which may be critical Check quality and progress of work on site Inspects samples of materials & fittings delivered to site Conducts the clients round the site when necessary Check that there are no other architect has been commissioned State the scope of work & clients financial limits Inform client of the other professional services required Answer quires where necessary
Architect should seek full details of client requirements; 
1.Nature size & function of proposed work 
2.Decide time & financial limits of the projects 
3.Prepare legal information - ownership of land, boundaries etc. 
4.Prepare application for planning permission 
5.Decide the members of design team involved
Client 
Architect 
whether / not he is able to carry out the commission 
Writing of the terms of conditions of the appointment & request confirmation 
He has adequate time staff, expertise & finance 
decide 
approach 
ensure 
architect advice client
ARCHITECT RESPONSIBILITY IN CONSTRUCTION PHASES
Gathering all information required prior to commencing design. Scope of work would typically include; 
•site analysis, measure up, develop brief, gather all council related information, advice on separate consultants Required 1-2 weeks for this phase
EXAMPLE OF PRE-DESIGN PHASE
Begin design by relating requirements to the site. Form the sketches for the preliminary design. Prepare proposed layout plans. 
The feedback from the clients will be incorporated into the design and carried through into the Design Development Phase. Requires 2-3 week for this phase.
EXAMPLES 
OF SCHEMATIC DESIGN PHASE
Begin and improve the detail design work. Finalise the space planning (indoor and outdoor), exterior forms and materials used in the project. Budget Estimation will review by Quantity Surveyor or Contractor. Requires 2 weeks for this phase.
EXAMPLES 
OF DESIGN DEVELOPMENT PHASE
Further development of the design and the necessary documentation would be prepared as required for building consent, tendering, and construction of the project. Sufficiently illustrate concept and details are required to obtain a PIM (Project Information Memorandum) from the local authority. Quantity Surveyor or Contractor will provide actual quote based on complete Contract Document. Architectural Drawing are presented and explained to the client.
Prepare tender and contract documentation. Answering queries from the various contractors and sub-contractors. Analyse the received tenders and checking tender compliance to meet the standards. Both the architect and the client evaluate and choose the best contractors for they construction.
Site Visit for inspecting the progression of work. Answer project queries and resolving architectural matters/ details. Administrating and certifying project payments Providing any additional drawings and details, as required. Approving final completion. Administrating maintenance defects during the maintenance period.
TYPE OF ARCHITECTURAL DRAWING
1. PRESENTATION DRAWING 
FUNCTION : To explain a scheme & to promote its merits
EXAMPLE 
OF PRESENTATION DRAWING
EXAMPLE 
OF PRESENTATION DRAWING
2. SURVEY DRAWINGS 
FUNCTION : To establish dimensions for the construction work
ANOTHER EXAMPLE OF SURVEY DRAWINGS
3. RECORD DRAWINGS 
FUNCTION : To understand & emulate the great architect known to architects
4. WORKING DRAWINGS 
FUNCTION : TO PROVIDE A COMPLETE EXPLANATION OF A BUILDING ON ONE PAPER. 
•Location drawing 
•Assembly drawing 
•Component drawing
EXAMPLES 
OF WORKING DRAWINGS
Site Plan Demolition Plan Drainage plans & Schematics Floor Plan Elevations Foundation plan Floor framing plan Roof framing plan Roof plan Sections Construction details Window & Door schedule Electrical Lighting plan (base only as the best is to involve the lighting supplier / designer to provide same detailed input here) Manufacturers Specifications / Warranties
Registration and give accreditation 
Representing 
Development and Promotion 
Regulation of their induct and ethics 
Conducting Professional Exam 
http://www.lam.gov.my/
Giving awards and regnition 
Published monthly magazine 
Organising exhibition, workshop, training, and seminars 
http://www.pam.org.my/
TYPES OF GRAPHITE LINES USED BY ARCHITECT
http://www2.lib.virginia.edu/exhibits/rotunda/postfire/mcdonald.html http://archtech-ie.blogspot.com/2009_11_01_archive.html http://hcap.artstor.org/cgi-bin/library?a=d&d=p2185.1 http://www.planedengardendesign.ie/garden-design-process/garden-design.html http://www.missionscalifornia.com/gallery/gal_architectural-drawings-slo.html http://www.2thepointdrafting.com/?page_id=206 http://www.nlcworktrax.com/tour/screens/document3.htm http://architectureplanelevation.blogspot.com http://www.gabrielking.com/indio%20villa.htm TAYLOR SCHOOL OF ARCHITACTURE , BUILDING AND DESIGN PROSPECTUS
http://bethantoine.com/paper_treatments/RoseRes.php http://www.kcet.org/arts/artbound/counties/los-angeles/architectural-drawings- california-modern-usc.html http://designhome.pics/architects-floor-plans/8/site-plan-and-floor-plans-the-wolf- residence-by-barton-myers-note-that/ http://cadservices.com/record-drawings-verification-surveys/ http://bunka.nii.ac.jp/jp/world/suisensyo/kyoto/REFERENCE-5/reference5-1.html http://www.designandlight.co.nz/practice/working_drawings http://blog.buildllc.com/2008/09/the-process-of-architecture/ http://en.wikipedia.org/wiki/Architectural_drawing http://www.creativearch.co.nz/index.asp?pageID=2145863519
Ici and itd project 1

Contenu connexe

Tendances

Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1xennechau
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFHaider Salman
 
Icixitdprojectintegration 150507054409-lva1-app6891
Icixitdprojectintegration 150507054409-lva1-app6891Icixitdprojectintegration 150507054409-lva1-app6891
Icixitdprojectintegration 150507054409-lva1-app6891Randall Martin
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15Amro Ali Ali
 
CVof_Ameen(Civil Engineer)
CVof_Ameen(Civil Engineer)CVof_Ameen(Civil Engineer)
CVof_Ameen(Civil Engineer)Mohamed Ameen
 
160226 muhammad alhanbali cv-rev00
160226 muhammad  alhanbali cv-rev00160226 muhammad  alhanbali cv-rev00
160226 muhammad alhanbali cv-rev00Muhammad Al-hanbali
 
CV Patrick Webster For Posting S4
CV Patrick Webster For Posting S4CV Patrick Webster For Posting S4
CV Patrick Webster For Posting S4patrick webster
 
BimSrv Profile
BimSrv ProfileBimSrv Profile
BimSrv ProfileDezlabs
 
ICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDESICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDESSheng Zhe
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1Jordon Wong
 
Engineering rana - cv - 2018
Engineering   rana - cv - 2018Engineering   rana - cv - 2018
Engineering rana - cv - 2018RanaMoustafa3
 
Drafting Technologist RF Resume
Drafting Technologist RF ResumeDrafting Technologist RF Resume
Drafting Technologist RF ResumeRicardo Ferreira
 

Tendances (15)

Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDF
 
ICI+ITD (PROJECT 1 INTEGRATION)
ICI+ITD (PROJECT 1 INTEGRATION)ICI+ITD (PROJECT 1 INTEGRATION)
ICI+ITD (PROJECT 1 INTEGRATION)
 
Icixitdprojectintegration 150507054409-lva1-app6891
Icixitdprojectintegration 150507054409-lva1-app6891Icixitdprojectintegration 150507054409-lva1-app6891
Icixitdprojectintegration 150507054409-lva1-app6891
 
hassan assamy - TO
hassan assamy  - TOhassan assamy  - TO
hassan assamy - TO
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
CVof_Ameen(Civil Engineer)
CVof_Ameen(Civil Engineer)CVof_Ameen(Civil Engineer)
CVof_Ameen(Civil Engineer)
 
160226 muhammad alhanbali cv-rev00
160226 muhammad  alhanbali cv-rev00160226 muhammad  alhanbali cv-rev00
160226 muhammad alhanbali cv-rev00
 
CV Patrick Webster For Posting S4
CV Patrick Webster For Posting S4CV Patrick Webster For Posting S4
CV Patrick Webster For Posting S4
 
BimSrv Profile
BimSrv ProfileBimSrv Profile
BimSrv Profile
 
ICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDESICI + ITD PROJECT 1 SLIDES
ICI + ITD PROJECT 1 SLIDES
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1
 
Engineering rana - cv - 2018
Engineering   rana - cv - 2018Engineering   rana - cv - 2018
Engineering rana - cv - 2018
 
Drafting Technologist RF Resume
Drafting Technologist RF ResumeDrafting Technologist RF Resume
Drafting Technologist RF Resume
 
CV_Ameen
CV_AmeenCV_Ameen
CV_Ameen
 

En vedette (11)

Breast lecture
Breast  lectureBreast  lecture
Breast lecture
 
Imaging of knee by mr and usg
Imaging of knee by mr and usgImaging of knee by mr and usg
Imaging of knee by mr and usg
 
Evolving Trends in Breast MRI
Evolving Trends in Breast MRIEvolving Trends in Breast MRI
Evolving Trends in Breast MRI
 
Updates and revision to the MRI BI-RADS Lexicon
Updates and revision to the MRI BI-RADS LexiconUpdates and revision to the MRI BI-RADS Lexicon
Updates and revision to the MRI BI-RADS Lexicon
 
Clase 2 hombro brazo-axila 2016 blog anatomia sanluisana
Clase 2 hombro brazo-axila 2016 blog anatomia sanluisanaClase 2 hombro brazo-axila 2016 blog anatomia sanluisana
Clase 2 hombro brazo-axila 2016 blog anatomia sanluisana
 
MRI OF SHOULDER INJURY
MRI OF SHOULDER INJURYMRI OF SHOULDER INJURY
MRI OF SHOULDER INJURY
 
Fibroadenoma
FibroadenomaFibroadenoma
Fibroadenoma
 
Región axilar anatomia
Región axilar  anatomiaRegión axilar  anatomia
Región axilar anatomia
 
Acute abdomen
Acute abdomenAcute abdomen
Acute abdomen
 
MRI of Shoulder anatomy
MRI of Shoulder anatomyMRI of Shoulder anatomy
MRI of Shoulder anatomy
 
Acute abdomen
Acute abdomenAcute abdomen
Acute abdomen
 

Similaire à Ici and itd project 1

Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1xennechau
 
FNBE 0315: ICI & ITD Project Integration (Project 1)
FNBE 0315: ICI & ITD Project Integration (Project 1)FNBE 0315: ICI & ITD Project Integration (Project 1)
FNBE 0315: ICI & ITD Project Integration (Project 1)haeykceb
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Sam
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1Jordon Wong
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1Trace96
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
Construction Administration Seminar
Construction Administration Seminar Construction Administration Seminar
Construction Administration Seminar jenkinswilliamc
 
Document 1
Document 1Document 1
Document 1Erik Ong
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...Galala University
 
Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples Claudio Modola Design
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabilMohamed Omer
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
Presentation 1.pdf
Presentation 1.pdfPresentation 1.pdf
Presentation 1.pdfAng Averllen
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slideSithick Mohamed .
 

Similaire à Ici and itd project 1 (20)

Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1
 
FNBE 0315: ICI & ITD Project Integration (Project 1)
FNBE 0315: ICI & ITD Project Integration (Project 1)FNBE 0315: ICI & ITD Project Integration (Project 1)
FNBE 0315: ICI & ITD Project Integration (Project 1)
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1
 
The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
Working drawing and detailing
Working drawing and detailingWorking drawing and detailing
Working drawing and detailing
 
Nps.Cv 2009
Nps.Cv 2009Nps.Cv 2009
Nps.Cv 2009
 
Construction Administration Seminar
Construction Administration Seminar Construction Administration Seminar
Construction Administration Seminar
 
Document 1
Document 1Document 1
Document 1
 
Guc arct 702 legislations lecture 4 - project delivery process and business...
Guc arct 702 legislations   lecture 4 - project delivery process and business...Guc arct 702 legislations   lecture 4 - project delivery process and business...
Guc arct 702 legislations lecture 4 - project delivery process and business...
 
JBA_CV_updated
JBA_CV_updatedJBA_CV_updated
JBA_CV_updated
 
Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples Claudio Modola Design - Architectural Design Process Examples
Claudio Modola Design - Architectural Design Process Examples
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabil
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
Presentation 1.pdf
Presentation 1.pdfPresentation 1.pdf
Presentation 1.pdf
 
Presentation 1
Presentation 1Presentation 1
Presentation 1
 
PPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slidePPT4 RIBA Plan of Work 2013 Power point slide
PPT4 RIBA Plan of Work 2013 Power point slide
 

Plus de KhangWei Chin

Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversingKhangWei Chin
 
Bs1 assignment march 2016
Bs1 assignment   march 2016Bs1 assignment   march 2016
Bs1 assignment march 2016KhangWei Chin
 
Building Services Report 2016
Building Services Report 2016Building Services Report 2016
Building Services Report 2016KhangWei Chin
 
CT2 Individual Assignment Brief
CT2 Individual Assignment BriefCT2 Individual Assignment Brief
CT2 Individual Assignment BriefKhangWei Chin
 
CT2 Building Material Group Assignement
CT2 Building Material Group AssignementCT2 Building Material Group Assignement
CT2 Building Material Group AssignementKhangWei Chin
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015KhangWei Chin
 
Integrated assignment ct1 and bm aug15 (1)
Integrated assignment ct1 and bm aug15 (1)Integrated assignment ct1 and bm aug15 (1)
Integrated assignment ct1 and bm aug15 (1)KhangWei Chin
 
Itinerary for site visit (2)
Itinerary for site visit (2)Itinerary for site visit (2)
Itinerary for site visit (2)KhangWei Chin
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1KhangWei Chin
 
Principle of Economics Module Outline
Principle of Economics Module OutlinePrinciple of Economics Module Outline
Principle of Economics Module OutlineKhangWei Chin
 
Basic Accounting Module Outline
Basic Accounting Module OutlineBasic Accounting Module Outline
Basic Accounting Module OutlineKhangWei Chin
 
Principle of Economics Research Analysis
Principle of Economics Research AnalysisPrinciple of Economics Research Analysis
Principle of Economics Research AnalysisKhangWei Chin
 
Basic Accounting Ratio Analysis Assignment Brief
Basic Accounting Ratio Analysis Assignment BriefBasic Accounting Ratio Analysis Assignment Brief
Basic Accounting Ratio Analysis Assignment BriefKhangWei Chin
 
Basic Accounting Assignment Ratio Analysis
Basic Accounting Assignment Ratio AnalysisBasic Accounting Assignment Ratio Analysis
Basic Accounting Assignment Ratio AnalysisKhangWei Chin
 
Intro To Business Charity Drive Report
Intro To Business Charity Drive ReportIntro To Business Charity Drive Report
Intro To Business Charity Drive ReportKhangWei Chin
 
Introduction To Business Charity Drive Assignment Brief
Introduction To Business Charity Drive Assignment BriefIntroduction To Business Charity Drive Assignment Brief
Introduction To Business Charity Drive Assignment BriefKhangWei Chin
 
Introduction To Business, Business Plan Presentation
Introduction To Business, Business Plan PresentationIntroduction To Business, Business Plan Presentation
Introduction To Business, Business Plan PresentationKhangWei Chin
 

Plus de KhangWei Chin (20)

Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversing
 
Ss report1
Ss report1Ss report1
Ss report1
 
Bs1 assignment march 2016
Bs1 assignment   march 2016Bs1 assignment   march 2016
Bs1 assignment march 2016
 
Building Services Report 2016
Building Services Report 2016Building Services Report 2016
Building Services Report 2016
 
CT2 Individual Assignment Brief
CT2 Individual Assignment BriefCT2 Individual Assignment Brief
CT2 Individual Assignment Brief
 
CT2 Building Material Group Assignement
CT2 Building Material Group AssignementCT2 Building Material Group Assignement
CT2 Building Material Group Assignement
 
Power point (1)
Power point (1)Power point (1)
Power point (1)
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Integrated assignment ct1 and bm aug15 (1)
Integrated assignment ct1 and bm aug15 (1)Integrated assignment ct1 and bm aug15 (1)
Integrated assignment ct1 and bm aug15 (1)
 
Itinerary for site visit (2)
Itinerary for site visit (2)Itinerary for site visit (2)
Itinerary for site visit (2)
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Principle of Economics Module Outline
Principle of Economics Module OutlinePrinciple of Economics Module Outline
Principle of Economics Module Outline
 
Basic Accounting Module Outline
Basic Accounting Module OutlineBasic Accounting Module Outline
Basic Accounting Module Outline
 
Principle of Economics Research Analysis
Principle of Economics Research AnalysisPrinciple of Economics Research Analysis
Principle of Economics Research Analysis
 
Basic Accounting Ratio Analysis Assignment Brief
Basic Accounting Ratio Analysis Assignment BriefBasic Accounting Ratio Analysis Assignment Brief
Basic Accounting Ratio Analysis Assignment Brief
 
Basic Accounting Assignment Ratio Analysis
Basic Accounting Assignment Ratio AnalysisBasic Accounting Assignment Ratio Analysis
Basic Accounting Assignment Ratio Analysis
 
Intro To Business Charity Drive Report
Intro To Business Charity Drive ReportIntro To Business Charity Drive Report
Intro To Business Charity Drive Report
 
Introduction To Business Charity Drive Assignment Brief
Introduction To Business Charity Drive Assignment BriefIntroduction To Business Charity Drive Assignment Brief
Introduction To Business Charity Drive Assignment Brief
 
Introduction To Business, Business Plan Presentation
Introduction To Business, Business Plan PresentationIntroduction To Business, Business Plan Presentation
Introduction To Business, Business Plan Presentation
 

Ici and itd project 1

  • 1. PROJECT DATE CLIENT 9TH SEPTEMBER 2014 INTRODUCTION TO CONSTRUCTION INDUSTRY & DRAWING ABDULLAH MAMODE . AMANDA CHIOG . BRIDGET HSU . CHAU XET NEE . CHIN KHANG WEI . NURAFIQAH ZARIFUL TAYLOR’S UNIVERSITY
  • 2.
  • 3. Bring together the design and budgetary requirements set by the client Restrains of a site Need of the building’s users Limitations of materials into a unique Balance design solution
  • 4. Ancient Egypt (3,050BC - 900BC) Classical (850BC - 476AD) Romanesque (800AD - 1,200AD) Gothic Architecture (1,100AD - 1,450AD) Renaissance Architecture (1,400AD - 1,600AD) Rococo Architecture (1,650AD - 1,790AD) Neoclassicism in Architecture (1,650AD - 1,790AD) Art Nouveau Architect (1,890AD - 1,914AD) Beaux Arts Architecture (1,895AD - 1,925AD) Neo-Gothic Architecture (1,905AD - 1,930AD) Art Deco Architecture (1,925AD - 1,937AD) Modernist Styles in Architecture (1,900AD - ?) Postmodernism in Architecture (1,972AD - ?)
  • 5. Degree Master Register as graduate member with Pertubuhan Arkitek Malaysia (PAM) and Register as graduate architect with Lembaga Arkitek Malaysia (LAM) LAM Part III Examination Register as an Architect Working experience
  • 7. Agrees variation to the contract document, normally alterations to the design & specification Attend site meeting, discuss delays & other problems which may be critical Check quality and progress of work on site Inspects samples of materials & fittings delivered to site Conducts the clients round the site when necessary Check that there are no other architect has been commissioned State the scope of work & clients financial limits Inform client of the other professional services required Answer quires where necessary
  • 8. Architect should seek full details of client requirements; 1.Nature size & function of proposed work 2.Decide time & financial limits of the projects 3.Prepare legal information - ownership of land, boundaries etc. 4.Prepare application for planning permission 5.Decide the members of design team involved
  • 9. Client Architect whether / not he is able to carry out the commission Writing of the terms of conditions of the appointment & request confirmation He has adequate time staff, expertise & finance decide approach ensure architect advice client
  • 10. ARCHITECT RESPONSIBILITY IN CONSTRUCTION PHASES
  • 11. Gathering all information required prior to commencing design. Scope of work would typically include; •site analysis, measure up, develop brief, gather all council related information, advice on separate consultants Required 1-2 weeks for this phase
  • 13. Begin design by relating requirements to the site. Form the sketches for the preliminary design. Prepare proposed layout plans. The feedback from the clients will be incorporated into the design and carried through into the Design Development Phase. Requires 2-3 week for this phase.
  • 14. EXAMPLES OF SCHEMATIC DESIGN PHASE
  • 15. Begin and improve the detail design work. Finalise the space planning (indoor and outdoor), exterior forms and materials used in the project. Budget Estimation will review by Quantity Surveyor or Contractor. Requires 2 weeks for this phase.
  • 16. EXAMPLES OF DESIGN DEVELOPMENT PHASE
  • 17. Further development of the design and the necessary documentation would be prepared as required for building consent, tendering, and construction of the project. Sufficiently illustrate concept and details are required to obtain a PIM (Project Information Memorandum) from the local authority. Quantity Surveyor or Contractor will provide actual quote based on complete Contract Document. Architectural Drawing are presented and explained to the client.
  • 18. Prepare tender and contract documentation. Answering queries from the various contractors and sub-contractors. Analyse the received tenders and checking tender compliance to meet the standards. Both the architect and the client evaluate and choose the best contractors for they construction.
  • 19. Site Visit for inspecting the progression of work. Answer project queries and resolving architectural matters/ details. Administrating and certifying project payments Providing any additional drawings and details, as required. Approving final completion. Administrating maintenance defects during the maintenance period.
  • 21. 1. PRESENTATION DRAWING FUNCTION : To explain a scheme & to promote its merits
  • 24. 2. SURVEY DRAWINGS FUNCTION : To establish dimensions for the construction work
  • 25. ANOTHER EXAMPLE OF SURVEY DRAWINGS
  • 26. 3. RECORD DRAWINGS FUNCTION : To understand & emulate the great architect known to architects
  • 27. 4. WORKING DRAWINGS FUNCTION : TO PROVIDE A COMPLETE EXPLANATION OF A BUILDING ON ONE PAPER. •Location drawing •Assembly drawing •Component drawing
  • 29. Site Plan Demolition Plan Drainage plans & Schematics Floor Plan Elevations Foundation plan Floor framing plan Roof framing plan Roof plan Sections Construction details Window & Door schedule Electrical Lighting plan (base only as the best is to involve the lighting supplier / designer to provide same detailed input here) Manufacturers Specifications / Warranties
  • 30. Registration and give accreditation Representing Development and Promotion Regulation of their induct and ethics Conducting Professional Exam http://www.lam.gov.my/
  • 31. Giving awards and regnition Published monthly magazine Organising exhibition, workshop, training, and seminars http://www.pam.org.my/
  • 32. TYPES OF GRAPHITE LINES USED BY ARCHITECT
  • 33. http://www2.lib.virginia.edu/exhibits/rotunda/postfire/mcdonald.html http://archtech-ie.blogspot.com/2009_11_01_archive.html http://hcap.artstor.org/cgi-bin/library?a=d&d=p2185.1 http://www.planedengardendesign.ie/garden-design-process/garden-design.html http://www.missionscalifornia.com/gallery/gal_architectural-drawings-slo.html http://www.2thepointdrafting.com/?page_id=206 http://www.nlcworktrax.com/tour/screens/document3.htm http://architectureplanelevation.blogspot.com http://www.gabrielking.com/indio%20villa.htm TAYLOR SCHOOL OF ARCHITACTURE , BUILDING AND DESIGN PROSPECTUS
  • 34. http://bethantoine.com/paper_treatments/RoseRes.php http://www.kcet.org/arts/artbound/counties/los-angeles/architectural-drawings- california-modern-usc.html http://designhome.pics/architects-floor-plans/8/site-plan-and-floor-plans-the-wolf- residence-by-barton-myers-note-that/ http://cadservices.com/record-drawings-verification-surveys/ http://bunka.nii.ac.jp/jp/world/suisensyo/kyoto/REFERENCE-5/reference5-1.html http://www.designandlight.co.nz/practice/working_drawings http://blog.buildllc.com/2008/09/the-process-of-architecture/ http://en.wikipedia.org/wiki/Architectural_drawing http://www.creativearch.co.nz/index.asp?pageID=2145863519