SlideShare une entreprise Scribd logo
1  sur  5
Doughty 1


Kyle Doughty

Mrs. Corbett

AP Literature 4th Period

8 April 2012

       Engineering projects are the manifestation of man’s free will. When a person decides to

create something, to affect change on his environment, to temporarily play God through the use

of mathematics and science, he becomes free. For that reason alone, I chose an engineering

project as my Senior Project; more specifically, I decided to build a bridge. I also researched

Bechtel Corporation, the largest engineering firm in the world, for the associated research paper

and to facilitate a greater understanding of what engineers can do in this world.

       Speaking of facilitation, my Project Facilitator was the architecture teacher at Creekview,

Ms. Salas. She taught me how to approach design problems in the past, so designing the bridge

proved to be a relatively simple task. In addition to designing at home, I used Ms. Salas’s

classroom in the afternoon to design my bridge. For the most part, the project was completely

within my pre-existing skill set, but she always had time available in the event that I needed to

consult her on an issue with the engineering.

       Bechtel Corporation also consults and solves engineering issues. The company began as a

contractor for highway and railroad building in California. Over the course of a century, it helped

build the Hoover Dam, constructed half of all nuclear power plants in America, built the English

Channel-Tunnel system, and single-handedly constructed an industrial complex that generates

seven percent of Saudi Arabia’s gross domestic product. This company represents the very

definition of tenacious engineering that I chose to pursue with my project.
Doughty 2


       In comparison, my project seems fairly straightforward. The goal was to build a

footbridge across a creek so that I could connect several trails on my property. This task proved

to be more laborious than I had anticipated, but I prevailed. I began by drawing rough sketches

of what I wanted the bridge to look like, and then I made a formal, architectural drawing. This

drawing required accurate measurements, so I hiked into the woods on my land and measured the

span of the two banks and their heights. These measurements would serve as the basis for all of

the dimensions of the bridge. After drawing all of the pieces of wood and metal that I would

need, I calculated the estimated costs of my project.

       The next logical step from cost calculation is purchase, and that holds true for my project.

My father and I purchased lumber from JP Hayne’s and all other supplies from Lowe’s after

carefully comparing online prices of their goods. Transport proved to be fairly simple, since my

father owns a trailer large enough to handle the kind of lumber I required. Once back at my

home, I cut all of the boards to the correct sizes required. The two-by-fours cooperated, while the

four-by-fours needed special care due to the cuts made. Only one six-by-six needed to be cut, so

it was the easiest of all up to that point. Later on, the six-by-sixes in general proved to be the

most difficult, because each one was sixteen feet long and hard to maneuver. Still, my father and

I somehow managed to transport them, hike them into the forest to the construction site and then

position them correctly.

       The first two six-by-sixes needed level footers to rest in. To acquire these footers, my

father and I had to dig. Each of us took a shovel and dug two holes on our respective banks.

These holes, once dug, contained cinder blocks for the six-by-six beams to rest on so as to avoid

moisture and contact with the ground. Each block had to be perfectly level and had to be on the

same working plane as every other block. After that tedious task, the two main beams were laid,
Doughty 3


and a bridge began to appear. Decking followed closely after the difficult task of accurately

positioning two sixteen-foot-long beams. In comparison, the decking proved to be both easier

and more tedious. Each board needed to be perpendicular to the beams, required two screws on

each side and had to have consistent expansion joints to avoid structural damage. Once done,

about half of the work was completed.

        The second half consisted of railing and support columns. The support columns required

their own footer, so my father and I dug a hole three feet deep in the creek bed. Needless to say,

we encountered rocks and mud in copious amounts. After finally digging deep enough, the

columns were set into position perpendicular to the beams. The concrete I bought was not marine

concrete, but my father and I used an abundant and nearby substitute. The creek contains many

large gravel rocks just below the silt, so we dug up the rocks and packed them around the

columns. The columns rest on solid bedrock, so they are now encapsulated in a stable and all-

natural foundation that has proven its worth. With the major supports taken care of, the railing

came next. Five supports, made out of four-by-fours, served as the vertical components of the

railing. These supports fit snuggly into grooves cut into the decking so that they touch the six-by-

six beams. My father and I exploited this feature by using seven-inch lag bolts to secure the

supports. Then, it was a simple matter of positioning and securing two ten-foot-long two-by-

fours and two two-by-sixes as handrails. The concrete came last, since it required a long, warm

day to set in.

        Looking back, the project seemed to have no major mishaps, but there were still plenty of

minor problems. Chief among them was margin of error. Every cut made takes a tiny fraction of

the board with it, and that fraction can be compounded after several cuts. In addition, the stated

measurements of the boards are before they have been treated and dried. This leads to scenarios
Doughty 4


where six-by-sixes are really five and three quarter inches to a side. Plans had to be altered on

site, but that represents the lesson of buying a little extra feet of board for surplus and reserves.

The weather also did not participate half the time. When a project involves a creek, it is best if

the creek does not get muddy. This does not happen in February. Only through sheer

perseverance did I position support columns and tighten lag bolts instead of constantly getting

myself bogged down in the mud.

       Several changes came up as the project took shape in the mud. The most obvious are

structural. Several diagonal supports were put in place to strengthen the vertical columns. Two

cross beams were also added near these supports, and now my bridge seems indestructible. The

lack of marine concrete played a role in how the foundation was created, but the bridge is still

stable. The largest change, which seems more of a momentary lapse of reason on my part, is the

use of expansion joints. During my planning stage, I never thought about the small gaps between

boards to allow for expansion in the event of moisture or temperature change. That being said,

they made it into the final product, and I learned a valuable lesson in planning.

       Many other lessons came from this project. Time management and budgeting resources

come to the forefront of my recollections, because I had never undertaken a project of this

magnitude before. It required discipline and a sheer force of will, but I was more than capable of

obliging its demands. I also learned that I still love the outdoors no matter the season, which is

why I have a trail system that needed this bridge in the first place. Manual labor also felt good,

because usually I am stuck behind a desk all day and doing homework all night. Those reasons

rank among the positives, but for there to be positives, there must also be negatives. My only real

negative was my attitude toward civil engineering. I enjoyed building the bridge, but I could not
Doughty 5


see myself enjoying the process as much if I were doing it for someone else. Luckily for me,

there are many branches of engineering and I have already found another one.

       The Georgia Institute of Technology accepted me to their School of Materials Science

and Engineering, which will allow me to pursue a career that falls more in line with my interests.

Materials science focuses on the chemical and physical properties of materials, which means that

I may still design and test materials for construction companies. It also means that I will have so

many more options, because everyone needs materials. The possibilities range from new textiles

to semiconductors, and I can play a meaningful role no matter which path I choose. Personally, I

plan to pursue nanotechnology as much as possible. The field is relatively new, jobs are

increasing at an exponential rate and the possibilities seem endless. I will still need to know basic

math and science that civil engineers know, but I will also delve deeper into the very nature of

creation. Nothing excites me more than to be pursuing a career that will allow me to exercise my

free will to its maximum potential, but I have to always remember that my bridge took me down

the correct path. Judges, thank you for your time. Are there any questions?

Contenu connexe

Similaire à Senior Project Speech

Senior Project Letter to the Judges
Senior Project Letter to the JudgesSenior Project Letter to the Judges
Senior Project Letter to the Judgeskhdoughty
 
michael_lyons_-_portfolio
michael_lyons_-_portfoliomichael_lyons_-_portfolio
michael_lyons_-_portfolioMichael Lyons
 
2016 DEID Madagascar Post Implementation Report
2016 DEID Madagascar Post Implementation Report2016 DEID Madagascar Post Implementation Report
2016 DEID Madagascar Post Implementation ReportDylan Kaiser
 
Noyaa project REPORT
Noyaa project REPORTNoyaa project REPORT
Noyaa project REPORTTom Vaughan
 
Wu han dma9_midterm_project
Wu han dma9_midterm_projectWu han dma9_midterm_project
Wu han dma9_midterm_projectHan Wu
 
Product Work Log
Product Work LogProduct Work Log
Product Work Logkhdoughty
 
Engineering Portfolio
Engineering PortfolioEngineering Portfolio
Engineering Portfoliojbrunn12
 
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...Gaurav Verma
 
Lettertothe judges
Lettertothe judgesLettertothe judges
Lettertothe judgeswaddell787
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 ReportWilden How
 
Saud AlmutairiPersonal Essay My name i.docx
Saud AlmutairiPersonal Essay                     My name i.docxSaud AlmutairiPersonal Essay                     My name i.docx
Saud AlmutairiPersonal Essay My name i.docxkenjordan97598
 
Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014
Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014
Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014DesignPlace
 
Descriptive Essay Educational And Career Go
Descriptive Essay Educational And Career GoDescriptive Essay Educational And Career Go
Descriptive Essay Educational And Career GoJennifer Ontiveros
 

Similaire à Senior Project Speech (20)

Senior Project Letter to the Judges
Senior Project Letter to the JudgesSenior Project Letter to the Judges
Senior Project Letter to the Judges
 
Speach
SpeachSpeach
Speach
 
Speech
SpeechSpeech
Speech
 
michael_lyons_-_portfolio
michael_lyons_-_portfoliomichael_lyons_-_portfolio
michael_lyons_-_portfolio
 
2016 DEID Madagascar Post Implementation Report
2016 DEID Madagascar Post Implementation Report2016 DEID Madagascar Post Implementation Report
2016 DEID Madagascar Post Implementation Report
 
Noyaa project REPORT
Noyaa project REPORTNoyaa project REPORT
Noyaa project REPORT
 
Wu han dma9_midterm_project
Wu han dma9_midterm_projectWu han dma9_midterm_project
Wu han dma9_midterm_project
 
Product Work Log
Product Work LogProduct Work Log
Product Work Log
 
Zen garden hole
Zen garden holeZen garden hole
Zen garden hole
 
Engineering Portfolio
Engineering PortfolioEngineering Portfolio
Engineering Portfolio
 
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
A 4 Days Site Visit Report on Green Building Constructing in DEI I Sustainabl...
 
Lettertothe judges
Lettertothe judgesLettertothe judges
Lettertothe judges
 
Building Construction 2 Report
Building Construction 2 ReportBuilding Construction 2 Report
Building Construction 2 Report
 
Project Summary 2
Project Summary 2Project Summary 2
Project Summary 2
 
Saud AlmutairiPersonal Essay My name i.docx
Saud AlmutairiPersonal Essay                     My name i.docxSaud AlmutairiPersonal Essay                     My name i.docx
Saud AlmutairiPersonal Essay My name i.docx
 
Site report
Site reportSite report
Site report
 
Concrete - Purifying Water for Agriculture IDM7
Concrete - Purifying Water for Agriculture IDM7Concrete - Purifying Water for Agriculture IDM7
Concrete - Purifying Water for Agriculture IDM7
 
Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014
Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014
Gehry’s Sydney Masterpiece Uncovered - Design Place: Designmag Issue 3 2014
 
Concrete, A strong and waterproof concrete
Concrete, A strong and waterproof concrete Concrete, A strong and waterproof concrete
Concrete, A strong and waterproof concrete
 
Descriptive Essay Educational And Career Go
Descriptive Essay Educational And Career GoDescriptive Essay Educational And Career Go
Descriptive Essay Educational And Career Go
 

Dernier

Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 

Dernier (20)

Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 

Senior Project Speech

  • 1. Doughty 1 Kyle Doughty Mrs. Corbett AP Literature 4th Period 8 April 2012 Engineering projects are the manifestation of man’s free will. When a person decides to create something, to affect change on his environment, to temporarily play God through the use of mathematics and science, he becomes free. For that reason alone, I chose an engineering project as my Senior Project; more specifically, I decided to build a bridge. I also researched Bechtel Corporation, the largest engineering firm in the world, for the associated research paper and to facilitate a greater understanding of what engineers can do in this world. Speaking of facilitation, my Project Facilitator was the architecture teacher at Creekview, Ms. Salas. She taught me how to approach design problems in the past, so designing the bridge proved to be a relatively simple task. In addition to designing at home, I used Ms. Salas’s classroom in the afternoon to design my bridge. For the most part, the project was completely within my pre-existing skill set, but she always had time available in the event that I needed to consult her on an issue with the engineering. Bechtel Corporation also consults and solves engineering issues. The company began as a contractor for highway and railroad building in California. Over the course of a century, it helped build the Hoover Dam, constructed half of all nuclear power plants in America, built the English Channel-Tunnel system, and single-handedly constructed an industrial complex that generates seven percent of Saudi Arabia’s gross domestic product. This company represents the very definition of tenacious engineering that I chose to pursue with my project.
  • 2. Doughty 2 In comparison, my project seems fairly straightforward. The goal was to build a footbridge across a creek so that I could connect several trails on my property. This task proved to be more laborious than I had anticipated, but I prevailed. I began by drawing rough sketches of what I wanted the bridge to look like, and then I made a formal, architectural drawing. This drawing required accurate measurements, so I hiked into the woods on my land and measured the span of the two banks and their heights. These measurements would serve as the basis for all of the dimensions of the bridge. After drawing all of the pieces of wood and metal that I would need, I calculated the estimated costs of my project. The next logical step from cost calculation is purchase, and that holds true for my project. My father and I purchased lumber from JP Hayne’s and all other supplies from Lowe’s after carefully comparing online prices of their goods. Transport proved to be fairly simple, since my father owns a trailer large enough to handle the kind of lumber I required. Once back at my home, I cut all of the boards to the correct sizes required. The two-by-fours cooperated, while the four-by-fours needed special care due to the cuts made. Only one six-by-six needed to be cut, so it was the easiest of all up to that point. Later on, the six-by-sixes in general proved to be the most difficult, because each one was sixteen feet long and hard to maneuver. Still, my father and I somehow managed to transport them, hike them into the forest to the construction site and then position them correctly. The first two six-by-sixes needed level footers to rest in. To acquire these footers, my father and I had to dig. Each of us took a shovel and dug two holes on our respective banks. These holes, once dug, contained cinder blocks for the six-by-six beams to rest on so as to avoid moisture and contact with the ground. Each block had to be perfectly level and had to be on the same working plane as every other block. After that tedious task, the two main beams were laid,
  • 3. Doughty 3 and a bridge began to appear. Decking followed closely after the difficult task of accurately positioning two sixteen-foot-long beams. In comparison, the decking proved to be both easier and more tedious. Each board needed to be perpendicular to the beams, required two screws on each side and had to have consistent expansion joints to avoid structural damage. Once done, about half of the work was completed. The second half consisted of railing and support columns. The support columns required their own footer, so my father and I dug a hole three feet deep in the creek bed. Needless to say, we encountered rocks and mud in copious amounts. After finally digging deep enough, the columns were set into position perpendicular to the beams. The concrete I bought was not marine concrete, but my father and I used an abundant and nearby substitute. The creek contains many large gravel rocks just below the silt, so we dug up the rocks and packed them around the columns. The columns rest on solid bedrock, so they are now encapsulated in a stable and all- natural foundation that has proven its worth. With the major supports taken care of, the railing came next. Five supports, made out of four-by-fours, served as the vertical components of the railing. These supports fit snuggly into grooves cut into the decking so that they touch the six-by- six beams. My father and I exploited this feature by using seven-inch lag bolts to secure the supports. Then, it was a simple matter of positioning and securing two ten-foot-long two-by- fours and two two-by-sixes as handrails. The concrete came last, since it required a long, warm day to set in. Looking back, the project seemed to have no major mishaps, but there were still plenty of minor problems. Chief among them was margin of error. Every cut made takes a tiny fraction of the board with it, and that fraction can be compounded after several cuts. In addition, the stated measurements of the boards are before they have been treated and dried. This leads to scenarios
  • 4. Doughty 4 where six-by-sixes are really five and three quarter inches to a side. Plans had to be altered on site, but that represents the lesson of buying a little extra feet of board for surplus and reserves. The weather also did not participate half the time. When a project involves a creek, it is best if the creek does not get muddy. This does not happen in February. Only through sheer perseverance did I position support columns and tighten lag bolts instead of constantly getting myself bogged down in the mud. Several changes came up as the project took shape in the mud. The most obvious are structural. Several diagonal supports were put in place to strengthen the vertical columns. Two cross beams were also added near these supports, and now my bridge seems indestructible. The lack of marine concrete played a role in how the foundation was created, but the bridge is still stable. The largest change, which seems more of a momentary lapse of reason on my part, is the use of expansion joints. During my planning stage, I never thought about the small gaps between boards to allow for expansion in the event of moisture or temperature change. That being said, they made it into the final product, and I learned a valuable lesson in planning. Many other lessons came from this project. Time management and budgeting resources come to the forefront of my recollections, because I had never undertaken a project of this magnitude before. It required discipline and a sheer force of will, but I was more than capable of obliging its demands. I also learned that I still love the outdoors no matter the season, which is why I have a trail system that needed this bridge in the first place. Manual labor also felt good, because usually I am stuck behind a desk all day and doing homework all night. Those reasons rank among the positives, but for there to be positives, there must also be negatives. My only real negative was my attitude toward civil engineering. I enjoyed building the bridge, but I could not
  • 5. Doughty 5 see myself enjoying the process as much if I were doing it for someone else. Luckily for me, there are many branches of engineering and I have already found another one. The Georgia Institute of Technology accepted me to their School of Materials Science and Engineering, which will allow me to pursue a career that falls more in line with my interests. Materials science focuses on the chemical and physical properties of materials, which means that I may still design and test materials for construction companies. It also means that I will have so many more options, because everyone needs materials. The possibilities range from new textiles to semiconductors, and I can play a meaningful role no matter which path I choose. Personally, I plan to pursue nanotechnology as much as possible. The field is relatively new, jobs are increasing at an exponential rate and the possibilities seem endless. I will still need to know basic math and science that civil engineers know, but I will also delve deeper into the very nature of creation. Nothing excites me more than to be pursuing a career that will allow me to exercise my free will to its maximum potential, but I have to always remember that my bridge took me down the correct path. Judges, thank you for your time. Are there any questions?