SlideShare a Scribd company logo
1 of 10
Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 Nashville WWTP 1993 ProgramNashville WWTP 1993 Program
 MA Mortenson, Prime ContractorMA Mortenson, Prime Contractor
► Scope of work included theScope of work included the
installation of 80K Tiebacks alonginstallation of 80K Tiebacks along
existing Soldier Pile and laggingexisting Soldier Pile and lagging
wall installed by the primewall installed by the prime
contractor.contractor.
► First installation occurred fall/winterFirst installation occurred fall/winter
1992 and was completed within 31992 and was completed within 3
weeksweeks
► Used 8” augured double groutedUsed 8” augured double grouted
tiebacks with 1” grade 160 Williamstiebacks with 1” grade 160 Williams
rods.rods.
► Used Prefabricated double channelUsed Prefabricated double channel
walerswalers
► Program expanded due to changedProgram expanded due to changed
excavation limits and additionalexcavation limits and additional
Tiebacks /cap waler was placedTiebacks /cap waler was placed
along an extended sheet pile wale.along an extended sheet pile wale.

Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 University of TennesseeUniversity of Tennessee
 Pedestrian /Steam Service TunnelPedestrian /Steam Service Tunnel
 Grinder Brothers, Prime ContractorGrinder Brothers, Prime Contractor
► Scope of work includes Excavation , excavationScope of work includes Excavation , excavation
bracing , compaction of subgrade , and placementbracing , compaction of subgrade , and placement
of seal slabs for urban site.of seal slabs for urban site.
► Site conditions required reduced size equipmentSite conditions required reduced size equipment
for access, flexible design to work around olderfor access, flexible design to work around older
abandoned work from 1972 classroomabandoned work from 1972 classroom
construction, and phased street crossing toconstruction, and phased street crossing to
maintain flow along a major street.maintain flow along a major street.
► Work placed in three phasesWork placed in three phases
 Phase One included excavation and bracedPhase One included excavation and braced
support of new north entry plaza to tunnelsupport of new north entry plaza to tunnel
system . Tangent soldier piles with internallysystem . Tangent soldier piles with internally
braced concrete capbraced concrete cap
 Phase Two included the excavation andPhase Two included the excavation and
braced support of off-street portion of steambraced support of off-street portion of steam
tunnel and south utility rooms. Work progresstunnel and south utility rooms. Work progress
south narrow alley with hostile property ownerssouth narrow alley with hostile property owners
on south perimeter. Tangent Cantilever soldieron south perimeter. Tangent Cantilever soldier
piles used as no opportunity to brace waspiles used as no opportunity to brace was
available either internally or tiebacks.available either internally or tiebacks.
 Phase Three required the closure of tunnels toPhase Three required the closure of tunnels to
entry plaza under a major street with significantentry plaza under a major street with significant
utility conflicts. Bracing was accomplished byutility conflicts. Bracing was accomplished by
use of Soldier piles and lagging with internaluse of Soldier piles and lagging with internal
pipe strut support. Four major utilities crossingpipe strut support. Four major utilities crossing
required support with needle beams andrequired support with needle beams and
girders supported by pile foundations.girders supported by pile foundations.
 Final Work included the demolition/removal ofFinal Work included the demolition/removal of
all systems a minimum of 3’ below grade.all systems a minimum of 3’ below grade.
Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 University of TennesseeUniversity of Tennessee
 Pedestrian /Steam Service TunnelPedestrian /Steam Service Tunnel
 Grinder Brothers, Prime ContractorGrinder Brothers, Prime Contractor
Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 Memphis Packing CompanyMemphis Packing Company
 Mayer Construction CompanyMayer Construction Company
 Scope Of Work included Drilled Shafts to support super-Scope Of Work included Drilled Shafts to support super-
structure and excavation /bracing of 30’ deep wetwell forstructure and excavation /bracing of 30’ deep wetwell for
plant sludge recovery.plant sludge recovery.
 Used tangent wall system with “bar Joist Reinforcement .Used tangent wall system with “bar Joist Reinforcement .
Under reamed piers were placed within ht tangent wallUnder reamed piers were placed within ht tangent wall
system.system.
 System was internally braced by ring beam construction.System was internally braced by ring beam construction.
 Excavation was preformed using drilled shaft equipmentExcavation was preformed using drilled shaft equipment
and final grade trimmed and cleanup mini 30HP mini-and final grade trimmed and cleanup mini 30HP mini-
excavator and skip buckets.excavator and skip buckets.
 Minimal Dewatering system was installed in bridgingMinimal Dewatering system was installed in bridging
stone base and abandoned in placestone base and abandoned in place
Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 City of MemphisCity of Memphis
 Cypress Creek Pump StationCypress Creek Pump Station
 G D Moore Construction Co. PrimeG D Moore Construction Co. Prime
ContractorContractor
 Scope Of Work included Drilled /H-Pile and Lagging earthScope Of Work included Drilled /H-Pile and Lagging earth
support for excavation of new Sewage Pump Station,support for excavation of new Sewage Pump Station,
Structural Excavation and Backfill of lift stationStructural Excavation and Backfill of lift station
construction.construction.
 Used Steel Wide Flange Beams installed in 24” DrilledUsed Steel Wide Flange Beams installed in 24” Drilled
shafts with Filter media backfill to allow for drainage ofshafts with Filter media backfill to allow for drainage of
overlaying strata.overlaying strata.
 System was internally braced using struts and cornerSystem was internally braced using struts and corner
braces. Braces were removed after placement of concretebraces. Braces were removed after placement of concrete
chambers to allow for clear placement of packaged pumpchambers to allow for clear placement of packaged pump
station..station..
 Excavation was preformed using combination of 2 cy trackExcavation was preformed using combination of 2 cy track
hoe and mini-Excavator to work lagging placement.hoe and mini-Excavator to work lagging placement.
 All Bracing extracted at completion to preventAll Bracing extracted at completion to prevent
interferences for incoming and outgoing deep sewers.interferences for incoming and outgoing deep sewers.
 Dewatering system was installed using Reverse rotaryDewatering system was installed using Reverse rotary
drilling and 8” PVC casing and Screen.drilling and 8” PVC casing and Screen.
 4 Similar Projects Completed reusing most of the4 Similar Projects Completed reusing most of the
extracted Bracing/lagging to gain economy/extracted Bracing/lagging to gain economy/
Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 A O Smith- Milan TennesseeA O Smith- Milan Tennessee
 New Press Line FoundationsNew Press Line Foundations
 Rentenbach Constructors Co. PrimeRentenbach Constructors Co. Prime
ContractorContractor
 Scope Of Work included installation of tangent soldierScope Of Work included installation of tangent soldier
piles and excavation of press pit.piles and excavation of press pit.
 Work complete inside of an operating stamping mill.Work complete inside of an operating stamping mill.
 Excavation Bracing designed to withstand shocks fromExcavation Bracing designed to withstand shocks from
adjacent stamping mills with minimal ground movement.adjacent stamping mills with minimal ground movement.
 All work completed within 25’ headroom and required aAll work completed within 25’ headroom and required a
stubby crane boom attachment.stubby crane boom attachment.
 Crane attachment used for work required a modifiedCrane attachment used for work required a modified
bridge as well as special short augers during the work.bridge as well as special short augers during the work.
 Bracing Installation . Supports , and struts installed withinBracing Installation . Supports , and struts installed within
2 weeks, Remaining work completed and billed within 452 weeks, Remaining work completed and billed within 45
days keeping to aggressive construction turnarounddays keeping to aggressive construction turnaround
schedule demanded by client.schedule demanded by client.
Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 Consolidated FreightwaysConsolidated Freightways
Memphis, TennesseeMemphis, Tennessee
 Retaining Wall ReplacementRetaining Wall Replacement
 R. C. Crawford, Inc. /H and MR. C. Crawford, Inc. /H and M
Construction Prime ContractorsConstruction Prime Contractors
 Scope Of Work included removal of existing stackedScope Of Work included removal of existing stacked
timber wall , re-grading of site to allow for install of steeltimber wall , re-grading of site to allow for install of steel
framed support.framed support.
 Once framework was installed a reconstructed TimberOnce framework was installed a reconstructed Timber
wall face was placed at original lines and grades.wall face was placed at original lines and grades.
 Additional back of wall drainage system was installed toAdditional back of wall drainage system was installed to
enhance the collection of Leachatte from adjacent landfill.enhance the collection of Leachatte from adjacent landfill.
 All steel prepped by hot galvanized process and repaintedAll steel prepped by hot galvanized process and repainted
in the field to cover welds and bolt punching with epoxyin the field to cover welds and bolt punching with epoxy
paint.paint.
 Selected Areas of wall backfill required the use of No-Selected Areas of wall backfill required the use of No-
Fines Concrete to allow for the excessive leachatte runoff.Fines Concrete to allow for the excessive leachatte runoff.
 Steel frame work supported by embedded H-pile inSteel frame work supported by embedded H-pile in
concrete drilled shafts.concrete drilled shafts.
 Design of all work supervised by owners Engineer ofDesign of all work supervised by owners Engineer of
Record.Record.
Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 Bunge CorporationBunge Corporation
 Port Improvements St. CharlesPort Improvements St. Charles
ArkansasArkansas
► Scope of work includes Excavation ,Scope of work includes Excavation ,
permanent tied back H-pile Retaining wallpermanent tied back H-pile Retaining wall
and slope restoration for new grain silosand slope restoration for new grain silos
and loading facilities on the St Francisand loading facilities on the St Francis
RiverRiver
► Site conditions required that installationsSite conditions required that installations
be worked around and existing loadingbe worked around and existing loading
bridge and silos.bridge and silos.
► Scope of work included 40’ H-PilesScope of work included 40’ H-Piles
Installed in Drilled Shafts to avoidInstalled in Drilled Shafts to avoid
vibrations.vibrations.
► Bracing consisted of 60K working loadBracing consisted of 60K working load
tiebacks up to 55’ deep. Permanenttiebacks up to 55’ deep. Permanent
corrosion protection provided by use ofcorrosion protection provided by use of
coal tar epoxy and re-grout of tendons. (2coal tar epoxy and re-grout of tendons. (2
level)level)
► Lagging consisted of new 7x9 oakLagging consisted of new 7x9 oak
creosote timbers.creosote timbers.
► Design of project by othersDesign of project by others
Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 Taylor Forge- Gulf And WesternTaylor Forge- Gulf And Western
 Re-tooling Plant to Pipe FlangeRe-tooling Plant to Pipe Flange
ProductionProduction
► Scope of work includesScope of work includes
Demolition/Excavation , excavationDemolition/Excavation , excavation
bracing, and pile foundations for newbracing, and pile foundations for new
press pits and rolling mills as part of re-press pits and rolling mills as part of re-
tooling of a plant.tooling of a plant.
► Site conditions required that installationsSite conditions required that installations
be coordinated around the final productionbe coordinated around the final production
runs of existing mill and required that siteruns of existing mill and required that site
be dewatered to lower water tablebe dewatered to lower water table
approximately 16’ to allow for dryapproximately 16’ to allow for dry
placement of structures.placement of structures.
► Excavation tracing required special designExcavation tracing required special design
to work around massive press pits toto work around massive press pits to
remain in place as well as support ofremain in place as well as support of
building/crane columns for ring rollingbuilding/crane columns for ring rolling
mill..mill..
► Other miscellaneous foundations installedOther miscellaneous foundations installed
included Bliss Press, 4000 T Press,included Bliss Press, 4000 T Press,
Pretreatment heaters, and miscellaneousPretreatment heaters, and miscellaneous
material handlers.material handlers.
Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects
R.C. Crawford, IncR.C. Crawford, Inc
 Taylor Forge- Gulf And WesternTaylor Forge- Gulf And Western
 Re-tooling Plant to Pipe FlangeRe-tooling Plant to Pipe Flange
ProductionProduction
► Scope of work includesScope of work includes
Demolition/Excavation , excavationDemolition/Excavation , excavation
bracing, and pile foundations for newbracing, and pile foundations for new
press pits and rolling mills as part of re-press pits and rolling mills as part of re-
tooling of a plant.tooling of a plant.
► Site conditions required that installationsSite conditions required that installations
be coordinated around the final productionbe coordinated around the final production
runs of existing mill and required that siteruns of existing mill and required that site
be dewatered to lower water tablebe dewatered to lower water table
approximately 16’ to allow for dryapproximately 16’ to allow for dry
placement of structures.placement of structures.
► Excavation tracing required special designExcavation tracing required special design
to work around massive press pits toto work around massive press pits to
remain in place as well as support ofremain in place as well as support of
building/crane columns for ring rollingbuilding/crane columns for ring rolling
mill..mill..
► Other miscellaneous foundations installedOther miscellaneous foundations installed
included Bliss Press, 4000 T Press,included Bliss Press, 4000 T Press,
Pretreatment heaters, and miscellaneousPretreatment heaters, and miscellaneous
material handlers.material handlers.

More Related Content

What's hot

BHA components and performances
BHA components and performances BHA components and performances
BHA components and performances Eni
 
Qcs Product Brochure
Qcs Product BrochureQcs Product Brochure
Qcs Product Brochurecalvinschmidt
 
Pile driving problems and solutions by Dr. Malek Smadi of GEOTILL
Pile driving problems and solutions by Dr. Malek Smadi of GEOTILLPile driving problems and solutions by Dr. Malek Smadi of GEOTILL
Pile driving problems and solutions by Dr. Malek Smadi of GEOTILLDr. Malek Smadi
 
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...Dr.Youssef Hammida
 
Topsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systemsTopsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systemsNiels Haakman
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetankAdrian Frantescu
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochureAdrian Frantescu
 
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...Dan Brown and Associates, PC
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
Vsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresVsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresAdrian Frantescu
 
Chad Irvine's CV
Chad Irvine's CVChad Irvine's CV
Chad Irvine's CVChad Irvine
 
ECA Drilling Rigs a Perfect Fit for Viaduct Replacement
ECA Drilling Rigs a Perfect Fit for Viaduct ReplacementECA Drilling Rigs a Perfect Fit for Viaduct Replacement
ECA Drilling Rigs a Perfect Fit for Viaduct ReplacementFraley Construction Marketing
 
Ct2 Precast concrete piles
Ct2 Precast concrete pilesCt2 Precast concrete piles
Ct2 Precast concrete pilesSze Ting Kuek
 
Basic drilling for we adp 2014 k edit3
Basic drilling for we adp 2014 k edit3Basic drilling for we adp 2014 k edit3
Basic drilling for we adp 2014 k edit3pakmek
 
Multi storey residential building
Multi storey residential buildingMulti storey residential building
Multi storey residential buildingIrshad Ansari
 

What's hot (20)

BHA components and performances
BHA components and performances BHA components and performances
BHA components and performances
 
Qcs Product Brochure
Qcs Product BrochureQcs Product Brochure
Qcs Product Brochure
 
Pile driving problems and solutions by Dr. Malek Smadi of GEOTILL
Pile driving problems and solutions by Dr. Malek Smadi of GEOTILLPile driving problems and solutions by Dr. Malek Smadi of GEOTILL
Pile driving problems and solutions by Dr. Malek Smadi of GEOTILL
 
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
 
IntegraLine Brochure
IntegraLine BrochureIntegraLine Brochure
IntegraLine Brochure
 
Topsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systemsTopsides installation options for semi-submersible floating production systems
Topsides installation options for semi-submersible floating production systems
 
MinDOC Photo
MinDOC PhotoMinDOC Photo
MinDOC Photo
 
Dn tanks prestressed_concretetank
Dn tanks prestressed_concretetankDn tanks prestressed_concretetank
Dn tanks prestressed_concretetank
 
Precast post tensioned tank brochure
Precast post tensioned tank brochurePrecast post tensioned tank brochure
Precast post tensioned tank brochure
 
Well head replacement
Well head replacementWell head replacement
Well head replacement
 
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Vsl pt concrete_storage_structures
Vsl pt concrete_storage_structuresVsl pt concrete_storage_structures
Vsl pt concrete_storage_structures
 
Chad Irvine's CV
Chad Irvine's CVChad Irvine's CV
Chad Irvine's CV
 
ECA Drilling Rigs a Perfect Fit for Viaduct Replacement
ECA Drilling Rigs a Perfect Fit for Viaduct ReplacementECA Drilling Rigs a Perfect Fit for Viaduct Replacement
ECA Drilling Rigs a Perfect Fit for Viaduct Replacement
 
Soil nailing
Soil nailingSoil nailing
Soil nailing
 
Ct2 Precast concrete piles
Ct2 Precast concrete pilesCt2 Precast concrete piles
Ct2 Precast concrete piles
 
Basic drilling for we adp 2014 k edit3
Basic drilling for we adp 2014 k edit3Basic drilling for we adp 2014 k edit3
Basic drilling for we adp 2014 k edit3
 
Multi storey residential building
Multi storey residential buildingMulti storey residential building
Multi storey residential building
 
Rig types.
Rig types.Rig types.
Rig types.
 

Viewers also liked

Braced cut in deep excavation
Braced cut in deep excavationBraced cut in deep excavation
Braced cut in deep excavationYogesh Pandey
 
Unit iii braced_cuts
Unit iii braced_cutsUnit iii braced_cuts
Unit iii braced_cutsGimmick
 
Excavation Techniques
Excavation TechniquesExcavation Techniques
Excavation TechniquesPaulVMcDowell
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundationPrabhat chhirolya
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructureguasiya
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety Reliance
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine mohammadsalikali
 

Viewers also liked (10)

Braced cut in deep excavation
Braced cut in deep excavationBraced cut in deep excavation
Braced cut in deep excavation
 
Unit iii braced_cuts
Unit iii braced_cutsUnit iii braced_cuts
Unit iii braced_cuts
 
Excavation Techniques
Excavation TechniquesExcavation Techniques
Excavation Techniques
 
Deep excavations
Deep excavationsDeep excavations
Deep excavations
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundation
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
 
Excavations ppt
Excavations pptExcavations ppt
Excavations ppt
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety
 
Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine Tunnel making methods and tunnel boring machine
Tunnel making methods and tunnel boring machine
 

Similar to Completed Projects Ex Brace Other

Wel Planing
Wel PlaningWel Planing
Wel Planingsaqib129
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpitseddiebradbrook
 
May 2016 M37 RH Milner AS PUBLISHED
May 2016 M37 RH Milner AS PUBLISHEDMay 2016 M37 RH Milner AS PUBLISHED
May 2016 M37 RH Milner AS PUBLISHEDDean Bassett
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdffreezefreeze2
 
Site Report for CT! MEASUREMENT AND BM
Site Report for CT! MEASUREMENT AND BMSite Report for CT! MEASUREMENT AND BM
Site Report for CT! MEASUREMENT AND BMcheeweishan
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sectionsjuwes
 
underwater construction
underwater constructionunderwater construction
underwater constructionYasir Hashmi
 
PRESENTATION 10-Reduced
PRESENTATION 10-ReducedPRESENTATION 10-Reduced
PRESENTATION 10-ReducedBill Rosselot
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 
Structural strengthening Westfield
Structural strengthening WestfieldStructural strengthening Westfield
Structural strengthening Westfieldrgaskill
 
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...muralikrishna317515
 

Similar to Completed Projects Ex Brace Other (20)

coalpreppic
coalpreppiccoalpreppic
coalpreppic
 
Wel Planing
Wel PlaningWel Planing
Wel Planing
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpits
 
May 2016 M37 RH Milner AS PUBLISHED
May 2016 M37 RH Milner AS PUBLISHEDMay 2016 M37 RH Milner AS PUBLISHED
May 2016 M37 RH Milner AS PUBLISHED
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdf
 
Site Report for CT! MEASUREMENT AND BM
Site Report for CT! MEASUREMENT AND BMSite Report for CT! MEASUREMENT AND BM
Site Report for CT! MEASUREMENT AND BM
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
Tunneling (2).ppt
Tunneling (2).pptTunneling (2).ppt
Tunneling (2).ppt
 
Shaft sinking 2
Shaft  sinking 2Shaft  sinking 2
Shaft sinking 2
 
Presentation on Highwall Mining
Presentation on Highwall MiningPresentation on Highwall Mining
Presentation on Highwall Mining
 
underwater construction
underwater constructionunderwater construction
underwater construction
 
4 Projects
4 Projects4 Projects
4 Projects
 
PRESENTATION 10-Reduced
PRESENTATION 10-ReducedPRESENTATION 10-Reduced
PRESENTATION 10-Reduced
 
Mahi ppt suez (2)
Mahi ppt suez (2)Mahi ppt suez (2)
Mahi ppt suez (2)
 
Site Report
Site ReportSite Report
Site Report
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
Structural strengthening Westfield
Structural strengthening WestfieldStructural strengthening Westfield
Structural strengthening Westfield
 
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
Deep Foundation Technologies for Resurgent India Charotar Basarkar Circulatio...
 

More from kingcrawford1

Building An Effective Linked In Profile part 2 fishing
Building An Effective Linked In Profile part 2 fishingBuilding An Effective Linked In Profile part 2 fishing
Building An Effective Linked In Profile part 2 fishingkingcrawford1
 
Building An Effective Linked In Profile Trapping
Building An Effective Linked In Profile TrappingBuilding An Effective Linked In Profile Trapping
Building An Effective Linked In Profile Trappingkingcrawford1
 
Completed Projects Urban Retail Roseville
Completed Projects Urban Retail RosevilleCompleted Projects Urban Retail Roseville
Completed Projects Urban Retail Rosevillekingcrawford1
 
Completed Projects Fcco
Completed Projects FccoCompleted Projects Fcco
Completed Projects Fccokingcrawford1
 
Completed Projects Urban Retail- The Galleria
Completed Projects Urban Retail- The GalleriaCompleted Projects Urban Retail- The Galleria
Completed Projects Urban Retail- The Galleriakingcrawford1
 
Completed Projects PPI Deep Foundations
Completed Projects PPI Deep FoundationsCompleted Projects PPI Deep Foundations
Completed Projects PPI Deep Foundationskingcrawford1
 

More from kingcrawford1 (7)

Building An Effective Linked In Profile part 2 fishing
Building An Effective Linked In Profile part 2 fishingBuilding An Effective Linked In Profile part 2 fishing
Building An Effective Linked In Profile part 2 fishing
 
Building An Effective Linked In Profile Trapping
Building An Effective Linked In Profile TrappingBuilding An Effective Linked In Profile Trapping
Building An Effective Linked In Profile Trapping
 
Completed Projects Urban Retail Roseville
Completed Projects Urban Retail RosevilleCompleted Projects Urban Retail Roseville
Completed Projects Urban Retail Roseville
 
Completed Projects Fcco
Completed Projects FccoCompleted Projects Fcco
Completed Projects Fcco
 
Case History Ncdot
Case History NcdotCase History Ncdot
Case History Ncdot
 
Completed Projects Urban Retail- The Galleria
Completed Projects Urban Retail- The GalleriaCompleted Projects Urban Retail- The Galleria
Completed Projects Urban Retail- The Galleria
 
Completed Projects PPI Deep Foundations
Completed Projects PPI Deep FoundationsCompleted Projects PPI Deep Foundations
Completed Projects PPI Deep Foundations
 

Recently uploaded

Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 

Recently uploaded (20)

Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 

Completed Projects Ex Brace Other

  • 1. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  Nashville WWTP 1993 ProgramNashville WWTP 1993 Program  MA Mortenson, Prime ContractorMA Mortenson, Prime Contractor ► Scope of work included theScope of work included the installation of 80K Tiebacks alonginstallation of 80K Tiebacks along existing Soldier Pile and laggingexisting Soldier Pile and lagging wall installed by the primewall installed by the prime contractor.contractor. ► First installation occurred fall/winterFirst installation occurred fall/winter 1992 and was completed within 31992 and was completed within 3 weeksweeks ► Used 8” augured double groutedUsed 8” augured double grouted tiebacks with 1” grade 160 Williamstiebacks with 1” grade 160 Williams rods.rods. ► Used Prefabricated double channelUsed Prefabricated double channel walerswalers ► Program expanded due to changedProgram expanded due to changed excavation limits and additionalexcavation limits and additional Tiebacks /cap waler was placedTiebacks /cap waler was placed along an extended sheet pile wale.along an extended sheet pile wale. 
  • 2. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  University of TennesseeUniversity of Tennessee  Pedestrian /Steam Service TunnelPedestrian /Steam Service Tunnel  Grinder Brothers, Prime ContractorGrinder Brothers, Prime Contractor ► Scope of work includes Excavation , excavationScope of work includes Excavation , excavation bracing , compaction of subgrade , and placementbracing , compaction of subgrade , and placement of seal slabs for urban site.of seal slabs for urban site. ► Site conditions required reduced size equipmentSite conditions required reduced size equipment for access, flexible design to work around olderfor access, flexible design to work around older abandoned work from 1972 classroomabandoned work from 1972 classroom construction, and phased street crossing toconstruction, and phased street crossing to maintain flow along a major street.maintain flow along a major street. ► Work placed in three phasesWork placed in three phases  Phase One included excavation and bracedPhase One included excavation and braced support of new north entry plaza to tunnelsupport of new north entry plaza to tunnel system . Tangent soldier piles with internallysystem . Tangent soldier piles with internally braced concrete capbraced concrete cap  Phase Two included the excavation andPhase Two included the excavation and braced support of off-street portion of steambraced support of off-street portion of steam tunnel and south utility rooms. Work progresstunnel and south utility rooms. Work progress south narrow alley with hostile property ownerssouth narrow alley with hostile property owners on south perimeter. Tangent Cantilever soldieron south perimeter. Tangent Cantilever soldier piles used as no opportunity to brace waspiles used as no opportunity to brace was available either internally or tiebacks.available either internally or tiebacks.  Phase Three required the closure of tunnels toPhase Three required the closure of tunnels to entry plaza under a major street with significantentry plaza under a major street with significant utility conflicts. Bracing was accomplished byutility conflicts. Bracing was accomplished by use of Soldier piles and lagging with internaluse of Soldier piles and lagging with internal pipe strut support. Four major utilities crossingpipe strut support. Four major utilities crossing required support with needle beams andrequired support with needle beams and girders supported by pile foundations.girders supported by pile foundations.  Final Work included the demolition/removal ofFinal Work included the demolition/removal of all systems a minimum of 3’ below grade.all systems a minimum of 3’ below grade.
  • 3. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  University of TennesseeUniversity of Tennessee  Pedestrian /Steam Service TunnelPedestrian /Steam Service Tunnel  Grinder Brothers, Prime ContractorGrinder Brothers, Prime Contractor
  • 4. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  Memphis Packing CompanyMemphis Packing Company  Mayer Construction CompanyMayer Construction Company  Scope Of Work included Drilled Shafts to support super-Scope Of Work included Drilled Shafts to support super- structure and excavation /bracing of 30’ deep wetwell forstructure and excavation /bracing of 30’ deep wetwell for plant sludge recovery.plant sludge recovery.  Used tangent wall system with “bar Joist Reinforcement .Used tangent wall system with “bar Joist Reinforcement . Under reamed piers were placed within ht tangent wallUnder reamed piers were placed within ht tangent wall system.system.  System was internally braced by ring beam construction.System was internally braced by ring beam construction.  Excavation was preformed using drilled shaft equipmentExcavation was preformed using drilled shaft equipment and final grade trimmed and cleanup mini 30HP mini-and final grade trimmed and cleanup mini 30HP mini- excavator and skip buckets.excavator and skip buckets.  Minimal Dewatering system was installed in bridgingMinimal Dewatering system was installed in bridging stone base and abandoned in placestone base and abandoned in place
  • 5. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  City of MemphisCity of Memphis  Cypress Creek Pump StationCypress Creek Pump Station  G D Moore Construction Co. PrimeG D Moore Construction Co. Prime ContractorContractor  Scope Of Work included Drilled /H-Pile and Lagging earthScope Of Work included Drilled /H-Pile and Lagging earth support for excavation of new Sewage Pump Station,support for excavation of new Sewage Pump Station, Structural Excavation and Backfill of lift stationStructural Excavation and Backfill of lift station construction.construction.  Used Steel Wide Flange Beams installed in 24” DrilledUsed Steel Wide Flange Beams installed in 24” Drilled shafts with Filter media backfill to allow for drainage ofshafts with Filter media backfill to allow for drainage of overlaying strata.overlaying strata.  System was internally braced using struts and cornerSystem was internally braced using struts and corner braces. Braces were removed after placement of concretebraces. Braces were removed after placement of concrete chambers to allow for clear placement of packaged pumpchambers to allow for clear placement of packaged pump station..station..  Excavation was preformed using combination of 2 cy trackExcavation was preformed using combination of 2 cy track hoe and mini-Excavator to work lagging placement.hoe and mini-Excavator to work lagging placement.  All Bracing extracted at completion to preventAll Bracing extracted at completion to prevent interferences for incoming and outgoing deep sewers.interferences for incoming and outgoing deep sewers.  Dewatering system was installed using Reverse rotaryDewatering system was installed using Reverse rotary drilling and 8” PVC casing and Screen.drilling and 8” PVC casing and Screen.  4 Similar Projects Completed reusing most of the4 Similar Projects Completed reusing most of the extracted Bracing/lagging to gain economy/extracted Bracing/lagging to gain economy/
  • 6. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  A O Smith- Milan TennesseeA O Smith- Milan Tennessee  New Press Line FoundationsNew Press Line Foundations  Rentenbach Constructors Co. PrimeRentenbach Constructors Co. Prime ContractorContractor  Scope Of Work included installation of tangent soldierScope Of Work included installation of tangent soldier piles and excavation of press pit.piles and excavation of press pit.  Work complete inside of an operating stamping mill.Work complete inside of an operating stamping mill.  Excavation Bracing designed to withstand shocks fromExcavation Bracing designed to withstand shocks from adjacent stamping mills with minimal ground movement.adjacent stamping mills with minimal ground movement.  All work completed within 25’ headroom and required aAll work completed within 25’ headroom and required a stubby crane boom attachment.stubby crane boom attachment.  Crane attachment used for work required a modifiedCrane attachment used for work required a modified bridge as well as special short augers during the work.bridge as well as special short augers during the work.  Bracing Installation . Supports , and struts installed withinBracing Installation . Supports , and struts installed within 2 weeks, Remaining work completed and billed within 452 weeks, Remaining work completed and billed within 45 days keeping to aggressive construction turnarounddays keeping to aggressive construction turnaround schedule demanded by client.schedule demanded by client.
  • 7. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  Consolidated FreightwaysConsolidated Freightways Memphis, TennesseeMemphis, Tennessee  Retaining Wall ReplacementRetaining Wall Replacement  R. C. Crawford, Inc. /H and MR. C. Crawford, Inc. /H and M Construction Prime ContractorsConstruction Prime Contractors  Scope Of Work included removal of existing stackedScope Of Work included removal of existing stacked timber wall , re-grading of site to allow for install of steeltimber wall , re-grading of site to allow for install of steel framed support.framed support.  Once framework was installed a reconstructed TimberOnce framework was installed a reconstructed Timber wall face was placed at original lines and grades.wall face was placed at original lines and grades.  Additional back of wall drainage system was installed toAdditional back of wall drainage system was installed to enhance the collection of Leachatte from adjacent landfill.enhance the collection of Leachatte from adjacent landfill.  All steel prepped by hot galvanized process and repaintedAll steel prepped by hot galvanized process and repainted in the field to cover welds and bolt punching with epoxyin the field to cover welds and bolt punching with epoxy paint.paint.  Selected Areas of wall backfill required the use of No-Selected Areas of wall backfill required the use of No- Fines Concrete to allow for the excessive leachatte runoff.Fines Concrete to allow for the excessive leachatte runoff.  Steel frame work supported by embedded H-pile inSteel frame work supported by embedded H-pile in concrete drilled shafts.concrete drilled shafts.  Design of all work supervised by owners Engineer ofDesign of all work supervised by owners Engineer of Record.Record.
  • 8. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  Bunge CorporationBunge Corporation  Port Improvements St. CharlesPort Improvements St. Charles ArkansasArkansas ► Scope of work includes Excavation ,Scope of work includes Excavation , permanent tied back H-pile Retaining wallpermanent tied back H-pile Retaining wall and slope restoration for new grain silosand slope restoration for new grain silos and loading facilities on the St Francisand loading facilities on the St Francis RiverRiver ► Site conditions required that installationsSite conditions required that installations be worked around and existing loadingbe worked around and existing loading bridge and silos.bridge and silos. ► Scope of work included 40’ H-PilesScope of work included 40’ H-Piles Installed in Drilled Shafts to avoidInstalled in Drilled Shafts to avoid vibrations.vibrations. ► Bracing consisted of 60K working loadBracing consisted of 60K working load tiebacks up to 55’ deep. Permanenttiebacks up to 55’ deep. Permanent corrosion protection provided by use ofcorrosion protection provided by use of coal tar epoxy and re-grout of tendons. (2coal tar epoxy and re-grout of tendons. (2 level)level) ► Lagging consisted of new 7x9 oakLagging consisted of new 7x9 oak creosote timbers.creosote timbers. ► Design of project by othersDesign of project by others
  • 9. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  Taylor Forge- Gulf And WesternTaylor Forge- Gulf And Western  Re-tooling Plant to Pipe FlangeRe-tooling Plant to Pipe Flange ProductionProduction ► Scope of work includesScope of work includes Demolition/Excavation , excavationDemolition/Excavation , excavation bracing, and pile foundations for newbracing, and pile foundations for new press pits and rolling mills as part of re-press pits and rolling mills as part of re- tooling of a plant.tooling of a plant. ► Site conditions required that installationsSite conditions required that installations be coordinated around the final productionbe coordinated around the final production runs of existing mill and required that siteruns of existing mill and required that site be dewatered to lower water tablebe dewatered to lower water table approximately 16’ to allow for dryapproximately 16’ to allow for dry placement of structures.placement of structures. ► Excavation tracing required special designExcavation tracing required special design to work around massive press pits toto work around massive press pits to remain in place as well as support ofremain in place as well as support of building/crane columns for ring rollingbuilding/crane columns for ring rolling mill..mill.. ► Other miscellaneous foundations installedOther miscellaneous foundations installed included Bliss Press, 4000 T Press,included Bliss Press, 4000 T Press, Pretreatment heaters, and miscellaneousPretreatment heaters, and miscellaneous material handlers.material handlers.
  • 10. Other Excavation Bracing/Specialty Excavation ProjectsOther Excavation Bracing/Specialty Excavation Projects R.C. Crawford, IncR.C. Crawford, Inc  Taylor Forge- Gulf And WesternTaylor Forge- Gulf And Western  Re-tooling Plant to Pipe FlangeRe-tooling Plant to Pipe Flange ProductionProduction ► Scope of work includesScope of work includes Demolition/Excavation , excavationDemolition/Excavation , excavation bracing, and pile foundations for newbracing, and pile foundations for new press pits and rolling mills as part of re-press pits and rolling mills as part of re- tooling of a plant.tooling of a plant. ► Site conditions required that installationsSite conditions required that installations be coordinated around the final productionbe coordinated around the final production runs of existing mill and required that siteruns of existing mill and required that site be dewatered to lower water tablebe dewatered to lower water table approximately 16’ to allow for dryapproximately 16’ to allow for dry placement of structures.placement of structures. ► Excavation tracing required special designExcavation tracing required special design to work around massive press pits toto work around massive press pits to remain in place as well as support ofremain in place as well as support of building/crane columns for ring rollingbuilding/crane columns for ring rolling mill..mill.. ► Other miscellaneous foundations installedOther miscellaneous foundations installed included Bliss Press, 4000 T Press,included Bliss Press, 4000 T Press, Pretreatment heaters, and miscellaneousPretreatment heaters, and miscellaneous material handlers.material handlers.