» Camber or cant or cross slope is the cross slope provided 
to raise middle of the road surface in the transverse 
direction to drain off rain water from road surface 
» Objectives of providing camber are: 
˃ Quick drying of pavement. 
˃ Surface protection. 
˃ Subgrade protection. 
By Kushal Patel 
2
By Kushal Patel 
3
IRC VALUES FOR CAMBER 
SURFACE HEAVY LIGHT 
TYPE RAIN RAIN 
CONCRETE/BITUMINOUS 2 % 1.7 % 
GRAVEL/WBM 3 % 2.5 % 
EARTHEN 4 % 3.0 % 
By Kushal Patel 
4
» The safe and efficient operation of vehicles on the road 
depends very much on the visibility of the road ahead of 
the driver. Thus the geometric design of the road should 
be done such that any obstruction on the road length 
could be visible to the driver from some distance ahead . 
This distance is said to be the sight distance. 
By Kushal Patel 
5
Types of sight distance 
Three sight distance situations are considered for design: 
1. Stopping sight distance (SSD) or the absolute minimum sight 
distance 
2. Intermediate sight distance (ISD) is defined as twice SSD 
3. Overtaking sight distance (OSD) for safe overtaking operation 
By Kushal Patel 
6
Stopping sight distance 
Stopping sight distance (SSD) is the minimum sight 
distance available on a highway at any spot having sufficient 
length to enable the driver to stop a vehicle traveling at 
design speed, safely without collision with any other 
obstruction. 
Over-taking sight distance 
The overtaking sight distance is the minimum distance 
open to the vision of the driver of a vehicle intending to 
overtake the slow vehicle ahead safely against the traffic in 
the opposite direction. 
By Kushal Patel 
7
» Super-elevation or cant or banking is the transverse slope 
provided at horizontal curve to counteract the centrifugal 
force, by raising the outer edge of the pavement with 
respect to the inner edge, throughout the length of the 
horizontal curve. When the outer edge is raised, a 
component of the curve weight will be complimented in 
counteracting the effect of centrifugal force 
By Kushal Patel 
8
Forces acting on a vehicle on horizontal curve of radius at a speed of are: 
• the centrifugal force acting horizontally out-wards through the center of 
gravity, 
• the weight of the vehicle acting down-wards through the center of gravity, 
and 
• the friction force between the wheels and the pavement, along the surface 
inward 
By Kushal Patel 
9
» The position or the layout of the central line of the 
highway on the ground is called the alignment. 
» There are two types of alignment 
˃ Horizontal alignment includes straight and curved paths. 
˃ Vertical alignment includes level and gradients. 
By Kushal Patel 
10
» Alignment decision is important because a bad alignment 
will enhance the construction, maintenance and vehicle 
operating costs. 
» Once an alignment is fixed and constructed, it is not easy 
to change it due to increase in cost of adjoining land and 
construction of costly structures by the roadside. 
By Kushal Patel 
11
» The alignment between two terminal stations should be 
short and straight. 
» The alignment should be easy to construct and maintain. 
It should be easy for the operation of vehicles. 
» It should be safe both from the construction and 
operating point of view especially at slopes, 
embankments, and cutting. 
» The alignment should be economical and it can be 
considered so only when the initial cost, maintenance 
cost, and operating cost are minimum. 
By Kushal Patel 
12
» Horizontal alignment is one of the most important 
features influencing the efficiency and safety of a highway 
» A poor design will result in lower speeds and resultant 
reduction in highway performance in terms of safety and 
comfort. In addition, it may increase the cost of vehicle 
operations and lower the highway capacity. 
By Kushal Patel 
13
» Transition curve is provided to change the horizontal 
alignment from straight to circular curve gradually and 
has a radius which decreases from infinity at the straight 
end to the desired radius of the circular curve at the other 
end. 
By Kushal Patel 
14
» OBJECTIVE OF PROVIDING TRANSITION CURVE 
» To enable the driver turn the steering gradually for his 
own comfort and security 
» To provide gradual introduction of super elevation 
» To provide gradual introduction of extra widening. 
» To enhance the aesthetic appearance of the road. 
By Kushal Patel 
15
» Extra widening refers to the additional width of 
carriageway that is required on a curved section of a road 
over and above that required on a straight alignment. 
» This widening is done due to two reasons: the first and 
most important is the additional width required for a 
vehicle taking a horizontal curve and the second is due to 
the tendency of the drivers to ply away from the edge of 
the carriageway as they drive on a curve. 
By Kushal Patel 
16
By Kushal Patel 
17

More Related Content

What's hot

BRIEF STUDY OF IRC STANDARD CODES
BRIEF STUDY OF IRC STANDARD CODESBRIEF STUDY OF IRC STANDARD CODES
BRIEF STUDY OF IRC STANDARD CODES
Jayvant Choudhary
 

What's hot (20)

Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and Superelevation
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometrics
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Traffic studies volume study
Traffic studies volume studyTraffic studies volume study
Traffic studies volume study
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Unit 3
Unit 3Unit 3
Unit 3
 
Chapter 7
Chapter 7Chapter 7
Chapter 7
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
 
Origin – Destination survey
Origin – Destination surveyOrigin – Destination survey
Origin – Destination survey
 
Interchange
InterchangeInterchange
Interchange
 
BRIEF STUDY OF IRC STANDARD CODES
BRIEF STUDY OF IRC STANDARD CODESBRIEF STUDY OF IRC STANDARD CODES
BRIEF STUDY OF IRC STANDARD CODES
 
Design of rotary
Design of rotaryDesign of rotary
Design of rotary
 
Unit 2
Unit 2Unit 2
Unit 2
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Geometric design
Geometric designGeometric design
Geometric design
 
Highway engineering PPT
Highway engineering PPTHighway engineering PPT
Highway engineering PPT
 
SIGHT DISTANCE
SIGHT DISTANCESIGHT DISTANCE
SIGHT DISTANCE
 
IRC Method of Signal Design
IRC Method of Signal DesignIRC Method of Signal Design
IRC Method of Signal Design
 
Origin & destination survey
Origin & destination surveyOrigin & destination survey
Origin & destination survey
 

Viewers also liked

Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
khaledalshami93
 
Horizontal curves pdf
Horizontal curves pdfHorizontal curves pdf
Horizontal curves pdf
Kaila Turla
 
Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )
mohit kumar panchal
 
The influence of road geometric design elements on highway safety
The influence of road geometric design elements on highway safetyThe influence of road geometric design elements on highway safety
The influence of road geometric design elements on highway safety
IAEME Publication
 
Airport Capacity Solutions
Airport Capacity SolutionsAirport Capacity Solutions
Airport Capacity Solutions
Matthew Bates
 
Airport capacity and_delay
Airport capacity and_delayAirport capacity and_delay
Airport capacity and_delay
nobel56
 
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et alBearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Johan Granlund
 

Viewers also liked (20)

Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
 
Horizontal alignment of Roads
Horizontal alignment of RoadsHorizontal alignment of Roads
Horizontal alignment of Roads
 
Horizontal curves pdf
Horizontal curves pdfHorizontal curves pdf
Horizontal curves pdf
 
Vertical Alignment in road design
Vertical Alignment in road designVertical Alignment in road design
Vertical Alignment in road design
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
 
Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignment
 
Vertical alignment
Vertical alignmentVertical alignment
Vertical alignment
 
Road
RoadRoad
Road
 
Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)
 
Highway Engineering topics
Highway Engineering topicsHighway Engineering topics
Highway Engineering topics
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 
The influence of road geometric design elements on highway safety
The influence of road geometric design elements on highway safetyThe influence of road geometric design elements on highway safety
The influence of road geometric design elements on highway safety
 
Airport Capacity Solutions
Airport Capacity SolutionsAirport Capacity Solutions
Airport Capacity Solutions
 
Ce1255
Ce1255Ce1255
Ce1255
 
Airport capacity and_delay
Airport capacity and_delayAirport capacity and_delay
Airport capacity and_delay
 
TRAFFIC FLOW ANALYSIS & EFFICIENCY OF GEOMETRIC DESIGN OF A T-INTERSECTION, A...
TRAFFIC FLOW ANALYSIS & EFFICIENCY OF GEOMETRIC DESIGN OF A T-INTERSECTION, A...TRAFFIC FLOW ANALYSIS & EFFICIENCY OF GEOMETRIC DESIGN OF A T-INTERSECTION, A...
TRAFFIC FLOW ANALYSIS & EFFICIENCY OF GEOMETRIC DESIGN OF A T-INTERSECTION, A...
 
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et alBearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
Bearing capacity at the pavement side - the NVF method, HVTT12 Granlund et al
 
R E T 565construction Technology Infrastructure
R E T 565construction Technology InfrastructureR E T 565construction Technology Infrastructure
R E T 565construction Technology Infrastructure
 

Similar to Road geometrics

Transportation engineering 1
Transportation engineering   1Transportation engineering   1
Transportation engineering 1
R VIJAYAKUMAR
 

Similar to Road geometrics (20)

Transportation engineering 1
Transportation engineering   1Transportation engineering   1
Transportation engineering 1
 
1 geometric design elements of road by malyar talash
1 geometric design elements of road by malyar talash1 geometric design elements of road by malyar talash
1 geometric design elements of road by malyar talash
 
SUPER_ELEVATION.pdf
SUPER_ELEVATION.pdfSUPER_ELEVATION.pdf
SUPER_ELEVATION.pdf
 
Transportation Engineering
Transportation EngineeringTransportation Engineering
Transportation Engineering
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
 
Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Lec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdfLec_3_Hoorizontal alignment_Curves.pdf
Lec_3_Hoorizontal alignment_Curves.pdf
 
geometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptgeometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).ppt
 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
 
Cross section of road and sight distance
Cross section of road and sight distanceCross section of road and sight distance
Cross section of road and sight distance
 
Unit_II ARP.pptx
Unit_II ARP.pptxUnit_II ARP.pptx
Unit_II ARP.pptx
 
Geometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptxGeometric design of Highway Chapter-3-pptx
Geometric design of Highway Chapter-3-pptx
 
Design and Development of H-Frame with Lateral Link Suspension for an All Ter...
Design and Development of H-Frame with Lateral Link Suspension for an All Ter...Design and Development of H-Frame with Lateral Link Suspension for an All Ter...
Design and Development of H-Frame with Lateral Link Suspension for an All Ter...
 
intro to alignment.pptx
intro to alignment.pptxintro to alignment.pptx
intro to alignment.pptx
 
Roads and its design factors pdf
Roads and its design factors pdfRoads and its design factors pdf
Roads and its design factors pdf
 
Geometric design of roads - Highways - Copy.docx
Geometric design of roads - Highways - Copy.docxGeometric design of roads - Highways - Copy.docx
Geometric design of roads - Highways - Copy.docx
 
Geometric design of roads - Highways.docx
Geometric design of roads - Highways.docxGeometric design of roads - Highways.docx
Geometric design of roads - Highways.docx
 
Reading and Analyzing of Non-Newtonian speed Bumps (speed breakers)
Reading and Analyzing of Non-Newtonian speed Bumps (speed breakers)Reading and Analyzing of Non-Newtonian speed Bumps (speed breakers)
Reading and Analyzing of Non-Newtonian speed Bumps (speed breakers)
 
Intersection,types
Intersection,typesIntersection,types
Intersection,types
 

More from Kushal Patel

More from Kushal Patel (17)

Moscow, ID case study traffic operation
Moscow, ID case study traffic operationMoscow, ID case study traffic operation
Moscow, ID case study traffic operation
 
Presentation hcm 2010 case study
Presentation hcm 2010 case studyPresentation hcm 2010 case study
Presentation hcm 2010 case study
 
sMs project tutorial_iit
sMs project tutorial_iitsMs project tutorial_iit
sMs project tutorial_iit
 
Ms project working example
Ms project working exampleMs project working example
Ms project working example
 
Ms project general introduction
Ms project general introductionMs project general introduction
Ms project general introduction
 
Scales in Engineering
Scales in EngineeringScales in Engineering
Scales in Engineering
 
Design guidance for freeway mainline ramp terminals
Design guidance for freeway mainline ramp terminalsDesign guidance for freeway mainline ramp terminals
Design guidance for freeway mainline ramp terminals
 
Autodesk civil3 d_tutorail
Autodesk civil3 d_tutorailAutodesk civil3 d_tutorail
Autodesk civil3 d_tutorail
 
Civil 3 d overview general
Civil 3 d overview generalCivil 3 d overview general
Civil 3 d overview general
 
Types of bridge(theory.explanation)
Types of bridge(theory.explanation)Types of bridge(theory.explanation)
Types of bridge(theory.explanation)
 
Types of bridge(concept)
Types of bridge(concept)Types of bridge(concept)
Types of bridge(concept)
 
Eia methods for transportation project
Eia methods for transportation projectEia methods for transportation project
Eia methods for transportation project
 
Plane table survey
Plane table surveyPlane table survey
Plane table survey
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 
Uts congestion components
Uts congestion componentsUts congestion components
Uts congestion components
 
Land use planning
Land use planningLand use planning
Land use planning
 
Airport lighting airport engineering
Airport lighting  airport engineeringAirport lighting  airport engineering
Airport lighting airport engineering
 

Recently uploaded

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Recently uploaded (20)

TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 

Road geometrics

  • 1.
  • 2. » Camber or cant or cross slope is the cross slope provided to raise middle of the road surface in the transverse direction to drain off rain water from road surface » Objectives of providing camber are: ˃ Quick drying of pavement. ˃ Surface protection. ˃ Subgrade protection. By Kushal Patel 2
  • 4. IRC VALUES FOR CAMBER SURFACE HEAVY LIGHT TYPE RAIN RAIN CONCRETE/BITUMINOUS 2 % 1.7 % GRAVEL/WBM 3 % 2.5 % EARTHEN 4 % 3.0 % By Kushal Patel 4
  • 5. » The safe and efficient operation of vehicles on the road depends very much on the visibility of the road ahead of the driver. Thus the geometric design of the road should be done such that any obstruction on the road length could be visible to the driver from some distance ahead . This distance is said to be the sight distance. By Kushal Patel 5
  • 6. Types of sight distance Three sight distance situations are considered for design: 1. Stopping sight distance (SSD) or the absolute minimum sight distance 2. Intermediate sight distance (ISD) is defined as twice SSD 3. Overtaking sight distance (OSD) for safe overtaking operation By Kushal Patel 6
  • 7. Stopping sight distance Stopping sight distance (SSD) is the minimum sight distance available on a highway at any spot having sufficient length to enable the driver to stop a vehicle traveling at design speed, safely without collision with any other obstruction. Over-taking sight distance The overtaking sight distance is the minimum distance open to the vision of the driver of a vehicle intending to overtake the slow vehicle ahead safely against the traffic in the opposite direction. By Kushal Patel 7
  • 8. » Super-elevation or cant or banking is the transverse slope provided at horizontal curve to counteract the centrifugal force, by raising the outer edge of the pavement with respect to the inner edge, throughout the length of the horizontal curve. When the outer edge is raised, a component of the curve weight will be complimented in counteracting the effect of centrifugal force By Kushal Patel 8
  • 9. Forces acting on a vehicle on horizontal curve of radius at a speed of are: • the centrifugal force acting horizontally out-wards through the center of gravity, • the weight of the vehicle acting down-wards through the center of gravity, and • the friction force between the wheels and the pavement, along the surface inward By Kushal Patel 9
  • 10. » The position or the layout of the central line of the highway on the ground is called the alignment. » There are two types of alignment ˃ Horizontal alignment includes straight and curved paths. ˃ Vertical alignment includes level and gradients. By Kushal Patel 10
  • 11. » Alignment decision is important because a bad alignment will enhance the construction, maintenance and vehicle operating costs. » Once an alignment is fixed and constructed, it is not easy to change it due to increase in cost of adjoining land and construction of costly structures by the roadside. By Kushal Patel 11
  • 12. » The alignment between two terminal stations should be short and straight. » The alignment should be easy to construct and maintain. It should be easy for the operation of vehicles. » It should be safe both from the construction and operating point of view especially at slopes, embankments, and cutting. » The alignment should be economical and it can be considered so only when the initial cost, maintenance cost, and operating cost are minimum. By Kushal Patel 12
  • 13. » Horizontal alignment is one of the most important features influencing the efficiency and safety of a highway » A poor design will result in lower speeds and resultant reduction in highway performance in terms of safety and comfort. In addition, it may increase the cost of vehicle operations and lower the highway capacity. By Kushal Patel 13
  • 14. » Transition curve is provided to change the horizontal alignment from straight to circular curve gradually and has a radius which decreases from infinity at the straight end to the desired radius of the circular curve at the other end. By Kushal Patel 14
  • 15. » OBJECTIVE OF PROVIDING TRANSITION CURVE » To enable the driver turn the steering gradually for his own comfort and security » To provide gradual introduction of super elevation » To provide gradual introduction of extra widening. » To enhance the aesthetic appearance of the road. By Kushal Patel 15
  • 16. » Extra widening refers to the additional width of carriageway that is required on a curved section of a road over and above that required on a straight alignment. » This widening is done due to two reasons: the first and most important is the additional width required for a vehicle taking a horizontal curve and the second is due to the tendency of the drivers to ply away from the edge of the carriageway as they drive on a curve. By Kushal Patel 16