Passive HousePt Reyes, CA Terry Nordby, General Contractor James Bill, Architect
Subject: friday report 4-30-10   Hi all, This week we completed the second roof foam insulation and plywood skin. Also finished the exterior pink foam to mitigate our thermal bridging of the wall assembly, we completed the roof shingles and  gutters as well as the front entry framing and roof. On the inside we punched our last hole in the exterior plywood/ air seal and stubbed out for all the second wall connections. There were twelve holes in total including water and waste lines, sprinkler, communications, HRV, solar, PV and electrical. For me it was counter intuitive to drill holes in a E ring assembly. The sound of each hole being drilled or cut set my nervous system on fire.  On monday I will finish sealing all the new holes and retest with the blower door to see just how well we sealed up the holes. 
Pink side out- roof started.
 corner trim and first Hardi Plank siding started. Outlet hole is not in air seal assembly but intentionally infront storage area to prevent puncture in air seal assembly
dryer vent raceway. here we used a 4" ABS pipe and fixed it tight and rigidto the framing. Normally one uses a soft and somewhat flexible steel or aluminum exit pipe which would be very hard to seal up at each puncture. Movement of the soft through wall pipe would or could break loose at the seal and leak air as time goes by. Here the intention is to supply a permanent solid conduit for the dryer vent. We have yet to figure out how we are going to attach and or release the dryer vent from this line but we got lots of ideas - TBCthis vent will also get a plywood
this vent will also get a plywood shroud around it for air sealing the sheetrock against.
finishing pink side out.
 if foam was fun it might look like this.
Note how the pink foam sidewall meets the polyiso roof foam overhang so thermal bridging is not broken at corners except for those pesky rafters.
Boron ahead of foam
Sun First, who are donating their time to CLAM, are installing  the support feet forthe solar thermal (hot water) panels. Each foot gets a roof jack covering with a leg poking out to support the panels
 How much extra does it cost to build a passive house?Here James Bill at left, Andy Blake a solar project manager/ consultant (pro-bono) and Dan Smith of Sebastopol Heat and Cool are finishing up a three hour on site meeting to figure out where and how to install the HRV system with the solar thermal and all the other hardware associated with the mechanical system of the house. There is probably a few hundred emails, debates, discussions, meetings and drawings before this meeting to reach a final design. A standard HVAC system might take two to four hours to reach design. Why is that? We have never done this before. It's like building the first car or the first airplane. These are the pioneers of the first passive house.
We have never done this before. It's like building the first car or the first airplane. These are the pioneers of the first passive house.
Passive house slide show
Passive house slide show
Passive house slide show
Passive house slide show
Passive house slide show
Passive house slide show

More Related Content

Similar to Passive house slide show

Visual dictionary - Sp10Window
Visual dictionary - Sp10WindowVisual dictionary - Sp10Window
Visual dictionary - Sp10WindowSp10window
 
Visual Dictionary 1 of 2
Visual Dictionary 1 of 2Visual Dictionary 1 of 2
Visual Dictionary 1 of 2spandrel
 
Insulated Foundation Analysis - Website newsletter article 1 070210
Insulated Foundation Analysis - Website newsletter article 1 070210Insulated Foundation Analysis - Website newsletter article 1 070210
Insulated Foundation Analysis - Website newsletter article 1 070210Bronwyn Barry
 
Visual Dictionary final
Visual Dictionary finalVisual Dictionary final
Visual Dictionary finalplasterboard
 
Plasterboard's Visual Dictionary
Plasterboard's Visual DictionaryPlasterboard's Visual Dictionary
Plasterboard's Visual Dictionaryplasterboard
 
Bolster2-Code Requirements to Mortar
Bolster2-Code Requirements to MortarBolster2-Code Requirements to Mortar
Bolster2-Code Requirements to Mortarbolster2
 
ProGUARD Insulated Sheathing
ProGUARD Insulated SheathingProGUARD Insulated Sheathing
ProGUARD Insulated Sheathingguest8f9cd2b
 
Visual dictionary
Visual dictionary Visual dictionary
Visual dictionary Sp10rebar
 
Visual dictionary GRADE THIS
Visual dictionary GRADE THISVisual dictionary GRADE THIS
Visual dictionary GRADE THISSp10rebar
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-BlockingBlocking
 
Infill Construction Guide
Infill Construction GuideInfill Construction Guide
Infill Construction GuideTradePros
 
Visual dictionary - Sp10knothole
Visual dictionary - Sp10knotholeVisual dictionary - Sp10knothole
Visual dictionary - Sp10knotholeSp10knothole
 
Visual Dictionary Final
Visual Dictionary FinalVisual Dictionary Final
Visual Dictionary FinalSp10rebar
 
Visual Dictionary - sp10cladding
Visual Dictionary - sp10claddingVisual Dictionary - sp10cladding
Visual Dictionary - sp10claddingSp10cladding
 
Grade Sheet 2 3 Visual Dict Bolster
Grade Sheet 2 3 Visual Dict BolsterGrade Sheet 2 3 Visual Dict Bolster
Grade Sheet 2 3 Visual Dict BolsterBarbara Holler
 
Visual Dictionary-Permeance
Visual Dictionary-PermeanceVisual Dictionary-Permeance
Visual Dictionary-Permeancepermeance
 

Similar to Passive house slide show (20)

Visual dictionary - Sp10Window
Visual dictionary - Sp10WindowVisual dictionary - Sp10Window
Visual dictionary - Sp10Window
 
Visual Dictionary 1 of 2
Visual Dictionary 1 of 2Visual Dictionary 1 of 2
Visual Dictionary 1 of 2
 
Insulated Foundation Analysis - Website newsletter article 1 070210
Insulated Foundation Analysis - Website newsletter article 1 070210Insulated Foundation Analysis - Website newsletter article 1 070210
Insulated Foundation Analysis - Website newsletter article 1 070210
 
Visual Dictionary final
Visual Dictionary finalVisual Dictionary final
Visual Dictionary final
 
Plasterboard's Visual Dictionary
Plasterboard's Visual DictionaryPlasterboard's Visual Dictionary
Plasterboard's Visual Dictionary
 
Bolster2-Code Requirements to Mortar
Bolster2-Code Requirements to MortarBolster2-Code Requirements to Mortar
Bolster2-Code Requirements to Mortar
 
ProGUARD Insulated Sheathing
ProGUARD Insulated SheathingProGUARD Insulated Sheathing
ProGUARD Insulated Sheathing
 
Visual dictionary
Visual dictionary Visual dictionary
Visual dictionary
 
Visual dictionary GRADE THIS
Visual dictionary GRADE THISVisual dictionary GRADE THIS
Visual dictionary GRADE THIS
 
Visual Dictionary-Blocking
Visual Dictionary-BlockingVisual Dictionary-Blocking
Visual Dictionary-Blocking
 
Infill Construction Guide
Infill Construction GuideInfill Construction Guide
Infill Construction Guide
 
Visual dictionary - Sp10knothole
Visual dictionary - Sp10knotholeVisual dictionary - Sp10knothole
Visual dictionary - Sp10knothole
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Visual Dictionary
Visual DictionaryVisual Dictionary
Visual Dictionary
 
Visual Dictionary Final
Visual Dictionary FinalVisual Dictionary Final
Visual Dictionary Final
 
10-07_Shelter
10-07_Shelter10-07_Shelter
10-07_Shelter
 
Visual Dictionary - sp10cladding
Visual Dictionary - sp10claddingVisual Dictionary - sp10cladding
Visual Dictionary - sp10cladding
 
Grade Sheet 2 3 Visual Dict Bolster
Grade Sheet 2 3 Visual Dict BolsterGrade Sheet 2 3 Visual Dict Bolster
Grade Sheet 2 3 Visual Dict Bolster
 
all sheets
all sheetsall sheets
all sheets
 
Visual Dictionary-Permeance
Visual Dictionary-PermeanceVisual Dictionary-Permeance
Visual Dictionary-Permeance
 

More from laneycollege

Review of green building march 2011
Review of green building march 2011Review of green building march 2011
Review of green building march 2011laneycollege
 
Presentation ieq and health
Presentation ieq and healthPresentation ieq and health
Presentation ieq and healthlaneycollege
 
Laney indoor environmental quality edited version may 2010
Laney indoor environmental quality edited version may 2010Laney indoor environmental quality edited version may 2010
Laney indoor environmental quality edited version may 2010laneycollege
 
From cob to prefab and beyond
From cob to prefab and beyondFrom cob to prefab and beyond
From cob to prefab and beyondlaneycollege
 
Green point rated and green materials
Green point rated and green materialsGreen point rated and green materials
Green point rated and green materialslaneycollege
 
Green building materials laney
Green building materials laneyGreen building materials laney
Green building materials laneylaneycollege
 
Volunteer orientation -grid alternatives
Volunteer orientation -grid alternativesVolunteer orientation -grid alternatives
Volunteer orientation -grid alternativeslaneycollege
 
Blue2 posters 100704c w nyt
  Blue2 posters 100704c w nyt  Blue2 posters 100704c w nyt
Blue2 posters 100704c w nytlaneycollege
 
John loyldsolarssu
John loyldsolarssuJohn loyldsolarssu
John loyldsolarssulaneycollege
 
Ebd sample energy audit report with detailed scope
Ebd sample energy audit report with detailed scopeEbd sample energy audit report with detailed scope
Ebd sample energy audit report with detailed scopelaneycollege
 
Laney lighting pec
Laney lighting pecLaney lighting pec
Laney lighting peclaneycollege
 
Cavallo point sustainability focus short- sonoma state 7-25-09 final
Cavallo point sustainability focus short- sonoma state 7-25-09 finalCavallo point sustainability focus short- sonoma state 7-25-09 final
Cavallo point sustainability focus short- sonoma state 7-25-09 finallaneycollege
 
070305 gamble-project-manual
070305 gamble-project-manual070305 gamble-project-manual
070305 gamble-project-manuallaneycollege
 
Green building codes, programs & rating systems
Green building codes, programs & rating systemsGreen building codes, programs & rating systems
Green building codes, programs & rating systemslaneycollege
 
Climate change and the sustainable built environment
Climate change and the sustainable built environmentClimate change and the sustainable built environment
Climate change and the sustainable built environmentlaneycollege
 
John Lloyd PV solar & LED lighting
John Lloyd PV solar & LED lighting John Lloyd PV solar & LED lighting
John Lloyd PV solar & LED lighting laneycollege
 
Passive solar, passive cooling and daylighting
Passive solar, passive cooling and daylightingPassive solar, passive cooling and daylighting
Passive solar, passive cooling and daylightinglaneycollege
 
Energy the carbon imperative - shorter version revised 3-17-11
Energy  the carbon imperative - shorter version revised 3-17-11Energy  the carbon imperative - shorter version revised 3-17-11
Energy the carbon imperative - shorter version revised 3-17-11laneycollege
 

More from laneycollege (20)

Review of green building march 2011
Review of green building march 2011Review of green building march 2011
Review of green building march 2011
 
Presentation ieq and health
Presentation ieq and healthPresentation ieq and health
Presentation ieq and health
 
Laney indoor environmental quality edited version may 2010
Laney indoor environmental quality edited version may 2010Laney indoor environmental quality edited version may 2010
Laney indoor environmental quality edited version may 2010
 
From cob to prefab and beyond
From cob to prefab and beyondFrom cob to prefab and beyond
From cob to prefab and beyond
 
Green point rated and green materials
Green point rated and green materialsGreen point rated and green materials
Green point rated and green materials
 
Green building materials laney
Green building materials laneyGreen building materials laney
Green building materials laney
 
Volunteer orientation -grid alternatives
Volunteer orientation -grid alternativesVolunteer orientation -grid alternatives
Volunteer orientation -grid alternatives
 
Blue2 posters 100704c w nyt
  Blue2 posters 100704c w nyt  Blue2 posters 100704c w nyt
Blue2 posters 100704c w nyt
 
John loyldsolarssu
John loyldsolarssuJohn loyldsolarssu
John loyldsolarssu
 
Ebd sample energy audit report with detailed scope
Ebd sample energy audit report with detailed scopeEbd sample energy audit report with detailed scope
Ebd sample energy audit report with detailed scope
 
Laney lighting pec
Laney lighting pecLaney lighting pec
Laney lighting pec
 
Building science
Building scienceBuilding science
Building science
 
Cavallo point sustainability focus short- sonoma state 7-25-09 final
Cavallo point sustainability focus short- sonoma state 7-25-09 finalCavallo point sustainability focus short- sonoma state 7-25-09 final
Cavallo point sustainability focus short- sonoma state 7-25-09 final
 
Leed for-homes
Leed for-homesLeed for-homes
Leed for-homes
 
070305 gamble-project-manual
070305 gamble-project-manual070305 gamble-project-manual
070305 gamble-project-manual
 
Green building codes, programs & rating systems
Green building codes, programs & rating systemsGreen building codes, programs & rating systems
Green building codes, programs & rating systems
 
Climate change and the sustainable built environment
Climate change and the sustainable built environmentClimate change and the sustainable built environment
Climate change and the sustainable built environment
 
John Lloyd PV solar & LED lighting
John Lloyd PV solar & LED lighting John Lloyd PV solar & LED lighting
John Lloyd PV solar & LED lighting
 
Passive solar, passive cooling and daylighting
Passive solar, passive cooling and daylightingPassive solar, passive cooling and daylighting
Passive solar, passive cooling and daylighting
 
Energy the carbon imperative - shorter version revised 3-17-11
Energy  the carbon imperative - shorter version revised 3-17-11Energy  the carbon imperative - shorter version revised 3-17-11
Energy the carbon imperative - shorter version revised 3-17-11
 

Recently uploaded

Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 

Recently uploaded (20)

Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 

Passive house slide show

  • 1. Passive HousePt Reyes, CA Terry Nordby, General Contractor James Bill, Architect
  • 2. Subject: friday report 4-30-10   Hi all, This week we completed the second roof foam insulation and plywood skin. Also finished the exterior pink foam to mitigate our thermal bridging of the wall assembly, we completed the roof shingles and  gutters as well as the front entry framing and roof. On the inside we punched our last hole in the exterior plywood/ air seal and stubbed out for all the second wall connections. There were twelve holes in total including water and waste lines, sprinkler, communications, HRV, solar, PV and electrical. For me it was counter intuitive to drill holes in a E ring assembly. The sound of each hole being drilled or cut set my nervous system on fire.  On monday I will finish sealing all the new holes and retest with the blower door to see just how well we sealed up the holes. 
  • 3. Pink side out- roof started.
  • 4.
  • 5.  corner trim and first Hardi Plank siding started. Outlet hole is not in air seal assembly but intentionally infront storage area to prevent puncture in air seal assembly
  • 6. dryer vent raceway. here we used a 4" ABS pipe and fixed it tight and rigidto the framing. Normally one uses a soft and somewhat flexible steel or aluminum exit pipe which would be very hard to seal up at each puncture. Movement of the soft through wall pipe would or could break loose at the seal and leak air as time goes by. Here the intention is to supply a permanent solid conduit for the dryer vent. We have yet to figure out how we are going to attach and or release the dryer vent from this line but we got lots of ideas - TBCthis vent will also get a plywood
  • 7. this vent will also get a plywood shroud around it for air sealing the sheetrock against.
  • 9.  if foam was fun it might look like this.
  • 10.
  • 11. Note how the pink foam sidewall meets the polyiso roof foam overhang so thermal bridging is not broken at corners except for those pesky rafters.
  • 13. Sun First, who are donating their time to CLAM, are installing  the support feet forthe solar thermal (hot water) panels. Each foot gets a roof jack covering with a leg poking out to support the panels
  • 14.  How much extra does it cost to build a passive house?Here James Bill at left, Andy Blake a solar project manager/ consultant (pro-bono) and Dan Smith of Sebastopol Heat and Cool are finishing up a three hour on site meeting to figure out where and how to install the HRV system with the solar thermal and all the other hardware associated with the mechanical system of the house. There is probably a few hundred emails, debates, discussions, meetings and drawings before this meeting to reach a final design. A standard HVAC system might take two to four hours to reach design. Why is that? We have never done this before. It's like building the first car or the first airplane. These are the pioneers of the first passive house.
  • 15. We have never done this before. It's like building the first car or the first airplane. These are the pioneers of the first passive house.