9. Other factors to consider
• Strategic access
• Urban form that would modify the underlying vegetation
(and changes bushfire behaviour)
• Look at decision guidelines at Clause 52.47-3 of the VPPs
Semi Managed
Fuel
9
10. Scary and unfamiliar terminology
Forms of bushfire attack
• Ember attack
• Radiant heat
• Direct flame contact
10
17. • The maps don’t give the answer
• It is not like a flood or native vegetation
• Comparing unlike things
• Subjective judgements about risk acceptance
18. Overcoming our fears?
• Accept the risk exists
• Present information about the bushfire hazard to
decision makers
• Form a judgment on acceptable risk – what is the
residual risk?
Risk Assessment
Acceptable
Not Acceptable
PANEL
19. Practical tools…
• In most peri-urban areas we will be considering
development in areas of:
• lesser risk (direct development)
• some risk (carefully consider and make a risk
judgement)
19
20. Information
Establish context
• Collate information regarding the site and
surrounds:
• Locality and site description (aerials and plans)
• Bushfire hazard information
•
•
•
•
•
•
Bushfire Management Overlay, Bushfire Prone Area mapping
Other Overlays – e.g. Environmental Significance Overlay
Victorian Fire Risk Register rating
Regional Bushfire Planning Assessment
Fire history
Any other relevant information
20
21. Information
Establish context (Cont.)
• Strategic justification
• Why has the location been selected?
• What other lesser risk locations were considered?
If none, why?
• Is there a structure plan (or similar) providing direction?
• Does that strategic plan consider bushfire matters?
• Outline of Proposal
• Conceptual plan
21
22. Information
Qualitative judgement/risk assessment
• For sites where development needs to be carefully
considered, additional information is required:
• Landscape scale assessment
•
•
•
Bushfire behaviour (landscape and local scale)
Access and egress both to the site and within the site
Proximity of the site to a settlement or township area
• Proposed bushfire protection measures
• Other information that may be necessary:
•
•
•
More information on the proposal (vulnerability)
Comments from Integrated Fire Management Planning/
Emergency Management
Vegetation controls/management
22
23. Case Study
•
•
•
•
•
Vegetation, topography and other factors?
What are the likely bushfire risks?
Forms of bushfire attack?
Mitigation measures?
Relationship with other planning objectives/
requirements?
• Residual risk – is it acceptable?
23