Legend Power LEED Performance
Assessment
Prepared For:
Erik Wolfe
Legend Power Systems Inc.
8618 Commerce Court
Burnaby, BC V5A 4N6
Prepared By:
Derek Satnik, P.Eng., LEED® AP
Kyle Anders, MASc
Mindscape Innovations
30 Duke St. W, Suite 702
Kitchener, ON N2H 3W5
www.mi-group.ca
Project No:
LPS-G1001-001
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page i
EXECUTIVE SUMMARY
This report is an assessment of Legend Power‟s performance within the various LEED rating
systems. We are pleased to advise you that for a typical building, Legend Power‟s Harmonizer-
AVR product contributes towards a number of points under each of the following rating systems:
LEED Rating System
LEED Point Threshold Legend
Power
Related Pts
Legend Power
Max. Direct Pt.
ContributionCertified Silver Gold Platinum
2009 NC
40 - 49 50 - 59 60 - 79 ≥80
19 4
2009 NC Schools 19 3
2009 NC Retail 19 4
2009 Canada-NC 19 4
2009 EBOM 18 5
2009 Canada-EBOM 18 5
2009 Core & Shell 21 4
2009 Canada-Core
&Shell
21 4
2008 Healthcare No point thresholds; benchmarking system 15 3
It should be noted that the eligibility of Legend Power in directly contributing points in LEED is
significantly influenced several factors including the proportion of a building‟s energy use
comprised of electricity, a building‟s proximity to the nearest substation and resulting voltage
supply, and the profile of a building‟s electricity end-uses (i.e. lighting type, number of motors,
etc.). Furthermore, to contribute points in LEED for a given project, appropriate documentation
in accordance with the exceptional calculation method in ASHRAE 90.1-2007 G2.5 would have
to be submitted, including assumptions made for both baseline and proposed design, theoretical
or empirical information supporting these assumptions, and specific energy cost savings
achieved. It is recommended that Legend Power more precisely determine the points their
Harmonizer-AVR would earn for different building scenarios and keep an appropriately
comprehensive set of case studies available for sales staff to reference as and when
appropriate.
In addition to the contributions made in the above green rating systems, Legend Power‟s
Harmonizer-AVR has other noteworthy environmental benefits that should be promoted: life
extension benefits for building equipment to reduce maintenance costs and waste, and
reduction in utilities peak demand which increases capacity within the existing generation and
distribution infrastructure. It is recommended that these benefits be expressed as the legitimate
benefits they are, and communicated in targeted and appropriate ways, alongside the benefits
referenced to the specific rating systems above.
Lastly, because of the relationship Mindscape enjoys with www.OntarioGreenSpec.ca, we have
added your product into their listing database online under the category "Energy & Atmosphere"
/ "Power Quality". For additional membership benefits and promotional opportunities at
www.OntarioGreenSpec.ca, please refer to
www.ontariogreenspec.ca/membership_rates_benefits. You may wish to consider promotional
opportunities both there and in other online green databases such as www.greenspec.com.
Please do not hesitate to contact us with any questions.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page ii
TABLE OF CONTENTS
Executive Summary .....................................................................................................................i
List of Tables ............................................................................................................................. iii
1.0 INTRODUCTION..................................................................................................................4
1.1 TERMS DEFINED ...............................................................................................................4
1.2 LEED RATING SYSTEMS....................................................................................................5
1.3 RATING METHODOLOGY ....................................................................................................7
2.0 PRODUCT STUDY FINDINGS & ASSUMPTIONS .....................................................................8
3.0 ASSESSMENT TABLES .......................................................................................................9
3.1 LEED 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS (USGBC)..........................9
3.2 LEED 2009 FOR SCHOOLS: NEW CONSTRUCTION AND MAJOR RENOVATION (USGBC) .........11
3.3 LEED 2009 FOR RETAIL: NEW CONSTRUCTION AND MAJOR RENOVATION (USGBC)................13
3.4 LEED 2009 CANADA-NEW CONSTRUCTION AND MAJOR RENOVATIONS (CAGBC)................15
3.5 LEED 2009 FOR EXISTING BUILDINGS: OPERATIONS & MAINTENANCE (USGBC) ...................17
3.6 LEED 2009 CANADA-EXISTING BUILDINGS: OPERATIONS & MAINTENANCE (CAGBC)..............18
3.7 LEED 2009 CORE & SHELL (USGBC) ................................................................................19
3.8 LEED 2009 CANADA-CORE & SHELL (CAGBC).................................................................21
3.9 LEED FOR HEALTHCARE (USGBC)......................................................................................23
4.0 ADDITIONAL MARKETABLE ENVIRONMENTAL ATTRIBUTES..................................................25
5.0 CONCLUSIONS & RECOMMENDATIONS .............................................................................26
APPENDIX A: ENERGY CREDIT TABLES
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page iii
LIST OF TABLES
Table 1: Standard Evaluation Table ........................................................................................... 7
Table 2: Potential Building Energy Cost Reductions by installing Harmonizer-AVR ................... 8
Table 3: Legend Power in LEED 2009 for New Construction and Major Renovations ................ 9
Table 4: Legend Power in LEED 2009 NCS..............................................................................11
Table 5: Legend Power in LEED 2009 NCR..............................................................................13
Table 6: Legend Power in LEED 2009 Canada-NC...................................................................15
Table 7: Legend Power in LEED 2009 Existing Buildings: Operations and Maintenance ..........17
Table 8: Legend Power in LEED 2009 Canada-Existing Buildings: Operations & Maintenance 18
Table 9: Legend Power in LEED 2009 for Core and Shell.........................................................19
Table 10: Legend Power in LEED 2009 Canada for Core and Shell..........................................21
Table 11: Legend Power in LEED for Healthcare......................................................................23
Table 12: Legend Power LEED Performance Summary............................................................26
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 4
1.0 INTRODUCTION
Thank you for contracting Mindscape Innovations Group Inc. (Mindscape) to assess your
eligibility for points in the various LEED® rating systems. Mindscape is one of Canada‟s leading
professional services firms in the commercial and residential energy ratings market, and is
proud to have played a key role in founding the LEED Canada-Homes (2008) program
especially. We provide consulting and certification services for all LEED Canada programs and
matching US programs: residential and commercial, existing buildings and new. We are most
actively engaged in the LEED for Homes market (low-rise, mid-rise, and high-rise), and are
recognized experts in the LEED rating systems generally, on both sides of the border: US and
Canada.
Legend Power System Inc.‟s (Legend Power) Harmonizer-Automatic Voltage Regulator (AVR)
can play a key role in energy efficient and environmentally responsible design of buildings. The
purpose of this report is to assess the point eligibility of Legend Power‟s products in the LEED
rating systems listed below.
1.1 TERMS DEFINED
Before delving into a point by point assessment of the various rating systems, it is important first
to clarify and define several terms commonly used therein:
USGBC: the United States Green Building Council: an industry body active in the green
building industry which, among other activities, creates and delivers the LEED rating
systems and related programs. The USGBC is the global originator of the LEED
brand, and controls the global intellectual property rights, licensing them out to other
national Green Building Council‟s such as the CaGBC for development in their own
countries.
CaGBC: the Canada Green Building Council: an industry body active in the green
building industry which, among other activities, is a licensee of the USGBC‟s LEED
products, and which creates and delivers LEED rating systems and related
programs in Canada.
LEED: “Leadership in Energy and Environmental Design”: a green building program
designed to quantify the environmental benefit of various green building strategies in
a rating system format, which ultimately includes a certification program that places a
certification label on the constructed building.
LEED Rating System: the LEED program includes several “Rating Systems” which
have been defined for niche markets, such as “LEED for New Construction and
Major Renovations” (LEED NC), or “LEED for Existing Buildings: Operation and
Maintenance” (LEED EB:OM), or “LEED for Homes”. Each rating system has the
same general structure of pre-requisites and credits, and the same general
process of certification, but the technical content will be customized to suit the
intended target market, and the process may include specialized parties relevant
only to that target market (such as home energy raters in the LEED for Homes rating
system).
LEED Points: points are the central measuring stick in LEED rating systems, and are
grouped by common strategies into credits. LEED rating systems will tend to have
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 5
anywhere from 70 to ~130 total points, grouped into anywhere from 35 to 44 credits.
Many credits will offer multiple points for progressively greater achievement on the
same theme, such as increased energy efficiency, increased water efficiency, etc.
LEED Pre-requisite: a single mandatory strategy for sustainability that has been defined
and made measurable. Whereas credits include optional measures that earn
points, pre-requisites are not optional and do not earn points: every LEED certified
building is required to achieve all the pre-requisites in the relevant rating system.
LEED Credit: a single optional strategy for sustainability that has been defined and
made measurable, which may include one or several points, and where increased
points could be earned under the same strategy for increased performance (e.g.: for
increased energy efficiency, increased water efficiency, or some other measure as
defined in the Credit).
LEED Certification: the process used by the USGBC and CaGBC to audit a building‟s
design and to verify its constructed performance. Buildings which meet all the pre-
requisites in the rating system, and which achieve a minimum number of points,
are eligible to be certified at the “Certified”, “Silver”, “Gold”, and “Platinum” levels,
each representing progressively greater achievement within the program. The nature
and number of pre-requisites and the number of points required to meet each
threshold varies with the specific LEED rating system (e.g.: LEED for Homes is
different than LEED NC), but the process of certification is essentially the same in all
LEED programs.
1.2 LEED RATING SYSTEMS
This report will assess the eligibility of Legend Power for points in the following rating systems:
1. LEED 2009 for New Construction and Major Renovations (NC), owned and delivered
by the US Green Building Council (USGBC) in the United States of America (USA) and
internationally where other LEED programs or allied programs are not available – for
construction of new commercial office and institutional buildings, including offices,
institutional buildings (libraries, museums, churches, etc), hotels and residential buildings
of 4 or more habitable stories;
2. LEED 2009 for Schools: New Construction and Major Renovations (NCS), owned
and delivered by the USGBC, for certifying the construction or major renovation of
academic buildings on K-12 school grounds;
3. LEED 2009 for Retail: New Construction and Major Renovations (NCR), owned and
delivered by USGBC, for certifying the construction or major renovation of retail
buildings;
4. LEED 2009 Canada-New Construction and Major Renovations (NC), owned and
delivered by the Canada Green Building Council (CaGBC) in Canada – for construction
of new commercial office and institutional buildings, including offices, institutional
buildings (libraries, museums, churches, etc), hotels and residential buildings of 4 or
more habitable stories;
5. LEED 2009 for Existing Buildings: Operations & Maintenance (EB:O&M), owned
and delivered by the USGBC, for certifying sustainability of ongoing operations of
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 6
existing commercial and institutional buildings, including offices, retail and service
establishments, institutional buildings (libraries, schools, museums, churches, etc.),
hotels and residential buildings of 4 or more habitable stories.
6. LEED 2009 Canada for Existing Buildings: Operations and Maintenance (EB:O&M),
owned and delivered by the CaGBC, for certifying sustainability of ongoing operations of
existing commercial and institutional buildings, including offices, retail and service
establishments, institutional buildings (libraries, schools, museums, churches, etc.),
hotels and residential buildings of 4 or more habitable stories.
7. LEED 2009 for Core & Shell (CS), owned and delivered by the USGBC, for
construction projects in which the developer controls the design and construction of the
entire core and shell base building (i.e. mechanical, electrical, plumbing, and fire
protection systems) but has not control over the design and construction of the tenant fit-
out.
8. LEED 2009 Canada-Core & Shell (CS), owned and delivered by the CaGBC, for
construction projects in which the developer controls the design and construction of the
entire core and shell base building (i.e. mechanical, electrical, plumbing, and fire
protection systems) but has not control over the design and construction of the tenant fit-
out.
9. LEED for Healthcare (HC), owned and delivered by the USGBC, for construction and
operation of buildings that are predominantly institutional occupancies as defined by the
local building code, such as acute care hospitals, where regulatory requirements have
created particular needs.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 7
1.3 RATING METHODOLOGY
Each of the ratings systems will be analyzed in the same way, using the following table:
Table 1: Standard Evaluation Table
[Rating
System] Credit
Total
Available
Points
Relevant Benefit of Legend Power
Product
Potential Legend
Power Point
Contribution
(1) (2) (3) (4)
This report will (1) reference the specific rating system that is being assessed, (2) list the total
number of points which may potentially be affected by Legend Power products under the
various credits defined in the referenced rating systems, (3) briefly explain how the product
fulfills the intent of the referenced credits, and (4) include an opinion of the actual potential
number of points that Legend Power would directly contribute towards earning within the
referenced rating system (which is typically expected to be less than the total points available
for a given credit). The indicated “Potential Legend Power Point Contribution” reflects available
industry standard resources and Mindscape‟s professional experience in our own projects and
is in no way a guarantee of future project performance.
Please note that it is important to understand the difference between claiming that a certain
product will earn points as opposed to claiming that it will contribute towards points. The reality
is that the LEED programs reward buildings, not products, so although your product may
have been a vital contributor towards an earned point, it may not be the only contributor for that
point. For example, if a point is earned by an insulated concrete form product (ICF) for recycled
content in LEED 2009 (NC) under credit MRc2 because there was sufficient recycled content
included in the concrete used on the job, then the ICF product will very likely have contributed
strongly to this point. However, so may the concrete in the foundation and floors, and it may be
true that the ICF portion of the total concrete used was not sufficient to earn a point without also
including the content used in the floors.
It is recommended that Legend Power avoid needing to educate their clients on this sensitivity
by simply stating that you “contribute towards” the points referenced in sections 3.1 through 3.9
below. The added benefit to this approach is that you then have the ability to make seemingly
larger claims which are no less true. For example, although it is true that in LEED 2009 NC (see
Table 3 below) under credit EAc1 you may only earn up to 5.0 points directly, it is equally true
that you are contributing towards the full 19 points that are available under that credit. For
clarity, you cannot claim to have earned points until after the CaGBC‟s auditing consultants
have verified that your product was in fact responsible for the points directly, but you can always
claim to be contributing towards the total number of points available in a given credit. Sample
claims that could be made are included later in this report after each assessment table to offer
further clarity.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 8
2.0 PRODUCT STUDY FINDINGS & ASSUMPTIONS
No energy performance measurements were directly performed by Mindscape for this
assessment. For the purpose of this report, the potential energy savings achieved by Legend
Power‟s Harmonizer-AVR was determined based on previous case studies provided by Legend
Power. Annual electricity cost savings of up to 9% through the installation of the Harmonizer-
AVR has been confirmed by Legend Power for their Il Mercato project1
. Based on this
maximum expected building electricity cost savings of 9% along with national statistics of
building energy consumption expenditures provided by the U.S. Energy Information Agency2
,
Table 2 shows the maximum reductions in overall building energy costs that can be expected
for each building type by installing the Harmonizer-AVR (e.g. for New Commercial, 84%×0.09 =
10% maximum overall energy cost savings).
Table 2: Potential Building Energy Cost Reductions by installing Harmonizer-AVR
Building
Type
Energy Costs From
Electricity Use
Maximum Overall Building
Energy Cost Savings
Applicable LEED
Rating System
New
Commercial
(2000-2003)
84% 7.5%
2009 NC
2009 CS
2009 Canada-NC
2009 Canada-CS
Existing
Commercial
(1920-2003)
77%3
6.9%3
2009 EBOM
2009 Canada-EBOM
Schools 68% 6.1% 2009 NCS
Retail 86% 7.7% 2009 NCR
Healthcare 68%3
6.2%3
2008 HC
1
Case Studies – Other Installations, Legend Power Website, accessed online 2010/05/12 @:
http://www.legendpower.com/case-studies/other-installations
2
Commercial Building Energy Consumption Survey, Energy Information Agency, 2003, Table C2 & C1,
accessed online 2010/05/12 @:
http://www.eia.doe.gov/emeu/cbecs/cbecs2003/detailed_tables_2003/detailed_tables_2003.html#consum
expen03
3
Note: Figures for „Existing Commercial‟ and „Healthcare‟ building types reflect energy use instead of
energy cost, since the LEED EBOM and LEED HC systems award energy use reduction as opposed to
energy cost reduction.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 9
3.0 ASSESSMENT TABLES
3.1 LEED 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS (USGBC)
Table 3: Legend Power in LEED 2009 for New Construction and Major Renovations
LEED 2009 NC Total
Available
Points
Relevant Benefit of Legend Power Product Potential
Legend
Power Point
Contribution
EAp2: Minimum
Energy
Performance
(required) By maximizing voltage optimization and
improving power quality, Legend Power‟s
Harmonizer-AVR reduces a building‟s energy
consumption and peak demand, thus
contributing towards meeting minimum energy
performance improvements of:
OPTION 1: 10% for new buildings or 5% for
major renovations relative to the baseline
building performance (ANSI/ASHRAE/IESNA
Standard 90.1-2007), or
OPTION 2: ASHRAE Advanced Energy Design
Guide for small office buildings/retail
buildings/warehouses and self storage, or
OPTION 3: Advanced Buildings Core
Performance Guide developed by the New
Buildings Institute.
No Points
Available
(NPA)
EAc1: Optimize
Energy
Performance
19 Legend Power‟s Harmonizer-AVR would
contribute towards reducing energy
consumption and peak demand, and would
earn credit based on the percentage reduction
in energy costs of the proposed building
compared to the baseline building (built to
ASHRAE Standard 90.1-2007), as outlined in
OPTION 1 – Whole Building Energy Simulation.
Assuming Legend Power can contribute a
maximum overall energy savings of 7.5% for a
typical new commercial building (see Section
2.0), a potential contribution of 3.8 points can
directly be earned (see Appendix A-Table A.1),
so long as minimum energy performance
requirements for EAp2 were met through other
means.
3.8
Total: 19 Of the 19 total LEED 2009 NC points which
Legend Power contributes towards, it could
directly take credit for up to 3.8 points in a
typical commercial building.
3.8
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 10
Based on the data shown in Table 3 above, Legend Power may confidently claim that it makes
a valuable contribution towards the available and related 19 points in the LEED 2009 NC rating
system, and further that it could directly contribute up to 3.8 points for a typical new commercial
building.
It should be noted that the eligibility of Legend Power in directly contributing points in LEED is
significantly influenced by the following building characteristics:
Proportion of the building‟s energy costs attributed to electricity;
Proximity of building to nearest substation, and corresponding voltage supply;
Building‟s electricity end-use profile (i.e. lighting type, number of motors, etc.).
Furthermore, the Legend Power‟s Harmonizer-AVR represents technology that, to the author‟s
knowledge, is not able to be modeled in current building energy simulation programs.
Therefore, to contribute points for a given LEED project, the exceptional calculation method in
ASHRAE 90.1-2007 G2.5 would have to be employed. This method requires submitting
documentation of energy saving, including:
Assumptions made for both the baseline and proposed design;
Theoretical or empirical information supporting these assumptions;
Specific energy cost savings achieved based on the exceptional calculation.
It is anticipated that the approach taken to comply with this calculation method will require at the
very least documentation from Legend Power‟s initial Measurement and Verification auditing
procedure for the given building, in addition to third-party verification. It is recommended that
Legend Power more precisely determine the points their Harmonizer-AVR would earn for
different building scenarios and keep an appropriately comprehensive set of case studies
available for sales staff to reference as and when appropriate.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 11
3.2 LEED 2009 FOR SCHOOLS: NEW CONSTRUCTION AND MAJOR RENOVATION
(USGBC)
Table 4: Legend Power in LEED 2009 NCS
LEED 2009
NCS
Total
Available
Points
Relevant Benefit of Legend Power Product Potential
Legend
Power Point
Contribution
EAp2: Minimum
Energy
Performance
(required) By maximizing voltage optimization and
improving power quality, Legend Power‟s
Harmonizer-AVR can reduce a building‟s
energy consumption and peak demand,
contributing towards meeting minimum energy
performance improvements of:
OPTION 1: 10% for new buildings or 5% for
major renovations relative to the baseline
building performance (ANSI/ASHRAE/IESNA
Standard 90.1-2007), or
OPTION 2: ASHRAE Advanced Energy Design
Guide for K-12 School Buildings, or
OPTION 3: Advanced Buildings Core
Performance Guide developed by the New
Buildings Institute.
No Points
Available
(NPA)
EAc1: Optimize
Energy
Performance
19 Legend Power‟s Harmonizer-AVR would
contribute towards reducing energy
consumption and peak demand, and would
earn credit based on the percentage reduction
in energy costs of the proposed building
compared to the baseline building (built to
ASHRAE Standard 90.1-2007), as outlined in
OPTION 1 – Whole Building Energy Simulation.
Assuming Legend Power can contribute a
maximum overall energy cost savings of 6.1%
for a typical school building (see Section 2.0), a
potential contribution of 3.1 points can directly
be earned (see Appendix A-Table A.1), so long
as the minimum energy performance
requirements for EAp2 were met through other
means.
3.1
Total: 19 Of the 19 total LEED 2009 NCS points which
Legend Power contributes towards, it would
directly take credit for up to 3.1 points in a
typical school building.
3.1
Based on the data shown in Table 4 above, Legend Power may confidently claim that it makes
a valuable contribution towards the available and related 19 points in the LEED 2009 NCS
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 12
rating system, and further that it could directly contribute up to 3.1 points for a typical school
building.
As discussed in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED
depends on numerous building characteristics, and requires the submission of verification
documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5.
It is recommended that case studies be performed under different project scenarios and made
available to sales personnel.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 13
3.3 LEED 2009 FOR RETAIL: NEW CONSTRUCTION AND MAJOR RENOVATION
(USGBC)
Table 5: Legend Power in LEED 2009 NCR
LEED 2009
NCR
Total
Available
Points
Relevant Benefit of Legend Power Product Potential
Legend
Power Point
Contribution
EAp2: Minimum
Energy
Performance
(required) By maximizing voltage optimization and
improving power quality, Legend Power‟s
Harmonizer-AVR can reduce a building‟s
energy consumption and peak demand,
contributing towards meeting minimum energy
performance improvements of:
OPTION 1: 10% for new buildings or 5% for
major renovations relative to the baseline
building performance (ANSI/ASHRAE/IESNA
Standard 90.1-2007), or
OPTION 2: ASHRAE Advanced Energy Design
Guide for Small Retail Buildings, or
OPTION 3: Advanced Buildings Core
Performance Guide developed by the New
Buildings Institute.
No Points
Available
(NPA)
EAc1: Optimize
Energy
Performance
19 Legend Power‟s Harmonizer-AVR would
contribute towards reducing energy
consumption and peak demand, and would
earn credit based on the percentage reduction
in energy costs of the proposed building
compared to the baseline building (built to
ASHRAE Standard 90.1-2007), as outlined in
OPTION 1 – Whole Building Energy Simulation.
Assuming Legend Power can contribute a
maximum overall energy cost savings of 7.7%
for a typical retail building (see Section 2.0), a
potential contribution of 3.9 points can directly
be earned (see Appendix A-Table A.1), so long
as the minimum energy performance
requirements for EAp2 were met through other
means.
3.9
Total: 19 Of the 19 total LEED 2009 NCR points which
Legend Power contributes towards, it could
directly take credit for up to 3.9 points in a
typical retail building.
3.9
Based on the data shown in Table 5 above, Legend Power may confidently claim that it makes
a valuable contribution towards the available and related 24 points in the LEED 2009 NCR
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 14
rating system, and further that it could directly contribute up to 3.9 points for a typical retail
building.
As discussed in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED
depends on numerous building characteristics, and requires the submission of verification
documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5.
It is recommended that case studies be performed under different project scenarios and made
available to sales personnel.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 15
3.4 LEED 2009 CANADA-NEW CONSTRUCTION AND MAJOR RENOVATIONS
(CAGBC)
Table 6: Legend Power in LEED 2009 Canada-NC
LEED 2009
Canada- NC
Total
Available
Points
Relevant Benefit of Legend Power Product Potential
Legend
Power Point
Contribution
EAp2: Minimum
Energy
Performance
(required) By maximizing voltage optimization and
improving power quality, Legend Power‟s
Harmonizer-AVR can reduce a building‟s
energy consumption and peak demand,
contributing towards meeting minimum energy
performance improvements of:
OPTION 1: reduce design energy consumption
by 25% (new buildings) or 10% (existing
building) relative to consumption of the
reference building designed to the Model
National Energy Code for Buildings 1997
(MNECB), or
OPTION2: reduce design energy cost by 18%
(new building) or meet equivalent energy
performance (existing buildings) relative to
reference building designed to ASHRAE/IESNA
90.1-2007 (without amendments)
No Points
Available
(NPA)
EAc1: Optimize
Energy
Performance
19 Legend Power‟s Harmonizer-AVR would
contribute towards reducing energy
consumption and peak demand, and would
earn credit based on the percentage reduction
in energy costs of the proposed building
compared to the baseline building (built to
ASHRAE Standard 90.1-2007 or MNECB
1997), as outlined in OPTION 1 – Whole
Building Energy Simulation. Assuming Legend
Power can contribute a maximum overall
energy cost savings of 3.8% for a typical
commercial building (see Section 2.0), a
potential contribution of 5.0 points can directly
be earned (see Appendix A-Table A.1), so long
as the minimum energy performance
requirements for EAp2 were met through other
means.
3.8
Total: 19 Of the 19 total LEED 2009 Canada-NC points
which Legend Power contributes towards, it
could directly take credit for up to 3.8 points in
a typical commercial building.
3.8
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 16
Based on the data shown in Table 6 above, Legend Power may confidently claim that its
Harmonizer-AVR product makes valuable contributions towards the available and related 19
points in the LEED 2009 Canada-NC rating system, and further that it could directly contribute
up to 3.8 points for a typical commercial building.
As discussed in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED
depends on numerous building characteristics, and requires the submission of verification
documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5.
It is recommended that case studies be performed under different project scenarios and made
available to sales personnel.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 17
3.5 LEED 2009 FOR EXISTING BUILDINGS: OPERATIONS & MAINTENANCE (USGBC)
Table 7: Legend Power in LEED 2009 Existing Buildings: Operations and Maintenance
LEED 2009
EB:O&M
Credit
Total
Available
Points
Relevant Benefit of Legend Power Product Potential
Legend
Power Point
Contribution
EAp2: Minimum
Energy
Efficiency
Performance
(required) By maximizing voltage optimization and
improving power quality, Legend Power‟s
Harmonizer-AVR can reduce a building‟s
energy consumption and peak demand,
contributing towards a building achieving an
energy performance rating of ≥69 through the
EPA‟s ENERGY STAR Portfolio Manager, or
demonstrating an increase in energy efficiency
of ≥19% versus the national average for similar
building types.
No Points
Available
(NPA)
EAc1: Optimize
Energy
Efficiency
Performance
18 Legend Power‟s Harmonizer-AVR would
contribute towards reducing energy
consumption and peak demand, and would
earn credit based on the percentage reduction
in energy use ≥21% versus the national
median4
, as outlined in CASE 2- OPTION 1.
Assuming Legend Power can contribute a
maximum overall reduction in energy use of
6.9% for a typical existing commercial building
(see Section 2.0), a potential contribution of 4.6
points can directly be earned (see Appendix A-
Table A.2), so long as the minimum energy
performance requirements for EAp2 were met
through other means.
4.6
Total: 18 Of the 18 total LEED 2009 EB:O&M points
which Legend Power contributes towards, it
could directly take credit for up to 4.6 points in
a typical existing commercial building.
4.6
Based on the data shown in Table 7 above, Legend Power may confidently claim that its
Harmonizer-AVR makes valuable contributions towards the available and related 18 points in
the LEED 2009 EB:O&M rating system, and further that it may directly contribute up to 4.6
points for a typical existing commercial building.
As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on
numerous factors, and requires the submission of energy savings verification documentation as
outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended
that case studies be performed under different project scenarios and made available to sales
personnel.
4
As listed in the source energy data provided by the EPA‟s Energy Star Portfolio Manager, accessed on
2010/05/13 @: www.energystar.gov/index.cfm?c=evaluate_performance.bus_portfoliomanager
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 18
3.6 LEED 2009 CANADA-EXISTING BUILDINGS: OPERATIONS & MAINTENANCE
(CAGBC)
Table 8: Legend Power in LEED 2009 Canada-Existing Buildings: Operations & Maintenance
LEED 2009
Canada-
EB:O&M
Credit
Total
Available
Points
Relevant Benefit of Legend Power Product Potential
Legend
Power Point
Contribution
EAp2: Minimum
Energy
Efficiency
Performance
(required) By maximizing voltage optimization and
improving power quality, Legend Power‟s
Harmonizer-AVR can reduce a building‟s
energy consumption and peak demand,
contributing towards a building achieving an
energy performance rating of ≥69 through the
EPA‟s ENERGY STAR Portfolio Manager, or
demonstrating an increase in energy efficiency
of ≥19% versus the national average for similar
building types.
No Points
Available
(NPA)
EAc1.2:
Optimizing
Energy
Performance
18 Legend Power‟s Harmonizer-AVR would
contribute towards reducing energy
consumption and peak demand, and would
earn credit based on the percentage reduction
in energy use ≥21% versus the national
median5
, as outlined in OPTION B. Assuming
Legend Power can contribute a maximum
overall reduction in energy use of 6.9% for a
typical existing commercial building (see
Section 2.0), a potential contribution of 4.6
points can directly be earned (see Appendix A-
Table A.2), so long as the minimum energy
performance requirements for EAp2 were met
through other means.
4.6
Total: 18 Of the 18 total LEED 2009 Canada-EB: O&M
points which Legend Power contributes
towards, it could directly take credit for up to
4.6 points in a typical existing commercial
building.
4.6
Based on the data shown in Table 8 above, Legend Power may confidently claim that its
Harmonizer-AVR makes valuable contributions towards the available and related 18 points in
the LEED 2009 Canada-EB:O&M rating system, and further that it may directly contribute up to
6.1 points for a typical existing commercial building.
As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on
numerous factors, and requires the submission of verification documentation as outlined in the
exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case
studies be performed under different project scenarios and made available to sales personnel.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 19
3.7 LEED 2009 CORE & SHELL (USGBC)
Table 9: Legend Power in LEED 2009 for Core and Shell
LEED 2009 CS
Credit
Total
Available
Points
Relevant Benefit of Legend Power Product Potential
Legend
Power Point
Contribution
EAp2: Minimum
Energy
Performance
(required) By maximizing voltage optimization and
improving power quality, Legend Power‟s
Harmonizer-AVR can reduce a building‟s
energy consumption and peak demand,
contributing towards meeting minimum energy
performance improvements of:
OPTION 1: 10% for new buildings or 5% for
major renovations relative to the baseline
building performance (ANSI/ASHRAE/IESNA
Standard 90.1-2007), or
OPTION 2: ASHRAE Advanced Energy Design
Guide for small office buildings/retail
buildings/warehouses and self storage or
OPTION 3: Advanced Buildings Core
Performance Guide developed by the New
Buildings Institute.
No Points
Available
(NPA)
EAc1: Optimize
Energy
Performance
21 Legend Power‟s Harmonizer-AVR would
contribute towards reducing energy
consumption and peak demand, and would
earn credit based on the percentage reduction
in energy costs of the proposed building
compared to the baseline building (built to
ASHRAE Standard 90.1-2007), as outlined in
OPTION 1 – Whole Building Energy Simulation.
Assuming Legend Power can contribute a
maximum overall energy cost savings of 7.5%
for a typical commercial building (see Section
2.0), a potential contribution of 3.8 points can
directly be earned (see Appendix A-Table A.3),
so long as the minimum energy performance
requirements for EAp2 were met through other
means.
3.8
Total: 21 Of the 21 total LEED 2009 CS points which
Legend Power contributes towards, it could
directly take credit for up to 3.8 points in a
typical residential building.
3.8
5
As listed in the source energy data provided by the EPA‟s Energy Star Portfolio Manager, accessed on
2010/05/13 @: www.energystar.gov/index.cfm?c=evaluate_performance.bus_portfoliomanager
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 20
Based on the data shown in Table 9 above, Legend Power may confidently claim that its
Harmonizer-AVR makes valuable contributions towards the available and related 21 points in
the LEED 2009 CS (USGBC) rating system, and further that it may directly contribute up to 3.8
points for a typical commercial building.
As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on
numerous factors, and requires the submission of verification documentation as outlined in the
exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case
studies be performed under different project scenarios and made available to sales personnel.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 21
3.8 LEED 2009 CANADA-CORE & SHELL (CAGBC)
Table 10: Legend Power in LEED 2009 Canada for Core and Shell
LEED 2009
Canada-CS
Credit
Total
Available
Points
Relevant Benefit of Legend Power Product Potential
Legend
Power Point
Contribution
EAp2: Minimum
Energy
Performance
(required) By maximizing voltage optimization and
improving power quality, Legend Power‟s
Harmonizer-AVR can reduce a building‟s
energy consumption and peak demand,
contributing towards meeting minimum energy
performance improvements of:
OPTION 1: 10% for new buildings or 5% for
major renovations relative to the baseline
building performance (ANSI/ASHRAE/IESNA
Standard 90.1-2007), or
OPTION 2: ASHRAE Advanced Energy Design
Guide for small office buildings/retail
buildings/warehouses and self storage or
OPTION 3: Advanced Buildings Core
Performance Guide developed by the New
Buildings Institute.
No Points
Available
(NPA)
EAc1: Optimize
Energy
Performance
21 Legend Power‟s Harmonizer-AVR would
contribute towards reducing energy
consumption and peak demand, and would
earn credit based on the percentage reduction
in energy costs of the proposed building
compared to the baseline building (built to
ASHRAE Standard 90.1-2007 or MNECB
2007), as outlined in OPTION 1 – Whole
Building Energy Simulation. Assuming Legend
Power can contribute a maximum overall
energy cost savings of 7.5% for a typical
commercial building (see Section 2.0), a
potential contribution of 3.8 points can directly
be earned (see Appendix A-Table A.3), so long
as the minimum energy performance
requirements for EAp2 were met through other
means.
3.8
Total: 21 Of the 21 total LEED 2009 Canada-CS points
which Legend Power contributes towards, it
could directly take credit for up to 3.8 points in
a typical commercial building.
3.8
Based on the data shown in Table 9 above, Legend Power may confidently claim that its
Harmonizer-AVR makes valuable contributions towards the available and related 21 points in
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 22
the LEED 2009 Canada-CS (CaGBC) rating system, and further that it may directly contribute
up to 3.8 points for a typical commercial building.
As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on
numerous factors, and requires the submission of verification documentation as outlined in the
exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case
studies be performed under different project scenarios and made available to sales personnel.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 23
3.9 LEED FOR HEALTHCARE (USGBC)
Table 11: Legend Power in LEED for Healthcare
LEED HC
Credit
Total
Available
Points
Relevant Benefit of Legend Power Product Potential
Legend
Power Point
Contribution
FMp2:
Minimum
Building Energy
Efficiency
Performance
(required) By maximizing voltage optimization and
improving power quality, Legend Power‟s
Harmonizer-AVR can reduce a building‟s
energy consumption and peak demand,
contributing towards meeting minimum energy
performance improvements of:
OPTION 1: Scoring of 69 using the EPA
Energy Star® Portfolio Manager Benchmarking
tool or demonstrating an EUI of 19% above
industry average in kBtu/ft2
/year.
OPTION 2: Facilities with Energy Star score
below 69 (or EUI <19%) shall improve energy
performance by 7% per year on average over
the improvement period until achieving Option
1 criteria.
No Points
Available
(NPA)
FM1:
Optimizing
Energy
Efficiency
Performance
15 Legend Power‟s Harmonizer-AVR would
contribute towards reducing energy
consumption and peak demand, and would
earn credit based on the EPA Energy Star®
score or % reduction in Energy Use Intensity
(EUI) relative to buildings of similar type6
.
Assuming Legend Power can contribute a
maximum overall reduction in energy use of
6.2% for a typical healthcare building (see
Section 2.0), a potential contribution of 3.1
points can directly be earned (see Appendix A-
Table A.4), so long as the minimum energy
performance requirements for FMp2 were met
through other means.
3.1
Total: 15 Of the 15 total LEED for Healthcare points
which Legend Power contributes towards, it
could directly take credit for up to 3.1 points in
a typical healthcare building.
3.1
Based on the data shown in Table 11 above, Legend Power may confidently claim that its
Harmonizer-AVR makes valuable contributions towards the available and related 15 points in
6
As listed in the source energy data provided by the EPA‟s Energy Star Portfolio Manager, accessed on
2010/05/13 @:
http://www.energystar.gov/ia/business/tools_resources/new_bldg_design/2003_CBECSPerformanceTarg
etsTable.pdf
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 24
the LEED for Healthcare (USGBC) rating system, and further that it may directly contribute up to
3.1 points for a typical healthcare building.
As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on
numerous factors, and requires the submission of verification documentation as outlined in the
exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case
studies be performed under different project scenarios and made available to sales personnel.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 25
4.0 ADDITIONAL MARKETABLE ENVIRONMENTAL ATTRIBUTES
Noting that the above rating systems award buildings, and not products, there are often
significant and meaningful benefits offered by product suppliers which are noteworthy, but which
cannot earn points in these building rating systems. In addition to the contributions made in the
above green rating systems, the following attributes of Legend Power‟s Harmonizer-AVR have
noteworthy environmental benefit and should be promoted:
Offers life extension benefits for building equipment by regulating voltage and thus
reducing operating temperatures. This can significantly increase the lifespan of power
and lighting equipment, thus reducing maintenance costs and waste.
10-14% reduction in utilities peak demand7
, therefore increasing capacity within existing
generation and distribution infrastructure
It is recommended that these benefits be expressed as the legitimate benefits they are, and
communicated in targeted and appropriate ways, alongside the benefits referenced to the
specific rating systems above.
7
The Electrical Harmonizer-AVR, Legend Power Systems Inc. – Product Brochure, accessed online
2010/05/12 @: http://www.legendpower.com/downloads/LPSI-ProductBrochure.pdf
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 26
5.0 CONCLUSIONS & RECOMMENDATIONS
The various LEED rating systems recognize top industry leadership in building design and
construction. Regardless of the type of building constructed, Legend Power will contribute
positively towards a more sustainable built environment, and it is recognized in the various
LEED rating systems. A performance summary of the Legend Power in the various LEED
programs outlined in this report is shown below in Table 12.
Table 12: Legend Power LEED Performance Summary
LEED Rating System
LEED Point Threshold Legend
Power
Related Pts
Legend Power
Max. Direct Pt.
ContributionCertified Silver Gold Platinum
2009 NC
40 - 49 50 - 59 60 - 79 ≥80
19 4
2009 NC Schools 19 3
2009 NC Retail 19 4
2009 Canada-NC 19 4
2009 EBOM 18 5
2009 Canada-EBOM 18 5
2009 Core & Shell 21 4
2009 Canada-Core
&Shell
21 4
2008 Healthcare No point thresholds; benchmarking system 15 3
It should be noted that the eligibility of Legend Power in directly contributing points in LEED is
significantly influenced several factors including the proportion of a building‟s energy use
comprised of electricity, the building‟s proximity to the nearest substation and resulting voltage
supply, and the profile of a building‟s electricity end-uses (i.e. lighting type, number of motors,
etc.). Furthermore, to contribute points in LEED for a given project, appropriate documentation
in accordance with the exceptional calculation method in ASHRAE 90.1-2007 G2.5 would have
to be submitted, including assumptions made for both baseline and proposed design, theoretical
or empirical information supporting these assumptions, and specific energy cost savings
achieved. It is recommended that Legend Power more precisely determine the points their
Harmonizer-AVR would earn for different building scenarios and keep an appropriately
comprehensive set of case studies available for sales staff to reference as and when
appropriate.
Because of the relationship Mindscape enjoys with www.OntarioGreenSpec.ca, we have added
your product into their listing database online under the category "Energy & Atmosphere" /
"Power Quality". For additional membership benefits and promotional opportunities at
www.OntarioGreenSpec.ca, please refer to
www.ontariogreenspec.ca/membership_rates_benefits. You may wish to consider promotional
opportunities both there and in other online green databases such as www.greenspec.com.
Legend Power LEED Performance Assessment May 14, 2010
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page A-1
APPENDIX A: ENERGY CREDIT TABLES
Legend Power LEED Performance Assessment May 14, 2010
APPENDIX A: Energy Credit Tables
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page A-1
Table A.1: LEED 2009 NC, LEED 2009 NCS, LEED 2009 NCR, and LEED 2009 Canada-NC energy cost savings
point threshold versus baseline ASHRAE 90.1-2007
≈ 0.5 pts per
1% energy savings
Legend Power LEED Performance Assessment May 14, 2010
APPENDIX A: Energy Credit Tables
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page A-2
Table A.2: LEED 2009 EB:O&M and LEED 2009 Canada-EB:O&M energy performance point threshold
Table A.3: LEED 2009 CS and LEED 2009 Canada -CS energy cost savings point threshold versus baseline
ASHRAE 90.1-2007
≈ 0.67 pts per
1% energy savings
≈ max 0.5 pts per
1% energy savings
Legend Power LEED Performance Assessment May 14, 2010
APPENDIX A: Energy Credit Tables
ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page A-3
Table A.4: LEED 2008 for Healthcare energy performance point threshold
≈ max 0.5 pts per
1% energy savings

Contenu connexe

En vedette

Environmental Law for Road Builders
Environmental Law for Road Builders Environmental Law for Road Builders
Environmental Law for Road Builders DSaxe
 
I2 Argentina Unitech
I2 Argentina UnitechI2 Argentina Unitech
I2 Argentina UnitechUNITECH S.A.
 
Power Pointless How To Make An Amazing Presentation
Power Pointless How To Make An Amazing PresentationPower Pointless How To Make An Amazing Presentation
Power Pointless How To Make An Amazing PresentationJoan Shi
 
Canadian Healthcare Codes and Terminology Standards
Canadian Healthcare Codes and Terminology StandardsCanadian Healthcare Codes and Terminology Standards
Canadian Healthcare Codes and Terminology Standards Intelliware Development Inc.
 
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...Marketing Network marcus evans
 
Quelle gouvernance pour le numérique?
Quelle gouvernance pour le numérique?Quelle gouvernance pour le numérique?
Quelle gouvernance pour le numérique?Antoine Vigneron
 
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...Larry Ajuwon
 
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...Intelliware Development Inc.
 
Add 2009 10
Add 2009 10Add 2009 10
Add 2009 10RUAULT
 
Coding is the new literacy to make a difference in the world
Coding is the new literacy to make a difference in the worldCoding is the new literacy to make a difference in the world
Coding is the new literacy to make a difference in the worldmcd_boulanger
 
Microsoft H1B Violations
Microsoft H1B ViolationsMicrosoft H1B Violations
Microsoft H1B ViolationsH1B
 

En vedette (17)

Environmental Law for Road Builders
Environmental Law for Road Builders Environmental Law for Road Builders
Environmental Law for Road Builders
 
Agile Testing
Agile Testing  Agile Testing
Agile Testing
 
I2 Argentina Unitech
I2 Argentina UnitechI2 Argentina Unitech
I2 Argentina Unitech
 
Power Pointless How To Make An Amazing Presentation
Power Pointless How To Make An Amazing PresentationPower Pointless How To Make An Amazing Presentation
Power Pointless How To Make An Amazing Presentation
 
Canadian Healthcare Codes and Terminology Standards
Canadian Healthcare Codes and Terminology StandardsCanadian Healthcare Codes and Terminology Standards
Canadian Healthcare Codes and Terminology Standards
 
City of deception
City of deceptionCity of deception
City of deception
 
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
A Doctor’s Perspective on the Future Role of Pharmaceutical-Doctor Relationsh...
 
Quelle gouvernance pour le numérique?
Quelle gouvernance pour le numérique?Quelle gouvernance pour le numérique?
Quelle gouvernance pour le numérique?
 
celestica
celesticacelestica
celestica
 
Master of deception (mod)
Master of deception (mod)Master of deception (mod)
Master of deception (mod)
 
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
Clinical development, contract & outsourcing in mena & asia pac webinar-l aju...
 
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
Enterprise Wearables: Wearing Our Parts On Our Sleeves - How Wearable Technol...
 
Add 2009 10
Add 2009 10Add 2009 10
Add 2009 10
 
Coding is the new literacy to make a difference in the world
Coding is the new literacy to make a difference in the worldCoding is the new literacy to make a difference in the world
Coding is the new literacy to make a difference in the world
 
Microsoft H1B Violations
Microsoft H1B ViolationsMicrosoft H1B Violations
Microsoft H1B Violations
 
Proyecto de Protección Ambiental de Bosawas, NIcaragua
Proyecto de Protección Ambiental de Bosawas, NIcaraguaProyecto de Protección Ambiental de Bosawas, NIcaragua
Proyecto de Protección Ambiental de Bosawas, NIcaragua
 
Xerox Corporation Fraud Case
Xerox Corporation Fraud CaseXerox Corporation Fraud Case
Xerox Corporation Fraud Case
 

Similaire à Legend Power Earns Up to 19 LEED Points

FFM - Technical Brief - Migrating Your Data Center to Become Energy Efficient...
FFM - Technical Brief - Migrating Your Data Center to Become Energy Efficient...FFM - Technical Brief - Migrating Your Data Center to Become Energy Efficient...
FFM - Technical Brief - Migrating Your Data Center to Become Energy Efficient...Vince Garr
 
Guidelines cdbus
Guidelines cdbusGuidelines cdbus
Guidelines cdbusMeg Cereno
 
Operations and-maintenance-best-practices
Operations and-maintenance-best-practicesOperations and-maintenance-best-practices
Operations and-maintenance-best-practicesNikhil Nangia
 
Supply Chain Metrics That Matter: The Cash-to-Cash Cycle 30 NOV 2012
Supply Chain Metrics That Matter: The Cash-to-Cash Cycle  30 NOV 2012Supply Chain Metrics That Matter: The Cash-to-Cash Cycle  30 NOV 2012
Supply Chain Metrics That Matter: The Cash-to-Cash Cycle 30 NOV 2012Lora Cecere
 
how to higg environment english
how to higg environment englishhow to higg environment english
how to higg environment englishzubeditufail
 
Creating Value with SAP BusinessObjects Planning and Consolidation, version f...
Creating Value with SAP BusinessObjects Planning and Consolidation, version f...Creating Value with SAP BusinessObjects Planning and Consolidation, version f...
Creating Value with SAP BusinessObjects Planning and Consolidation, version f...dcd2z
 
Role of Alternative Energy Sources: Natural Gas Technology Assessment
Role of Alternative Energy Sources: Natural Gas Technology AssessmentRole of Alternative Energy Sources: Natural Gas Technology Assessment
Role of Alternative Energy Sources: Natural Gas Technology AssessmentMarcellus Drilling News
 
R12 upgrade considerations by product v6.0 1
R12 upgrade considerations by product v6.0 1R12 upgrade considerations by product v6.0 1
R12 upgrade considerations by product v6.0 1Miguel Felicio
 
R12 upgrade considerations by product v6.0 1
R12 upgrade considerations by product v6.0 1R12 upgrade considerations by product v6.0 1
R12 upgrade considerations by product v6.0 1Miguel Felicio
 
AMBOK Guide 2012 Edition
AMBOK Guide 2012 EditionAMBOK Guide 2012 Edition
AMBOK Guide 2012 EditionjensenPMP
 
The Supply Chains To Admire Report for 2021
The Supply Chains To Admire Report for 2021The Supply Chains To Admire Report for 2021
The Supply Chains To Admire Report for 2021Lora Cecere
 
Us gsa (1992) value engineering program guide for design and construction -...
Us gsa (1992)   value engineering program guide for design and construction -...Us gsa (1992)   value engineering program guide for design and construction -...
Us gsa (1992) value engineering program guide for design and construction -...Wan Yusoff Wan Mahmood
 
1.  Describe the rational for constructing a new building to be wa.docx
1.  Describe the rational for constructing a new building to be wa.docx1.  Describe the rational for constructing a new building to be wa.docx
1.  Describe the rational for constructing a new building to be wa.docxgasciognecaren
 
El valor de la migración y Modernizacion a Microsoft azure
El valor de la migración y Modernizacion a Microsoft azureEl valor de la migración y Modernizacion a Microsoft azure
El valor de la migración y Modernizacion a Microsoft azureCade Soluciones
 
GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB
 
United States Building Energy Efficiency Retrofits
United States Building Energy Efficiency RetrofitsUnited States Building Energy Efficiency Retrofits
United States Building Energy Efficiency RetrofitsThe Rockefeller Foundation
 

Similaire à Legend Power Earns Up to 19 LEED Points (20)

Dmmehosp
DmmehospDmmehosp
Dmmehosp
 
FFM - Technical Brief - Migrating Your Data Center to Become Energy Efficient...
FFM - Technical Brief - Migrating Your Data Center to Become Energy Efficient...FFM - Technical Brief - Migrating Your Data Center to Become Energy Efficient...
FFM - Technical Brief - Migrating Your Data Center to Become Energy Efficient...
 
The sustainablesubstationconcept
The sustainablesubstationconceptThe sustainablesubstationconcept
The sustainablesubstationconcept
 
Guidelines cdbus
Guidelines cdbusGuidelines cdbus
Guidelines cdbus
 
Operations and-maintenance-best-practices
Operations and-maintenance-best-practicesOperations and-maintenance-best-practices
Operations and-maintenance-best-practices
 
WEBGUIDE.PDF
WEBGUIDE.PDFWEBGUIDE.PDF
WEBGUIDE.PDF
 
LEED research paper
LEED research paperLEED research paper
LEED research paper
 
Supply Chain Metrics That Matter: The Cash-to-Cash Cycle 30 NOV 2012
Supply Chain Metrics That Matter: The Cash-to-Cash Cycle  30 NOV 2012Supply Chain Metrics That Matter: The Cash-to-Cash Cycle  30 NOV 2012
Supply Chain Metrics That Matter: The Cash-to-Cash Cycle 30 NOV 2012
 
how to higg environment english
how to higg environment englishhow to higg environment english
how to higg environment english
 
Creating Value with SAP BusinessObjects Planning and Consolidation, version f...
Creating Value with SAP BusinessObjects Planning and Consolidation, version f...Creating Value with SAP BusinessObjects Planning and Consolidation, version f...
Creating Value with SAP BusinessObjects Planning and Consolidation, version f...
 
Role of Alternative Energy Sources: Natural Gas Technology Assessment
Role of Alternative Energy Sources: Natural Gas Technology AssessmentRole of Alternative Energy Sources: Natural Gas Technology Assessment
Role of Alternative Energy Sources: Natural Gas Technology Assessment
 
R12 upgrade considerations by product v6.0 1
R12 upgrade considerations by product v6.0 1R12 upgrade considerations by product v6.0 1
R12 upgrade considerations by product v6.0 1
 
R12 upgrade considerations by product v6.0 1
R12 upgrade considerations by product v6.0 1R12 upgrade considerations by product v6.0 1
R12 upgrade considerations by product v6.0 1
 
AMBOK Guide 2012 Edition
AMBOK Guide 2012 EditionAMBOK Guide 2012 Edition
AMBOK Guide 2012 Edition
 
The Supply Chains To Admire Report for 2021
The Supply Chains To Admire Report for 2021The Supply Chains To Admire Report for 2021
The Supply Chains To Admire Report for 2021
 
Us gsa (1992) value engineering program guide for design and construction -...
Us gsa (1992)   value engineering program guide for design and construction -...Us gsa (1992)   value engineering program guide for design and construction -...
Us gsa (1992) value engineering program guide for design and construction -...
 
1.  Describe the rational for constructing a new building to be wa.docx
1.  Describe the rational for constructing a new building to be wa.docx1.  Describe the rational for constructing a new building to be wa.docx
1.  Describe the rational for constructing a new building to be wa.docx
 
El valor de la migración y Modernizacion a Microsoft azure
El valor de la migración y Modernizacion a Microsoft azureEl valor de la migración y Modernizacion a Microsoft azure
El valor de la migración y Modernizacion a Microsoft azure
 
GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing GRESB Greenbuild 2017 PACE Financing
GRESB Greenbuild 2017 PACE Financing
 
United States Building Energy Efficiency Retrofits
United States Building Energy Efficiency RetrofitsUnited States Building Energy Efficiency Retrofits
United States Building Energy Efficiency Retrofits
 

Plus de Legend Power

Legend 2013 agm april 11
Legend 2013 agm april 11Legend 2013 agm april 11
Legend 2013 agm april 11Legend Power
 
Agm presentation 2012
Agm presentation 2012Agm presentation 2012
Agm presentation 2012Legend Power
 
Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%Legend Power
 
Legend Power Technical Brochure
Legend Power Technical BrochureLegend Power Technical Brochure
Legend Power Technical BrochureLegend Power
 
Product Client Presentation
Product Client PresentationProduct Client Presentation
Product Client PresentationLegend Power
 
Power Conservation Technology Integration Webinar
Power Conservation Technology Integration WebinarPower Conservation Technology Integration Webinar
Power Conservation Technology Integration WebinarLegend Power
 

Plus de Legend Power (6)

Legend 2013 agm april 11
Legend 2013 agm april 11Legend 2013 agm april 11
Legend 2013 agm april 11
 
Agm presentation 2012
Agm presentation 2012Agm presentation 2012
Agm presentation 2012
 
Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%Case Study: IKEA Richmond Reduces Power Costs by 5%
Case Study: IKEA Richmond Reduces Power Costs by 5%
 
Legend Power Technical Brochure
Legend Power Technical BrochureLegend Power Technical Brochure
Legend Power Technical Brochure
 
Product Client Presentation
Product Client PresentationProduct Client Presentation
Product Client Presentation
 
Power Conservation Technology Integration Webinar
Power Conservation Technology Integration WebinarPower Conservation Technology Integration Webinar
Power Conservation Technology Integration Webinar
 

Dernier

Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Nikki Chapple
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Kaya Weers
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityIES VE
 

Dernier (20)

Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)Design pattern talk by Kaya Weers - 2024 (v2)
Design pattern talk by Kaya Weers - 2024 (v2)
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Decarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a realityDecarbonising Buildings: Making a net-zero built environment a reality
Decarbonising Buildings: Making a net-zero built environment a reality
 

Legend Power Earns Up to 19 LEED Points

  • 1. Legend Power LEED Performance Assessment Prepared For: Erik Wolfe Legend Power Systems Inc. 8618 Commerce Court Burnaby, BC V5A 4N6 Prepared By: Derek Satnik, P.Eng., LEED® AP Kyle Anders, MASc Mindscape Innovations 30 Duke St. W, Suite 702 Kitchener, ON N2H 3W5 www.mi-group.ca Project No: LPS-G1001-001
  • 2. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page i EXECUTIVE SUMMARY This report is an assessment of Legend Power‟s performance within the various LEED rating systems. We are pleased to advise you that for a typical building, Legend Power‟s Harmonizer- AVR product contributes towards a number of points under each of the following rating systems: LEED Rating System LEED Point Threshold Legend Power Related Pts Legend Power Max. Direct Pt. ContributionCertified Silver Gold Platinum 2009 NC 40 - 49 50 - 59 60 - 79 ≥80 19 4 2009 NC Schools 19 3 2009 NC Retail 19 4 2009 Canada-NC 19 4 2009 EBOM 18 5 2009 Canada-EBOM 18 5 2009 Core & Shell 21 4 2009 Canada-Core &Shell 21 4 2008 Healthcare No point thresholds; benchmarking system 15 3 It should be noted that the eligibility of Legend Power in directly contributing points in LEED is significantly influenced several factors including the proportion of a building‟s energy use comprised of electricity, a building‟s proximity to the nearest substation and resulting voltage supply, and the profile of a building‟s electricity end-uses (i.e. lighting type, number of motors, etc.). Furthermore, to contribute points in LEED for a given project, appropriate documentation in accordance with the exceptional calculation method in ASHRAE 90.1-2007 G2.5 would have to be submitted, including assumptions made for both baseline and proposed design, theoretical or empirical information supporting these assumptions, and specific energy cost savings achieved. It is recommended that Legend Power more precisely determine the points their Harmonizer-AVR would earn for different building scenarios and keep an appropriately comprehensive set of case studies available for sales staff to reference as and when appropriate. In addition to the contributions made in the above green rating systems, Legend Power‟s Harmonizer-AVR has other noteworthy environmental benefits that should be promoted: life extension benefits for building equipment to reduce maintenance costs and waste, and reduction in utilities peak demand which increases capacity within the existing generation and distribution infrastructure. It is recommended that these benefits be expressed as the legitimate benefits they are, and communicated in targeted and appropriate ways, alongside the benefits referenced to the specific rating systems above. Lastly, because of the relationship Mindscape enjoys with www.OntarioGreenSpec.ca, we have added your product into their listing database online under the category "Energy & Atmosphere" / "Power Quality". For additional membership benefits and promotional opportunities at www.OntarioGreenSpec.ca, please refer to www.ontariogreenspec.ca/membership_rates_benefits. You may wish to consider promotional opportunities both there and in other online green databases such as www.greenspec.com. Please do not hesitate to contact us with any questions.
  • 3. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page ii TABLE OF CONTENTS Executive Summary .....................................................................................................................i List of Tables ............................................................................................................................. iii 1.0 INTRODUCTION..................................................................................................................4 1.1 TERMS DEFINED ...............................................................................................................4 1.2 LEED RATING SYSTEMS....................................................................................................5 1.3 RATING METHODOLOGY ....................................................................................................7 2.0 PRODUCT STUDY FINDINGS & ASSUMPTIONS .....................................................................8 3.0 ASSESSMENT TABLES .......................................................................................................9 3.1 LEED 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS (USGBC)..........................9 3.2 LEED 2009 FOR SCHOOLS: NEW CONSTRUCTION AND MAJOR RENOVATION (USGBC) .........11 3.3 LEED 2009 FOR RETAIL: NEW CONSTRUCTION AND MAJOR RENOVATION (USGBC)................13 3.4 LEED 2009 CANADA-NEW CONSTRUCTION AND MAJOR RENOVATIONS (CAGBC)................15 3.5 LEED 2009 FOR EXISTING BUILDINGS: OPERATIONS & MAINTENANCE (USGBC) ...................17 3.6 LEED 2009 CANADA-EXISTING BUILDINGS: OPERATIONS & MAINTENANCE (CAGBC)..............18 3.7 LEED 2009 CORE & SHELL (USGBC) ................................................................................19 3.8 LEED 2009 CANADA-CORE & SHELL (CAGBC).................................................................21 3.9 LEED FOR HEALTHCARE (USGBC)......................................................................................23 4.0 ADDITIONAL MARKETABLE ENVIRONMENTAL ATTRIBUTES..................................................25 5.0 CONCLUSIONS & RECOMMENDATIONS .............................................................................26 APPENDIX A: ENERGY CREDIT TABLES
  • 4. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page iii LIST OF TABLES Table 1: Standard Evaluation Table ........................................................................................... 7 Table 2: Potential Building Energy Cost Reductions by installing Harmonizer-AVR ................... 8 Table 3: Legend Power in LEED 2009 for New Construction and Major Renovations ................ 9 Table 4: Legend Power in LEED 2009 NCS..............................................................................11 Table 5: Legend Power in LEED 2009 NCR..............................................................................13 Table 6: Legend Power in LEED 2009 Canada-NC...................................................................15 Table 7: Legend Power in LEED 2009 Existing Buildings: Operations and Maintenance ..........17 Table 8: Legend Power in LEED 2009 Canada-Existing Buildings: Operations & Maintenance 18 Table 9: Legend Power in LEED 2009 for Core and Shell.........................................................19 Table 10: Legend Power in LEED 2009 Canada for Core and Shell..........................................21 Table 11: Legend Power in LEED for Healthcare......................................................................23 Table 12: Legend Power LEED Performance Summary............................................................26
  • 5. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 4 1.0 INTRODUCTION Thank you for contracting Mindscape Innovations Group Inc. (Mindscape) to assess your eligibility for points in the various LEED® rating systems. Mindscape is one of Canada‟s leading professional services firms in the commercial and residential energy ratings market, and is proud to have played a key role in founding the LEED Canada-Homes (2008) program especially. We provide consulting and certification services for all LEED Canada programs and matching US programs: residential and commercial, existing buildings and new. We are most actively engaged in the LEED for Homes market (low-rise, mid-rise, and high-rise), and are recognized experts in the LEED rating systems generally, on both sides of the border: US and Canada. Legend Power System Inc.‟s (Legend Power) Harmonizer-Automatic Voltage Regulator (AVR) can play a key role in energy efficient and environmentally responsible design of buildings. The purpose of this report is to assess the point eligibility of Legend Power‟s products in the LEED rating systems listed below. 1.1 TERMS DEFINED Before delving into a point by point assessment of the various rating systems, it is important first to clarify and define several terms commonly used therein: USGBC: the United States Green Building Council: an industry body active in the green building industry which, among other activities, creates and delivers the LEED rating systems and related programs. The USGBC is the global originator of the LEED brand, and controls the global intellectual property rights, licensing them out to other national Green Building Council‟s such as the CaGBC for development in their own countries. CaGBC: the Canada Green Building Council: an industry body active in the green building industry which, among other activities, is a licensee of the USGBC‟s LEED products, and which creates and delivers LEED rating systems and related programs in Canada. LEED: “Leadership in Energy and Environmental Design”: a green building program designed to quantify the environmental benefit of various green building strategies in a rating system format, which ultimately includes a certification program that places a certification label on the constructed building. LEED Rating System: the LEED program includes several “Rating Systems” which have been defined for niche markets, such as “LEED for New Construction and Major Renovations” (LEED NC), or “LEED for Existing Buildings: Operation and Maintenance” (LEED EB:OM), or “LEED for Homes”. Each rating system has the same general structure of pre-requisites and credits, and the same general process of certification, but the technical content will be customized to suit the intended target market, and the process may include specialized parties relevant only to that target market (such as home energy raters in the LEED for Homes rating system). LEED Points: points are the central measuring stick in LEED rating systems, and are grouped by common strategies into credits. LEED rating systems will tend to have
  • 6. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 5 anywhere from 70 to ~130 total points, grouped into anywhere from 35 to 44 credits. Many credits will offer multiple points for progressively greater achievement on the same theme, such as increased energy efficiency, increased water efficiency, etc. LEED Pre-requisite: a single mandatory strategy for sustainability that has been defined and made measurable. Whereas credits include optional measures that earn points, pre-requisites are not optional and do not earn points: every LEED certified building is required to achieve all the pre-requisites in the relevant rating system. LEED Credit: a single optional strategy for sustainability that has been defined and made measurable, which may include one or several points, and where increased points could be earned under the same strategy for increased performance (e.g.: for increased energy efficiency, increased water efficiency, or some other measure as defined in the Credit). LEED Certification: the process used by the USGBC and CaGBC to audit a building‟s design and to verify its constructed performance. Buildings which meet all the pre- requisites in the rating system, and which achieve a minimum number of points, are eligible to be certified at the “Certified”, “Silver”, “Gold”, and “Platinum” levels, each representing progressively greater achievement within the program. The nature and number of pre-requisites and the number of points required to meet each threshold varies with the specific LEED rating system (e.g.: LEED for Homes is different than LEED NC), but the process of certification is essentially the same in all LEED programs. 1.2 LEED RATING SYSTEMS This report will assess the eligibility of Legend Power for points in the following rating systems: 1. LEED 2009 for New Construction and Major Renovations (NC), owned and delivered by the US Green Building Council (USGBC) in the United States of America (USA) and internationally where other LEED programs or allied programs are not available – for construction of new commercial office and institutional buildings, including offices, institutional buildings (libraries, museums, churches, etc), hotels and residential buildings of 4 or more habitable stories; 2. LEED 2009 for Schools: New Construction and Major Renovations (NCS), owned and delivered by the USGBC, for certifying the construction or major renovation of academic buildings on K-12 school grounds; 3. LEED 2009 for Retail: New Construction and Major Renovations (NCR), owned and delivered by USGBC, for certifying the construction or major renovation of retail buildings; 4. LEED 2009 Canada-New Construction and Major Renovations (NC), owned and delivered by the Canada Green Building Council (CaGBC) in Canada – for construction of new commercial office and institutional buildings, including offices, institutional buildings (libraries, museums, churches, etc), hotels and residential buildings of 4 or more habitable stories; 5. LEED 2009 for Existing Buildings: Operations & Maintenance (EB:O&M), owned and delivered by the USGBC, for certifying sustainability of ongoing operations of
  • 7. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 6 existing commercial and institutional buildings, including offices, retail and service establishments, institutional buildings (libraries, schools, museums, churches, etc.), hotels and residential buildings of 4 or more habitable stories. 6. LEED 2009 Canada for Existing Buildings: Operations and Maintenance (EB:O&M), owned and delivered by the CaGBC, for certifying sustainability of ongoing operations of existing commercial and institutional buildings, including offices, retail and service establishments, institutional buildings (libraries, schools, museums, churches, etc.), hotels and residential buildings of 4 or more habitable stories. 7. LEED 2009 for Core & Shell (CS), owned and delivered by the USGBC, for construction projects in which the developer controls the design and construction of the entire core and shell base building (i.e. mechanical, electrical, plumbing, and fire protection systems) but has not control over the design and construction of the tenant fit- out. 8. LEED 2009 Canada-Core & Shell (CS), owned and delivered by the CaGBC, for construction projects in which the developer controls the design and construction of the entire core and shell base building (i.e. mechanical, electrical, plumbing, and fire protection systems) but has not control over the design and construction of the tenant fit- out. 9. LEED for Healthcare (HC), owned and delivered by the USGBC, for construction and operation of buildings that are predominantly institutional occupancies as defined by the local building code, such as acute care hospitals, where regulatory requirements have created particular needs.
  • 8. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 7 1.3 RATING METHODOLOGY Each of the ratings systems will be analyzed in the same way, using the following table: Table 1: Standard Evaluation Table [Rating System] Credit Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution (1) (2) (3) (4) This report will (1) reference the specific rating system that is being assessed, (2) list the total number of points which may potentially be affected by Legend Power products under the various credits defined in the referenced rating systems, (3) briefly explain how the product fulfills the intent of the referenced credits, and (4) include an opinion of the actual potential number of points that Legend Power would directly contribute towards earning within the referenced rating system (which is typically expected to be less than the total points available for a given credit). The indicated “Potential Legend Power Point Contribution” reflects available industry standard resources and Mindscape‟s professional experience in our own projects and is in no way a guarantee of future project performance. Please note that it is important to understand the difference between claiming that a certain product will earn points as opposed to claiming that it will contribute towards points. The reality is that the LEED programs reward buildings, not products, so although your product may have been a vital contributor towards an earned point, it may not be the only contributor for that point. For example, if a point is earned by an insulated concrete form product (ICF) for recycled content in LEED 2009 (NC) under credit MRc2 because there was sufficient recycled content included in the concrete used on the job, then the ICF product will very likely have contributed strongly to this point. However, so may the concrete in the foundation and floors, and it may be true that the ICF portion of the total concrete used was not sufficient to earn a point without also including the content used in the floors. It is recommended that Legend Power avoid needing to educate their clients on this sensitivity by simply stating that you “contribute towards” the points referenced in sections 3.1 through 3.9 below. The added benefit to this approach is that you then have the ability to make seemingly larger claims which are no less true. For example, although it is true that in LEED 2009 NC (see Table 3 below) under credit EAc1 you may only earn up to 5.0 points directly, it is equally true that you are contributing towards the full 19 points that are available under that credit. For clarity, you cannot claim to have earned points until after the CaGBC‟s auditing consultants have verified that your product was in fact responsible for the points directly, but you can always claim to be contributing towards the total number of points available in a given credit. Sample claims that could be made are included later in this report after each assessment table to offer further clarity.
  • 9. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 8 2.0 PRODUCT STUDY FINDINGS & ASSUMPTIONS No energy performance measurements were directly performed by Mindscape for this assessment. For the purpose of this report, the potential energy savings achieved by Legend Power‟s Harmonizer-AVR was determined based on previous case studies provided by Legend Power. Annual electricity cost savings of up to 9% through the installation of the Harmonizer- AVR has been confirmed by Legend Power for their Il Mercato project1 . Based on this maximum expected building electricity cost savings of 9% along with national statistics of building energy consumption expenditures provided by the U.S. Energy Information Agency2 , Table 2 shows the maximum reductions in overall building energy costs that can be expected for each building type by installing the Harmonizer-AVR (e.g. for New Commercial, 84%×0.09 = 10% maximum overall energy cost savings). Table 2: Potential Building Energy Cost Reductions by installing Harmonizer-AVR Building Type Energy Costs From Electricity Use Maximum Overall Building Energy Cost Savings Applicable LEED Rating System New Commercial (2000-2003) 84% 7.5% 2009 NC 2009 CS 2009 Canada-NC 2009 Canada-CS Existing Commercial (1920-2003) 77%3 6.9%3 2009 EBOM 2009 Canada-EBOM Schools 68% 6.1% 2009 NCS Retail 86% 7.7% 2009 NCR Healthcare 68%3 6.2%3 2008 HC 1 Case Studies – Other Installations, Legend Power Website, accessed online 2010/05/12 @: http://www.legendpower.com/case-studies/other-installations 2 Commercial Building Energy Consumption Survey, Energy Information Agency, 2003, Table C2 & C1, accessed online 2010/05/12 @: http://www.eia.doe.gov/emeu/cbecs/cbecs2003/detailed_tables_2003/detailed_tables_2003.html#consum expen03 3 Note: Figures for „Existing Commercial‟ and „Healthcare‟ building types reflect energy use instead of energy cost, since the LEED EBOM and LEED HC systems award energy use reduction as opposed to energy cost reduction.
  • 10. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 9 3.0 ASSESSMENT TABLES 3.1 LEED 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS (USGBC) Table 3: Legend Power in LEED 2009 for New Construction and Major Renovations LEED 2009 NC Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution EAp2: Minimum Energy Performance (required) By maximizing voltage optimization and improving power quality, Legend Power‟s Harmonizer-AVR reduces a building‟s energy consumption and peak demand, thus contributing towards meeting minimum energy performance improvements of: OPTION 1: 10% for new buildings or 5% for major renovations relative to the baseline building performance (ANSI/ASHRAE/IESNA Standard 90.1-2007), or OPTION 2: ASHRAE Advanced Energy Design Guide for small office buildings/retail buildings/warehouses and self storage, or OPTION 3: Advanced Buildings Core Performance Guide developed by the New Buildings Institute. No Points Available (NPA) EAc1: Optimize Energy Performance 19 Legend Power‟s Harmonizer-AVR would contribute towards reducing energy consumption and peak demand, and would earn credit based on the percentage reduction in energy costs of the proposed building compared to the baseline building (built to ASHRAE Standard 90.1-2007), as outlined in OPTION 1 – Whole Building Energy Simulation. Assuming Legend Power can contribute a maximum overall energy savings of 7.5% for a typical new commercial building (see Section 2.0), a potential contribution of 3.8 points can directly be earned (see Appendix A-Table A.1), so long as minimum energy performance requirements for EAp2 were met through other means. 3.8 Total: 19 Of the 19 total LEED 2009 NC points which Legend Power contributes towards, it could directly take credit for up to 3.8 points in a typical commercial building. 3.8
  • 11. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 10 Based on the data shown in Table 3 above, Legend Power may confidently claim that it makes a valuable contribution towards the available and related 19 points in the LEED 2009 NC rating system, and further that it could directly contribute up to 3.8 points for a typical new commercial building. It should be noted that the eligibility of Legend Power in directly contributing points in LEED is significantly influenced by the following building characteristics: Proportion of the building‟s energy costs attributed to electricity; Proximity of building to nearest substation, and corresponding voltage supply; Building‟s electricity end-use profile (i.e. lighting type, number of motors, etc.). Furthermore, the Legend Power‟s Harmonizer-AVR represents technology that, to the author‟s knowledge, is not able to be modeled in current building energy simulation programs. Therefore, to contribute points for a given LEED project, the exceptional calculation method in ASHRAE 90.1-2007 G2.5 would have to be employed. This method requires submitting documentation of energy saving, including: Assumptions made for both the baseline and proposed design; Theoretical or empirical information supporting these assumptions; Specific energy cost savings achieved based on the exceptional calculation. It is anticipated that the approach taken to comply with this calculation method will require at the very least documentation from Legend Power‟s initial Measurement and Verification auditing procedure for the given building, in addition to third-party verification. It is recommended that Legend Power more precisely determine the points their Harmonizer-AVR would earn for different building scenarios and keep an appropriately comprehensive set of case studies available for sales staff to reference as and when appropriate.
  • 12. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 11 3.2 LEED 2009 FOR SCHOOLS: NEW CONSTRUCTION AND MAJOR RENOVATION (USGBC) Table 4: Legend Power in LEED 2009 NCS LEED 2009 NCS Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution EAp2: Minimum Energy Performance (required) By maximizing voltage optimization and improving power quality, Legend Power‟s Harmonizer-AVR can reduce a building‟s energy consumption and peak demand, contributing towards meeting minimum energy performance improvements of: OPTION 1: 10% for new buildings or 5% for major renovations relative to the baseline building performance (ANSI/ASHRAE/IESNA Standard 90.1-2007), or OPTION 2: ASHRAE Advanced Energy Design Guide for K-12 School Buildings, or OPTION 3: Advanced Buildings Core Performance Guide developed by the New Buildings Institute. No Points Available (NPA) EAc1: Optimize Energy Performance 19 Legend Power‟s Harmonizer-AVR would contribute towards reducing energy consumption and peak demand, and would earn credit based on the percentage reduction in energy costs of the proposed building compared to the baseline building (built to ASHRAE Standard 90.1-2007), as outlined in OPTION 1 – Whole Building Energy Simulation. Assuming Legend Power can contribute a maximum overall energy cost savings of 6.1% for a typical school building (see Section 2.0), a potential contribution of 3.1 points can directly be earned (see Appendix A-Table A.1), so long as the minimum energy performance requirements for EAp2 were met through other means. 3.1 Total: 19 Of the 19 total LEED 2009 NCS points which Legend Power contributes towards, it would directly take credit for up to 3.1 points in a typical school building. 3.1 Based on the data shown in Table 4 above, Legend Power may confidently claim that it makes a valuable contribution towards the available and related 19 points in the LEED 2009 NCS
  • 13. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 12 rating system, and further that it could directly contribute up to 3.1 points for a typical school building. As discussed in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on numerous building characteristics, and requires the submission of verification documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case studies be performed under different project scenarios and made available to sales personnel.
  • 14. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 13 3.3 LEED 2009 FOR RETAIL: NEW CONSTRUCTION AND MAJOR RENOVATION (USGBC) Table 5: Legend Power in LEED 2009 NCR LEED 2009 NCR Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution EAp2: Minimum Energy Performance (required) By maximizing voltage optimization and improving power quality, Legend Power‟s Harmonizer-AVR can reduce a building‟s energy consumption and peak demand, contributing towards meeting minimum energy performance improvements of: OPTION 1: 10% for new buildings or 5% for major renovations relative to the baseline building performance (ANSI/ASHRAE/IESNA Standard 90.1-2007), or OPTION 2: ASHRAE Advanced Energy Design Guide for Small Retail Buildings, or OPTION 3: Advanced Buildings Core Performance Guide developed by the New Buildings Institute. No Points Available (NPA) EAc1: Optimize Energy Performance 19 Legend Power‟s Harmonizer-AVR would contribute towards reducing energy consumption and peak demand, and would earn credit based on the percentage reduction in energy costs of the proposed building compared to the baseline building (built to ASHRAE Standard 90.1-2007), as outlined in OPTION 1 – Whole Building Energy Simulation. Assuming Legend Power can contribute a maximum overall energy cost savings of 7.7% for a typical retail building (see Section 2.0), a potential contribution of 3.9 points can directly be earned (see Appendix A-Table A.1), so long as the minimum energy performance requirements for EAp2 were met through other means. 3.9 Total: 19 Of the 19 total LEED 2009 NCR points which Legend Power contributes towards, it could directly take credit for up to 3.9 points in a typical retail building. 3.9 Based on the data shown in Table 5 above, Legend Power may confidently claim that it makes a valuable contribution towards the available and related 24 points in the LEED 2009 NCR
  • 15. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 14 rating system, and further that it could directly contribute up to 3.9 points for a typical retail building. As discussed in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on numerous building characteristics, and requires the submission of verification documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case studies be performed under different project scenarios and made available to sales personnel.
  • 16. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 15 3.4 LEED 2009 CANADA-NEW CONSTRUCTION AND MAJOR RENOVATIONS (CAGBC) Table 6: Legend Power in LEED 2009 Canada-NC LEED 2009 Canada- NC Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution EAp2: Minimum Energy Performance (required) By maximizing voltage optimization and improving power quality, Legend Power‟s Harmonizer-AVR can reduce a building‟s energy consumption and peak demand, contributing towards meeting minimum energy performance improvements of: OPTION 1: reduce design energy consumption by 25% (new buildings) or 10% (existing building) relative to consumption of the reference building designed to the Model National Energy Code for Buildings 1997 (MNECB), or OPTION2: reduce design energy cost by 18% (new building) or meet equivalent energy performance (existing buildings) relative to reference building designed to ASHRAE/IESNA 90.1-2007 (without amendments) No Points Available (NPA) EAc1: Optimize Energy Performance 19 Legend Power‟s Harmonizer-AVR would contribute towards reducing energy consumption and peak demand, and would earn credit based on the percentage reduction in energy costs of the proposed building compared to the baseline building (built to ASHRAE Standard 90.1-2007 or MNECB 1997), as outlined in OPTION 1 – Whole Building Energy Simulation. Assuming Legend Power can contribute a maximum overall energy cost savings of 3.8% for a typical commercial building (see Section 2.0), a potential contribution of 5.0 points can directly be earned (see Appendix A-Table A.1), so long as the minimum energy performance requirements for EAp2 were met through other means. 3.8 Total: 19 Of the 19 total LEED 2009 Canada-NC points which Legend Power contributes towards, it could directly take credit for up to 3.8 points in a typical commercial building. 3.8
  • 17. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 16 Based on the data shown in Table 6 above, Legend Power may confidently claim that its Harmonizer-AVR product makes valuable contributions towards the available and related 19 points in the LEED 2009 Canada-NC rating system, and further that it could directly contribute up to 3.8 points for a typical commercial building. As discussed in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on numerous building characteristics, and requires the submission of verification documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case studies be performed under different project scenarios and made available to sales personnel.
  • 18. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 17 3.5 LEED 2009 FOR EXISTING BUILDINGS: OPERATIONS & MAINTENANCE (USGBC) Table 7: Legend Power in LEED 2009 Existing Buildings: Operations and Maintenance LEED 2009 EB:O&M Credit Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution EAp2: Minimum Energy Efficiency Performance (required) By maximizing voltage optimization and improving power quality, Legend Power‟s Harmonizer-AVR can reduce a building‟s energy consumption and peak demand, contributing towards a building achieving an energy performance rating of ≥69 through the EPA‟s ENERGY STAR Portfolio Manager, or demonstrating an increase in energy efficiency of ≥19% versus the national average for similar building types. No Points Available (NPA) EAc1: Optimize Energy Efficiency Performance 18 Legend Power‟s Harmonizer-AVR would contribute towards reducing energy consumption and peak demand, and would earn credit based on the percentage reduction in energy use ≥21% versus the national median4 , as outlined in CASE 2- OPTION 1. Assuming Legend Power can contribute a maximum overall reduction in energy use of 6.9% for a typical existing commercial building (see Section 2.0), a potential contribution of 4.6 points can directly be earned (see Appendix A- Table A.2), so long as the minimum energy performance requirements for EAp2 were met through other means. 4.6 Total: 18 Of the 18 total LEED 2009 EB:O&M points which Legend Power contributes towards, it could directly take credit for up to 4.6 points in a typical existing commercial building. 4.6 Based on the data shown in Table 7 above, Legend Power may confidently claim that its Harmonizer-AVR makes valuable contributions towards the available and related 18 points in the LEED 2009 EB:O&M rating system, and further that it may directly contribute up to 4.6 points for a typical existing commercial building. As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on numerous factors, and requires the submission of energy savings verification documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case studies be performed under different project scenarios and made available to sales personnel. 4 As listed in the source energy data provided by the EPA‟s Energy Star Portfolio Manager, accessed on 2010/05/13 @: www.energystar.gov/index.cfm?c=evaluate_performance.bus_portfoliomanager
  • 19. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 18 3.6 LEED 2009 CANADA-EXISTING BUILDINGS: OPERATIONS & MAINTENANCE (CAGBC) Table 8: Legend Power in LEED 2009 Canada-Existing Buildings: Operations & Maintenance LEED 2009 Canada- EB:O&M Credit Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution EAp2: Minimum Energy Efficiency Performance (required) By maximizing voltage optimization and improving power quality, Legend Power‟s Harmonizer-AVR can reduce a building‟s energy consumption and peak demand, contributing towards a building achieving an energy performance rating of ≥69 through the EPA‟s ENERGY STAR Portfolio Manager, or demonstrating an increase in energy efficiency of ≥19% versus the national average for similar building types. No Points Available (NPA) EAc1.2: Optimizing Energy Performance 18 Legend Power‟s Harmonizer-AVR would contribute towards reducing energy consumption and peak demand, and would earn credit based on the percentage reduction in energy use ≥21% versus the national median5 , as outlined in OPTION B. Assuming Legend Power can contribute a maximum overall reduction in energy use of 6.9% for a typical existing commercial building (see Section 2.0), a potential contribution of 4.6 points can directly be earned (see Appendix A- Table A.2), so long as the minimum energy performance requirements for EAp2 were met through other means. 4.6 Total: 18 Of the 18 total LEED 2009 Canada-EB: O&M points which Legend Power contributes towards, it could directly take credit for up to 4.6 points in a typical existing commercial building. 4.6 Based on the data shown in Table 8 above, Legend Power may confidently claim that its Harmonizer-AVR makes valuable contributions towards the available and related 18 points in the LEED 2009 Canada-EB:O&M rating system, and further that it may directly contribute up to 6.1 points for a typical existing commercial building. As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on numerous factors, and requires the submission of verification documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case studies be performed under different project scenarios and made available to sales personnel.
  • 20. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 19 3.7 LEED 2009 CORE & SHELL (USGBC) Table 9: Legend Power in LEED 2009 for Core and Shell LEED 2009 CS Credit Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution EAp2: Minimum Energy Performance (required) By maximizing voltage optimization and improving power quality, Legend Power‟s Harmonizer-AVR can reduce a building‟s energy consumption and peak demand, contributing towards meeting minimum energy performance improvements of: OPTION 1: 10% for new buildings or 5% for major renovations relative to the baseline building performance (ANSI/ASHRAE/IESNA Standard 90.1-2007), or OPTION 2: ASHRAE Advanced Energy Design Guide for small office buildings/retail buildings/warehouses and self storage or OPTION 3: Advanced Buildings Core Performance Guide developed by the New Buildings Institute. No Points Available (NPA) EAc1: Optimize Energy Performance 21 Legend Power‟s Harmonizer-AVR would contribute towards reducing energy consumption and peak demand, and would earn credit based on the percentage reduction in energy costs of the proposed building compared to the baseline building (built to ASHRAE Standard 90.1-2007), as outlined in OPTION 1 – Whole Building Energy Simulation. Assuming Legend Power can contribute a maximum overall energy cost savings of 7.5% for a typical commercial building (see Section 2.0), a potential contribution of 3.8 points can directly be earned (see Appendix A-Table A.3), so long as the minimum energy performance requirements for EAp2 were met through other means. 3.8 Total: 21 Of the 21 total LEED 2009 CS points which Legend Power contributes towards, it could directly take credit for up to 3.8 points in a typical residential building. 3.8 5 As listed in the source energy data provided by the EPA‟s Energy Star Portfolio Manager, accessed on 2010/05/13 @: www.energystar.gov/index.cfm?c=evaluate_performance.bus_portfoliomanager
  • 21. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 20 Based on the data shown in Table 9 above, Legend Power may confidently claim that its Harmonizer-AVR makes valuable contributions towards the available and related 21 points in the LEED 2009 CS (USGBC) rating system, and further that it may directly contribute up to 3.8 points for a typical commercial building. As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on numerous factors, and requires the submission of verification documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case studies be performed under different project scenarios and made available to sales personnel.
  • 22. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 21 3.8 LEED 2009 CANADA-CORE & SHELL (CAGBC) Table 10: Legend Power in LEED 2009 Canada for Core and Shell LEED 2009 Canada-CS Credit Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution EAp2: Minimum Energy Performance (required) By maximizing voltage optimization and improving power quality, Legend Power‟s Harmonizer-AVR can reduce a building‟s energy consumption and peak demand, contributing towards meeting minimum energy performance improvements of: OPTION 1: 10% for new buildings or 5% for major renovations relative to the baseline building performance (ANSI/ASHRAE/IESNA Standard 90.1-2007), or OPTION 2: ASHRAE Advanced Energy Design Guide for small office buildings/retail buildings/warehouses and self storage or OPTION 3: Advanced Buildings Core Performance Guide developed by the New Buildings Institute. No Points Available (NPA) EAc1: Optimize Energy Performance 21 Legend Power‟s Harmonizer-AVR would contribute towards reducing energy consumption and peak demand, and would earn credit based on the percentage reduction in energy costs of the proposed building compared to the baseline building (built to ASHRAE Standard 90.1-2007 or MNECB 2007), as outlined in OPTION 1 – Whole Building Energy Simulation. Assuming Legend Power can contribute a maximum overall energy cost savings of 7.5% for a typical commercial building (see Section 2.0), a potential contribution of 3.8 points can directly be earned (see Appendix A-Table A.3), so long as the minimum energy performance requirements for EAp2 were met through other means. 3.8 Total: 21 Of the 21 total LEED 2009 Canada-CS points which Legend Power contributes towards, it could directly take credit for up to 3.8 points in a typical commercial building. 3.8 Based on the data shown in Table 9 above, Legend Power may confidently claim that its Harmonizer-AVR makes valuable contributions towards the available and related 21 points in
  • 23. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 22 the LEED 2009 Canada-CS (CaGBC) rating system, and further that it may directly contribute up to 3.8 points for a typical commercial building. As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on numerous factors, and requires the submission of verification documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case studies be performed under different project scenarios and made available to sales personnel.
  • 24. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 23 3.9 LEED FOR HEALTHCARE (USGBC) Table 11: Legend Power in LEED for Healthcare LEED HC Credit Total Available Points Relevant Benefit of Legend Power Product Potential Legend Power Point Contribution FMp2: Minimum Building Energy Efficiency Performance (required) By maximizing voltage optimization and improving power quality, Legend Power‟s Harmonizer-AVR can reduce a building‟s energy consumption and peak demand, contributing towards meeting minimum energy performance improvements of: OPTION 1: Scoring of 69 using the EPA Energy Star® Portfolio Manager Benchmarking tool or demonstrating an EUI of 19% above industry average in kBtu/ft2 /year. OPTION 2: Facilities with Energy Star score below 69 (or EUI <19%) shall improve energy performance by 7% per year on average over the improvement period until achieving Option 1 criteria. No Points Available (NPA) FM1: Optimizing Energy Efficiency Performance 15 Legend Power‟s Harmonizer-AVR would contribute towards reducing energy consumption and peak demand, and would earn credit based on the EPA Energy Star® score or % reduction in Energy Use Intensity (EUI) relative to buildings of similar type6 . Assuming Legend Power can contribute a maximum overall reduction in energy use of 6.2% for a typical healthcare building (see Section 2.0), a potential contribution of 3.1 points can directly be earned (see Appendix A- Table A.4), so long as the minimum energy performance requirements for FMp2 were met through other means. 3.1 Total: 15 Of the 15 total LEED for Healthcare points which Legend Power contributes towards, it could directly take credit for up to 3.1 points in a typical healthcare building. 3.1 Based on the data shown in Table 11 above, Legend Power may confidently claim that its Harmonizer-AVR makes valuable contributions towards the available and related 15 points in 6 As listed in the source energy data provided by the EPA‟s Energy Star Portfolio Manager, accessed on 2010/05/13 @: http://www.energystar.gov/ia/business/tools_resources/new_bldg_design/2003_CBECSPerformanceTarg etsTable.pdf
  • 25. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 24 the LEED for Healthcare (USGBC) rating system, and further that it may directly contribute up to 3.1 points for a typical healthcare building. As in Section 3.1, Legend Power‟s eligibility in directly contributing points in LEED depends on numerous factors, and requires the submission of verification documentation as outlined in the exceptional calculation method in ASHRAE 90.1-2007, G2.5. It is recommended that case studies be performed under different project scenarios and made available to sales personnel.
  • 26. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 25 4.0 ADDITIONAL MARKETABLE ENVIRONMENTAL ATTRIBUTES Noting that the above rating systems award buildings, and not products, there are often significant and meaningful benefits offered by product suppliers which are noteworthy, but which cannot earn points in these building rating systems. In addition to the contributions made in the above green rating systems, the following attributes of Legend Power‟s Harmonizer-AVR have noteworthy environmental benefit and should be promoted: Offers life extension benefits for building equipment by regulating voltage and thus reducing operating temperatures. This can significantly increase the lifespan of power and lighting equipment, thus reducing maintenance costs and waste. 10-14% reduction in utilities peak demand7 , therefore increasing capacity within existing generation and distribution infrastructure It is recommended that these benefits be expressed as the legitimate benefits they are, and communicated in targeted and appropriate ways, alongside the benefits referenced to the specific rating systems above. 7 The Electrical Harmonizer-AVR, Legend Power Systems Inc. – Product Brochure, accessed online 2010/05/12 @: http://www.legendpower.com/downloads/LPSI-ProductBrochure.pdf
  • 27. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page 26 5.0 CONCLUSIONS & RECOMMENDATIONS The various LEED rating systems recognize top industry leadership in building design and construction. Regardless of the type of building constructed, Legend Power will contribute positively towards a more sustainable built environment, and it is recognized in the various LEED rating systems. A performance summary of the Legend Power in the various LEED programs outlined in this report is shown below in Table 12. Table 12: Legend Power LEED Performance Summary LEED Rating System LEED Point Threshold Legend Power Related Pts Legend Power Max. Direct Pt. ContributionCertified Silver Gold Platinum 2009 NC 40 - 49 50 - 59 60 - 79 ≥80 19 4 2009 NC Schools 19 3 2009 NC Retail 19 4 2009 Canada-NC 19 4 2009 EBOM 18 5 2009 Canada-EBOM 18 5 2009 Core & Shell 21 4 2009 Canada-Core &Shell 21 4 2008 Healthcare No point thresholds; benchmarking system 15 3 It should be noted that the eligibility of Legend Power in directly contributing points in LEED is significantly influenced several factors including the proportion of a building‟s energy use comprised of electricity, the building‟s proximity to the nearest substation and resulting voltage supply, and the profile of a building‟s electricity end-uses (i.e. lighting type, number of motors, etc.). Furthermore, to contribute points in LEED for a given project, appropriate documentation in accordance with the exceptional calculation method in ASHRAE 90.1-2007 G2.5 would have to be submitted, including assumptions made for both baseline and proposed design, theoretical or empirical information supporting these assumptions, and specific energy cost savings achieved. It is recommended that Legend Power more precisely determine the points their Harmonizer-AVR would earn for different building scenarios and keep an appropriately comprehensive set of case studies available for sales staff to reference as and when appropriate. Because of the relationship Mindscape enjoys with www.OntarioGreenSpec.ca, we have added your product into their listing database online under the category "Energy & Atmosphere" / "Power Quality". For additional membership benefits and promotional opportunities at www.OntarioGreenSpec.ca, please refer to www.ontariogreenspec.ca/membership_rates_benefits. You may wish to consider promotional opportunities both there and in other online green databases such as www.greenspec.com.
  • 28. Legend Power LEED Performance Assessment May 14, 2010 ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page A-1 APPENDIX A: ENERGY CREDIT TABLES
  • 29. Legend Power LEED Performance Assessment May 14, 2010 APPENDIX A: Energy Credit Tables ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page A-1 Table A.1: LEED 2009 NC, LEED 2009 NCS, LEED 2009 NCR, and LEED 2009 Canada-NC energy cost savings point threshold versus baseline ASHRAE 90.1-2007 ≈ 0.5 pts per 1% energy savings
  • 30. Legend Power LEED Performance Assessment May 14, 2010 APPENDIX A: Energy Credit Tables ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page A-2 Table A.2: LEED 2009 EB:O&M and LEED 2009 Canada-EB:O&M energy performance point threshold Table A.3: LEED 2009 CS and LEED 2009 Canada -CS energy cost savings point threshold versus baseline ASHRAE 90.1-2007 ≈ 0.67 pts per 1% energy savings ≈ max 0.5 pts per 1% energy savings
  • 31. Legend Power LEED Performance Assessment May 14, 2010 APPENDIX A: Energy Credit Tables ka / rpt_LPS-G1001-001_2010-05-13 MINDSCAPE INNOVATIONS Page A-3 Table A.4: LEED 2008 for Healthcare energy performance point threshold ≈ max 0.5 pts per 1% energy savings