N.C. Department of Transportation
   The Construction of I40/I77 Interchange
                August 9, 2012
I-40/ I-77 Need for Project

Very Important Crossroad of North Carolina
Built and opened in Late 1960’s
Has outlived its service life
Current configuration does not meet todays design
guidelines, i.e. weave distances, size of radiuses
Original Traffic Projections were 5000vpd, today the
 traffic on both interstates is about 70,000vpd, this
is projected to be about 110,000vpd in 2035
I-40/I-77 Interchange
         Project to Be Built in Three Phases

A I-40/US 21 Interchange and work along I-40 with
    Ramps from I77 NB to I40 WB and ramp from I-40
     WB to collector Dist.

B The I-40/I77 Interchange Proper

C Peripheral ends of Interstates
I-40/I-77 Interchange
                        Time Lines

I-3819A Let to contract June 19 2012

I-3819B Let to contract March 2016

I-3819C Post Year

R/W is being secured for entire corridor at this time
I-40/I-77 Interchange
                    What is being Built
I-40
Widen to six lanes from NC 115 to Old Mocksville Rd with
collector distributors at 21 (EB and WB)
I-77
Widen to six lanes from South of Broad St. to Jane Sowers
Construct Multi Level Interchange of the two
            Interstates
I-40/I-77 Interchange

                      What is being Built
US 21
Reconstruct from just north of Glenway Dr. to BB&T south
of the interstate with a Double Diverging Interchange at I-40


Broad Steet
Widen from just past Lower Mall Entrance to just
past Cynthia Street
I-40/I-77 Interchange
New Bridge at Radio Rd.

New Bridge Davie Ave.

Broad Street Bridge will be reconstructed

Existing Interchange at Old US 64 will be closed

I-40/Old Mocksville Rd will be upgraded
I-40/I-77 Interchange
          How Much will it cost?


Construction of entire project will cost approx.



          $251,000,000.00
Final Configuration of
         Interchange
    I-40/I-77 Interchange


N
I-3819 A
          What is being Constructed
I-40 WB Collector Distributor
I-40 WB complete to final configuration (Minus one lane)
Reconstruct Radio Rd Bridge
New Bridge over US 21 and 4th Creek
DDI Interchange at I-40 and US 21
I 77 NB ramp to I 40 WB
I 40 WB to I 77 NB and to Collector Dist.
Reconnection to Gaither Rd.
Noise Walls and Retaining Walls
I-40 at Old Movie Theater




       N
I-40/I-77 Initial Interchange




N
I3819 A

                   Time Line and Cost

Construction to begin August 2012

Project Completion Date March 2017

Cost approximately $90 million

Bridges being built to accommodate future projects
I-3819A… US 21 DDI
                   What is DDI
1.DDI  is Double Diverging Interchange
2.Will require traffic to cross over onto opposite
side
3.Eliminated the need for conflicting left turn
movements…thus eliminating conflicts and
congestion
4.Will allow US 21 to flow freely
5.Median Island will prevent left turns out
US 21

Reconstruct US 21 to 4 lanes with a median island

Sidewalks will be constructed on both sides

Median Island from 4th Creek Bridge south thru DDI to the
 south end of construction, this will prevent left turns

Full access will be allowed at Carolina Ave. via a
 signal
Gaither Rd

The two way traffic on the existing interstate ramp will be
 closed off

Gaither will access US 21 via a new Rd from just beside
 the Furniture Store and will intersect US 21 at a Signal at
 Glenway Dr, between Chili’s and Wendy’s.
US 21 Gaither Rd Connection
Noise and Retaining Walls
Both Noise and Retaining Walls will be built:

Retaining Walls will be a combination of MSEs (Segmental
 Precast Units) and Soil Nails with a shotcreate facades.

Noise walls will be precast modules with concrete piles, the
 facade will be a simulated stone masonry pattern on both
 sides.
Noise Walls
Noise Wall Locations:
I-40 Westbound
  Begins directly across from Western Ave. Baptist Church

 (just west of Radio Rd Bridge) and runs to where
 Museum Rd. moves away from I-40

I-40 Eastbound
   Begins at east side of Radio Rd and continues
   down interstate and down ramp at US 21 to
Noise Walls
I-77 Southbound

 Begins just south of Davie Ave and runs southward and
 up ramp to Broad St.

 Begins again at the Creek just south of Broad St and runs
 southward to behind the Catholic Church
I-40/I-77 Interchange
NCDOT will do significant Public Relations
 as the project nears and during the life of
 the project

The project will have its own dedicated
 Website where up to date information
 will be posted
Contact Info
                Contractor
Zachary Construction Corp.
www.zachryconstructioncorp.com
12625 Wetmore Road, Suite 301
 San Antonio, Texas 78347
(210) 871-2700
Contact Info
                  NCDOT
John Cook, Resident Engineer
124 Prison Camp Road
Statesville, NC 28625
Email: jrcook@ncdot.gov
Phone: (704) 876-3543
Questions?
Feel Free to contact any
of the NCDOT Personnel
in attendance tonight.

Contenu connexe

Similaire à The Construction of the I-40/I-77 Interchange August 9, 2012

Jan_2016_US27-SR29-jef.pdf
Jan_2016_US27-SR29-jef.pdfJan_2016_US27-SR29-jef.pdf
Jan_2016_US27-SR29-jef.pdfssuser87d0a41
 
Pharmacy to Kennedy CLC - March 2020
Pharmacy to Kennedy CLC - March 2020Pharmacy to Kennedy CLC - March 2020
Pharmacy to Kennedy CLC - March 2020Crosstown TO
 
NCDOT Master Plan Presentation
NCDOT Master Plan PresentationNCDOT Master Plan Presentation
NCDOT Master Plan PresentationCub Berrian
 
Carrington Street Review
Carrington Street ReviewCarrington Street Review
Carrington Street ReviewSonny Hughey
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingVDOT Northern Virginia
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingCrosstown TO
 
Eglinton - Mt Pleasant CLC - May 11, 2022 compressed.pptx
Eglinton - Mt Pleasant CLC - May 11, 2022 compressed.pptxEglinton - Mt Pleasant CLC - May 11, 2022 compressed.pptx
Eglinton - Mt Pleasant CLC - May 11, 2022 compressed.pptxCrosstown TO
 
Leaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfLeaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfCrosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingCrosstown TO
 
Eglinton & Mount Pleasant CLC - July 13, 2022
Eglinton & Mount Pleasant CLC - July 13, 2022Eglinton & Mount Pleasant CLC - July 13, 2022
Eglinton & Mount Pleasant CLC - July 13, 2022Crosstown TO
 
East At-Grade Town Hall Meeting
East At-Grade Town Hall MeetingEast At-Grade Town Hall Meeting
East At-Grade Town Hall MeetingCrosstown TO
 
MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...Brad Howard
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxCrosstown TO
 
Dulles metro construction update oct 2010
Dulles metro construction update oct 2010Dulles metro construction update oct 2010
Dulles metro construction update oct 2010Brian Block
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020Crosstown TO
 

Similaire à The Construction of the I-40/I-77 Interchange August 9, 2012 (15)

Jan_2016_US27-SR29-jef.pdf
Jan_2016_US27-SR29-jef.pdfJan_2016_US27-SR29-jef.pdf
Jan_2016_US27-SR29-jef.pdf
 
Pharmacy to Kennedy CLC - March 2020
Pharmacy to Kennedy CLC - March 2020Pharmacy to Kennedy CLC - March 2020
Pharmacy to Kennedy CLC - March 2020
 
NCDOT Master Plan Presentation
NCDOT Master Plan PresentationNCDOT Master Plan Presentation
NCDOT Master Plan Presentation
 
Carrington Street Review
Carrington Street ReviewCarrington Street Review
Carrington Street Review
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meeting
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
Eglinton - Mt Pleasant CLC - May 11, 2022 compressed.pptx
Eglinton - Mt Pleasant CLC - May 11, 2022 compressed.pptxEglinton - Mt Pleasant CLC - May 11, 2022 compressed.pptx
Eglinton - Mt Pleasant CLC - May 11, 2022 compressed.pptx
 
Leaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfLeaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdf
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Eglinton & Mount Pleasant CLC - July 13, 2022
Eglinton & Mount Pleasant CLC - July 13, 2022Eglinton & Mount Pleasant CLC - July 13, 2022
Eglinton & Mount Pleasant CLC - July 13, 2022
 
East At-Grade Town Hall Meeting
East At-Grade Town Hall MeetingEast At-Grade Town Hall Meeting
East At-Grade Town Hall Meeting
 
MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
 
Dulles metro construction update oct 2010
Dulles metro construction update oct 2010Dulles metro construction update oct 2010
Dulles metro construction update oct 2010
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
 

Dernier

CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 

Dernier (20)

DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 

The Construction of the I-40/I-77 Interchange August 9, 2012

  • 1. N.C. Department of Transportation The Construction of I40/I77 Interchange August 9, 2012
  • 2. I-40/ I-77 Need for Project Very Important Crossroad of North Carolina Built and opened in Late 1960’s Has outlived its service life Current configuration does not meet todays design guidelines, i.e. weave distances, size of radiuses Original Traffic Projections were 5000vpd, today the traffic on both interstates is about 70,000vpd, this is projected to be about 110,000vpd in 2035
  • 3. I-40/I-77 Interchange Project to Be Built in Three Phases A I-40/US 21 Interchange and work along I-40 with Ramps from I77 NB to I40 WB and ramp from I-40 WB to collector Dist. B The I-40/I77 Interchange Proper C Peripheral ends of Interstates
  • 4. I-40/I-77 Interchange Time Lines I-3819A Let to contract June 19 2012 I-3819B Let to contract March 2016 I-3819C Post Year R/W is being secured for entire corridor at this time
  • 5. I-40/I-77 Interchange What is being Built I-40 Widen to six lanes from NC 115 to Old Mocksville Rd with collector distributors at 21 (EB and WB) I-77 Widen to six lanes from South of Broad St. to Jane Sowers Construct Multi Level Interchange of the two Interstates
  • 6. I-40/I-77 Interchange What is being Built US 21 Reconstruct from just north of Glenway Dr. to BB&T south of the interstate with a Double Diverging Interchange at I-40 Broad Steet Widen from just past Lower Mall Entrance to just past Cynthia Street
  • 7. I-40/I-77 Interchange New Bridge at Radio Rd. New Bridge Davie Ave. Broad Street Bridge will be reconstructed Existing Interchange at Old US 64 will be closed I-40/Old Mocksville Rd will be upgraded
  • 8. I-40/I-77 Interchange How Much will it cost? Construction of entire project will cost approx. $251,000,000.00
  • 9. Final Configuration of Interchange I-40/I-77 Interchange N
  • 10. I-3819 A What is being Constructed I-40 WB Collector Distributor I-40 WB complete to final configuration (Minus one lane) Reconstruct Radio Rd Bridge New Bridge over US 21 and 4th Creek DDI Interchange at I-40 and US 21 I 77 NB ramp to I 40 WB I 40 WB to I 77 NB and to Collector Dist. Reconnection to Gaither Rd. Noise Walls and Retaining Walls
  • 11. I-40 at Old Movie Theater N
  • 13. I3819 A Time Line and Cost Construction to begin August 2012 Project Completion Date March 2017 Cost approximately $90 million Bridges being built to accommodate future projects
  • 14. I-3819A… US 21 DDI What is DDI 1.DDI is Double Diverging Interchange 2.Will require traffic to cross over onto opposite side 3.Eliminated the need for conflicting left turn movements…thus eliminating conflicts and congestion 4.Will allow US 21 to flow freely 5.Median Island will prevent left turns out
  • 15.
  • 16. US 21 Reconstruct US 21 to 4 lanes with a median island Sidewalks will be constructed on both sides Median Island from 4th Creek Bridge south thru DDI to the south end of construction, this will prevent left turns Full access will be allowed at Carolina Ave. via a signal
  • 17. Gaither Rd The two way traffic on the existing interstate ramp will be closed off Gaither will access US 21 via a new Rd from just beside the Furniture Store and will intersect US 21 at a Signal at Glenway Dr, between Chili’s and Wendy’s.
  • 18. US 21 Gaither Rd Connection
  • 19. Noise and Retaining Walls Both Noise and Retaining Walls will be built: Retaining Walls will be a combination of MSEs (Segmental Precast Units) and Soil Nails with a shotcreate facades. Noise walls will be precast modules with concrete piles, the facade will be a simulated stone masonry pattern on both sides.
  • 20. Noise Walls Noise Wall Locations: I-40 Westbound Begins directly across from Western Ave. Baptist Church (just west of Radio Rd Bridge) and runs to where Museum Rd. moves away from I-40 I-40 Eastbound Begins at east side of Radio Rd and continues down interstate and down ramp at US 21 to
  • 21. Noise Walls I-77 Southbound Begins just south of Davie Ave and runs southward and up ramp to Broad St. Begins again at the Creek just south of Broad St and runs southward to behind the Catholic Church
  • 22. I-40/I-77 Interchange NCDOT will do significant Public Relations as the project nears and during the life of the project The project will have its own dedicated Website where up to date information will be posted
  • 23. Contact Info Contractor Zachary Construction Corp. www.zachryconstructioncorp.com 12625 Wetmore Road, Suite 301 San Antonio, Texas 78347 (210) 871-2700
  • 24. Contact Info NCDOT John Cook, Resident Engineer 124 Prison Camp Road Statesville, NC 28625 Email: jrcook@ncdot.gov Phone: (704) 876-3543
  • 25. Questions? Feel Free to contact any of the NCDOT Personnel in attendance tonight.