WHAT IS BRIDGE ??
-WHEN THE WATER WAY IS MORE THAN 6 METER THE CROSS-DRAINAGE
STRUCTURE IS PROVIDED TO CROSS STREAMS AND OTHER BODIES OF WATER
IS CALLED BRIDGE.
-A BRIDGE SHOULD BE DESIGNED TO CARRY IRC STANDARD LOADING WITH
REASONABLE AMOUNT OF SAFETY, AND SHOULD FIT INTO THE SURROUNDING
LANDSCAPE.
Highway Engineering
Bridge and Location of a Bridge
Ideal Location For a Bridge Site
 A straight reach of a river, so that the piers of
the bridge can be located parallel to the direction
of flow.
 There should be steady regime of a river and
absence of serious whirls or cross-currents.
 Availability narrow and well defined channel.
 Absence of a sharp curve e in approaches, so that
Scouring(erosion) and Silting(deposition) action
can be prevented.
Ideal Location For a Bridge Site
 Preferring reasonable
proximity(availability) to the direct
alignment of road to be served .
 Rocky or other compact and non-erodable
bed is preferrable.
Factors affecting selection of Bridge
Site
 Width of a River:- The site at which there is least width of
the river is available is suitable for construction of a
bridge.
 A Straight Approach:- Cross-section of a bridge should be
straight as far as possible, because a straight bridge is far
more stable than a curved bridge.
 River Banks:-
 Velocity of the Flow:- The place where the velocity of the
water flow is min. considering the width of the river is
suitable for bridge cons.
Factors affecting selection of Bridge
Site
 Free Board:-
 Absence of Scouring and Silting:- There
should be no erosion and deposition of the
rock and other materials like sand, silt, gravel,
on either side of the river. This can cause a
failure to the piers of the bridge..
 No confluence of large Tributaries:-
Construction of a bridge should be carried out
at such a site where no large tributaries of
rivers meet.
Data to be collected for location of a
Bridge Site
 Type of soil:- Necessary information about the soil type and its
condition should be collected by the geologist/engineer and should
ensure that the soil bed conforms the I.S. for the particular bridge const.
 Avail. of Electricity:-Ample amount of electricity and its sources and
substitutes should be made available in const. of a bridge site.
 Avail. of Skilled&Unskilledlabours:- Construction of different
components of bridge needs different type of labours in considerable
amount .
 Hydrological Data:- Collection of info. about the Rainfall, Run-off,
Infiltration by soil, Evaporisation, Velocity of flow etc .
 Avail. of Const. Material:- More than ample amount of const. material
should be available at all time.
Data to be collected for location of a
Bridge Site
 Possibility of Navigation Facilities:- Navigation of heavy
machinery should be possible at site.
 Possibility of Earthquake:- A site for bridge const. should be
least prone to earthquake, and necessary data of past EQ should
be collected and acc. to it bridge should be designed.
 Present and Future Traffic Volume:- The width of a carriage
way of bridge should fulfill the traffic requirements of the
present and future conditions of the surrounding areas.
FIELD SURVEY.
Before a highway alignment is finalised in highway project,
the engineering surveys are to be carried out. And these
surveys are carried out in four stages. The first three stages
consider all possible alternate alignment i.e. various
requirements of highway alignment and fourth stage is
meant for detailed survey of the selected alignment.
STAGES OF ENGINEERING SURVEYS.
THE FOUR STAGES OF ENGINEERING
SURVEYS:-
1. Mapstudy
2. Reconnaissance
3. Preliminarysurveys
4. Finallocationanddetailedsurveys
MAP STUDY
It is a kind of study of topographic map of an area,
so as to suggest the possible routes of the road.The
main features like river , hills , valley etc are also
shown in this map. By careful study of such maps , it
is possible to have an idea of several alternate
routes of the road.
Details from the map.
 Alignment avoiding valleys , ponds or lakes.
 In hills , possibility of crossing through a
mountain pass.
 Approximate location of bridge site for
crossing rivers.
 Alternate route with permissible gradient.
RECONNAISSANCE
It is a second stage of surveys and used to examine the
general character of the area for deciding the most feasible
routes for detailed studies. A field surveyor may inspect a
fairly broad stretch of land along the proposed alternative
routes of the map in the field.
OBJECTIVES
 To obtain general knowledge of the entire
territory.
 To obtain specific information of salient
features of the area.
 To collect information about the soil type along
the route.
 To collect information about sources of
construction materials.
PRELIMINARY SURVEY
OBJECTIVES
1. To conduct the survey for alternate alignments propose
after reconnaissance.
2. To compare the different proposals in view of the
requirement of a good alignment.
3. To collect necessary physical information and details of
topography, drainage and soil.
4. To estimate quality of earth work materials.
Procedure of preliminary survey
1. Primary traverse.
The first step in the preliminary survey is to establish the primary
traverse following the line recommended in the reconnaissance.
2. Topographical features.
All geographical and other man made features along the transverse
and for a certain width are surveyed and plotted.
3. Levelling work.
Levelling work is also carried out side by side to give the center line
profiles and typical cross section.
4. Drainage studies and Hydrological data.
Drainage investigations and hydrological data are collected so as to
estimate the type, number and approximate size of cross drainage
structures.
5. SOIL SURVEY
It is an essential part of preliminary survey and by help of this
survey final location is being decided.
6. MATERIAL SURVEY
This survey is done for naturally occurring materials like
stone aggregates and identification of suitable quarries.
7. TRAFFIC SURVEY
This survey is conducted in the region for deciding the
number of traffic lanes and roadway width, pavement
design and economic analysis of highway project.
8. DETERMINATION OF FINAL CENTER LINE
After completing the preliminary survey and conducting the
comparative studies of alternate alignments the final
center line of the road is to be decided before the final
location survey.
FINAL LOCATION AND DETAILED SURVEY
The alignment finalised after the preliminary survey then detailed
survey is carried out for the preparation of plans and construction
details.
The location survey is carried out in two stages;
1. On paper location
2. Field location
1. On paper location.
The final route is put on the drawings and details such as gradient
, radius of curves etc are marked clearly.
2. Field location
On paper location is transferred to the field within help of transit
theodolite and precise level.
DETAILED SURVEY
 Temporary bench marks are fixed at the at the interval
of 250m.
 Vertical alignment , earth work and drainage details
are worked out from level notes.
 A detailed soil survey is carried out and soil profile is
established.
 Work on all rivers and valley are surveyed in detail up
to considerable distance on either sides.
DRAWING REQUIRED FOR HIGHWAY
PROJECT
 IN A HIGHWAY PROJECT,THE FOLLING
DRAWING ARE REQUIRED:-
 KEY PLAN
 INDEX MAP
 PRELIMINARY SURVEY PLANS
 DETAILED PALNS
 LONGITUDINAL SECTION
 CROSS SECTION
 LAND ACQUISITION PLANS
 DEAWING OF ROAD INTERSECTION
KEY MAP
 It shows how actually the project has to be
done
 Map showing proposed and existing roads
 Importatant places to be connected
 Size of the map should not exceed
240x330mm(A4 size)
 Scale should be chosen depending upon the
area
INDEX MAP
 It shows how actully the highway project
looks like
 It shows the general topography of the area
 Details are symbolically represented
 Size of the map should not exceed
240x330mm(A4 size)
 The usual scale is 1cm=0.5km
PRELIMINARY SURVEY PLANS
 It shows the details of various alternative
alignments
 It shows all the information collected during
preliminaery survey
 Its size from 240x330mm(A4 size) to
880x1230mm(A0).
 Scale 10cm=1km
DETAILED PALNS
 It shows the ground plan with alignment and
boundaries,countour at interval 1 to 2 m in
plain country and 3 to 6 m in hilly areas.
 Size of the drawing may b 625x880 mm
 It should also the existing structures ,rivers
,physical features ,etc.
LONGITUDINAL SECTION
 The Longitudinal section(L-section) should be
drawn to a horizontal scale of 1:2000 and a
vertical scale of 1:2000
 The levels should be taken at 50m intervals for
plain and rolling terrain and at 25m interval for
hilly terrain.
 The L-section should have information like
chainages ,horizontal and vertical alignment
,datum level ,ground level ,formation level
,depth of cutting ,height of filling ,posiotion of
cross-roads etc
CROSS-SECTION
 It should be drawn at to nstural scale of 1cm=2-
2.5 m
 It should be drawn in every 100m or where
abrupt changes in level
 It should include cross-section number,the
reduced distances and the area of cutting and
filling.
 In hill roads cross section should be drawn at
closer intervals.
LAND ACQUISITION PLANS
 It shows the land acquisition details.
 Generl details like building, wells, nature of
gradients and others details required for
assessing the values.
 The scale adpoted may b 1cm=40m or less.
 Drawing of road intersections should be
prepared showing all details of pavement ,
islands etc.

More Related Content

What's hot

Highway drainage
 Highway drainage Highway drainage
Highway drainageRaju Bhele
 
Site distance in highway engineering
Site distance in highway engineeringSite distance in highway engineering
Site distance in highway engineeringtirath prajapati
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Basics of Transportation Engineering
Basics of Transportation EngineeringBasics of Transportation Engineering
Basics of Transportation Engineeringkajol panchal
 
History of roads
History of roadsHistory of roads
History of roadskarthick s
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
project final year civil
project final year civilproject final year civil
project final year civilAlankar jaiswal
 
Classification of Roads and Road patterns
Classification of Roads and Road patternsClassification of Roads and Road patterns
Classification of Roads and Road patternsRAMPRASAD KUMAWAT
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highwayPratikShinde113
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackMani Vel
 
GEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAYGEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAYreemajadwani
 
Setting out of bridges unit 6
Setting out of bridges unit 6Setting out of bridges unit 6
Setting out of bridges unit 6SachinGunjal7
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringLatif Hyder Wadho
 
Module 1(highway planning and scope of highway engineering)
Module 1(highway planning and scope of highway engineering)Module 1(highway planning and scope of highway engineering)
Module 1(highway planning and scope of highway engineering)Pankti Jethi
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfTVijayaGowri
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stressesMani Vel
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenenceGhanashyam Prajapati
 

What's hot (20)

Highway planning
Highway planningHighway planning
Highway planning
 
Highway drainage
 Highway drainage Highway drainage
Highway drainage
 
Site distance in highway engineering
Site distance in highway engineeringSite distance in highway engineering
Site distance in highway engineering
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Basics of Transportation Engineering
Basics of Transportation EngineeringBasics of Transportation Engineering
Basics of Transportation Engineering
 
History of roads
History of roadsHistory of roads
History of roads
 
Superelevation
SuperelevationSuperelevation
Superelevation
 
Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
project final year civil
project final year civilproject final year civil
project final year civil
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Classification of Roads and Road patterns
Classification of Roads and Road patternsClassification of Roads and Road patterns
Classification of Roads and Road patterns
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highway
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
 
GEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAYGEOMETRIC DESIGN OF HIGHWAY
GEOMETRIC DESIGN OF HIGHWAY
 
Setting out of bridges unit 6
Setting out of bridges unit 6Setting out of bridges unit 6
Setting out of bridges unit 6
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
 
Module 1(highway planning and scope of highway engineering)
Module 1(highway planning and scope of highway engineering)Module 1(highway planning and scope of highway engineering)
Module 1(highway planning and scope of highway engineering)
 
Fittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdfFittings and Fastenings of Rails.pdf
Fittings and Fastenings of Rails.pdf
 
5.track or permanent way and track stresses
5.track or permanent way and track stresses5.track or permanent way and track stresses
5.track or permanent way and track stresses
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 

Similar to Highway presentation

hillroads-200131051526.pptx
hillroads-200131051526.pptxhillroads-200131051526.pptx
hillroads-200131051526.pptxDESHANTAGGARWAL1
 
Location survey for the Rural and urban areas
Location survey for the Rural and urban areasLocation survey for the Rural and urban areas
Location survey for the Rural and urban areasRana Ibrahim
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 Sachin PatiL
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGRNRANGANATH
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfDhananjayM13
 
2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptxnatan82253
 
Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)lltdayar
 
Terrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse PlanningTerrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse Planningpankaj kumar
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentIRJET Journal
 
Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...GauravGautam344043
 
Canal Surveying.pdf
Canal Surveying.pdfCanal Surveying.pdf
Canal Surveying.pdfBivaYadav3
 
Chapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaaChapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaaBashaFayissa1
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveyingMir Zafarullah
 

Similar to Highway presentation (20)

Geological investigations for highways
Geological investigations for highwaysGeological investigations for highways
Geological investigations for highways
 
Lecture 7
Lecture 7Lecture 7
Lecture 7
 
Hill roads
Hill roadsHill roads
Hill roads
 
hillroads-200131051526.pptx
hillroads-200131051526.pptxhillroads-200131051526.pptx
hillroads-200131051526.pptx
 
Location survey for the Rural and urban areas
Location survey for the Rural and urban areasLocation survey for the Rural and urban areas
Location survey for the Rural and urban areas
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3
 
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNINGUnit 1:- HIGHWAY DEVELOPMENT AND PLANNING
Unit 1:- HIGHWAY DEVELOPMENT AND PLANNING
 
Module 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdfModule 1 Highway Engg (1).pdf
Module 1 Highway Engg (1).pdf
 
2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx2 - Route Surveys and Location.pptx
2 - Route Surveys and Location.pptx
 
Highway Alignment
Highway AlignmentHighway Alignment
Highway Alignment
 
Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)Minor project bridge report( aka survey camp)
Minor project bridge report( aka survey camp)
 
Terrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse PlanningTerrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse Planning
 
Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
Unit 5
Unit 5Unit 5
Unit 5
 
Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...Important of soil survey and selection of suitable dam site-topography/geolog...
Important of soil survey and selection of suitable dam site-topography/geolog...
 
Aen 203
Aen 203Aen 203
Aen 203
 
Canal Surveying.pdf
Canal Surveying.pdfCanal Surveying.pdf
Canal Surveying.pdf
 
Chapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaaChapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaa
 
Dam engineering i 3
Dam engineering i 3Dam engineering i 3
Dam engineering i 3
 
Introduction to surveying
Introduction to surveyingIntroduction to surveying
Introduction to surveying
 

Recently uploaded

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 

Recently uploaded (20)

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 

Highway presentation

  • 1. WHAT IS BRIDGE ?? -WHEN THE WATER WAY IS MORE THAN 6 METER THE CROSS-DRAINAGE STRUCTURE IS PROVIDED TO CROSS STREAMS AND OTHER BODIES OF WATER IS CALLED BRIDGE. -A BRIDGE SHOULD BE DESIGNED TO CARRY IRC STANDARD LOADING WITH REASONABLE AMOUNT OF SAFETY, AND SHOULD FIT INTO THE SURROUNDING LANDSCAPE. Highway Engineering Bridge and Location of a Bridge
  • 2. Ideal Location For a Bridge Site  A straight reach of a river, so that the piers of the bridge can be located parallel to the direction of flow.  There should be steady regime of a river and absence of serious whirls or cross-currents.  Availability narrow and well defined channel.  Absence of a sharp curve e in approaches, so that Scouring(erosion) and Silting(deposition) action can be prevented.
  • 3. Ideal Location For a Bridge Site  Preferring reasonable proximity(availability) to the direct alignment of road to be served .  Rocky or other compact and non-erodable bed is preferrable.
  • 4. Factors affecting selection of Bridge Site  Width of a River:- The site at which there is least width of the river is available is suitable for construction of a bridge.  A Straight Approach:- Cross-section of a bridge should be straight as far as possible, because a straight bridge is far more stable than a curved bridge.  River Banks:-  Velocity of the Flow:- The place where the velocity of the water flow is min. considering the width of the river is suitable for bridge cons.
  • 5. Factors affecting selection of Bridge Site  Free Board:-  Absence of Scouring and Silting:- There should be no erosion and deposition of the rock and other materials like sand, silt, gravel, on either side of the river. This can cause a failure to the piers of the bridge..  No confluence of large Tributaries:- Construction of a bridge should be carried out at such a site where no large tributaries of rivers meet.
  • 6. Data to be collected for location of a Bridge Site  Type of soil:- Necessary information about the soil type and its condition should be collected by the geologist/engineer and should ensure that the soil bed conforms the I.S. for the particular bridge const.  Avail. of Electricity:-Ample amount of electricity and its sources and substitutes should be made available in const. of a bridge site.  Avail. of Skilled&Unskilledlabours:- Construction of different components of bridge needs different type of labours in considerable amount .  Hydrological Data:- Collection of info. about the Rainfall, Run-off, Infiltration by soil, Evaporisation, Velocity of flow etc .  Avail. of Const. Material:- More than ample amount of const. material should be available at all time.
  • 7. Data to be collected for location of a Bridge Site  Possibility of Navigation Facilities:- Navigation of heavy machinery should be possible at site.  Possibility of Earthquake:- A site for bridge const. should be least prone to earthquake, and necessary data of past EQ should be collected and acc. to it bridge should be designed.  Present and Future Traffic Volume:- The width of a carriage way of bridge should fulfill the traffic requirements of the present and future conditions of the surrounding areas.
  • 8.
  • 9. FIELD SURVEY. Before a highway alignment is finalised in highway project, the engineering surveys are to be carried out. And these surveys are carried out in four stages. The first three stages consider all possible alternate alignment i.e. various requirements of highway alignment and fourth stage is meant for detailed survey of the selected alignment.
  • 10. STAGES OF ENGINEERING SURVEYS. THE FOUR STAGES OF ENGINEERING SURVEYS:- 1. Mapstudy 2. Reconnaissance 3. Preliminarysurveys 4. Finallocationanddetailedsurveys
  • 11. MAP STUDY It is a kind of study of topographic map of an area, so as to suggest the possible routes of the road.The main features like river , hills , valley etc are also shown in this map. By careful study of such maps , it is possible to have an idea of several alternate routes of the road.
  • 12. Details from the map.  Alignment avoiding valleys , ponds or lakes.  In hills , possibility of crossing through a mountain pass.  Approximate location of bridge site for crossing rivers.  Alternate route with permissible gradient.
  • 13. RECONNAISSANCE It is a second stage of surveys and used to examine the general character of the area for deciding the most feasible routes for detailed studies. A field surveyor may inspect a fairly broad stretch of land along the proposed alternative routes of the map in the field.
  • 14. OBJECTIVES  To obtain general knowledge of the entire territory.  To obtain specific information of salient features of the area.  To collect information about the soil type along the route.  To collect information about sources of construction materials.
  • 15. PRELIMINARY SURVEY OBJECTIVES 1. To conduct the survey for alternate alignments propose after reconnaissance. 2. To compare the different proposals in view of the requirement of a good alignment. 3. To collect necessary physical information and details of topography, drainage and soil. 4. To estimate quality of earth work materials.
  • 16. Procedure of preliminary survey 1. Primary traverse. The first step in the preliminary survey is to establish the primary traverse following the line recommended in the reconnaissance. 2. Topographical features. All geographical and other man made features along the transverse and for a certain width are surveyed and plotted. 3. Levelling work. Levelling work is also carried out side by side to give the center line profiles and typical cross section. 4. Drainage studies and Hydrological data. Drainage investigations and hydrological data are collected so as to estimate the type, number and approximate size of cross drainage structures.
  • 17. 5. SOIL SURVEY It is an essential part of preliminary survey and by help of this survey final location is being decided. 6. MATERIAL SURVEY This survey is done for naturally occurring materials like stone aggregates and identification of suitable quarries. 7. TRAFFIC SURVEY This survey is conducted in the region for deciding the number of traffic lanes and roadway width, pavement design and economic analysis of highway project. 8. DETERMINATION OF FINAL CENTER LINE After completing the preliminary survey and conducting the comparative studies of alternate alignments the final center line of the road is to be decided before the final location survey.
  • 18. FINAL LOCATION AND DETAILED SURVEY The alignment finalised after the preliminary survey then detailed survey is carried out for the preparation of plans and construction details. The location survey is carried out in two stages; 1. On paper location 2. Field location 1. On paper location. The final route is put on the drawings and details such as gradient , radius of curves etc are marked clearly. 2. Field location On paper location is transferred to the field within help of transit theodolite and precise level.
  • 19. DETAILED SURVEY  Temporary bench marks are fixed at the at the interval of 250m.  Vertical alignment , earth work and drainage details are worked out from level notes.  A detailed soil survey is carried out and soil profile is established.  Work on all rivers and valley are surveyed in detail up to considerable distance on either sides.
  • 20. DRAWING REQUIRED FOR HIGHWAY PROJECT  IN A HIGHWAY PROJECT,THE FOLLING DRAWING ARE REQUIRED:-  KEY PLAN  INDEX MAP  PRELIMINARY SURVEY PLANS  DETAILED PALNS  LONGITUDINAL SECTION  CROSS SECTION  LAND ACQUISITION PLANS  DEAWING OF ROAD INTERSECTION
  • 21. KEY MAP  It shows how actually the project has to be done  Map showing proposed and existing roads  Importatant places to be connected  Size of the map should not exceed 240x330mm(A4 size)  Scale should be chosen depending upon the area
  • 22. INDEX MAP  It shows how actully the highway project looks like  It shows the general topography of the area  Details are symbolically represented  Size of the map should not exceed 240x330mm(A4 size)  The usual scale is 1cm=0.5km
  • 23. PRELIMINARY SURVEY PLANS  It shows the details of various alternative alignments  It shows all the information collected during preliminaery survey  Its size from 240x330mm(A4 size) to 880x1230mm(A0).  Scale 10cm=1km
  • 24. DETAILED PALNS  It shows the ground plan with alignment and boundaries,countour at interval 1 to 2 m in plain country and 3 to 6 m in hilly areas.  Size of the drawing may b 625x880 mm  It should also the existing structures ,rivers ,physical features ,etc.
  • 25. LONGITUDINAL SECTION  The Longitudinal section(L-section) should be drawn to a horizontal scale of 1:2000 and a vertical scale of 1:2000  The levels should be taken at 50m intervals for plain and rolling terrain and at 25m interval for hilly terrain.  The L-section should have information like chainages ,horizontal and vertical alignment ,datum level ,ground level ,formation level ,depth of cutting ,height of filling ,posiotion of cross-roads etc
  • 26. CROSS-SECTION  It should be drawn at to nstural scale of 1cm=2- 2.5 m  It should be drawn in every 100m or where abrupt changes in level  It should include cross-section number,the reduced distances and the area of cutting and filling.  In hill roads cross section should be drawn at closer intervals.
  • 27. LAND ACQUISITION PLANS  It shows the land acquisition details.  Generl details like building, wells, nature of gradients and others details required for assessing the values.  The scale adpoted may b 1cm=40m or less.  Drawing of road intersections should be prepared showing all details of pavement , islands etc.