   1) What are all the types of cement?




                au ll c
   2) Write the ASTM classifications of cement?




                au
   3) What are all the uses of rapid hardening cement?




             np
           iinp
   4) Write the usage of quick settling cement?




         ejj
     ..rre
   5) Define hydration of the cement?

   6) Differentiate dry process and wet process of manufacturing cement?




 ww
  ww
   7) Define batching, what are all the methods of batching?




w
w
   8) What are all the raw materials of the cement?

   9) Write notes on steam curing.

   10) Define non destructive testing.

   11) Write the requirement of supervision needed when concreting.

   12) What are all the transporting equipment needed to transport the concrete?

   13) Which is the efficient type of vibrator used to compact the concrete?

   14) What are all the types of concrete test?

   15) Explain the manufacturing of cement with neat sketches and flow chart

   16) Explain briefly about the chemicals used in concrete and their advantages

   17) Write the step by step procedure for BIS mix design
www.rejinpaul.com
   18) Explain the procedure of compression test on concrete

   19) What are all the different types of curing of concrete explain detailedly

   20) What are all the different methods adopting to transport concrete explain detailedly?




UNIT II CONSTRUCTION PRACTICES

   21) What are all the steps involved in site clearance?

   22) How will you mark a site for setting out a foundation?

   23) Define the term masonry.

   24) Explain the sequence of operation in construction with an example.

   25) What is composite masonry?




                       om
                    ..c om
   26) What are all the types of ashlar masonry?




                au
                au ll c
   27) Differentiate English bond and Flemish bond.

   28) Write notes on zig-zag bond




             np
           iinp
   29) Write notes on temporary shed




         ejj
   30) What are all the types of scaffolding?




     ..rre
   31) Write notes on centring



   w
 ww
   32) Define dampness




w
w w33) What are all the causes of dampness?

   34) What are all the types of damp proofing courses?

   35) Write the fire protective requirement of the building

   36) Explain the various types of foundation with neat sketches

   37) Explain the various types of stone masonry with neat sketches

   38) Make a comparison between stone masonry and brick masonry

   39) What are all the different types of bonds in masonry

   40) Explain the various types of flooring with neat sketches

   41) Explain the various types of trusses with neat sketches

   42) Explain the various types of roof finishes with neat sketches
www.rejinpaul.com
   43) Write notes on acoustic of the building

   44) Write the step by step procedure of laying of brick


   45) What are all the various types of roof finishes




UNIT III SUB STRUCTURE CONSTRUCTION

   46) Define box jacking

   47) Differentiate pie jacking and box jacking

   48) Write notes on under water construction of diaphragm walls

   49) What are all the techniques adopted for tunneling?

   50) What are all te different types of coffer dams?




                       om
                    ..c om
   51) Write short note on well foundation.




                au
                au ll c
   52) Write notes on sheet piles.

   53) Define anchoring.




             np
           iinp
   54) What is well point explain?




         ejj
   55) Define dewatering?




     ..rre
   56) Explain under water construction of diaphragm walls with neat sketches.



   w
 ww
   57) Write the operation procedure for caissons




w
w w58) Explain the various types of sheet piles.

   59) Explain the methods of piling

   60) Write notes on Dewatering and stand by Plant equipment for underground open excavation.




UNIT IV SUPER STRUCTURE CONSTRUCTION



   61) Define bridge decks

   62) What are all the types of off shore platforms?

   63) What are all the specials forms for shells?
www.rejinpaul.com
  64) What is the major technique adopted for heavy decks?

  65) Define the term pre stress concrete

  66) Define sky scrapers

  67) Define articulated structures

  68) What are all the light weight components of tall structures?

  69) Define support structures

  70) What are all the types of domes?

  71) What are all the usage of adopting domes?

  72) Define space decks

  73) What are all the usage of space decks




                       omm
  74) What are all the usage of pre stress concrete?




                    ..c o
                   ll c
  75) Write notes on material handling




                au
                au
  76) Explain the types of bridge decks with sketch




             np
  77) What is the procedure of erecting heavy decks




           iinp
         ejj
  78) Write detailed notes on erecting light weight components on tall structures




     ..rre
  79) Explain the method of Erection of articulated structures




   w
  80) Write notes on braced domes and space decks




w
www
  w
UNIT V CONSTRUCTION EQUIPMENT


  81) What are all the major earth moving operations?

  82) Define tractors.

  83) What are all the operations conducted with the help of tractors?

  84) Write the parts of a motor graders.

  85) Define scrapers.

  86) What are all the parts of scraper?

  87) How can scrapers help to increase the speed of construction?
www.rejinpaul.com
    88) Write short notes on earth movers.

    89) What are all the various forms of earth movers?

    90) Write short notes on pile driving equipment.

    91) Differentiate single acting hammer and double acting hammer

    92) What are all the compacting equipments?

    93) What is TBM explain shortly.

    94) What is the need of equipment management in site?

    95) Write notes on trenching equipment.

    96) What are all the points should be considered while selecting an earth work equipment

    97) Explain the importants and working of tractors and scrapers.




                       omm
    98) Explain the equipment used for mixing and compaction of concrete.




                    ..c o
                   ll c
    99) Explain briefly about the various pile driving equipments




                au
                au
    100)         Write notes on equipment used for erection of structures.




.


         ejj np
           iinp
   w ..rre
w
www
  w
www.rejinpaul.com




                       om
                    ..c om
                au
                au ll c
             np
           iinp
         ejj
   w ..rre
w
www
  w

Contenu connexe

Similaire à Ce2203 qb

Ctep civil
Ctep civilCtep civil
Ctep civillotuseye
 
BCE assignments
BCE assignmentsBCE assignments
BCE assignmentsDYPCET
 
07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesignimaduddin91
 
Mt ii question bank
Mt ii question bankMt ii question bank
Mt ii question bankKANNANS94
 
Manufacturing Technology-I
Manufacturing Technology-I Manufacturing Technology-I
Manufacturing Technology-I nagoorvali8
 
Civil Engineering Materials and Construction Practices
Civil Engineering Materials and Construction PracticesCivil Engineering Materials and Construction Practices
Civil Engineering Materials and Construction PracticesAMIE(I) Study Circle
 
2102 Fundamentals Of Aeronautical Engineering Set1
2102 Fundamentals Of Aeronautical Engineering Set12102 Fundamentals Of Aeronautical Engineering Set1
2102 Fundamentals Of Aeronautical Engineering Set1guestac67362
 
2102 Fundamentals Of Aeronautical Engineering Set1
2102 Fundamentals Of Aeronautical Engineering Set12102 Fundamentals Of Aeronautical Engineering Set1
2102 Fundamentals Of Aeronautical Engineering Set1guestd436758
 
Dss 2(7th&8th)dec2014
Dss 2(7th&8th)dec2014Dss 2(7th&8th)dec2014
Dss 2(7th&8th)dec2014Surender Verma
 
Manufacturing Technology-I
Manufacturing Technology-I Manufacturing Technology-I
Manufacturing Technology-I nagoorvali8
 
Earthquake resistant design of structures question
Earthquake resistant design of structures questionEarthquake resistant design of structures question
Earthquake resistant design of structures questionCochin University
 
Soil question by me
Soil question by meSoil question by me
Soil question by mePrionath Roy
 
Soil question by me
Soil question by meSoil question by me
Soil question by mePrionath Roy
 
Mf5103 advances-in-casting-and-welding
Mf5103 advances-in-casting-and-weldingMf5103 advances-in-casting-and-welding
Mf5103 advances-in-casting-and-weldingDineshS158
 
Eme 503 manufacturing science-ii 12-13
Eme 503 manufacturing science-ii 12-13Eme 503 manufacturing science-ii 12-13
Eme 503 manufacturing science-ii 12-13Manoj Yadav
 

Similaire à Ce2203 qb (20)

Ctep civil
Ctep civilCtep civil
Ctep civil
 
BCE assignments
BCE assignmentsBCE assignments
BCE assignments
 
07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign07 a80106 pavementanalysisanddesign
07 a80106 pavementanalysisanddesign
 
Quation bank ii
Quation bank iiQuation bank ii
Quation bank ii
 
X10696 (me8451)
X10696 (me8451)X10696 (me8451)
X10696 (me8451)
 
Mt ii question bank
Mt ii question bankMt ii question bank
Mt ii question bank
 
Quation bank i
Quation bank  i Quation bank  i
Quation bank i
 
Manufacturing Technology-I
Manufacturing Technology-I Manufacturing Technology-I
Manufacturing Technology-I
 
Civil Engineering Materials and Construction Practices
Civil Engineering Materials and Construction PracticesCivil Engineering Materials and Construction Practices
Civil Engineering Materials and Construction Practices
 
2102 Fundamentals Of Aeronautical Engineering Set1
2102 Fundamentals Of Aeronautical Engineering Set12102 Fundamentals Of Aeronautical Engineering Set1
2102 Fundamentals Of Aeronautical Engineering Set1
 
2102 Fundamentals Of Aeronautical Engineering Set1
2102 Fundamentals Of Aeronautical Engineering Set12102 Fundamentals Of Aeronautical Engineering Set1
2102 Fundamentals Of Aeronautical Engineering Set1
 
Dss 2(7th&8th)dec2014
Dss 2(7th&8th)dec2014Dss 2(7th&8th)dec2014
Dss 2(7th&8th)dec2014
 
Manufacturing Technology-I
Manufacturing Technology-I Manufacturing Technology-I
Manufacturing Technology-I
 
Earthquake resistant design of structures question
Earthquake resistant design of structures questionEarthquake resistant design of structures question
Earthquake resistant design of structures question
 
Soil question by me
Soil question by meSoil question by me
Soil question by me
 
Soil question by me
Soil question by meSoil question by me
Soil question by me
 
Interview questions
Interview questionsInterview questions
Interview questions
 
Mf5103 advances-in-casting-and-welding
Mf5103 advances-in-casting-and-weldingMf5103 advances-in-casting-and-welding
Mf5103 advances-in-casting-and-welding
 
Ce 408 id[a0627]
Ce 408 id[a0627]Ce 408 id[a0627]
Ce 408 id[a0627]
 
Eme 503 manufacturing science-ii 12-13
Eme 503 manufacturing science-ii 12-13Eme 503 manufacturing science-ii 12-13
Eme 503 manufacturing science-ii 12-13
 

Ce2203 qb

  • 1. www.rejinpaul.com FORM NO. CF14 : B.Magesh Subject Name : Construction techniques equipment and Code : CE2203 practices Year : II Semester : III Degree & Branch : B.E. – Civil Engineering Section : UNIT I CONCRETE TECHNOLOGY om ..c om 1) What are all the types of cement? au ll c 2) Write the ASTM classifications of cement? au 3) What are all the uses of rapid hardening cement? np iinp 4) Write the usage of quick settling cement? ejj ..rre 5) Define hydration of the cement? 6) Differentiate dry process and wet process of manufacturing cement? ww ww 7) Define batching, what are all the methods of batching? w w 8) What are all the raw materials of the cement? 9) Write notes on steam curing. 10) Define non destructive testing. 11) Write the requirement of supervision needed when concreting. 12) What are all the transporting equipment needed to transport the concrete? 13) Which is the efficient type of vibrator used to compact the concrete? 14) What are all the types of concrete test? 15) Explain the manufacturing of cement with neat sketches and flow chart 16) Explain briefly about the chemicals used in concrete and their advantages 17) Write the step by step procedure for BIS mix design
  • 2. www.rejinpaul.com 18) Explain the procedure of compression test on concrete 19) What are all the different types of curing of concrete explain detailedly 20) What are all the different methods adopting to transport concrete explain detailedly? UNIT II CONSTRUCTION PRACTICES 21) What are all the steps involved in site clearance? 22) How will you mark a site for setting out a foundation? 23) Define the term masonry. 24) Explain the sequence of operation in construction with an example. 25) What is composite masonry? om ..c om 26) What are all the types of ashlar masonry? au au ll c 27) Differentiate English bond and Flemish bond. 28) Write notes on zig-zag bond np iinp 29) Write notes on temporary shed ejj 30) What are all the types of scaffolding? ..rre 31) Write notes on centring w ww 32) Define dampness w w w33) What are all the causes of dampness? 34) What are all the types of damp proofing courses? 35) Write the fire protective requirement of the building 36) Explain the various types of foundation with neat sketches 37) Explain the various types of stone masonry with neat sketches 38) Make a comparison between stone masonry and brick masonry 39) What are all the different types of bonds in masonry 40) Explain the various types of flooring with neat sketches 41) Explain the various types of trusses with neat sketches 42) Explain the various types of roof finishes with neat sketches
  • 3. www.rejinpaul.com 43) Write notes on acoustic of the building 44) Write the step by step procedure of laying of brick 45) What are all the various types of roof finishes UNIT III SUB STRUCTURE CONSTRUCTION 46) Define box jacking 47) Differentiate pie jacking and box jacking 48) Write notes on under water construction of diaphragm walls 49) What are all the techniques adopted for tunneling? 50) What are all te different types of coffer dams? om ..c om 51) Write short note on well foundation. au au ll c 52) Write notes on sheet piles. 53) Define anchoring. np iinp 54) What is well point explain? ejj 55) Define dewatering? ..rre 56) Explain under water construction of diaphragm walls with neat sketches. w ww 57) Write the operation procedure for caissons w w w58) Explain the various types of sheet piles. 59) Explain the methods of piling 60) Write notes on Dewatering and stand by Plant equipment for underground open excavation. UNIT IV SUPER STRUCTURE CONSTRUCTION 61) Define bridge decks 62) What are all the types of off shore platforms? 63) What are all the specials forms for shells?
  • 4. www.rejinpaul.com 64) What is the major technique adopted for heavy decks? 65) Define the term pre stress concrete 66) Define sky scrapers 67) Define articulated structures 68) What are all the light weight components of tall structures? 69) Define support structures 70) What are all the types of domes? 71) What are all the usage of adopting domes? 72) Define space decks 73) What are all the usage of space decks omm 74) What are all the usage of pre stress concrete? ..c o ll c 75) Write notes on material handling au au 76) Explain the types of bridge decks with sketch np 77) What is the procedure of erecting heavy decks iinp ejj 78) Write detailed notes on erecting light weight components on tall structures ..rre 79) Explain the method of Erection of articulated structures w 80) Write notes on braced domes and space decks w www w UNIT V CONSTRUCTION EQUIPMENT 81) What are all the major earth moving operations? 82) Define tractors. 83) What are all the operations conducted with the help of tractors? 84) Write the parts of a motor graders. 85) Define scrapers. 86) What are all the parts of scraper? 87) How can scrapers help to increase the speed of construction?
  • 5. www.rejinpaul.com 88) Write short notes on earth movers. 89) What are all the various forms of earth movers? 90) Write short notes on pile driving equipment. 91) Differentiate single acting hammer and double acting hammer 92) What are all the compacting equipments? 93) What is TBM explain shortly. 94) What is the need of equipment management in site? 95) Write notes on trenching equipment. 96) What are all the points should be considered while selecting an earth work equipment 97) Explain the importants and working of tractors and scrapers. omm 98) Explain the equipment used for mixing and compaction of concrete. ..c o ll c 99) Explain briefly about the various pile driving equipments au au 100) Write notes on equipment used for erection of structures. . ejj np iinp w ..rre w www w
  • 6. www.rejinpaul.com om ..c om au au ll c np iinp ejj w ..rre w www w