Chapter 2
Cost Concepts And Design
        Economic

  Created By : Eng. Saad Hamasha
     & Eng.Maysaa Gharaybeh
Fixed, Variable and Incremental
             costs.
Fixed costs :

 Unaffected by changes in activity level over a
  feasible range of operations for the capacity or
  capability available.

 Example :insurance and taxes on facilities,
  administrative salaries, license fees, and
  interest costs on borrowed capital.
Variable Costs :

• It vary in total with the number of the output
  unite .
• Example :
 costs of material and labor used in a product or
  service, because they vary in total with the
  number of output units even though costs per
  unit remain the same.
More ways to categorize costs

• Direct: can be measured and allocated to a specific
  work activity
    (Materials, Labor)
• Indirect: difficult to attribute or allocate to a
  specific output or work activity
      (overhead, maintenance)
• Standard cost: cost per unit of output,
    Standard costs play an important role in cost control and
    other management functions.
• Cash cost: a cost that involves a payment of cash.
• Book cost: a cost that does not involve a cash
  transaction but is reflected in the accounting
  system.
    ( equipments, machines, Depreciation)

• Sunk cost: a cost that has occurred in the past and
  has no relevance to estimates of future costs and
  revenues related to an alternative course of action.
   (money spend on a passport)
• Opportunity cost: the monetary advantage foregone due
  to limited resources. The cost of the best rejected
  opportunity.
   ( A student can work with 10,000$ Per year.
     or goes to the university for a year and spend 5,000$.
     Opportunity cost = 15,000$)

• Life-cycle cost: the summation of all costs related to a
  product, structure, system, or service during its life
  span.
Example 2-1
Cost Factor      Site A        Site B        •5,000 cubic yards of
Distance         6 miles       4.3 miles     asphalt
Monthly rental $1,000          $5,000        •4 months (17 weeks
cost                                         5- days a week)
Cost (Set up $   $15,000       $25,000       •Compare the
Removing)
Equipment
                                              2 sites??!!!!!
Hauling          $1.15/yd3 –   $1.15/yd3 –   •NOTE:
expenses         mile          mile          •Rent , Set up/
                                             Removal and Flag
Flag person      No need       $96/day       person are Fixed costs
                               ($8,160)      BUT
BUT Hauling is variable cost
Site A = 6*5000*$1.15 = $345,000
Site B= 4.3*5,000*$1.15 = $247,250
Then the total cost is
2. Which is the better site?   Site B


3. How many cubic yards of asphalt does the contractor have to
deliver before starting to make a profit if paid 8.05$ per cubic yard
The General Economic Environment
Consumer and Producer Goods and Service

Consumer Goods and Service: are those
products or service that are directly used by
people to satisfy their wants.

Producer Goods and Service: are used to
produce consumer goods or service or other
producers goods.
Goods and service are produced and desired because they
have utility.

Utility: The power to satisfy human wants and needs.

Utility is most commonly measured in terms of value.

Value: the price that must be paid to obtain the particular
        item.

Necessities and Luxuries needs.
Price And Demand
 Engineering focusing on increasing the utility
  (value) of materials by changing their form or
  location.

 P : the price that must be paid
 D: is the quantity that must be demanded or
  purchased
The general price-demand relationship
The demand for a product or service is directly related to
its price according to

                  p = a - bD
       for 0 ≤ D ≤ a/b , a > 0, b > 0

where p is price, D is demand, and a and b are constants
that depend on the particular product or service.
 a = price axis intercept
 -b = slope
Competition

Perfect Competition: occurs in a situation in which any
given product is supplied by a large number of venders and
there is no restriction on additional suppliers entering the
market (never occurs in actual practice).

Perfect Monopoly: exist when a unique product or service is
only available from a single supplier and that vender can
prevent the entry of all others into the markets.
 (rarely occurs in the practice)
Total Revenue Function

Total revenue is the product of the selling price per unit,
p, and the number of units sold, D.
             TR = p × D

From: p = a – bD


We find:
Maximize Revenue

    TR  a D  b D 2



    d 2TR
        2
            2b  0
    dD

The demand at maximum revenue:   ˆ  a
                                 D
                                     2b

                ˆ     ˆ     a2   a2   a2
 Maximum TR  a D  b D 2         
                            2b 4b 4b
Profit

   Profit = Total Revenue (TR) – Total Cost (CT)

 Total Cost (CT) = Fixed Cost (CF) + Variable Cost (CV)
                   CT  C F  CV

Variable Cost (CV) = Variable cost per unit (cv) × Demand (D)
                      CV  cv  D

 Total Cost: CT  C F  cv D
Maximum profit

Scenario 1: Demand is a function of price ( p = a – bD)


TR  a D  b D 2
Profit = Total Revenue (TR) – Total Cost (CT)

      and     CT  CF  cv D

      and     TR  a D  b D 2

            Then   Profit  (a D  b D 2 )  ( CF  cv D)
                   Profit   b D 2  (a  cv ) D  CF

To find the maximum profit       d ( profit )
                                               a  cv  2 b D  0
                                     dD
                                 d 2 ( profit )
                                         2
                                                  2b  0
                                     dD

                                a  cv
 Demand at Max profit:     D *
                                 2b
Breakeven points are found when
      Total Revenue = Total Cost.

       a D  b D 2  CF  cv D
         b D 2  (a  cv ) D  CF  0

 The demand at breakeven:


  D 
                                2
                                                
        a  cv   a  cv   4  b  C F 
                                                    1
                                                        2


                            2b
Example: A company produces an electronic timing switch. The fixed
   cost (CF) is 73,000$ per month. The variable cost per unit (cv) is
   83$. The selling price per unit (p = 180$ – 0.02D).
A. Determine the optimal volume of product?
B. Find the volume at breakeven occurs, what is the range of
   profitable demand?

Solution:
A. a = 180, b = 0.02
              a  cv 180  83
       D *                    2,425 units per month
               2b     2  0.02
B.    Total Revenue = Total Cost.
     a D  b D 2  CF  cv D
      b D 2  (a  cv ) D  CF  0


D 
                             2
                                              
      a  cv   a  cv   4  b  C F 
                                                  1
                                                      2


                          2b

               D 
                              
                     97  97   4  0.02 73000
                                      2
                                                          
                                                          1
                                                              2


                                   20.02

                       97  59.74
                  
                 D1                 932 unit per month
                           0.04
                        97  59.74
                   
                 D2                 3,918 unit per month
                           0.04
                    Range = 932 to 3,918 unit per month
Scenario 2: Price and Demand are independent

               TR = P × D
Example:
Variable cost per service hour = 62$.
Selling price = 85.56$ per hour.
Maximum Hours per year = 160,000 hours.
Fixed cost = 2,024,000$ per year.
A. What is the breakeven point in hours and in % of total capacity?

     Total revenue = Total cost (breakeven)
             p D  CF  cv D
                        CF
                D 
                      p  cv 
            2024000
     D                85,908 hours per year
          85.56  62
           85,908
     D           0.537  53.7% of capacity
          160,000
B. What is the % reduction In breakeven point (sensitivity) if:
  1. Fixed cost reduced by 10%?

                          0.92024000
                   D                   77,138 hours per year
                           85.56  62
                                   85,908  77,318
                  D reduction                     0.1 10%
                                       85,908



 2. variable cost per hour reduced by 10%?

                      2024000
           D                        68,011 hours per year
                  85.56  0.9  62
                            85,908  68.011
           D reduction                     0.208  20.8%
                                85,908
3. selling price increase by 10%?

                    2024000
         D                       63,021 hours per year
                1.1 85.56  62
                         85,908  63,021
        D reduction                     0.266  26.6%
                             85,908




Then the breakeven point is more sensitive to reduction in
variable cost than fixed cost

Contenu connexe

Tendances

Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methodsBich Lien Pham
 
Equity Valuation
Equity ValuationEquity Valuation
Equity Valuationcgshah
 
Time value of money
Time value of moneyTime value of money
Time value of moneyAmeen San
 
Chapter 7 ror analysis for a single alternative
Chapter 7   ror analysis for a single alternativeChapter 7   ror analysis for a single alternative
Chapter 7 ror analysis for a single alternativeBich Lien Pham
 
MG 6863 FORMULA SHEET ENGINEERING ECONOMICS
MG 6863  FORMULA SHEET ENGINEERING ECONOMICSMG 6863  FORMULA SHEET ENGINEERING ECONOMICS
MG 6863 FORMULA SHEET ENGINEERING ECONOMICSAsha A
 
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...mianmohsinmumtazshb
 
Project management techniques
Project management techniquesProject management techniques
Project management techniquesBikramjit Singh
 
Chapter 11 replacement & retention decisions
Chapter 11   replacement & retention decisionsChapter 11   replacement & retention decisions
Chapter 11 replacement & retention decisionsBich Lien Pham
 
Chapter 9 benefit & cost analysis
Chapter 9   benefit & cost analysisChapter 9   benefit & cost analysis
Chapter 9 benefit & cost analysisBich Lien Pham
 
Chapter 2 full slides to students
Chapter 2   full slides to studentsChapter 2   full slides to students
Chapter 2 full slides to studentsSaad Ul Fataah
 
fm_formula__ipcc-2.pdf
fm_formula__ipcc-2.pdffm_formula__ipcc-2.pdf
fm_formula__ipcc-2.pdfhitishaagrawal
 
A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period Essam Lotffy, PMP®, CCP®
 

Tendances (17)

Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methods
 
Equity Valuation
Equity ValuationEquity Valuation
Equity Valuation
 
ch 11 Capital budgeting
ch 11 Capital budgetingch 11 Capital budgeting
ch 11 Capital budgeting
 
Time value of money
Time value of moneyTime value of money
Time value of money
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Chapter 7 ror analysis for a single alternative
Chapter 7   ror analysis for a single alternativeChapter 7   ror analysis for a single alternative
Chapter 7 ror analysis for a single alternative
 
MG 6863 FORMULA SHEET ENGINEERING ECONOMICS
MG 6863  FORMULA SHEET ENGINEERING ECONOMICSMG 6863  FORMULA SHEET ENGINEERING ECONOMICS
MG 6863 FORMULA SHEET ENGINEERING ECONOMICS
 
Chapter6[1]
Chapter6[1]Chapter6[1]
Chapter6[1]
 
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
cost of capital .....ch ...of financial management ..solution by MIAN MOHSIN ...
 
10 depreciation and depletion
10 depreciation and depletion10 depreciation and depletion
10 depreciation and depletion
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Chapter 11 replacement & retention decisions
Chapter 11   replacement & retention decisionsChapter 11   replacement & retention decisions
Chapter 11 replacement & retention decisions
 
Chapter 9 benefit & cost analysis
Chapter 9   benefit & cost analysisChapter 9   benefit & cost analysis
Chapter 9 benefit & cost analysis
 
Chapter 2 full slides to students
Chapter 2   full slides to studentsChapter 2   full slides to students
Chapter 2 full slides to students
 
Ch12ppt
Ch12pptCh12ppt
Ch12ppt
 
fm_formula__ipcc-2.pdf
fm_formula__ipcc-2.pdffm_formula__ipcc-2.pdf
fm_formula__ipcc-2.pdf
 
A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period A simple example to calculate net present value and pay back period
A simple example to calculate net present value and pay back period
 

En vedette

hydro chapter_4_b_pipe_network_by louy Al hami
hydro  chapter_4_b_pipe_network_by louy Al hami hydro  chapter_4_b_pipe_network_by louy Al hami
hydro chapter_4_b_pipe_network_by louy Al hami Louy Alhamy
 
hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami Louy Alhamy
 
hydro chapter_11_hydrology_by louy al hami
hydro  chapter_11_hydrology_by louy al hami hydro  chapter_11_hydrology_by louy al hami
hydro chapter_11_hydrology_by louy al hami Louy Alhamy
 
economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami Louy Alhamy
 
hydro chapter_4_a_by louy al hami
hydro chapter_4_a_by louy al hami hydro chapter_4_a_by louy al hami
hydro chapter_4_a_by louy al hami Louy Alhamy
 
hydro chapter_5_a_by louy Al hami
hydro chapter_5_a_by louy Al hami hydro chapter_5_a_by louy Al hami
hydro chapter_5_a_by louy Al hami Louy Alhamy
 
hydro chapter_3 by louy Al hami
hydro chapter_3 by louy Al hami hydro chapter_3 by louy Al hami
hydro chapter_3 by louy Al hami Louy Alhamy
 

En vedette (11)

hydro chapter_4_b_pipe_network_by louy Al hami
hydro  chapter_4_b_pipe_network_by louy Al hami hydro  chapter_4_b_pipe_network_by louy Al hami
hydro chapter_4_b_pipe_network_by louy Al hami
 
7 routing
7 routing7 routing
7 routing
 
Flood Routing using Muskingum Method
Flood Routing using Muskingum MethodFlood Routing using Muskingum Method
Flood Routing using Muskingum Method
 
Flood routing
Flood routingFlood routing
Flood routing
 
hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami hydro chapter_7_groundwater_by louy Al hami
hydro chapter_7_groundwater_by louy Al hami
 
hydro chapter_11_hydrology_by louy al hami
hydro  chapter_11_hydrology_by louy al hami hydro  chapter_11_hydrology_by louy al hami
hydro chapter_11_hydrology_by louy al hami
 
economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami economy Chapter6 2011_by louy Al hami
economy Chapter6 2011_by louy Al hami
 
Surface runoff
Surface runoffSurface runoff
Surface runoff
 
hydro chapter_4_a_by louy al hami
hydro chapter_4_a_by louy al hami hydro chapter_4_a_by louy al hami
hydro chapter_4_a_by louy al hami
 
hydro chapter_5_a_by louy Al hami
hydro chapter_5_a_by louy Al hami hydro chapter_5_a_by louy Al hami
hydro chapter_5_a_by louy Al hami
 
hydro chapter_3 by louy Al hami
hydro chapter_3 by louy Al hami hydro chapter_3 by louy Al hami
hydro chapter_3 by louy Al hami
 

Similaire à economy Chapter2_by louy Al hami

H2 Economics - Costs and Production Lecture 1
H2 Economics - Costs and Production Lecture 1H2 Economics - Costs and Production Lecture 1
H2 Economics - Costs and Production Lecture 1Dixon Ho
 
3. good inventory-management-edited-ppt
3. good  inventory-management-edited-ppt3. good  inventory-management-edited-ppt
3. good inventory-management-edited-pptshahidch44
 
12 Managerial Accounting 12 Depreciation.ppt
12 Managerial Accounting 12 Depreciation.ppt12 Managerial Accounting 12 Depreciation.ppt
12 Managerial Accounting 12 Depreciation.pptOuardaMicrobiologist
 
Managerial Accounting Mid-term Cheat Sheet
Managerial Accounting  Mid-term Cheat Sheet Managerial Accounting  Mid-term Cheat Sheet
Managerial Accounting Mid-term Cheat Sheet UCFPMBA
 
9 Replacement problems.pptx .
9 Replacement problems.pptx                        .9 Replacement problems.pptx                        .
9 Replacement problems.pptx .Athar739197
 
EGT267 Programming for Engineering Applications Spring 2020 .docx
EGT267 Programming for Engineering Applications Spring 2020 .docxEGT267 Programming for Engineering Applications Spring 2020 .docx
EGT267 Programming for Engineering Applications Spring 2020 .docxgidmanmary
 
integral calculus and it’s uses in different fields.
 integral calculus and it’s uses in different fields. integral calculus and it’s uses in different fields.
integral calculus and it’s uses in different fields.kamrul_Hasan
 
Production and costs
Production and costsProduction and costs
Production and costsOnline
 
Inventory Management Self Study Exercises.pptx
Inventory Management Self Study Exercises.pptxInventory Management Self Study Exercises.pptx
Inventory Management Self Study Exercises.pptxFarhatHossain3
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methodsBich Lien Pham
 
Inventory Man2
Inventory Man2Inventory Man2
Inventory Man2ajithsrc
 
Principles_of_Managerial_Economics_-_Yahya_Alshehhi
Principles_of_Managerial_Economics_-_Yahya_AlshehhiPrinciples_of_Managerial_Economics_-_Yahya_Alshehhi
Principles_of_Managerial_Economics_-_Yahya_AlshehhiYahya Alshehhi
 
Costs, revenue and profit
Costs, revenue and profitCosts, revenue and profit
Costs, revenue and profitSuresh Madhavan
 

Similaire à economy Chapter2_by louy Al hami (20)

H2 Economics - Costs and Production Lecture 1
H2 Economics - Costs and Production Lecture 1H2 Economics - Costs and Production Lecture 1
H2 Economics - Costs and Production Lecture 1
 
3. good inventory-management-edited-ppt
3. good  inventory-management-edited-ppt3. good  inventory-management-edited-ppt
3. good inventory-management-edited-ppt
 
Cost & fm
Cost & fmCost & fm
Cost & fm
 
12 Managerial Accounting 12 Depreciation.ppt
12 Managerial Accounting 12 Depreciation.ppt12 Managerial Accounting 12 Depreciation.ppt
12 Managerial Accounting 12 Depreciation.ppt
 
Managerial Accounting Mid-term Cheat Sheet
Managerial Accounting  Mid-term Cheat Sheet Managerial Accounting  Mid-term Cheat Sheet
Managerial Accounting Mid-term Cheat Sheet
 
Application of integration
Application of integrationApplication of integration
Application of integration
 
9 Replacement problems.pptx .
9 Replacement problems.pptx                        .9 Replacement problems.pptx                        .
9 Replacement problems.pptx .
 
Acct303 chapter2
Acct303 chapter2Acct303 chapter2
Acct303 chapter2
 
Level demand1
Level demand1Level demand1
Level demand1
 
EGT267 Programming for Engineering Applications Spring 2020 .docx
EGT267 Programming for Engineering Applications Spring 2020 .docxEGT267 Programming for Engineering Applications Spring 2020 .docx
EGT267 Programming for Engineering Applications Spring 2020 .docx
 
integral calculus and it’s uses in different fields.
 integral calculus and it’s uses in different fields. integral calculus and it’s uses in different fields.
integral calculus and it’s uses in different fields.
 
Production and costs
Production and costsProduction and costs
Production and costs
 
Inventory Management Self Study Exercises.pptx
Inventory Management Self Study Exercises.pptxInventory Management Self Study Exercises.pptx
Inventory Management Self Study Exercises.pptx
 
Chapter 16 depreciation methods
Chapter 16   depreciation methodsChapter 16   depreciation methods
Chapter 16 depreciation methods
 
Inventry..
Inventry..Inventry..
Inventry..
 
Inventory Man2
Inventory Man2Inventory Man2
Inventory Man2
 
Principles_of_Managerial_Economics_-_Yahya_Alshehhi
Principles_of_Managerial_Economics_-_Yahya_AlshehhiPrinciples_of_Managerial_Economics_-_Yahya_Alshehhi
Principles_of_Managerial_Economics_-_Yahya_Alshehhi
 
Cost Concept
Cost ConceptCost Concept
Cost Concept
 
EC4004 Lecture 10: Costs
EC4004 Lecture 10: CostsEC4004 Lecture 10: Costs
EC4004 Lecture 10: Costs
 
Costs, revenue and profit
Costs, revenue and profitCosts, revenue and profit
Costs, revenue and profit
 

Dernier

Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 

Dernier (20)

Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 

economy Chapter2_by louy Al hami

  • 1. Chapter 2 Cost Concepts And Design Economic Created By : Eng. Saad Hamasha & Eng.Maysaa Gharaybeh
  • 2. Fixed, Variable and Incremental costs.
  • 3. Fixed costs :  Unaffected by changes in activity level over a feasible range of operations for the capacity or capability available.  Example :insurance and taxes on facilities, administrative salaries, license fees, and interest costs on borrowed capital.
  • 4. Variable Costs : • It vary in total with the number of the output unite . • Example : costs of material and labor used in a product or service, because they vary in total with the number of output units even though costs per unit remain the same.
  • 5. More ways to categorize costs • Direct: can be measured and allocated to a specific work activity (Materials, Labor) • Indirect: difficult to attribute or allocate to a specific output or work activity (overhead, maintenance) • Standard cost: cost per unit of output, Standard costs play an important role in cost control and other management functions.
  • 6. • Cash cost: a cost that involves a payment of cash. • Book cost: a cost that does not involve a cash transaction but is reflected in the accounting system. ( equipments, machines, Depreciation) • Sunk cost: a cost that has occurred in the past and has no relevance to estimates of future costs and revenues related to an alternative course of action. (money spend on a passport)
  • 7. • Opportunity cost: the monetary advantage foregone due to limited resources. The cost of the best rejected opportunity. ( A student can work with 10,000$ Per year. or goes to the university for a year and spend 5,000$. Opportunity cost = 15,000$) • Life-cycle cost: the summation of all costs related to a product, structure, system, or service during its life span.
  • 9. Cost Factor Site A Site B •5,000 cubic yards of Distance 6 miles 4.3 miles asphalt Monthly rental $1,000 $5,000 •4 months (17 weeks cost 5- days a week) Cost (Set up $ $15,000 $25,000 •Compare the Removing) Equipment 2 sites??!!!!! Hauling $1.15/yd3 – $1.15/yd3 – •NOTE: expenses mile mile •Rent , Set up/ Removal and Flag Flag person No need $96/day person are Fixed costs ($8,160) BUT
  • 10. BUT Hauling is variable cost Site A = 6*5000*$1.15 = $345,000 Site B= 4.3*5,000*$1.15 = $247,250 Then the total cost is
  • 11. 2. Which is the better site? Site B 3. How many cubic yards of asphalt does the contractor have to deliver before starting to make a profit if paid 8.05$ per cubic yard
  • 12. The General Economic Environment
  • 13. Consumer and Producer Goods and Service Consumer Goods and Service: are those products or service that are directly used by people to satisfy their wants. Producer Goods and Service: are used to produce consumer goods or service or other producers goods.
  • 14. Goods and service are produced and desired because they have utility. Utility: The power to satisfy human wants and needs. Utility is most commonly measured in terms of value. Value: the price that must be paid to obtain the particular item. Necessities and Luxuries needs.
  • 15. Price And Demand  Engineering focusing on increasing the utility (value) of materials by changing their form or location.  P : the price that must be paid  D: is the quantity that must be demanded or purchased
  • 16. The general price-demand relationship
  • 17. The demand for a product or service is directly related to its price according to p = a - bD for 0 ≤ D ≤ a/b , a > 0, b > 0 where p is price, D is demand, and a and b are constants that depend on the particular product or service. a = price axis intercept -b = slope
  • 18. Competition Perfect Competition: occurs in a situation in which any given product is supplied by a large number of venders and there is no restriction on additional suppliers entering the market (never occurs in actual practice). Perfect Monopoly: exist when a unique product or service is only available from a single supplier and that vender can prevent the entry of all others into the markets. (rarely occurs in the practice)
  • 19. Total Revenue Function Total revenue is the product of the selling price per unit, p, and the number of units sold, D. TR = p × D From: p = a – bD We find:
  • 20. Maximize Revenue TR  a D  b D 2 d 2TR 2   2b  0 dD The demand at maximum revenue: ˆ  a D 2b ˆ ˆ a2 a2 a2 Maximum TR  a D  b D 2    2b 4b 4b
  • 21.
  • 22. Profit Profit = Total Revenue (TR) – Total Cost (CT) Total Cost (CT) = Fixed Cost (CF) + Variable Cost (CV) CT  C F  CV Variable Cost (CV) = Variable cost per unit (cv) × Demand (D) CV  cv  D Total Cost: CT  C F  cv D
  • 23. Maximum profit Scenario 1: Demand is a function of price ( p = a – bD) TR  a D  b D 2
  • 24. Profit = Total Revenue (TR) – Total Cost (CT) and CT  CF  cv D and TR  a D  b D 2 Then Profit  (a D  b D 2 )  ( CF  cv D) Profit   b D 2  (a  cv ) D  CF To find the maximum profit d ( profit )  a  cv  2 b D  0 dD d 2 ( profit ) 2   2b  0 dD a  cv Demand at Max profit: D * 2b
  • 25. Breakeven points are found when Total Revenue = Total Cost. a D  b D 2  CF  cv D  b D 2  (a  cv ) D  CF  0 The demand at breakeven: D   2   a  cv   a  cv   4  b  C F  1 2  2b
  • 26. Example: A company produces an electronic timing switch. The fixed cost (CF) is 73,000$ per month. The variable cost per unit (cv) is 83$. The selling price per unit (p = 180$ – 0.02D). A. Determine the optimal volume of product? B. Find the volume at breakeven occurs, what is the range of profitable demand? Solution: A. a = 180, b = 0.02 a  cv 180  83 D *   2,425 units per month 2b 2  0.02
  • 27. B. Total Revenue = Total Cost. a D  b D 2  CF  cv D  b D 2  (a  cv ) D  CF  0 D   2   a  cv   a  cv   4  b  C F  1 2  2b D    97  97   4  0.02 73000 2  1 2  20.02  97  59.74  D1   932 unit per month  0.04  97  59.74  D2   3,918 unit per month  0.04 Range = 932 to 3,918 unit per month
  • 28. Scenario 2: Price and Demand are independent TR = P × D
  • 29. Example: Variable cost per service hour = 62$. Selling price = 85.56$ per hour. Maximum Hours per year = 160,000 hours. Fixed cost = 2,024,000$ per year. A. What is the breakeven point in hours and in % of total capacity? Total revenue = Total cost (breakeven) p D  CF  cv D CF D   p  cv  2024000 D   85,908 hours per year 85.56  62 85,908 D   0.537  53.7% of capacity 160,000
  • 30. B. What is the % reduction In breakeven point (sensitivity) if: 1. Fixed cost reduced by 10%? 0.92024000 D   77,138 hours per year 85.56  62 85,908  77,318 D reduction   0.1 10% 85,908 2. variable cost per hour reduced by 10%? 2024000 D   68,011 hours per year 85.56  0.9  62 85,908  68.011 D reduction   0.208  20.8% 85,908
  • 31. 3. selling price increase by 10%? 2024000 D   63,021 hours per year 1.1 85.56  62 85,908  63,021 D reduction   0.266  26.6% 85,908 Then the breakeven point is more sensitive to reduction in variable cost than fixed cost