7. Building Rehabilitation, Lisbon
GENERAL DATA
Scaffold Maximum Height = 59 m
Scaffold Total Area = 3342 m²
Scaffold Total Weight = 63091 Kg
Scaffold = 18.878 Kg/m²
Assembly Team = 12 PERI workers
Assembly Time = 3 weeks (15 work days)
Scaffold moved ≈ 350.50 Kg/day/worker
Scaffold assembled ≈ 18.56 m²/day/worker
7