SlideShare une entreprise Scribd logo
1  sur  3
AC MOTOR DRIVE USING IGBT


OBJECTIVE:
             The aim of the project is to develop a speed control
system for ac motor. It is proposed to include the start. Over-head
no-volt protection also.


PRINCIPLE:
           Since the speed of AC motor depends on stator-applied
voltage. the speed can varied by varying stator voltage. but if
voltage is varied by keeping the frequency constant, the flux of the
machine will also vary. which is undesirable. It can be operated
constant flux condition.


TEAM DESCRIPTION:
                The functional block diagram of AC motor speed
control system is shown in fig.1.
               The controlled rectifier is a 3-phase half controlled
bridge rectifier constructed using SCRs and Diodes .the controlled
is used to obtain variable DC supply voltage. the variable DC
supply voltage is converted to 3 phase AC supply using else
IGBT.


                  The speed adjust circuitry will firing angles of
rectifier and rectifier and inverter to achieve the desired speed
=desired transformer(CT’s)are provided to sense the over-load or
no-volt condition and the firing pulses.
FEACTURES:
1. No need of extra starter.
2. soft start (while starting the current will not exceed the full
   load current)
3. consonant speeds or constant torque operation.
4. over-load and no-volt protection.
Block Diagram


           3 phase input(R,Y,B)




             3 phase Rectifier




                     Soft Start Switch
                     (RELAY
                     CONTROL)


                                                       Microcontroller
                                                        PIC16F877

           Current
           Amplifier                     PWM




   IGBT(INSULATED
    GATE BIPOLAR
     TRANSISTOR)




                                               SPEED
          AC Motor                             SENSOR-
                                               PROXIMITY

Contenu connexe

Plus de ASHOKKUMAR RAMAR

FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system ASHOKKUMAR RAMAR
 
GSM APPLICATIONS PROJECTS:Gsm based 3 phase motor on off control with safety ...
GSM APPLICATIONS PROJECTS:Gsm based 3 phase motor on off control with safety ...GSM APPLICATIONS PROJECTS:Gsm based 3 phase motor on off control with safety ...
GSM APPLICATIONS PROJECTS:Gsm based 3 phase motor on off control with safety ...ASHOKKUMAR RAMAR
 
REAL TIME WORKING PROJECTS ECE-ELECTRONICS PROJECTS TAMBARAM
REAL TIME WORKING  PROJECTS ECE-ELECTRONICS PROJECTS TAMBARAMREAL TIME WORKING  PROJECTS ECE-ELECTRONICS PROJECTS TAMBARAM
REAL TIME WORKING PROJECTS ECE-ELECTRONICS PROJECTS TAMBARAMASHOKKUMAR RAMAR
 
PROJECTS CENTER IN TAMBARAM MAASTECH-ECE PROJECTS TAMBARAM
PROJECTS CENTER IN TAMBARAM MAASTECH-ECE PROJECTS TAMBARAMPROJECTS CENTER IN TAMBARAM MAASTECH-ECE PROJECTS TAMBARAM
PROJECTS CENTER IN TAMBARAM MAASTECH-ECE PROJECTS TAMBARAMASHOKKUMAR RAMAR
 
BEST EMBEDDED PROJECT CENTER TAMBARAM/PALLAVARAM/T.NAGAR/TAMBARAM
BEST EMBEDDED PROJECT CENTER TAMBARAM/PALLAVARAM/T.NAGAR/TAMBARAMBEST EMBEDDED PROJECT CENTER TAMBARAM/PALLAVARAM/T.NAGAR/TAMBARAM
BEST EMBEDDED PROJECT CENTER TAMBARAM/PALLAVARAM/T.NAGAR/TAMBARAMASHOKKUMAR RAMAR
 
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAMBEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAMASHOKKUMAR RAMAR
 
BEST PROJECT CENTER IN TAMBARAM/TAMBARAM IEEEPROJECTS
BEST PROJECT CENTER IN TAMBARAM/TAMBARAM IEEEPROJECTSBEST PROJECT CENTER IN TAMBARAM/TAMBARAM IEEEPROJECTS
BEST PROJECT CENTER IN TAMBARAM/TAMBARAM IEEEPROJECTSASHOKKUMAR RAMAR
 
IEEE PROJECTS CENTER TAMBARAM/PALLAVARAM/CHROMPET- a zigbee based animal hea...
IEEE PROJECTS CENTER  TAMBARAM/PALLAVARAM/CHROMPET- a zigbee based animal hea...IEEE PROJECTS CENTER  TAMBARAM/PALLAVARAM/CHROMPET- a zigbee based animal hea...
IEEE PROJECTS CENTER TAMBARAM/PALLAVARAM/CHROMPET- a zigbee based animal hea...ASHOKKUMAR RAMAR
 
mini projects center chennai-maastech electrical parameters in industries
mini projects center chennai-maastech electrical parameters in industriesmini projects center chennai-maastech electrical parameters in industries
mini projects center chennai-maastech electrical parameters in industriesASHOKKUMAR RAMAR
 
mini projects titles for electronics engineering:design for visually impaired...
mini projects titles for electronics engineering:design for visually impaired...mini projects titles for electronics engineering:design for visually impaired...
mini projects titles for electronics engineering:design for visually impaired...ASHOKKUMAR RAMAR
 
ieee projects titles for ece students contact maastech-+91 98402 34766
ieee projects titles for ece students contact maastech-+91 98402 34766ieee projects titles for ece students contact maastech-+91 98402 34766
ieee projects titles for ece students contact maastech-+91 98402 34766ASHOKKUMAR RAMAR
 
latest ieee projects for ece-petrol bunk automation with prepaid cards and gs...
latest ieee projects for ece-petrol bunk automation with prepaid cards and gs...latest ieee projects for ece-petrol bunk automation with prepaid cards and gs...
latest ieee projects for ece-petrol bunk automation with prepaid cards and gs...ASHOKKUMAR RAMAR
 
microcontroller projects center chennai -rfid projects & rfid applications
microcontroller projects center  chennai -rfid projects & rfid applicationsmicrocontroller projects center  chennai -rfid projects & rfid applications
microcontroller projects center chennai -rfid projects & rfid applicationsASHOKKUMAR RAMAR
 
best biomedical project center chennai- recent advances in wearable sensors f...
best biomedical project center chennai- recent advances in wearable sensors f...best biomedical project center chennai- recent advances in wearable sensors f...
best biomedical project center chennai- recent advances in wearable sensors f...ASHOKKUMAR RAMAR
 
LATEST IEEE PROJECTS TITLES : personal lung function monitoring devices for a...
LATEST IEEE PROJECTS TITLES : personal lung function monitoring devices for a...LATEST IEEE PROJECTS TITLES : personal lung function monitoring devices for a...
LATEST IEEE PROJECTS TITLES : personal lung function monitoring devices for a...ASHOKKUMAR RAMAR
 
IEEE PROJECTS ABSTRACT 2015-2016: model based mean arterial pressure estimation
IEEE PROJECTS ABSTRACT 2015-2016: model based mean arterial pressure estimationIEEE PROJECTS ABSTRACT 2015-2016: model based mean arterial pressure estimation
IEEE PROJECTS ABSTRACT 2015-2016: model based mean arterial pressure estimationASHOKKUMAR RAMAR
 
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAIFINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAIASHOKKUMAR RAMAR
 
FREE INPLANT TRAIINING FOR ENGINEERING STUDENTS EEE/BIOMEDICAL/ECE
FREE INPLANT TRAIINING FOR ENGINEERING STUDENTS EEE/BIOMEDICAL/ECEFREE INPLANT TRAIINING FOR ENGINEERING STUDENTS EEE/BIOMEDICAL/ECE
FREE INPLANT TRAIINING FOR ENGINEERING STUDENTS EEE/BIOMEDICAL/ECEASHOKKUMAR RAMAR
 
FREE INPLANT TRAINING ECE CHENNAI-T.NAGAR/KODAMBAKKAM
FREE INPLANT TRAINING ECE  CHENNAI-T.NAGAR/KODAMBAKKAMFREE INPLANT TRAINING ECE  CHENNAI-T.NAGAR/KODAMBAKKAM
FREE INPLANT TRAINING ECE CHENNAI-T.NAGAR/KODAMBAKKAMASHOKKUMAR RAMAR
 
FREE INPLANT TRAINING CHENNAI FOR ENGINEERING STUDENTS
FREE INPLANT TRAINING CHENNAI FOR ENGINEERING STUDENTSFREE INPLANT TRAINING CHENNAI FOR ENGINEERING STUDENTS
FREE INPLANT TRAINING CHENNAI FOR ENGINEERING STUDENTSASHOKKUMAR RAMAR
 

Plus de ASHOKKUMAR RAMAR (20)

FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
FINAL YEAR PROJECT ABSTRACT:Automated environmental friendly vechicle system
 
GSM APPLICATIONS PROJECTS:Gsm based 3 phase motor on off control with safety ...
GSM APPLICATIONS PROJECTS:Gsm based 3 phase motor on off control with safety ...GSM APPLICATIONS PROJECTS:Gsm based 3 phase motor on off control with safety ...
GSM APPLICATIONS PROJECTS:Gsm based 3 phase motor on off control with safety ...
 
REAL TIME WORKING PROJECTS ECE-ELECTRONICS PROJECTS TAMBARAM
REAL TIME WORKING  PROJECTS ECE-ELECTRONICS PROJECTS TAMBARAMREAL TIME WORKING  PROJECTS ECE-ELECTRONICS PROJECTS TAMBARAM
REAL TIME WORKING PROJECTS ECE-ELECTRONICS PROJECTS TAMBARAM
 
PROJECTS CENTER IN TAMBARAM MAASTECH-ECE PROJECTS TAMBARAM
PROJECTS CENTER IN TAMBARAM MAASTECH-ECE PROJECTS TAMBARAMPROJECTS CENTER IN TAMBARAM MAASTECH-ECE PROJECTS TAMBARAM
PROJECTS CENTER IN TAMBARAM MAASTECH-ECE PROJECTS TAMBARAM
 
BEST EMBEDDED PROJECT CENTER TAMBARAM/PALLAVARAM/T.NAGAR/TAMBARAM
BEST EMBEDDED PROJECT CENTER TAMBARAM/PALLAVARAM/T.NAGAR/TAMBARAMBEST EMBEDDED PROJECT CENTER TAMBARAM/PALLAVARAM/T.NAGAR/TAMBARAM
BEST EMBEDDED PROJECT CENTER TAMBARAM/PALLAVARAM/T.NAGAR/TAMBARAM
 
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAMBEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
BEST PROJECT CENTER IN TAMBARAM-HARDWARE PROJECTS TAMBARAM
 
BEST PROJECT CENTER IN TAMBARAM/TAMBARAM IEEEPROJECTS
BEST PROJECT CENTER IN TAMBARAM/TAMBARAM IEEEPROJECTSBEST PROJECT CENTER IN TAMBARAM/TAMBARAM IEEEPROJECTS
BEST PROJECT CENTER IN TAMBARAM/TAMBARAM IEEEPROJECTS
 
IEEE PROJECTS CENTER TAMBARAM/PALLAVARAM/CHROMPET- a zigbee based animal hea...
IEEE PROJECTS CENTER  TAMBARAM/PALLAVARAM/CHROMPET- a zigbee based animal hea...IEEE PROJECTS CENTER  TAMBARAM/PALLAVARAM/CHROMPET- a zigbee based animal hea...
IEEE PROJECTS CENTER TAMBARAM/PALLAVARAM/CHROMPET- a zigbee based animal hea...
 
mini projects center chennai-maastech electrical parameters in industries
mini projects center chennai-maastech electrical parameters in industriesmini projects center chennai-maastech electrical parameters in industries
mini projects center chennai-maastech electrical parameters in industries
 
mini projects titles for electronics engineering:design for visually impaired...
mini projects titles for electronics engineering:design for visually impaired...mini projects titles for electronics engineering:design for visually impaired...
mini projects titles for electronics engineering:design for visually impaired...
 
ieee projects titles for ece students contact maastech-+91 98402 34766
ieee projects titles for ece students contact maastech-+91 98402 34766ieee projects titles for ece students contact maastech-+91 98402 34766
ieee projects titles for ece students contact maastech-+91 98402 34766
 
latest ieee projects for ece-petrol bunk automation with prepaid cards and gs...
latest ieee projects for ece-petrol bunk automation with prepaid cards and gs...latest ieee projects for ece-petrol bunk automation with prepaid cards and gs...
latest ieee projects for ece-petrol bunk automation with prepaid cards and gs...
 
microcontroller projects center chennai -rfid projects & rfid applications
microcontroller projects center  chennai -rfid projects & rfid applicationsmicrocontroller projects center  chennai -rfid projects & rfid applications
microcontroller projects center chennai -rfid projects & rfid applications
 
best biomedical project center chennai- recent advances in wearable sensors f...
best biomedical project center chennai- recent advances in wearable sensors f...best biomedical project center chennai- recent advances in wearable sensors f...
best biomedical project center chennai- recent advances in wearable sensors f...
 
LATEST IEEE PROJECTS TITLES : personal lung function monitoring devices for a...
LATEST IEEE PROJECTS TITLES : personal lung function monitoring devices for a...LATEST IEEE PROJECTS TITLES : personal lung function monitoring devices for a...
LATEST IEEE PROJECTS TITLES : personal lung function monitoring devices for a...
 
IEEE PROJECTS ABSTRACT 2015-2016: model based mean arterial pressure estimation
IEEE PROJECTS ABSTRACT 2015-2016: model based mean arterial pressure estimationIEEE PROJECTS ABSTRACT 2015-2016: model based mean arterial pressure estimation
IEEE PROJECTS ABSTRACT 2015-2016: model based mean arterial pressure estimation
 
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAIFINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
FINAL YEAR PROJECTS TITLES 2016-IEEE PAPER-MAASTECH CHENNAI
 
FREE INPLANT TRAIINING FOR ENGINEERING STUDENTS EEE/BIOMEDICAL/ECE
FREE INPLANT TRAIINING FOR ENGINEERING STUDENTS EEE/BIOMEDICAL/ECEFREE INPLANT TRAIINING FOR ENGINEERING STUDENTS EEE/BIOMEDICAL/ECE
FREE INPLANT TRAIINING FOR ENGINEERING STUDENTS EEE/BIOMEDICAL/ECE
 
FREE INPLANT TRAINING ECE CHENNAI-T.NAGAR/KODAMBAKKAM
FREE INPLANT TRAINING ECE  CHENNAI-T.NAGAR/KODAMBAKKAMFREE INPLANT TRAINING ECE  CHENNAI-T.NAGAR/KODAMBAKKAM
FREE INPLANT TRAINING ECE CHENNAI-T.NAGAR/KODAMBAKKAM
 
FREE INPLANT TRAINING CHENNAI FOR ENGINEERING STUDENTS
FREE INPLANT TRAINING CHENNAI FOR ENGINEERING STUDENTSFREE INPLANT TRAINING CHENNAI FOR ENGINEERING STUDENTS
FREE INPLANT TRAINING CHENNAI FOR ENGINEERING STUDENTS
 

Dernier

Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinojohnmickonozaleda
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)cama23
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 

Dernier (20)

Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipino
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)Global Lehigh Strategic Initiatives (without descriptions)
Global Lehigh Strategic Initiatives (without descriptions)
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 

ELECTRICAL PROJECTS ABSTRACT MOTOR CONTROL :Ac motor drive using igbt 3phase

  • 1. AC MOTOR DRIVE USING IGBT OBJECTIVE: The aim of the project is to develop a speed control system for ac motor. It is proposed to include the start. Over-head no-volt protection also. PRINCIPLE: Since the speed of AC motor depends on stator-applied voltage. the speed can varied by varying stator voltage. but if voltage is varied by keeping the frequency constant, the flux of the machine will also vary. which is undesirable. It can be operated constant flux condition. TEAM DESCRIPTION: The functional block diagram of AC motor speed control system is shown in fig.1. The controlled rectifier is a 3-phase half controlled bridge rectifier constructed using SCRs and Diodes .the controlled is used to obtain variable DC supply voltage. the variable DC supply voltage is converted to 3 phase AC supply using else IGBT. The speed adjust circuitry will firing angles of rectifier and rectifier and inverter to achieve the desired speed =desired transformer(CT’s)are provided to sense the over-load or no-volt condition and the firing pulses.
  • 2. FEACTURES: 1. No need of extra starter. 2. soft start (while starting the current will not exceed the full load current) 3. consonant speeds or constant torque operation. 4. over-load and no-volt protection.
  • 3. Block Diagram 3 phase input(R,Y,B) 3 phase Rectifier Soft Start Switch (RELAY CONTROL) Microcontroller PIC16F877 Current Amplifier PWM IGBT(INSULATED GATE BIPOLAR TRANSISTOR) SPEED AC Motor SENSOR- PROXIMITY