SlideShare une entreprise Scribd logo
1  sur  14
PROJECT SCOPE
 MANAGEMENT
          TRAINING
[
TRAINING




                              OBJECTIVE
               To qualify the students to manage scope ensuring that the project
               includes all the activities to be performed and facilitates the
               processes of formalizing the acceptance and the project scope
               documentation.
               The course also aims to enable the students to control scope
               changes proposed by the client or project sponsor.




           TRAINING CONTENT
               At the end of the course the student will be able to:

               ✓✓Decompose the project scope through the Work Breakdown
                 Structure (WBS)

               ✓✓Scale the work packages
               ✓✓Determine the appropriate project scope detail level
               ✓✓Distinguish the functional scope from the technical scope
               ✓✓Translate the functional and technical scope into activities
               ✓✓Create the WBS dictionary
               ✓✓Avoid problems such us the uncontrolled scope creep
               ✓✓Validate the scoped with the majors project stakeholders
               ✓✓Associate risks to the developed work packages
               ✓✓Structure a scope change control system

                                                 © Macrosolutions SA. All rights reserved.   2/14
[
TRAINING




                         FACT SHEET
                                                                                DESCRIPTION

                                                           Course number of hours. The number of days depends
           COURSE DURATION
                                                           on the daily number of hours dedicated in each course.
           16 Hours.

                                                           The minimum number of students suggested to ensure
           NUMBER OF PARTICIPANTS
                                                           the training economic viability.
           Minimum 20 students per class.

           TARGET AUDIENCE
           Project managers, project team members, sponsors and others stakeholders interested in the
           project management process.

           REQUIREMENTS
           Desirable project management knowledge.

                                                           The language in which the training is ministered.
           LANGUAGE(S)
           Portuguese, English and Spanish.

           LOCAL
           Provided by the contractor. Worldwide attendance.

                                                           Closed classes are hired by a particular organization
           CLOSED CLASSES
                                                           or group. In this case all the participants are selected/
           (IN COMPANY)?                                   chosen by the contracting organization.
           Yes.

                                                           Open classes offer public access in which the
           OPEN CLASSES?
                                                           registration is done by each participant, individually.
           No.

                                                           Professional Development Units are the measuring
           CERTIFICATION AND PDU
                                                           units issued by the Project Management Institute for
           All training participants will receive a        the credential holders. With these units the credential
           participation certificate with 16 PMI’s PDUs.   holders can maintain their certifications.
           (PMI R.E.P. activity number: Macro012)



                                                                            © Macrosolutions SA. All rights reserved.   3/14
[
TRAINING




STANDARDS AND
METHODOLOGIES
                                              Project management standards and methodologies discussed
                                              and addressed in the training.


               Project Management Institute (PMI)                   UK Office of Government Commerce (OGC)

    PMBOK Guide                                              PRINCE2 (Projects in Controlled Environments)

    PMI Practice Standard for Estimating                     MSP (Managing Successful Programmes)                      —

    PMI Practice Standard for Earned Value Management    —   M_O_R (Management of Risks)                               —

    PMI Practice Standard for Configuration                  P3M3 (Portfolio, Programme, and Project
                                                                                                                       —
    Management                                               Management Maturity Model)

    PMI Practice Standard for Risk Management            —   P3O (Portfolio, Programme and Project Offices)            —

    PMI Practice Standard for Work Breakdown Structure       MoP (Management of Portfolios)                            —

    PMI Practice Standard for Scheduling                 —   MoV (Management of Value)                                 —

    PMI Standard for Portfolio Management                —
                                                                                  Scrum Alliance
    PMI Standard for Program Management                  —
                                                             Scrum Methodology
    PMI Project Manager Development Competency
                                                         —
    Framework
                                                               International Project Management Association (IPMA)
    Organizational Project Management Maturity Model
                                                         —   ICB® IPMA Competence Baseline
    (OPM3®)                                                                                                            —



                                                                                 © Macrosolutions SA. All rights reserved.   4/14
[
TRAINING




                  BASIC
               PROGRAM
    [
    COURSE OPENING


    [
    THE CONTEXT OF PROJECT INTEGRATION AND SCOPE MANAGEMENT
    ›› Project definition and management
    ›› Defining integration management
    ›› Defining scope management
    ›› The characteristics of scope management
    ›› Project failures and scope management
    ›› Factors that support the project scope
    ›› The main causes of scope problems


    [
    THE PROJECT PHASES
    ›› The 5 project phases
    ›› The overlapping of project phases in the PMBOK
    ›› The interference of the phases in the project integration and scope management
    ›› The 42 processes that constitute the PMBOK Guide – 4th Edition


    [
    THE PROJECT INTEGRATION AND SCOPE MANAGEMENT PROCESSES
    ›› Developing the Project Charter
    ›› Developing the Preliminary Scope Statement
    ›› Developing the Project Plan
    ›› Guide and manage the project execution
    ›› Monitoring and controlling the project work
    ›› Integrated change control
    ›› Closing the project

                                                                    © Macrosolutions SA. All rights reserved.   5/14
[
TRAINING
BASIC PROGRAM




    [
    THE SCOPE MANAGEMENT PROCESSES
    ›› Scope planning
    ›› Scope definition
    ›› Create WBS
    ›› The basic rules to create a WBS
    ›› Scope verification
    ›› Scope control


    [
    DETAILING SCOPE AND PROJECT REQUIREMENTS
    ›› Project scope requirements
    ›› The different type of scope
    ›› Functional and technical scope
    ›› Activity scope
    ›› How to better specify the project scope


    [
    INITIATING A PROJECT
    ›› The needs that drive the creation of a project
    ›› SMART objectives
    ›› Project’s justifications, product and deliverables
    ›› Project Charter
    ›› Scope Statement


    [
    WORK BREAKDOWN STRUCTURE (WBS)
    ›› Defining the WBS
    ›› The advantages and disadvantages of the WBS
    ›› Work Packages
    ›› The decomposition process to create the WBS
    ›› WBS Dictionary


    [
    AGILE METHODS FOR THE SCOPE DEFINITION
    ›› How to distinguish fixed scope from incremental scope
    ›› How to control changes in the agile methods
    ›› How to apply the agile methods together with the controlled scope models


    [
    SCOPE CHANGE CONTROL PROCESS
    ›› Where do changes come from
    ›› Change control system
    ›› Managing changes
    ›› Configuration Management


    [
    COURSE CLOSE-OUT

                                                                   © Macrosolutions SA. All rights reserved.   6/14
[
TRAINING




    MY COOKING
       PROJECT                                                                 ®


       EXERCISE
           Ricardo Vargas had the opportunity to learn very interesting
           dynamics that show the project management importance
           while studying in the Strategy and Innovation program at the
           Massachusetts Institute of Technology (MIT).
           During the classes, he developed a simple dynamic based on
           the elaboration of a quick dinner for guests to demonstrate
           the importance of establishing the appropriate strategies for
           managing the project and the inherent risks to every decision
           making and also to the manager risk profile.

                                          © Macrosolutions SA. All rights reserved.   7/14
[
TRAINING
MY COOKING PROJECT EXERCISE




                                                                                                                                                                                                                                                                                                            The dynamics is are performed in two hours with all participants.
                                                                                                                                                                                                                                                                                                            They were divided into groups, competing for the best performance
                                                                                                                                                                                                                                                                                                            seeking to understand the risks associated with each decision.


                                                                                                         Features                                                                                                                                                                                           1- Shows the influence of the RISK PROFILE of
                                                                                                                                                                                                                                                                                                            the project decision maker.
                                                                                                                                                                                                                                                                                                            2- Promotes TEAMWORK in the decision-
                                                                                                                                                                                                                                                                                                            making
                                                                                                                                                                                                                                                                                                            3- Evaluate the effectiveness of the duration
                                                                                                                                                                                                                                                                                                            COMPRESSION mechanisms.


                                                                                                                                                                                                                                                                                                                                           [     MY COOKING PROJECT®
                                                                                                                                                                                                                                                                                                                                                 MAPA DE RISCOS



      [     MY COOKING PROJECT®
            GRÁFICO DE GANTT
                                                                                                                                                                                                                                                                                                                                                                          CENÁRIO 01

                                                                                                                                  CENÁRIO 01                                                                                                        Tempo Total:
                                                                                                                                                                                                                                                                                                                                               ALTA




    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18   18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82
                                                                                                                                                                                                                                                                                                                                         PROBABILIDADE
                                                                                                                                                                                                                                                                                                                                             MÉDIA
                                                                                                                                                                                                                                                                                                                                               BAIXA




                                                                                                                                                                                                                                                                                                                                                           BAIXO              MÉDIO                                   ALTO
                                                                                                                                                                                                                                                                                                                                                                             IMPACTO
    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18   18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82




    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18
                                                                                                                                 CENÁRIO 02                                                                                                         Tempo Total:
                                                                             18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82
                                                                                                                                                                                                                                                                                                                                                                          CENÁRIO 02
                                                                                                                                                                                                                                                                                                                                               ALTA
                                                                                                                                                                                                                                                                                                                                         PROBABILIDADE
                                                                                                                                                                                                                                                                                                                                             MÉDIA
                                                                                                                                                                                                                                                                                                                                               BAIXA




    0-2   2-4   4-6   6-8   8 - 10   10 - 12   12 - 14   14 - 16   16 - 18   18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74   74 - 76 76 - 78 78 - 80 80 - 82


                                                                                                                                                                                                                                           © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida.




                                                                                                                                                                                                                                                                                                                                                           BAIXO              MÉDIO                                   ALTO
                                                                                                                                                                                                                                                                                                                                                                             IMPACTO
                                                                                                                                                                                                                                                                                                                                                                                          © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida.




                                                                                                                                                                                                                                                                                                                                                                       © Macrosolutions SA. All rights reserved.                                                         8/14
[
TRAINING




    PMCOASTER                                                                    ®


      DYNAMIC
                       It is a dynamics developed to simulate the real
                       projects environment.
                       Divided into teams, the participants will plan and
                       execute the construction of a functional high speed
                       roller coaster prototype for a theme park.
                        Students will define the work, evaluate the project
           feasible budget and time in order to execute it. They will do so
           concerning the time and costs constraints. Then, students will
           execute and monitor the project to demonstrate the effectiveness
           of the plan in adverse conditions.
           The approximate duration of the dynamics is 2 hours and its main
           objective is to show the interrelationship between the scope
           required, deadlines and available budget. In addition, the aspects
           related to the teamwork quality are directly addressed.

                                            © Macrosolutions SA. All rights reserved.   9/14
[
TRAINING
PMCOASTER DYNAMIC




       Features     1- Shows the direct relationship between
                    project SCOPE, TIME and COSTS.
                    2- It highlights the importance of the
                    DECISION MAKING in resource-limited
                    settings.
                    3- Enables participants to understand the
                    mechanisms directly related to the creation of
                    the project schedule.




                                           © Macrosolutions SA. All rights reserved.   10/14
[
TRAINING




                                ADDITIONAL
                                 DYNAMICS
                                    As part of our methodology, in this course the following dynamics
                                    will be used:



    [
    CASE STUDIES
    › Ricardo Vargas and the Macrosolutions’ team have selected a relevant set of case studies and
      exercises that allow the participants to associate real and fictional cases the to daily work.
    › All case studies are appropriate to the nature of the client and the training audience.


    [
    VIDEOS SELECTION
    › In order to facilitate the student learning, videos that cover various parts of movies,
      commercials, home videos, etc. are used in the classroom environment to fix concepts and
      associate technical issues with the reality of work and also to introduce new concepts.
    › They are short videos with direct focus on specific topics, tools and cases.


    [
    GROUP WORK
    › Several studies and exercises will be proposed by the instructor in order to present a particular
      topic or discuss a particular approach to project management.
    › Throughout the training the teamwork will be encouraged and strengthened as a mean for the
      group to learn.


    [
    LEARNING EXERCISES
    › During the training, students perform concepts retaining quick exercises. Usually the exercises
      are quick and direct and involve some kind of mathematical calculation.

                                                                      © Macrosolutions SA. All rights reserved.   11/14
[
TRAINING




EXCLUSIVE STUDENT
     ACCESS AREA
                                                          In addition to the exclusive printed material,
                                                          all participants will have access to the
                                                          courseware’s electronic version, to the files
                                                          of exercises and to the work done in the
                                                          classroom.
                                                          The access is given through the restricted
                                                          site that is available and prepared by the
                                                          Macrosolutions team considering each
                                                          course that we provide. This initiative is a
                                                          pioneer in the educational market and also
                                                          anticipates trends related to the documents’
                                                          electronic management
    Student Area’s on the website macrosolutions.com.br

                                                                       © Macrosolutions SA. All rights reserved.   12/14
[
TRAINING




            REQUIRED
           EQUIPMENT
            The equipment required for the proper realization of the course is:




           [ HIGH RESOLUTION PROJECTOR (1024X768)


           [ SOUND SYSTEM FOR VIDEO DISPLAY


           [ INTERNET ACCESS


           [ VARIABLE ILLUMINATION INSIDE THE CLASSROOM


           [ 01 TABLE FOR EACH GROUP OF FIVE STUDENTS


           [ 01 FLIP CHART FOR EACH GROUP OF FIVE STUDENTS

                                              © Macrosolutions SA. All rights reserved.   13/14
[
TRAINING




         FURTHER
     INFORMATION
           For further information about this course, please contact:


           Phone: +55 31 3024-3003
           Fax: +55 31 3024-3005
           email: info@macrosolutions.com.br

                                            © Macrosolutions SA. All rights reserved.   14/14

Contenu connexe

Tendances

Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions SA
 
Macrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in CrisisMacrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in CrisisMacrosolutions SA
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions SA
 
Macrosolutions Training: Risk Management
Macrosolutions Training: Risk ManagementMacrosolutions Training: Risk Management
Macrosolutions Training: Risk ManagementMacrosolutions SA
 
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions SA
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Brian Phillips
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondekLucie Budíková
 
Intl. pm standards prince2, pmi & co. - potifob 2011
Intl. pm standards   prince2, pmi & co. - potifob 2011Intl. pm standards   prince2, pmi & co. - potifob 2011
Intl. pm standards prince2, pmi & co. - potifob 2011POTIFOB
 
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions SA
 
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions SA
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions SA
 
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions SA
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefitsPOTIFOB1
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions SA
 
Macrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions SA
 
Future Africa
Future AfricaFuture Africa
Future AfricaLarsStork
 
Pdc capmhandbook
Pdc capmhandbookPdc capmhandbook
Pdc capmhandbookjohnlucy
 
Pdc pmphandbook
Pdc pmphandbookPdc pmphandbook
Pdc pmphandbookjohnlucy
 

Tendances (20)

Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
Macrosolutions Training: Planning and Monitoring Projects with Microsoft Proj...
 
Macrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in CrisisMacrosolutions Training: Managing Complex Projects and Projects in Crisis
Macrosolutions Training: Managing Complex Projects and Projects in Crisis
 
Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)Macrosolutions PMDome Workshop (en)
Macrosolutions PMDome Workshop (en)
 
Macrosolutions Training: Risk Management
Macrosolutions Training: Risk ManagementMacrosolutions Training: Risk Management
Macrosolutions Training: Risk Management
 
Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...Macrosolutions Training: Project Human Resource Management and Project Leader...
Macrosolutions Training: Project Human Resource Management and Project Leader...
 
Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2Repositioning The Project Management Profession 2 2
Repositioning The Project Management Profession 2 2
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondek
 
Intl. pm standards prince2, pmi & co. - potifob 2011
Intl. pm standards   prince2, pmi & co. - potifob 2011Intl. pm standards   prince2, pmi & co. - potifob 2011
Intl. pm standards prince2, pmi & co. - potifob 2011
 
Macrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project ManagersMacrosolutions Training: Negotiation Techniques for Project Managers
Macrosolutions Training: Negotiation Techniques for Project Managers
 
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
netmind - Mejores prácticas en Gestión de Proyectos, Programas y Portfolios-t…
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
 
Macrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career PlanMacrosolutions Consulting Service: Development of Project Management Career Plan
Macrosolutions Consulting Service: Development of Project Management Career Plan
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefits
 
Macrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projectsMacrosolutions Training: Earned Value Analysis in projects
Macrosolutions Training: Earned Value Analysis in projects
 
Macrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications ManagementMacrosolutions Training: Project Communications Management
Macrosolutions Training: Project Communications Management
 
Future Africa
Future AfricaFuture Africa
Future Africa
 
Rd portfolio management presentationv3
Rd portfolio management presentationv3Rd portfolio management presentationv3
Rd portfolio management presentationv3
 
Pdc capmhandbook
Pdc capmhandbookPdc capmhandbook
Pdc capmhandbook
 
Pdc pmphandbook
Pdc pmphandbookPdc pmphandbook
Pdc pmphandbook
 

Similaire à Macrosolutions Training: Project Scope Management

Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions SA
 
Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions SA
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions SA
 
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions SA
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions SA
 
Training Catalog 0710
Training Catalog 0710Training Catalog 0710
Training Catalog 0710olivierlazar
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...Stefan Ondek, PMP, CSPM
 
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions SA
 
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...Macrosolutions SA
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions SA
 
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions SA
 
Macrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment ManagementMacrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment ManagementMacrosolutions SA
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overviewhouserdah
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedCTE Solutions Inc.
 
George Jucan: Using PMCDF to Advance One's Career
George Jucan: Using PMCDF to Advance One's CareerGeorge Jucan: Using PMCDF to Advance One's Career
George Jucan: Using PMCDF to Advance One's CareerPMI SWOC
 
Pmp project management professional
Pmp   project management professionalPmp   project management professional
Pmp project management professionalZabeel Institute
 

Similaire à Macrosolutions Training: Project Scope Management (19)

Macrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for ExecutivesMacrosolutions Training: Project Management for Executives
Macrosolutions Training: Project Management for Executives
 
Macrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management OfficeMacrosolutions Training: PMO – Project Management Office
Macrosolutions Training: PMO – Project Management Office
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
 
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
Macrosolutions Consulting Service: Project Management Office (PMO) Implementa...
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
 
Training Catalog 0710
Training Catalog 0710Training Catalog 0710
Training Catalog 0710
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
 
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...
 
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
Macrosolutions Consulting Service: Projects, Programs and Portfolios Communic...
 
Pmo
PmoPmo
Pmo
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management Processes
 
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
 
Project Management Credentials
Project Management CredentialsProject Management Credentials
Project Management Credentials
 
Macrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment ManagementMacrosolutions Consulting Service: Portfolio and Investment Management
Macrosolutions Consulting Service: Portfolio and Investment Management
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison Demystified
 
Project Management, Pmi Perspective
Project Management, Pmi PerspectiveProject Management, Pmi Perspective
Project Management, Pmi Perspective
 
George Jucan: Using PMCDF to Advance One's Career
George Jucan: Using PMCDF to Advance One's CareerGeorge Jucan: Using PMCDF to Advance One's Career
George Jucan: Using PMCDF to Advance One's Career
 
Pmp project management professional
Pmp   project management professionalPmp   project management professional
Pmp project management professional
 

Plus de Macrosolutions SA

Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions SA
 
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions SA
 
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions SA
 
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions SA
 

Plus de Macrosolutions SA (15)

Portfólio Macrosolutions
Portfólio MacrosolutionsPortfólio Macrosolutions
Portfólio Macrosolutions
 
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em ProjetosMacrosolutions Treinamento: Gerenciamento de Tempo em Projetos
Macrosolutions Treinamento: Gerenciamento de Tempo em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
Macrosolutions Treinamento: Gerenciamento de Recursos Humanos em Projetos e L...
 
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em ProjetosMacrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
Macrosolutions Treinamento: Gerenciamento da Qualidade em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
Macrosolutions Treinamento: Gerenciamento de Projetos Complexos e Crises em P...
 
Macrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management OfficeMacrosolutions Treinamento: PMO – Project Management Office
Macrosolutions Treinamento: PMO – Project Management Office
 
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de ProjetoMacrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
Macrosolutions Treinamento: Técnicas de Negociação para Gerentes de Projeto
 
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para ExecutivosMacrosolutions Treinamento: Gerenciamento de Projetos para Executivos
Macrosolutions Treinamento: Gerenciamento de Projetos para Executivos
 
Macrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de RiscosMacrosolutions Treinamento: Gerenciamento de Riscos
Macrosolutions Treinamento: Gerenciamento de Riscos
 
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
Macrosolutions Treinamento: Gerenciamento de Projetos: Estabelecendo Diferenc...
 
Macrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de ProgramasMacrosolutions Treinamento: Gerenciamento de Programas
Macrosolutions Treinamento: Gerenciamento de Programas
 
Macrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de PortfólioMacrosolutions Treinamento: Gerenciamento de Portfólio
Macrosolutions Treinamento: Gerenciamento de Portfólio
 
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetosMacrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
Macrosolutions Treinamento: Gerenciamento e Controle de Mudanças em projetos
 
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em ProjetosMacrosolutions Treinamento: Gerenciamento de Escopo em Projetos
Macrosolutions Treinamento: Gerenciamento de Escopo em Projetos
 
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
Macrosolutions Treinamento: Gerenciamento de Custos e Gestão Financeira em pr...
 

Dernier

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 

Dernier (20)

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 

Macrosolutions Training: Project Scope Management

  • 2. [ TRAINING OBJECTIVE To qualify the students to manage scope ensuring that the project includes all the activities to be performed and facilitates the processes of formalizing the acceptance and the project scope documentation. The course also aims to enable the students to control scope changes proposed by the client or project sponsor. TRAINING CONTENT At the end of the course the student will be able to: ✓✓Decompose the project scope through the Work Breakdown Structure (WBS) ✓✓Scale the work packages ✓✓Determine the appropriate project scope detail level ✓✓Distinguish the functional scope from the technical scope ✓✓Translate the functional and technical scope into activities ✓✓Create the WBS dictionary ✓✓Avoid problems such us the uncontrolled scope creep ✓✓Validate the scoped with the majors project stakeholders ✓✓Associate risks to the developed work packages ✓✓Structure a scope change control system © Macrosolutions SA. All rights reserved. 2/14
  • 3. [ TRAINING FACT SHEET DESCRIPTION Course number of hours. The number of days depends COURSE DURATION on the daily number of hours dedicated in each course. 16 Hours. The minimum number of students suggested to ensure NUMBER OF PARTICIPANTS the training economic viability. Minimum 20 students per class. TARGET AUDIENCE Project managers, project team members, sponsors and others stakeholders interested in the project management process. REQUIREMENTS Desirable project management knowledge. The language in which the training is ministered. LANGUAGE(S) Portuguese, English and Spanish. LOCAL Provided by the contractor. Worldwide attendance. Closed classes are hired by a particular organization CLOSED CLASSES or group. In this case all the participants are selected/ (IN COMPANY)? chosen by the contracting organization. Yes. Open classes offer public access in which the OPEN CLASSES? registration is done by each participant, individually. No. Professional Development Units are the measuring CERTIFICATION AND PDU units issued by the Project Management Institute for All training participants will receive a the credential holders. With these units the credential participation certificate with 16 PMI’s PDUs. holders can maintain their certifications. (PMI R.E.P. activity number: Macro012) © Macrosolutions SA. All rights reserved. 3/14
  • 4. [ TRAINING STANDARDS AND METHODOLOGIES Project management standards and methodologies discussed and addressed in the training. Project Management Institute (PMI) UK Office of Government Commerce (OGC) PMBOK Guide PRINCE2 (Projects in Controlled Environments) PMI Practice Standard for Estimating MSP (Managing Successful Programmes) — PMI Practice Standard for Earned Value Management — M_O_R (Management of Risks) — PMI Practice Standard for Configuration P3M3 (Portfolio, Programme, and Project — Management Management Maturity Model) PMI Practice Standard for Risk Management — P3O (Portfolio, Programme and Project Offices) — PMI Practice Standard for Work Breakdown Structure MoP (Management of Portfolios) — PMI Practice Standard for Scheduling — MoV (Management of Value) — PMI Standard for Portfolio Management — Scrum Alliance PMI Standard for Program Management — Scrum Methodology PMI Project Manager Development Competency — Framework International Project Management Association (IPMA) Organizational Project Management Maturity Model — ICB® IPMA Competence Baseline (OPM3®) — © Macrosolutions SA. All rights reserved. 4/14
  • 5. [ TRAINING BASIC PROGRAM [ COURSE OPENING [ THE CONTEXT OF PROJECT INTEGRATION AND SCOPE MANAGEMENT ›› Project definition and management ›› Defining integration management ›› Defining scope management ›› The characteristics of scope management ›› Project failures and scope management ›› Factors that support the project scope ›› The main causes of scope problems [ THE PROJECT PHASES ›› The 5 project phases ›› The overlapping of project phases in the PMBOK ›› The interference of the phases in the project integration and scope management ›› The 42 processes that constitute the PMBOK Guide – 4th Edition [ THE PROJECT INTEGRATION AND SCOPE MANAGEMENT PROCESSES ›› Developing the Project Charter ›› Developing the Preliminary Scope Statement ›› Developing the Project Plan ›› Guide and manage the project execution ›› Monitoring and controlling the project work ›› Integrated change control ›› Closing the project © Macrosolutions SA. All rights reserved. 5/14
  • 6. [ TRAINING BASIC PROGRAM [ THE SCOPE MANAGEMENT PROCESSES ›› Scope planning ›› Scope definition ›› Create WBS ›› The basic rules to create a WBS ›› Scope verification ›› Scope control [ DETAILING SCOPE AND PROJECT REQUIREMENTS ›› Project scope requirements ›› The different type of scope ›› Functional and technical scope ›› Activity scope ›› How to better specify the project scope [ INITIATING A PROJECT ›› The needs that drive the creation of a project ›› SMART objectives ›› Project’s justifications, product and deliverables ›› Project Charter ›› Scope Statement [ WORK BREAKDOWN STRUCTURE (WBS) ›› Defining the WBS ›› The advantages and disadvantages of the WBS ›› Work Packages ›› The decomposition process to create the WBS ›› WBS Dictionary [ AGILE METHODS FOR THE SCOPE DEFINITION ›› How to distinguish fixed scope from incremental scope ›› How to control changes in the agile methods ›› How to apply the agile methods together with the controlled scope models [ SCOPE CHANGE CONTROL PROCESS ›› Where do changes come from ›› Change control system ›› Managing changes ›› Configuration Management [ COURSE CLOSE-OUT © Macrosolutions SA. All rights reserved. 6/14
  • 7. [ TRAINING MY COOKING PROJECT ® EXERCISE Ricardo Vargas had the opportunity to learn very interesting dynamics that show the project management importance while studying in the Strategy and Innovation program at the Massachusetts Institute of Technology (MIT). During the classes, he developed a simple dynamic based on the elaboration of a quick dinner for guests to demonstrate the importance of establishing the appropriate strategies for managing the project and the inherent risks to every decision making and also to the manager risk profile. © Macrosolutions SA. All rights reserved. 7/14
  • 8. [ TRAINING MY COOKING PROJECT EXERCISE The dynamics is are performed in two hours with all participants. They were divided into groups, competing for the best performance seeking to understand the risks associated with each decision. Features 1- Shows the influence of the RISK PROFILE of the project decision maker. 2- Promotes TEAMWORK in the decision- making 3- Evaluate the effectiveness of the duration COMPRESSION mechanisms. [ MY COOKING PROJECT® MAPA DE RISCOS [ MY COOKING PROJECT® GRÁFICO DE GANTT CENÁRIO 01 CENÁRIO 01 Tempo Total: ALTA 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 PROBABILIDADE MÉDIA BAIXA BAIXO MÉDIO ALTO IMPACTO 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 CENÁRIO 02 Tempo Total: 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 CENÁRIO 02 ALTA PROBABILIDADE MÉDIA BAIXA 0-2 2-4 4-6 6-8 8 - 10 10 - 12 12 - 14 14 - 16 16 - 18 18 - 20 20 - 22 22 - 24 24 - 26 26 - 28 28 - 30 30 - 32 32 - 34 34 - 36 36 - 38 38 - 40 40 - 42 42 - 44 44 - 46 46 - 48 48 - 50 50 - 52 52 - 54 54 - 56 56 - 58 58 - 60 62 - 64 64 - 66 66 - 68 68 - 70 70 - 72 72 - 74 74 - 76 76 - 78 78 - 80 80 - 82 © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida. BAIXO MÉDIO ALTO IMPACTO © 2010 Ricardo Viana Vargas. Todos direitos reservados. Reprodução Proibida. © Macrosolutions SA. All rights reserved. 8/14
  • 9. [ TRAINING PMCOASTER ® DYNAMIC It is a dynamics developed to simulate the real projects environment. Divided into teams, the participants will plan and execute the construction of a functional high speed roller coaster prototype for a theme park. Students will define the work, evaluate the project feasible budget and time in order to execute it. They will do so concerning the time and costs constraints. Then, students will execute and monitor the project to demonstrate the effectiveness of the plan in adverse conditions. The approximate duration of the dynamics is 2 hours and its main objective is to show the interrelationship between the scope required, deadlines and available budget. In addition, the aspects related to the teamwork quality are directly addressed. © Macrosolutions SA. All rights reserved. 9/14
  • 10. [ TRAINING PMCOASTER DYNAMIC Features 1- Shows the direct relationship between project SCOPE, TIME and COSTS. 2- It highlights the importance of the DECISION MAKING in resource-limited settings. 3- Enables participants to understand the mechanisms directly related to the creation of the project schedule. © Macrosolutions SA. All rights reserved. 10/14
  • 11. [ TRAINING ADDITIONAL DYNAMICS As part of our methodology, in this course the following dynamics will be used: [ CASE STUDIES › Ricardo Vargas and the Macrosolutions’ team have selected a relevant set of case studies and exercises that allow the participants to associate real and fictional cases the to daily work. › All case studies are appropriate to the nature of the client and the training audience. [ VIDEOS SELECTION › In order to facilitate the student learning, videos that cover various parts of movies, commercials, home videos, etc. are used in the classroom environment to fix concepts and associate technical issues with the reality of work and also to introduce new concepts. › They are short videos with direct focus on specific topics, tools and cases. [ GROUP WORK › Several studies and exercises will be proposed by the instructor in order to present a particular topic or discuss a particular approach to project management. › Throughout the training the teamwork will be encouraged and strengthened as a mean for the group to learn. [ LEARNING EXERCISES › During the training, students perform concepts retaining quick exercises. Usually the exercises are quick and direct and involve some kind of mathematical calculation. © Macrosolutions SA. All rights reserved. 11/14
  • 12. [ TRAINING EXCLUSIVE STUDENT ACCESS AREA In addition to the exclusive printed material, all participants will have access to the courseware’s electronic version, to the files of exercises and to the work done in the classroom. The access is given through the restricted site that is available and prepared by the Macrosolutions team considering each course that we provide. This initiative is a pioneer in the educational market and also anticipates trends related to the documents’ electronic management Student Area’s on the website macrosolutions.com.br © Macrosolutions SA. All rights reserved. 12/14
  • 13. [ TRAINING REQUIRED EQUIPMENT The equipment required for the proper realization of the course is: [ HIGH RESOLUTION PROJECTOR (1024X768) [ SOUND SYSTEM FOR VIDEO DISPLAY [ INTERNET ACCESS [ VARIABLE ILLUMINATION INSIDE THE CLASSROOM [ 01 TABLE FOR EACH GROUP OF FIVE STUDENTS [ 01 FLIP CHART FOR EACH GROUP OF FIVE STUDENTS © Macrosolutions SA. All rights reserved. 13/14
  • 14. [ TRAINING FURTHER INFORMATION For further information about this course, please contact: Phone: +55 31 3024-3003 Fax: +55 31 3024-3005 email: info@macrosolutions.com.br © Macrosolutions SA. All rights reserved. 14/14