SlideShare une entreprise Scribd logo
1  sur  79
1
QM Module
Santosh
2
QM Overview
QM Module General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
3
© SAP AG 1999
Main Business Scenario
 Industrial companies perform quality inspections on
products at various stages in the logistics supply
chain.
 They need to maintain inspection specifications,
record inspection results, and can perform
evaluations using this data.
QM Overview
Business Scenario :
QM Integration
PPPPMMMM
PurchasingPurchasing RequisitionRequisition
Inventory mgmt
Goods receipt
Stock transfer
Goods issue
Inventory mgmt
Goods receipt
Stock transfer
Goods issue
Shipping
Billing
Shipping
Billing
SDSD
Invoice
verification
Invoice
verification
Warehouse
management
Warehouse
management
Inspection lotInspection lot
QMQM Inspection lotInspection lot
Print insp. instructionPrint insp. instruction
Results recordingResults recording
Usage decisionUsage decision
Basic dataBasic dataBasic dataBasic data
Test equipment
management
Test equipment
management
PMPM
Production
planning
Production
planning
Reqt planning
R-cut capacity
planning
Reqt planning
R-cut capacity
planning
Planned
Orders
Planned
Orders
Opening
period
Opening
period
Order:
- Creation
- Release
- Confirmation
Order:
- Creation
- Release
- Confirmation
Shop floor
control
Capacity
leveling
Shop floor
control
Capacity
leveling
CAMCAM
MaterialsMaterials
VendorsVendors
RoutingsRoutings
DocumentsDocuments
Inspection plan
Characteristics
Insp. methods
Insp. catalogs
Test equipment
5
Control
Planning Inspection
QM Overview
6
QM Overview
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
Quality Planning: Activities
Creating and managing the
master data that is required
(among other items) to plan
and execute quality
inspections.
7
QM Overview
Quality Inspection: Activities
Determining whether the units
inspected fulfill the predefined
quality requirements.
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
8
QM Overview
R
Quality Control: Activities
Implementing different
preventive, monitoring and
corrective activities.
These activities are based on the
specifications from quality
planning and the evaluations of
quality inspections and quality
notifications.
npnp
157157 005005
398398
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
9
QM Overview
R
Quality Certificates: Activities
Certifying the quality of a material
or product.
Quality certificates contain texts,
specification values, and
inspection results.
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
10
QM Overview
R
Quality Notification : Activities
Recording the Non-Conformance
or product.
Investigation and analysis of defect
Record Cause , Task and activities ,
etc.,
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
11
QM Overview
R
Test Equipment Management: Activities
Managing master data as well as
the planning and processing
calibration inspections for test
and measurement equipment.
30
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
12
QM Overview
QM Module - General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
13
QM Overview
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
Quality Planning: Activities
Creating and managing the
master data that is required
(among other items) to plan
and execute quality
inspections.
14
Quality Planning
 Inspection Planning
 Inspection Plan
 Master Recipes
 Basic Data
 Catalog / Selected Sets
 Master Inspection Characteristics
 Class Characteristics
 Inspection Method
 Sampling Procedure / Sampling
Scheme
 Work Center
 Logistic Master Data
 Material master QM-View
 Quality Info Record
15
© SAP AG 2001
QM Basic Data and Inspection Plan Structure
Operation
Header
Insp. plan
Material master
record
Vendor master
record
Inspection
characteristic
Work center
Production
resources/tools
Customer master
record
Quality Planning
Inspection Plan Structure :
16
Quality Planning
Inspection Plan :
 Inspection plans is used to describe how a quality
inspection should be performed for one or more materials.
 Define in the inspection plan in which order individual
inspection operations should occur and which inspection
characteristics should be inspected, using which inspection
specifications.
Inspection plans for different uses (for Example goods issue
inspection, Inprocess Inspection, Inspection during Sales etc.).
17
© SAP AG 1999
What is to be inspected?
General data
Characteristic
control
References to
master records
Administrative data
Master Inspection Characteristic
Quality Planning
Basic Data : Master Inspection Characteristics
18
Quality Planning
Master Inspection Characteristics :
 Inspection characteristic describes WHAT needs to be inspected.
 MIC can be either Qualitative or Quantitative and intended for
repetitive use.
 Catalogs & inspection Methods are assigned to MICs
 Defect Catalogs are assigned in case Defect Recording is required.
 Control Indicators defines the parameters for Result recording of
the MIC & Result analysis.
19© SAP AG 2001
CODING
ScratchedScratched
WarpedWarped
DamagedDamaged
CrackedCracked
Usage of Catalogs
1001 Warped
1002 Damaged
1003 Cracked
1004 Dented
Quality Planning
Basic Data : Usage of Catalog
20
Quality Planning
Defects
Defect consequences
Causes
Events
Usage decisions
Task
Characteristic attributes
Selected
Set
Codes
Cat
Type
Codes Codes
Grp
Selected
Set
9
6
5
4
3
2
1
21
Quality Planning
Catalog :
The catalog contains unique, non-numerical data in
the system that is defined at client or plant level.
 Can define our own code groups and codes for
each catalog type.
 Directly assign catalogs to master inspection
characteristics
 Use the catalogs to make it easier to record inspection
results, defects, and defect locations during inspection
lot processing
22© SAP AG 2001
Inspection Method: General
What kind of inspection
is to be performed?
Validity
Qualification
Texts
Classification
Quality Planning
Basic Data : Inspection Method
23
Quality Planning
Inspection Method:
 An inspection method describes how the inspection to be carried out
for an inspection characteristic.
 Common family of components which are inspected under standard
specifications, norms etc can be treated as inspection method which will
be assigned to master inspection characteristic
 Up to ten inspection methods can be assigned to a master inspection
characteristic, however only one inspection method can be assigned to
the planned characteristic.
 Inspection method is maintained at plant level and validity from effective
date.
 Inspection method identifier is optional Text, Long Text, Inspector
Qualification to be entered on data screen for every inspection method
24
Quality Planning
Quality Info Record :
 When a quotation or purchase order is created, the system
checks whether a Q-info record is required and available for the
combination of material and vendor. A check is made to
determine whether the purchase order can be released
 Specify a status profile for releasing the supply relationships as
well as the QM system of the material-vendor combination in the
Q-info record
 This facilitates the inspection or perform a goods receipt
inspection and/or source inspections
25
QM Overview
QM Module General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
26
QM Overview
Quality Inspection: Activities
Determining whether the units
inspected fulfill the predefined
quality requirements.
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
27
Quality Inspection
 Inspection Lot Creation
 Manual / Automatic Lot
 Stock / Non-Stock relevant Lot
 Result Recording
 Quantitative / Qualitative / Calculated chars
 Single/Multiple recording
 Valuation with specification
 Defect Recording : For deviation
 Manual / Auto creation
 Continued with notification : Background process
 Usage Decision
 UD code / Stock Posting / Quality Score Calculation
28
© SAP AG 1999
Inspection Lot: Business Scenario
Inspection
lot
The inspection lot represents the request to a
plant to perform a quality inspection on a
certain quantity of a material.
Quality Inspection
Inspection Lot :
29
© SAP AG 2001
12
9
6
3
11 1
7 5
8 4
210
Goods
movement
Production
order
Customer
order
Delivery
Deadline
monitoring
Manual
Inspection
lot
Maintenance
order
Inspection Lot: General
Quality
inspection
Quality Inspection
Inspection Lot : General
30
© SAP AG 1999
QM Inspection Process: Results Recording
Event
Sample determination
Usage decision
Evaluation
Defects recording
Inspection lot
Enter results
Valuation
Completion
Results
recording
Quality Inspection
Inspection Process : Result Recording
31
© SAP AG 1999
Defects Recording: Business Scenario
Quality Inspection
Defect recording business scenario :
32
© SAP AG 1999
!!Purchasing Production
Vendor Stock
A
A B
C
D
Statistics
Units
t
Quality level
Inspection stage
Time
Usage Decision: Effects
Quality Inspection
Usage Decision – Effects :
33
QM Overview
QM Module : General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
34
QM Overview
R
Quality Certificates: Activities
Certifying the quality of a material
or product.
Quality certificates contain texts,
specification values, and
inspection results.
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
35
Quality Certificate
 Incoming
 Vendor certificate against Good receipt
 Outgoing
 Certificate Profile
- Certificate Planning
- Certificate Processing
36
Quality Certificate
37
QM Overview
QM Module : General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
38
QM Overview
R
Quality Notification : Activities
Recording the Non-Conformance
or product.
Investigation and analysis of defect
Record Cause , Task and activities ,
etc.,
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
39
Quality Notification
 Notification Type
 Vendor problem
 Internal problem
 Customer complaint
 Notification Process
 Automatic trigger from defect recording / Manual creation.
 Predefined codes as per catalog used in
- Item / Task / Activity
 Catalog maintained at client level.
 Task completion for notification closure
 Standard report for notification.
Quality Notification
Status
management
Nonconformity
costs
QM costs
Q Notification
Actions
Defects analysis
TasksEvaluations
Controlling
Workflow
DescriptionArchive Link
Elements:
41
Quality Notification
Notification
Task Completion and
Notification closure
Report
Complaint Details
Complaint type and rejection details
Partners and Coordinator
Internal and External failures
Causes (Root Cause)
Tasks (Corrective Action )
Activities (Preventive Action)
Purpose :
 To record & process
different types of
problems..
 To analyze the defects &
monitor the correction of
these defects.
42
QM Overview
QM Module : General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment Management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
43
QM Overview
R
Test Equipment Management: Activities
Managing master data as well as
the planning and processing
calibration inspections for test
and measurement equipment.
30
 Quality planning
 Quality inspection
 Quality control
 Quality certificates
 Quality notifications
 Test equipment mgmt.
44
Test Equipment Management
Purpose :
 To ensure that the Test Equipment ( which is used for Inspection )
continues to meet the pre-defined specifications.
Process:
 Creation of
• Equipment
• Maintenance task list
• Maintenance plan
 Scheduling the Plan
 Processing of Calibration order (Internal / External)
 Creation of the lot
 Result recording
 Defect recording
 Usage decision
 Notification processing for any deviation.
45
QM Overview
QM Module : General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
QM Integration
PPPPMMMM
PurchasingPurchasing RequisitionRequisition
Inventory mgmt
Goods receipt
Stock transfer
Goods issue
Inventory mgmt
Goods receipt
Stock transfer
Goods issue
Shipping
Billing
Shipping
Billing
SDSD
Invoice
verification
Invoice
verification
Warehouse
management
Warehouse
management
Inspection lotInspection lot
QMQM Inspection lotInspection lot
Print insp. instructionPrint insp. instruction
Results recordingResults recording
Usage decisionUsage decision
Basic dataBasic dataBasic dataBasic data
Test equipment
management
Test equipment
management
PMPM
Production
planning
Production
planning
Reqt planning
R-cut capacity
planning
Reqt planning
R-cut capacity
planning
Planned
Orders
Planned
Orders
Opening
period
Opening
period
Order:
- Creation
- Release
- Confirmation
Order:
- Creation
- Release
- Confirmation
Shop floor
control
Capacity
leveling
Shop floor
control
Capacity
leveling
CAMCAM
MaterialsMaterials
VendorsVendors
RoutingsRoutings
DocumentsDocuments
Inspection plan
Characteristics
Insp. methods
Insp. catalogs
Test equipment
47
© SAP AG 1999
Quality
Management:
Integration
in logistical
processes
PM
MM PP
SD
Quality
Management
Position of QM
QM integration
48
QM integration
Material Management
 Manages quality information for materials, vendors
 Releases vendors; Monitors their QM systems
 Manages the release status of delivery relationships, for example
Vendor approval, Sample Approval etc
 Evaluates vendors on the basis of quality using quality scores
from audits, goods receipt inspections, and problem notifications.
 Requests quality certificates and monitors their receipt. Tracking
of vendor certificates.
 Triggers source inspections to be carried out at the vendor’s
premises before the vendor is due to make a delivery - Source
inspection.
 Triggers inspections for goods movements, for example, goods
receipt
 Blocks payments until Inspection Lots are accepted
49
QM integration
Production Planning
 Batch management
 Handles inspection characteristics and setup characteristics for
operations
 Manages quality inspections for manufacturing orders
 Handles in-process inspections during production at freely
defined inspection Points- In-process Inspection (Qty/time
based)
 Scrapping procedures
 Triggers final inspection upon goods receipt from production
 Confirms quality and quantity information for manufacturing
orders
 Monitors production quality with the help of control charts and
determines process capability.
 Manages problems in production using quality notifications and
by processing corrective tasks
50
QM integration
Sales and Distribution
 Batch allocation during delivery of finished goods
 Customer Complaints Handling
 Manages customer-related quality information
 Triggers an inspection at shipping when the delivery is created-
Lot Creation thro PGI for Sales Inspection
 Lot Creation thro PGR for Customer Returns
 Creates quality certificates with the delivery
Plant Maintenance
 Equipment related data maintenance
 Calibration
51
QM Overview
QM Module : General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
52
Reports
53
Reports
54
Reports
55
Reports
56
Reports
57
QM Overview
QM Module : General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
58
Benefits
BENEFITS :
 Comprehensive master data maintenance by system.
 Stocks in Quality till inspection is completed.
 Inspection Results are available on line, hence retrieval is
will be easy and trends/SPC of characteristics can be
viewed on line
 Quality Score for vendor is based on U D.
 Standardized methodology for complaint reporting and
analysis.
 Calibration frequency scheduled by system for instruments.
 Standard reports for analysis and review.
59
QM Overview
QM Module : General
Quality Planning
Quality Inspection
Quality Certificate
Quality Notification
Test Equipment management
QM Integration with Other Modules
Standard Reports
Benefits
Processes
60
QM Processes
1. QM Master Data
2. Incoming Inspection
3. In Process Inspection
4. Final Inspection
5. Stock Transfer Inspection
6. Customer Complaints and Return
7. Miscellaneous Inspection
8. Calibration Inspection
61
1. QM Master Data
62
QM Master Data
1. Material master : MM01,MM02,MM03
2. Inspection Method : QS31,QS32,QS33
3. MIC : QS21,QS23,QS24
4. Equipment Master : IE01,IE02,IE03
5. Catalog : QS41,QS42
6. Selected Set : QS51,QS52
7. Sampling Procedure : QDV1,QDV2,QDV3
8. Inspection plan : QP01,QP02,QP03
9. Maintenance Task list : IA01,IA02,IA03
10.Quality info Record : QI01,QI02,QI03
1. Material master : MM01,MM02,MM03
2. Inspection Method : QS31,QS32,QS33
3. MIC : QS21,QS23,QS24
4. Equipment Master : IE01,IE02,IE03
5. Catalog : QS41,QS42
6. Selected Set : QS51,QS52
7. Sampling Procedure : QDV1,QDV2,QDV3
8. Inspection plan : QP01,QP02,QP03
9. Maintenance Task list : IA01,IA02,IA03
10.Quality info Record : QI01,QI02,QI03
Create
(One time only)
Change
(many times) Display
(any time)
63
2. Incoming Inspection
64
Incoming Inspection
GR-MIGO Posting by MM
Inspection Lot : Type 01
created and viewed thro
QA32
Result Recording
(QE51n) for inspection
characteristics
Resul
t
Usage Decision (QA11)
- Stock Posting
- Quality Score updation
- UD code Valuation
- Inspection lot completion
Defect Recording
in RR
Notification
Creation (QM01)
Background
Notification
processing (QM02)
Incoming Insp
Notification
Closure
Not
Ok
OK
Quality
Notification
65
3. In-Process Inspection
66
In-process Inspection
Order create by PP
Inspection Lot : Type 03
created and viewed thro
QA32
Result Recording
(QE51n) for inspection
characteristics
Resul
t
Valuation is required on each
recording
Defect Recording
in RR
Notification
Creation (QM01)
Background
Notification
processing (QM02)
In-process Materials
Notification
Closure
Not
Ok
OK
Lot Usage Decision
Quality
Notification
67
4. Final Packing Inspection
68
Final Inspection
GR Posting by PP
Inspection Lot : Type 04
created and viewed thro
QA32
Result Recording
(QE51n) for inspection
characteristics
Resul
t
Defect Recording
in RR
Notification
Creation (QM01)
Background
Notification
processing (QM02)
Final Inspection
Notification
Closure
Not
Ok
OK
Usage Decision (QA11)
- Stock Posting in Silo
- Quality Score updation
- UD code Valuation
- Inspection lot completion
Quality
Notification
69
5. Stock Transfer Inspection
70
Stock Transfer Inspection
Stock Transfer
GR Posting by MM
Inspection Lot : Type 08
created and viewed thro
QA32
Result Recording
(QE51n) for inspection
characteristics
Resul
t
Usage Decision (QA11)
- Stock Posting
- Quality Score updation
- UD code Valuation
- Inspection lot completion
Defect Recording
in RR
Notification
Creation (QM01)
Background
Notification
processing (QM02)
Plant to Plant
Notification
Closure
Not
Ok
OK
Quality
Notification
71
6. Customer complaint
and Returns
72
Customer Rejection
Post Goods Receipt to
storage loc using VL01n
for Inspection lot creation.
Create Notification
Result Recording for
investigation finding
Defect
Recording
Create Return Sale Order
by SD thro VA01
Inspection Lot : Type 05 created
and viewed thro QA32
Task Completion and
Notification closure
Generate Report
Usage Decision
for the Lot
Notifications Process contains :
•Customer Details / Sale order
•Complaint type and rejection
details
•Partners and Coordinator
•Internal and External failures
•Causes (Root Cause)
•Tasks (Corrective Action )
•Activities (Preventive Action)
Classification of
customer
complaint
73
Customer complaint
Task Completion and
Notification closure
Generate Report
Notification Raised
by SD
Notifications Process contains :
•Customer Details / Sale order
•Complaint type and rejection
details
•Partners and Coordinator
•Internal and External failures
•Causes (Root Cause)
•Tasks (Corrective Action )
•Activities (Preventive Action)
Send to Concerned
Personnel for actions
74
7. Miscellaneous Inspection
75
Miscellaneous Inspection
Manual Lot Creation
using QA01
Manual Lot origin :Type 89
created and viewed thro
QA32
Result Recording (QE51n)
for inspection
characteristics
Resul
t
Usage Decision (QA11)
- Quality Score updation
- UD code Valuation
- Inspection lot completion
Defect Recording
in RR
Notification
Creation (QM01)
Background
Notification
processing (QM02)
Miscellaneous Inspection
(Audit/Reverse Engg)
Notification
Closure
Not
Ok
OK
Quality
Notification
76
8. Calibration Inspection
77
Internal Calibration
Calibration Order
Searching thro IW39
Inspection Lot list :Type 14
created and viewed thro
QA32
Result Recording (QE51n)
for inspection
characteristics
Resul
t
Usage Decision (QA11)
- UD code Valuation
- Inspection lot completion
Defect Recording
in RR
Notification
Creation (QM01)
Background
Notification
processing (QM02)
QC Equipment
Notification
Closure
Not
Ok
OK
Master Data :
• Equipment Master : IE01,IE02,IE03
• Maintenance Task list : IA01,IA02,IA03
• Maintenance Plan : IP41
• Scheduling : IP10
Master Data :
• Equipment Master : IE01,IE02,IE03
• Maintenance Task list : IA01,IA02,IA03
• Maintenance Plan : IP41
• Scheduling : IP10
Quality
Notification
78
External Calibration
Create service entry sheet by
MM thro ML81N
Inspection Lot list :Type 14
created and viewed thro QA32
Result Recording (QE51n) for
inspection characteristics
Resul
t
Usage Decision (QA11)
- UD code Valuation
- Inspection lot completion
Defect Recording
in RR
Notification
Creation (QM01)
Background
Notification
processing (QM02)
Lab Equipment
to be calibrated by external
Notification
Closure
Not Ok
OK
Service Entry Sheet completion /
MIRO Processing by QM
Create Purchase Order and
Gate Pass by MM thro ME21N
Calibration Order Searching thro IW39
Calibration Order Processing thro IW32
If Inspection Lot not required
Master Data :
• Equipment Master : IE01,IE02,IE03
• Maintenance Task list : IA01,IA02,IA03
• Maintenance Plan : IP41
• Scheduling : IP10
Master Data :
• Equipment Master : IE01,IE02,IE03
• Maintenance Task list : IA01,IA02,IA03
• Maintenance Plan : IP41
• Scheduling : IP10
Quality
Notification
79
Thank you

Contenu connexe

Tendances

SAP PM Master Data Training Guide
SAP PM Master Data Training GuideSAP PM Master Data Training Guide
SAP PM Master Data Training Guidesapdocs. info
 
Variant Configuration in SAP PP: Beginner's Guide
Variant Configuration in SAP PP: Beginner's GuideVariant Configuration in SAP PP: Beginner's Guide
Variant Configuration in SAP PP: Beginner's Guidesapdocs. info
 
62729459 sap-mm-master-data
62729459 sap-mm-master-data62729459 sap-mm-master-data
62729459 sap-mm-master-dataNabil Sayed
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookellamuralikrishnanookella
 
WM - PP Interface
WM - PP InterfaceWM - PP Interface
WM - PP Interfaceharsh shah
 
Scm660 handling-unit-management
Scm660 handling-unit-managementScm660 handling-unit-management
Scm660 handling-unit-managementLokesh Modem
 
Production Supply with SAP EWM
Production Supply with SAP EWMProduction Supply with SAP EWM
Production Supply with SAP EWMVictor Cerullo
 
SAP Production Planning and Execution presentation
SAP Production Planning and Execution presentationSAP Production Planning and Execution presentation
SAP Production Planning and Execution presentationAnkur Aggarwal
 
Extened warehouse management EWM
Extened warehouse management EWMExtened warehouse management EWM
Extened warehouse management EWMSethuRaja P
 
Introduction to sap r3 (mm)
Introduction to sap r3 (mm)Introduction to sap r3 (mm)
Introduction to sap r3 (mm)Vanitha Dassari
 
Sap batch management overview
Sap batch management overviewSap batch management overview
Sap batch management overviewdhl1234
 

Tendances (20)

SAP PM Master Data Training Guide
SAP PM Master Data Training GuideSAP PM Master Data Training Guide
SAP PM Master Data Training Guide
 
Bn1011 demo ppt sap qm
Bn1011 demo ppt sap qmBn1011 demo ppt sap qm
Bn1011 demo ppt sap qm
 
Variant Configuration in SAP PP: Beginner's Guide
Variant Configuration in SAP PP: Beginner's GuideVariant Configuration in SAP PP: Beginner's Guide
Variant Configuration in SAP PP: Beginner's Guide
 
62729459 sap-mm-master-data
62729459 sap-mm-master-data62729459 sap-mm-master-data
62729459 sap-mm-master-data
 
Sap ewm detailed presentation
Sap ewm detailed presentationSap ewm detailed presentation
Sap ewm detailed presentation
 
Sap mm tutorial
Sap mm tutorialSap mm tutorial
Sap mm tutorial
 
SAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna NookellaSAP PP Case study by Murali Krishna Nookella
SAP PP Case study by Murali Krishna Nookella
 
SAP Landscape
SAP Landscape SAP Landscape
SAP Landscape
 
WM - PP Interface
WM - PP InterfaceWM - PP Interface
WM - PP Interface
 
Stock overview
Stock overviewStock overview
Stock overview
 
SAP mm-overview
SAP mm-overviewSAP mm-overview
SAP mm-overview
 
Scm660 handling-unit-management
Scm660 handling-unit-managementScm660 handling-unit-management
Scm660 handling-unit-management
 
Production Supply with SAP EWM
Production Supply with SAP EWMProduction Supply with SAP EWM
Production Supply with SAP EWM
 
Sap qm
Sap qmSap qm
Sap qm
 
SAP Production Planning
SAP Production PlanningSAP Production Planning
SAP Production Planning
 
SAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration processSAP PM: Test Equipment Management/Calibration process
SAP PM: Test Equipment Management/Calibration process
 
SAP Production Planning and Execution presentation
SAP Production Planning and Execution presentationSAP Production Planning and Execution presentation
SAP Production Planning and Execution presentation
 
Extened warehouse management EWM
Extened warehouse management EWMExtened warehouse management EWM
Extened warehouse management EWM
 
Introduction to sap r3 (mm)
Introduction to sap r3 (mm)Introduction to sap r3 (mm)
Introduction to sap r3 (mm)
 
Sap batch management overview
Sap batch management overviewSap batch management overview
Sap batch management overview
 

En vedette (17)

SAP QM by Direct trainer
SAP QM by Direct trainerSAP QM by Direct trainer
SAP QM by Direct trainer
 
2010.Ship.Office.Floor
2010.Ship.Office.Floor2010.Ship.Office.Floor
2010.Ship.Office.Floor
 
Dilip sadh mm wm overview
Dilip sadh  mm wm overviewDilip sadh  mm wm overview
Dilip sadh mm wm overview
 
Manual QM
Manual QMManual QM
Manual QM
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 
Office TPM
Office TPMOffice TPM
Office TPM
 
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEETO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
Co product costing config ecc6
Co product costing config ecc6Co product costing config ecc6
Co product costing config ecc6
 
Sap MM Presentation
Sap MM PresentationSap MM Presentation
Sap MM Presentation
 
Document splitting in New GL in SAP
Document splitting in New GL in SAPDocument splitting in New GL in SAP
Document splitting in New GL in SAP
 
Training Methods Technique and Aids
Training Methods Technique and AidsTraining Methods Technique and Aids
Training Methods Technique and Aids
 
SAP MM Configuration Step by Step guide by Tata Mcgraw hill
SAP MM Configuration Step by Step guide by Tata Mcgraw hillSAP MM Configuration Step by Step guide by Tata Mcgraw hill
SAP MM Configuration Step by Step guide by Tata Mcgraw hill
 
Sap mm full
Sap mm fullSap mm full
Sap mm full
 
Mm module sap
Mm module sapMm module sap
Mm module sap
 
Product costing in SAP - a primer
Product costing in SAP - a primerProduct costing in SAP - a primer
Product costing in SAP - a primer
 
SAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration documentSAP Logistics - CS - Standard Process & Configuration document
SAP Logistics - CS - Standard Process & Configuration document
 

Similaire à Qm overview

Sap qm online training in india
Sap qm online training in indiaSap qm online training in india
Sap qm online training in indiaspectosap
 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxTanmayPanigrahy
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master planBharatlal Sain
 
Manufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industriesManufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industriesSumita Sahoo
 
Regulatory expectation & design approach on continuous process verification
Regulatory expectation & design approach on continuous process verificationRegulatory expectation & design approach on continuous process verification
Regulatory expectation & design approach on continuous process verificationKaran Rajendra Khairnar
 
209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-listUsama Waly
 
Computer aided quality control
Computer aided quality controlComputer aided quality control
Computer aided quality controlAhmad Bajwa
 
Ricky's Resume
Ricky's ResumeRicky's Resume
Ricky's ResumeRicky Moll
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master planPrinka Choudhary
 
(1)Statistics in QbD Stats WS 09-06.ppt
(1)Statistics in QbD Stats WS 09-06.ppt(1)Statistics in QbD Stats WS 09-06.ppt
(1)Statistics in QbD Stats WS 09-06.pptDiptoKumerSarker1
 
Medical Device Agile Quality Demo
Medical Device Agile Quality DemoMedical Device Agile Quality Demo
Medical Device Agile Quality DemoZero Wait-State
 
Procon Engineering Private Limited
Procon Engineering Private LimitedProcon Engineering Private Limited
Procon Engineering Private LimitedSaad_Sarfraz
 
The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...arvindsinghrathore6
 
Incorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanIncorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanInstitute of Validation Technology
 

Similaire à Qm overview (20)

Sap qm online training in india
Sap qm online training in indiaSap qm online training in india
Sap qm online training in india
 
validationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptxvalidationandcalibrationmasterplan-190223191733.pptx
validationandcalibrationmasterplan-190223191733.pptx
 
Validation and calibration master plan
Validation and calibration master planValidation and calibration master plan
Validation and calibration master plan
 
Manufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industriesManufacturing planning and self inspection in pharmaceutical industries
Manufacturing planning and self inspection in pharmaceutical industries
 
Regulatory expectation & design approach on continuous process verification
Regulatory expectation & design approach on continuous process verificationRegulatory expectation & design approach on continuous process verification
Regulatory expectation & design approach on continuous process verification
 
Process validation
Process validationProcess validation
Process validation
 
209422504 process-audit-check-list
209422504 process-audit-check-list209422504 process-audit-check-list
209422504 process-audit-check-list
 
Computer aided quality control
Computer aided quality controlComputer aided quality control
Computer aided quality control
 
Validation ksd
Validation ksdValidation ksd
Validation ksd
 
Ricky's Resume
Ricky's ResumeRicky's Resume
Ricky's Resume
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
 
(1)Statistics in QbD Stats WS 09-06.ppt
(1)Statistics in QbD Stats WS 09-06.ppt(1)Statistics in QbD Stats WS 09-06.ppt
(1)Statistics in QbD Stats WS 09-06.ppt
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 
Medical Device Agile Quality Demo
Medical Device Agile Quality DemoMedical Device Agile Quality Demo
Medical Device Agile Quality Demo
 
Procon Engineering Private Limited
Procon Engineering Private LimitedProcon Engineering Private Limited
Procon Engineering Private Limited
 
The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...The 5 core tools are recognized as standard quality tools for the automotive ...
The 5 core tools are recognized as standard quality tools for the automotive ...
 
Incorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanIncorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation Plan
 
Validation
ValidationValidation
Validation
 
RFP Presentation Example
RFP Presentation ExampleRFP Presentation Example
RFP Presentation Example
 
concept of validation
concept of validationconcept of validation
concept of validation
 

Dernier

Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 

Dernier (20)

Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 

Qm overview

  • 2. 2 QM Overview QM Module General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment management QM Integration with Other Modules Standard Reports Benefits Processes
  • 3. 3 © SAP AG 1999 Main Business Scenario  Industrial companies perform quality inspections on products at various stages in the logistics supply chain.  They need to maintain inspection specifications, record inspection results, and can perform evaluations using this data. QM Overview Business Scenario :
  • 4. QM Integration PPPPMMMM PurchasingPurchasing RequisitionRequisition Inventory mgmt Goods receipt Stock transfer Goods issue Inventory mgmt Goods receipt Stock transfer Goods issue Shipping Billing Shipping Billing SDSD Invoice verification Invoice verification Warehouse management Warehouse management Inspection lotInspection lot QMQM Inspection lotInspection lot Print insp. instructionPrint insp. instruction Results recordingResults recording Usage decisionUsage decision Basic dataBasic dataBasic dataBasic data Test equipment management Test equipment management PMPM Production planning Production planning Reqt planning R-cut capacity planning Reqt planning R-cut capacity planning Planned Orders Planned Orders Opening period Opening period Order: - Creation - Release - Confirmation Order: - Creation - Release - Confirmation Shop floor control Capacity leveling Shop floor control Capacity leveling CAMCAM MaterialsMaterials VendorsVendors RoutingsRoutings DocumentsDocuments Inspection plan Characteristics Insp. methods Insp. catalogs Test equipment
  • 6. 6 QM Overview  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt. Quality Planning: Activities Creating and managing the master data that is required (among other items) to plan and execute quality inspections.
  • 7. 7 QM Overview Quality Inspection: Activities Determining whether the units inspected fulfill the predefined quality requirements.  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt.
  • 8. 8 QM Overview R Quality Control: Activities Implementing different preventive, monitoring and corrective activities. These activities are based on the specifications from quality planning and the evaluations of quality inspections and quality notifications. npnp 157157 005005 398398  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt.
  • 9. 9 QM Overview R Quality Certificates: Activities Certifying the quality of a material or product. Quality certificates contain texts, specification values, and inspection results.  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt.
  • 10. 10 QM Overview R Quality Notification : Activities Recording the Non-Conformance or product. Investigation and analysis of defect Record Cause , Task and activities , etc.,  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt.
  • 11. 11 QM Overview R Test Equipment Management: Activities Managing master data as well as the planning and processing calibration inspections for test and measurement equipment. 30  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt.
  • 12. 12 QM Overview QM Module - General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment management QM Integration with Other Modules Standard Reports Benefits Processes
  • 13. 13 QM Overview  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt. Quality Planning: Activities Creating and managing the master data that is required (among other items) to plan and execute quality inspections.
  • 14. 14 Quality Planning  Inspection Planning  Inspection Plan  Master Recipes  Basic Data  Catalog / Selected Sets  Master Inspection Characteristics  Class Characteristics  Inspection Method  Sampling Procedure / Sampling Scheme  Work Center  Logistic Master Data  Material master QM-View  Quality Info Record
  • 15. 15 © SAP AG 2001 QM Basic Data and Inspection Plan Structure Operation Header Insp. plan Material master record Vendor master record Inspection characteristic Work center Production resources/tools Customer master record Quality Planning Inspection Plan Structure :
  • 16. 16 Quality Planning Inspection Plan :  Inspection plans is used to describe how a quality inspection should be performed for one or more materials.  Define in the inspection plan in which order individual inspection operations should occur and which inspection characteristics should be inspected, using which inspection specifications. Inspection plans for different uses (for Example goods issue inspection, Inprocess Inspection, Inspection during Sales etc.).
  • 17. 17 © SAP AG 1999 What is to be inspected? General data Characteristic control References to master records Administrative data Master Inspection Characteristic Quality Planning Basic Data : Master Inspection Characteristics
  • 18. 18 Quality Planning Master Inspection Characteristics :  Inspection characteristic describes WHAT needs to be inspected.  MIC can be either Qualitative or Quantitative and intended for repetitive use.  Catalogs & inspection Methods are assigned to MICs  Defect Catalogs are assigned in case Defect Recording is required.  Control Indicators defines the parameters for Result recording of the MIC & Result analysis.
  • 19. 19© SAP AG 2001 CODING ScratchedScratched WarpedWarped DamagedDamaged CrackedCracked Usage of Catalogs 1001 Warped 1002 Damaged 1003 Cracked 1004 Dented Quality Planning Basic Data : Usage of Catalog
  • 20. 20 Quality Planning Defects Defect consequences Causes Events Usage decisions Task Characteristic attributes Selected Set Codes Cat Type Codes Codes Grp Selected Set 9 6 5 4 3 2 1
  • 21. 21 Quality Planning Catalog : The catalog contains unique, non-numerical data in the system that is defined at client or plant level.  Can define our own code groups and codes for each catalog type.  Directly assign catalogs to master inspection characteristics  Use the catalogs to make it easier to record inspection results, defects, and defect locations during inspection lot processing
  • 22. 22© SAP AG 2001 Inspection Method: General What kind of inspection is to be performed? Validity Qualification Texts Classification Quality Planning Basic Data : Inspection Method
  • 23. 23 Quality Planning Inspection Method:  An inspection method describes how the inspection to be carried out for an inspection characteristic.  Common family of components which are inspected under standard specifications, norms etc can be treated as inspection method which will be assigned to master inspection characteristic  Up to ten inspection methods can be assigned to a master inspection characteristic, however only one inspection method can be assigned to the planned characteristic.  Inspection method is maintained at plant level and validity from effective date.  Inspection method identifier is optional Text, Long Text, Inspector Qualification to be entered on data screen for every inspection method
  • 24. 24 Quality Planning Quality Info Record :  When a quotation or purchase order is created, the system checks whether a Q-info record is required and available for the combination of material and vendor. A check is made to determine whether the purchase order can be released  Specify a status profile for releasing the supply relationships as well as the QM system of the material-vendor combination in the Q-info record  This facilitates the inspection or perform a goods receipt inspection and/or source inspections
  • 25. 25 QM Overview QM Module General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment management QM Integration with Other Modules Standard Reports Benefits Processes
  • 26. 26 QM Overview Quality Inspection: Activities Determining whether the units inspected fulfill the predefined quality requirements.  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt.
  • 27. 27 Quality Inspection  Inspection Lot Creation  Manual / Automatic Lot  Stock / Non-Stock relevant Lot  Result Recording  Quantitative / Qualitative / Calculated chars  Single/Multiple recording  Valuation with specification  Defect Recording : For deviation  Manual / Auto creation  Continued with notification : Background process  Usage Decision  UD code / Stock Posting / Quality Score Calculation
  • 28. 28 © SAP AG 1999 Inspection Lot: Business Scenario Inspection lot The inspection lot represents the request to a plant to perform a quality inspection on a certain quantity of a material. Quality Inspection Inspection Lot :
  • 29. 29 © SAP AG 2001 12 9 6 3 11 1 7 5 8 4 210 Goods movement Production order Customer order Delivery Deadline monitoring Manual Inspection lot Maintenance order Inspection Lot: General Quality inspection Quality Inspection Inspection Lot : General
  • 30. 30 © SAP AG 1999 QM Inspection Process: Results Recording Event Sample determination Usage decision Evaluation Defects recording Inspection lot Enter results Valuation Completion Results recording Quality Inspection Inspection Process : Result Recording
  • 31. 31 © SAP AG 1999 Defects Recording: Business Scenario Quality Inspection Defect recording business scenario :
  • 32. 32 © SAP AG 1999 !!Purchasing Production Vendor Stock A A B C D Statistics Units t Quality level Inspection stage Time Usage Decision: Effects Quality Inspection Usage Decision – Effects :
  • 33. 33 QM Overview QM Module : General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment management QM Integration with Other Modules Standard Reports Benefits Processes
  • 34. 34 QM Overview R Quality Certificates: Activities Certifying the quality of a material or product. Quality certificates contain texts, specification values, and inspection results.  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt.
  • 35. 35 Quality Certificate  Incoming  Vendor certificate against Good receipt  Outgoing  Certificate Profile - Certificate Planning - Certificate Processing
  • 37. 37 QM Overview QM Module : General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment management QM Integration with Other Modules Standard Reports Benefits Processes
  • 38. 38 QM Overview R Quality Notification : Activities Recording the Non-Conformance or product. Investigation and analysis of defect Record Cause , Task and activities , etc.,  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt.
  • 39. 39 Quality Notification  Notification Type  Vendor problem  Internal problem  Customer complaint  Notification Process  Automatic trigger from defect recording / Manual creation.  Predefined codes as per catalog used in - Item / Task / Activity  Catalog maintained at client level.  Task completion for notification closure  Standard report for notification.
  • 40. Quality Notification Status management Nonconformity costs QM costs Q Notification Actions Defects analysis TasksEvaluations Controlling Workflow DescriptionArchive Link Elements:
  • 41. 41 Quality Notification Notification Task Completion and Notification closure Report Complaint Details Complaint type and rejection details Partners and Coordinator Internal and External failures Causes (Root Cause) Tasks (Corrective Action ) Activities (Preventive Action) Purpose :  To record & process different types of problems..  To analyze the defects & monitor the correction of these defects.
  • 42. 42 QM Overview QM Module : General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment Management QM Integration with Other Modules Standard Reports Benefits Processes
  • 43. 43 QM Overview R Test Equipment Management: Activities Managing master data as well as the planning and processing calibration inspections for test and measurement equipment. 30  Quality planning  Quality inspection  Quality control  Quality certificates  Quality notifications  Test equipment mgmt.
  • 44. 44 Test Equipment Management Purpose :  To ensure that the Test Equipment ( which is used for Inspection ) continues to meet the pre-defined specifications. Process:  Creation of • Equipment • Maintenance task list • Maintenance plan  Scheduling the Plan  Processing of Calibration order (Internal / External)  Creation of the lot  Result recording  Defect recording  Usage decision  Notification processing for any deviation.
  • 45. 45 QM Overview QM Module : General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment management QM Integration with Other Modules Standard Reports Benefits Processes
  • 46. QM Integration PPPPMMMM PurchasingPurchasing RequisitionRequisition Inventory mgmt Goods receipt Stock transfer Goods issue Inventory mgmt Goods receipt Stock transfer Goods issue Shipping Billing Shipping Billing SDSD Invoice verification Invoice verification Warehouse management Warehouse management Inspection lotInspection lot QMQM Inspection lotInspection lot Print insp. instructionPrint insp. instruction Results recordingResults recording Usage decisionUsage decision Basic dataBasic dataBasic dataBasic data Test equipment management Test equipment management PMPM Production planning Production planning Reqt planning R-cut capacity planning Reqt planning R-cut capacity planning Planned Orders Planned Orders Opening period Opening period Order: - Creation - Release - Confirmation Order: - Creation - Release - Confirmation Shop floor control Capacity leveling Shop floor control Capacity leveling CAMCAM MaterialsMaterials VendorsVendors RoutingsRoutings DocumentsDocuments Inspection plan Characteristics Insp. methods Insp. catalogs Test equipment
  • 47. 47 © SAP AG 1999 Quality Management: Integration in logistical processes PM MM PP SD Quality Management Position of QM QM integration
  • 48. 48 QM integration Material Management  Manages quality information for materials, vendors  Releases vendors; Monitors their QM systems  Manages the release status of delivery relationships, for example Vendor approval, Sample Approval etc  Evaluates vendors on the basis of quality using quality scores from audits, goods receipt inspections, and problem notifications.  Requests quality certificates and monitors their receipt. Tracking of vendor certificates.  Triggers source inspections to be carried out at the vendor’s premises before the vendor is due to make a delivery - Source inspection.  Triggers inspections for goods movements, for example, goods receipt  Blocks payments until Inspection Lots are accepted
  • 49. 49 QM integration Production Planning  Batch management  Handles inspection characteristics and setup characteristics for operations  Manages quality inspections for manufacturing orders  Handles in-process inspections during production at freely defined inspection Points- In-process Inspection (Qty/time based)  Scrapping procedures  Triggers final inspection upon goods receipt from production  Confirms quality and quantity information for manufacturing orders  Monitors production quality with the help of control charts and determines process capability.  Manages problems in production using quality notifications and by processing corrective tasks
  • 50. 50 QM integration Sales and Distribution  Batch allocation during delivery of finished goods  Customer Complaints Handling  Manages customer-related quality information  Triggers an inspection at shipping when the delivery is created- Lot Creation thro PGI for Sales Inspection  Lot Creation thro PGR for Customer Returns  Creates quality certificates with the delivery Plant Maintenance  Equipment related data maintenance  Calibration
  • 51. 51 QM Overview QM Module : General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment management QM Integration with Other Modules Standard Reports Benefits Processes
  • 57. 57 QM Overview QM Module : General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment management QM Integration with Other Modules Standard Reports Benefits Processes
  • 58. 58 Benefits BENEFITS :  Comprehensive master data maintenance by system.  Stocks in Quality till inspection is completed.  Inspection Results are available on line, hence retrieval is will be easy and trends/SPC of characteristics can be viewed on line  Quality Score for vendor is based on U D.  Standardized methodology for complaint reporting and analysis.  Calibration frequency scheduled by system for instruments.  Standard reports for analysis and review.
  • 59. 59 QM Overview QM Module : General Quality Planning Quality Inspection Quality Certificate Quality Notification Test Equipment management QM Integration with Other Modules Standard Reports Benefits Processes
  • 60. 60 QM Processes 1. QM Master Data 2. Incoming Inspection 3. In Process Inspection 4. Final Inspection 5. Stock Transfer Inspection 6. Customer Complaints and Return 7. Miscellaneous Inspection 8. Calibration Inspection
  • 62. 62 QM Master Data 1. Material master : MM01,MM02,MM03 2. Inspection Method : QS31,QS32,QS33 3. MIC : QS21,QS23,QS24 4. Equipment Master : IE01,IE02,IE03 5. Catalog : QS41,QS42 6. Selected Set : QS51,QS52 7. Sampling Procedure : QDV1,QDV2,QDV3 8. Inspection plan : QP01,QP02,QP03 9. Maintenance Task list : IA01,IA02,IA03 10.Quality info Record : QI01,QI02,QI03 1. Material master : MM01,MM02,MM03 2. Inspection Method : QS31,QS32,QS33 3. MIC : QS21,QS23,QS24 4. Equipment Master : IE01,IE02,IE03 5. Catalog : QS41,QS42 6. Selected Set : QS51,QS52 7. Sampling Procedure : QDV1,QDV2,QDV3 8. Inspection plan : QP01,QP02,QP03 9. Maintenance Task list : IA01,IA02,IA03 10.Quality info Record : QI01,QI02,QI03 Create (One time only) Change (many times) Display (any time)
  • 64. 64 Incoming Inspection GR-MIGO Posting by MM Inspection Lot : Type 01 created and viewed thro QA32 Result Recording (QE51n) for inspection characteristics Resul t Usage Decision (QA11) - Stock Posting - Quality Score updation - UD code Valuation - Inspection lot completion Defect Recording in RR Notification Creation (QM01) Background Notification processing (QM02) Incoming Insp Notification Closure Not Ok OK Quality Notification
  • 66. 66 In-process Inspection Order create by PP Inspection Lot : Type 03 created and viewed thro QA32 Result Recording (QE51n) for inspection characteristics Resul t Valuation is required on each recording Defect Recording in RR Notification Creation (QM01) Background Notification processing (QM02) In-process Materials Notification Closure Not Ok OK Lot Usage Decision Quality Notification
  • 67. 67 4. Final Packing Inspection
  • 68. 68 Final Inspection GR Posting by PP Inspection Lot : Type 04 created and viewed thro QA32 Result Recording (QE51n) for inspection characteristics Resul t Defect Recording in RR Notification Creation (QM01) Background Notification processing (QM02) Final Inspection Notification Closure Not Ok OK Usage Decision (QA11) - Stock Posting in Silo - Quality Score updation - UD code Valuation - Inspection lot completion Quality Notification
  • 69. 69 5. Stock Transfer Inspection
  • 70. 70 Stock Transfer Inspection Stock Transfer GR Posting by MM Inspection Lot : Type 08 created and viewed thro QA32 Result Recording (QE51n) for inspection characteristics Resul t Usage Decision (QA11) - Stock Posting - Quality Score updation - UD code Valuation - Inspection lot completion Defect Recording in RR Notification Creation (QM01) Background Notification processing (QM02) Plant to Plant Notification Closure Not Ok OK Quality Notification
  • 72. 72 Customer Rejection Post Goods Receipt to storage loc using VL01n for Inspection lot creation. Create Notification Result Recording for investigation finding Defect Recording Create Return Sale Order by SD thro VA01 Inspection Lot : Type 05 created and viewed thro QA32 Task Completion and Notification closure Generate Report Usage Decision for the Lot Notifications Process contains : •Customer Details / Sale order •Complaint type and rejection details •Partners and Coordinator •Internal and External failures •Causes (Root Cause) •Tasks (Corrective Action ) •Activities (Preventive Action) Classification of customer complaint
  • 73. 73 Customer complaint Task Completion and Notification closure Generate Report Notification Raised by SD Notifications Process contains : •Customer Details / Sale order •Complaint type and rejection details •Partners and Coordinator •Internal and External failures •Causes (Root Cause) •Tasks (Corrective Action ) •Activities (Preventive Action) Send to Concerned Personnel for actions
  • 75. 75 Miscellaneous Inspection Manual Lot Creation using QA01 Manual Lot origin :Type 89 created and viewed thro QA32 Result Recording (QE51n) for inspection characteristics Resul t Usage Decision (QA11) - Quality Score updation - UD code Valuation - Inspection lot completion Defect Recording in RR Notification Creation (QM01) Background Notification processing (QM02) Miscellaneous Inspection (Audit/Reverse Engg) Notification Closure Not Ok OK Quality Notification
  • 77. 77 Internal Calibration Calibration Order Searching thro IW39 Inspection Lot list :Type 14 created and viewed thro QA32 Result Recording (QE51n) for inspection characteristics Resul t Usage Decision (QA11) - UD code Valuation - Inspection lot completion Defect Recording in RR Notification Creation (QM01) Background Notification processing (QM02) QC Equipment Notification Closure Not Ok OK Master Data : • Equipment Master : IE01,IE02,IE03 • Maintenance Task list : IA01,IA02,IA03 • Maintenance Plan : IP41 • Scheduling : IP10 Master Data : • Equipment Master : IE01,IE02,IE03 • Maintenance Task list : IA01,IA02,IA03 • Maintenance Plan : IP41 • Scheduling : IP10 Quality Notification
  • 78. 78 External Calibration Create service entry sheet by MM thro ML81N Inspection Lot list :Type 14 created and viewed thro QA32 Result Recording (QE51n) for inspection characteristics Resul t Usage Decision (QA11) - UD code Valuation - Inspection lot completion Defect Recording in RR Notification Creation (QM01) Background Notification processing (QM02) Lab Equipment to be calibrated by external Notification Closure Not Ok OK Service Entry Sheet completion / MIRO Processing by QM Create Purchase Order and Gate Pass by MM thro ME21N Calibration Order Searching thro IW39 Calibration Order Processing thro IW32 If Inspection Lot not required Master Data : • Equipment Master : IE01,IE02,IE03 • Maintenance Task list : IA01,IA02,IA03 • Maintenance Plan : IP41 • Scheduling : IP10 Master Data : • Equipment Master : IE01,IE02,IE03 • Maintenance Task list : IA01,IA02,IA03 • Maintenance Plan : IP41 • Scheduling : IP10 Quality Notification

Notes de l'éditeur

  1. For integration into the vendor evaluation, the calculation of the sub-criterion "complaint" takes place on the basis of quality notifications.