In this article the start up of a siphonic roof drainage system is described. It is intended to give
better insight in the behavior of the system and help design systems that will work optimally
and siphonic more often.
The development of the hydraulic jump and the elimination of air from the system by the
suction power in the downpipe are key items in the development of siphonic functioning.
To reach siphonic drainage as quickly as possible a longer vertical tailpipe as well as a quick
deceleration in the horizontal pipe is preferable.



   1. Introduction                                         2. Start up phase

Siphonic roof drainage systems are                    When the rain starts the roof drainage
designed to operate with full bore flow.              system slowly starts up. At first the water
The computations made for siphonic roof               flows into the roof outlet at a low rate and
drainage systems therefore focus on single            shallow water level. The water flows along
phase water flow. For the proper design of            the vertical walls of the tail pipe creating
the maximum capacity of a siphonic                    an annular flow. At the bend to the
system this is sufficient.                            horizontal tail pipe or collector pipe the
However it is necessary to have a good                flow collects at the bottom of the bend
insight in the start up phase to siphonic             resulting in a separated flow in the
functioning of the system as well. Most of            horizontal pipe. In the downpipe behind
the times the rain intensity will not be high         the collector pipe the water is forming an
enough to get the system to work siphonic.            annular flow again.
It is preferable to have the system work
siphonic once or twice a year at least to
self clean the system of debris. Also when
the system works siphonic the noise
production is lower than with two-phase
flow (combined water/air flow).
In this article the start up phase will be            fig 1. flow regimes in vertical pipes: annular, slug and bubble
described to have a better understanding of           flow
the phenomena and develop measures to
stimulate full bore flow.
Figure 3. hydraulic jump
fig 2. flow regimes in horizontal pipes: straight, wavy and slug
flow
                                                                   The above explains 2 things: first of all
This is independent of the water velocity                          why an increasing length of vertical tail
streaming into this pipe. The flow can                             pipe leads to earlier priming, second why
follow the inner contour of the bend or                            an increasing resistance in the collector
splash onto the opposite wall. The point at                        pipe leads to this same result.
which the annular flow is reinstalled will                         An increasing length of tail pipe leads to
differ, as will the pressure distribution                          more length to accelerate the fluid coming
when the pipe is closed off by the                                 from the roof, thus to higher velocities in
splashing water.                                                   the bend to the horizontal pipe. This will
At some higher flow rates the separated                            lead to a higher hydraulic jump when the
flow in the horizontal pipes will become                           flow is decelerated in the horizontal pipe.
wavy.                                                              Also the more the flow is decelerated in
                                                                   the horizontal pipe, thus the higher the
                                                                   resistance downstream of the bend, the
     3. Hydraulic jump                                             higher the hydraulic jump will be.
                                                                   Eventually the hydraulic jump will close
When the water streams down the vertical                           off the whole pipe diameter, leading to
tailpipe it is accelerated by gravity. When                        below atmospheric pressures in the system
it flows into the horizontal pipe the flow is                      behind the closure and priming will start.
decelerated forming a hydraulic jump.
The principle can be compared to the                                    4. Start of priming
stream of vehicles on highways or race
tracks. Vehicles can accelerate optimally                          When the hydraulic jump closes off the
on roads that are straight and keep on                             whole periphery of the pipe the air behind
being straight for miles. As soon as there is                      the jump has only one way to leave the
a curve in the road the vehicles have to                           system and that is through the downpipe.
slow down. When the first vehicle                                  To transport the air through the downpipe
decelerates the one behind him has to                              the friction forces between the water and
decelerate also and the distance between                           the air have to overcome the buoyancy
the vehicles is decreasing. This is very                           forces of the air. In other words the water
often the moment for accidents to happen:                          has to drag the air along against its
there is an increasing chance for collision.                       tendency to rise. To make this happen the
Exactly this is the case for fluid particles in                    flow rate has to increase further.
a stream. When particles are redirected
from the vertical downfall to horizontal                                5. Measures to enhance priming
flow the fluid is decelerated. As fluid
particles have no brakes they will collide                         As stated above to enhance the priming of
and the only way they can go is up,                                the system a longer tail pipe can be chosen
creating height and thus a hydraulic jump.                         or the deceleration of the flow in the
                                                                   horizontal pipe can be increased in order to
make the hydraulic jump close off the                       The development of the hydraulic jump
periphery of the pipe as quickly as possible                and the elimination of air from the system
leading to earlier priming                                  by the suction power in the downpipe are
                                                            key items in the development of siphonic
    6. Conclusions                                          functioning.
                                                            To reach siphonic drainage as quickly as
In this article the start up of a siphonic roof             possible a longer vertical tailpipe as well as
drainage system has been described. It is                   a quick deceleration in the horizontal pipe
intended to give better insight in the                      is preferable.
behavior of the system and help design
systems that will work optimally and
siphonic more often.
    7. References

    1.   Fox, Robert W. , McDonald, Alan T. , Introduction to fluid mechanics, third edition, 1985, School of
         Mechanical Engineering Purdue University, John Wiley & Sons
    2.   Scott Arthur, John A. Swaffield, Siphonic roof drainage: current understanding, 2001, Water research
         group, Department of civil and offshore engineering, Heriot-Watt University, Edinburg, Scotland (UK)
    3.   G.B. Wright, S. Arthur, J.A. Swaffield, Numerical simulation of the dynamic operation of multi-outlet
         siphonic roof drainage systems, 2005, Drainage and water supply research group, School of the build
         environment, Heriot-Watt University, Edinburg, Scotland (UK)
    4.   Scott Arthur, The priming focused design of siphonic roof drainage, drainage research group, School of
         the built environment, Heriot-Watt University, Edinburg, Scotland (UK)
    5.   S. Arthur, G.B. Wright, Siphonic roof drainage systems – priming focused design, 2006, School of the
         built environment, Heriot-Watt University, Edinburg, Scotland (UK)
    6.   S. Arthur, J.A. Swaffield, Siphonic roof drainage system analysis utilizing unsteady flow theory, 2000,
         Department of building engineering and surveying, Heriot-Watt University, Edinburg, Scotland (UK)

Contenu connexe

Tendances

Cooling tower internals and the role of fill
Cooling tower internals and the role of fillCooling tower internals and the role of fill
Cooling tower internals and the role of fillAshok Mannava
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenancesAjay B.K
 
5201 5205.output
5201 5205.output5201 5205.output
5201 5205.outputj1075017
 
Lecture 4 flow_measurements
Lecture 4 flow_measurementsLecture 4 flow_measurements
Lecture 4 flow_measurementsRaghubir Singh
 
Spillways components and types
Spillways components and typesSpillways components and types
Spillways components and typesRajkumar G
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure Kiran Jadhav
 
Iaetsd design and analysis of water hammer effect in a network
Iaetsd design and analysis of water hammer effect in a networkIaetsd design and analysis of water hammer effect in a network
Iaetsd design and analysis of water hammer effect in a networkIaetsd Iaetsd
 
Modeling of transient fluid flow in the simple pipeline system
Modeling of transient fluid flow in the simple pipeline systemModeling of transient fluid flow in the simple pipeline system
Modeling of transient fluid flow in the simple pipeline systemjeet707
 
Flow through branched pipes_AMIT
Flow through branched pipes_AMITFlow through branched pipes_AMIT
Flow through branched pipes_AMITAmit Sharma
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis newsonukhan123
 
04 pipeline-channel hydraulics
04 pipeline-channel hydraulics04 pipeline-channel hydraulics
04 pipeline-channel hydraulicsAkepati S. Reddy
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Latif Hyder Wadho
 
losses in pipe flow
losses in pipe flowlosses in pipe flow
losses in pipe flowKaran Patel
 

Tendances (20)

Cooling tower internals and the role of fill
Cooling tower internals and the role of fillCooling tower internals and the role of fill
Cooling tower internals and the role of fill
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenances
 
L 51 appurtennances (Valves)
L 51 appurtennances (Valves)L 51 appurtennances (Valves)
L 51 appurtennances (Valves)
 
Weirs
WeirsWeirs
Weirs
 
Stilling basin
Stilling basinStilling basin
Stilling basin
 
weirs
weirsweirs
weirs
 
5201 5205.output
5201 5205.output5201 5205.output
5201 5205.output
 
4 spillways
4 spillways4 spillways
4 spillways
 
Lecture 4 flow_measurements
Lecture 4 flow_measurementsLecture 4 flow_measurements
Lecture 4 flow_measurements
 
Spillways components and types
Spillways components and typesSpillways components and types
Spillways components and types
 
Syphon
SyphonSyphon
Syphon
 
design of weirs
design of weirsdesign of weirs
design of weirs
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Iaetsd design and analysis of water hammer effect in a network
Iaetsd design and analysis of water hammer effect in a networkIaetsd design and analysis of water hammer effect in a network
Iaetsd design and analysis of water hammer effect in a network
 
Modeling of transient fluid flow in the simple pipeline system
Modeling of transient fluid flow in the simple pipeline systemModeling of transient fluid flow in the simple pipeline system
Modeling of transient fluid flow in the simple pipeline system
 
Flow through branched pipes_AMIT
Flow through branched pipes_AMITFlow through branched pipes_AMIT
Flow through branched pipes_AMIT
 
Classification of weis new
Classification of weis newClassification of weis new
Classification of weis new
 
04 pipeline-channel hydraulics
04 pipeline-channel hydraulics04 pipeline-channel hydraulics
04 pipeline-channel hydraulics
 
Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)Drainage Engineering (cross drainage structures)
Drainage Engineering (cross drainage structures)
 
losses in pipe flow
losses in pipe flowlosses in pipe flow
losses in pipe flow
 

En vedette (20)

APAC drainage brochure web
APAC drainage brochure webAPAC drainage brochure web
APAC drainage brochure web
 
Rainwater drainage
Rainwater drainageRainwater drainage
Rainwater drainage
 
11.effects of bad drainage on roads
11.effects of bad drainage on roads11.effects of bad drainage on roads
11.effects of bad drainage on roads
 
DESIGN OF ROAD DRAINAGE BY SIMBEIWET DANIEL
DESIGN OF ROAD DRAINAGE BY SIMBEIWET DANIELDESIGN OF ROAD DRAINAGE BY SIMBEIWET DANIEL
DESIGN OF ROAD DRAINAGE BY SIMBEIWET DANIEL
 
Transportation engg
Transportation enggTransportation engg
Transportation engg
 
Roadside drainage-cover
Roadside drainage-coverRoadside drainage-cover
Roadside drainage-cover
 
Road drainage
Road drainageRoad drainage
Road drainage
 
DESIGN OF SUBSURFACE DRAINAGE SYSTEM
DESIGN OF SUBSURFACE DRAINAGE SYSTEMDESIGN OF SUBSURFACE DRAINAGE SYSTEM
DESIGN OF SUBSURFACE DRAINAGE SYSTEM
 
Roads & Pavements
Roads & PavementsRoads & Pavements
Roads & Pavements
 
Drainage system
Drainage systemDrainage system
Drainage system
 
Design Of Flexible Pavements
Design Of Flexible PavementsDesign Of Flexible Pavements
Design Of Flexible Pavements
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
National health
National healthNational health
National health
 
Turner1
Turner1Turner1
Turner1
 
Whole ppm
Whole ppmWhole ppm
Whole ppm
 
Podstawy ekonomii - cz. VI
Podstawy ekonomii - cz. VIPodstawy ekonomii - cz. VI
Podstawy ekonomii - cz. VI
 
F 3-2011-1
F 3-2011-1F 3-2011-1
F 3-2011-1
 
Sinong Gustong Maging Milyonaryo
Sinong Gustong Maging MilyonaryoSinong Gustong Maging Milyonaryo
Sinong Gustong Maging Milyonaryo
 
Ortografia
OrtografiaOrtografia
Ortografia
 
Pgd0015 group dynamic topic 2
Pgd0015 group dynamic topic 2Pgd0015 group dynamic topic 2
Pgd0015 group dynamic topic 2
 

Similaire à Tp2 siphonic roof drainage systems the road to priming(dr)

Tp1 collector pipes in siphonic roof drainage systems to incline or not to in...
Tp1 collector pipes in siphonic roof drainage systems to incline or not to in...Tp1 collector pipes in siphonic roof drainage systems to incline or not to in...
Tp1 collector pipes in siphonic roof drainage systems to incline or not to in...Marc Buitenhuis
 
160120119032 2141906
160120119032 2141906160120119032 2141906
160120119032 2141906Bhavesh Jain
 
Hydraulic Ram Pumping in Rural Community Development - Rijswijk University
Hydraulic Ram Pumping in Rural Community Development - Rijswijk UniversityHydraulic Ram Pumping in Rural Community Development - Rijswijk University
Hydraulic Ram Pumping in Rural Community Development - Rijswijk UniversityFatin62c
 
Hydraulic Ram Pumps - Technical Brief - Natural Resources Conservation Service
Hydraulic Ram Pumps - Technical Brief -  Natural Resources Conservation ServiceHydraulic Ram Pumps - Technical Brief -  Natural Resources Conservation Service
Hydraulic Ram Pumps - Technical Brief - Natural Resources Conservation ServiceFatin62c
 
Flow phenomena of a siphonic roof outlet anqip format
Flow phenomena of a siphonic roof outlet anqip formatFlow phenomena of a siphonic roof outlet anqip format
Flow phenomena of a siphonic roof outlet anqip formatMarc Buitenhuis
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation WorksAbdul Sahid
 
Two Phase Flow Research
Two Phase Flow ResearchTwo Phase Flow Research
Two Phase Flow ResearchRex Liu
 
Conveyance of water and plumbing services
Conveyance of water and plumbing services  Conveyance of water and plumbing services
Conveyance of water and plumbing services Deepankar Garg
 
Possibilities for Locally Fabricated Hydraulic Ram Pumps
Possibilities for Locally Fabricated Hydraulic Ram PumpsPossibilities for Locally Fabricated Hydraulic Ram Pumps
Possibilities for Locally Fabricated Hydraulic Ram PumpsAnnie Thompson
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptxBibhabasu Mohanty
 
HydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof DrainageHydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof DrainageHydroMax Inc. Limited
 
Unit I Water Distribution System.pdf
Unit I Water Distribution System.pdfUnit I Water Distribution System.pdf
Unit I Water Distribution System.pdfEcologixConsultancy
 
Water Hammer Analysis in Long Pipelines
Water Hammer Analysis in Long PipelinesWater Hammer Analysis in Long Pipelines
Water Hammer Analysis in Long Pipelinesijtsrd
 
Tp7 akavent systems principles(dr)
Tp7 akavent systems principles(dr)Tp7 akavent systems principles(dr)
Tp7 akavent systems principles(dr)Marc Buitenhuis
 

Similaire à Tp2 siphonic roof drainage systems the road to priming(dr) (20)

Tp1 collector pipes in siphonic roof drainage systems to incline or not to in...
Tp1 collector pipes in siphonic roof drainage systems to incline or not to in...Tp1 collector pipes in siphonic roof drainage systems to incline or not to in...
Tp1 collector pipes in siphonic roof drainage systems to incline or not to in...
 
sewage layy out lec
sewage layy out lecsewage layy out lec
sewage layy out lec
 
160120119032 2141906
160120119032 2141906160120119032 2141906
160120119032 2141906
 
Hydraulic Ram Pumping in Rural Community Development - Rijswijk University
Hydraulic Ram Pumping in Rural Community Development - Rijswijk UniversityHydraulic Ram Pumping in Rural Community Development - Rijswijk University
Hydraulic Ram Pumping in Rural Community Development - Rijswijk University
 
Hydraulic ram pumps
Hydraulic ram pumpsHydraulic ram pumps
Hydraulic ram pumps
 
Hydraulic Ram Pumps - Technical Brief - Natural Resources Conservation Service
Hydraulic Ram Pumps - Technical Brief -  Natural Resources Conservation ServiceHydraulic Ram Pumps - Technical Brief -  Natural Resources Conservation Service
Hydraulic Ram Pumps - Technical Brief - Natural Resources Conservation Service
 
Flow phenomena of a siphonic roof outlet anqip format
Flow phenomena of a siphonic roof outlet anqip formatFlow phenomena of a siphonic roof outlet anqip format
Flow phenomena of a siphonic roof outlet anqip format
 
Canal Regulation Works
Canal Regulation WorksCanal Regulation Works
Canal Regulation Works
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Hydraulicdesignofsewer
HydraulicdesignofsewerHydraulicdesignofsewer
Hydraulicdesignofsewer
 
Two Phase Flow Research
Two Phase Flow ResearchTwo Phase Flow Research
Two Phase Flow Research
 
Conveyance of water and plumbing services
Conveyance of water and plumbing services  Conveyance of water and plumbing services
Conveyance of water and plumbing services
 
Possibilities for Locally Fabricated Hydraulic Ram Pumps
Possibilities for Locally Fabricated Hydraulic Ram PumpsPossibilities for Locally Fabricated Hydraulic Ram Pumps
Possibilities for Locally Fabricated Hydraulic Ram Pumps
 
Canal regulation works. m4pptx
Canal regulation works. m4pptxCanal regulation works. m4pptx
Canal regulation works. m4pptx
 
Reaction turbine
Reaction turbineReaction turbine
Reaction turbine
 
HydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof DrainageHydroMax™ Siphonic (Syphonic) Roof Drainage
HydroMax™ Siphonic (Syphonic) Roof Drainage
 
Unit I Water Distribution System.pdf
Unit I Water Distribution System.pdfUnit I Water Distribution System.pdf
Unit I Water Distribution System.pdf
 
Hydraulic Ram
Hydraulic RamHydraulic Ram
Hydraulic Ram
 
Water Hammer Analysis in Long Pipelines
Water Hammer Analysis in Long PipelinesWater Hammer Analysis in Long Pipelines
Water Hammer Analysis in Long Pipelines
 
Tp7 akavent systems principles(dr)
Tp7 akavent systems principles(dr)Tp7 akavent systems principles(dr)
Tp7 akavent systems principles(dr)
 

Plus de Marc Buitenhuis

Tp6 principles of siphonic roof drainage systems(dr)
Tp6 principles of siphonic roof drainage systems(dr)Tp6 principles of siphonic roof drainage systems(dr)
Tp6 principles of siphonic roof drainage systems(dr)Marc Buitenhuis
 
Tp5 nothing but the rain(dr)
Tp5 nothing but the rain(dr)Tp5 nothing but the rain(dr)
Tp5 nothing but the rain(dr)Marc Buitenhuis
 
Tp3 siphonic roof drainage systems gutters(dr)
Tp3 siphonic roof drainage systems gutters(dr)Tp3 siphonic roof drainage systems gutters(dr)
Tp3 siphonic roof drainage systems gutters(dr)Marc Buitenhuis
 
Tp4 siphonic roof drainage systemsno space to breath(dr)
Tp4 siphonic roof drainage systemsno space to breath(dr)Tp4 siphonic roof drainage systemsno space to breath(dr)
Tp4 siphonic roof drainage systemsno space to breath(dr)Marc Buitenhuis
 

Plus de Marc Buitenhuis (6)

Enduria2a
Enduria2aEnduria2a
Enduria2a
 
Enduria
EnduriaEnduria
Enduria
 
Tp6 principles of siphonic roof drainage systems(dr)
Tp6 principles of siphonic roof drainage systems(dr)Tp6 principles of siphonic roof drainage systems(dr)
Tp6 principles of siphonic roof drainage systems(dr)
 
Tp5 nothing but the rain(dr)
Tp5 nothing but the rain(dr)Tp5 nothing but the rain(dr)
Tp5 nothing but the rain(dr)
 
Tp3 siphonic roof drainage systems gutters(dr)
Tp3 siphonic roof drainage systems gutters(dr)Tp3 siphonic roof drainage systems gutters(dr)
Tp3 siphonic roof drainage systems gutters(dr)
 
Tp4 siphonic roof drainage systemsno space to breath(dr)
Tp4 siphonic roof drainage systemsno space to breath(dr)Tp4 siphonic roof drainage systemsno space to breath(dr)
Tp4 siphonic roof drainage systemsno space to breath(dr)
 

Tp2 siphonic roof drainage systems the road to priming(dr)

  • 1. Siphonic roof drainage systems: the road to priming Marc Buitenhuis Hydraulic research engineer Akatherm International BV, Panningen, The Netherlands 16-01-2009 Abstract In this article the start up of a siphonic roof drainage system is described. It is intended to give better insight in the behavior of the system and help design systems that will work optimally and siphonic more often. The development of the hydraulic jump and the elimination of air from the system by the suction power in the downpipe are key items in the development of siphonic functioning. To reach siphonic drainage as quickly as possible a longer vertical tailpipe as well as a quick deceleration in the horizontal pipe is preferable. 1. Introduction 2. Start up phase Siphonic roof drainage systems are When the rain starts the roof drainage designed to operate with full bore flow. system slowly starts up. At first the water The computations made for siphonic roof flows into the roof outlet at a low rate and drainage systems therefore focus on single shallow water level. The water flows along phase water flow. For the proper design of the vertical walls of the tail pipe creating the maximum capacity of a siphonic an annular flow. At the bend to the system this is sufficient. horizontal tail pipe or collector pipe the However it is necessary to have a good flow collects at the bottom of the bend insight in the start up phase to siphonic resulting in a separated flow in the functioning of the system as well. Most of horizontal pipe. In the downpipe behind the times the rain intensity will not be high the collector pipe the water is forming an enough to get the system to work siphonic. annular flow again. It is preferable to have the system work siphonic once or twice a year at least to self clean the system of debris. Also when the system works siphonic the noise production is lower than with two-phase flow (combined water/air flow). In this article the start up phase will be fig 1. flow regimes in vertical pipes: annular, slug and bubble described to have a better understanding of flow the phenomena and develop measures to stimulate full bore flow.
  • 2. Figure 3. hydraulic jump fig 2. flow regimes in horizontal pipes: straight, wavy and slug flow The above explains 2 things: first of all This is independent of the water velocity why an increasing length of vertical tail streaming into this pipe. The flow can pipe leads to earlier priming, second why follow the inner contour of the bend or an increasing resistance in the collector splash onto the opposite wall. The point at pipe leads to this same result. which the annular flow is reinstalled will An increasing length of tail pipe leads to differ, as will the pressure distribution more length to accelerate the fluid coming when the pipe is closed off by the from the roof, thus to higher velocities in splashing water. the bend to the horizontal pipe. This will At some higher flow rates the separated lead to a higher hydraulic jump when the flow in the horizontal pipes will become flow is decelerated in the horizontal pipe. wavy. Also the more the flow is decelerated in the horizontal pipe, thus the higher the resistance downstream of the bend, the 3. Hydraulic jump higher the hydraulic jump will be. Eventually the hydraulic jump will close When the water streams down the vertical off the whole pipe diameter, leading to tailpipe it is accelerated by gravity. When below atmospheric pressures in the system it flows into the horizontal pipe the flow is behind the closure and priming will start. decelerated forming a hydraulic jump. The principle can be compared to the 4. Start of priming stream of vehicles on highways or race tracks. Vehicles can accelerate optimally When the hydraulic jump closes off the on roads that are straight and keep on whole periphery of the pipe the air behind being straight for miles. As soon as there is the jump has only one way to leave the a curve in the road the vehicles have to system and that is through the downpipe. slow down. When the first vehicle To transport the air through the downpipe decelerates the one behind him has to the friction forces between the water and decelerate also and the distance between the air have to overcome the buoyancy the vehicles is decreasing. This is very forces of the air. In other words the water often the moment for accidents to happen: has to drag the air along against its there is an increasing chance for collision. tendency to rise. To make this happen the Exactly this is the case for fluid particles in flow rate has to increase further. a stream. When particles are redirected from the vertical downfall to horizontal 5. Measures to enhance priming flow the fluid is decelerated. As fluid particles have no brakes they will collide As stated above to enhance the priming of and the only way they can go is up, the system a longer tail pipe can be chosen creating height and thus a hydraulic jump. or the deceleration of the flow in the horizontal pipe can be increased in order to
  • 3. make the hydraulic jump close off the The development of the hydraulic jump periphery of the pipe as quickly as possible and the elimination of air from the system leading to earlier priming by the suction power in the downpipe are key items in the development of siphonic 6. Conclusions functioning. To reach siphonic drainage as quickly as In this article the start up of a siphonic roof possible a longer vertical tailpipe as well as drainage system has been described. It is a quick deceleration in the horizontal pipe intended to give better insight in the is preferable. behavior of the system and help design systems that will work optimally and siphonic more often. 7. References 1. Fox, Robert W. , McDonald, Alan T. , Introduction to fluid mechanics, third edition, 1985, School of Mechanical Engineering Purdue University, John Wiley & Sons 2. Scott Arthur, John A. Swaffield, Siphonic roof drainage: current understanding, 2001, Water research group, Department of civil and offshore engineering, Heriot-Watt University, Edinburg, Scotland (UK) 3. G.B. Wright, S. Arthur, J.A. Swaffield, Numerical simulation of the dynamic operation of multi-outlet siphonic roof drainage systems, 2005, Drainage and water supply research group, School of the build environment, Heriot-Watt University, Edinburg, Scotland (UK) 4. Scott Arthur, The priming focused design of siphonic roof drainage, drainage research group, School of the built environment, Heriot-Watt University, Edinburg, Scotland (UK) 5. S. Arthur, G.B. Wright, Siphonic roof drainage systems – priming focused design, 2006, School of the built environment, Heriot-Watt University, Edinburg, Scotland (UK) 6. S. Arthur, J.A. Swaffield, Siphonic roof drainage system analysis utilizing unsteady flow theory, 2000, Department of building engineering and surveying, Heriot-Watt University, Edinburg, Scotland (UK)