Des Moines Bicycle and Trails
        Master Plan

     TAC Meeting #1
     June 18th, 2009
Project Work Plan

 • Final Product: Long-Range Bicycle Network Master
   Plan
    • Existing Conditions/Opportunities-and-Constraints
    • Safety and Needs Assessment
    • Recommended Bike Network
    • Education, Encouragement, Enforcement,
      Evaluation strategies
    • Funding and Implementation
    • Draft and Final Plan
Build on Previous/Current
       Planning Efforts
• 2006 - City applies for bicycle friendly community
  designation and is rejected
• 2007 – Council adopted goals to become a bicycle
  friendly community – conducting a bicycle and trails
  master plan is a key goal
• 2008 – Council adopts a complete streets policy
• 2009 – Alta is hired by City to conduct master plan
Bicycle Facilities
   Bike lanes
   Shared roadways
   • Wide outside lanes
   • Shared lane markings
   • Bicycle Boulevards
   Shared use paths
Bicyclist Types – For Whom do we
Plan?
  • Strong and fearless
  • Enthusiastic and confident
  • Interested but concerned
  • No way, no how
The Bicyclist

How much space needed?
• 2-ft. wide handle bars
• 1-ft. “buffer” on each side
• Total: At least 4 ft.
Bicycle Facilities – How to Select?

  Numerous factors:
     • Road type (arterial, local street, etc.)
     • Traffic volumes
     • Speeds
     • Traffic mix (e.g., trucks, buses, etc.)
     • Expected users – skill, age, volume, destinations
     • Road conditions, space, intersections, parking
       demand
Bicycle Facilities – Bike Lanes
• Install with new roadway
• Pave shoulder/widen road
• Reduce travel lane or parking lane widths
• Remove travel lanes
• Remove parking
Bicycle Facilities – Bike Lanes
Bicycle Facilities – Bike Lanes
Bicycle Facilities –
Wide Outside Lanes
 •   Used mostly on busy (arterial) streets with insufficient room for
     bike lanes
 •   14’ width desirable
 •   Any wider should include a striped bike lane
Bicycle Facilities –
Shared Lane Markings
  • Used in numerous cities worldwide
  • FHWA to adopt in 2009
Bicycle Facilities – Low Volume
Streets
   • Great for getting around neighborhoods

   • Attract riders of all ages, confidence levels

   • Not always practical for longer distances
Bicycle Facilities – Bicycle
Boulevards
  • Local streets modified to act as thru streets for bicyclists
  •   Traffic calming reduces vehicle speeds & thru trips
  •   Traffic controls give priority to thru bicycle movement
  •   Work best in a connected grid
Bicycle Facilities – Bicycle
Boulevards



                                                       Intersection
                                                       Treatments

    Signage                     Pavement Markings




              Traffic Calming                       Traffic Diversion
Bicycle Facilities - Challenges
• Lack of well-defined routes
• Major streets lacking bicycle
  facilities
• System gaps
• Conflicts with motorists (e.g., at
  driveways, intersections)
• Glass, debris, obstructions in
  bike lanes/shoulders
• Lack of bike parking
Shared Use Paths
• Intended for pedestrians,
  bicyclists, other non-
  motorized users
• Width: 10-14’ paved
• Shy distance: 2-3’
• Overhead clearance: 8-10’
• Roadway separation: 5’
  minimum
Shared Use Paths
            Keys to Successful Paths
               • Separate from vehicle traffic
               • Scenic qualities
               • Connected to land uses
               • Well-designed street crossings
               • Visibility
               • Separate different users when
                 necessary
               • Proper maintenance
Other Infrastructure Elements
Programmatic Elements
Innovative Treatments
Thinking practical…..
….. and thinking big
Questions??

Contenu connexe

Tendances

Bikeway Design for Complete Streets
Bikeway Design for Complete StreetsBikeway Design for Complete Streets
Bikeway Design for Complete Streets
Trailnet
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
JumpingJaq
 

Tendances (20)

Pedestrian Woes
Pedestrian WoesPedestrian Woes
Pedestrian Woes
 
Bikeway Design for Complete Streets
Bikeway Design for Complete StreetsBikeway Design for Complete Streets
Bikeway Design for Complete Streets
 
East-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking RecommendationsEast-West Connector Bicycle Parking Recommendations
East-West Connector Bicycle Parking Recommendations
 
Bicycle way
Bicycle wayBicycle way
Bicycle way
 
Pune Pedestrians Day - December 11 2021
Pune Pedestrians Day - December 11 2021Pune Pedestrians Day - December 11 2021
Pune Pedestrians Day - December 11 2021
 
Bhubaneswar Street Design Guidelines
Bhubaneswar Street Design GuidelinesBhubaneswar Street Design Guidelines
Bhubaneswar Street Design Guidelines
 
Exclusive Bicycle Facilities
Exclusive Bicycle FacilitiesExclusive Bicycle Facilities
Exclusive Bicycle Facilities
 
Improving Street Design Through 'Link and Place'
Improving Street Design Through 'Link and Place'Improving Street Design Through 'Link and Place'
Improving Street Design Through 'Link and Place'
 
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City EventBirmingham Cycle Revolution, Paul Simkins- Cycle City Event
Birmingham Cycle Revolution, Paul Simkins- Cycle City Event
 
LSCOG Bike and Pedestrian Regional Plan Executive Summary
LSCOG Bike and Pedestrian Regional Plan Executive SummaryLSCOG Bike and Pedestrian Regional Plan Executive Summary
LSCOG Bike and Pedestrian Regional Plan Executive Summary
 
Existing Conditions
Existing Conditions Existing Conditions
Existing Conditions
 
Unravelling Urban Design project 2
Unravelling Urban Design project 2Unravelling Urban Design project 2
Unravelling Urban Design project 2
 
Brett Maynard
Brett MaynardBrett Maynard
Brett Maynard
 
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
Achieving Exemplary Walking and Cycling Outcomes in a Major Road Project
 
Jacksonville Landing Charette
Jacksonville Landing CharetteJacksonville Landing Charette
Jacksonville Landing Charette
 
ATS14- Transit and active transportation- Chris Smith
ATS14- Transit and active transportation- Chris SmithATS14- Transit and active transportation- Chris Smith
ATS14- Transit and active transportation- Chris Smith
 
Unravelling Urban Design Project3 public artstrategy
Unravelling Urban Design Project3 public artstrategyUnravelling Urban Design Project3 public artstrategy
Unravelling Urban Design Project3 public artstrategy
 
Urban roads
Urban roadsUrban roads
Urban roads
 
W Johnson
W JohnsonW Johnson
W Johnson
 
Urban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, BangaloreUrban Design-Literature study St. Marks Road, Bangalore
Urban Design-Literature study St. Marks Road, Bangalore
 

En vedette (8)

Animaladas
AnimaladasAnimaladas
Animaladas
 
Crossing Guard Module 4 Roles
Crossing Guard Module 4 RolesCrossing Guard Module 4 Roles
Crossing Guard Module 4 Roles
 
A M I S T A D
A M I S T A DA M I S T A D
A M I S T A D
 
Crossing Guard Module 6 Practical
Crossing Guard Module 6 PracticalCrossing Guard Module 6 Practical
Crossing Guard Module 6 Practical
 
Tu Deseo
Tu DeseoTu Deseo
Tu Deseo
 
Crossing Guard Training Module 1 Hazards
Crossing Guard Training Module 1 HazardsCrossing Guard Training Module 1 Hazards
Crossing Guard Training Module 1 Hazards
 
ABC Quick Check
ABC Quick CheckABC Quick Check
ABC Quick Check
 
Crossing Guard 1 Hazards
Crossing Guard 1 HazardsCrossing Guard 1 Hazards
Crossing Guard 1 Hazards
 

Similaire à Des Moines Bike Planning Overview

Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
Tim Pheby
 
Evanston Bicycle Plan Public Workshop #2
Evanston Bicycle Plan Public Workshop #2Evanston Bicycle Plan Public Workshop #2
Evanston Bicycle Plan Public Workshop #2
cityofevanston
 

Similaire à Des Moines Bike Planning Overview (20)

Designing for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim PhebyDesigning for Cycling RTPI 15.6.16 Tim Pheby
Designing for Cycling RTPI 15.6.16 Tim Pheby
 
Revolutionise roundabout design
Revolutionise roundabout designRevolutionise roundabout design
Revolutionise roundabout design
 
#5 Part 1: Presenting the Model Design Manual for Living Streets - Snyder, Moule
#5 Part 1: Presenting the Model Design Manual for Living Streets - Snyder, Moule#5 Part 1: Presenting the Model Design Manual for Living Streets - Snyder, Moule
#5 Part 1: Presenting the Model Design Manual for Living Streets - Snyder, Moule
 
DMURS - DIT November 2014
DMURS - DIT November 2014 DMURS - DIT November 2014
DMURS - DIT November 2014
 
Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12Beacon Street Construction Proposal 10/15/12
Beacon Street Construction Proposal 10/15/12
 
Complete Streets in Large Urban Counties
Complete Streets in Large Urban CountiesComplete Streets in Large Urban Counties
Complete Streets in Large Urban Counties
 
Bike Path Presentation
Bike Path PresentationBike Path Presentation
Bike Path Presentation
 
Complete Streets: Designing Healthy Places in Rhode Island
Complete Streets: Designing Healthy Places in Rhode Island Complete Streets: Designing Healthy Places in Rhode Island
Complete Streets: Designing Healthy Places in Rhode Island
 
Sp4 b evanston city council bike presentation 2014 0721 7.21.14
Sp4 b evanston city council bike presentation 2014 0721 7.21.14Sp4 b evanston city council bike presentation 2014 0721 7.21.14
Sp4 b evanston city council bike presentation 2014 0721 7.21.14
 
International Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil JonesInternational Cycling Infrastructure, Best Practice Study, Phil Jones
International Cycling Infrastructure, Best Practice Study, Phil Jones
 
#14 Part 2: Presenting the Model Design Manual for Living Streets (Implementa...
#14 Part 2: Presenting the Model Design Manual for Living Streets (Implementa...#14 Part 2: Presenting the Model Design Manual for Living Streets (Implementa...
#14 Part 2: Presenting the Model Design Manual for Living Streets (Implementa...
 
Bicycle friendly traffic lights
Bicycle friendly traffic lightsBicycle friendly traffic lights
Bicycle friendly traffic lights
 
GO Plan Final Public Forum - 9/17/15
GO Plan Final Public Forum - 9/17/15GO Plan Final Public Forum - 9/17/15
GO Plan Final Public Forum - 9/17/15
 
Proposed peak hour_extensions_public_meeting_presentation
Proposed peak hour_extensions_public_meeting_presentationProposed peak hour_extensions_public_meeting_presentation
Proposed peak hour_extensions_public_meeting_presentation
 
2017 VDOT Repaving and Restriping-Reston: Nov. 14, 2016
2017 VDOT Repaving and Restriping-Reston: Nov. 14, 20162017 VDOT Repaving and Restriping-Reston: Nov. 14, 2016
2017 VDOT Repaving and Restriping-Reston: Nov. 14, 2016
 
Stakeholder Meeting Csss092909
Stakeholder Meeting Csss092909Stakeholder Meeting Csss092909
Stakeholder Meeting Csss092909
 
2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett2 cip infuse-ottawa-bennett
2 cip infuse-ottawa-bennett
 
Rein Lepik - Development of cycling routes in Estonia
Rein Lepik - Development of cycling routes in Estonia Rein Lepik - Development of cycling routes in Estonia
Rein Lepik - Development of cycling routes in Estonia
 
Evanston Bicycle Plan Public Workshop #2
Evanston Bicycle Plan Public Workshop #2Evanston Bicycle Plan Public Workshop #2
Evanston Bicycle Plan Public Workshop #2
 
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
Requirements for Pedestrian Improvements on Road Projects in the Board's Six ...
 

Plus de Iowa Bicycle Coalition

Plus de Iowa Bicycle Coalition (15)

Crossing Guard 2 Law
Crossing Guard 2 LawCrossing Guard 2 Law
Crossing Guard 2 Law
 
Crossing Guard 4 Roles
Crossing Guard 4 RolesCrossing Guard 4 Roles
Crossing Guard 4 Roles
 
Crossing Guard 5 Techniques
Crossing Guard 5 TechniquesCrossing Guard 5 Techniques
Crossing Guard 5 Techniques
 
Crossing Guard 3 Safety
Crossing Guard 3 SafetyCrossing Guard 3 Safety
Crossing Guard 3 Safety
 
Walking School Bus Driver Training
Walking School Bus Driver TrainingWalking School Bus Driver Training
Walking School Bus Driver Training
 
Helmet Use & Fit
Helmet Use & FitHelmet Use & Fit
Helmet Use & Fit
 
Economical Bridges
Economical BridgesEconomical Bridges
Economical Bridges
 
Crossing Guard Training Module 7 Policies
Crossing Guard Training Module 7 PoliciesCrossing Guard Training Module 7 Policies
Crossing Guard Training Module 7 Policies
 
Crossing Guard Training Module 5 Techniques
Crossing Guard Training Module 5 TechniquesCrossing Guard Training Module 5 Techniques
Crossing Guard Training Module 5 Techniques
 
Crossing Guard Training Module 3 Safety
Crossing Guard Training Module 3 SafetyCrossing Guard Training Module 3 Safety
Crossing Guard Training Module 3 Safety
 
Crossing Guard Module 2 Law
Crossing Guard Module 2 LawCrossing Guard Module 2 Law
Crossing Guard Module 2 Law
 
Bike To Work Business Presentation
Bike To Work Business PresentationBike To Work Business Presentation
Bike To Work Business Presentation
 
Bike To Work Presentation
Bike To Work PresentationBike To Work Presentation
Bike To Work Presentation
 
Driver Ed Presentation
Driver Ed PresentationDriver Ed Presentation
Driver Ed Presentation
 
1.1 The Bicycle
1.1 The Bicycle1.1 The Bicycle
1.1 The Bicycle
 

Dernier

怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
eeanqy
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
ehyxf
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
balqisyamutia
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
eeanqy
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Nitya salvi
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
wpkuukw
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
yhavx
 
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
eeanqy
 

Dernier (20)

怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
BLOCK CHAIN PROJECT block chain project
BLOCK CHAIN  PROJECT block chain projectBLOCK CHAIN  PROJECT block chain project
BLOCK CHAIN PROJECT block chain project
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024The hottest UI and UX Design Trends 2024
The hottest UI and UX Design Trends 2024
 
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
怎样办理伯明翰大学学院毕业证(Birmingham毕业证书)成绩单留信认证
 
Lecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptxLecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptx
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
一比一定(购)卡尔顿大学毕业证(CU毕业证)成绩单学位证
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
怎样办理伯明翰城市大学毕业证(BCU毕业证书)成绩单留信认证
 

Des Moines Bike Planning Overview

  • 1. Des Moines Bicycle and Trails Master Plan TAC Meeting #1 June 18th, 2009
  • 2. Project Work Plan • Final Product: Long-Range Bicycle Network Master Plan • Existing Conditions/Opportunities-and-Constraints • Safety and Needs Assessment • Recommended Bike Network • Education, Encouragement, Enforcement, Evaluation strategies • Funding and Implementation • Draft and Final Plan
  • 3. Build on Previous/Current Planning Efforts • 2006 - City applies for bicycle friendly community designation and is rejected • 2007 – Council adopted goals to become a bicycle friendly community – conducting a bicycle and trails master plan is a key goal • 2008 – Council adopts a complete streets policy • 2009 – Alta is hired by City to conduct master plan
  • 4. Bicycle Facilities Bike lanes Shared roadways • Wide outside lanes • Shared lane markings • Bicycle Boulevards Shared use paths
  • 5. Bicyclist Types – For Whom do we Plan? • Strong and fearless • Enthusiastic and confident • Interested but concerned • No way, no how
  • 6. The Bicyclist How much space needed? • 2-ft. wide handle bars • 1-ft. “buffer” on each side • Total: At least 4 ft.
  • 7. Bicycle Facilities – How to Select? Numerous factors: • Road type (arterial, local street, etc.) • Traffic volumes • Speeds • Traffic mix (e.g., trucks, buses, etc.) • Expected users – skill, age, volume, destinations • Road conditions, space, intersections, parking demand
  • 8. Bicycle Facilities – Bike Lanes • Install with new roadway • Pave shoulder/widen road • Reduce travel lane or parking lane widths • Remove travel lanes • Remove parking
  • 11. Bicycle Facilities – Wide Outside Lanes • Used mostly on busy (arterial) streets with insufficient room for bike lanes • 14’ width desirable • Any wider should include a striped bike lane
  • 12. Bicycle Facilities – Shared Lane Markings • Used in numerous cities worldwide • FHWA to adopt in 2009
  • 13. Bicycle Facilities – Low Volume Streets • Great for getting around neighborhoods • Attract riders of all ages, confidence levels • Not always practical for longer distances
  • 14. Bicycle Facilities – Bicycle Boulevards • Local streets modified to act as thru streets for bicyclists • Traffic calming reduces vehicle speeds & thru trips • Traffic controls give priority to thru bicycle movement • Work best in a connected grid
  • 15. Bicycle Facilities – Bicycle Boulevards Intersection Treatments Signage Pavement Markings Traffic Calming Traffic Diversion
  • 16. Bicycle Facilities - Challenges • Lack of well-defined routes • Major streets lacking bicycle facilities • System gaps • Conflicts with motorists (e.g., at driveways, intersections) • Glass, debris, obstructions in bike lanes/shoulders • Lack of bike parking
  • 17. Shared Use Paths • Intended for pedestrians, bicyclists, other non- motorized users • Width: 10-14’ paved • Shy distance: 2-3’ • Overhead clearance: 8-10’ • Roadway separation: 5’ minimum
  • 18. Shared Use Paths Keys to Successful Paths • Separate from vehicle traffic • Scenic qualities • Connected to land uses • Well-designed street crossings • Visibility • Separate different users when necessary • Proper maintenance