- The document describes how to clear the configuration of a switch connected to other switches to prepare it for a new lab. This involves erasing the startup configuration from NVRAM, deleting the VLAN database, shutting down interfaces, removing VLANs, and optionally configuring transparent VTP mode to prevent VLANs from being relearned.