4. Fix the first mast
to the scaffold
using the
anchorage.
5. Install the wire-winder next to the base.
We should give 7 rounds for getting tension
on the inside springs. Afterwards connect
the cable to the machine.
6. Connect the hand control to the
machine. It will be used only for
installation process.
7. Assemble the second mast, use the screws to fix it. Use the hand control to lift the
machine when you need it.
8. Before start up the CAMAC SMART
check that all switches are not active
or pressed.
Top limit switch
Safety switch
Bottom limit switch
Floor switch
9. Follow the erection by
assembling more masts
and one anchorage every
3 meters.
10. Anchorages are fixed on
the mast using this plate.
Floor stop. Can be fixed
anywhere on the mast.
Its used for fixing the stop
positions according the
scaffold levels.