ITS Heartland 2012
Annual Meeting
Kansas City, MO
Please visit our Vimeo site to access voice narrated presentations: https://vimeo.com/matc/review/42161817/84ca915f1e
Presented by Marc Thornsberry, Federal Highway Administration- Missouri Division
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
Real Time Systems Management Information Program
1. Real-Time System Management
Information Program
4th Annual ITS Heartland
Operations & Incident Management
Symposium
March 26, 2012
Marc J. Thornsberry
Safety & Mobility Engineer, Missouri Division
1
2. Provisions of 23 CFR Part 511
• Two-stage implementation
▫ All Interstates within 4 years (November 2014)
▫ Other metropolitan “Routes of Significance” as identified by
States in collaboration with local agencies within 6 years
(November 2016)
• Information to be made available
▫ Construction lane and road closures
▫ Road- or lane-blocking traffic incidents
▫ Hazardous conditions & road or lane closures due to adverse weather
▫ Travel times (in Metropolitan areas)
• “Metropolitan” = greater than 1 million MSA
• New additions with 2010 Census: Salt Lake City, Raleigh
2
4. Metropolitan Geographic Scope
Draft guidance:
• Geographic coverage for major metropolitan
areas under the provisions of 23 CFR Part 511
will be based on MPO-established boundaries.
– Other geographic area definitions that may be
appropriate for specific major metropolitan areas
may be proposed by the State, and concurred by
FHWA, based on supporting information related to
specific metropolitan areas.
5. Routes of Significance
• Only applicable in major metropolitan areas
• Determined / identified by States
• All information requirements of information
for Interstates in metropolitan areas apply
– Exception: Travel time information not required
for non-limited-access roadways (e.g., arterials)
• Implementation required by November 2016
6. Next Steps
• Guidelines for Implementation
– Information gathering, quality
measures, methods for making information
available, etc.
– Potential linkages to other programs
(performance management, road weather, etc.)
• Process Review Guidelines
– To FHWA Division Offices in Spring
• Update Data Exchange Formats
– Guidelines expected by Fall for appropriate
information exchange formats, standards, etc. 6