SlideShare une entreprise Scribd logo
1  sur  72
Télécharger pour lire hors ligne
Education, Police & Justice
Enforcement Action Log


Severity ratings:                     Investigation underway
                                                                                                                                                                                  10
                                                                                                                                                   Total:




                                                                                                                                                             Monitoring to continue,
                                                                                                                                                             however meeting (Nov
   Metropolitan Police
                                                                                                                                                              08) was constructive.
                         s17, s45 (advice & assistance (bianket exemptions) I 04/06/2008
                                                                                           Warning   letter sent. Meeting to discuss issues held      Open
        Service                                                                                                                                                                            JS
                                             and IR)                                                                                                            Six month follow
     ENF0201053
                                                                                                                                                              meeting to be held in
                                                                                                                                                                   May 2009
Pre
                                                                                         enforcement
                                                                                         action letter
                                                                                         04/06/08.
                                                                                         Case offcer
                                                                                         drafted text
                                                                                               OM of
                                                                                         for           ON




                                                                                    Pre
                                                            PA sought to neither
                                                            confirm nor deny whethe enforcement
                                                                                    acti6nletter
                                                            info sought was held
                                                                                         04/06/08
                                                            Reasons for refusal          Pre
                        07/02/20061 s 17 - application of
           27/05/2008
ENF08150
                                                            provided in IR verbatim      enforcement
                                   additional
                                                                                         action letter
                                   exemptions during        to those provided in RN
                                                                                         04/06/08.
                                                            for the most par. RM
                                   course of
                                                                                         Text drafted
                                                            difficulties identified at
                                    investigation
                                                                                         forOM
                                                            later stage of
                                    (almost 2 years
                                                                                         section of ON
                                    later). Use of 30 &     investigation
                                    21+ 1+
Pre
                                                                                                                                      enforcement
                                                                                                                                      action letter
                                                                                                                                      04/06/08
ENF08153 127/05/20081 Audit 1188116                                                       20/11/20071 s45 (IR) - RN 1 Post Guidance
                                      Jenny     JS                                                                                    Pre
                                                                                                    advises that IR can
                                      Sanders                                                                                         enforcement
                                                     &1~~mtH~1t:::1 Metropolitan Police
                                                                                                    take 3 months                     action letter
                                                                                                                                      04/06/08
Result of                       Comments/issues
                                                                             Comments
                                                    Request
Complainant I Reference   I Date of
                                                                 IR          regarding           encountered
                                                    forlR
                           request    I refusal
                                        Date of
                                                                                                 during
                                                                             processing
                                       notice
                                                                                                 investi ation
                                                                             of re uest
                                                                                                 Refused to provide
             FS50088977 I 18/03/05    I 01/04/05   I 19/04/05   I 12/07/05 I None-
                                                                             proced    u rally   to iea a copy of
                                                                                                 the withheld info.
                                                                             fine.
                                                                                                 Only did so
                                                                                                 following IN.
             FS50129227 I 07/02/06                 102/07/06
                                      126/04/06                 I 01/08/06 1 Late response
                                                                             to info request
                           24/05/06                             I 24/08/06 I Lengthy delay
                                                   125/05/06
                                      124/05/06
                                                                             to IR
                           02/06/05
                                       10/10/05
                           09/08/05                             21/08/06 1 to both
                                                                            Late response
                                                   119/03/06
                                      19/07/05
                                                                              requests,
                                                                             failed to deal
                                                                             with first
                                                                             request under
                                                                              FOI. Lengthy
                                                                              delay to IR.
             FS50169737 I 08/01/07                 113/02/07
                                      109/02/07                 I 29/06/07 I Late response
                                                                             to request.
                                                                              Lengthy delay
                                                                              to IR.
                                                                                                 Struggled to get
              FS50106800 I 25/07/05   I 30/01/06   I 20/10/06   i Never
                                                                                                 copy of info-
                                                                 rec'd       I to request. No
                                                                               Late response
                                                                                                 classed as 'secret'.
                                                                               IR seen
                                                                                                 Eventuallv oosted
                                                                               thouah claim
a few examples.
                                                                           to have done
                                                                                            Lack of co-op with
                                                                           one.
                                                                                            caseworker -
                                                                           Changing use
                                                                                            having to chase
                                                                           of exemptions
                                                                                            responses. Have
                                                                           & very poor
                                                                                            given access
                                                                           PIT
                                                                                            outside of FOI.
                                                                           arauments.
                                                                                            Lack of response
                                                                           Late response
                                                                15/12/05
                                                    07/06/05
                                        27/05/05
                             11/04/05
                FS50099861
                                                                                            resulted in IN. This
                                                                           to request to
                                                                                            is turn resulted in
                                                                           request and
     'r~'p.;r
..                                                                                          angry phone call
                                                                           IR-
                                                                                            from PA. No reply
                                                                           complainant
                                                                                            was apparent from
                                                                           chased
                                                                           several times.   IN, however when
                                                    .-                     Very poor        chasêdit .seems to
 ,
                                                                                            have been lost in
                                                                           PIT
                                              ~f(                                           the post. The
                                                                           arguments.
                                                                                            eventual reply
                                                                                            answered an
                                                                                            earlier letter rather
                                                                                            than the IN itself so
                                                                                            further questions
                                                                                            had to be raised!
                                                                                            Long delay in
                                                                           Late
                                                                20/12/05
                                                     21/08/05
                                        11/08/05
                FS50101864 20/05/05
                                                                                            responding to
                                                                           responses to
                                                                                            initial request for
                                                                           request and
11                                                                         IR request.      explanation and
                                                                                            info. Had to
                                                                           Request not
                                                                                            threaten IN.
                                                                           considered in
fulL. Five       Brought in two
                                                                               more exemptions
                                                              exemptions
                                                              cited, not       (making total
                                                              enough           claimed - seven!).
                                                              explanation or   Do not wish to
                                                                               provide info to
                                                              PIT given.
                                                                               ICO, citing MOU
                                                                               as reason-
                                                                               sections 23 and 24
                                                                               now relied upon.
                                                                               Seems however,
                                                                               that info is only
                                                                               marked 'secret' or
                                                                               not marked at alL.
                                                                               This matter is stil
                                                                               very much ongoing
                                                                               so there may be
                                                                               more to add...
                                      Not clear
                          Not clear               Not clear   Have
     FS50090852 several                                                        (Case included
                                                                               more for
                                                              attempted to
r-                                                                             demonstration than
                                                              do bare
                                                                               direct action. Was
                                                              minimum
                                                                               being handled by
                                                              rather than
                                                                               Joe Ivatts, I've
                                                              assist
                                                                               taken it fairly
                                                              complainant
                                                              in any           recently.)
                                                                               Different info has
                                                              manner.
                                                                               been sent to comp
                                                              Requests
                                                                               regarding same
                                                              have gone
                                                                               request and MPS
                                                              unanswered
do not seem to be
                                                     or not been
                                                                   able to explain this.
                                                     considered
                                                     under FOI.    Slow in responding
                                                                   to any issues
                                                                   raised, do not
                                                                   seem to know what
                                                                   they have
                                                                   responded to and
                                                                   what they have
                                                                   not. Have been
                                                                   sent
                                                                   correspondence by
                                                                   Joe in an effort to
                                                                   get responses to
                                                                   all requests and
                                                                   none received. I
                                                                   have tried chasing
                                                                   by telephone and
                                                                   do not receive calls
                                                                   back.
                                                                   Update (05/02/08)
                                                                   Nigel Shankster at
                                                                   MPS took over this
                                                                   matter and actually
                                                                   brought it to a
                                                                   conclusion. He
                                                                   seems helpful and
                                                                   willng. Case now
                                                                   closed.
                  2 reqs:                                          Needs to ask for I R
                                                     Na
                                        Not
                            21/5/07 &         None
     FS50168043
-~
Metropolitan
                                       requested
             17/3/07 & I 15/6/07
             7/6/07                                                                                  Police
                                       11/4/06 I 18/5/06
FS50127256 I 24/1/06 I 10/2/06                                No issue re
                                                              20 days & IR
                                                              time
FS50153447 I 29/11/2006 I 29/1/2007 129/1/2007 17/3/07        20 days not
                                                              complied with,
                                                              IR time OK
FS50153447 11/9/06    27/9/06          4/10/06     5/12/06
FS50170141 24/02/07   14/03/07         22/03/07    04/04/07
                                       Not made    Not made Late response      PA appeared to
FS50123037 14/02/2006 20/03/07
                         - said part   on that                                 realise it did hold
                                                   on that  to request
                         of info                                               relevant info only
                                       point       point
                                                                               when we pointed it
                         requested
                         not held                                              out from a related
                                                                               case in Sept 07
ENF0201053 - The Metropolitan Police Service: Position (t 7 May 2008



           Enforcement Log Entries:


ENF06029     Jul-Dec 06            106985   Chris       JPL                                                  s45 Failed
                                                                          Metropolitan Police   12/10/2005                                  Complaint audit to be
                                            Williams                                                         to offer or                    undertaken
                                                                r.                                           conduct a
                                                                                                             proper
                                                                                                             internal
                                                                                                             review
ENF07106                                    Lisa
             21/08/2007           86089                                   Metropolitan Police                s1 -
                                                        JS                                      09/02/2005                 Complaint
                                            Adshead                                                          Information   audit to be
                                                                ..                                           held, s.46    undertaken
                                                                                                             (Record
                                                                                                             keepinq)
                          .




           ON's served:

           Case Ref: FS50087563
           Date: 20/09/2006
           Public Authority: Metropolitan Police Service
           Summary: The complainant requested details of policies and the individuals responsible for those policies within the public authority. The
           Commissioner's decision in this matter is two fold in that the Public Authority has not dealt with the Complainant's request in accordance with
           Part I of the Act in that it has failed to comply with its obligations under section 1 (1), section 10 and section 17. Further, the Public Authority has
           applied section 21 and their application of this is in part, upheld by the Commissioner as he is satisfied that the policies are available but not the
           individuals' names. The Public Authority is required by this Decision Notice to provide some of the information requested (as detailed below)
           within 35 days.
Section of ActlEIR & Finding: FOI 1 - Complaint Upheld, FOI 21 - Complaint Partly Upheld, FOI 17 - Complaint Upheld
View PDF of Decision Notice FS50087563

Case Ref: FS50087366
Date: 22/01/2007
Public Authority: Metropolitan Police Service
Summary: The complainant submitted a request to the public authority for information relating to an investigation undertaken in the early 1990s
into allegations of corruption by employees of a local counciL. The public authority advised the complainant that although its records confirmed
that a file relating to this investigation had once been held, due to the time that had elapsed since the investigation took place this file had since
been weeded or destroyed. Having considered the information available the Commissioner is satisfied that the information requested by the
complainant is no longer held by the public authority.
Section of ActlEIR & Finding: FOl1 - Complaint Not upheld, FOI 14 - Complaint Upheld
View PDF of Decision Notice FS50087366

Case Ref: FS50088977
Date: 08/01/2008
Public Authority: Metropolitan Police Service
Summary: The complainant requested the agreement leading to the reinstatement following suspensio.Q.~of a senior officer at the public
authority. The public authority withheld this, citing sections 38 (health and safety), 40 (personal information) and 41 (information provided in
confidence). Following the intervention of the Commissioner, the public authority dropped its claim that section 38 applied. The Commissioner
finds that the exemption provided by section 40(2) is not engaged as, whilst the information in question does constitute personal information, its
disclosure would not breach the data protection principles. The Commissioner also finds that the exemption provided by section 41 is not
engaged as the information in question was not provided to the public authority from a third party. The public authority is required to disclose
the information initially withheld. This decision notice is currently under appeal to the Information TribunaL.
Section of ActlEIR & Finding: FOI 1 - Complaint Upheld, FOI 40 - Complaint Upheld, FOI 41 - Complaint Upheld
View PDF of Decision Notice FS50088977


Publication scheme - No recorded entry on CMEH, however likely to have adopted the ACPO modeL. Receipt of declaration - W3007984 on
interim system
CM   EH Cases: Position cæ 08_05_08.

    Search criteria: s50 cases I 01 Jan 07 - 08 May 08




           FS50146176 I 26 April     Unknown     Unknown I Unknown   . 1 st request unclear                                 x-
                        2006                                                                                                Insufficient
-                                                                                                                           info on file.
                                                                     · 2nd request clearly requests information
                         22 May
                         2006                                                                                               Delays pre-
                                                                     · MPS response appears to be dated the 13 July
                                                                                                                            guidance
                                                                        2006

                                                                     · Extensions for the time to respond are sent on the
                                                                        27 June, 18 September and the 2 November 2006
                                                                        (pre guidance)



           FS50146678    21          10 April    Unknown   Unknown                                                          x~
                                                                     · MPS claim that request was not received until the
                         September   2007                               ieo forwarded it                                    Insufficient
                         2006                                                                                               info on file.
FS50148975   02 June       19 July       19 March                                                                        ./ - however,
                                                              21 August   . s10 delay
                       2005          2005          2006       2006
-                                                                                                                                  further case
                                                                                                                                   progression
                       09 August     10 October                                                                                    needed
                       2005 - also   2005-                                . IR delay (pre-guidance)
                       request for   response to
                       IR?           IR?                                  . s17 - RN of 19 July inadequate

                                                                          · Despite initial acknowledgements to comp
                                                                             explaining that the matter would be dealt with
                                                                             under FOIA, the response explains that the matter
                                                                             has been handled outside of the Act and that the
                                                                             MPS are unwillng to release the info. This
                                                                             amounts to an insufficient RN

                                                                          · Some confusion surrounding number of requests!
                                                                              RN's !IR's;. we appear to have contributed to this


                       19 January 121 January I Unknown                   · s17 - insufficient RN - application of exemptions      ./ - in respect
                                                              Unknown
 - - --   FS50150414 I 2007 2007                                                                                                   of refusal only
                                                                             not explained! no IR details supplied
~ -- quot;-
FS50153447   29              29 January   29 January I 7 March                                                              ./ - in respect
                                                                      . s10
                  November        2007         2007 2007                                                                         of delay and
                  2006                                                · Delay in responding as documents requested               IR
..                                                                          contained in an off-site archive (14 Dec 06)

                                                                      · Complaint procedure (RN of 29 Jan 07) advises
                                                                           that 'In all possible circumstances the MPS wil
                                                                           aim to respond to your complaint within three
                                                                           months.'

                                                                      · Some information released on review
                                                                                                                  ( 7. Mar 07)

                                                               )~     · Inadequate IR - did not address application of
                                                                           exemptions (7 Mar 07)




                  11
     FS50154349                   27           4 October   5          · Application of blanket exemptions?                       x - further
                  September       September    2006        December                                                              investigation
                  2006            2006                     2006       · IR very limited however - as MPS have opted to           on
.                                                                                                                                applicabilty of
                                                                           neither confirm or deny it could be argued that it
                                                                           would be difficult to provide more detail             exemptions
                         ,quot;iquot;quot;
                                                                                                                                 needed,
                          .fj                                                                                                    particularly in
                                                                      · RN limited - possibly for similar reasons
                   .~      :~g:
                                                                                                                                 respect of
                                                                                                                                 whether the
have been
                                                                                                               applied as a
                                                                                                               'blanket' and
                                                                                                               on the
                                                                                                               suitability of
                                                                                                               s40 as the
                                                                                                               subject of the
                                                                                                               request is
                                                                                                               deceased

                                                       · MPS claim that they have no record of request -       x-
FS50157859 I 18         Unknown   18 I Unknown            following the ie's intervention, it seems that the   Insufficient
             November             December                request was processed under DPA                      info on file.
             2006                 2006


                                                                                                               ./ - in respect
                                                       . s10
FS50167718 I 10 May     Unknown   Unknown    Unknown                                                           of delay
             2007                                      · Staff leave cited as a reason for delay

                                                       · Request appears to have been made by a staff
                                                          member and this may have influenced the way in
                                                          which it was handled
FS50168043 I 17 March    21 May       7 June               · Chain of correspondence - (chronology of IR's &
                                                         Unknown                                                           x-
                      2007       2007         2007                    RN's in particular) is muddled                       Insufficient
..                                                                                                                         info on file.
                                                                   · See related case FS50170141


        FS50169014 I 30 March    23 May       31 May     12 June   · Appear to have carried out PIT in relation to third
                      2007       2007         2007       2007                                                              x - no
                                                                      party personal data (RN of 23 May 2007)
                                                                                                                           substantive
                                                                                                                           issues
                                                                   · Have provided advice and assistance (RN of 23
                                                                      M~y 2007)


                     8 January   9 February
.. I FS50169737                               13         29 June                                                           ./ - in respect
                                                                   · Delay in conducting IR (part of which is post
                     2007        2007         February   2007         guidance)                                            of IR delay.
                                              2007                                                                         Investigation
                                                                                                                           may shed
                                                                   · RN limited - however the decision to neither
                                                                                                                           more light on
                                                                      confirm or deny may be a factor in this
                                                                                                                           the
                                                                                                                           applicability of
                                                                   · IR upholds original decision despite complainants
                                                                                                                           exemptions I
                                                                      assertions that some of the information is already
                                                                                                                           info already
                                                                      in the public domain
                                                                                                                           available in
                                                                                                                           the public
                                                                                                                           domain
.    IR upholds decision to neither confirm or deny
     I FS50169899                              119 June
                    1 Unknown      I Unknown
                                                                           I
                                                2007         I Undated                                                                      I Insufficient
                                                                                                                                              X-
-                                                                                                                                               info on file.


                     24 February    14 March    22 March
      FS50170141                                                 Unknown            Not clear whether IR has been conducted
                                                                               .                                                                X-
                                                             I
                     2007           2007        2007                                                                                            Insufficient
--
                                                                                                                                            I info on file.
                                                                                                                                            I

                     22 May         19 July
      FS50170294                                Unknown          Unknown       .    Several exemptions appear to have been applied,
                                                                                                                                                ./ - in respect
                     2007           2007                                           'with no explanation as to why - very muddled RN
-                                                                                                                                     ,'.       of s10 delay
                                                                                   which does not reflect fully the requirements of
                                                                                                                                                and RN
                                                                                   s17

                                                                                    s10 delay
                                                                               .

                                    18 May
                     1 May 2007                 23 April         24 July
      FS50170381                                                               .    Part of request processed separately under DPA-             X-
                     and others     2007        2007 and a 2007                    the RN appears to imply that all of the requested            corresponden
.                                               number of
                     thereafter?                                                                                                                ce on file
                                                                                   info will be dealt with as a SAR - however some of
                                                times                                                                                           unclear
                                                                                   the info, such as the cost of the inquiry etc
                                                thereafter                         appears to be FOIA

                                                                                    Email of 5 June 2007 advises 'The MPS
                                                                               .
                                                                                    endeavour to respond to FOIA appeals within 3
                                                                                    months'.
. IR declines to confirm or deny in respect of
                                                                                   Section 40, Section 30 and Section 31


                                                                               . Very muddled chronology of correspondence

                                                                               . MPS reply in respect of SAR suggests that some
                                                                                   of the info requested is not personal data, and this
                                                                                   appear to contradict earlier responses


                      16   June
                  I                                                                                                                           X-
                                                                                   MPS' initial response of the 20 June 2007 app-ears
     FS50172692                                                           quot;,
                                                                                                                                              corresponden
                                     2007                                'i · to supply the complainant with forms for his
                      2007                                   I Unknown
                                    110 August   i 2007?
                                                   26 June
                                                                                                                                              ce on file
                                                                                   completion but does not address the requestitself
                                                                                                                                              unclear
                                                                                                                                          i
                                                                                   Very muddled case
                                                                               .

                                                                                                                                              X-
                                                                               .
                                     Unknown      Unknown     Unknown              Possible non-response
                      6 July 2007
     FS50173912
                                                                                                                                              Insufficient
                                                                                                                                              info on file.
.                                                                                                                                             X - no
                                                                               .   Complainant directed to submit a SAR in respect
                                     14 August
                      16 July
     FS50174492                                   27
                                                  September September                                                                         substantive
                                                                                   of part of the request - however it appears that the
                                     2007
                      2007
..                                                                                                                                            issues
                                                                                   MPS have also adopted to neither confirm or deny
                                                  2007 2007
                                                                                   whether information is held
· IR upholds original decision - appears to make a
                                                                 distinction between release to the 'world' and to
                                                                 the complainant in respect of the SAR route

                                                              · Complainant was advised by IC to exhaust SAR




                  24 July                                                                                            ./ - in
                            26 July
__ I FS50176308                        26 July    Unknown     · RN advises complainant to submit a SAR
                  2007      2007       2007                                                                          respect of
                                                                                                                     SAR
                                                              · In the IC's opinion the information requested was
                                                                 not personal data and as such the responses         confusion
                                                                 provided were insufficient

                                                              · The complainants letter of the 26 July 2007 should
                                                                 have triggered an internal review



                  18 July   2 August
~i FS50178276                          8 August   18                                                                 x - no
                                                              · RN limited, however likely to be due to the MPS'
                  2007      2007       2007       September      decision to neither confirm or deny                 substantive
                                                  2007                                                               issues.
                                                                                                                     Investigation
                                                              · Complainants request for IR challenges the
                                                                                                                     required to
                                                                 decision to neither confirm or deny on the basis
                                                                 that the existence of the information is already    determine
                                                                                                                     applicability of
                                                                 known publicly
                                                                                                                     exemptions
· The IR replies stating the fact that the existence of
                                                                 the information is publicly known does not
                                                                 necessarily mean it is held by the MPS



     FS50178467 I 17 August   Unknown   Unknown               . Alleged s10
                                                  Unknown                                                               x-
                   2007                                                                                                 Insufficient
..                                                                                                                      info on file.


                   22 May
     FS50179851               26 July   31 July   Unknown                                                               x - no
                                                              · Request made to a police stàtion - response sent
                                        200,&¡
                   2007       2007                               from the 'Sutton Partnership' - advised that info      substantive
..                                                               was not held by Police and that the response had       issues.
                                                                 been forwarded to the Council

                                                              . Possible inappropriate transferral of request in
                                                                 terms of keeping the complainant informed, and
                                                                 failure to recognise a request for review but both
                                                                 are minor issues in the context of this complaint



     FS50185687 I 27 April              30 July
                              28 June                                                                                   ./ - in respect
                                                  7           . s10
                   2007       2007      2007      September                                                             of s10 and IR
                                                  2007        . Delayed IR (post guidance)                              delay
.
.   Clarification sought on the 30 March - dates on
                    I 15 March
     I FS50186040
                                               116 August 18 October   I
                      2007       118 May
                                  2007          2007 2007                                                                            ./ - in respect
                                                                               which this was provided unclear and as such, it is
-                                                                              difficult to asses whether the MPS breached s 10      of IR delay

                                                                               Delay in providing IR (post guidance)
                                                                           .

                     26 April
      FS50186880                  25 May        Unknown    Unknown         .   Insufficient information on file
                     2007         2007                                                                                                X-
                                                                                                                                    I Insufficient
-                                                                                                                                    info on file.




                                  Unknown       Unknown    Unknown             MPS contend that the request was not received
                                                                           .                                                         X-
     i FS50186901   114
                     November                                                                                                        Insufficient
..                   2007                                                                                                            info on file.


                                  15 January
      FS50188116     20                         Unknown    Unknown         .   MPS seek clarification on the 23 November 2007        X-
                     November     2008                                                                                               Insufficient
..                   2007                                                                                                            info on file.
                                                                           .   The information was released to the complainant,
                                                                               but date on which clarification was submitted is
                                                                               unclear
21         7 January                                                              vquot; - in respect
                                                                           .   No attempt to offer advice and assistance in
                    2007                           November   2007             respect of the application of s 12 (see refusal of the of s16/ s45
    I FS50190522                    I ~ePtember
                   114 August
                                        2007       2007                        4 September)                                           A&A
-
     FS50190668     18 October          12         15         17 January       Delayed IR (post guidance)
                                                                           .
                    2007                November   November   2008                                                                 Ivquot; - indelay
                                                                                                                                    of IR respect
                                        2007       2007


                                        07 March
     FS50199925     Unknown                        23         Unknown      .   Insufficient information on file
                                        2008       February
                                '.' i                                          ,-~l
                                                   2008                                                                              X-
                                                                                                                                   I Insufficient
                                                                                                                                     info on file.
Cases predating 01 Jan 2007 taken from Team 2's issue log




          FS50088977   I 18 March                                    12 July            IR delay (pre-dates guidance)
                                                                                    .
                         2005         I 01 April
                                        2005       I again on
                                                     01 and          2007                                                                     1./ -IN respect
                                                                                                                                               of in
                                                    19 April                            IN issued following refusal to provide ICO with
                                                                                    .
                                                    2005                                withheld information (1 August 2007)
                                                    (following
                                                    meeting)     I              I   .   RN is limited, however relatively early days in
                                                                                        respect of the Act's implementation

                                                                                    .   IR extremely limited and as a result not
                                                                                        conversant with the s45 Code

                                                                                    .   DN issued - finds in breach of sections 1 (1) (a) -
                                                                                        subject to an appeal

                        07 February                 2 July
          FS50129227                   26 April                      1 August           s10 delay
                                                                                    .                                                          .. - in respect
                       2006            2006         2006             2006
..                                                                                                                                             ofs10, s17
                                                                                    .   Delays in responding to ICO I difficulties in          and delays in
                                                                                                                                               responding to
                                                                                        contacting MPS (see letter of 16 January 2008)
                                                                                                                                               ICO
                                                                                        Exemptions introduced during investigation,
                                                                                    .
                                                                                        therefore a breach of s17 (1) (see email of the 24
                                                                                        January 2008)
FS50139215   24 May   24 May   25 May   24 August                                                    -/ - in respect
                                                    .   IR delay (pre-guidance)
             2006     2006     2006     2006                                                         of s17
                                                        Refusal of the 24 May fails to meet the
                                                    .
                                                        requirements of s17 (no appeal rights/poor
                                                        explanation of exemptions)
FS50106800   25 July   30 January   Various   Unknown                                                           -/ - in respect
                                                        .   Although refusal was provided on the 30 January
             2005      2006                                 2006, MPS did invite the complainant to view the    of s10, s17,
                                                            documentation provided that an undertaking not to   s45 and
                                                            disclose certain parts of the information was       restrictive
                                                            signed (letter of the 31 August 2005)               approach

                                                        · In connection with the above, MPS provided a
                                                            form for the complainant to sign which made
                                                            reference to information which is exempt under
                                                            s31 and s38 of the Act

                                                        · A request for review is submitted on the 22
                                                            September 2005 in relation to the undertaking -
                                                            this should have been dealt with under s45

                                                        · A second request for review is sent on the 21
                                                            December 2005

                                                        · A third request for review is submitted on the 19
                                                            October 2006

                                                        · Material sought is over 100 years old and as such,
                                                            some of   the exemptions cited (s31) cannot apply

                                                        · Refusal of 30 January 2006 contains limited PIT
                                                            arguments

                                                        · Co-operation of MPS during investigation poor

                                                        · Numerous additional exemptions added during
                                                            course of investigation
õ-
                         Q)
                          0.1'
                          C/ ..
                          Q) C/
                          .. -
                          c: ..
                             0
                         .- C/ LO
                         quot;~ t quot;quot;
                          I
                             0 C/

     c:             Q)
                         ;:
                    C/
     Q)
     0.                                                                  ro
                         ro
                ~ r5
                                       ..
                         ~             Q)
                                                                          E
                                       ..                                 ..
                                                                 ..
Q) .0                                                            Q)
                Q) C/
..   c:
                         o                                       +-
                ã; t
                   £     LO                                              .E
                                       0)
..   ro
                                                                         c:
                                       c:
                C/                                               Q)
.9   C/
                         ..                                      quot;0
                C/ 0      Q)
                                                                         õ
                                       c:
                                       o                         ..
quot;0   ro         Q) 0)                                            ïñ
                                                                         ..
                         +-
Q) c:                                  0.
                                       ..
C/ 0                                                             ::
                tó .!:    c: .-
                                                                         ::
                                                                 o
ro:; .-                                C/
                          o quot;0
                                       o
                E -g                                                     C/
                         quot;0 2
Q) ro I'
                                       0.                        C/
                                                                         ~
- c: 0          z ro      Q) .-
~ 0)0
                                       Õ
                         quot;0 c:
                            Ü
                o ..                                             ~       ro
                   ..
C/ ïñ N                  c:
                                                                         C/
                                                                 C/
                          Q) .Q
                ¡t 0                   1i
ro Q) Q)
                                                                 :.
~ quot;0 §          ro 0                                                     ro
                         X Õ.                                    +-
           quot;0                                   I-
                                       8                                 quot;0
                         Q) E                                    o
                -0 0.
c: .$ -:   Q)
                                       o
           Õ                                                             Q)
                                                a.
                                       ..                        +-
.Q ';'0         Q) ên                                                    C/
                          Q) Q)
                                                                         o
                          C/ X
           ::
ro c: N                                                          Q)
                                                quot;0
                                                                         Õ
                .. a.                  quot;0
                :: Q)
                   ~      c: Q)
           quot;0                                    Q)
                          o0           .~       +-               ê Q)
E'- Q)     c:                                                            C/
           o     o
.. ~ ..
                                                                 0.ro
                                                                 o
                                       0.
t - t                   g- c:                                          i5
                                                                    0
o 0..                                           'Ë
           ü                           0.
           ..                                   :.
                c: ..
                          ~ ..
.!:.E 0                                                    ;:    C/ C/   C/
                o +-
           o
      ..                                ro 0)                    Q) Q)
                                                      ..
                15£       .. ~                              ro
                                                                         ~
           c:                                                    .. E
                                       co .!
                                                      o
Q) .. Q)
                         .E ~                   ro
.. c: ..                                                   ID     i :;
                                       (' quot;0
                Q) C/
                                                      o                  o c:
                                                C/
           C/
.. ro ..                               C/ quot;0               quot;0
                C/ Q)
                          Q) 0                        0.                 1: 0
                                                                 quot;0 quot;0
                ~0
t c: Q)
O'm '-     ~                                               0:
                                quot;0 Q)                            Q) Q)
                         ~ .. c: ~ ~                                     .- :¡
                                                                 :: :i
                             .. ro - ..               ~
                          E
                O c:                                                     Q) ::
           0:     ~
Q) 0. quot;E
                         00 .. ~ o
                         '-LO                              0)    quot;- quot;Ë
                                                                 ~ ..
                                                      Q)
000                                                   ;:
EE0                                                                      E0
                                                           c:
                         .. 0 c; e a.
                Q) Q)
                                      o                     o
                .. t
           c:                                                            o C/
                                                                 z~
                                                           ..
                                                      0:
           .:
(f ü ~                    C/ N                                           (f ~
                I- ~
.          .    .                      .        .     .          .       .
                          .                                .

                               ..
                               Q)
                               .0
                               E
                               ÜO
                               Q) LO

                         LO Q) 0
                         .. 0 N

                         Q)
                         c: LO
                          :: 0
                         -: N
                         I' 0
                                           '.



                                       ,




                         ;:
                         ro
                         ~ LO
                            0
                         I' 0
                         NN

                         'C
                         o.LO
                         .: 0
                            0
                         .. N
                         ..
                         ..
                         co
                         co
                         0)
                         0)
                         o
                         o
                         LO
                         (f
                         LL




                         .                                 ~.
20 May
    FS50101864                                                                                                                    ./ - in respect
                                      11 August   21 August   20         .   s10
                 2005                 2005        2005        December                                                            of s10, s17,
-                                                             2005                                                                s45
                                                                             IR delay (pre-guidance)
                                                                         .
                                                                             IN threatened
                                                                         .
                                                                             s17 - poor refusal, lack of explanation for PIT
                                                                         .
                                                                             given the number of exemptions cited. Doesn't
                                                                             appear to consider the request in its entirety

                                                                             MPS reply of the 11 October 2005 appears to
                                                                         .
                                                                             have overlooked the IR element of the
                                                                             complainants refusal
                          , ,_.~
                                   ~ ..-                                     IR does little to suggest that a truly fresh
                                                                         .
                                                                             consideration of matters was undertaken

                                                                             Additional exemptions applied during course of
                                                                         .
                                                                             investigation - reluctance to provide ICO with all
                                                                             of the withheld information
Unknown          Unknown
                          Various
         FS50090852                                                  Unknown                                                             .. - in respect
                                                                                   Initial response from MPS (09 September 2005) -
                                                                               .
                                                                                                                                         of muddled
                                                                                   advises that 'The issues you raise are not covered
                          (including 7
-.                        September                                                by FOIA'                                              responses
                          2005)
                                                                                   MPS appears to have muddled responses and is
                                                                               .
                                                                                   unclear on what information has already been
                                                                                   provided. In mitigation, it seems that the requests
                                                                                   themselves were fairly confusing (47 requests in
                                                                                   total, submitted at various times)




                                                          11 April
                                         2 February                  18 May
                          Numerous
         FS50127256                                                                                                                      .. - in respect
                                                                                   MPS response advises that info not held 'as may'quot;
                                                                               .
                                                          2006
                                         2006                        2006          have been destroyed'                                  ofs46
                          (including
-                         24 January
                          2006)                                                    MPS appear to have sought clarification via the
                                                                               .
                                                                                   iea from the complainant. This occurred during
                                                                                   the investigation and arguably should have been
                                                                                   carried out from the outset

                                                                                   Suggestion of record management difficulties
                                                                               .
                                                                                   (letters of the 2 & 7 April 2008) - no centralised
                                                                                   records for historical records? (letter of 18 April
                                                                                   2008)

                                                                               .   Reluctance to provide iea with relevant info, as
                                                                                   suggested in previous cases

     i                I                               i
14 February
          FS50123037                   Unknown   Unknown               Irrelevant - case concerns the Metropolitan Police
                                                             Unknown                                                               N/A
                         2006                                          Authority, although there may be issues in respect of the
-                                                                      correct transferral of requests




    Clarification required:

    Length of complaint procedure (Rosenbaum complaint and others)
ENF0201053 - The Metropolitan Police Service (MPS) -
Recommendation for progression of case


Cases considered:


2005 í
2 Enforcement Log entries (1069851'86089) - both relate to requests from


30 cases received from 01 January 2007 to 08 May 2008 (including those
falling within this date range from the Team 2 issue log)

9 cases from Team 2 issues log which predate the above

Total: 41* (one of which relates to MPA but is included on account of the
possible transferral of request issues)

* this does not represent the total number of complaints received about the
MPS (approx 61 s50 cases)


Patterns arising i notable points:

s 10 breaches




4                                                             o
                                         3
                    3



.-                  129227 __ 167718--
148975 -



                                        -
..                  146176 --. 170294-
106800 -



                                        -
                    153447 -
                                         185687 -
99861-'-
.
101864 -


087563-quot;
(ON issued)
517

    · Poor explanation of application of exemptions in the context of the
         information withheld (148975 _2005 /150414__ 2007)
    . Poor PIT's (099861__ 2005)
    . Extension of time to respond to request without explaining which
         exemption is applicable (17 (1)) (146176'-2006)
    . Application of blanket exemptions - particularly s24 (national security),
       s30 (investigations), s31 (law enforcement), s38 (health and safety). In
         one case (10680~2005) s31 was applied to information
         which was over 100 years old, in another s38 was applied to the cost of
         postponing the Royal Wedding (099861_2005)

         ~006)
    . Introduction of additional exemptions during investigation ( 129227




545

    . IR's do not appear to take a truly fresh look at matters, although in
         mitigation there are examples of information which has been released
         on review (153447 2006)
    . Examples of requests dealt with outside the Act's parameters (148975
              72005 / 170381_(OPA) 2007/ 174492_(OPA)
         2007/176308 (OPA) 2007/106800 2005)
    . Post guidance IR delays: 4




                  13Feb07
169737                                                            Partly post
                                 29 June 07       90 days +
                                                                  guidance
          ..
¡

2007).



         .
185687                                           29 days
                  30 July 07     7 Sept 07                        Need to
                                                                  determine
:
                                                                  whether
2007)
                                                                  extension
                                                                 justified
186040(_         16 Aug 07                        38 days         Need to
                                 8 act 07
2007)                                                             determine
                                                                  whether
                                                                  extension
                                                                  justified



-
190668                                           40 days
                 15 Nov 07       17 Jan 08                        Need to
                                                                  determine
                                                  (allowing for
2007)                                                             whether
                                                 bank
                                                                  extension
                                                 holidays)
                                                                  justified

s46

   · Delays in responding due to inform~tion held in off-site archives
        (153447 2006)
   . Some difficulties in determining the fate of historical information
      (127256 m ; 2006)

                                                                           2005)
   . Record keeping raised as an issue within CEAF (86089

Relationship with ICO

                                                                     2005/
   . IN's issued or threatened in various cases (88977
        101864. 2005)
   · Numerous instances of questioning why ICO required to see withheld
      information



Conclusions:
The most notable characteristic of MPS' responses is the application of
stringent exemptions, some of which appear to have been applied in a blanket
manner. Whilst there is certainly room for improvement in this respect, this is
something that could be approached informally at the present time. Such an
approach is supported by the need to ensure that we fully understand the
sensitivities of the information the MPS holds before drawing further
conclusions from the use of exemptions.

In respect of the procedural failings, there is room for improvement in respect
of refusal notices, but I am not particularly concerned about the MPS'
adherence to section 10 at present.
There is also scope to for the MPS to develop their approach to internal
reviews. At present they are failing to demonstrate that they are taking a truly
fresh consideration of matters. Additionally, their current complaint procedure
does not appear to have adopted the timescales recommended by the
Commissioner.

In respect of MPS' relationship with the ICO, there is scope for a more
positive relationship between the two parties - however given our experience
with other PA's I'm not overly concerned that it departs significantly from the
norm.

                                             is a problem with the handling of
Finally, the MPS have suggested that there

requests on account of the un-centralised process. The MPS appear receptive
to the ICO's advice on this issue - see email of 06 February 2008 from DW to
JPL.


Recommendation:
That the Enforcement Team approaches MPS on an informal basis to
highlight the following concerns:

     o Refusal Notices (
     o Timescales for IR's I Reconsideration of issues at IR
     o Use of blanket exemptions

Should the informal approach fail to elicit an appropriate response, formal
action may be considered.


Date I Officer: 13 May 2008 - Jo Stones, FOI Enforcement Officer
Page 1 of 1




From: Joanne Stones
Sent: 13 May 2008 16:58
To: Jo Pedder
Subject: The Met

Hi Jo,


                                                                    case: ENF0201053.
Just to let you know the reference for the MPS Enforcement



                                   letter to them is drafted and send you a copy. I've agreed with J-P that the
I'll be in touch once the informal

main topics it will cover are as follows:

             Refusal Notices
             Timescales for IRs / Reconsideration of issues at IR
             Apparent use of blanket exemptions

Please don't hesitate to contact me if you would like to discuss further

Jo
5344




fie://C:temp(Ref. ENF0201053) .html                                                                01/0412009
Page 1 of2




From: Joanne Stones
sent: 27 May 2008 13:39
To: Jo Pedder
Subject: The Met - Enforcement Letter


HiJo,
Attached is a draft of the letter I'm planning to send out to the Met later this week. As it references a number of cases
which are still under investigation, I thought it may be helpful for you to see it.

                                                                                         requests:
The letter covers the following issues arising from the MPS' handling of



                Explanation of the application of exemptions is limited or generic (including reference to the duty to confirm or
               deny)
                Application of additional exemptions during the course of investigation
               Timescale for internal reviews
               Reconsideration of issues at review

Although the number of issues covered is relatively small, they are novel and the need to include examples has resulted
in a rather lengthy letter. The cases used as examples within the letter are listed in the table below,

If you (or anyone else on your team) would like an explanation as to why a particular case has been included or more

general detials about our approach feel free to give me a shout.

                   helpfuL.
Hope this if



Jo

5344


                                         Offcer
  Case / Complainant                                                        ,Status
                                                                           quot;'      quot;



                                         Carolyn quot;owes                          Open
  FS50106800 -




                                                                                Closed
 FS50170294 -                            Helen Jarman

               0
                                                                                Closed
 FS50150414 -                            Aaminah Khan


        ,




.                                        FOI Team 2                          Open
 FS50154349 -




                                         FOI Team 2                        . ,Open
 FS50169737 -
                                                                                   quot;,quot;




                                         Elizabeth Hogan                     Open
 FS50129227 -




fie:! IC:temp(Ref. ENF020 1053 J .html                                                                           01104/2009
Page 2 of2




                        lo Pedder          Open
  FS50101864 -


         a                                 i:
     ¡




                        FOI Team 2
 FS50153447 -                              Open




 FS50188116-            Jennifer Sanders   Closed




fie:IIC:temp(Ref. ENF0201053) .html               01/04/2009
· Reasonable opportunity for you to inspect a record containing the
       information; and/or '

   · A digest or summary of the information in permanent form or in another
       form acceptable to you

We will comply with your preferred form of presentation as far as it is
reasonably practicable. In determining whether it is reasonably practicable,
we will review all the circumstances, including the cost.

Where we are unable to comply with your preferred format, we will notify as to
the reasons why. Where you have not specified your preferred method of
communication, we will provide the information by any means reasonable in
the circumstances.

Where a request for information has been made successfully, we will advise
you in writing of the following:

. The decision;
. The date on which it was made;
. The name and designation of the pèrson who dealt with the request;
. Form and manner of access; and '
· Your right to complain, including details of the internal complaints
   procedure and the Information Commissioner's details.


Where a Request is Refused
Where we receive a request for information and its release is refused, we will
advise you, the applicant, within 20 days, of the following:

. The decision;
. The day on which it was made;
. The name and designation of the person who dealt with the request;
. The grounds for refusing the request, e.g. the application of an exemption,
    in the public interest, cost of compliance;
. When exemption/s are used, the specific exemption used and the reasons
   for using the exemption;
· When the public interest test has been considered, the reasons why it was
   applied;
. Any other issues relevant to the deèision or matters that were taken into
   consideration; and
· Details for the internal procedures for dealing with complaints and your
   right to apply to the Information Commissioner for a decision notice.

Note: The Police Service is not obliged to state why an exemption
      applies if by doing so, exempt information would be revealed.




                                                                               12
Dealing with Vexatious or Repeat Requests
The Police Service can refuse to process an FOI request if we consider it to
be either vexatious or repeated, or both.
If this is the case, we will inform you within 20 days of receiving the request.
At the same time, we will provide details about our internal procedures for
dealing with complaints and your right to apply to the Information
Commissioner for a decision notice.
If a notice has already been issued that a request is repeated or vexatious, we
will not send out a further notice.
Where a second request is received for information that has already been
provided and the second request is identical or substantially similar, we wil
not comply with the request unless a reasonable time has elapsed between
the two requests.

The Complaints Procedure
Our decisions and actions on any request will be logged and recorded. These
will be retained, together with any other pertinent information in the event of a
complaint.

Structure of Review
We have rigorous procedures in place to ensure that the original decision-
maker wil provide an independent reviewer with all the information relevant to
processing the complaint.

We will review the following aspects of the request:

. Timescales.
. Was the applicant kept informed?
· Was the applicant helped to locate information if not held by Police
   Service?
· Was the response communicated in the format preference of the
    applicant? If not, why not?
· Was a transfer or partial transfer of request made? If so, was this handled
   correctly?
· Was a fees notice served and the principles of the charging regime
   applied?
. Was a refusal notice served?
· If the request appeared to be vexatious, was the correct procedure
   followed and the correct decision reached?
· Was the information requested sourced correctly?
· Was there a need to obtain additional information?
· Were all systems and information directories searched in response to the
    information requested?
· Were any problems encountered in obtåining the information from the
   information owners?


                                                                                   13
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1
Metropolitan Police 1

Contenu connexe

Dernier

Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 

Dernier (20)

Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 

En vedette

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

En vedette (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Metropolitan Police 1

  • 1. Education, Police & Justice Enforcement Action Log Severity ratings: Investigation underway 10 Total: Monitoring to continue, however meeting (Nov Metropolitan Police 08) was constructive. s17, s45 (advice & assistance (bianket exemptions) I 04/06/2008 Warning letter sent. Meeting to discuss issues held Open Service JS and IR) Six month follow ENF0201053 meeting to be held in May 2009
  • 2. Pre enforcement action letter 04/06/08. Case offcer drafted text OM of for ON Pre PA sought to neither confirm nor deny whethe enforcement acti6nletter info sought was held 04/06/08 Reasons for refusal Pre 07/02/20061 s 17 - application of 27/05/2008 ENF08150 provided in IR verbatim enforcement additional action letter exemptions during to those provided in RN 04/06/08. for the most par. RM course of Text drafted difficulties identified at investigation forOM later stage of (almost 2 years section of ON later). Use of 30 & investigation 21+ 1+
  • 3. Pre enforcement action letter 04/06/08 ENF08153 127/05/20081 Audit 1188116 20/11/20071 s45 (IR) - RN 1 Post Guidance Jenny JS Pre advises that IR can Sanders enforcement &1~~mtH~1t:::1 Metropolitan Police take 3 months action letter 04/06/08
  • 4. Result of Comments/issues Comments Request Complainant I Reference I Date of IR regarding encountered forlR request I refusal Date of during processing notice investi ation of re uest Refused to provide FS50088977 I 18/03/05 I 01/04/05 I 19/04/05 I 12/07/05 I None- proced u rally to iea a copy of the withheld info. fine. Only did so following IN. FS50129227 I 07/02/06 102/07/06 126/04/06 I 01/08/06 1 Late response to info request 24/05/06 I 24/08/06 I Lengthy delay 125/05/06 124/05/06 to IR 02/06/05 10/10/05 09/08/05 21/08/06 1 to both Late response 119/03/06 19/07/05 requests, failed to deal with first request under FOI. Lengthy delay to IR. FS50169737 I 08/01/07 113/02/07 109/02/07 I 29/06/07 I Late response to request. Lengthy delay to IR. Struggled to get FS50106800 I 25/07/05 I 30/01/06 I 20/10/06 i Never copy of info- rec'd I to request. No Late response classed as 'secret'. IR seen Eventuallv oosted thouah claim
  • 5. a few examples. to have done Lack of co-op with one. caseworker - Changing use having to chase of exemptions responses. Have & very poor given access PIT outside of FOI. arauments. Lack of response Late response 15/12/05 07/06/05 27/05/05 11/04/05 FS50099861 resulted in IN. This to request to is turn resulted in request and 'r~'p.;r .. angry phone call IR- from PA. No reply complainant was apparent from chased several times. IN, however when .- Very poor chasêdit .seems to , have been lost in PIT ~f( the post. The arguments. eventual reply answered an earlier letter rather than the IN itself so further questions had to be raised! Long delay in Late 20/12/05 21/08/05 11/08/05 FS50101864 20/05/05 responding to responses to initial request for request and 11 IR request. explanation and info. Had to Request not threaten IN. considered in
  • 6. fulL. Five Brought in two more exemptions exemptions cited, not (making total enough claimed - seven!). explanation or Do not wish to provide info to PIT given. ICO, citing MOU as reason- sections 23 and 24 now relied upon. Seems however, that info is only marked 'secret' or not marked at alL. This matter is stil very much ongoing so there may be more to add... Not clear Not clear Not clear Have FS50090852 several (Case included more for attempted to r- demonstration than do bare direct action. Was minimum being handled by rather than Joe Ivatts, I've assist taken it fairly complainant in any recently.) Different info has manner. been sent to comp Requests regarding same have gone request and MPS unanswered
  • 7. do not seem to be or not been able to explain this. considered under FOI. Slow in responding to any issues raised, do not seem to know what they have responded to and what they have not. Have been sent correspondence by Joe in an effort to get responses to all requests and none received. I have tried chasing by telephone and do not receive calls back. Update (05/02/08) Nigel Shankster at MPS took over this matter and actually brought it to a conclusion. He seems helpful and willng. Case now closed. 2 reqs: Needs to ask for I R Na Not 21/5/07 & None FS50168043 -~
  • 8. Metropolitan requested 17/3/07 & I 15/6/07 7/6/07 Police 11/4/06 I 18/5/06 FS50127256 I 24/1/06 I 10/2/06 No issue re 20 days & IR time FS50153447 I 29/11/2006 I 29/1/2007 129/1/2007 17/3/07 20 days not complied with, IR time OK FS50153447 11/9/06 27/9/06 4/10/06 5/12/06 FS50170141 24/02/07 14/03/07 22/03/07 04/04/07 Not made Not made Late response PA appeared to FS50123037 14/02/2006 20/03/07 - said part on that realise it did hold on that to request of info relevant info only point point when we pointed it requested not held out from a related case in Sept 07
  • 9. ENF0201053 - The Metropolitan Police Service: Position (t 7 May 2008 Enforcement Log Entries: ENF06029 Jul-Dec 06 106985 Chris JPL s45 Failed Metropolitan Police 12/10/2005 Complaint audit to be Williams to offer or undertaken r. conduct a proper internal review ENF07106 Lisa 21/08/2007 86089 Metropolitan Police s1 - JS 09/02/2005 Complaint Adshead Information audit to be .. held, s.46 undertaken (Record keepinq) . ON's served: Case Ref: FS50087563 Date: 20/09/2006 Public Authority: Metropolitan Police Service Summary: The complainant requested details of policies and the individuals responsible for those policies within the public authority. The Commissioner's decision in this matter is two fold in that the Public Authority has not dealt with the Complainant's request in accordance with Part I of the Act in that it has failed to comply with its obligations under section 1 (1), section 10 and section 17. Further, the Public Authority has applied section 21 and their application of this is in part, upheld by the Commissioner as he is satisfied that the policies are available but not the individuals' names. The Public Authority is required by this Decision Notice to provide some of the information requested (as detailed below) within 35 days.
  • 10. Section of ActlEIR & Finding: FOI 1 - Complaint Upheld, FOI 21 - Complaint Partly Upheld, FOI 17 - Complaint Upheld View PDF of Decision Notice FS50087563 Case Ref: FS50087366 Date: 22/01/2007 Public Authority: Metropolitan Police Service Summary: The complainant submitted a request to the public authority for information relating to an investigation undertaken in the early 1990s into allegations of corruption by employees of a local counciL. The public authority advised the complainant that although its records confirmed that a file relating to this investigation had once been held, due to the time that had elapsed since the investigation took place this file had since been weeded or destroyed. Having considered the information available the Commissioner is satisfied that the information requested by the complainant is no longer held by the public authority. Section of ActlEIR & Finding: FOl1 - Complaint Not upheld, FOI 14 - Complaint Upheld View PDF of Decision Notice FS50087366 Case Ref: FS50088977 Date: 08/01/2008 Public Authority: Metropolitan Police Service Summary: The complainant requested the agreement leading to the reinstatement following suspensio.Q.~of a senior officer at the public authority. The public authority withheld this, citing sections 38 (health and safety), 40 (personal information) and 41 (information provided in confidence). Following the intervention of the Commissioner, the public authority dropped its claim that section 38 applied. The Commissioner finds that the exemption provided by section 40(2) is not engaged as, whilst the information in question does constitute personal information, its disclosure would not breach the data protection principles. The Commissioner also finds that the exemption provided by section 41 is not engaged as the information in question was not provided to the public authority from a third party. The public authority is required to disclose the information initially withheld. This decision notice is currently under appeal to the Information TribunaL. Section of ActlEIR & Finding: FOI 1 - Complaint Upheld, FOI 40 - Complaint Upheld, FOI 41 - Complaint Upheld View PDF of Decision Notice FS50088977 Publication scheme - No recorded entry on CMEH, however likely to have adopted the ACPO modeL. Receipt of declaration - W3007984 on interim system
  • 11. CM EH Cases: Position cæ 08_05_08. Search criteria: s50 cases I 01 Jan 07 - 08 May 08 FS50146176 I 26 April Unknown Unknown I Unknown . 1 st request unclear x- 2006 Insufficient - info on file. · 2nd request clearly requests information 22 May 2006 Delays pre- · MPS response appears to be dated the 13 July guidance 2006 · Extensions for the time to respond are sent on the 27 June, 18 September and the 2 November 2006 (pre guidance) FS50146678 21 10 April Unknown Unknown x~ · MPS claim that request was not received until the September 2007 ieo forwarded it Insufficient 2006 info on file.
  • 12. FS50148975 02 June 19 July 19 March ./ - however, 21 August . s10 delay 2005 2005 2006 2006 - further case progression 09 August 10 October needed 2005 - also 2005- . IR delay (pre-guidance) request for response to IR? IR? . s17 - RN of 19 July inadequate · Despite initial acknowledgements to comp explaining that the matter would be dealt with under FOIA, the response explains that the matter has been handled outside of the Act and that the MPS are unwillng to release the info. This amounts to an insufficient RN · Some confusion surrounding number of requests! RN's !IR's;. we appear to have contributed to this 19 January 121 January I Unknown · s17 - insufficient RN - application of exemptions ./ - in respect Unknown - - -- FS50150414 I 2007 2007 of refusal only not explained! no IR details supplied ~ -- quot;-
  • 13. FS50153447 29 29 January 29 January I 7 March ./ - in respect . s10 November 2007 2007 2007 of delay and 2006 · Delay in responding as documents requested IR .. contained in an off-site archive (14 Dec 06) · Complaint procedure (RN of 29 Jan 07) advises that 'In all possible circumstances the MPS wil aim to respond to your complaint within three months.' · Some information released on review ( 7. Mar 07) )~ · Inadequate IR - did not address application of exemptions (7 Mar 07) 11 FS50154349 27 4 October 5 · Application of blanket exemptions? x - further September September 2006 December investigation 2006 2006 2006 · IR very limited however - as MPS have opted to on . applicabilty of neither confirm or deny it could be argued that it would be difficult to provide more detail exemptions ,quot;iquot;quot; needed, .fj particularly in · RN limited - possibly for similar reasons .~ :~g: respect of whether the
  • 14. have been applied as a 'blanket' and on the suitability of s40 as the subject of the request is deceased · MPS claim that they have no record of request - x- FS50157859 I 18 Unknown 18 I Unknown following the ie's intervention, it seems that the Insufficient November December request was processed under DPA info on file. 2006 2006 ./ - in respect . s10 FS50167718 I 10 May Unknown Unknown Unknown of delay 2007 · Staff leave cited as a reason for delay · Request appears to have been made by a staff member and this may have influenced the way in which it was handled
  • 15. FS50168043 I 17 March 21 May 7 June · Chain of correspondence - (chronology of IR's & Unknown x- 2007 2007 2007 RN's in particular) is muddled Insufficient .. info on file. · See related case FS50170141 FS50169014 I 30 March 23 May 31 May 12 June · Appear to have carried out PIT in relation to third 2007 2007 2007 2007 x - no party personal data (RN of 23 May 2007) substantive issues · Have provided advice and assistance (RN of 23 M~y 2007) 8 January 9 February .. I FS50169737 13 29 June ./ - in respect · Delay in conducting IR (part of which is post 2007 2007 February 2007 guidance) of IR delay. 2007 Investigation may shed · RN limited - however the decision to neither more light on confirm or deny may be a factor in this the applicability of · IR upholds original decision despite complainants exemptions I assertions that some of the information is already info already in the public domain available in the public domain
  • 16. . IR upholds decision to neither confirm or deny I FS50169899 119 June 1 Unknown I Unknown I 2007 I Undated I Insufficient X- - info on file. 24 February 14 March 22 March FS50170141 Unknown Not clear whether IR has been conducted . X- I 2007 2007 2007 Insufficient -- I info on file. I 22 May 19 July FS50170294 Unknown Unknown . Several exemptions appear to have been applied, ./ - in respect 2007 2007 'with no explanation as to why - very muddled RN - ,'. of s10 delay which does not reflect fully the requirements of and RN s17 s10 delay . 18 May 1 May 2007 23 April 24 July FS50170381 . Part of request processed separately under DPA- X- and others 2007 2007 and a 2007 the RN appears to imply that all of the requested corresponden . number of thereafter? ce on file info will be dealt with as a SAR - however some of times unclear the info, such as the cost of the inquiry etc thereafter appears to be FOIA Email of 5 June 2007 advises 'The MPS . endeavour to respond to FOIA appeals within 3 months'.
  • 17. . IR declines to confirm or deny in respect of Section 40, Section 30 and Section 31 . Very muddled chronology of correspondence . MPS reply in respect of SAR suggests that some of the info requested is not personal data, and this appear to contradict earlier responses 16 June I X- MPS' initial response of the 20 June 2007 app-ears FS50172692 quot;, corresponden 2007 'i · to supply the complainant with forms for his 2007 I Unknown 110 August i 2007? 26 June ce on file completion but does not address the requestitself unclear i Very muddled case . X- . Unknown Unknown Unknown Possible non-response 6 July 2007 FS50173912 Insufficient info on file. . X - no . Complainant directed to submit a SAR in respect 14 August 16 July FS50174492 27 September September substantive of part of the request - however it appears that the 2007 2007 .. issues MPS have also adopted to neither confirm or deny 2007 2007 whether information is held
  • 18. · IR upholds original decision - appears to make a distinction between release to the 'world' and to the complainant in respect of the SAR route · Complainant was advised by IC to exhaust SAR 24 July ./ - in 26 July __ I FS50176308 26 July Unknown · RN advises complainant to submit a SAR 2007 2007 2007 respect of SAR · In the IC's opinion the information requested was not personal data and as such the responses confusion provided were insufficient · The complainants letter of the 26 July 2007 should have triggered an internal review 18 July 2 August ~i FS50178276 8 August 18 x - no · RN limited, however likely to be due to the MPS' 2007 2007 2007 September decision to neither confirm or deny substantive 2007 issues. Investigation · Complainants request for IR challenges the required to decision to neither confirm or deny on the basis that the existence of the information is already determine applicability of known publicly exemptions
  • 19. · The IR replies stating the fact that the existence of the information is publicly known does not necessarily mean it is held by the MPS FS50178467 I 17 August Unknown Unknown . Alleged s10 Unknown x- 2007 Insufficient .. info on file. 22 May FS50179851 26 July 31 July Unknown x - no · Request made to a police stàtion - response sent 200,&¡ 2007 2007 from the 'Sutton Partnership' - advised that info substantive .. was not held by Police and that the response had issues. been forwarded to the Council . Possible inappropriate transferral of request in terms of keeping the complainant informed, and failure to recognise a request for review but both are minor issues in the context of this complaint FS50185687 I 27 April 30 July 28 June ./ - in respect 7 . s10 2007 2007 2007 September of s10 and IR 2007 . Delayed IR (post guidance) delay .
  • 20. . Clarification sought on the 30 March - dates on I 15 March I FS50186040 116 August 18 October I 2007 118 May 2007 2007 2007 ./ - in respect which this was provided unclear and as such, it is - difficult to asses whether the MPS breached s 10 of IR delay Delay in providing IR (post guidance) . 26 April FS50186880 25 May Unknown Unknown . Insufficient information on file 2007 2007 X- I Insufficient - info on file. Unknown Unknown Unknown MPS contend that the request was not received . X- i FS50186901 114 November Insufficient .. 2007 info on file. 15 January FS50188116 20 Unknown Unknown . MPS seek clarification on the 23 November 2007 X- November 2008 Insufficient .. 2007 info on file. . The information was released to the complainant, but date on which clarification was submitted is unclear
  • 21. 21 7 January vquot; - in respect . No attempt to offer advice and assistance in 2007 November 2007 respect of the application of s 12 (see refusal of the of s16/ s45 I FS50190522 I ~ePtember 114 August 2007 2007 4 September) A&A - FS50190668 18 October 12 15 17 January Delayed IR (post guidance) . 2007 November November 2008 Ivquot; - indelay of IR respect 2007 2007 07 March FS50199925 Unknown 23 Unknown . Insufficient information on file 2008 February '.' i ,-~l 2008 X- I Insufficient info on file.
  • 22. Cases predating 01 Jan 2007 taken from Team 2's issue log FS50088977 I 18 March 12 July IR delay (pre-dates guidance) . 2005 I 01 April 2005 I again on 01 and 2007 1./ -IN respect of in 19 April IN issued following refusal to provide ICO with . 2005 withheld information (1 August 2007) (following meeting) I I . RN is limited, however relatively early days in respect of the Act's implementation . IR extremely limited and as a result not conversant with the s45 Code . DN issued - finds in breach of sections 1 (1) (a) - subject to an appeal 07 February 2 July FS50129227 26 April 1 August s10 delay . .. - in respect 2006 2006 2006 2006 .. ofs10, s17 . Delays in responding to ICO I difficulties in and delays in responding to contacting MPS (see letter of 16 January 2008) ICO Exemptions introduced during investigation, . therefore a breach of s17 (1) (see email of the 24 January 2008)
  • 23. FS50139215 24 May 24 May 25 May 24 August -/ - in respect . IR delay (pre-guidance) 2006 2006 2006 2006 of s17 Refusal of the 24 May fails to meet the . requirements of s17 (no appeal rights/poor explanation of exemptions)
  • 24. FS50106800 25 July 30 January Various Unknown -/ - in respect . Although refusal was provided on the 30 January 2005 2006 2006, MPS did invite the complainant to view the of s10, s17, documentation provided that an undertaking not to s45 and disclose certain parts of the information was restrictive signed (letter of the 31 August 2005) approach · In connection with the above, MPS provided a form for the complainant to sign which made reference to information which is exempt under s31 and s38 of the Act · A request for review is submitted on the 22 September 2005 in relation to the undertaking - this should have been dealt with under s45 · A second request for review is sent on the 21 December 2005 · A third request for review is submitted on the 19 October 2006 · Material sought is over 100 years old and as such, some of the exemptions cited (s31) cannot apply · Refusal of 30 January 2006 contains limited PIT arguments · Co-operation of MPS during investigation poor · Numerous additional exemptions added during course of investigation
  • 25. õ- Q) 0.1' C/ .. Q) C/ .. - c: .. 0 .- C/ LO quot;~ t quot;quot; I 0 C/ c: Q) ;: C/ Q) 0. ro ro ~ r5 .. ~ Q) E .. .. .. Q) .0 Q) Q) C/ .. c: o +- ã; t £ LO .E 0) .. ro c: c: C/ Q) .9 C/ .. quot;0 C/ 0 Q) õ c: o .. quot;0 ro Q) 0) ïñ .. +- Q) c: 0. .. C/ 0 :: tó .!: c: .- :: o ro:; .- C/ o quot;0 o E -g C/ quot;0 2 Q) ro I' 0. C/ ~ - c: 0 z ro Q) .- ~ 0)0 Õ quot;0 c: Ü o .. ~ ro .. C/ ïñ N c: C/ C/ Q) .Q ¡t 0 1i ro Q) Q) :. ~ quot;0 § ro 0 ro X Õ. +- quot;0 I- 8 quot;0 Q) E o -0 0. c: .$ -: Q) o Õ Q) a. .. +- .Q ';'0 Q) ên C/ Q) Q) o C/ X :: ro c: N Q) quot;0 Õ .. a. quot;0 :: Q) ~ c: Q) quot;0 Q) o0 .~ +- ê Q) E'- Q) c: C/ o o .. ~ .. 0.ro o 0. t - t g- c: i5 0 o 0.. 'Ë ü 0. .. :. c: .. ~ .. .!:.E 0 ;: C/ C/ C/ o +- o .. ro 0) Q) Q) .. 15£ .. ~ ro ~ c: .. E co .! o Q) .. Q) .E ~ ro .. c: .. ID i :; (' quot;0 Q) C/ o o c: C/ C/ .. ro .. C/ quot;0 quot;0 C/ Q) Q) 0 0. 1: 0 quot;0 quot;0 ~0 t c: Q) O'm '- ~ 0: quot;0 Q) Q) Q) ~ .. c: ~ ~ .- :¡ :: :i .. ro - .. ~ E O c: Q) :: 0: ~ Q) 0. quot;E 00 .. ~ o '-LO 0) quot;- quot;Ë ~ .. Q) 000 ;: EE0 E0 c: .. 0 c; e a. Q) Q) o o .. t c: o C/ z~ .. 0: .: (f ü ~ C/ N (f ~ I- ~ . . . . . . . . . . .. Q) .0 E ÜO Q) LO LO Q) 0 .. 0 N Q) c: LO :: 0 -: N I' 0 '. , ;: ro ~ LO 0 I' 0 NN 'C o.LO .: 0 0 .. N .. .. co co 0) 0) o o LO (f LL . ~.
  • 26. 20 May FS50101864 ./ - in respect 11 August 21 August 20 . s10 2005 2005 2005 December of s10, s17, - 2005 s45 IR delay (pre-guidance) . IN threatened . s17 - poor refusal, lack of explanation for PIT . given the number of exemptions cited. Doesn't appear to consider the request in its entirety MPS reply of the 11 October 2005 appears to . have overlooked the IR element of the complainants refusal , ,_.~ ~ ..- IR does little to suggest that a truly fresh . consideration of matters was undertaken Additional exemptions applied during course of . investigation - reluctance to provide ICO with all of the withheld information
  • 27. Unknown Unknown Various FS50090852 Unknown .. - in respect Initial response from MPS (09 September 2005) - . of muddled advises that 'The issues you raise are not covered (including 7 -. September by FOIA' responses 2005) MPS appears to have muddled responses and is . unclear on what information has already been provided. In mitigation, it seems that the requests themselves were fairly confusing (47 requests in total, submitted at various times) 11 April 2 February 18 May Numerous FS50127256 .. - in respect MPS response advises that info not held 'as may'quot; . 2006 2006 2006 have been destroyed' ofs46 (including - 24 January 2006) MPS appear to have sought clarification via the . iea from the complainant. This occurred during the investigation and arguably should have been carried out from the outset Suggestion of record management difficulties . (letters of the 2 & 7 April 2008) - no centralised records for historical records? (letter of 18 April 2008) . Reluctance to provide iea with relevant info, as suggested in previous cases i I i
  • 28. 14 February FS50123037 Unknown Unknown Irrelevant - case concerns the Metropolitan Police Unknown N/A 2006 Authority, although there may be issues in respect of the - correct transferral of requests Clarification required: Length of complaint procedure (Rosenbaum complaint and others)
  • 29. ENF0201053 - The Metropolitan Police Service (MPS) - Recommendation for progression of case Cases considered: 2005 í 2 Enforcement Log entries (1069851'86089) - both relate to requests from 30 cases received from 01 January 2007 to 08 May 2008 (including those falling within this date range from the Team 2 issue log) 9 cases from Team 2 issues log which predate the above Total: 41* (one of which relates to MPA but is included on account of the possible transferral of request issues) * this does not represent the total number of complaints received about the MPS (approx 61 s50 cases) Patterns arising i notable points: s 10 breaches 4 o 3 3 .- 129227 __ 167718-- 148975 - - .. 146176 --. 170294- 106800 - - 153447 - 185687 - 99861-'- . 101864 - 087563-quot; (ON issued)
  • 30. 517 · Poor explanation of application of exemptions in the context of the information withheld (148975 _2005 /150414__ 2007) . Poor PIT's (099861__ 2005) . Extension of time to respond to request without explaining which exemption is applicable (17 (1)) (146176'-2006) . Application of blanket exemptions - particularly s24 (national security), s30 (investigations), s31 (law enforcement), s38 (health and safety). In one case (10680~2005) s31 was applied to information which was over 100 years old, in another s38 was applied to the cost of postponing the Royal Wedding (099861_2005) ~006) . Introduction of additional exemptions during investigation ( 129227 545 . IR's do not appear to take a truly fresh look at matters, although in mitigation there are examples of information which has been released on review (153447 2006) . Examples of requests dealt with outside the Act's parameters (148975 72005 / 170381_(OPA) 2007/ 174492_(OPA) 2007/176308 (OPA) 2007/106800 2005) . Post guidance IR delays: 4 13Feb07 169737 Partly post 29 June 07 90 days + guidance .. ¡ 2007). . 185687 29 days 30 July 07 7 Sept 07 Need to determine : whether 2007) extension justified
  • 31. 186040(_ 16 Aug 07 38 days Need to 8 act 07 2007) determine whether extension justified - 190668 40 days 15 Nov 07 17 Jan 08 Need to determine (allowing for 2007) whether bank extension holidays) justified s46 · Delays in responding due to inform~tion held in off-site archives (153447 2006) . Some difficulties in determining the fate of historical information (127256 m ; 2006) 2005) . Record keeping raised as an issue within CEAF (86089 Relationship with ICO 2005/ . IN's issued or threatened in various cases (88977 101864. 2005) · Numerous instances of questioning why ICO required to see withheld information Conclusions: The most notable characteristic of MPS' responses is the application of stringent exemptions, some of which appear to have been applied in a blanket manner. Whilst there is certainly room for improvement in this respect, this is something that could be approached informally at the present time. Such an approach is supported by the need to ensure that we fully understand the sensitivities of the information the MPS holds before drawing further conclusions from the use of exemptions. In respect of the procedural failings, there is room for improvement in respect of refusal notices, but I am not particularly concerned about the MPS' adherence to section 10 at present. There is also scope to for the MPS to develop their approach to internal
  • 32. reviews. At present they are failing to demonstrate that they are taking a truly fresh consideration of matters. Additionally, their current complaint procedure does not appear to have adopted the timescales recommended by the Commissioner. In respect of MPS' relationship with the ICO, there is scope for a more positive relationship between the two parties - however given our experience with other PA's I'm not overly concerned that it departs significantly from the norm. is a problem with the handling of Finally, the MPS have suggested that there requests on account of the un-centralised process. The MPS appear receptive to the ICO's advice on this issue - see email of 06 February 2008 from DW to JPL. Recommendation: That the Enforcement Team approaches MPS on an informal basis to highlight the following concerns: o Refusal Notices ( o Timescales for IR's I Reconsideration of issues at IR o Use of blanket exemptions Should the informal approach fail to elicit an appropriate response, formal action may be considered. Date I Officer: 13 May 2008 - Jo Stones, FOI Enforcement Officer
  • 33. Page 1 of 1 From: Joanne Stones Sent: 13 May 2008 16:58 To: Jo Pedder Subject: The Met Hi Jo, case: ENF0201053. Just to let you know the reference for the MPS Enforcement letter to them is drafted and send you a copy. I've agreed with J-P that the I'll be in touch once the informal main topics it will cover are as follows: Refusal Notices Timescales for IRs / Reconsideration of issues at IR Apparent use of blanket exemptions Please don't hesitate to contact me if you would like to discuss further Jo 5344 fie://C:temp(Ref. ENF0201053) .html 01/0412009
  • 34. Page 1 of2 From: Joanne Stones sent: 27 May 2008 13:39 To: Jo Pedder Subject: The Met - Enforcement Letter HiJo, Attached is a draft of the letter I'm planning to send out to the Met later this week. As it references a number of cases which are still under investigation, I thought it may be helpful for you to see it. requests: The letter covers the following issues arising from the MPS' handling of Explanation of the application of exemptions is limited or generic (including reference to the duty to confirm or deny) Application of additional exemptions during the course of investigation Timescale for internal reviews Reconsideration of issues at review Although the number of issues covered is relatively small, they are novel and the need to include examples has resulted in a rather lengthy letter. The cases used as examples within the letter are listed in the table below, If you (or anyone else on your team) would like an explanation as to why a particular case has been included or more general detials about our approach feel free to give me a shout. helpfuL. Hope this if Jo 5344 Offcer Case / Complainant ,Status quot;' quot; Carolyn quot;owes Open FS50106800 - Closed FS50170294 - Helen Jarman 0 Closed FS50150414 - Aaminah Khan , . FOI Team 2 Open FS50154349 - FOI Team 2 . ,Open FS50169737 - quot;,quot; Elizabeth Hogan Open FS50129227 - fie:! IC:temp(Ref. ENF020 1053 J .html 01104/2009
  • 35. Page 2 of2 lo Pedder Open FS50101864 - a i: ¡ FOI Team 2 FS50153447 - Open FS50188116- Jennifer Sanders Closed fie:IIC:temp(Ref. ENF0201053) .html 01/04/2009
  • 36. · Reasonable opportunity for you to inspect a record containing the information; and/or ' · A digest or summary of the information in permanent form or in another form acceptable to you We will comply with your preferred form of presentation as far as it is reasonably practicable. In determining whether it is reasonably practicable, we will review all the circumstances, including the cost. Where we are unable to comply with your preferred format, we will notify as to the reasons why. Where you have not specified your preferred method of communication, we will provide the information by any means reasonable in the circumstances. Where a request for information has been made successfully, we will advise you in writing of the following: . The decision; . The date on which it was made; . The name and designation of the pèrson who dealt with the request; . Form and manner of access; and ' · Your right to complain, including details of the internal complaints procedure and the Information Commissioner's details. Where a Request is Refused Where we receive a request for information and its release is refused, we will advise you, the applicant, within 20 days, of the following: . The decision; . The day on which it was made; . The name and designation of the person who dealt with the request; . The grounds for refusing the request, e.g. the application of an exemption, in the public interest, cost of compliance; . When exemption/s are used, the specific exemption used and the reasons for using the exemption; · When the public interest test has been considered, the reasons why it was applied; . Any other issues relevant to the deèision or matters that were taken into consideration; and · Details for the internal procedures for dealing with complaints and your right to apply to the Information Commissioner for a decision notice. Note: The Police Service is not obliged to state why an exemption applies if by doing so, exempt information would be revealed. 12
  • 37. Dealing with Vexatious or Repeat Requests The Police Service can refuse to process an FOI request if we consider it to be either vexatious or repeated, or both. If this is the case, we will inform you within 20 days of receiving the request. At the same time, we will provide details about our internal procedures for dealing with complaints and your right to apply to the Information Commissioner for a decision notice. If a notice has already been issued that a request is repeated or vexatious, we will not send out a further notice. Where a second request is received for information that has already been provided and the second request is identical or substantially similar, we wil not comply with the request unless a reasonable time has elapsed between the two requests. The Complaints Procedure Our decisions and actions on any request will be logged and recorded. These will be retained, together with any other pertinent information in the event of a complaint. Structure of Review We have rigorous procedures in place to ensure that the original decision- maker wil provide an independent reviewer with all the information relevant to processing the complaint. We will review the following aspects of the request: . Timescales. . Was the applicant kept informed? · Was the applicant helped to locate information if not held by Police Service? · Was the response communicated in the format preference of the applicant? If not, why not? · Was a transfer or partial transfer of request made? If so, was this handled correctly? · Was a fees notice served and the principles of the charging regime applied? . Was a refusal notice served? · If the request appeared to be vexatious, was the correct procedure followed and the correct decision reached? · Was the information requested sourced correctly? · Was there a need to obtain additional information? · Were all systems and information directories searched in response to the information requested? · Were any problems encountered in obtåining the information from the information owners? 13