PRINCE2® & Six-Sigma for Data Projects
    The training and consultancy team at Attra Partners writes:

    The recent economic crisis has lead to increasing regulatory focus within banking and finance. Particular
    focus has been on the accuracy of client and market data which has led many leading financial institutions
    to establish data quality and governance functions. Industry opinion is that considerable benefits will result
    in the overall management of data and it's deserved treatment as a fundamental asset will finally be
    recognised. Institutions of all types can no longer afford to haphazardly create and proliferate data within
    their organizations without appropriate governance. The lessons have been learned - quality data is the
    fuel of the modern day enterprise.

    The evolution and establishment of these data quality functions is gradually maturing with the adoption of
    structured approaches, tools & techniques. With extensive experience in the Data Management domain,
    Hany Choueiri has developed a high level framework (using PRINCE2 and Six-Sigma) which can be
    adopted for improved governance of data centric projects. The white paper/high level framework has
    recently been published with case studies underway. Familiarity with PRINCE2 and Six-Sigma is assumed
    in the following diagrams.

    If you have any questions or comments please email sales@attrapartners.com




     Copyright © 2009 Attra Partners Limited. All rights reserved. Reproduction in whole or in part in any form or medium without
                                    express written permission of Attra Partners Ltd is prohibited

Attra Partners Limited is an affiliate of Rovsing Management A/S.   PRINCE2® is a Registered Trademark of the
Rovsing Management A/S is an accredited ATO by the APMG on          Office of Government Commerce in the
behalf of the OGC (Office of Government Commerce U.K.).             United Kingdom and other countries.
PRINCE2
   PRINCE2® integrated with Six-Sigma (DMAIC)                                                                                               (Processes)
   (for Reference & Data Quality Projects)
                                                                                                       One or more       One or more
                                                       Stage #1                 Stage #2               Management Stages Management Stages
                                                                                          Six-Sigma            Six-Sigma               Six-Sigma
                                       Starting-up a                                      (Measure)
                                                                                       Six-Sigma               (Improve)                (Control)
                                          Project                Initiation                (Analyze)
                                                                                       (Improve)
     Project                                                       Stage                     Measure          Execute Data            Develop the
                                        Pre-project                                     Execute Data
                                                                                      Execute Data
     Mandate                                                                             Remediation
                                                                                      Remediation             Remediation              Controls


            Directing              DP                               Give ad-hoc Direction                                Authorize Project Closure

            Executive                     Authorize                    Authorize the                    Authorize a Stage
         Senior Supplier(s)               Initiation                      Project                       or Exception Plan
          Senior User(s)

                                                                                                                         ...
           Managing                    SU                                      SB                SB               SB     ...                   CP
         Project Manager                                                  IP                      CS              CS
                                                                                                                         ...                     CS


           Delivering
          Team Manager                                                                            MP              MP     ...                    MP


                           SU – Staring       MP – Managing         IP – Initiating     SB – Stage      DP – Directing   CS – Controlling   CP – Closing
          PRINCE2          up a Project       Product Delivery      a Project           Boundaries      a Project        a Stage            a Project

          Six-Sigma

Attra Partners Limited is an affiliate of Rovsing Management A/S.              PRINCE2® is a Registered Trademark of the
Rovsing Management A/S is an accredited ATO by the APMG on                     Office of Government Commerce in the
behalf of the OGC (Office of Government Commerce U.K.).                        United Kingdom and other countries.
PRINCE2
   PRINCE2® integrated with Six-Sigma (DMAIC)                                                                       (Processes)
   (for Reference & Data Quality Projects)


    NOTES:
     The Six-Sigma Define phase is mapped onto the PRINCE2 Starting-Up a Project (SU) process. The specific activity
      within SU (not shown in the diagram) being Prepare the Outline Business Case .

     The Six-Sigma Measure and Analyze can be executed in Stage 2 of a PRINCE2 project (or split across a number of
      Stages for very large and complex Data Quality remediation)

     The Managing aStage Boundary (SB) at the end of Stage 2 gives the Project board the opportunity to review the
      status and ensure that accurate analysis has been conducted, and that the ultimate root causes(s) have been
      identified. Authorization to proceed to the next stage (Stage 3) can be given in the Directing a Project Process (DP)
      within the Authorize a Stage or Exception Plan PRINCE2 activity.

     Stage 3 can implement the Six-Sigma Improve phase, which is the heart of the data remediation and quality
      improvement. It may also involve typically involve IT system enhancements and process improvements in order to
      remediate the root cause of the data quality problems. Manual remediation efforts may also involve individuals from the
      Senior User community to assist with data validation.

     Stage 4 can implement the Six-Sigma Control phase which in this model represents the development of the necessary
      Controls (not their implementation). The execution of the Controls can commence post Project Closure after hand-
      over to the most relevant operations group (see next note)

     During the PRINCE2 Closing a Project Process (CP), product handover is undertaken (via the Hand-Over Products
      PRINCE2 activity within CP) and should include not only remediated data, but also the Controls developed during the
      project. These Controls will be executed regularly by the operational groups in order to ensure that the data
      remediation is permanent and no further data corruption occurs



Attra Partners Limited is an affiliate of Rovsing Management A/S.   PRINCE2® is a Registered Trademark of the
Rovsing Management A/S is an accredited ATO by the APMG on          Office of Government Commerce in the
behalf of the OGC (Office of Government Commerce U.K.).             United Kingdom and other countries.
PRINCE2
                                                                                                                               (Organization)
   PRINCE2® integrated with Six-Sigma (DMAIC)
   (for Reference & Data Quality Projects)

                                                  Corporate or programme management


                                                          Project Board
                      Senior User(s)                                                                  Senior Supplier(s)
                                                                    Executive
                                                                                                  Data Quality Stream Lead
                Business Function Head                                                                    IT Lead
                                                           (Head of Data Quality)
                  Asset Class Owner                                                                    Offshore Lead           2



          1 Business, User & Supplier                                                                 Change Authority
                   Project Assurance
                                                    3         Project Manager
                                                                                                       Project Support

                                                              Team Manager(s)



                                              4                Team members

           Typical User Assurance responsibilities can reside with a                  PRINCE2 qualification and a good appreciation of the
      1    RTB/BAU (business as usual) reporting function                        3    Six-Sigma philosophy are paramount.
           In cases where a partially offshore/onshore model is                  4    Team Members typically consist of strong Data Analysts.
     2     adopted, board representation by a senior offshore lead is                 Some Data Modelling expertise may also be beneficial to
           desirable                                                                  help identify weaknesses in the current data landscape

Attra Partners Limited is an affiliate of Rovsing Management A/S.        PRINCE2® is a Registered Trademark of the
Rovsing Management A/S is an accredited ATO by the APMG on               Office of Government Commerce in the
behalf of the OGC (Office of Government Commerce U.K.).                  United Kingdom and other countries.

Contenu connexe

Tendances

Dev High Level Process Flow 0.7
Dev High Level Process Flow 0.7Dev High Level Process Flow 0.7
Dev High Level Process Flow 0.7Mark Bethel
 
PRINCE2 Process Model
PRINCE2 Process ModelPRINCE2 Process Model
PRINCE2 Process ModelprojectingIT
 
Integrating SCRUM with classical Project Management
Integrating SCRUM with classical Project ManagementIntegrating SCRUM with classical Project Management
Integrating SCRUM with classical Project ManagementJens Hoffmann
 
Prince2 and agile happy bedfellows
Prince2 and agile happy bedfellowsPrince2 and agile happy bedfellows
Prince2 and agile happy bedfellowsallenm01
 
The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)PaulWaskett
 
Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Digite Inc
 
Novaces General Brochure
Novaces General BrochureNovaces General Brochure
Novaces General Brochureza6smbb
 
Primavera _ Robert Turner _ The evolving maturity of project planning and con...
Primavera _ Robert Turner _ The evolving maturity of project planning and con...Primavera _ Robert Turner _ The evolving maturity of project planning and con...
Primavera _ Robert Turner _ The evolving maturity of project planning and con...InSync2011
 
Bridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineeringBridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineeringJordan Berkley, MBA,PMP,CSM
 
Status reporting guidelines
Status reporting guidelinesStatus reporting guidelines
Status reporting guidelinesEric Tachibana
 
Software enginnering unit 01 by manoj kumar soni
Software enginnering unit 01 by manoj kumar soniSoftware enginnering unit 01 by manoj kumar soni
Software enginnering unit 01 by manoj kumar sonimanojsonikgn
 
Buying Or Getting Bought A Case Study In M And A Projects
Buying Or Getting Bought   A Case Study In M And A ProjectsBuying Or Getting Bought   A Case Study In M And A Projects
Buying Or Getting Bought A Case Study In M And A Projectsjhoebler
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions SA
 
Agile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical IndustryAgile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical IndustryVijay Brzee
 
PMP - Process 42 Chart Matrix
PMP - Process 42 Chart MatrixPMP - Process 42 Chart Matrix
PMP - Process 42 Chart Matrixgijoeusa
 
Implementing Lean Six Sigma for IT
Implementing Lean Six Sigma for ITImplementing Lean Six Sigma for IT
Implementing Lean Six Sigma for ITprashanthi_ks
 

Tendances (20)

Dev High Level Process Flow 0.7
Dev High Level Process Flow 0.7Dev High Level Process Flow 0.7
Dev High Level Process Flow 0.7
 
PRINCE2 Process Model
PRINCE2 Process ModelPRINCE2 Process Model
PRINCE2 Process Model
 
Integrating SCRUM with classical Project Management
Integrating SCRUM with classical Project ManagementIntegrating SCRUM with classical Project Management
Integrating SCRUM with classical Project Management
 
Prince2 and agile happy bedfellows
Prince2 and agile happy bedfellowsPrince2 and agile happy bedfellows
Prince2 and agile happy bedfellows
 
The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)
 
Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?Are you geared for Outsourcing Governance?
Are you geared for Outsourcing Governance?
 
Novaces General Brochure
Novaces General BrochureNovaces General Brochure
Novaces General Brochure
 
Primavera _ Robert Turner _ The evolving maturity of project planning and con...
Primavera _ Robert Turner _ The evolving maturity of project planning and con...Primavera _ Robert Turner _ The evolving maturity of project planning and con...
Primavera _ Robert Turner _ The evolving maturity of project planning and con...
 
Bridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineeringBridging the gap between manufacturing and engineering
Bridging the gap between manufacturing and engineering
 
Status reporting guidelines
Status reporting guidelinesStatus reporting guidelines
Status reporting guidelines
 
RAM, LLC Six Sigma Intro Awareness Training
RAM, LLC Six Sigma Intro Awareness TrainingRAM, LLC Six Sigma Intro Awareness Training
RAM, LLC Six Sigma Intro Awareness Training
 
Heizer 03
Heizer 03Heizer 03
Heizer 03
 
Software enginnering unit 01 by manoj kumar soni
Software enginnering unit 01 by manoj kumar soniSoftware enginnering unit 01 by manoj kumar soni
Software enginnering unit 01 by manoj kumar soni
 
Buying Or Getting Bought A Case Study In M And A Projects
Buying Or Getting Bought   A Case Study In M And A ProjectsBuying Or Getting Bought   A Case Study In M And A Projects
Buying Or Getting Bought A Case Study In M And A Projects
 
Dhm e_mls2market
 Dhm e_mls2market Dhm e_mls2market
Dhm e_mls2market
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
 
Talent Review and Engagement
Talent Review and EngagementTalent Review and Engagement
Talent Review and Engagement
 
Agile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical IndustryAgile Importance in Pharmaceutical Industry
Agile Importance in Pharmaceutical Industry
 
PMP - Process 42 Chart Matrix
PMP - Process 42 Chart MatrixPMP - Process 42 Chart Matrix
PMP - Process 42 Chart Matrix
 
Implementing Lean Six Sigma for IT
Implementing Lean Six Sigma for ITImplementing Lean Six Sigma for IT
Implementing Lean Six Sigma for IT
 

Similaire à PRINCE2 and Six-Sigma

PRINCE2 and Agile
PRINCE2 and AgilePRINCE2 and Agile
PRINCE2 and Agilemchouha
 
PRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSPRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSJens Hoffmann
 
Agile transformation best practices
Agile transformation best practicesAgile transformation best practices
Agile transformation best practicesAllyson Chiarini
 
Strategies For A Successful CRM Implementation
Strategies For A Successful CRM ImplementationStrategies For A Successful CRM Implementation
Strategies For A Successful CRM Implementationsnuthakki
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting CapabilitiesQuinn Harry
 
Getting started with Sugar Best practices
Getting started with Sugar Best practicesGetting started with Sugar Best practices
Getting started with Sugar Best practicesSugarCRM
 
CRM 101: Session 7: Best Practices for Your CRM Implementation
CRM 101: Session 7: Best Practices for Your CRM ImplementationCRM 101: Session 7: Best Practices for Your CRM Implementation
CRM 101: Session 7: Best Practices for Your CRM ImplementationSugarCRM
 
Emids Afternoon Msi Case Study V1
Emids   Afternoon Msi Case Study V1Emids   Afternoon Msi Case Study V1
Emids Afternoon Msi Case Study V1techcouncil
 
Visual resume created by picto cv
Visual resume created by picto cvVisual resume created by picto cv
Visual resume created by picto cvPictoCV
 
Advertisement-ISOQualitas
Advertisement-ISOQualitasAdvertisement-ISOQualitas
Advertisement-ISOQualitasRenato Pisani
 
Implementing And Sustaining Enterprise Management (With BSC, PRINCE2, EVM, An...
Implementing And Sustaining Enterprise Management (With BSC, PRINCE2, EVM, An...Implementing And Sustaining Enterprise Management (With BSC, PRINCE2, EVM, An...
Implementing And Sustaining Enterprise Management (With BSC, PRINCE2, EVM, An...HolisticMeta (Self Employed, Part Time)
 
CV_Rex Fu_PP QM
CV_Rex Fu_PP QMCV_Rex Fu_PP QM
CV_Rex Fu_PP QMRex Fu
 
SwissQ Agile Trends & Benchmarks 2012 (Englisch)
SwissQ Agile Trends & Benchmarks 2012 (Englisch)SwissQ Agile Trends & Benchmarks 2012 (Englisch)
SwissQ Agile Trends & Benchmarks 2012 (Englisch)SwissQ Consulting AG
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentHelene Heller, PMP
 
Wellingtone | Showcase of Microsoft PPM – the Tool of the Future PMO - Future...
Wellingtone | Showcase of Microsoft PPM – the Tool of the Future PMO - Future...Wellingtone | Showcase of Microsoft PPM – the Tool of the Future PMO - Future...
Wellingtone | Showcase of Microsoft PPM – the Tool of the Future PMO - Future...Wellingtone
 
01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write UpStefan Afendoulis
 

Similaire à PRINCE2 and Six-Sigma (20)

PRINCE2 and Agile
PRINCE2 and AgilePRINCE2 and Agile
PRINCE2 and Agile
 
Priklenk Final
Priklenk FinalPriklenk Final
Priklenk Final
 
PRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSPRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESS
 
Agile transformation best practices
Agile transformation best practicesAgile transformation best practices
Agile transformation best practices
 
Strategies For A Successful CRM Implementation
Strategies For A Successful CRM ImplementationStrategies For A Successful CRM Implementation
Strategies For A Successful CRM Implementation
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting Capabilities
 
RPM and BPM
RPM and BPMRPM and BPM
RPM and BPM
 
Getting started with Sugar Best practices
Getting started with Sugar Best practicesGetting started with Sugar Best practices
Getting started with Sugar Best practices
 
CRM 101: Session 7: Best Practices for Your CRM Implementation
CRM 101: Session 7: Best Practices for Your CRM ImplementationCRM 101: Session 7: Best Practices for Your CRM Implementation
CRM 101: Session 7: Best Practices for Your CRM Implementation
 
Emids Afternoon Msi Case Study V1
Emids   Afternoon Msi Case Study V1Emids   Afternoon Msi Case Study V1
Emids Afternoon Msi Case Study V1
 
Visual resume created by picto cv
Visual resume created by picto cvVisual resume created by picto cv
Visual resume created by picto cv
 
Advertisement-ISOQualitas
Advertisement-ISOQualitasAdvertisement-ISOQualitas
Advertisement-ISOQualitas
 
Implementing And Sustaining Enterprise Management (With BSC, PRINCE2, EVM, An...
Implementing And Sustaining Enterprise Management (With BSC, PRINCE2, EVM, An...Implementing And Sustaining Enterprise Management (With BSC, PRINCE2, EVM, An...
Implementing And Sustaining Enterprise Management (With BSC, PRINCE2, EVM, An...
 
CV_Rex Fu_PP QM
CV_Rex Fu_PP QMCV_Rex Fu_PP QM
CV_Rex Fu_PP QM
 
SwissQ Agile Trends & Benchmarks 2012 (Englisch)
SwissQ Agile Trends & Benchmarks 2012 (Englisch)SwissQ Agile Trends & Benchmarks 2012 (Englisch)
SwissQ Agile Trends & Benchmarks 2012 (Englisch)
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT Investment
 
Asap overview
Asap overviewAsap overview
Asap overview
 
Resume arvind -csm
Resume arvind -csmResume arvind -csm
Resume arvind -csm
 
Wellingtone | Showcase of Microsoft PPM – the Tool of the Future PMO - Future...
Wellingtone | Showcase of Microsoft PPM – the Tool of the Future PMO - Future...Wellingtone | Showcase of Microsoft PPM – the Tool of the Future PMO - Future...
Wellingtone | Showcase of Microsoft PPM – the Tool of the Future PMO - Future...
 
01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up
 

PRINCE2 and Six-Sigma

  • 1. PRINCE2® & Six-Sigma for Data Projects The training and consultancy team at Attra Partners writes: The recent economic crisis has lead to increasing regulatory focus within banking and finance. Particular focus has been on the accuracy of client and market data which has led many leading financial institutions to establish data quality and governance functions. Industry opinion is that considerable benefits will result in the overall management of data and it's deserved treatment as a fundamental asset will finally be recognised. Institutions of all types can no longer afford to haphazardly create and proliferate data within their organizations without appropriate governance. The lessons have been learned - quality data is the fuel of the modern day enterprise. The evolution and establishment of these data quality functions is gradually maturing with the adoption of structured approaches, tools & techniques. With extensive experience in the Data Management domain, Hany Choueiri has developed a high level framework (using PRINCE2 and Six-Sigma) which can be adopted for improved governance of data centric projects. The white paper/high level framework has recently been published with case studies underway. Familiarity with PRINCE2 and Six-Sigma is assumed in the following diagrams. If you have any questions or comments please email sales@attrapartners.com Copyright © 2009 Attra Partners Limited. All rights reserved. Reproduction in whole or in part in any form or medium without express written permission of Attra Partners Ltd is prohibited Attra Partners Limited is an affiliate of Rovsing Management A/S. PRINCE2® is a Registered Trademark of the Rovsing Management A/S is an accredited ATO by the APMG on Office of Government Commerce in the behalf of the OGC (Office of Government Commerce U.K.). United Kingdom and other countries.
  • 2. PRINCE2 PRINCE2® integrated with Six-Sigma (DMAIC) (Processes) (for Reference & Data Quality Projects) One or more One or more Stage #1 Stage #2 Management Stages Management Stages Six-Sigma Six-Sigma Six-Sigma Starting-up a (Measure) Six-Sigma (Improve) (Control) Project Initiation (Analyze) (Improve) Project Stage Measure Execute Data Develop the Pre-project Execute Data Execute Data Mandate Remediation Remediation Remediation Controls Directing DP Give ad-hoc Direction Authorize Project Closure Executive Authorize Authorize the Authorize a Stage Senior Supplier(s) Initiation Project or Exception Plan Senior User(s) ... Managing SU SB SB SB ... CP Project Manager IP CS CS ... CS Delivering Team Manager MP MP ... MP SU – Staring MP – Managing IP – Initiating SB – Stage DP – Directing CS – Controlling CP – Closing PRINCE2 up a Project Product Delivery a Project Boundaries a Project a Stage a Project Six-Sigma Attra Partners Limited is an affiliate of Rovsing Management A/S. PRINCE2® is a Registered Trademark of the Rovsing Management A/S is an accredited ATO by the APMG on Office of Government Commerce in the behalf of the OGC (Office of Government Commerce U.K.). United Kingdom and other countries.
  • 3. PRINCE2 PRINCE2® integrated with Six-Sigma (DMAIC) (Processes) (for Reference & Data Quality Projects) NOTES:  The Six-Sigma Define phase is mapped onto the PRINCE2 Starting-Up a Project (SU) process. The specific activity within SU (not shown in the diagram) being Prepare the Outline Business Case .  The Six-Sigma Measure and Analyze can be executed in Stage 2 of a PRINCE2 project (or split across a number of Stages for very large and complex Data Quality remediation)  The Managing aStage Boundary (SB) at the end of Stage 2 gives the Project board the opportunity to review the status and ensure that accurate analysis has been conducted, and that the ultimate root causes(s) have been identified. Authorization to proceed to the next stage (Stage 3) can be given in the Directing a Project Process (DP) within the Authorize a Stage or Exception Plan PRINCE2 activity.  Stage 3 can implement the Six-Sigma Improve phase, which is the heart of the data remediation and quality improvement. It may also involve typically involve IT system enhancements and process improvements in order to remediate the root cause of the data quality problems. Manual remediation efforts may also involve individuals from the Senior User community to assist with data validation.  Stage 4 can implement the Six-Sigma Control phase which in this model represents the development of the necessary Controls (not their implementation). The execution of the Controls can commence post Project Closure after hand- over to the most relevant operations group (see next note)  During the PRINCE2 Closing a Project Process (CP), product handover is undertaken (via the Hand-Over Products PRINCE2 activity within CP) and should include not only remediated data, but also the Controls developed during the project. These Controls will be executed regularly by the operational groups in order to ensure that the data remediation is permanent and no further data corruption occurs Attra Partners Limited is an affiliate of Rovsing Management A/S. PRINCE2® is a Registered Trademark of the Rovsing Management A/S is an accredited ATO by the APMG on Office of Government Commerce in the behalf of the OGC (Office of Government Commerce U.K.). United Kingdom and other countries.
  • 4. PRINCE2 (Organization) PRINCE2® integrated with Six-Sigma (DMAIC) (for Reference & Data Quality Projects) Corporate or programme management Project Board Senior User(s) Senior Supplier(s) Executive Data Quality Stream Lead Business Function Head IT Lead (Head of Data Quality) Asset Class Owner Offshore Lead 2 1 Business, User & Supplier Change Authority Project Assurance 3 Project Manager Project Support Team Manager(s) 4 Team members Typical User Assurance responsibilities can reside with a PRINCE2 qualification and a good appreciation of the 1 RTB/BAU (business as usual) reporting function 3 Six-Sigma philosophy are paramount. In cases where a partially offshore/onshore model is 4 Team Members typically consist of strong Data Analysts. 2 adopted, board representation by a senior offshore lead is Some Data Modelling expertise may also be beneficial to desirable help identify weaknesses in the current data landscape Attra Partners Limited is an affiliate of Rovsing Management A/S. PRINCE2® is a Registered Trademark of the Rovsing Management A/S is an accredited ATO by the APMG on Office of Government Commerce in the behalf of the OGC (Office of Government Commerce U.K.). United Kingdom and other countries.