SlideShare une entreprise Scribd logo
1  sur  9
Télécharger pour lire hors ligne
Napa Sol Far
          ar   m
   A 6.7 MW Sol Micr
                 ar    o-Ut it
                           il y
   Napa C ount C al or USA
              y,    if nia

    Executive Summary
A Project of t Gr Tech Power Gr
              he een           oup
  A Renewabl Ener Devel
            e    gy    opm entCom pany
C al or O f ice:
                      if nia f
                   500 Wal Avenue
                            nut
                   Q uar er O , Mar Isl
                         t s        e and
                   Valej C A 94592
                       l o,
                   O f ice 707.225-0098 Fax 707.553-2681
                      f




Pr ect Devel
  oj       oper
Green Tech Power Group, LLC is a Nevada Lim it Liabil y Com pany or
                                               ed       it              ganized t devel
                                                                                 o     op
m egawat cl
         t ass, ut it
                  il y-scal r
                           e enewabl ener pr
                                    e    gy oject as an Independent Power Pr
                                                 s                            oducer under
long-term Power Pur  chase A gr ent Wit Headquart s l ed in Las Vegas, Nevada and
                               eem s.     h        er ocat
Project Developm entoffice l ed on M ar Isl
                             ocat       e and, Val ejo, Cal
                                                   l        ifornia t principal ar civil and
                                                                     he        s e
environm ent engineer wit over 25 year of business and ent epr
            al          s h             s                  r eneurial experience in t cl
                                                                                     he ean
technology industry.
Pr ect Descr ion:
  oj        ipt
   The Napa Solar Farm is a pr  oposed 6.7-M W sol el r power gener ion facil y l ed adjacentt t Cit of
                                                     ar ect ic             at        it ocat              o he y
    A m erican Canyon in t unincor at ar of Napa Count Cal nia. The pr
                          he       por ed ea                  y,   ifor            oposed ut it
                                                                                            il y-scal cent al
                                                                                                     e     r
    power at wil  consist of appr
            st ion l                oxim at y 50,000 sol phot
                                           el            ar    ovol aic m odul
                                                                   t          es, assem bl int l ge-scal sol ar ays
                                                                                          ed o ar          e ar r
    and gr ound-m ount on st suppor st uct es on a fixed-axis. The pr
                      ed     eel       t r ur                           oject wil be const uct on a 50-acr vacant
                                                                                 l         r ed              e
    par of l t was for er y a r
       cel and hat           m l     egionall andfil sit ser
                                                    l e ving t Cit of Napa, V al ejo, and A m er
                                                                 he ies                l               ican Canyon and
    t Count of Napa and owned by t Napa-V al ejo Wast M anagem entA ut it
     he       y                       he          l         e                 hor y.

   The Pr ojectDeveloper is t Green Tech Power Group (GTPG) who wil l
                              he                                     l ease t 50-acr sit fr t Napa-
                                                                             he     e e om he
    V al ejo Wast M anagem entA ut it and int connect t Napa Sol Far t t ut it gr owned by t l
        l        er               hor y      er        he       ar m o he il y id                  he ocal
    ut it Pacific Gas and Electric Company (PGE). GTPG is t Ener Ser
      il y,                                                he     gy   vice Providerand wil buil own and
                                                                                           l    d,
    oper e t sol far .
         at he ar m

   El r y gener ed fr t Napa Sol Far wil be sol by GTPG t PGE under a l
       ect icit     at     om he       ar m      l     d        o           ong-t m Power Purchase
                                                                                   er
    Agreem ent (PPA ) in or for PGE t m eet t st e-m andat Renewabl Ener Por fol St
                            der      o       he at        ed       e     gy t io andar (RPS) of 20% by
                                                                                           d
    2010 and 33% st t in year2011 t year 2020. Renewabl Ener Cer ificat (REC’ s) under A B32 wil be
                    ar ing          o                   e    gy   t    es                       l
    t ansfer ed t PGE.
     r       r o

   The envir  onm ent benefit of t 6.7-MW Sol Power Micr
                      al       s his                 ar           o-Ut it Pr
                                                                       il y oject fort A ut it ser
                                                                                      he   hor y vice ar incl t
                                                                                                        ea    ude he
    avoidance of t fol owing gl
                   he l            obalwar ing pol ut s: 60,000 l of Sm og (NO X ); 52,000 l of A cid Rain (SO 2); 80
                                           m        l ant           bs.                      bs.
    m il ion l of Car
        l     bs.       bon Em issions (CO 2). A l of t is equival t r oving 7,500 car pl ing 12,000 acr of
                                                  l his           ent o em               s; ant            es
    t ees; and pr
     r            oviding 3,200 hom es wit el r power
                                          h ect ical        .

   In addit t t ener savings and envir
            ion o he    gy                 onm ent benefit t pr
                                                  al      s, his oject wil al cr e bet
                                                                          l so eat    ween 75-100 Gr Col ar
                                                                                                    een l
    Jobs – wit 60-75 par -t e jobs dur t inst l ion and const uct phase and 25-30 per anentjobs post
              h         t im          ing he   al at            r ion                  m
    const uct for t oper ion and m aint
         r ion      he     at            enance of t sol power facil y.
                                                    his ar          it
Pr ect Sit
  oj      e:
The Napa Solar Farm is locat on an 80-acr cl
                             ed            e osed sanit y l
                                                         ar andf lsit owned by t Napa-Valej Wast
                                                                   il e             he         l o      e
Managem ent Aut it a gover ent ent y com pr
                 hor y,         nm   al it         ised of t C it of Napa, Valej & Am er
                                                            he    ies             l o,      ican C anyon and
t C ount of Napa and oper ing under a Joint Power Agr
 he       y                  at                      s     eem ent (JPA). The Pr ect Sit is l
                                                                                  oj    e    ocat in t
                                                                                                 ed    he
unincor at ar of Napa C ount adj
       por ed ea                   y   acent t t C it of Am er
                                              o he    y         ican C anyon cit l it appr
                                                                                y im s,   oxim at y 45 m il
                                                                                                 el       es
nor h of San Fr
    t          ancisco, C al or
                           if nia.
Pr ect Business Pr
  oj              oponents
o Green Tech Power Group (GTPG): Project Developer Owner
                                                  ,     ,
Oper or of Napa Sol Farm ; al Ener Service Pr
    at             ar        so   gy         ovider.
o Napa-Vallejo Waste Management Authority (NV WM A )
  o Land owner and Lessor wil l
                         :   l ease 50+ acr of cl
                                           es    osed landfil sit t GTPG
                                                             l e o
  o Host Cust er exist
             om :     ing cust er of PG& E and wil pur
                              om                   l chase m inim alpower
    fr GTPG
      om
o Pacific Gas and Electric (PGE): Off-taker and purchaser of
el ricit pr
  ect y oduced by t Napa Sol Farm
                   he       ar
  o Long term (20-25 year Power Pur
                           )       chase A gr ent(PPA )
                                             eem
  o California Renewabl Port io St
                        e     fol andar (20% by 2010; 33% by 2020)
                                       d
  o California Feed-in-Tariff
Business Model

                                                                                   Manufacturer
                         PG& E                     Equipment,                        Installer
                                                   installation,
                                         PPA        warranties

                                $                                              - Receives revenue from sale of
Napa-Vallejo                              Napa               Sales &             panels, inverters
   Waste           Land Lease         Solar Farm           O&M revenue         - Provides warranties for
Management                                                                       equipment and performance
                                        (Green Tech
  Authority                            Power Group)                Financing
  (NVWMA)                 $

- Land O wner                       - Provides Design/        Solar
                                                                                    Third Party
- Host C ust er
            om                        Construction EPC       Services                Investor
- Leases Land t G TPG
                o                   - Provides Capital
- Purchase m in. power
                                    - Provides O&M                             - Receives low-risk ROI from
                                                                                 electricity sales, federal ITC
                                    - Shares Revenue
                                                                                 & MACRS
                                      Stream
                                                                               - Green Tags
                                                                               - ARRA Grants
Pr ect St us
  oj     at
 Sit Cont ol
     e    r :
   Project Developer (GTPG) is oper ing under an Excl
                                    at                usive Rightto
    Negot e wit t Napa-V al ejo Wast M anagem ent A ut it
          iat     h he         l       e                 hor y,
    appr oved Jul 29, 2009 by Boar of Dir or under sol sour
                 y                d      ect s         e     ce
    cont act
        r .
   A ut it pr
        hor y ovided Sit Capabil y A ssessm entfor Sol Far use
                         e        it                  ar m
 Use Per it
         m :
   Use Per it t be fil wit t Count of Napa Pl
           m o         ed h he     y          anning Depar m ent
                                                          t
    under a negot ed, expedit pr
                   iat          ed ocessing t el (90 days) for r
                                              im ine                eview,
    publ hear and appr
         ic     ing          oval
   Negat Decl at
           ive      ar ion under CEQA det m ined by Legal Counsel of
                                           er
    Napa
   Building Per it can be pr
                  m            ocessed concur ent y
                                             r l
   Sit Pl
       e ans, PV Layout and dr
                           ,      awings com pl ed and r
                                               et       eady for filing
   Two pr im inar m eet
             el      y     ings wit Pl
                                   h anning and Legal Counselon pr    ocess
   A ut it appr
        hor y       oved Consentt Fil Use Per it on Nov 2, 2009
                                   o e          m
Pr ect St us
  oj     at
 Sol Panel M anufact er scr
     ar              ur     eening
  Screened pricing and t specs fr 3 PV m anufact er
                         ech      om             ur s
   (Japan, China, Ger any) for l
                     m          ogist equipm entdel y
                                     ics,             iver
   schedul et
           es, c.
  Pr im inar sol panel sit l
     el       y ar           e ayoutand sizing com pl ed in-
                                                     et
   house based on various technologies (for Use Per it
                                                   m
   purposes)
 Pr im inar Engineer
    el      y        ing com pl ed
                               et
  In-house capabil ies for Civil Topo, Sur
                   it            ,         vey, St uct al PV
                                                  r ur ,
   Syst s
       em
  Identified local El r Engineer for int -connectser
                      ect ical   s       er          vices
 Local Napa Gener Cont act ident
                  al   r or      ified
  Bonding capacit based on pr im inar inst l ion est at
                  y           el      y    al at     im es
  Wil pr
      l ovide const uct costest at based on final
                    r ion        im es
   engineering, sit design, and Use Per it and Buil
                   e                   m           ding Per it
                                                           m
   requir ent
         em s
Pr ect Mil ones
  oj     est
        Napa Solar Farm: American Canyon Landfill Site, Napa County, California USA
                                                          2009                   2010                                        
                                                          Nov        Dec         Jan     Feb           Mar   Apr      May   Jun   Jul       Aug         Sep   O ct
        Consent to File Use Permit                  2-NovX                                                                                                     
            Fil Use Per it App w/Napa
               e          m                        20-Nov    X                                                                                                 
            Use Per it Review
                     m                             20-Dec                X                                                                                     
            C EQ A Review                          20-Dec                X                                                                                     
            Publ Hear on Use Per it
                  ic     ing             m         22-Feb                                      X                                                               
            Buil ding/Use Per it Appr
                             m         oval        26-Feb                                          X                                                           
        File PPA Request w/PGE                     20-Nov        X                                                                                             
            Subm it Pr ect Viabil y For s
                       oj         it      m        20-Nov        X                                                                                             
            Appr  ove PPA/Feed In Tar f if         20-Jan                            X                                                                         
        File Interconnet App w/PGE                  7-Dec            X                                                                                         
            Subm it Engineer ing/Int conn.
                                     er            18-Jan                            X                                                                         

           PG E Review of Int connect App.
                                 er            180 d.                                                                                                          
           Int connect Appr
               er               oval               30-Jul                                                                               X                      
        Equipment Delivery                     120 d.                                                                                                          
           Mat ial Handl
                er s         ing                    8-Feb                                              X                    X                                  
           Sol PV & BO S
                ar                                  8-Feb                                              X                    X                                         
        Installation of Solar PV System        4 m o.                                                                                                          
           C onst uct St t e Wor
                   r ion ar /Sit         k          1-Apr                                                    X                                                 
           PanelAssem bl    y/Fabr ion
                                    icat           15-Apr                                                        X                                             
           Inst l ion and G r Int t
                alat             id er ie      120 d.                                                                X                                         
           C onst uct C om pl ed
                   r ion           et             15-Aug                                                                                        X              
           C om m issioning by PG E               30-Aug                                                                                            X          
        Project Placed in Service                 30-Aug                                                                                            X          
           Subm it ARRA C l   aim For sm            1-Sep                                                                                               X      
           Paym ent by Dept of Tr
                               .      easury   60 d.                                                                                                                     X
                                                                                                                                                               




            The Napa Sol Far can be com pl ed in year 2010 given t
                         ar m                 et                   he
            above Project M il ones which is based on pr
                              est                       oject equipm ent
                                                             ed
            del y schedul and appr
               iver         es       oved gover ent per it
                                                 nm al m s.

Contenu connexe

En vedette

5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationErica Santiago
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellSaba Software
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming LanguageSimplilearn
 
The Pixar Way: 37 Quotes on Developing and Maintaining a Creative Company (fr...
The Pixar Way: 37 Quotes on Developing and Maintaining a Creative Company (fr...The Pixar Way: 37 Quotes on Developing and Maintaining a Creative Company (fr...
The Pixar Way: 37 Quotes on Developing and Maintaining a Creative Company (fr...Palo Alto Software
 
9 Tips for a Work-free Vacation
9 Tips for a Work-free Vacation9 Tips for a Work-free Vacation
9 Tips for a Work-free VacationWeekdone.com
 
I Rock Therefore I Am. 20 Legendary Quotes from Prince
I Rock Therefore I Am. 20 Legendary Quotes from PrinceI Rock Therefore I Am. 20 Legendary Quotes from Prince
I Rock Therefore I Am. 20 Legendary Quotes from PrinceEmpowered Presentations
 

En vedette (20)

5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 
Introduction to C Programming Language
Introduction to C Programming LanguageIntroduction to C Programming Language
Introduction to C Programming Language
 
The Pixar Way: 37 Quotes on Developing and Maintaining a Creative Company (fr...
The Pixar Way: 37 Quotes on Developing and Maintaining a Creative Company (fr...The Pixar Way: 37 Quotes on Developing and Maintaining a Creative Company (fr...
The Pixar Way: 37 Quotes on Developing and Maintaining a Creative Company (fr...
 
9 Tips for a Work-free Vacation
9 Tips for a Work-free Vacation9 Tips for a Work-free Vacation
9 Tips for a Work-free Vacation
 
I Rock Therefore I Am. 20 Legendary Quotes from Prince
I Rock Therefore I Am. 20 Legendary Quotes from PrinceI Rock Therefore I Am. 20 Legendary Quotes from Prince
I Rock Therefore I Am. 20 Legendary Quotes from Prince
 

Napa solar farm exec sum1

  • 1. Napa Sol Far ar m A 6.7 MW Sol Micr ar o-Ut it il y Napa C ount C al or USA y, if nia Executive Summary A Project of t Gr Tech Power Gr he een oup A Renewabl Ener Devel e gy opm entCom pany
  • 2. C al or O f ice: if nia f 500 Wal Avenue nut Q uar er O , Mar Isl t s e and Valej C A 94592 l o, O f ice 707.225-0098 Fax 707.553-2681 f Pr ect Devel oj oper Green Tech Power Group, LLC is a Nevada Lim it Liabil y Com pany or ed it ganized t devel o op m egawat cl t ass, ut it il y-scal r e enewabl ener pr e gy oject as an Independent Power Pr s oducer under long-term Power Pur chase A gr ent Wit Headquart s l ed in Las Vegas, Nevada and eem s. h er ocat Project Developm entoffice l ed on M ar Isl ocat e and, Val ejo, Cal l ifornia t principal ar civil and he s e environm ent engineer wit over 25 year of business and ent epr al s h s r eneurial experience in t cl he ean technology industry.
  • 3. Pr ect Descr ion: oj ipt  The Napa Solar Farm is a pr oposed 6.7-M W sol el r power gener ion facil y l ed adjacentt t Cit of ar ect ic at it ocat o he y A m erican Canyon in t unincor at ar of Napa Count Cal nia. The pr he por ed ea y, ifor oposed ut it il y-scal cent al e r power at wil  consist of appr  st ion l oxim at y 50,000 sol phot el ar ovol aic m odul t es, assem bl int l ge-scal sol ar ays ed o ar e ar r and gr ound-m ount on st suppor st uct es on a fixed-axis. The pr ed eel t r ur oject wil be const uct on a 50-acr vacant l r ed e par of l t was for er y a r cel and hat m l egionall andfil sit ser l e ving t Cit of Napa, V al ejo, and A m er he ies l ican Canyon and t Count of Napa and owned by t Napa-V al ejo Wast M anagem entA ut it he y he l e hor y.  The Pr ojectDeveloper is t Green Tech Power Group (GTPG) who wil l he l ease t 50-acr sit fr t Napa- he e e om he V al ejo Wast M anagem entA ut it and int connect t Napa Sol Far t t ut it gr owned by t l l er hor y er he ar m o he il y id he ocal ut it Pacific Gas and Electric Company (PGE). GTPG is t Ener Ser il y, he gy vice Providerand wil buil own and l d, oper e t sol far . at he ar m  El r y gener ed fr t Napa Sol Far wil be sol by GTPG t PGE under a l ect icit at om he ar m l d o ong-t m Power Purchase er Agreem ent (PPA ) in or for PGE t m eet t st e-m andat Renewabl Ener Por fol St der o he at ed e gy t io andar (RPS) of 20% by d 2010 and 33% st t in year2011 t year 2020. Renewabl Ener Cer ificat (REC’ s) under A B32 wil be ar ing o e gy t es l t ansfer ed t PGE. r r o  The envir onm ent benefit of t 6.7-MW Sol Power Micr al s his ar o-Ut it Pr il y oject fort A ut it ser he hor y vice ar incl t ea ude he avoidance of t fol owing gl he l obalwar ing pol ut s: 60,000 l of Sm og (NO X ); 52,000 l of A cid Rain (SO 2); 80 m l ant bs. bs. m il ion l of Car l bs. bon Em issions (CO 2). A l of t is equival t r oving 7,500 car pl ing 12,000 acr of l his ent o em s; ant es t ees; and pr r oviding 3,200 hom es wit el r power h ect ical .  In addit t t ener savings and envir ion o he gy onm ent benefit t pr al s, his oject wil al cr e bet l so eat ween 75-100 Gr Col ar een l Jobs – wit 60-75 par -t e jobs dur t inst l ion and const uct phase and 25-30 per anentjobs post h t im ing he al at r ion m const uct for t oper ion and m aint r ion he at enance of t sol power facil y. his ar it
  • 4. Pr ect Sit oj e: The Napa Solar Farm is locat on an 80-acr cl ed e osed sanit y l ar andf lsit owned by t Napa-Valej Wast il e he l o e Managem ent Aut it a gover ent ent y com pr hor y, nm al it ised of t C it of Napa, Valej & Am er he ies l o, ican C anyon and t C ount of Napa and oper ing under a Joint Power Agr he y at s eem ent (JPA). The Pr ect Sit is l oj e ocat in t ed he unincor at ar of Napa C ount adj por ed ea y acent t t C it of Am er o he y ican C anyon cit l it appr y im s, oxim at y 45 m il el es nor h of San Fr t ancisco, C al or if nia.
  • 5. Pr ect Business Pr oj oponents o Green Tech Power Group (GTPG): Project Developer Owner , , Oper or of Napa Sol Farm ; al Ener Service Pr at ar so gy ovider. o Napa-Vallejo Waste Management Authority (NV WM A ) o Land owner and Lessor wil l : l ease 50+ acr of cl es osed landfil sit t GTPG l e o o Host Cust er exist om : ing cust er of PG& E and wil pur om l chase m inim alpower fr GTPG om o Pacific Gas and Electric (PGE): Off-taker and purchaser of el ricit pr ect y oduced by t Napa Sol Farm he ar o Long term (20-25 year Power Pur ) chase A gr ent(PPA ) eem o California Renewabl Port io St e fol andar (20% by 2010; 33% by 2020) d o California Feed-in-Tariff
  • 6. Business Model Manufacturer PG& E Equipment, Installer installation, PPA warranties $ - Receives revenue from sale of Napa-Vallejo Napa Sales & panels, inverters Waste Land Lease Solar Farm O&M revenue - Provides warranties for Management equipment and performance (Green Tech Authority Power Group) Financing (NVWMA) $ - Land O wner - Provides Design/ Solar Third Party - Host C ust er om Construction EPC Services Investor - Leases Land t G TPG o - Provides Capital - Purchase m in. power - Provides O&M - Receives low-risk ROI from electricity sales, federal ITC - Shares Revenue & MACRS Stream - Green Tags - ARRA Grants
  • 7. Pr ect St us oj at  Sit Cont ol e r :  Project Developer (GTPG) is oper ing under an Excl at usive Rightto Negot e wit t Napa-V al ejo Wast M anagem ent A ut it iat h he l e hor y, appr oved Jul 29, 2009 by Boar of Dir or under sol sour y d ect s e ce cont act r .  A ut it pr hor y ovided Sit Capabil y A ssessm entfor Sol Far use e it ar m  Use Per it m :  Use Per it t be fil wit t Count of Napa Pl m o ed h he y anning Depar m ent t under a negot ed, expedit pr iat ed ocessing t el (90 days) for r im ine eview, publ hear and appr ic ing oval  Negat Decl at ive ar ion under CEQA det m ined by Legal Counsel of er Napa  Building Per it can be pr m ocessed concur ent y r l  Sit Pl e ans, PV Layout and dr , awings com pl ed and r et eady for filing  Two pr im inar m eet el y ings wit Pl h anning and Legal Counselon pr ocess  A ut it appr hor y oved Consentt Fil Use Per it on Nov 2, 2009 o e m
  • 8. Pr ect St us oj at  Sol Panel M anufact er scr ar ur eening Screened pricing and t specs fr 3 PV m anufact er ech om ur s (Japan, China, Ger any) for l m ogist equipm entdel y ics, iver schedul et es, c. Pr im inar sol panel sit l el y ar e ayoutand sizing com pl ed in- et house based on various technologies (for Use Per it m purposes)  Pr im inar Engineer el y ing com pl ed et In-house capabil ies for Civil Topo, Sur it , vey, St uct al PV r ur , Syst s em Identified local El r Engineer for int -connectser ect ical s er vices  Local Napa Gener Cont act ident al r or ified Bonding capacit based on pr im inar inst l ion est at y el y al at im es Wil pr l ovide const uct costest at based on final r ion im es engineering, sit design, and Use Per it and Buil e m ding Per it m requir ent em s
  • 9. Pr ect Mil ones oj est Napa Solar Farm: American Canyon Landfill Site, Napa County, California USA 2009 2010           Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep O ct   Consent to File Use Permit 2-NovX       Fil Use Per it App w/Napa e m 20-Nov X       Use Per it Review m 20-Dec X     C EQ A Review 20-Dec X       Publ Hear on Use Per it ic ing m 22-Feb   X     Buil ding/Use Per it Appr m oval 26-Feb   X     File PPA Request w/PGE 20-Nov X       Subm it Pr ect Viabil y For s oj it m 20-Nov X       Appr ove PPA/Feed In Tar f if 20-Jan   X     File Interconnet App w/PGE 7-Dec X     Subm it Engineer ing/Int conn. er 18-Jan   X     PG E Review of Int connect App. er 180 d.                     Int connect Appr er oval 30-Jul   X     Equipment Delivery 120 d.       Mat ial Handl er s ing 8-Feb   X     X     Sol PV & BO S ar 8-Feb   X     X     Installation of Solar PV System 4 m o.       C onst uct St t e Wor r ion ar /Sit k 1-Apr   X     PanelAssem bl y/Fabr ion icat 15-Apr   X       Inst l ion and G r Int t alat id er ie 120 d.   X          C onst uct C om pl ed r ion et 15-Aug   X     C om m issioning by PG E 30-Aug   X     Project Placed in Service 30-Aug   X     Subm it ARRA C l aim For sm 1-Sep   X     Paym ent by Dept of Tr . easury 60 d.       X                             The Napa Sol Far can be com pl ed in year 2010 given t ar m et he above Project M il ones which is based on pr est oject equipm ent ed del y schedul and appr iver es oved gover ent per it nm al m s.