International Seismic Application Technology
Engineered Seismic Bracing Systems
and Services
ASCE 7-10 SEISMIC DESIGN REQUIREMENTS
FOR MEP NON-STRUCTURAL COMPONENTS
For :
GAYNER ENGINEERS
Presented by Tim Lindfelt, Regional
Engineering Manager 1
Why Is Seismic Bracing Required for
MEP Systems
Life Safety Functionality
2
EXAMPLE:
1994 NORTHRIDGE EARTHQUAKE
80-90% of the damage was to NON-structural elements
10 Essential Hospitals temporarily inoperable due
primarily to water damage, broken glass, dangling
light fixtures, and lack of emergency power due to
failures in the distribution or control systems.
3
PERFORMANCE OF PUBLIC WATER
SUPPLY SYSTEMS IN HISTORIC
EARTHQUAKES
4
SEISMIC BRACING IS A CODE
REQUIREMENT
5
6
AREAS REQUIRING SEISMIC BRACING
Seismic Ground Acceleration Code
Changes “G-Force”
7
SEISMIC DESIGN REQUIREMENTS FOR
NONSTRUCTURAL COMPONENTS
CHAPTER 13
8
BRACING/SUPPORTS FOR MEP SYSTEMS
MUST BE ENGINEERED BY A PE AND
REVIEWED AND APPROVED BY THE AHJ
9
IMPORTANT GENERAL TERMS
10
Component Importance Factor (Ip)
11
Ip =1.5 EXAMPLES
 Examples of life-safety :
• Fire protection system
• Smoke exhaust system
• Power to life-safety/hazardous
systems
• Emergency Power
• Flammable, toxic, hazardous
 Examples of Risk
Category IV Buildings :
• Acute Care Hospitals
• Emergency Response
Centers/Shelters
• Fire/Police Stations
• Air Traffic Control Towers
• Water Facilities Supplying OCC
CAT IV Buildings
• Some Buildings
Storing/Processing Hazardous
Materials
• Strategic National Defense
12
SEISMIC DEMANDS ON
NONSTRUCTURAL COMPONENTS
 13.3.1 – SEISMIC DESIGN FORCE
UPPER LIMIT
LOWER LIMIT
With Modal AnalysisWithout Modal Analysis
13
SEISMIC DEMANDS ON
NONSTRUCTURAL COMPONENTS
FLOOR MOUNTED per TABLE 13.6-1
High Deformability Component
ap = 1.0 and Rp = 2.5 (ap/Rp = 0.4)
14
SEISMIC DEMANDS ON
NONSTRUCTURAL COMPONENTS
FLOOR MOUNTED per TABLE 13.6-1
15
Spring Isolated Component
ap = 2.5 and Rp = 2.0 (ap/Rp = 1.25)
SEISMIC DEMANDS ON
NONSTRUCTURAL COMPONENTS
DISTRIBUTED per TABLE 13.6-1
Pipes welded or brazed
ap = 2.5 and Rp = 12.0 (ap/Rp = 0.2)
16
SEISMIC DEMANDS ON
NONSTRUCTURAL COMPONENTS
DISTRIBUTED
Pipes threaded, coupled, etc
Ap = 2.5 and Rp = 6.0 (ap/Rp = 0.42)
17
SEISMIC DEMANDS ON
NONSTRUCTURAL COMPONENTS
DISTRIBUTED
Low Deformable Material (Glass or Cast Iron
ap = 2.5, Rp = 3.0 ap/Rp = 0.83)
18
GLASS PIPES CAST IRON PIPES
WHAT REQUIRES BRACING?
PER 13.1.4:
 SUSPENDED/WALL MOUNTED COMPONENTS OVER 20LBS OR 5PLF
 FLOOR MOUNTED EQUIPMENT OVER 400LBS OR CENTER OF GRAVITY 4 FT
OR HIGHER ABOVE FLOOR
19
WHAT REQUIRES BRACING….
ELECTRICAL SYSTEMS (RACEWAYS):
 SEISMIC DESIGN CAT. C,D,E,F:
Ip=1.5– Conduit > 2.5” dia. (SDC C)
Ip=1.0 and 1.5 – Conduit > 2.5” dia (SDC D, E, F)
Ip=1.0 and 1.5 – Trapezed Conduit/CT ≥ 10plf
Conduits > 2.5” attached to panels, cabinets
or other equipment shall be installed with flexible
connections.
13.6.5.6:
20
WHAT REQUIRES BRACING….
ELECTRICAL SYSTEMS cont.:
 Light Fixtures, Lighted Signs, Ceiling Fans
• Vertical supports shall be designed for 140% of operating weight with
simultaneous horizontal force of 140% of operating weight.
• Lights within a ceiling grid < 56 lbs does not need additional bracing
• Connection to structure shall allow a 360 degree range of motion if no
bracing is provided
13.6.1:
21
WHAT REQUIRES BRACING….
HVAC SYSTEMS:
 SEISMIC DESIGN CATEGORY C,D,E,F:
Ip=1.0 or 1.5 – Duct ≥ 6 Sq. Ft. or weigh > 17 lb/ft
**Provisions must be made to avoid impact with larger ducts
or mechanical components, or the ducts must be
protected in the event of such impacts
Ip=1.0 or 1.5 –Ducts supported on trapeze ≥ 10 lb/ft
Ip=1.0 or 1.5 – Inline Equipment > 75lbs , unbraced
pipes attached to inline equipment shall have flex
connections
Note: All smoke control/hazardous /
toxic ductwork requires bracing with
no size exceptions.
13.6.7:
22
WHAT REQUIRES BRACING….
PIPING SYSTEMS:
 SEISMIC DESIGN CAT. C:
Ip=1.0 – No bracing required for single hung pipe
Ip=1.5 – Piping > 2” dia.
Ip= 1.0 and 1.5 – Trapezed Piping ≥ 10plf
 SEISMIC DESIGN CAT. D,E,F:
Ip=1.0 – Piping > 3” dia. (Cast Iron > 2” dia)
Ip=1.5 – Piping > 1” dia.
Ip=1.0 and 1.5 – Trapezed Piping ≥ 10plf
13.6.8:
23
WHAT REQUIRES BRACING….
PIPING SYSTEMS cont.:
 Item 3: Piping has an Rp < 4.5 per Table 13.6-1, piping
systems and attachment shall be designed for the seismic
forces and relative displacements of Section 13.3.
13.6.8.3:
24
Ap Rp
GENERAL EXCEPTIONS TO THE RULES
12” RULE:
 Must be ALL hangers on a run
 Provisions are made for the piping to accommodate expected
deflections (flexes at components with relative displacements)
 Assure that components does not swing and damage another utility.
13.6.5.6, 13.6.7, 13.6.8:
25
GENERAL EXCEPTIONS TO THE RULES
12” RULE cont.:
 ELECTRICAL CONDUITS AND MECHANICAL DUCTS:
• If rods are used as hangers, swivels shall be provided to
prevent inelastic bending in rods.
• Rods and anchors will have to be designed for bending due
to seismic forces in Section 13.3 if swivels are not installed
 PIPING SYSTEMS:
• If rods are used as hangers, swivels, eyenuts, or other
devices to prevent any bending in the rods.
13.6.5.6, 13.6.7, 13.6.8:
26
DAMAGING IMPACT &
CONSEQUENTIAL DAMAGE
13.2.3:
27
• Unbraced component shall not
damage an essential component.
Hazardous
exhaust flue
Unbraced pipe
TYPICAL BRACING RULES - PIPING
 Transverse Max Spacing : Steel/Cu = 40 ft ; Cast Iron = 20 ft
 Longitudinal Max Spacing : Steel/Cu = 80 ft ; Cast Iron = 40 ft
 Min Run Length = 10 ft
 A Brace Within 2ft of 90deg Turn Can Work for Both Sides
28
ASCE REQUIRES :
HOLISTIC SEISMIC DESIGN
29
SUSPENDED PIPING BRACING
METHODS - TRANSVERSE
30
SUSPENDED PIPING BRACING
METHODS - LONGITUDINAL
31
SUSPENDED PIPING BRACING
METHODS – CABLE TRANS & LONG
32
SEISMIC BRACING- WHAT NOT TO DO!
33
SEISMIC BRACING- WHAT NOT TO DO!
34
ROOF TOP SUPPORTS
 Wind forces shall be designed per section
29.5
 Wind provisions for components and
cladding is now in chapter 30
 Wind provisions on equipment is part 6
 Compare section 13.3 vs WIND SECTION
29.5
35
ROOF TOP SUPPORTS
 Detailing for wind design shall
be per Ch 13 (13.1.6 c)
 Code compliance requires
“Positive Attachment” to
structure.
 Friction resistance cannot be
used
36
ROOF TOP EQUIPMENT
 ASCE 29.5 and 29.5.1
• Wind loads shall be increased by 1.9 if your roof top equipment or
structure is on a roof that is no more than 60ft from grade.
• Studies from Texas Tech University showed that the wind gust factor is
actually 1.63 compared to 0.85 that was in ASCE 7-02. The 1.9 factor
was used to increase the pressure based on the testing (1.63/0.85 =
1.9).
37
ROOF SCREENS DO NOT REDUCE
WIND LOADS ON STRUCTURES
 Definition of mechanical screens per 2010 CBC
38
FEMA 549 ATTACHMENT OF ROOFTOP EQUIPMENT IN HIGH WIND REGIONS
INTERSTORY DRIFT
 Caused by earthquake forces
 Deflection is typically 1% of
story height
 MEP systems physically attached
to two different floors
 Methods to mitigate effects:
- Use flex couplings/hose
- Use slotted mounts
- Spring isolators
39
INTERSTORY DRIFT AFFECTS ON
PIPING DROPS INTO EQUIPMENT
40
VIDEO OF PIPE RUPTURE AT
CONNECTION TO EQUIPMENT - SHAKE
TABLE TEST
Welded/Brazed Connections Outperformed Threaded
Watch here
41
FORCES ON A PIPE DROPPING INTO A
FLOOR MOUNTED EQUIPMENT
42
FORCES ON A PIPE DROPPING INTO A
FLOOR MOUNTED EQUIPMENT
43
DEFORMED FLEX
FORCES ON A PIPE DROPPING INTO A
FLOOR MOUNTED EQUIPMENT
44
DEFORMED FLEX
TYPICAL FLEX CUTSHEETS
45
SEISMIC RELATIVE DISPLACEMENT
Components will respond differently in an
earthquake. Provide adequate flexibility.
46
SEISMIC BUILDING JOINTS
47
SEISMIC ON THERMALLY ACTIVE
PIPING
 Avoid over bracing hot water and steam piping
48
THERMAL PIPING RISER DESIGN
Guide
Anchor
Spring Mount
Guide
Guide
Spring Mount
Anchor
Spring Mount
49
PIPING INSULATION VS LOAD PATH
TRADITIONAL METHOD
50
PIPING INSULATION VS LOAD PATH
CODE COMPLIANT METHOD
51
Pre-Insulated Pipe Support Integral Attachment Support
Example: 10” Pipe with 2” Insulation – Hot Water Service, 200°F
No Direct Path for Heat Loss Direct Path for Heat Loss thru Tee
Heat Loss = 100 Btu/hr Heat Loss = 2500 Btu/hr
HEAT LOSS THRU PIPE SUPPORT –
PRE-INSULATED VS INTEGRAL
52
PRE-INSULATED ANCHOR
ENGINEERED DATA SHEET
53
BRACING/SUPPORTS FOR MEP SYSTEMS
MUST BE ENGINEERED BY A PE AND
REVIEWED AND APPROVED BY THE AHJ
54
Special Seismic Certification
13.2.2:
 Manufacturer Submit Cert of Compliance for Approval to the
Registered Design Professional and Building Official
 Designated (Ip=1.5) Equipment
 Options : Testing / Analysis / Experiential Data
 Registered Design Professional must state requirements on
Construction Documents
55
IBC REQUIRES SPECIAL INSPECTION
For Ip=1.5 Systems
56
IBC REQUIRES SPECIAL INSPECTION For
Ip=1.5 (Designated Seismic Systems)
57
• Inspector needs to check
• Label of equipment
• Anchorage or mounted conforms to certificate of
compliance
IBC 2012 REQUIRES SPECIAL INSPECTION
MEP COMPONENTS
58
SEISMIC BRACING IS PART OF INSTALLATION
THEREFORE NEEDS TO BE INSPECTED ALSO
Mechanical Engineer of Record Duties
 Define Ip for Each Component
 Determine List of Special Seismic Certifications
 Review Subcontractor Submittals (Seismic Bracing and
Anchorage Submittals)
 Statement of Special Inspections
59
Contractor Statement of Responsibility
60
ISAT’S APPROACH TO COMPLY WITH
CODE
61
ISAT OPA-0485-07
 Only large MEP Design-Vendor with 2007 Specific
OPA!!
62
SEISMIC BRACING SUBMITTAL DRAWINGS
Each Seismic Location is Detailed on the Plans and
Denoted with a Location Specific I.D. Number
A Seismic Bracing Legend is Added
to Assist Installers, Inspectors, and
Reviewing Engineers in
Understanding the Constraints of
the Design
ISAT’s Structural Engineers “Wet” Stamp Each
Layout with Their Stamp from the Project State
63
IN-HOUSE CUSTOM ENGINEERING
 California Licensed PE’s, SE’s, ME’s
 Custom Details and Calculations
 ELECTRONIC “WET STAMPS”
64
Seismic Bracing Inserted and
Coordinated Within The Model
65
Custom Bracing Installation Solutions
66
Point Load Maps
67
Deck Pour/Insert Coordination
GPS Total Station
68
Example: Cable Bracing Kit
Kits Labeled with:
-Contractor Name
-Project Name
-Drawing #
-Building
Area/Floor
Cables are Pre-Tied
to custom lengths,
field adjustable,
with correct
brackets installed.
(No need to field
cut and swage
cables, no
“hunting” for
correct materials)
Correct concrete anchors, beam clamps, wood
connections, etc. are included in each kit. (No quote
surprises, No “hunting” for Anchors)
Appropriate quantity of Rod Stiffener components are included in
each kit. (No surprises in the quote (stiffeners are usually an add
with other systems), No “hunting” for materials)
Installation Details
are in each kit
Kit Production and Material Shipment…
69
ISAT’s “Blue Banger Hanger”
Cast-In-Place Concrete Deck Inserts
IBC COMPLIANT
70
Buy American Act
ISAT’s Seismic Bracing Kits and Blue Banger
Hangers, labeled as such, are a “Domestic
Construction Material” under FAR 52.225-9 and FAR
52.225-2
71
PHD STRUT PRODUCTS
72
PHD PIPE HANGER PRODUCTS
73
Stiffy Supports – Light Duty Low Voltage
Engineered Supports
Typical Vibration Isolation
• Spring hangers for suspended equipment, piping,
and duct
• Un-housed spring mounts
• Seismically restrained spring mounts
• Neoprene mounts
• Neoprene hangers
• Equipment frames (e.g. cooling towers)
• Equipment inertia bases
• Riser supports (anchors, guides, and springs)
• Most material complies with Buy American Act
Flexible Hose and Expansion Joints
 Flexible Hose
• Stainless, bronze,
• CSA certified for natural gas
• Variety of end fittings
• Custom lengths
 Rubber sphere expansion joints
 Expansion compensators
 Seismic expansion joints
• V-loops for easy nesting
• U-loops
• Drain ports
• O2 cleaned, capped, and bagged for medical gas
• CSA certified for natural gas
 PTFE bellows and hose
Los Angeles, CA (HQ)
San Francisco, CA
San Diego, CA
Sacramento, CA
Phoenix, AZ
Las Vegas, NV
Portland, OR
Seattle, WA
Salt Lake City, UT
Denver, CO
Charlotte, NC
Atlanta, GA
New York, NY
San Juan, Puerto Rico
ISAT Office Locations
ISAT is opening additional offices in geographic regions where
building code compliance for nonstructural seismic restraints is
becoming more stringent.
ISAT’s Website…www.isatsb.com
A wealth of information at your fingertips!
THE END 78

Contenu connexe

Tendances

4100 1998 r2016
4100 1998 r20164100 1998 r2016
4100 1998 r2016Nav2016
 
DUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE pptDUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE pptVikrant Sharma
 
System neutral-earthing
System neutral-earthingSystem neutral-earthing
System neutral-earthingazzaabo
 
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Vladimir Popovic
 
Designing a Cold-Formed Steel Beam Using AS4600:2018 and 2005 - Webinar
Designing a Cold-Formed Steel Beam Using AS4600:2018 and 2005 - WebinarDesigning a Cold-Formed Steel Beam Using AS4600:2018 and 2005 - Webinar
Designing a Cold-Formed Steel Beam Using AS4600:2018 and 2005 - WebinarClearCalcs
 
Viii disposições construtivas gerais das armaduras
Viii   disposições construtivas gerais das armadurasViii   disposições construtivas gerais das armaduras
Viii disposições construtivas gerais das armadurasfrancisco silva
 
Crack control of slabs design booklet
Crack control of slabs design bookletCrack control of slabs design booklet
Crack control of slabs design bookletAbdullah Anjum
 
CE 72.52 - Lecture 7 - Strut and Tie Models
CE 72.52 - Lecture 7 - Strut and Tie ModelsCE 72.52 - Lecture 7 - Strut and Tie Models
CE 72.52 - Lecture 7 - Strut and Tie ModelsFawad Najam
 
Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protectionSalim Palayi
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATIONPower System Operation
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slabsarani_reza
 
Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....
Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....
Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....Hossam Shafiq II
 

Tendances (20)

4100 1998 r2016
4100 1998 r20164100 1998 r2016
4100 1998 r2016
 
DUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE pptDUCTILE DETAILING AS PER CODE ppt
DUCTILE DETAILING AS PER CODE ppt
 
System neutral-earthing
System neutral-earthingSystem neutral-earthing
System neutral-earthing
 
Design of reinforced concrete beam
Design of reinforced concrete beamDesign of reinforced concrete beam
Design of reinforced concrete beam
 
Dss notes
Dss notesDss notes
Dss notes
 
Etabs steel-design
Etabs steel-designEtabs steel-design
Etabs steel-design
 
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
Hydrostatic pressure testing of PE pipelines (handbook) as per EN805
 
Designing a Cold-Formed Steel Beam Using AS4600:2018 and 2005 - Webinar
Designing a Cold-Formed Steel Beam Using AS4600:2018 and 2005 - WebinarDesigning a Cold-Formed Steel Beam Using AS4600:2018 and 2005 - Webinar
Designing a Cold-Formed Steel Beam Using AS4600:2018 and 2005 - Webinar
 
Tl book
Tl bookTl book
Tl book
 
Viii disposições construtivas gerais das armaduras
Viii   disposições construtivas gerais das armadurasViii   disposições construtivas gerais das armaduras
Viii disposições construtivas gerais das armaduras
 
Types of-tower
Types of-towerTypes of-tower
Types of-tower
 
Crack control of slabs design booklet
Crack control of slabs design bookletCrack control of slabs design booklet
Crack control of slabs design booklet
 
CE 72.52 - Lecture 7 - Strut and Tie Models
CE 72.52 - Lecture 7 - Strut and Tie ModelsCE 72.52 - Lecture 7 - Strut and Tie Models
CE 72.52 - Lecture 7 - Strut and Tie Models
 
Secant pile wall for emergency dump pond
Secant pile wall for emergency dump pondSecant pile wall for emergency dump pond
Secant pile wall for emergency dump pond
 
Basics of overcurrent protection
Basics of overcurrent protectionBasics of overcurrent protection
Basics of overcurrent protection
 
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
400/220 kV SCADA controlled gis based TRANSMISSION SUBSTATION
 
One-Way Slab Design
One-Way Slab DesignOne-Way Slab Design
One-Way Slab Design
 
GIS 400kv substation
GIS  400kv substationGIS  400kv substation
GIS 400kv substation
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
 
Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....
Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....
Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....
 

Similaire à International Seismic Application Technology

GIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & ShanniGIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & ShanniBHARATKUMAR RATHOD
 
Technical presentation on modern earthing
Technical presentation on modern earthingTechnical presentation on modern earthing
Technical presentation on modern earthingPankaj Chakraborty
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS LtdMahesh Chandra Manav
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1Mahesh Chandra Manav
 
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Niels Inderbiethen
 
Electrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuitElectrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuitRLarivee
 
MNS Technical Presentation.pdf
MNS Technical Presentation.pdfMNS Technical Presentation.pdf
MNS Technical Presentation.pdfAhmed Ramadan
 
2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...
2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...
2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...Schneider Electric
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Mahesh Chandra Manav
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsMahesh Chandra Manav
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lpsMahesh Chandra Manav
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lpsMahesh Chandra Manav
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyNSW Environment and Planning
 
ELECTRICITYWIRING REGULATION for safety of
ELECTRICITYWIRING REGULATION for safety ofELECTRICITYWIRING REGULATION for safety of
ELECTRICITYWIRING REGULATION for safety ofabdirahman gure
 
360786862-Indice-de-Normas.pdf
360786862-Indice-de-Normas.pdf360786862-Indice-de-Normas.pdf
360786862-Indice-de-Normas.pdfEduardo Bas
 
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptxChapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptxborapring
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and StandardsSolar Reference
 

Similaire à International Seismic Application Technology (20)

GIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & ShanniGIS (Gas-Insulated Substation) by Bharat & Shanni
GIS (Gas-Insulated Substation) by Bharat & Shanni
 
Technical presentation on modern earthing
Technical presentation on modern earthingTechnical presentation on modern earthing
Technical presentation on modern earthing
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1
 
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...Example of Substation Maintenance & Assessment Audits for Training - Niels In...
Example of Substation Maintenance & Assessment Audits for Training - Niels In...
 
Electrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuitElectrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuit
 
MNS Technical Presentation.pdf
MNS Technical Presentation.pdfMNS Technical Presentation.pdf
MNS Technical Presentation.pdf
 
2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...
2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...
2014 National Electrical Code: Top 10 Revisions Impacting Electrical Installa...
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)Worldwide Lightning called as Disaster not as Guest(SACHET)
Worldwide Lightning called as Disaster not as Guest(SACHET)
 
Presentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lpsPresentation lightning protection system by jmv lps
Presentation lightning protection system by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Presentation department of space by jmv lps
Presentation department of space by jmv lpsPresentation department of space by jmv lps
Presentation department of space by jmv lps
 
Michael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case studyMichael Wood - Loader electric shocks, a case study
Michael Wood - Loader electric shocks, a case study
 
ELECTRICITYWIRING REGULATION for safety of
ELECTRICITYWIRING REGULATION for safety ofELECTRICITYWIRING REGULATION for safety of
ELECTRICITYWIRING REGULATION for safety of
 
360786862-Indice-de-Normas.pdf
360786862-Indice-de-Normas.pdf360786862-Indice-de-Normas.pdf
360786862-Indice-de-Normas.pdf
 
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptxChapter 11 Introduction to Gas Insulation Substation (GIS).pptx
Chapter 11 Introduction to Gas Insulation Substation (GIS).pptx
 
Solar PV Codes and Standards
Solar PV Codes and StandardsSolar PV Codes and Standards
Solar PV Codes and Standards
 
EFYP2 Presentation
EFYP2 PresentationEFYP2 Presentation
EFYP2 Presentation
 

Plus de michaeljmack

Auburn, NY - 200 Years of History 1793-1993
Auburn, NY - 200 Years of History  1793-1993Auburn, NY - 200 Years of History  1793-1993
Auburn, NY - 200 Years of History 1793-1993michaeljmack
 
Auburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 YearbookAuburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 Yearbookmichaeljmack
 
Auburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 YearbookAuburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 Yearbookmichaeljmack
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systemsmichaeljmack
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flashmichaeljmack
 
Siemens MV GIS Switchgear
Siemens MV GIS SwitchgearSiemens MV GIS Switchgear
Siemens MV GIS Switchgearmichaeljmack
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrushmichaeljmack
 
Building information modeling
Building information modelingBuilding information modeling
Building information modelingmichaeljmack
 
15 years of experience stator ground fault protection
15 years of experience stator ground fault protection15 years of experience stator ground fault protection
15 years of experience stator ground fault protectionmichaeljmack
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systemsmichaeljmack
 
Lighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit SpacesLighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit Spacesmichaeljmack
 
COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708michaeljmack
 
Seismic Compliance of Electrical Distribution
Seismic Compliance of Electrical DistributionSeismic Compliance of Electrical Distribution
Seismic Compliance of Electrical Distributionmichaeljmack
 
Generator Set Transient Performance
Generator Set Transient PerformanceGenerator Set Transient Performance
Generator Set Transient Performancemichaeljmack
 
Modeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital SimulatorModeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital Simulatormichaeljmack
 
Facts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind PlantsFacts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind Plantsmichaeljmack
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Storiesmichaeljmack
 
Blackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load SheddingBlackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load Sheddingmichaeljmack
 
Transformer Fundamentals
Transformer FundamentalsTransformer Fundamentals
Transformer Fundamentalsmichaeljmack
 

Plus de michaeljmack (20)

Auburn, NY - 200 Years of History 1793-1993
Auburn, NY - 200 Years of History  1793-1993Auburn, NY - 200 Years of History  1793-1993
Auburn, NY - 200 Years of History 1793-1993
 
Auburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 YearbookAuburn High School, Auburn, NY, 1982 Yearbook
Auburn High School, Auburn, NY, 1982 Yearbook
 
Auburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 YearbookAuburn High School, Auburn, NY, 1980 Yearbook
Auburn High School, Auburn, NY, 1980 Yearbook
 
Surge Protection
Surge ProtectionSurge Protection
Surge Protection
 
Diesel Particulate Filters Control Systems
Diesel Particulate Filters Control SystemsDiesel Particulate Filters Control Systems
Diesel Particulate Filters Control Systems
 
Understanding Arc Flash
Understanding Arc FlashUnderstanding Arc Flash
Understanding Arc Flash
 
Siemens MV GIS Switchgear
Siemens MV GIS SwitchgearSiemens MV GIS Switchgear
Siemens MV GIS Switchgear
 
Fundamentals of transformer inrush
Fundamentals of transformer inrushFundamentals of transformer inrush
Fundamentals of transformer inrush
 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
 
15 years of experience stator ground fault protection
15 years of experience stator ground fault protection15 years of experience stator ground fault protection
15 years of experience stator ground fault protection
 
Emergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby SystemsEmergency, Legally Required and Optional Standby Systems
Emergency, Legally Required and Optional Standby Systems
 
Lighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit SpacesLighting Control Solutions for Daylit Spaces
Lighting Control Solutions for Daylit Spaces
 
COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708COPS: An Arresting Look at NEC Article 708
COPS: An Arresting Look at NEC Article 708
 
Seismic Compliance of Electrical Distribution
Seismic Compliance of Electrical DistributionSeismic Compliance of Electrical Distribution
Seismic Compliance of Electrical Distribution
 
Generator Set Transient Performance
Generator Set Transient PerformanceGenerator Set Transient Performance
Generator Set Transient Performance
 
Modeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital SimulatorModeling of a digital protective relay in a RT Digital Simulator
Modeling of a digital protective relay in a RT Digital Simulator
 
Facts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind PlantsFacts on Grid Friendly Wind Plants
Facts on Grid Friendly Wind Plants
 
Power Plant Horror Stories
Power Plant Horror StoriesPower Plant Horror Stories
Power Plant Horror Stories
 
Blackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load SheddingBlackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load Shedding
 
Transformer Fundamentals
Transformer FundamentalsTransformer Fundamentals
Transformer Fundamentals
 

Dernier

Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...Amil Baba Dawood bangali
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 

Dernier (20)

Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
NO1 Certified Black Magic Specialist Expert Amil baba in Uae Dubai Abu Dhabi ...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 

International Seismic Application Technology

  • 1. International Seismic Application Technology Engineered Seismic Bracing Systems and Services ASCE 7-10 SEISMIC DESIGN REQUIREMENTS FOR MEP NON-STRUCTURAL COMPONENTS For : GAYNER ENGINEERS Presented by Tim Lindfelt, Regional Engineering Manager 1
  • 2. Why Is Seismic Bracing Required for MEP Systems Life Safety Functionality 2
  • 3. EXAMPLE: 1994 NORTHRIDGE EARTHQUAKE 80-90% of the damage was to NON-structural elements 10 Essential Hospitals temporarily inoperable due primarily to water damage, broken glass, dangling light fixtures, and lack of emergency power due to failures in the distribution or control systems. 3
  • 4. PERFORMANCE OF PUBLIC WATER SUPPLY SYSTEMS IN HISTORIC EARTHQUAKES 4
  • 5. SEISMIC BRACING IS A CODE REQUIREMENT 5
  • 7. Seismic Ground Acceleration Code Changes “G-Force” 7
  • 8. SEISMIC DESIGN REQUIREMENTS FOR NONSTRUCTURAL COMPONENTS CHAPTER 13 8
  • 9. BRACING/SUPPORTS FOR MEP SYSTEMS MUST BE ENGINEERED BY A PE AND REVIEWED AND APPROVED BY THE AHJ 9
  • 12. Ip =1.5 EXAMPLES  Examples of life-safety : • Fire protection system • Smoke exhaust system • Power to life-safety/hazardous systems • Emergency Power • Flammable, toxic, hazardous  Examples of Risk Category IV Buildings : • Acute Care Hospitals • Emergency Response Centers/Shelters • Fire/Police Stations • Air Traffic Control Towers • Water Facilities Supplying OCC CAT IV Buildings • Some Buildings Storing/Processing Hazardous Materials • Strategic National Defense 12
  • 13. SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS  13.3.1 – SEISMIC DESIGN FORCE UPPER LIMIT LOWER LIMIT With Modal AnalysisWithout Modal Analysis 13
  • 14. SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS FLOOR MOUNTED per TABLE 13.6-1 High Deformability Component ap = 1.0 and Rp = 2.5 (ap/Rp = 0.4) 14
  • 15. SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS FLOOR MOUNTED per TABLE 13.6-1 15 Spring Isolated Component ap = 2.5 and Rp = 2.0 (ap/Rp = 1.25)
  • 16. SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS DISTRIBUTED per TABLE 13.6-1 Pipes welded or brazed ap = 2.5 and Rp = 12.0 (ap/Rp = 0.2) 16
  • 17. SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS DISTRIBUTED Pipes threaded, coupled, etc Ap = 2.5 and Rp = 6.0 (ap/Rp = 0.42) 17
  • 18. SEISMIC DEMANDS ON NONSTRUCTURAL COMPONENTS DISTRIBUTED Low Deformable Material (Glass or Cast Iron ap = 2.5, Rp = 3.0 ap/Rp = 0.83) 18 GLASS PIPES CAST IRON PIPES
  • 19. WHAT REQUIRES BRACING? PER 13.1.4:  SUSPENDED/WALL MOUNTED COMPONENTS OVER 20LBS OR 5PLF  FLOOR MOUNTED EQUIPMENT OVER 400LBS OR CENTER OF GRAVITY 4 FT OR HIGHER ABOVE FLOOR 19
  • 20. WHAT REQUIRES BRACING…. ELECTRICAL SYSTEMS (RACEWAYS):  SEISMIC DESIGN CAT. C,D,E,F: Ip=1.5– Conduit > 2.5” dia. (SDC C) Ip=1.0 and 1.5 – Conduit > 2.5” dia (SDC D, E, F) Ip=1.0 and 1.5 – Trapezed Conduit/CT ≥ 10plf Conduits > 2.5” attached to panels, cabinets or other equipment shall be installed with flexible connections. 13.6.5.6: 20
  • 21. WHAT REQUIRES BRACING…. ELECTRICAL SYSTEMS cont.:  Light Fixtures, Lighted Signs, Ceiling Fans • Vertical supports shall be designed for 140% of operating weight with simultaneous horizontal force of 140% of operating weight. • Lights within a ceiling grid < 56 lbs does not need additional bracing • Connection to structure shall allow a 360 degree range of motion if no bracing is provided 13.6.1: 21
  • 22. WHAT REQUIRES BRACING…. HVAC SYSTEMS:  SEISMIC DESIGN CATEGORY C,D,E,F: Ip=1.0 or 1.5 – Duct ≥ 6 Sq. Ft. or weigh > 17 lb/ft **Provisions must be made to avoid impact with larger ducts or mechanical components, or the ducts must be protected in the event of such impacts Ip=1.0 or 1.5 –Ducts supported on trapeze ≥ 10 lb/ft Ip=1.0 or 1.5 – Inline Equipment > 75lbs , unbraced pipes attached to inline equipment shall have flex connections Note: All smoke control/hazardous / toxic ductwork requires bracing with no size exceptions. 13.6.7: 22
  • 23. WHAT REQUIRES BRACING…. PIPING SYSTEMS:  SEISMIC DESIGN CAT. C: Ip=1.0 – No bracing required for single hung pipe Ip=1.5 – Piping > 2” dia. Ip= 1.0 and 1.5 – Trapezed Piping ≥ 10plf  SEISMIC DESIGN CAT. D,E,F: Ip=1.0 – Piping > 3” dia. (Cast Iron > 2” dia) Ip=1.5 – Piping > 1” dia. Ip=1.0 and 1.5 – Trapezed Piping ≥ 10plf 13.6.8: 23
  • 24. WHAT REQUIRES BRACING…. PIPING SYSTEMS cont.:  Item 3: Piping has an Rp < 4.5 per Table 13.6-1, piping systems and attachment shall be designed for the seismic forces and relative displacements of Section 13.3. 13.6.8.3: 24 Ap Rp
  • 25. GENERAL EXCEPTIONS TO THE RULES 12” RULE:  Must be ALL hangers on a run  Provisions are made for the piping to accommodate expected deflections (flexes at components with relative displacements)  Assure that components does not swing and damage another utility. 13.6.5.6, 13.6.7, 13.6.8: 25
  • 26. GENERAL EXCEPTIONS TO THE RULES 12” RULE cont.:  ELECTRICAL CONDUITS AND MECHANICAL DUCTS: • If rods are used as hangers, swivels shall be provided to prevent inelastic bending in rods. • Rods and anchors will have to be designed for bending due to seismic forces in Section 13.3 if swivels are not installed  PIPING SYSTEMS: • If rods are used as hangers, swivels, eyenuts, or other devices to prevent any bending in the rods. 13.6.5.6, 13.6.7, 13.6.8: 26
  • 27. DAMAGING IMPACT & CONSEQUENTIAL DAMAGE 13.2.3: 27 • Unbraced component shall not damage an essential component. Hazardous exhaust flue Unbraced pipe
  • 28. TYPICAL BRACING RULES - PIPING  Transverse Max Spacing : Steel/Cu = 40 ft ; Cast Iron = 20 ft  Longitudinal Max Spacing : Steel/Cu = 80 ft ; Cast Iron = 40 ft  Min Run Length = 10 ft  A Brace Within 2ft of 90deg Turn Can Work for Both Sides 28
  • 29. ASCE REQUIRES : HOLISTIC SEISMIC DESIGN 29
  • 31. SUSPENDED PIPING BRACING METHODS - LONGITUDINAL 31
  • 32. SUSPENDED PIPING BRACING METHODS – CABLE TRANS & LONG 32
  • 33. SEISMIC BRACING- WHAT NOT TO DO! 33
  • 34. SEISMIC BRACING- WHAT NOT TO DO! 34
  • 35. ROOF TOP SUPPORTS  Wind forces shall be designed per section 29.5  Wind provisions for components and cladding is now in chapter 30  Wind provisions on equipment is part 6  Compare section 13.3 vs WIND SECTION 29.5 35
  • 36. ROOF TOP SUPPORTS  Detailing for wind design shall be per Ch 13 (13.1.6 c)  Code compliance requires “Positive Attachment” to structure.  Friction resistance cannot be used 36
  • 37. ROOF TOP EQUIPMENT  ASCE 29.5 and 29.5.1 • Wind loads shall be increased by 1.9 if your roof top equipment or structure is on a roof that is no more than 60ft from grade. • Studies from Texas Tech University showed that the wind gust factor is actually 1.63 compared to 0.85 that was in ASCE 7-02. The 1.9 factor was used to increase the pressure based on the testing (1.63/0.85 = 1.9). 37
  • 38. ROOF SCREENS DO NOT REDUCE WIND LOADS ON STRUCTURES  Definition of mechanical screens per 2010 CBC 38 FEMA 549 ATTACHMENT OF ROOFTOP EQUIPMENT IN HIGH WIND REGIONS
  • 39. INTERSTORY DRIFT  Caused by earthquake forces  Deflection is typically 1% of story height  MEP systems physically attached to two different floors  Methods to mitigate effects: - Use flex couplings/hose - Use slotted mounts - Spring isolators 39
  • 40. INTERSTORY DRIFT AFFECTS ON PIPING DROPS INTO EQUIPMENT 40
  • 41. VIDEO OF PIPE RUPTURE AT CONNECTION TO EQUIPMENT - SHAKE TABLE TEST Welded/Brazed Connections Outperformed Threaded Watch here 41
  • 42. FORCES ON A PIPE DROPPING INTO A FLOOR MOUNTED EQUIPMENT 42
  • 43. FORCES ON A PIPE DROPPING INTO A FLOOR MOUNTED EQUIPMENT 43 DEFORMED FLEX
  • 44. FORCES ON A PIPE DROPPING INTO A FLOOR MOUNTED EQUIPMENT 44 DEFORMED FLEX
  • 46. SEISMIC RELATIVE DISPLACEMENT Components will respond differently in an earthquake. Provide adequate flexibility. 46
  • 48. SEISMIC ON THERMALLY ACTIVE PIPING  Avoid over bracing hot water and steam piping 48
  • 49. THERMAL PIPING RISER DESIGN Guide Anchor Spring Mount Guide Guide Spring Mount Anchor Spring Mount 49
  • 50. PIPING INSULATION VS LOAD PATH TRADITIONAL METHOD 50
  • 51. PIPING INSULATION VS LOAD PATH CODE COMPLIANT METHOD 51
  • 52. Pre-Insulated Pipe Support Integral Attachment Support Example: 10” Pipe with 2” Insulation – Hot Water Service, 200°F No Direct Path for Heat Loss Direct Path for Heat Loss thru Tee Heat Loss = 100 Btu/hr Heat Loss = 2500 Btu/hr HEAT LOSS THRU PIPE SUPPORT – PRE-INSULATED VS INTEGRAL 52
  • 54. BRACING/SUPPORTS FOR MEP SYSTEMS MUST BE ENGINEERED BY A PE AND REVIEWED AND APPROVED BY THE AHJ 54
  • 55. Special Seismic Certification 13.2.2:  Manufacturer Submit Cert of Compliance for Approval to the Registered Design Professional and Building Official  Designated (Ip=1.5) Equipment  Options : Testing / Analysis / Experiential Data  Registered Design Professional must state requirements on Construction Documents 55
  • 56. IBC REQUIRES SPECIAL INSPECTION For Ip=1.5 Systems 56
  • 57. IBC REQUIRES SPECIAL INSPECTION For Ip=1.5 (Designated Seismic Systems) 57 • Inspector needs to check • Label of equipment • Anchorage or mounted conforms to certificate of compliance
  • 58. IBC 2012 REQUIRES SPECIAL INSPECTION MEP COMPONENTS 58 SEISMIC BRACING IS PART OF INSTALLATION THEREFORE NEEDS TO BE INSPECTED ALSO
  • 59. Mechanical Engineer of Record Duties  Define Ip for Each Component  Determine List of Special Seismic Certifications  Review Subcontractor Submittals (Seismic Bracing and Anchorage Submittals)  Statement of Special Inspections 59
  • 60. Contractor Statement of Responsibility 60
  • 61. ISAT’S APPROACH TO COMPLY WITH CODE 61
  • 62. ISAT OPA-0485-07  Only large MEP Design-Vendor with 2007 Specific OPA!! 62
  • 63. SEISMIC BRACING SUBMITTAL DRAWINGS Each Seismic Location is Detailed on the Plans and Denoted with a Location Specific I.D. Number A Seismic Bracing Legend is Added to Assist Installers, Inspectors, and Reviewing Engineers in Understanding the Constraints of the Design ISAT’s Structural Engineers “Wet” Stamp Each Layout with Their Stamp from the Project State 63
  • 64. IN-HOUSE CUSTOM ENGINEERING  California Licensed PE’s, SE’s, ME’s  Custom Details and Calculations  ELECTRONIC “WET STAMPS” 64
  • 65. Seismic Bracing Inserted and Coordinated Within The Model 65
  • 69. Example: Cable Bracing Kit Kits Labeled with: -Contractor Name -Project Name -Drawing # -Building Area/Floor Cables are Pre-Tied to custom lengths, field adjustable, with correct brackets installed. (No need to field cut and swage cables, no “hunting” for correct materials) Correct concrete anchors, beam clamps, wood connections, etc. are included in each kit. (No quote surprises, No “hunting” for Anchors) Appropriate quantity of Rod Stiffener components are included in each kit. (No surprises in the quote (stiffeners are usually an add with other systems), No “hunting” for materials) Installation Details are in each kit Kit Production and Material Shipment… 69
  • 70. ISAT’s “Blue Banger Hanger” Cast-In-Place Concrete Deck Inserts IBC COMPLIANT 70
  • 71. Buy American Act ISAT’s Seismic Bracing Kits and Blue Banger Hangers, labeled as such, are a “Domestic Construction Material” under FAR 52.225-9 and FAR 52.225-2 71
  • 73. PHD PIPE HANGER PRODUCTS 73
  • 74. Stiffy Supports – Light Duty Low Voltage Engineered Supports
  • 75. Typical Vibration Isolation • Spring hangers for suspended equipment, piping, and duct • Un-housed spring mounts • Seismically restrained spring mounts • Neoprene mounts • Neoprene hangers • Equipment frames (e.g. cooling towers) • Equipment inertia bases • Riser supports (anchors, guides, and springs) • Most material complies with Buy American Act
  • 76. Flexible Hose and Expansion Joints  Flexible Hose • Stainless, bronze, • CSA certified for natural gas • Variety of end fittings • Custom lengths  Rubber sphere expansion joints  Expansion compensators  Seismic expansion joints • V-loops for easy nesting • U-loops • Drain ports • O2 cleaned, capped, and bagged for medical gas • CSA certified for natural gas  PTFE bellows and hose
  • 77. Los Angeles, CA (HQ) San Francisco, CA San Diego, CA Sacramento, CA Phoenix, AZ Las Vegas, NV Portland, OR Seattle, WA Salt Lake City, UT Denver, CO Charlotte, NC Atlanta, GA New York, NY San Juan, Puerto Rico ISAT Office Locations ISAT is opening additional offices in geographic regions where building code compliance for nonstructural seismic restraints is becoming more stringent.
  • 78. ISAT’s Website…www.isatsb.com A wealth of information at your fingertips! THE END 78